O/H E O/H E O/H E O/H E O/H E O/H E O/H E O/H E PROJECT DETAILS: CLIENT DETAILS: ACENERGY PTY LTD LEDCOURT SOLAR FARM 4785 Western Highway, Ledcourt -36.973579, 142.610209 PROJECT NO: 001 DRAWN BY : APPROVED BY : PROJECT MGR : LZ RZ XT 0 150 300m ..\..\图图\ACE LOGO.png REV STATUS DESCRIPTION DATE D.B. C.B. REVISIONS LOCATION DIAGRAM DRAWING TITLE: LOCATION LAYOUT 7/04/2020 SCALE : REV. NO: ISSUE DATE : B 19/04/2020 ISSUE : DRAWING NR: SHEET SIZE: A3 G-1.2_000201 AS INDICATED XT RZ DD A DETAIL DESIGN North SOLAR FARM LOCATION SITE BOUNDARY WESTERN HWY REA ROAD MT DRUMMOND ROAD WESTERN HWY NEW O/H LINE EXISTING O/H LINE RESIDENTIAL AREA RESIDENTIAL AREA SITE ENTRANCE GATE AND ACCESS ROAD ≈234m ≈150m ≈38m ≈54m ≈76m DISTANCE FROM NEAREST DWELLING DISTANCE FROM DWELLING SITE ENTRANCE GATE AND ACCESS ROAD RELOCATE 19/04/2020 XT RZ DD B ≈43m
Transcript
Page 1: North REA ROAD - AC Energy · transformer oil trayac lv cable concrete footing. section view. scale 1:120 ≈0.8m. hv cable in conduit ≈3m ≈4m ≈4m ≈12m. natural ground level.

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

PROJECT DETAILS:

CLIENT DETAILS:

ACENERGY PTY LTD

LEDCOURT SOLAR FARM

4785 Western Highway, Ledcourt

-36.973579, 142.610209

PROJECT NO:

001

DRAWN BY : APPROVED BY : PROJECT MGR :

LZRZXT

0 150 300m

..\..\图图\ACE LOGO.png

REV STATUS DESCRIPTION DATE D.B. C.B.

REVISIONS

LOCATION DIAGRAM

DRAWING TITLE:

LOCATION LAYOUT 7/04/2020

SCALE :

REV. NO:

ISSUE DATE :

B

19/04/2020

ISSUE :

DRAWING NR:

SHEET SIZE:

A3

G-1.2_000201

AS INDICATED

XT RZDDA

DETAIL DESIGN

No

rth

SOLAR FARM LOCATION

SITE BOUNDARY

W

E

S

T

E

R

N

H

W

Y

R

E

A

R

O

A

D

M

T

D

R

U

M

M

O

N

D

R

O

A

D

W

E

S

T

E

R

N

H

W

Y

NEW O/H LINE

EXISTING O/H LINE

RESIDENTIAL AREA

RESIDENTIAL AREA

SITE ENTRANCE GATE AND ACCESS ROAD

2

3

4

m

1

5

0

m

3

8

m

5

4

m

≈76m

DISTANCE FROM

NEAREST DWELLING

DISTANCE FROM DWELLING

SITE ENTRANCE GATE AND ACCESS ROAD RELOCATE 19/04/2020 XT RZDDB

≈4

3m

Page 2: North REA ROAD - AC Energy · transformer oil trayac lv cable concrete footing. section view. scale 1:120 ≈0.8m. hv cable in conduit ≈3m ≈4m ≈4m ≈12m. natural ground level.

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

O

/

H

E

PROJECT DETAILS:

CLIENT DETAILS:

ACENERGY PTY LTD

LEDCOURT SOLAR FARM

4785 Western Highway, Ledcourt

-36.973579, 142.610209

PROJECT NO:

001

DRAWN BY : APPROVED BY : PROJECT MGR :

LZRZXT

0 10 20 30 40 50 60 70 80 90 100m

SITE ACCESS GATE AND ROAD

SITE CAR PARK ZONE

SITE CONSTRUCTION

OFFLOAD ZONE

POWERCOR SERVICE POLE

POWERCOR HV CABLE

SOLAR FARM FENCE

1.8 METER HIGH

CHAIN MESH SECURITY FENCE

GALVANISED STEEL

PV ARRAY BLOCK

(≈38m x 29m)

SUNGROW POWER STATION

AND STRING INVERTERLANDSCAPE

ROAD / HIGHWAY

TITLE BOUNDARY

RESIDENTIAL AREA

PV ARRAY BLOCK

(≈39m x 27m)

NEIGHBOURING PROPERTY

BOUNDARY

≈1

00

0

≈1

00

0

≈1

00

0

..\..\..\invertere.PNG

..\..\图图\ACE LOGO.png

BOTTOM VIEW

Ground

SIDE VIEWFRONT VIEW

..\..\..\MVPS111.PNG

REV STATUS DESCRIPTION DATE D.B. C.B.

REVISIONS

SITE PLAN

DRAWING TITLE:

INITIAL ISSUE 08/04/20

SCALE :

REV. NO:

ISSUE DATE :

B

19/04/2020

ISSUE :

DRAWING NR:

SHEET SIZE:

A3

G-1.1_000201

AS INDICATED

XT RZDDA

DETAIL DESIGN

No

rth

670

89

0

≈6.5 meter

≈3

m

ete

r

≈2.5 meter

CONCRETE FUNDATION

≈0.3 meter

W

E

S

T

E

R

N

H

W

Y

LEGEND

INVERTER LAYOUT

MV POWER STATION LAYOUT

TYPICAL MV POWER STATION

GREY COLOR

POWDER COATED STEEL

TYPICAL STRING INVERTER

WHITE COLOR

POWDER COATED STEEL

EXISTING O/H LINE

SITE ENTRANCE GATE AND ACCESS ROAD

CAR PARK AREA

OFF LOAD ZONE

(DURING CONSTRUCTION ONLY)

LANDSCAPE (≈2m)

SITE SECURITY FENCE

(1.8 METER HIGH, CHAIN MESH SECURITY FENCE, GALVANISED STEEL)

DETAIL DRAWING REFER TO "G-4.0_000201"

INVERTER, MV POWER STATION

HV SWITCHBOARD, POWERCOR

O/H POLE AND HV CABLE

DETAIL DRAWING REFER TO "G-3.0_000201"

EXISTING TREES

2

7

4

m

2

6

4

m

≈131m

≈2

41

m

2

6

3

m

≈2m

≈4m

≈3

7m

≈76m

1

2

m

1

0

m

2

3

m

1

8

m

1

2

m

≈17m

1

4

m

2

5

0

m

≈402m

RESIDENTIAL

AREA

RESIDENTIAL

AREA

5

4

m

≈3

7m

2

8

m

6

8

m

5

3

m

3

8

m

SITE ENTRANCE GATE AND ACCESS ROAD RELOCATE 19/04/20 XT RZDDB

STORAGE TANK FOR FIRE FIGHTING - EXAMPLE

MINIMUM STATIC STORAGE OF 22,500 LITRES

TANK WATER LEVEL INDICATOR

AN EXTERNAL WATER INDICATOR TO BE INSTALLED

AND IS TO BE VISIBLE FROM THE HARD STAND AREA

CFA SUCTION POINT

INSTALL HARD SUCTION POINT WITH 150MM FULL BORE ISOLATION VALVE

EQUIPPED WITH A STORZ CONNECTION, SIZED TO COMPLY WITH THE

REQUIRED SUCTION HYDRAULIC PERFORMANCE. ADAPTORS THAT MAY BE

REQUIRED TO MATCH THE CONNECTION ARE 125MM, 100MM, 90MM, 75MM &

65MM STORZ TREE ADAPTORS WITH A MATCHING BLANK END PROVIDED

E

X

I

S

T

I

N

G

O

/

H

P

O

L

E

P

R

O

P

O

S

E

D

N

E

W

O

/

H

P

O

L

E

P

R

O

P

O

S

E

D

N

E

W

U

G

O

/

H

P

O

L

E

TITLE BOUNDARY

TURNING MOVEMENT (≈10m)

LANDSCAPE (≈2m)

PROPOSED WATER TANK LOCATION

(≈22,500LITERS)

PV BLOCK

DETAIL DRAWING REFER TO

"G-2.0_000201"

6

5

m

≈4

3m

AutoCAD SHX Text
PM S 19M
AutoCAD SHX Text
AUSTROADS 2013 (AU)
AutoCAD SHX Text
(c) 2020 Transoft Solutions, Inc. All rights reserved.
Page 3: North REA ROAD - AC Energy · transformer oil trayac lv cable concrete footing. section view. scale 1:120 ≈0.8m. hv cable in conduit ≈3m ≈4m ≈4m ≈12m. natural ground level.

PROJECT DETAILS:

CLIENT DETAILS:

ACENERGY PTY LTD

LEDCOURT SOLAR FARM

4785 Western Highway, Ledcourt

-36.973579, 142.610209

PROJECT NO:

001

DRAWN BY : APPROVED BY : PROJECT MGR :

LZRZXT

..\..\图图\ACE LOGO.png

REV STATUS DESCRIPTION DATE D.B. C.B.

REVISIONS

SOLAR MODULE DETAILS

DRAWING TITLE:

FOR INITIAL ISSUE 19/04/2020

SCALE :

REV. NO:

ISSUE DATE :

A

19/04/2020

ISSUE :

DRAWING NR:

SHEET SIZE:

A3

G-2.0_000201

AS INDICATED

XT RZDDA

DETAIL DESIGN

≈38m

≈2

9m

PV BLOCK LAYOUT: 14*34 MODULES

≈0

.7

m

≈1

m

PV ARRAY ELEVATION

SCALE: 1:350

NATURAL GROUND

LEVEL

≈39m

≈2

7m

≈1

m

NATURAL GROUND

LEVEL

≈0

.7

m

PV BLOCK LAYOUT: 13*36 MODULES

≈66mm

≈21mm

PV ARRAY LAYOUT

SCALE: 1:50

PV ARRAY ELEVATION

SCALE: 1:350

TYPICAL SOLAR MODULE

≈2

m

≈1m

Page 4: North REA ROAD - AC Energy · transformer oil trayac lv cable concrete footing. section view. scale 1:120 ≈0.8m. hv cable in conduit ≈3m ≈4m ≈4m ≈12m. natural ground level.

PROJECT DETAILS:

CLIENT DETAILS:

ACENERGY PTY LTD

PROJECT NO:

201

DRAWN BY : APPROVED BY : PROJECT MGR :

LZRZXT

..\..\..\ACE LOGO.png

TOP VIEW

SCALE 1:120

INVERTER STATIONMV POWER STATIONHV SWITCHBOARDPOWERCOR UGOH POLE

≈6.5m

≈5m

≈5m

AC LV CABLE

TRANSFORMER OIL TRAY

CONCRETE FOOTING

SECTION VIEW

SCALE 1:120

≈0.8m

HV CABLE IN CONDUIT

≈3

m

≈4

m

≈4

m

≈1

2m

NATURAL GROUND

LEVEL

REV STATUS DESCRIPTION DATE D.B. C.B.

REVISIONS

DRAWING TITLE:

FOR INITIAL ISSUE 19/04/2020

SCALE :

REV. NO:

ISSUE DATE :

A

19/04/2020

ISSUE :

DRAWING NR:

SHEET SIZE:

A3

G-3.0_000201

AS INDICATED

XT RZDDA

DETAIL DESIGN

INVERTER STATION, MV POWER STATION, HV

SWITCHBOARD AND POWERCOR POLE DETAIL LAYOUT

≈20m

≈5

m

≈3

m

≈2

m

≈2

.5

m

LEDCOURT SOLAR FARM

4785 Western Highway, Ledcourt

-36.973579, 142.610209

≈0

.3

m

≈0

.3

m

Page 5: North REA ROAD - AC Energy · transformer oil trayac lv cable concrete footing. section view. scale 1:120 ≈0.8m. hv cable in conduit ≈3m ≈4m ≈4m ≈12m. natural ground level.

PROJECT DETAILS:

CLIENT DETAILS:

ACENERGY PTY LTD

LEDCOURT SOLAR FARM

4785 Western Highway, Ledcourt

-36.973579, 142.610209

PROJECT NO:

001

DRAWN BY : APPROVED BY : PROJECT MGR :

LZRZXT

..\..\图图\ACE LOGO.png

REV STATUS DESCRIPTION DATE D.B. C.B.

REVISIONS

SECURITY FENCE DETAILS

DRAWING TITLE:

FOR INITIAL ISSUE 19/04/2020

SCALE :

REV. NO:

ISSUE DATE :

A

19/04/2020

ISSUE :

DRAWING NR:

SHEET SIZE:

A3

G-4.0_000201

AS INDICATED

XT RZDDA

DETAIL DESIGN

≈1

.8

m

OVERALL HEIGHT FROM NGL

(≈1.8m)

GALVANIZED FINISHED MESH FENCE

LOCATION: INSIDE LANDSCAPE

CONCRETE FOOTING NATURAL GROUND LEVEL

TYPICAL GALVANIZED

FINISHED MESH FENCE

LANDSCAPE AND FENCE CROSS SECTION VIEW

SCALE: 1:50

≈2m

LANDSCAPE

AREA (≈2m)

SECURITY FENCY (≈1.8m)

SOLAR MODULE

NATURAL GROUND LEVEL

≈1

.8

m

SECURITY FENCE CROSS SECTION VIEW

SCALE: 1:35

≈17m


Recommended