CMPDI Annexure No-I ___________________________________________________________________ Summarised EIA-EMP of khadia OCP __________________________________________________________________ A-1 (Job. No.-6101031) Summarized Environmental Impact Assessment (EIA) & Environmental Management Plan (EMP) FOR Khadia OCP (10.00 to 14.00 MTPA) NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant, Dist. Singrauli, MP-486890
Transcript
Page 1: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-1

(Job. No.-6101031)

Summarized Environmental Impact Assessment (EIA) &

Environmental Management Plan (EMP) FOR

Khadia OCP (10.00 to 14.00 MTPA)

NORTHERN COALFIELDS LIMITED

November- 2014

Prepared By

CMPDI

REGIONAL INSTITUTE – VI

P.O: Jayant, Dist. Singrauli,

MP-486890

Page 2: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-2

(Job. No.-6101031)

Summarized Environmental Impact Assessment (EIA) &

Environmental Management Plan (EMP) For

Khadia OCP (10.00 to 14.00 Mtpa)

(As per the MoEF OM No.J-15012/30/2004.IA.II (M) dated 30.05.2014)

CONTENTS

PARTICULARS PAGE NO.

Summarised EIA-EMP for EC of Khadia OCP (10.0 to 14.0 MTPA) A-1 to A-50

LIST OF TABLES

Sl.No. Particulars Table No. Page No.

1. Ambient Air Quality Report Table No. -1 A-18 to A-24

2. Water / Effluent Quality Data Table No. -2 A-25 to A-39

3. Noise Level Measurement Data Table No. -3 A-40 to A-45

4. Ground Water Level & Quality Data Table No. -4 A-46 to A-50

Page 3: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-3

(Job. No.-6101031)

Summarised Environmental Impact Assessment (EIA) &

Environmental Management Plan (EMP) FOR

Khadia OCP (10.00 to 14.00 MTPA)

(As per the MoEF OM No.J-15012/30/2004.IA.II (M) dated 30.05.2014)

1 INTRODUCTION

Khadia OCP is an existing operating mine in Singrauli Coalfields, NCL in an area of 1640 Ha. The mine is working since 1984 and has produced 72.86 MT of coal and removed 281.97 million m3 of OB till 31.03.2014.

This mine has the capacity to increase coal production by 4.0 MTPA without additional land requirement.

Purpose of the report

This application has been made as per the OM No.J-15012/30/2004.IA.II (M) dated 30.05.2014 for grant of prior Environmental Clearance (EC) for increased capacity by 4.0MTY of Khadia OCP to 14.00 MTPA considering the following points.

A Khadia OCP has got the capability of producing coal by 4.0 MTPA higher than 10.00 MTPA, with higher utilization of plant & machinery.

B The total leasehold area as per earlier approved EMP is 1640.00 Ha (extra land is not required and the forestry and other clearances have already been obtained).

C No change in technology is proposed. D No change in backfilling & land reclamation programme will take place. Khadia OCP

has one of the best land reclamation plans and the same shall continue after including the increased capacity of the mine to 14.00 MTPA also.

E The total approved manpower is 1452 (3 shift working), no increase in which is proposed.

F The grade of coal is grade G-8 (Calorific value in the range of 4900-5200 Kcal / Kg) and the linkage of coal is to M/s Anapara “B & C” STPS of UPRVUNL.

G The mine-able coal reserves was estimated to be 296.85 MT and the average stripping ratio is 4.23 m3/T. Approximately 224.29 Million Tonne of mineable coal reserve is left to be mined as on 31.03.2014.

H Due to the increasing demand of coal for the nation, it is requested to consider the proposal for grant of environmental clearance from MOEF for increased capacity of 14.0 MTPA (from 10.00 MTPA normative capacity to increased capacity of 14.0 MTPA).

Therefore this project qualifies for EC as per the MoEF OM No.J-15012/30/2004.IA.II (M) dated 30.05.2014 for increase in production capacity from 10.00 MTPA to 14.0 MTPA. The filled up application in Form-I & this summarized EIA/EMP of the Project are put up for due diligence of EAC for inclusion of 14.0 MTPA increase in capacity by 4.0MTPA of existing & approved Khadia OCP.

Page 4: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-4

(Job. No.-6101031)

Previous Coal Production

The production of this project for the last 5 years is given below:

Sl. No. Year Production MT

1 2009-2010 3.72

2 2010-2011 4.39

3 2011-2012 4.65

4 2012-2013 4.38

5 2013-2014 5.14

Total 22.28

Balance Mineable Reserve & Life of the Mine The balance mineable coal left in Khadia OCP as on 31.03.2014 is 224.29 MT. Corresponding to this, the balance life of Khadia opencast is 23 years (up to 2036-37),and the life will decrease by 5 year if 4.0MTPA increase in capacity is proposed.

Revised calendar plan for production for increased capacity

e

Sl.No Year Normative Coal Production( Mt)

Proposed Increase in Coal Production( Mt)

OB removal for increased Production

(Mm3)

Up to 2013-14 72.86 72.86 281.97

1 2014-15 10.00 14.00* 70.14

2 2015-16 10.00 14.00* 70.14 3 2016-17 10.00 14.00* 70.14 4 2017-18 10.00 14.00* 70.14 5 2018-19 10.00 14.00* 70.14 6 2019-20 10.00 14.00* 60.58 7 2020-21 10.00 14.00* 60.58 8 2021-22 10.00 14.00* 60.58 9 2022-23 10.00 14.00* 60.58 10 2023-24 10.00 14.00* 60.59 11 2024-25 10.00 14.00* 60.58 12 2025-26 10.00 14.00* 60.58

13 2026-27 10.00 14.00* 60.55

14 2027-28 10.00 14.00* 56.11

15 2028-29 10.00 10.00* 31.92

16 2029-30 10.00 8.00 25.04

17 2030-31 10.00 6.00 18.25

18 2031-32 10.00 3.99 9.58

19 2032-33 10.00 - -

20 2033-34 10.00 - -

21 2034-35 10.00 - -

22 2035-36 10.00 - -

23 2036-37 4.29 - -

Total 296.85 296.85 1255.72

*Proposed increase in production shall be achieved in only the years where the geo mining conditions are favorable and by augmenting capacity through outsourcing and by increasing number of working days to meet the overall demand of coal on NCL.

Page 5: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-5

(Job. No.-6101031)

Identification of project & project proponent

The project under consideration, i.e. Khadia OCP is administratively under the NCL headed by Chief General Manager, Khadia project. Geologically, it is one of the eleven blocks of Moher Sub-basins and falls partly in Uttar Pradesh and partly in Madhya Pradesh. The mailing address of the Project Officer is given below: General Manager, Khadia OCP,NCL PO: Khadia, Distt. Sonebhadra UP-231222 Location & Communication

The Project is one of the eleven blocks of Moher Sub-basins of Singrauli Coalfields which is located mainly in the Singrauli District of Madhya Pradesh excepting an area of 80 sq. km in the Sonebhadra district of Uttar Pradesh. The Khadia block falls partly in Uttar Pradesh (Sonebhadra District) and partly in Madhya Pradesh (Singrauli district). Project is covered under Topo sheet no. 63-L /12 between latitude 240 07' 26" to 240 08' 47" North and longitudes 820 41' 40" to 820 44' 47" East. The project is located at a distance of 60 km by road from Renukut in UP and about 20 km from Waidhan in MP. It is approachable by an all weathered road. There is a metalled PWD road from Aundi to Shaktinagar STPS and the project area is located within 1 km of this road. The project is also approachable from the headquarters at Singrauli by a fair weather road. The nearest railway station “Shaktinagar” is just adjacent to the project at a distance of about 1 KM and another is Singrauli railway station on Chopan-Katni branch line is at a distance of about 12 KM from the project. A railway line with train service has been extended from Karela road on Chopan-Katni branch line of Eastern Railway to Shaktinagar near Khadia O/C Project. Refer location plan at Plate No -1 and plan showing leasehold area of project in KML format in Plate No.-1(A), attached with accompanying Form-I.

Description of importance to the country and region

Northern Coalfields Limited is facing increasing demand of coal because of increased demand from industry and power sector. Continuing and augmentation of coal production from the mines of NCL will help to bridge the gap of demand and supply of coal in India. To meet the growing demand of coal, especially in power and steel sectors, the Ministry of Coal has given target to NCL for the year 2014-15 as 77.50 Mt which will increase to 103.82 Mt by the terminal year of XIIth Plan period i.e. in year 2016-17. Khadia Opencast Project will make available additional coal @ 4.0 MTPA apart from 10.00 MTPA, to meet the growing demand of non-coking coal.

2 PROJECT DESCRIPTION

Nature and size of the project Design, development and operation of Khadia OCP were done by Northern Coalfields Limited. This project originally had an operating capacity of 10.00 Mtpa ROM coal production. The project is proposed to increase production capacity by 4.0 MTPA i.e.., 14.0 mtpa. Refer Plate No-2 for surface plan of Khadia OCP.

Page 6: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-6

(Job. No.-6101031)

Khadia is mined by opencast method. It is characterised by the presence of up to five seams of which Tura, Purewa Bottom, Purewa top are fairly thick with dip angles of 2°-3° and have potential for exploitation. Other seams viz. Kota and Khadia have not been explored in detail because of its thin, impersistent and interbanded nature. Seam thickness ranges from 19 m to 22 m (Turra seam), 8.00 to 13.00m (Purewa bottom Seam), and 8.00 to 10.00m (Purewa top Seam). The total mineable reserve is 296.85 Mt at average strip ratio of 4.23cum/te. Quarry Parameters

As per existing scenario, the balance coal production will come as per detail given below:

Sl. No. Seam Stripping Ratio & other Quarry Parameters for balance reserves as on 31.03.2013

1 Total Coal ( Mtes) 296.85

2 Total OBR(Mm3) 1255.72

3 S. Ratio (m3/te.) 4.23

4 Life ( Years) 23/18

5 Dip of seams (Degree) 2°-4°.

6 Strike Length (Km) along Turra Seam Floor

1.95 (East) ,2.8(West)

7 Maximum depth (m) 280(East) ,260(West)

3 DESCRIPTION OF THE ENVIRONMENT

Ambient Air Quality

The project is regularly monitored for environmental parameters like Ambient Air, water /effluent and noise levels. Location of the sampling points is indicated in Plate No.-2. Ambient Air quality at present level of production with control measures is found to be within specified limit (as per Gazette notification no GSR 742(E) dt. 25-9-2000, Standard for Coal mines). The present ambient air quality data are given in Table no. -1. The SPM & RPM levels for 2012-13 & 2013-14 are given below. The results reveal that the RPM values found to be within specified limit due to increase in mining activities.

All values are expressed in microgram per cubic meter.

Station Code/Name : Category FOR YEAR 2012-13 FOR YEAR 2013-14

SPM RPM SPM RPM

1. KHA1- Sub-Station(OB) Industrial 280 94 283 102

2. KHA2- Guest House Residential 121 38 124 43

3.KHA3- Chilkatand Village Residential 121 38 126 43

3.KHA4- Khadia VTC Industrial 302 102 340 123

Annual Average Permissible Limits Industrial 430 215 430 215

Annual Average Permissible Limits Residential 140 60 140 60

Page 7: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-7

(Job. No.-6101031)

C. Ambient Air Quality Impact Prediction through Modeling:

Except RPM (PM10) level no other parameter will be increased which is a major emission from various opencast mining activities. An ambient air quality impact prediction (AAQIP) for enhanced production of 14.0 Mtpa has been predicted by using FDM model. This AAQIP reveals that, the increase in RPM (PM10) level will be marginal and within permissible limit. The AAQIP details are enclosed as Annexure No.-II. The predicted and Monitored 24 hourly average PM10 Concentration Levels at Various Receptors (5.14-14.0 mtpa) are given below:

Predicted and Monitored 24 hourly average PM10 Concentration Levels

at Various Receptors (5.14-14.0 mtpa)

Receptor

24 Hours average PM10 concentration (µg/ m3)

Monitored/ Baseline

value

Change in values without

control measures

(prediction)

Change in values with

control measures

(prediction)

Total concentration

without control

measures

Total concentration with control measures

Permissible Limits

Auri Village 46 0.004 0.002 46.004 46.002 100

Khadia Substation

111 56.016 28.903 167.016 139.903 300

Khadia Guest House

51 8.645 4.384 59.645 55.384 100

Chilkatand Basti

53 22.163 11.105 75.163 64.105 100

Kohroul Village

53 0.132 0.061 5.132 53.061 100

Noise Level status

Noise Level Sites and their rationale: i) Mine Site (KHN1)

To assess the noise level in mine site due to mining activities. The noise levels were recorded in the mine area where all mining activities are in progress.

ii) OB Workshop (KHN2)

To assess the noise generated in the OB workshop due to maintenance and mining activities also, noise levels were recorded in the workshop.

Page 8: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-8

(Job. No.-6101031)

iii) Coal Workshop (KHN3)

To assess the noise generated in the workshop due to maintenance of HEMM and it is nearer to the mine and so the noise levels from mining activities were recorded in the coal workshop.

Iv) Colony (KHN4)

To assess the noise level in the residential area, noise levels were recorded during day as well as night time in the colony

Summary of the observations and noise level measurements are given in Table No-3. Water quality status Location of Sampling Stations and their rationale:

i) Inlet of ETP (KHW1) CHP generate waste water is tested before treatment at ETP to assess the effluent

quality. This location has been selected to monitor the quality of CHP effluent

ii) Outlet point of ETP (KHW2) This location has been selected to monitor the discharge quality of treated effluent

through ETP.

iii) Outlet point of STP (KHW3) This site was selected to assess the quality of effluent discharged from sewage

treatment plant into natural stream.

iv) Drinking water (IWSS) (KHW4) This site was selected to assess the quality of water being supplied from IWSS to the

Project Colony.

Water quality data are given in Table No-2. Also, the ground water levels and quality monitoring locations in the project area are given in Plate No.4. and results are in Table No.4.

4 DETAIL OF ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES

Air Pollution Control

Sources of air pollution The main sources of air pollution are identified as-

1) Drilling & blasting in coal & OB benches.

2) Coal & OB transportation inside the mine.

3) Coal crushing & conveying from the mine.

4) Coal handling activities.

Page 9: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-9

(Job. No.-6101031)

5) Coal loading in wagons.

6) Wind erosion effect of coal stockyard & OB Dump.

Ambient Air Quality Control Measures

Air pollution control measures

A movable water sprinkling system has been provided to check dust emissions from various parts of mine. (a) 20 KL water tanker : 5 nos. (departmental) b) 6 KL water tanker : 7 nos. (outsourcing) At all transfer points of conveyor system water sprinkling system are available.

Vehicles are regularly being maintained to control the emissions. Coal transportation is being done in covered trucks. The haul road is being graded regularly in order to make it smooth. Coal before being loaded into tippers is watered properly to avoid generation of dust in course of transportation.

Major coal transport is made through MGR railway system.

Dust extractors have been provided and made operative in drills. Arrangement of wet drilling has also been made at Project level.

Dust is controlled regularly by spraying water at Haul road, transfer point etc.

Persons working in industrial area have been provided with protective respiratory device. Regular training is being imparted to inculcate safety and health aspect. Each person working in or about the mine is being examined periodically by Doctor trained in occupational health services.

Water Pollution Control

Sources of water pollution Likely sources of water pollution from this project along with the type of pollutants are as follows:

(i) Sanitary (domestic) waste water : Suspended solids and BOD.

(ii) Industrial wastewater from workshop : Suspended solids, oil & grease;

(iii) Waste water from mine : Suspended solids of coal, clay and oil;

(iv) Surface run-off passing through coal stockpiles

: Suspended solids;

(v) Storm water from leasehold area and built-up area

: Suspended solids.

Effective water pollution control measures shall be taken as necessary keeping the following point. Sufficient safeguards have been taken to make the project eco-friendly from water

pollution control point of view.

Page 10: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-10

(Job. No.-6101031)

Recycling of wastewater at some sources after appropriate treatment to the extent possible.

Conforming to the limits of the General Standards for discharge of environmental

pollutants for the quality of the treated effluents. The mitigation measures to be adopted in this project are given below:

Water Quality Management:

Water pollution control measures

Catch drains and siltation ponds of sufficient size have been constructed to arrest the silt and sediment. The clean water so collected is being utilized for watering mine area, roads, green belt developments etc. The drains are being regularly de-silted and maintained properly. Sufficient sump capacity has been provided to have adequate retention period to allow proper settling of silt.

Sufficient check dam shall be maintained in the toe area of dump to arrest silting of sump.

The effluent from workshop, CHP and Mine discharge is being treated in existing Effluent Treatment Plant of 1600m3/hr (38.4 MLD) capacity.

The Project has already constructed a Sewerage Treatment Plant (STP) of 1.5 MLD capacity for treatment of domestic effluent from colony. The STP is in operation and treated effluent is used for horticulture purposes. Also, the Industrial buildings are having facilities of septic tank and soak pit.

Rain Water Harvesting

In order to augment ground water resource, artificial ground water recharge measures have been taken. Further, numerous numbers of hand pumps , wells and ponds have been provided in nearby villages to meet the water requirements of villagers , animals and plants.

Additional Water requirement for the proposed 14.00 MTPA (4.0 MTPA Increased Capacity) of Khadia OCP

Due to increase in capacity there will be slight increase in water requirement for industrial (haul road dust suppression).This increase of water requirement will be met by mine water and treated water from ETP.

Noise Level Management:

The mining operation may cause noise nuisance if adequate precautions are not taken to keep the noise level within limits. Environment standards for coal mines stipulates that noise level in operational/ working zone shall not exceed 85 dB(A) Leq. The following measures therefore, have been envisaged to reduce the noise Level to protect the workers from noise hazard and to adhere to the Environmental standards in respect of noise.

Use of equipment with arrangements for absorbing the operational noise.

Page 11: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-11

(Job. No.-6101031)

Foundations of vibrating equipment to be designed with isolators to prevent vibrations so

that the noise level does not exceed 85 dB(A) Leq.

Controlled blasting is undertaken under supervision of the blasting officer. Proper

blast design is prepared to control ground vibration and to arrest fly rocks, air trashes

and boulders. Blasting is done with the use of soft tubes.

Use of insulated cabins for operators

Use of rubber/ polymer liners in chutes and hoppers

Use of ear muffs by workers in the zone of high noise source (if any)

Plantation of trees around the plant area.

Routine maintenance of HEMM.

Regular maintenance with prompt replacement of worn-out parts.

Land Requirement & Management

• The earlier approved Khadia OCP involved land requirement of 1640 Ha, no increase in land requirement is proposed for increase in coal production.

• There will be no change in total OB quantity, dump area, final dump plan and dumping strategy due to increase inak production from 10.00 Mtpa to14.00 Mtpa.

• Modalities for Technical & Biological reclamation will be remain same as mentioned in approved EMP (10.00 Mtpa) of Khadia OCP.

Pre mining Land Use is given below:

1 Forest land 844.00 Ha

2 Agricultural land (Tenancy Land) 449.00 Ha

3 Govt. Land 347.00 Ha

Total 1640.00 Ha

The detail of land use at operational stage as per approved Khadia OCP (10.00 MTPA) is given below.

Sl. no

Particulars Land Requirement (Ha) Total

Forest land Non- forest land

1 Quarry 600 403 1003

2 External OB dump 144 114 258

3 Industrial Area(W/S, CHP, S/S. ,Roads and Railways, Mineral Storage, ETP)

9 121 130

4 Green Belt and Township --- 142 142

5 Safety zone 91 16 107

Page 12: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-12

(Job. No.-6101031)

Total Area Required 844 796 1640

* Final dump plan and cross section showing profile of internal OB dump at the end of mining is shown in Plate No.-5, & 6.

Post-mining land use of core zone with environment management

Sl. No.

Land Use Total Land (Ha)

Post mining land use in Ha

Plantation/ Afforestation

Water Body

Public use

Others

1. Top Soil Top soil will be completely used in reclaimation of OB

Dumps

1 External Waste dump(OB Dump)

258.00 258.00 - - -

2 Excavation area (backfill +void+batter)

1003.00 808.00 39.00

-

156.00 (batter)

3 Residential & Greenbelt 142.00

- 142.00 -

4 Leveled area after decommissioning of Infrastructural structure

130.00 49.00 - 81.00 -

5 Undisturbed Land (Safety zone)

107.00 107.00 - - -

Total 1640.00 1222.00 39.00 223.00 156.00

* Final dump plan and cross section showing profile of internal OB dump at post-mining stage is shown in Plate-7, & 8.

Land use / cover mapping of study area based on Remote Sensing map: A map showing Land use / cover mapping of study area of Khadia OCP based on Resource sat P8 / L IV Remote Sensing map for the 2013, was prepared using remote sensing technique by Geometrics Division (Remote Sensing Cell), CMPDIL, (HQ) Ranchi. The map is given as Plate No.-3. The land use pattern of the core zone area based on the satellite imagery is as under:

AREA STATISTICS

Core Zone

Sl. No. Class of land Sub Class Area

Km2 %

Page 13: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-13

(Job. No.-6101031)

Core Zone

Sl. No. Class of land Sub Class Area

Km2 %

1. Forests

Open forest 1.70 11.40

Total Forest 1.70 11.40

2. Scrubs Scrubs 1.25 9.95

3. Plantation

Social Forestry 3.24 21.73

Plantation on OB dumps 0.66 4.43

Plantation on backfill 1.51 10.13

Total plantation 5.41 36.28

Total vegetation 8.36 57.64

4. Mining area

Active quarry 1.10 7.38

Advance quarry site 0.45 3.02

Coal dump 0.03 0.20

Quarry filled with water 0.16 1.07

Total area under active mining

1.74 11.67

5. Reclaimed area

Barren OB dump 0.70 4.69

Barren backfill 2.40 16.10

Total Area under technical reclamation

3.10 20.79

Total area under mining 4.84 32.46

6. Agriculture

Crop land 0.00 0.00 Fallow land 0.00 0.00

Total agriculture 0.00 0.00

7. Wasteland

Wasteland 0.37 2.48

Fly ash pond 0.00 0.00 Total wasteland 0.37 2.48

8. Settlement

Urban settlement 1.11 7.44

Rural settlement 0.00 0.00 Industrial settlement 0.16 1.07

Total settlement 1.27 8.52

9. Water bodies water body 0.07 0.47

Grand Total 14.91 100

Bio-Environment Conservation at Khadia OCP:

Plantation is being done as per the norms and guidelines of forest department. This helps in enriching the flora and fauna of project area. The density of plantations undertaken is 2500 plants per Ha in plain area and 3500 plants per Ha on OB dumps.

Total no. of saplings planted: 18.95 lakhs (up to Sept.-2014). At present total 45.00 ha area of external dump and 35.00 ha of internal dump technically and biologically reclaimed. Thus, total 80.00 ha of dump area reclaimed technically and biologically.

Species of plantation : Sagaon , Chipal , Sheeesam , Pletafarm , Kachnar , Akesia , Prosopis , JangalJalebi , Ber , Babool , Amala , Karani ,Babul etc. The plantation done on Plain area and OB dump in the Khadia OCP upto Sept.,2014 is given below:

Page 14: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-14

(Job. No.-6101031)

i) On Plain area – 818100 nos. ii) on OB Dump area – 1077805 nos.

Socio-Economic Issues:

The project has given a boost to the economy of the area by providing primary and secondary employment to local people. The infra-structural facilities provided by the project are benefitting local villagers also. The mine closure activity is likely to significantly reduce the impact of industrial activity on the land apart from increasing the green cover and surface water availability. The standard of living of the local inhabitants has improved significantly due to indirect employment and service opportunities.

Resettlement & Rehabilitation of PAPs As per earlier proposals of 10.00 MTPA of Khadia OCP, 569 PAFs were proposed to be rehabilitated. The rehabilitation & resettlement has been completed. There is no issue of R&R in the present proposal.

Corporate Social Responsibility Corporate Social Responsibility (CSR) is taken up at Khadia Project level. Different villages falling in core zone and adjoining areas are benefited through CSR activities run at project level. The nature of benefits include maintenance of ponds and community buildings, well digging and renovation, road repair, renovation of schools and construction of boundary wall, medical camps, water supply, skill development for employment generation etc. The expenditure on CSR activities in Khadia Area in last few years is given below:

Year 2010-11 2011-12 2012-13 2013-14 Proposed 2014-15

Amount Spent (Rs. Lakh)

24.55 11.00 31.82 17.99 250.00

As per the CIL CSR policy of June-2014 , the fund for the CSR should be allocated based on 2% of the average net profit of the company for the three immediate preceding financial years or Rs.2/- per tonne of coal production of previous year whichever is higher. Out of above, 80% would be allocated for CSR activities to be carried out within the radius of 25 Kms of the project site and balance 20% would be allocated for carrying out CSR activities by company in the State to which it belongs. Detail of Last Public Hearing

The last public hearings for approval of 10.00 MTPA project was held on 06.04.2005 Samudaik Bhawan, Waidhan, Singrauli (MP) by MPSPCB and on 18.04.2006 at Collectrate Sabhagar, District Headquarters,Lodhi, Sonebhadra (UP) by UPSPCB. Detail of Public Hearing is enclosed as Annexure No.-V.

5 Analysis of Alternatives

Not applicable, as this is an increase in production capacity by 4.0 MTPA of existing opencast mine.

6 Environmental Monitoring Program

For effective implementation, a time bound action plan for environmental management including all aspects is being followed by the project. Samples for study of ambient air quality, water quality, ground water level and noise level are collected and tested quarterly at strategic places representing all the categories of location. Refer Plate No.2,& 5 for

Page 15: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-15

(Job. No.-6101031)

sampling point location details.

7 Project Benefits

Development of Khadia OCP has considerably improved the socio-economic status of the adjoining areas. This has resulted in following benefits:

Improvements in Physical Infrastructure

Improvements in Social Infrastructure

Increase in Employment Potential

Contribution to the Exchequer

Meet energy requirement

Post-mining Enhancement of Green Cover

8 Environmental Management Plan

Northern Coalfields Limited, the owner of this project has already set-up an Environmental Department headed by a General Manager at its HQs. The cell provides necessary support that is required for Environmental Management of various projects and mines under the jurisdiction of the company.

9 Mine Closure Planning:

Mine closure planning has to be carried out at the starting of the mine and needs periodic reviewing and revision during its life cycle to cope with the geo-technical constraints, safety and economic risks, social & environmental challenges. Various other objectives are as follows:

a) To allow a productive and sustainable after-use of the site that is acceptable to the mine owner and the regulatory authority.

b) To protect public health and safety. c) To alleviate or eliminate environmental damage and thereby encourage environmental

sustainability. d) To minimize adverse socio-economic impacts.

The Mine Closure Plan has been prepared as per the Guidelines approved by the Ministry of Coal, Govt. of India and notified vide communication No. 55011-01-2009-CPAM on dated 27th August, 2009, 8th September,2009, 11th January, 2012, 25th April, 2012 and & 7th January, 2013 and approved by NCL Board on 10-12-2011.. . The mine closure cost has been estimated as Rs 23492.67 lakhs. The depth of the void after filling OB will be about 30 to 40 m. There is provision of Rs. 20828.60 Lakhs in mine closure cost for this purpose. Final reclaimed dump plan and cross section is given in Plate No.-7, 8.

10 Disclosure of Consultants

Environmental baseline data generation at 10.0 Mtpa stage, was done from March, 2004 to Nov, 2005. The detail of consultants employed for different studies is given below:

Page 16: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-16

(Job. No.-6101031)

Sl. No.

Nature of Study Date and duration of study

Name of Agency which has conducted the study

1 Seasonal Ambient Air Quality Study

Oct’04 - Jan’05 M/S PDIL, Sindri, Bihar

2 Soil Quality study Feb’2004 M/S R&C, Chennai.

3 Socio- Economic Study May’05 Census of India 2001 & University Department of

Sociology, Ranchi University

4 Flora & Fauna study Feb’03 University Department of Botany, T.M. Bhagalpur University,

Bhagalpur

5 Ambient Noise Level Study

Q.E Mar’2005 CMPDI

6 Water Quality study Q.E Mar’2005

7 Hydro-geological Study Nov’2006

8 Geology, Mining & economic parameter

Project Report (Updated)-July,2005

9 Groundwater level data for Observation wells

From 1990 to 2003 M.P. State Groundwater Data Centre, Bhopal

11 Cost of Environmental Control Measures (July-2005)

S. No. Particulars Cost (Rs Lakh)

1 Cost of Technical Reclamation 537.00

2 Anti Pollution Measures In Mine & Industrial area 1608.59

3 Anti Pollution Measures In Colony area 513.05

4 Other Provisions 40.00

Total 2698.64

12. Justification for grant of Environmental Clearance

1. The project has already obtained Environmental Clearance for 10.00 Mtpa vide MoEF letter no. J-11015/255/2006-IA-II (M) dated 10th April 2007. The Environmental Clearance letter is given. (Ref.Annx.No-III).

There is no change in mining lease area, mining technology, project economics and other project parameters.

2. There is no Court case pending in any court of law against the Project.

Page 17: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-17

(Job. No.-6101031)

3. There is no Notice given to the project under section 5 of the Environment (Protection) Act. 1986 and section 18 of the Air (Prevention and Control of Pollution) Act, 1981.

4. The 4.0 MTPA increase in production capacity is well within the ceiling of 4.0 Mtpa as specified in MoEF OM No.J-15012/30/2004.IA.II (M) dated 30.05.2014. The total transportation of coal is by conveyor and rail only.

5. This summarised EIA-EMP has been prepared on existing environmental scenario, impact assessment & control measures, disaster management due to increased production. By increasing the capacity of mine from 10.00Mtpa to 14.0 Mtpa, there will be no increase in the pollution load except marginal increase of SPM level which will also be within the permissible limit.

The Project authority is monitoring the Environmental Quality to determine the pollution level and ensuring that Ambient Air, Water & Noise quality is kept within permissible limit.

It is assessed that there will be no increase in the pollution load and the air quality level due to increase in production will be within the prescribed limit.

6. As because there is

No adverse impact on environment is involved.

No additional Resettlement and Rehabilitation is required.

No additional Land acquisition is required.

for the incremental production and all the statutory environmental requirements are complied with, therefore, it is kindly submitted that approval for environmental clearance for 14.00 Mtpa in respect of Khadia OCP of NCL may please be granted.

*************************************************

Page 18: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-18

(Job. No.-6101031)

Table No.-1

AMBIENT AIR QUALITY DATA

Name of the Company : Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Q.E.: March’2014.

Name of the Stations & Code :

1. KHA1- Sub-Station(OB) 2. KHA2- Guest House

3. KHA3- Chilkatand Village 4. KHA4- Old GM Office

1. Station Code/Name: KHA1 –Sub.Station (OB), Category: Industrial.

2. Station Code/Name: KHA2 – Guest House, Category: Residential

Dates of sampling

SPM RPM SO2 NOx

13/14.01.2014 272 90 14 23

29/30.01.2014 209 68 10 18

13/14.02.2014 343 115 17 29

26/27.02.2014 286 95 14 24

14/15.03.2014 428 155 21 36

29/30.03.2014 387 140 19 33

Quarterly Average 321 111 16 27

Permissible Limits 600 300 120 120

Dates of sampling

SPM RPM SO2 NOx

13/14.01.2014 130 41 12 22

29/30.01.2014 147 46 14 25

13/14.02.2014 162 52 15 28

26/27.02.2014 153 49 15 26

Page 19: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-19

(Job. No.-6101031)

Table No.-1

AMBIENT AIR QUALITY DATA 3. Station Code/Name: KHA3 - Chilka Tand Village, Category: Residential.

4. Station Code/Name: KHA4 –Khadia VTC, Category: Industrial.

14/15.03.2014 163 62 15 28

29/30.03.2014 142 55 13 24

Quarterly Average 150 51 14 25

Permissible Limits 200 100 80 80

Dates of sampling

SPM

RPM SO2 NOx

04/05.01.2014 147 46 14 25

20/21.01.2014 159 51 15 27

05/06.02.2014 158 50 15 27

20/21.02.2014 147 46 14 25

05/06.03.2014 154 59 15 26

20/21.03.2014 176 67 17 30

Quarterly Average 157 53 15 27

Permissible Limits 200 100 80 80

Dates of sampling

SPM RPM SO2 NOx

13/14.01.2014 432 146 22 37

29/30.01.2014 416 141 21 35

13/14.02.2014 386 130 19 33

26/27.02.2014 426 144 21 36

14/15.03.2014 418 151 21 36

29/30.03.2014 394 143 20 33

Quarterly Average 412 143 21 35

Permissible Limits 600 300 120 120

Page 20: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-20

(Job. No.-6101031)

Note: All values are expressed in microgram per cubic meter unless specified

24 hours duration

Predominant wind direction South – East.

Table No.-1

AMBIENT AIR QUALITY DATA

Annual Average for the Year 2013 - 2014

(From April – 2013 to March – 2014) Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project

Name of the Stations & Code :

1. KHA1- Sub-Station(OB) 2. KHA2- Guest House

3. KHA3- Chilka Tand Village

Page 21: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-21

(Job. No.-6101031)

Total Nos. of Observation at each sampling station is 24 (Fortnightly)

All values are expressed in microgram per cubic meter unless specified.

Table No.-1

AMBIENT AIR QUALITY DATA

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E.: June’2014.

Core Zone

Name of the Stations & Code :

1. KHA1- Sub-Station(OB) 2. KHA2- Coal Testing Lab

3. KHA3- CGM Office 4. KHA4- Khadia STP

1. Station Code/Name: KHA1 –Sub.Station (OB), Category: Industrial.

Station Code/Name : Category SPM RPM SO2 NOx

1. KHA1- Sub-Station(OB) Industrial 283 102 18 28

2. KHA2- Guest House Residential 124 43 15 25

3.KHA3- Chilka Tand Village Residential 126 43 15 25

3.KHA4- Khadia VTC Industrial 340 123 21 33

Annual Average Permissible Limits

Industrial 430 215 80 80

Annual Average Permissible Limits

Residential 140 60 50 40

Dates of sampling

SPM RPM SO2 NOx

Page 22: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-22

(Job. No.-6101031)

2. Station Code/Name: KHA2 – Coal Testing Lab, Category: Industrial.

Table No.-1

AMBIENT AIR QUALITY DATA

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E.: June’2014.

Core Zone

3. Station Code/Name: KHA3 - CGM Office, Category: Residential.

12/13.04.2014 518 280 31 47

29/30.04.2014 392 250 24 35

02/03.05.2014 527 285 32 47

16/17.05.2014 465 297 28 42

13/14.06.2014 570 280 34 51

27/28.06.2014 546 295 33 49

Quarterly Average 503 281 30 45

Permissible Limits 600 300 120 120

Dates of sampling

SPM RPM SO2 NOx

12/13.04.2014 458 293 27 44

29/30.04.2014 384 245 23 36

02/03.05.2014 542 266 33 51

16/17.05.2014 594 292 36 56

13/14.06.2014 368 234 22 35

27/28.06.2014 428 273 26 41

Quarterly Average 462 267 28 44

Permissible Limits 600 300 120 120

Dates of sampling

SPM

RPM SO2 NOx

12/13.04.2014 161 76 19 29

29/30.04.2014 186 88 22 33

02/03.05.2014 188 89 23 34

Page 23: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-23

(Job. No.-6101031)

4. Station Code/Name: KHA4 – Khadia STP, Category: Residential.

Table No.-1

AMBIENT AIR QUALITY DATA

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E.: June’2014.

Buffer Zone

Name of the 1. KHA5- Chilka Tand Village 2. BA3 – Bina STP

16/17.05.2014 170 80 20 31

13/14.06.2014 192 91 23 35

27/28.06.2014 195 93 23 35

Quarterly Average 182 86 22 33

Permissible Limits 200 100 80 80

Dates of sampling

SPM RPM SO2 NOx

12/13.04.2014 186 88 22 33

29/30.04.2014 154 72 18 28

02/03.05.2014 178 84 21 32

16/17.05.2014 156 73 19 28

13/14.06.2014 159 75 19 29

27/28.06.2014 82 48 10 15

Quarterly Average 153 73 18 27

Permissible Limits 200 100 80 80

Page 24: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-24

(Job. No.-6101031)

Stations & Code : 3. CWA2 – Indira Bhawan 4. KSA4 – Kohroul Village

1. Station Code/Name: KHA5- Chilka Tand Village, Category: Residential.

2. Station Code/Name: BA3 – Bina STP, Category: Residential

Table No.-1

AMBIENT AIR QUALITY DATA

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E.: June’2014.

Buffer Zone

3. Station Code/Name: CWA2 – Indira Bhawan, Category: Residential.

Dates of sampling

SPM RPM SO2 NOx

14/15.04.2014 102 61 16 22

29/30.04.2014 115 70 18 25

02/03.05.2014 184 87 29 40

16/07.05.2014 171 81 10 24

12/13.06.2014 150 93 24 33

27/28.06.2014 121 74 19 27

Quarterly Average 141 77 20 29

Permissible Limits 200 100 80 80

Dates of sampling

SPM RPM SO2 NOx

11/12.04.2014 186 88 11 18

26/27.04.2014 184 87 11 17

05/06.05.2014 195 93 12 19

20/21.05.2014 171 89 10 16

12/13.06.2014 168 87 10 16

25/26.06.2014 179 93 11 17

Quarterly Average 181 90 11 17

Permissible Limits 200 100 80 80

Dates of sampling

SPM

RPM SO2 NOx

Page 25: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-25

(Job. No.-6101031)

4. Station Code/Name: KSA4 – Kohroul Village, Category: Residential.

Note: All values are expressed in microgram per cubic meter.

24 hours duration

Predominant wind direction South – East.

Table No.-2

WATER QUALITY DATA (Effluent Water)

Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : January.

Name of the 1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

07/08.04.2014 134 82 21 35

22/23.04.2014 176 83 11 17

09/10.05.2014 97 58 16 25

27/28.05.2014 84 50 13 22

04/05.06.2014 195 93 12 19

21/22.06.2014 171 81 10 16

Quarterly Average 143 74 14 22

Permissible Limits 200 100 80 80

Dates of sampling

SPM RPM SO2 NOx

12/13.04.2014 63 36 14 18

28/29.04.2014 182 86 22 33

03/04.05.2014 194 92 23 35

17/18.05.2014 174 82 21 31

10/11.06.2014 174 82 21 31

25/26.06.2014 158 74 19 28

Quarterly Average 158 75 20 29

Permissible Limits 200 100 80 80

Page 26: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-26

(Job. No.-6101031)

Stations & Code: 3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

03.01.2014 03.01.2014 03.01.2014

1 Total Suspended Solids

258 36 44 100 (Max)

2 pH 7.42 7.76 7.28 5.5 - 9.0

3 Oil & Grease 18 2 1 10 (Max)

4 COD 97 38 52 250 (Max)

5 BOD - - 13 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

18.01.2014 18.01.2014 18.01.2014

1 Total Suspended Solids

274 42 38 100 (Max)

2 pH 7.46 7.78 7.26 5.5 - 9.0

3 Oil & Grease 16 2 1 10 (Max)

4 COD 93 39 58 250 (Max)

5 BOD - - 14 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

WATER QUALITY DATA

(Effluent Water) Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : February.

Page 27: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-27

(Job. No.-6101031)

Name of the

Stations & Code:

1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

04.02.2014 04.02.2014 04.02.2014

1 Total Suspended Solids

322 42 36 100 (Max)

2 pH 7.41 7.72 7.29 5.5 - 9.0

3 Oil & Grease 18 3 1 10 (Max)

4 COD 98 37 61 250 (Max)

5 BOD - - 15 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

19.02.2014 19.02.2014 19.02.2014

1 Total Suspended Solids

286 32 28 100 (Max)

2 pH 7.47 7.71 7.31 5.5 - 9.0

3 Oil & Grease 16 2 1 10 (Max)

4 COD 94 36 51 250 (Max)

5 BOD - - 13 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

WATER QUALITY DATA

(Effluent Water)

Name of the Company : Northern Coalfield Limited Year : 2013-14. Name of the Project : Khadia Opencast Project Month. : March.

Page 28: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-28

(Job. No.-6101031)

Name of the

Stations & Code:

1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

04.03.2014 04.03.2014 04.03.2014

1 Total Suspended Solids

358 44 36 100 (Max)

2 pH 7.45 7.72 7.27 5.5 - 9.0

3 Oil & Grease 18 3 1 10 (Max)

4 COD 98 41 54 250 (Max)

5 BOD - - 13 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

20.03.2014 20.03.2014 20.03.2014

1 Total Suspended Solids

268 26 22 100 (Max)

2 pH 7.45 7.78 7.22 5.5 - 9.0

3 Oil & Grease 14 2 1 10 (Max)

4 COD 97 33 58 250 (Max)

5 BOD - - 15 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

WATER QUALITY DATA

(Drinking Water)

Page 29: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-29

(Job. No.-6101031)

Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : January.

Name of the Stations& Code :

1. KHW4- Tap Water- Drinking Water IWSS

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

03.01.2014

1. Dissolved Solids 24 500 (Max)

2. pH 7.26 6.5 – 8.5

3. Fluoride 0.18 1 (Max)

4. Turbidity, NTU 2 5 (Max)

5 Residual Free Chlorine 0.14 0.2 (Min)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

18.01.2014

1. Dissolved Solids 18 500 (Max)

2. pH 7.26 6.5 – 8.5

3. Fluoride 0.16 1 (Max)

4. Turbidity, NTU 3 5 (Max)

5 Residual Free Chlorine 0.11 0.2 (Min)

All values are expressed in mg/lit unless specified.

Table No.-2

WATER QUALITY DATA

(Drinking Water)

Page 30: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-30

(Job. No.-6101031)

Name of the Company : Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : February.

Name of the Stations & Code:

1. KHW4- Tap Water- Drinking Water IWSS

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

04.02.2014

1. Dissolved Solids

Results are included in all parameters for drinking

water for Q.E. March, 2014 given separately

500 (Max)

2. pH 6.5 – 8.5

3. Fluoride 1 (Max)

4. Turbidity, NTU 5 (Max)

5 Residual Free Chlorine 0.2 (Min)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

19.02.2014

1. Dissolved Solids 24 500 (Max)

2. pH 7.24 6.5 – 8.5

3. Fluoride 0.19 1 (Max)

4. Turbidity, NTU 2 5 (Max)

5 Residual Free Chlorine 0.12 0.2 (Min)

All values are expressed in mg/lit unless specified.

Table No.-2

WATER QUALITY DATA

Page 31: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-31

(Job. No.-6101031)

(Drinking Water)

Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : March.

Name of the Stations& Code :

1. KHW4- Tap Water- Drinking Water IWSS

I. First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

04.03.2014

1. Dissolved Solids 28 500 (Max)

2. pH 7.28 6.5 – 8.5

3. Fluoride 0.14 1 (Max)

4. Turbidity, NTU 3 5 (Max)

5 Residual Free Chlorine 0.16 0.2 (Min)

II. Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500

Drinking water Standard)

KHW4 Tap water

20.03.2014

1. Dissolved Solids 22 500 (Max)

2. pH 7.29 6.5 – 8.5

3. Fluoride 0.18 1 (Max)

4. Turbidity, NTU 2 5 (Max)

5 Residual Free Chlorine 0.10 0.2 (Min)

All values are expressed in mg/lit unless specified.

Table No.-2

WATER QUALITY DATA

Page 32: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-32

(Job. No.-6101031)

(Drinking Water)

Name of the Company : Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Q.E. : March, 2014

Name of the Stations & Code:

1. KHW4- Tap Water- Drinking Water IWSS

Sl. No.

Parameters

Sampling station & sampling date Tolerance Limit (As per IS-10500 Drinking

water Standard) KHW4

(Tap water received from IWSS )

04.02.2014

1 Colour , Hazen Unit. 8 5 (Max)

2 Odour Unobjectionable Unobjectionable

3 Taste Agreeable Agreeable

4 Turbidity, NTU 3 5 (Max)

5 pH Value 7.29 6.5 - 8.5

6 Total Hardness 28 300 (Max)

7 Iron BDL (<0.05) 0.3 (Max)

8 Chlorides 3.2 250 (Max)

9 Residual Free Chlorine 0.12 0.2 (Min)

10 Dissolved Solids 24 500 (Max)

11 Calcium 16.0 75 (Max)

12 Sulphate 12 200 (Max)

13 Nitrate 1.0 45 (Max)

14 Fluoride 0..19 1 (Max)

15 Phenolics BDL (<0.001) 0.001 (Max)

16 Alkalinity 48 200 (Max)

17 Hexavalent Chromium BDL (<0.01) 0.05 (Max)

18 Boron BDL (<0.01) 1(Max)

19 Copper BDL (<0.02) 0.05 (Max)

20 Manganese BDL (<0.05) 0.1 (Max)

21 Arsenic BDL (<0.01) 0.05 (Max)

22 Selenium BDL (<0.01) 0.01 (Max)

23 Lead BDL (<0.05) 0.05 (Max)

24 Zinc 0.15 5 (Max)

All values are expressed in mg/lit unless specified

Table No.-2

WATER QUALITY (EFFLUENT WATER)

Page 33: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-33

(Job. No.-6101031)

Name of the Company : Northern Coalfield Limited Year: 2013 -14 PROJECT : Khadia OCP PERIOD: APRIL, 2013- MARCH, 2014. SAMPLE CODE: KHW1 - Inlet of ETP KHW2 - Outlet from ETP KHW3 - Outlet from STP ALL VALUES ARE EXPRESSED IN mg/l UNLESS SPECIFIED

Sl.No.

Parameters KHW1 (Inlet of ETP)

KHW2 (Outlet from

ETP)

KHW3 (Outlet from

STP )

As per MOEF Gazette Notification No. GSR 742(E) dt

25.09.2000 Standards for Coal

Mines

Date of Sampling 05.11.2013 05.11.2013 05.11.2013

1 Colour & Odour Acceptable Acceptable Acceptable Acceptable

2 Total Suspended Solids 238 28 22 100

3 pH 7.38 7.74 7.29 5.5 - 9.0

4 Temperature (oC) 13.8 14.2 14.6 Shall not exceed 5 oC above the receiving

temp.

5 Oil & Grease 19 3 1 10

6 Total Residual Chlorine BDL (<0.04 ) BDL (<0.04 ) BDL (<0.04 ) 1

7 Ammonical Nitrogen BDL (<0.02 ) BDL (<0.02 ) BDL (<0.02 ) 50

8 Free Ammonia BDL (<0.02 ) BDL (<0.02 ) BDL (<0.02 ) 5

9 BOD ( 3 days 27 oC) 34 22 18 30

10 COD 106 74 81 250

11 Hexavalent Chromium BDL (<0.01 ) BDL (<0.01 ) BDL (<0.01 ) 0.1

12 Fluorides 0.18 0.08 0.14 2

13 Dissolved Phosphate 0.54 0.26 0.38 5

14 Sulphide 0.32 0.24 0.36 2

15 Phenolics Compounds BDL (<0.001 ) BDL (<0.001 ) BDL (<0.001 ) 1

16 Iron BDL (<0.05 ) BDL (<0.05 ) BDL (<0.05 ) 3

17 Nitrate Nitrogen 4.6 3.8 4.4 10

18 Arsenic BDL (<0.01 ) BDL (<0.01 ) BDL (<0.01 ) 0.2

19 Lead BDL (<0.05 ) BDL (<0.05 ) BDL (<0.05 ) 0.1

20 Total Chromium BDL (<0.1 ) BDL (<0.1 ) BDL (<0.1 ) 2

21 Copper BDL (<0.02 ) BDL (<0.02 ) BDL (<0.02 ) 3

22 Zinc 0.08 0.04 0.03 5

23 Selenium BDL (<0.01 ) BDL (<0.01 ) BDL (<0.01 ) 0.05

24 Nickel BDL (<0.1 ) BDL (<0.1 ) BDL (<0.1 ) 3

25 Manganese 0.26 0.08 0.09 2

26 Total Kjeldahl Nitrogen 7.6 4.8 5.4 100

Table No.-2

Page 34: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-34

(Job. No.-6101031)

WATER QUALITY DATA (Effluent Water)

Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : April.

Name of the

Stations & Code:

1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

03.04.2014 03.04.2014 03.04.2014

1 Total Suspended Solids 458 36 28 100 (Max)

2 pH 7.36 7.98 7.26 5.5 - 9.0

3 Oil & Grease 22 3 1 10 (Max)

4 COD 93 37 42 250 (Max)

5 BOD - - 17 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

18.04.2014 18.04.2014 18.04.2014

1 Total Suspended Solids 386 34 26 100 (Max)

2 pH 7.38 8.05 7.22 5.5 - 9.0

3 Oil & Grease 18 2 1 10 (Max)

4 COD 84 33 34 250 (Max)

5 BOD - - 18 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

Page 35: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-35

(Job. No.-6101031)

WATER QUALITY DATA

(Effluent Water) Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : May.

Name of the

Stations & Code:

1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

15.05.2014 15.05.2014 15.05.2014

1 Total Suspended Solids 386 31 38 100 (Max)

2 pH 7.46 8.12 7.32 5.5 - 9.0

3 Oil & Grease 22 4 1 10 (Max)

4 COD 93 41 55 250 (Max)

5 BOD - - 21 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

20.05.2014 20.05.2014 20.05.2014

1 Total Suspended Solids 378 28 34 100 (Max)

2 pH 7.44 8.16 7.28 5.5 - 9.0

3 Oil & Grease 18 3 1 10 (Max)

4 COD 96 33 46 250 (Max)

5 BOD - - 18 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

Page 36: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-36

(Job. No.-6101031)

WATER QUALITY DATA

(Effluent Water)

Name of the Company : Northern Coalfield Limited Year : 2014-15. Name of the Project : Khadia Opencast Project Month. : June.

Name of the

Stations & Code:

1. KHW1- Inlet of ETP 2. KHW2- Outlet of ETP

3. KHW3- Outlet of STP

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

04.06.2014 04.06.2014 04.06.2014

1 Total Suspended Solids 428 28 22 100 (Max)

2 pH 7.38 8.16 7.24 5.5 - 9.0

3 Oil & Grease 22 2 1 10 (Max)

4 COD 94 39 46 250 (Max)

5 BOD - - 17 30 (Max)

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

* Limit KHW1 (Inlet of ETP )

KHW2 (Outlet of

ETP )

KHW3 (Outlet of

STP )

18.06.2014 18.06.2014 18.06.2014

1 Total Suspended Solids 378 34 29 100 (Max)

2 pH 7.42 8.06 7.28 5.5 - 9.0

3 Oil & Grease 18 3 1 10 (Max)

4 COD 89 39 44 250 (Max)

5 BOD - - 18 30 (Max)

All values are expressed in mg/lit unless specified.

* Limits - As per MOEF Gazette Notification No. GSR 742(E) dt. 25.09.2000 Std. for Coal mines

Table No.-2

Page 37: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-37

(Job. No.-6101031)

WATER QUALITY DATA

(Drinking Water)

Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : April.

Name of the Stations& Code :

1. KHW4- Tap Water- Drinking Water IWSS

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

03.04.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid 82 500 2000

2 pH 7.46 6.5 – 8.5 No relaxation

3 Fluoride 0.16 1.0 1.5

4 Turbidity, NTU 3 1 5

5 Residual Free Chlorine 0.11 0.2 1

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

18.04.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid 94 500 2000

2 pH 7.46 6.5 – 8.5 No relaxation

3 Fluoride 0.21 1.0 1.5

4 Turbidity, NTU 4 1 5

5 Residual Free Chlorine 0.12 0.2 1

All values are expressed in mg/lit unless specified.

Page 38: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-38

(Job. No.-6101031)

Table No.-2

WATER QUALITY DATA

(Drinking Water)

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : May.

Name of the Stations & Code:

1. KHW4- Tap Water- Drinking Water IWSS

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

15.05.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid Results are included in all parameters for drinking water for Q.E. June,2014 given separately

500 2000

2 pH 6.5 – 8.5 No relaxation

3 Fluoride 1.0 1.5

4 Turbidity, NTU 1 5

5 Residual Free Chlorine 0.2 1

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

20.05.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid 76 500 2000

2 pH 7.59 6.5 – 8.5 No relaxation

3 Fluoride 0.16 1.0 1.5

4 Turbidity, NTU 3 1 5

5 Residual Free Chlorine 0.11 0.2 1

All values are expressed in mg/lit unless specified.

Page 39: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-39

(Job. No.-6101031)

Table No.-2

WATER QUALITY DATA

(Drinking Water)

Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : June.

Name of the Stations& Code :

1. KHW4- Tap Water- Drinking Water IWSS

First Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

04.06.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid 86 500 2000

2 pH 7.41 6.5 – 8.5 No relaxation

3 Fluoride 0.18 1.0 1.5

4 Turbidity, NTU 4 1 5

5 Residual Free Chlorine 0.14 0.2 1

Second Fortnight data

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

18.06.2014

Requirement (

Acceptable Limit)

Permissible Limit in the absence of Alternate Source

1 Dissolved Solid 84 500 2000

2 pH 7.56 6.5 – 8.5 No relaxation

3 Fluoride 0.21 1.0 1.5

4 Turbidity, NTU 3 1 5

5 Residual Free Chlorine 0.11 0.2 1

All values are expressed in mg/lit unless specified.

Page 40: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-40

(Job. No.-6101031)

Table No.-2

WATER QUALITY DATA

(Drinking Water)

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E. : June, 2014

Name of the Stations& Code :

1. KHW4- Tap Water- Drinking Water IWSS

Sl. No.

Parameters

Sampling station & sampling date

Tolerance Limit (As per IS-10500/2012 for Drinking water Standard) KHW4 Tap water

15.05.2014 Requirement ( Acceptable

Limit)

Permissible Limit in the absence of Alternate Source

1 Colour , Hazen Unit. 11 5 15

2 Odour Agreeable Agreeable Agreeable

3 Taste Agreeable Agreeable Agreeable

4 Turbidity, NTU 3 1 5

5 pH Value 7.68 6.5 – 8.5 No relaxation

6 Total Hardness 72 200 600

7 Iron 0.04 0.3 No relaxation

8 Chlorides 18 250 1000

9 Residual Free Chlorine

0.11 0.2 1

10 Dissolved Solids 82 500 2000

11 Calcium 22 75 200

12 Sulphate 108 200 400

13 Nitrate 3.6 45 No relaxation

14 Fluoride 0.18 1.0 1.5

15 Phenolics BDL (<0.001) 0.001 0.002

16 Alkalinity 64 200 600

17 Hexavalent Chromium BDL (<0.01) 0.05 No relaxation

18 Boron BDL (<0.01) 0.5 1.0

19 Copper BDL (<0.02) 0.05 1.5

20 Manganese BDL (<0.05) 0.1 0.3

21 Arsenic BDL (<0.01) 0.01 0.05

22 Selenium BDL (<0.01) 0.01 No relaxation

23 Lead BDL (<0.01) 0.01 No relaxation

24 Zinc BDL (<0.02) 5 15

25 Mercury BDL (<0.001) 0.001 No relaxation

Page 41: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-41

(Job. No.-6101031)

All values are expressed in mg/lit unless specified

Table No.-3

NOISE LEVEL DATA Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : January.

Name of the Stations & Code:

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 4. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

14.01.2014 Day 10.40 o 11.40 68.7 75

04.01.2014 Night 00.10 to 01.10 49.2 70

2. O/B Work Shop KHN2

Industrial area

14.01.2014 Day 12.00 to 13.00 71.6 75

04.01.2014 Night 23.05 to 00.05 49.8 70

3. Coal Work Shop KHN3

Industrial area

14.01.2014 Day 09.30 to 10.30 64.2 75

04.01.2014 Night 01.15 to 02.15 43.8 70

4. Colony KHN4

Residential area

14.01.2014 Day 08.00 to 09.00 47.5 55

04.01.2014 Night 22.00 to 23.00 41.2 45

Second Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

29.01.2014 Day 08.30 to 09.30 63.7 75

20.01.2014 Night 00.10 to 01.10 44.8 70

2. O/B Work Shop KHN2

Industrial area

29.01.2014 Day 11.00 to 12.00 69.2 75

20.01.2014 Night 23.05 to 00.05 48.7 70

3. Coal Work Shop KHN3

Industrial area

29.01.2014 Day 09.40 to 10.40 63.4 75

20.01.2014 Night 01.20 to 02.20 41.6 70

4. Colony KHN4

Residential area

29.01.2014 Day 12.30 to 13.30 48.5 55

20.01.2014 Night 22.00 to 23.00 39.7 45

+ Day Time: 6.00 AM to 10.00 PM, +Night Time : 10.00 PM to 6.00 AM.

Page 42: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-42

(Job. No.-6101031)

*Permissible limits of Noise Level as per Pollution Control Act

Table No.-3

NOISE LEVEL DATA

Name of the Company: Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : February.

Name of the Stations & Code:

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 4. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

14.02.2014 Day 09.20 to 10.20 62.8 75

05.02.2014 Night 00.10 to 01.10 45.6 70

2. O/B Work Shop KHN2

Industrial area

14.02.2014 Day 08.00 to 09.00 59.8 75

05.02.2014 Night 23.05 to 00.05 48.7 70

3. Coal Work Shop KHN3

Industrial area

14.02.2014 Day 10.30 to 11.30 67.3 75

05.02.2014 Night 01.15 to 02.15 41.6 70

4. Colony KHN4

Residential area

14.02.2014 Day 11.50 to 12.50 52.4 55

05.02.2014 Night 22.00 to 23.00 41.7 45

Second Fortnight data

Sl. No.

Station

Name/Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

19.02.2014 Day 09.30 to 10.30 69.4 75

20.02.2014 Night 00.10 to 01.10 39.6 70

2. O/B Work Shop KHN2

Industrial area

19.02.2014 Day 12.00 to 13.00 72.8 75

20.02.2014 Night 23.05 to 00.05 51.3 70

3. Coal Work Shop KHN3

Industrial area

19.02.2014 Day 10.40 to 11.40 72.8 75

20.02.2014 Night 01.15 to 02.15 41.5 70

4. Colony KHN4

Residential area

19.02.2014 Day 08.00 to 09.00 43.6 55

20.02.2014 Night 22.00 to 23.00 38.5 45

+ Day Time: 6.00 AM to 10.00 PM, +Night Time: 10.00 PM to 6.00 AM.

Page 43: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-43

(Job. No.-6101031)

*Permissible limits of Noise Level as per Pollution Control Act

Table No.-3

NOISE LEVEL DATA Name of the Company : Northern Coalfield Limited Year : 2013-14.

Name of the Project : Khadia Opencast Project Month. : March.

Name of the Stations & Code :

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 3. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible

Limit of Noise level in

dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A) LEQ

1. Mine Site KHN1

Industrial area

14.03.2014 Day 10.30 to 11.30 71.6 75

05.03.2014 Night 00.10 to 01.10 42.5 70

2. O/B Work Shop KHN2

Industrial area

14.03.2014 Day 08.00 to 09.00 63.4 75

05.03.2014 Night 23.05 to 00.05 48.7 70

3. Coal Work Shop KHN3

Industrial area

14.03.2014 Day 09.20 to 10.20 65.8 75

05.03.2014 Night 01.15 to 02.15 44.6 70

4. Colony KHN4

Residential area

14.03.2014 Day 11.50 to 12.50 51.9 55

05.03.2014 Night 22.00 to 23.00 42.3 45

Second Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible

Limit of Noise level in

dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A) LEQ

1. Mine Site KHN1

Industrial area

31.03.2014 Day 09.40 to 10.40 68.7 75

21.03.2014 Night 00.10 to 01.10 48.2 70

2. O/B Work Shop KHN2

Industrial area

31.03.2014 Day 11.00 to 12.00 69.3 75

21.03.2014 Night 23.05 to 00.05 51.6 70

3. Coal Work Shop KHN3

Industrial area

31.03.2014 Day 08.30 to 09.30 58.3 75

21.03.2014 Night 01.15 to 02.15 38.7 70

4. Colony KHN4

Residential area

31.03.2014 Day 12.30 to 13.30 51.6 55

21.03.2014 Night 22.00 to 23.00 42.4 45

Page 44: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-44

(Job. No.-6101031)

+ Day Time: 6.00 AM to 10.00 PM, +Night Time: 10.00 PM to 6.00 AM. *Permissible limits of Noise Level as per Pollution Control Act

Table No.-3

NOISE LEVEL DATA

Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : April.

Name of the Stations & Code:

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 4. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

15.04.2014 Day 11.30 to 12.30 54.8 75

14.04.2014 Night 00.20 to 01.20 52.1 70

2. O/B Work Shop KHN2

Industrial area

15.04.2014 Day 08.35 to 09.35 60.4 75

14.04.2014 Night 23.10 to 00.10 50.6 70

3. Coal Work Shop KHN3

Industrial area

15.04.2014 Day 09.40 to 10.40 65.7 75

14.04.2014 Night 01.15 to 02.15 54.2 70

4. Colony KHN4

Residential area

15.04.2014 Day 07.30 to 08.30 45.6 55

14.04.2014 Night 22.00 to 23.00 40.6 45

Second Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

28.04.2014 Day 10.00 to 11.00 58.7 75

29.04.2014 Night 00.15 to 01.15 52.1 70

2. O/B Work Shop KHN2

Industrial area

28.04.2014 Day 08.50 to 09.50 60.4 75

29.04.2014 Night 23.10 to 00.10 50.6 70

3. Coal Work Shop KHN3

Industrial area

28.04.2014 Day 11.15 to 12.15 57.3 75

29.04.2014 Night 01.20 to 02.20 54.3 70

4. Colony KHN4

Residential area

28.04.2014 Day 07.40 to 08.40 44.2 55

29.04.2014 Night 22.00 to 23.00 42.8 45

+ Day Time: 6.00 AM to 10.00 PM, +Night Time: 10.00 PM to 6.00 AM.

Page 45: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-45

(Job. No.-6101031)

*Permissible limits of Noise Level as per Pollution Control Act

Table No.-3

NOISE LEVEL DATA

Name of the Company: Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : May.

Name of the Stations & Code:

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 4. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

02.05.2014 Day 10.00 to 11.00 54.3 75

03.05.2014 Night 00.15 to 01.15 48.7 70

2. O/B Work Shop KHN2

Industrial area

02.05.2014 Day 08.45 to 09.45 62.8 75

03.05.2014 Night 23.10 to 00.10 44.3 70

3. Coal Work Shop KHN3

Industrial area

02.05.2014 Day 11.15 to 12.15 58.2 75

03.05.2014 Night 01.20 to 02.20 54.2 70

4. Colony KHN4

Residential area

02.05.2014 Day 07.40 to 08.40 44.3 55

03.05.2014 Night 22.00 to 23.00 40.7 45

Second Fortnight data

Sl. No.

Station

Name/Code

Category of

area

Measurement Details *Permissible Limit of Noise

level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A)LEQ

1. Mine Site KHN1

Industrial area

17.05.2014 Day 10.00 to 11.00 66.2 75

16.05.2014 Night 00.15 to 01.15 50.3 70

2. O/B Work Shop KHN2

Industrial area

17.05.2014 Day 08.40 to 09.40 69.4 75

16.05.2014 Night 23.10 to 00.10 48.7 70

3. Coal Work Shop KHN3

Industrial area

17.05.2014 Day 11.10 to 12.10 57.5 75

16.05.2014 Night 01.25 to 02.25 51.6 70

4. Colony Residential 17.05.2014 Day 07.40 to 08.40 46.1 55

Page 46: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-46

(Job. No.-6101031)

KHN4 area 16.05.2014 Night 22.00 to 23.00 38.6 45

+ Day Time: 6.00 AM to 10.00 PM, +Night Time : 10.00 PM to 6.00 AM. *Permissible limits of Noise Level as per Pollution Control Act

Table No.-3

NOISE LEVEL DATA Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Month. : June.

Name of the Stations & Code :

1. KHN1- Mine Site 2. KHN2- O/B Workshop

3. KHN3- Coal Workshop 3. KHN4- Colony

First Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible Limit of Noise level in dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A) LEQ

1. Mine Site KHN1

Industrial area

13.06.2014 Day 10.00 to 11.00 57.5 75

12.06.2014 Night 00.10 to 01.10 48.7 70

2. O/B Work Shop KHN2

Industrial area

13.06.2014 Day 08.45 to 09.45 60.2 75

12.06.2014 Night 23.05 to 00.05 46.2 70

3. Coal Work Shop KHN3

Industrial area

13.06.2014 Day 11.15 to 12.15 63.4 75

12.06.2014 Night 01.15 to 02.15 52.3 70

4. Colony KHN4

Residential area

13.06.2014 Day 07.40 to 08.40 43.2 55

12.06.2014 Night 22.00 to 23.00 42.3 45

Second Fortnight data

Sl. No.

Station Name/ Code

Category of

area

Measurement Details *Permissible

Limit of Noise level in

dB(A)

Date

Time +Day/ Night

Duration (In Hrs.)

Noise level dB(A) LEQ

1. Mine Site KHN1

Industrial area

28.06.2014 Day 10.00 to 11.00 57.2 75

27.06.2014 Night 00.10 to 01.10 47.2 70

2. O/B Work Shop KHN2

Industrial area

28.06.2014 Day 08.50 to 09.50 62.8 75

27.06.2014 Night 23.05 to 00.05 45.6 70

3. Coal Work Shop KHN3

Industrial area

28.06.2014 Day 11.30 to 12.30 65.2 75

27.06.2014 Night 01.20 to 02.20 48.2 70

4. Colony Residential 28.06.2014 Day 07.40 to 08.40 45.6 55

Page 47: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-47

(Job. No.-6101031)

KHN4 area 27.06.2014 Night 22.00 to 23.00 40.5 45

+ Day Time: 6.00 AM to 10.00 PM, +Night Time: 10.00 PM to 6.00 AM.

*Permissible limits of Noise Level as per Pollution Control Act

Table No.-4

Dug Well Inventory and Water Level Details - KHADIA PROJECT

S.

No.

Well No.

M.P. T.D. Dia. R.L. Geology Use

Village Owner (m.agl) (m.bgl) (m) of M.P.

1 J-1 Pipralal S.P.Tiwari 0.33 9.03 1.64 293.35 Talchir Domestic

2 J-2 Jaitpur Ram Kumar Sahu 0.20 5.56 1.50 292.02 Barakar sst Domestic

3 J-3 Sarswa Raja Nand Lal Kushwaha

0.78 10.05 1.23 294.33 Barakar sst Domestic

4 J-14A* Merhauli Dewan Waisya G.L 12.69 4.11 384.00 Barakar sst Domestic

5 J-15 Motwani Dam NCL G.L 9.18 3.33 303.86 Barakar sst Domestic

6 KD-2 Kota Basti NPCC 0.73 6.78 2.75 275.00 Barakar sst Domestic

7 KD-3A Khadia Basti 0.21 5.88 1.25 NA Barakar sst Domestic

8 KD-4A Khadia Market 0.36 6.33 2.89 NA Barakar sst Domestic

9 KD-5 Bhairwan Krishna Kanti Pandey

0.30 13.00 1.37 273.06 Barakar sst Domestic

10 KD-6A* Khadia DAV NCL 0.47 8.90 2.47 NA Barakar sst Domestic

11 KD-7 Khadia Sitaram Sahu 0.57 6.14 1.50 273.30 Barakar sst Domestic

12 KD-8 Chilka Dand Kanti Chaube 0.00 12.60 1.45 284.55 Barakar sst Domestic

13 KD-10 Chilkatand NCL 0.62 6.65 2.57 290.97 Barakar sst Domestic

14 B-4A* Gharsari NCL 1.03 13.52 2.98 NA Talchirs Domestic

15 B-5 Basi Kaustryalya Yadav 0.47 10.30 2.98 271.13 Talchirs Domestic

16 K-1 Audi Mode Abdul Kayyum Khan

0.58 14.83 1.14 295.11 Archaeans Domestic

17 K-5 Kakri GM Office

Gulab Chand Chamar

0.74 13.75 1.28 276.32 Talchir Domestic

18 D-1 Chatka Basti Ram Lalu 0.48 9.55 1.88 365.16 Barakar sst Domestic

19 D-2 Panjreh Lalbhadur 1.09 15.94 1.74 375.32 Barakar sst Domestic

20 D-3 Jadutand Syam Sunder Sahu

G.L 17.84 2.04 389.98 Barakar sst Domestic

21 D-4 Mirchaghar Shabhapati G.L 13.75 2.00 383.37 Barakar sst Domestic

22 JH-2 Jhingurdah Roshan Singh 0.90 8.00 2.75 350.19 Barakar sst Domestic

23 JH-9 Chandrapur NCL 0.29 9.76 2.99 357.66 Barakar sst Domestic

24 JH-10 Jhingurdah Tola Gohbar Singh

0.46 5.14 1.63 381.96 Archaeans Domestic

25 JH-11 Morwa/CETI S.P. Dwedi 0.31 14.33 1.30 378.79 Barakar sst Domestic

26 JH-18 Khanhana Tola Maheshwari Prasad

0.26 9.26 2.20 365.53 Archaeans Domestic

27 JH-19 Bichhari Laxman Lohar G.L 3.63 2.32 279.76 Archaeans Domestic

28 G-1 Morwa Madan Singh 0.90 7.50 3.04 357.75 Barakar sst Domestic

Page 48: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-48

(Job. No.-6101031)

29 N-21 CMPDI colony RI-VI 0.74 6.37 2.27 305.20 Barakar sst Domestic

30 N-23A* Budhwa Tola 0.48 14.89 2.72 NA Barakar sst Domestic

M.P. = Measuring Point

Dia. = Diameter NA=Not Available

*Note: New dugwells included for monitoring. agl = Above Ground Level

T.D. = Total Depth R.L. = Reduced Level Above MSL bgl = Below Ground Level

Table No.-4 Dug Well Inventory and Water Level (in meters) Details - KHADIA PROJECT

S.No. Well No.

Post-monsoon Winter

Pre-monsoon Monsoon

Post-monsoon Winter

Pre-monsoon Monsoon

Nov'12 Feb'13 May'13 Aug'13 Nov'13 Jan'14 April'14 Aug'14

1 J-1 3.10 4.67 5.71 4.49 2.89 3.89 5.65 5.23

2 J-2 2.42 3.43 4.23 2.26 2.21 2.84 3.97 3.02

3 J-3 3.87 5.29 5.72 4.38 2.84 3.84 4.58 4.44

4 J-14A* NA NA NA NA NA 5.18 5.74 6.42

5 J-15 2.42 2.68 3.65 3.52 1.50 2.43 2.97 2.86

6 KD-2 2.42 2.57 2.78 1.68 1.34 1.81 2.01 2.27

7 KD-3A NA NA NA NA 3.34 3.48 4.34 4.45

8 KD-4A NA NA NA NA 4.52 3.90 4.30 4.60

9 KD-5 2.82 3.50 4.12 1.75 2.58 3.28 3.53 4.23

10 KD-6A* NA NA NA NA 3.12 3.50 3.37 3.44

11 KD-7 1.46 1.55 2.1 0.68 0.91 0.85 1.25 1.13

12 KD-8 4.05 4.13 4.62 3.60 4.04 4.05 4.30 4.35

13 KD-10 3.04 3.19 3.9 3.00 2.63 2.55 2.68 2.88

14 B-4A* NA NA NA NA NA 6.48 7.21 8.01

15 B-5 5.74 6.08 6.72 5.87 5.75 5.72 6.12 6.24

16 K-1 9.22 10.62 11.76 10.70 9.35 9.97 11.04 12.12

17 K-5 9.70 10.05 11.2 10.74 9.90 10.65 11.04 11.58

18 D-1 5.86 8.14 8.5 8.25 4.73 5.98 NA 7.02

19 D-2 12.07 12.85 13.18 13.32 11.06 11.50 12.24 12.71

20 D-3 13.32 14.45 NA 6.46 14.03 12.15 NA NA

21 D-4 6.07 9.85 10.03 9.36 NA 9.17 9.50 9.83

22 JH-2 2.24 4.00 6.44 3.10 1.44 3.07 4.52 6.31

23 JH-9 2.35 3.38 4.86 4.24 1.67 2.58 3.07 4.07

24 JH-10 1.05 1.21 2.03 1.41 0.76 0.65 1.31 1.64

25 JH-11 9.95 10.43 11.26 11.77 10.24 10.47 11.23 12.27

26 JH-18 3.70 5.18 6.66 5.80 3.11 4.50 5.71 7.82

27 JH-19 1.26 1.30 1.51 1.16 1.44 1.40 1.65 1.67

28 G-1 2.26 3.25 3.58 1.52 0.83 3.21 4.43 6.12

29 N-21 1.86 1.84 2.72 2.26 0.84 0.85 1.67 1.37

30 N-23A* NA NA NA NA NA 11.25 12.46 13.16

NA=Not Available

*Note: New dugwells included for monitoring.

Page 49: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-49

(Job. No.-6101031)

Table No.-4

WATER QUALITY DATA (FOR GROUND WATER MONITORING)

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E. : June’14

Name of the Stations & Code :

6. Kota Basti, NPCC KD - 2

7. Khadia Basti, KD – 3A

8. Khadia Market, KD – 4A

Sl. No.

Parameters 6 7 8 Tolerance Limit

(As per IS-10500/2012 for Drinking water Standard)

Date of Sampling 21.04.2014 21.04.2014 21.04.2014 Requirement ( Acceptable

Limit)

Permissible Limit in the absence of Alternate Source

1 Colour , Hazen Unit. 18 16 12 5 15

2 Odour Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity, NTU 11 9 8 1 5

5 pH Value 8.36 9.05 8.31 6.5 – 8.5 No relaxation

6 Total Hardness 164 186 122 200 600

7 Iron 0.11 0.1 0.18 0.3 No relaxation

8 Chlorides 16 22 21 250 1000

9 Dissolved Solids 151 592 240 500 2000

10 Calcium 31.72 26.05 89.46 75 200

11 Sulphate 124 143 154 200 400

12 Nitrate 4.8 7.6 8.2 45 No relaxation

13 Fluoride 0.22 0.18 0.16 1.0 1.5

14 Phenolics BDL (<0.001)

BDL (<0.001)

BDL (<0.001)

0.001 0.002

15 Alkalinity 92 600 164 200 600

16 Hexavalent Chromium BDL (<0.01) BDL (<0.01) BDL (<0.01) 0.05 No relaxation

17 Boron BDL (<0.01) BDL (<0.01) BDL (<0.01) 0.5 1.0

18 Copper 0.02 BDL (<0.02) 0.02 0.05 1.5

19 Manganese BDL (<0.05) BDL (<0.05) BDL (<0.05) 0.1 0.3

20 Arsenic BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 0.05

21 Selenium BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 No relaxation

Page 50: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-50

(Job. No.-6101031)

22 Lead BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 No relaxation

23 Zinc BDL (<0.02) BDL (<0.02) BDL (<0.02) 5 15

24 MPN NIL NIL NIL NIL No relaxation

25 Mercury BDL (<0.001)

BDL (<0.001)

BDL (<0.001)

0.001 No relaxation

All values are expressed in mg/lit unless specified (Except pH)

Table No.-4

WATER QUALITY DATA (FOR GROUND WATER MONITORING)

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E. : June’14

Name of the Stations & Code :

9. Bhairwa, Krishna Kant Pandey KD – 5

10. Khadia DAV, NCL KD – 6A

11. Khadia, Sitaram Sahu KD – 7

Sl. No.

Parameters 9 10 11 Tolerance Limit

(As per IS-10500/2012 for Drinking water Standard)

Date of Sampling 21.04.2014 21.04.2014 21.04.2014 Requirement ( Acceptable

Limit)

Permissible Limit in the absence of Alternate Source

1 Colour , Hazen Unit. 12 16 9 5 15

2 Odour Agreeable Agreeable Agreeable Agreeable Agreeable

3 Taste Agreeable Agreeable Agreeable Agreeable Agreeable

4 Turbidity, NTU 8 6 4 1 5

5 pH Value 8.34 8.12 7.93 6.5 – 8.5 No relaxation

6 Total Hardness 168 184 132 200 600

7 Iron 0.27 0.18 0.17 0.3 No relaxation

8 Chlorides 24 18 12 250 1000

9 Dissolved Solids 681 354 288 500 2000

10 Calcium 92.64 83.0 120.5 75 200

11 Sulphate 148 124 118 200 400

12 Nitrate 8.6 4.3 6.2 45 No relaxation

13 Fluoride 0.21 0.24 0.22 1.0 1.5

14 Phenolics BDL (<0.001)

BDL (<0.001)

BDL (<0.001) 0.001 0.002

15 Alkalinity 312 184 120 200 600

16 Hexavalent Chromium BDL (<0.01) BDL (<0.01) BDL (<0.01) 0.05 No relaxation

17 Boron BDL (<0.01) BDL (<0.01) BDL (<0.01) 0.5 1.0

18 Copper BDL (<0.02) 0.02 BDL (<0.02) 0.05 1.5

19 Manganese BDL (<0.05) BDL (<0.05) BDL (<0.05) 0.1 0.3

20 Arsenic BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 0.05

21 Selenium BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 No relaxation

Page 51: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-51

(Job. No.-6101031)

22 Lead BDL (<0.01)

BDL (<0.01)

BDL (<0.01) 0.01 No relaxation

23 Zinc BDL (<0.02) BDL (<0.02) BDL (<0.02) 5 15

24 MPN NIL NIL NIL NIL No relaxation

25 Mercury

BDL (<0.001)

BDL (<0.001)

BDL (<0.001) 0.001 No relaxation

All values are expressed in mg/lit unless specified (Except pH)

Table No.-4

WATER QUALITY DATA (FOR GROUND WATER MONITORING)

Name of the Company : Northern Coalfield Limited Year : 2014-15.

Name of the Project : Khadia Opencast Project Q.E. : June’14

Name of the Stations & Code :

12. Chilkatand, Kanti Chaube KD – 8

13. Chilkatand, NTPC KD - 10

Sl. No.

Parameters 12 13 Tolerance Limit

(As per IS-10500/2012 for Drinking water Standard)

Date of Sampling 21.04.2014 21.04.2014 Requirement ( Acceptable

Limit)

Permissible Limit in the absence of Alternate Source

1 Colour , Hazen Unit. 19 11 5 15

2 Odour Agreeable Agreeable Agreeable Agreeable

3 Taste Agreeable Agreeable Agreeable Agreeable

4 Turbidity, NTU 11 4 1 5

5 pH Value 8.18 8.14 6.5 – 8.5 No relaxation

6 Total Hardness 168 184 200 600

7 Iron 0.19 0.12 0.3 No relaxation

8 Chlorides 21 26 250 1000

9 Dissolved Solids 200 424 500 2000

10 Calcium 59.9 116 75 200

11 Sulphate 132 124 200 400

12 Nitrate 8.6 4.8 45 No relaxation

13 Fluoride 0.29 0.22 1.0 1.5

14 Phenolics BDL (<0.001)

BDL (<0.001)

0.001 0.002

15 Alkalinity 176 186 200 600

16 Hexavalent Chromium BDL (<0.01) BDL (<0.01) 0.05 No relaxation

17 Boron BDL (<0.01) BDL (<0.01) 0.5 1.0

18 Copper 0.02 BDL (<0.02) 0.05 1.5

19 Manganese 0.08 BDL (<0.05) 0.1 0.3

20 Arsenic BDL (<0.01) BDL (<0.01) 0.01 0.05

Page 52: NORTHERN COALFIELDS LIMITEDenvironmentclearance.nic.in/writereaddata/EIA/13122014T2...NORTHERN COALFIELDS LIMITED November- 2014 Prepared By CMPDI REGIONAL INSTITUTE – VI P.O: Jayant,

CMPDI Annexure No-I ___________________________________________________________________

Summarised EIA-EMP of khadia OCP

__________________________________________________________________ A-52

(Job. No.-6101031)

21 Selenium BDL (<0.01) BDL (<0.01) 0.01 No relaxation

22 Lead BDL (<0.01) BDL (<0.01) 0.01 No relaxation

23 Zinc BDL (<0.02) BDL (<0.02) 5 15

24 MPN NIL NIL NIL No relaxation

25 Mercury

BDL (<0.001)

BDL (<0.001)

0.001 No relaxation

All values are expressed in mg/lit unless specified (Except pH)


Recommended