/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/
/
/ /
/ /
/
/
/
/
/ // // // // // // // // // // // // // // // // /
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ // /
/ // /
/ // /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ // /
/ // /
/ // / / / / / / / / / / /
/ /
/ /
/ /
/ // /
/ /
/ /
/ // /
/ // /
/ // /
/ // /
/
/
/
/
/
/
/ /
/ /
/ // /
/ // /
/ // /
/ // /
/ // /
/ /
/ // /
/ /
/ / / / / / / / / // /
/ // /
/ // /
/ /
/ /
/ /
/ /
/ / / / / / / / / // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ // /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
0
20
40
60
80
100
120
1
4
0
1
6
0
1
8
0
200
2
2
0
2
4
0
2
6
0
2
8
0
3
0
0
3
2
0
340
360
380
TP
: 38.910
T
P
: 1
5
0
.4
8
9
T
P
: 1
8
0
.0
0
0
T
P
: 326.217
H
LOT 1
DPS 57923
NO 9
LOT 11
NO 17
LOT 10
NO 19
LOT 9
NO 27
LOT 8
NO 29
LOT 7
LOT 2
North Ridge Drive
Ho
rsh
am
D
ow
ns R
oa
d
Lot 22
DP 511805
Lot 21
DP 511805
Lot 1
DP 394180
Lot 5
DPS 62858
Lot 1
DP 315729
Lot 4
DPS 62858
Lot 7
DPS 65770
Lot 8
DPS 62858
Lot 9
DPS 62858
Lot 17
DPS 62858
Lot 10
DPS 62470
Part Lot
11 DPS
Part Lot 1 DPS
Lot 2
DP 513093 7595m²
791702
Lot 1
DP 513093 2408m²
791701
Lot 200
DP 511805
revisionjob no sheet no
scale:drawn:
sheet titlecontractor
all dimensions to be verified on site before making any shop drawings or commencing any work. the copyright of this drawing remains with BCD Group
client consultant
project status
project title
at A1
FOR INFORMATION
NORTH RIDGE DRIVE UPGRADE
HAMILTON
engineer:
Rev Date by Reason
1:500
18-0231
RJM
1401
STREET TREE PLAN
1 01/10/2019 RJM FOR INFORMATION
N
O
R
T
H
NE
Notes:
· All existing vehicle crossings to be extended or developed to be
invoiced.
· Parking bay extent to be confirmed and subdivision engineering plans
are developed.
· All street tree planting to be undertaken in accordance with the Regional
Infrastructure Technical Specification section 7 Landscape.
· New trees to be Acer rubrum Columnare
Legend
stormwater manhole
stormwater catch pit
stormwater double catch pit
wastewater manhole
existing manhole
existing seal to remain
new street light
existing tree to remain
existing tree to be removed
new tree
Acer rubrum Columnare