Northeast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive Vice President HAKS Engineers, P.C.
Transcript
Page 1: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Northeast Bridge

Preservation ConferenceSeptember 28-30, 2010

Hartford, CT

Rocker Bearing IssuesBy

Franco Balassone, P.E.

Executive Vice President

HAKS Engineers, P.C.

Page 2: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Typical Bridge Bearing Types

• Sliding Plate Bearings

• Roller Bearings

• Elastomeric Bearings

• Spherical Bearings

• Pot Bearings

• Rocker Bearings

Page 3: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Rocker Bearing

Page 4: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Why Discuss Rocker Why Discuss Rocker

Bearings?

Page 5: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Bridge Closed, July 28, 2005

Rocker Bearing Failure

Albany, NY (I-787, Exit 3 NB)

Page 6: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Albany, NY (I-787, Exit 3 NB)

Page 7: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Albany, NY (I-787, Exit 3 NB)

Contributing Factors:•Misaligned / Over-expanded Bearing

• Overly Flexible Pier

Source: NYDOT

Page 8: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Pittsburgh, PA (Birmingham Bridge)Bridge Closed February 8, 2008

Rocker Bearing Failure

Page 9: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Pittsburgh, PA (Birmingham Bridge)

Page 10: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Pittsburgh, PA (Birmingham Bridge)

Contributing Factors:•Misalignment of Bearing

• Cumulative Bearing Ratcheting

• Horizontal Force – Deflection of Pier

Source: PennDOT

Page 11: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Pittsburgh, PA (Birmingham Bridge)

Source: PennDOT

Page 12: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Pittsburgh, PA (Birmingham Bridge)

Source: PennDOT

Page 13: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Rocker Bearing FailureContributing Factors

• Corrosion (pack rust) below rocker

or pivot point

• Section Loss, Debris

• Abnormal Behavior • Abnormal Behavior

– Contracted position in warm

weather, Expanded in cold

• Misalignment, Ratcheting

• Substructure Movement

Page 14: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

Consists of 9 spans overConsists of 9 spans over

Connecticut River & AmtrakConnecticut River & Amtrak

ADT = 26,200ADT = 26,200

Length = 1,345ft Length = 1,345ft

Deck Area = 80,344sfDeck Area = 80,344sf

Page 15: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

Pack Rust – Displacements

Page 16: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

Flattened Rockers – Inhibited Movement

Page 17: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

Documentation – Section Loss & Pack Rust

Page 18: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

Impacts:

Pack Rust - Displacements

• Deferential Displacement

• Racking Floorbeams

• Pintles exposed • Pintles exposed

• Potential for walking

Flattened Rockers – Inhibited Movement

• Increased stresses on girders

• Lateral loading on substructures

Page 19: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge, CT (Route 190)

• New Expansion Bearings

- designed by ConnDOT

- On-site

Replacement

Recommended

- On-site

• Replacement

– October 2010

Page 20: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Suffield Bridge Gold Star

Page 21: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Vital Infrastructure Link

Gold Star Bridge, CT (Interstate - 95)

Vital Infrastructure Link

Largest Complex Bridge in CT Largest Complex Bridge in CT

ADT = 120,000 +ADT = 120,000 +

Length = 6000ftLength = 6000ft

Deck Area = 1,000,000sfDeck Area = 1,000,000sf

Main Span: L = 540ftMain Span: L = 540ft

140’ Vertical Clearance 140’ Vertical Clearance

Page 22: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Gold Star Bridge, CT (Interstate - 95)

Pack Rust - Bearing Pin / Gusset PlateInterface

Frozen Rocker Bearings

Span 31 Span 30

Page 23: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Gold Star Bridge, CT (Interstate - 95)

Impacts:

Seized Rocker Pin

– No Movement

• Increased stresses - Truss members

• Lateral loading on substructures• Lateral loading on substructures

Excessive Wear

– Pin / Gusset Interface

• Non-uniform gaps and

contact area.

Page 24: Northeast Bridge Preservation Conference · PDF fileNortheast Bridge Preservation Conference September 28-30, 2010 Hartford, CT Rocker Bearing Issues By Franco Balassone, P.E. Executive

Gold Star Bridge, CT (Interstate - 95)

Replacement Recommended

Intermediate Steps:

Determine the urgency of replacement:

- Instrumentation of Truss Members

- Quantify Induced Stresses

- Scheduling Bearing Replacement- Scheduling Bearing Replacement