National Economic and Development Authority 28 March 2011 1
NORTH LUZON IRRIGATION PROJECT:
Philippine Country Report
Capacity Building Programme on the Economics of Climate Change AdaptationSupporting National/Sub-National Adaptation Planning and Action
2nd Regional Training WorkshopThe Grand Milleninum Sukhumvit Hotel, Bangkok, Thailand30 September – 4 October 2013
National Economic and Development Authority 28 March 2011 2
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 2
The NLIP generally intends to reduce the adverse effect of climate change and support enhanced water management in rural areas through the construction of water impounding facilities.
Specific objectives:
• Provide sustainable development in the rural areas by improving agricultural productivity;
• Increase agricultural production through the provision and improvement of irrigation and drainage infrastructure in the project area; and
• Increase farmers’ income.
Project Profile
National Economic and Development Authority 28 March 2011 3
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 3
Project Profile
Location: Isabela Province, Cagayan
Valley Beneficiaries: 685 to 933 families in five (5) barangays
Implementing Agency: National Government
Implementation Period: Four (4) Years
Project Cost: US$ 9.53 Million
National Economic and Development Authority 28 March 2011 4
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 3
Project Profile
Involves 4-year construction of:
•34-meter high earth-filled dam across the Pasa river
•Reservoir with an active storage of 4.28 mcm
•5.93 km main canal
•16.20 km lateral canals
Irrigates 980 has
National Economic and Development Authority 28 March 2011 5
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 4
Project Components
National Economic and Development Authority 28 March 2011 62nd Regional Training on ECCA 01 October 2013 5
Costs and Benefits
Environmental Costs
National Economic and Development Authority 28 March 2011 7
Outline of the Presentation
Background Project Component and Interventions Cost and Benefit
2nd Regional Training on ECCA 01 October 2013 6
Thank you!
Salamat!