Northampton College Daventry Campus 1 www.northamptoncollege.ac.uk PICK EVERARD PICK EVERARD Welcome and introduction Northampton College would like to thank you for taking the time to visit and learn more about the proposals for the Daventry campus. The context for this exhibition is the need to improve the range and quality of the College’s existing facilities in Daventry. The reason for the project is to improve the education offer of the town with the provision of exciting new facilities which will help to stem the flow of students leaving the town to receive their education. This exhibition is being made available to as many local people and stakeholders as possible. It has been announced in the local press and local households in the immediate area have been leafleted. In addition, the exhibition material is also available to view on the College’s website:- www.northamptoncollege.ac.uk/daventryplans The College would like to explain the more detailed work on the new building’s design that has been undertaken to date and is very keen to hear your views and ideas. College staff and the consultant team are on hand to answer any questions you may have. What does the proposal comprise? The proposal involves the construction of new high quality further education facilities on part of the existing site. It is the College’s intention to have the new facilities operational in time for the beginning of the 2016-17 academic year (September 2016). To help facilitate this ambitious project, the College is proposing to sell part of the existing site for residential development. Any proceeds from this sale will be reinvested directly back into the College’s capital investment programme. A public exhibition took place earlier this year where the residential element was described in more detail.
Transcript
Page 1: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

1

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

Welcome and introduction

Northampton College would like to thank you for taking the time to visit and learn more about the proposals for the Daventry campus.

The context for this exhibition is the need to improve the range and quality of the College’s existing facilities in Daventry. The reason for the project is to improve the education offer of the town with the provision of exciting new facilities which will help to stem the flow of students leaving the town to receive their education.

This exhibition is being made available to as many local people and stakeholders as possible. It has been announced in the local press and local households in the immediate area have been leafleted. In addition, the exhibition material is also available to view on the College’s website:- www.northamptoncollege.ac.uk/daventryplans

The College would like to explain the more detailed work on the new building’s design that has been undertaken to date and is very keen to hear your views and ideas. College staff and the consultant team are on hand to answer any questions you may have.

What does the proposal comprise?

The proposal involves the construction of new high quality further education facilities on part of the existing site. It is the College’s intention to have the new facilities operational in time for the beginning of the 2016-17 academic year (September 2016). To help facilitate this ambitious project, the College is proposing to sell part of the existing site for residential development. Any proceeds from this sale will be reinvested directly back into the College’s capital investment programme. A public exhibition took place earlier this year where the residential element was described in more detail.

Page 2: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

2

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

The need for a new college

Northampton College merged with Daventry Tertiary College in 2004. In 2007 the College announced its intention to replace the existing buildings in Daventry with purpose-built facilities. Unfortunately, Government funding cuts at the time meant that it was not possible to implement the proposal for Daventry. Prior to this, the Daventry Campus had witnessed little capital investment since the buildings were constructed in the 1970s. This has led to the current position whereby existing physical resources:

• Are considered to have reached the end of their economic life – small-scale investment would not eliminate inherent building defects meaning that replacement is seen as the only viable proposition• Are dated, meaning that the College is no longer able to meet the needs of students and staff • Are expensive to maintain and operate• Do not meet the sustainability agenda• Are too large for current and future needs • Are currently under-utilised.

In August 2014, the College secured grant support from South East Midlands Local Enterprise Partnership towards the cost of replacing the existing buildings in Daventry. In order to realise this ambition, the College needs to generate further additional capital funding, a proportion of which it is envisaged will come from disposal proceeds for some of the Badby Road site.

New facilities at Northampton College, Booth Lane, Northampton

Existing College buildings and playing fields

Page 3: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

3

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

The masterplan

The indicative masterplan below shows, in outline, the proposed arrangement of the College facilities and adjacent residential development.

The masterplan retains the existing perimeter trees and landscaping wherever possible, and allows for open landscaped edges alongside - unless there are existing ‘built’ edges.

The 2 and 3 storey College building is located centrally within the site, set back from Badby Road West to maintain the open campus feel around it. Sports pitches are located to the north of Badby Road West, in their existing position, to retain the openness of this part of the site.

The Design Principles plan shows how the proposals can respond to the site’s existing character and layout. The aim has been to locate the College in a position which is accessible, and to enable the pitches to maintain the openness of this part of the site. The residential development is shown to accommodate the land to the north and west of the College building, connecting with existing residential uses and open space.

One of the guiding principles of the layout is to maintain the playing fields and landscaping along the Badby Road frontage, and for development to be set well back from it. The College and its associated pitches is therefore positioned within this part of the site.

Access is shown to be taken from the existing access point at Badby Road West, with a secondary access from Yeomanry Way. Additional pedestrian connection points could be formed into Grovelands and to the adjoining open space to the west.

vehicular entrance car parkmain entrance

sportspitches

Page 4: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

4

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

Car parking and landscaping

� ����

� ����

6

9

11

12

13

14

15

1617

18

19

20

21

2425

2627

3031

32

33

34

35

36

37

38

39

40

41

42

43

44

45

47

48

95

96

97

98

99100

119

109

117118

129

128125

126

127

55

52

53

54

56

58

59

60

62

63

66

68

69

70

71

73

72

86

87

75-81

74

10

22

23

2829

46

57

61

64

65

67

82

83

84

8588

89

90

91

92

93

94

101 102

103

104

105

106107

108

114

115

116

120121

122

123124

130

IN

externaldeck

pedestrianaccess

coach

drop off

possible lay by

bins in

secu

re co

mpound

secu

re bike

parking

coach parking

90 parking spaces

Badby R

oad W

est

vehicleaccess

Providing sufficient well designed and easily accessible car parking is one of the most important considerations in ensuring that the redevelopment of the college is successful. The redevelopment is proposing 90 car parking spaces, together with coach drop off and parking as well as secure cycle and motorbike parking.

As well as car parking, proposals for landscaping include tree planting along the front of the College, as well as native hedge planting around the perimeter, planted around a weldmesh fence.

Parking and accessThis plan shows the location of the main vehicular access to the campus off the existing entrance point from Badby Road West, together with the location of the coach drop off and layby parking.

LandscapingThis plan shows the location of the sports pitches, the extent of the new boundary hedge, as well as the location of the existing and new proposed new tree planting areas.

� ����

� ����

6

9

11

12

13

14

15

1617

18

19

20

21

2425

2627

3031

32

33

34

35

36

37

38

39

40

41

42

43

44

45

47

48

95

96

97

98

99100

119

109

117118

129

128125

126

127

55

52

53

54

56

58

59

60

62

63

66

68

69

70

71

73

72

86

87

75-81

74

10

22

23

2829

46

57

61

64

65

67

82

83

84

8588

89

90

91

92

93

94

101 102

103

104

105

106107

108

114

115

116

120121

122

123124

130

IN

Badby R

oad W

est

9-a-side pitch

7-a-side pitch

5-a-side pitch

Page 5: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

5

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

Plans

The new facilities will replace the existing College buildings and will comprise general teaching accommodation, such as general purpose and IT/Mac classrooms, and specialist teaching accommodation including hairdressing & beauty therapy salons, motor vehicle workshop, engineering workshop and science labs.

The new building would also provide a cafeteria, library and learning resource centre, staff and other support facilities. It is proposed that Moulton College will lease workshop spaces from the college. The hairdressing, beauty therapy and sports facilities will be available for community use.

Min Min Min Min

FRE

UP

UP

Hair

Kitchen

Base RoomSpecialist Workshop 1

(Animal Welfare)

Reception

Laundry

Beauty

HBAT Store HBAT Store

Stairs 01

MAINENTRANCE

teachingspace

teachingspace

Stairs 02

EXTERNAL SEATING AREAWITH CANOPY OVER (PAVED)

Sensory / Quiet

GP Classroom

Dry Good Store

Freezer Walk-in

Freezer Walk-in

Office Finance

CafeteriaEstates Equipment

Store

Specialist Workshop 2

(Construction)

IT Drop in

First Aid

Kitchen

Incoming Electrics

Service Riser 2

Stairs 03

Lobby

Kitchen/Servery

Coffee Area

Female WC

Corridor

ServiceRiser 1

Entrance Lobby

Lift 01

Office-Student Services

WorkshopStore

Meeting Room 1

Cleanersstore

Waiting Area

Corridor

Lift 02

Flat / Wet Room

Motor Vehicle & Engine Workshop

WC Guest

WC Guest

Dis WC

Cleaners

Male WC

3650

Office-Estates + Goods in

CompressorStore

1 : 100A-1200

LEVEL 01

IT/ MAC

Lift 01

IT/ MAC/ GP GP

Male WC

Arts & Crafts

Meeting Room 2

Library

Plant RoomScience Lab 2Prep Room

Science Lab 1Staff Room

IT/ MAC

Corridor

Office-Drop in

IT/ MAC

IT/ MAC

IT/ MAC

Server Room

IT Lab/ MAC Lab/ GP

Staff Kitchen

Stair 01

ServiceRiser 1

DisabledWC

MF Lobby

MF PrayerRoom

Cleaners

Arts & Crafts Store

Corridor

Stair 02

OfficeCentre

Manager

Staff WC

ServiceRiser 2

Store

Lift 02

ROO

F O

VER

(Man

safe

sys

tem

requ

ired

for

mai

nten

ance

)

ROOF OVER

Drinkingfountain

Female WC

Store

Working wall

Lock

ers

Lock

ers

Stor

age

for

IT L

ab

Lock

ers

IT office

1 : 100A-1201LEVEL 12

High level windows

Raised roof to give 5 metres headclearance from Motor Vehicle Workshopfloor level as indicated hatched area

Parapet wall to take twodifferent roof level

GP GP GP

GP

Female WC

On Line Exam

Craft (Care)GP

Lobby(Online Exam)

Lift 01

Lift 02

Stair 02

Male WC

GP

Staff Room

Meeting Room 3

Store

Cleaners

Dis WC

Lobby

Service Risers

Corridor

Staff WC

StaffKitchen

Stair 03

ServiceRiser 2

Exam SecureStore

Store

ROOF/FUTURE EXPANSION SPACE

Drinkingfountain

Wor

king

wal

l

Lock

ers

Lock

ers

Lock

ers

Wor

king

wal

lW

orki

ng w

all

ROOF/FUTURE EXPANSION SPACE

Exam Office

Mansafe system required to rooffor maintenance

1 : 100A-1202

LEVEL 21

Ground floor-The ground floor will contain predominantly larger uses, such as the cafe, hair and beauty, and specialist and engineering workshops.

First floor-The first floor will contain a broad mix of classrooms, from science to arts to computer rooms and the library / learning resource centre.

Second floor -The second floor will mostly consist of smaller general purpose classrooms and the staff room.

Page 6: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

6

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

Proposed elevations

The proposed elevations show a modern design, with lots of windows to allow generous amounts of light into the building, and the mass of the building is broken down into smaller elements, with the library and its full height windows and the fully glazed entrance area providing the focus to the front of the building on the western elevation.

The proposed new building will be built to high environmental standards using the Building Research Establishment’s BREEAM rating system.

Page 7: Northampton College Daventry Campus · 2015. 5. 11. · Northampton College would like to thank you for taking the time to visit and learn more about the . proposals for the Daventry

Northampton CollegeDaventry Campus

7

www.northamptoncollege.ac.uk

PICK EVERARD

PICK EVERARD

Feedback and next steps

Northampton College is very keen to hear your views on the proposals for the new College, as well as thoughts you have on any of the individual issues raised. Please submit comments by 22nd May 2015.

You can convey your comments in a number of ways so that we have a record of them. All these details are included on the comment sheet:

1 - by filling in the comment sheet and placing it in the comments box provided.

2 - via email to: [email protected]

3 - by letter to:

Daventry Project Team, Estates Department, Northampton College, Booth Lane, Northampton NN3 3RF.

All comments received during the consultation period will be reviewed and taken into account in the finalisation of documents prior to submission of planning applications to Daventry District Council.