TABLE OF CONTENTS
Northern Regional Map ................................................. 1
Introduction ................................................................... 2
Northern Expansion 2016 – 2020 ................................... 3
Northern Rehabilitation 2016 – 2020 ............................. 6
NORTHERN HIGHWAYS PROGRAM 2016-2020INTRODUCTION
Creating Jobs and Building a Stronger Ontario
In 2016/17, the Ontario government will be investing more than $2.1 billion to repair and expand provincial highways and bridges. This includes $541 million for Northern Ontario creating or sustaining 5,400 direct and indirect jobs. Improving Ontario's transportation network is part of the government’s plan to strengthen the economy.
2016 Planned Accomplishments Northern Ontario
New highways 71 lane km
New bridges 3
Highways rehabilitated 551 centreline km
Bridges rehabilitated 23
The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
2
NORTHERN EXPANSION 2016 – 2020
NORTHEASTERN ONTARIO EXPANSION 2016-2020†
Hwy Status Location Type of Work
Target Completion
Date
66 Underway Highway Realignment atVirginiatown Realignment 2017
69 Planned North of Hwy 559 northerly Four-lane widening Beyond 2020
69 Planned South of Hwy 7182 northerly 5km Four-lane widening Beyond 2020
69 Planned North Hwy 7182 (Shebeshegong Rd.) northerly, north of Nobel Four-lane widening Beyond 2020
69 Planned South Junction of Hwy 529northerly, Pointe au Baril Four-lane widening Beyond 2020
69 Planned South of North Junction of Hwy 529 northerly, Pointe au Baril Station
Four-lane widening Beyond 2020
69 Planned Hwy 526 northerly, Britt Four-lane widening / New four-lane highway Beyond 2020
69 Underway CNR Realignment, south of Hwy522
Four-lane widening / New four-lane highway 2017
69 Underway North of Hwy 522 northerly,French River Four-lane widening 2020
69 Underway North of Hwy 607 northerly,north of French River Four-lane widening 2016
†The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval,
property acquisition and construction requirements.
3
NORTHEASTERN ONTARIO EXPANSION 2016-2020†
Hwy Status Location Type of Work
Target Completion
Date
69 Planned Hwy 69 Connection to Sudbury SEBypass Four-lane widening Beyond 2020
7182 Underway Hwy 7182 (Shebeshekong Rd.) Reconstruction 2016
†The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval,
property acquisition and construction requirements.
4
NORTHWESTERN ONTARIO EXPANSION 2016-2020† Hwy Status Location Type of Work
Target Completion
Date
11/17 Underway 5.0 km west of Hwy 587 easterly Four-lane widening 2018
11/17 Planned Hwy 587 to Pearl Creek Four-lane widening 2020
11/17 Planned West of Ouimet CPR Overhead to Dorion East Loop Four-lane widening 2019
11/17 Planned Black Sturgeon River westerly to Hwy 582 Four-lane widening Beyond 2020
11/17 Underway Stillwater Creek Nipigon westerly Four-lane widening Beyond 2020
11/17 Planned Black Sturgeon River to Red Rock Four-lane widening 2021
11/17 Underway Nipigon River Bridge and Approaches Four-lane widening 2017
17 Planned Manitoba border easterly Four-lane widening / new four-lane highway
2020
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
5
NORTHERN REHABILITATION 2016 – 2020
NORTHEASTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
6 Planned South of Whitefish Falls northerly Resurfacing 12 2016
6, 17 Planned West of Hwy 6 easterly to Nairn Centre
Resurfacing / bridge rehabilitations 22 2017
11 Underway Northbound lanes, south of Hwy 534 interchange, Powassan
Resurfacing / new bridge / new culverts / culvert replacement / rehabilitation
5 2017
11 Underway North of north junction Hwy 17/11B northerly, north of North Bay
Resurfacing / bridge replacement 7 2016
11 Underway South of Lakeshore Dr. southerly, Temagami
Resurfacing / culvert rehabilitations 11 2016
11 Planned South limits of Latchford southerly Resurfacing 5 2016
11, 652 Planned South, east, west of Hwy 579,
Cochrane Culvert replacements / culvert rehabilitations n/a 2016
11 Planned Kapuskasing to Opasatika
Resurfacing / bridge rehabilitation / culvert rehabilitation / culvert replacement
32 2017
11B Underway South junction Hwy 11B northerly to Haileybury Resurfacing 7 2016
17, 101 Underway South of Hwy 101 northerly,
Wawa Resurfacing / culvert rehabilitation 33 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
6
NORTHEASTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
17 Planned Signalization at Hwy 17 and Municipal Road 4, west of Sudbury
Intersection improvement 1 2016
17 Planned East of Municipal Rd. 55 interchange westerly, Sudbury Resurfacing 21 2016
17 Underway Hwy 539, Warren to Hwy 64, Verner
Resurfacing / culvert rehabilitations and replacement
15 2016
17 Underway Sturgeon Falls westerly Resurfacing / passing lanes / culvert rehabilitation
10 2016
60 Underway Hwy 127 easterly, east of Whitney
Resurfacing / bridge and culvert rehabilitation / culvert replacements
19 2016
65 Underway South of Hwy 66 northerly, north of Englehart
Resurfacing / culvert rehabilitation 16 2016
69 Underway French River Bridge at French River Bridge rehabilitation n/a 2016
101 Underway Jackpine River, Michipicoten River, east of Wawa Bridge coating n/a 2016
101 Underway Shawmere River Bridge easterly, Foleyet
Resurfacing / bridge rehabilitation 48 2016
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
7
NORTHEASTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
101 Planned Foleyet easterly Resurfacing 21 2016
108 Underway Hwy 17 northerly to Elliot Lake Resurfacing 23 2016
112, 650 Underway Hwy 11 northerly, Kirkland Lake Resurfacing 21 2016
112 Planned Stoney Creek, south of Tarzwell Culvert rehabilitation n/a 2016
129 Planned Phillips Creek, Sharpsand River, Thessalon northerly Culvert replacements n/a 2016
144 Planned Regional Rd. 12 northerly, Dowling
Resurfacing / culvert replacement 12 2016
144 Underway Onaping northerly to Cartier Resurfacing / culvert rehabilitations 18 2016
144 Underway Half Way Lake northerly, north of Cartier Resurfacing 36 2016
518, 520 Underway Haines Creek east of Orrville,
Jenkins Creek at Magnetawan Culvert replacements n/a 2016
539, 805 Underway
McCarty Creek Bridge and Sturgeon River Bridge, Silver Creek Culvert, River Valley
Bridge rehabilitations / culvert rehabilitations n/a 2016
540, 540B Underway West of Hwy 551, Kagawong
westerly
Resurfacing / bridge replacement / culvert replacements / culvert rehabilitations
18 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
8
NORTHEASTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
540, 542, 551
Underway East junction Hwy 542 northerly, Mindemoya
Resurfacing / bridge replacement and rehabilitations / culvert rehabilitations
14 2016
547 Underway Hawk Creek and McVeigh Creek Bridges, east of Wawa Bridge rehabilitations n/a 2017
552, 556 Planned Hwy 556 and Hwy 552 east of
Hwy 17, Heyden Resurfacing 11 2016
560 Underway 6 Mile Creek, Tamarac Creek, and Lost Lake Bridge, west of Elk Lake
Bridge rehabilitation / culvert replacements / culvert rehabilitations
n/a 2016
583 Underway Obijou River, south of Hearst Culvert replacement n/a 2016
583 Underway Jessie River, Prune Creek, south of Hwy 11, south of Hearst
Bridge replacements n/a 2016
654 Planned Hwy 534 easterly to Hwy 11, Nipissing
Resurfacing / bridge rehabilitations 23 2017
655 Underway Jocko Creek, north of Hwy 101, north of Timmins Culvert replacement n/a 2016
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
9
NORTHWESTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
Hewitson Creek Bridge Planned Hewitson Creek Bridge east of
Rossport (Formerly Hwy 17) Bridge replacement n/a 2016
Pickle Lake Rd. Planned Crow River (July Falls) Bridge,
north of Pickle Lake Bridge replacement n/a 2016
11 Planned
West of Hwy 71 westerly including Bunting and Rainy River Culverts, north of Rainy River
Resurfacing / culvert replacements
26 2016
11 Planned Everett Creek Culvert west of Fort Frances
Culvert replacement n/a 2016
11 Underway Noden Causeway, east of Fort Frances
Bridge rehabilitation n/a 2017
11 Underway Fort Frances easterly Resurfacing 27 2016
11 Planned Kemuel and Lerome Lakes, and Jackfish Creek Culverts, west of Atikokan
Culvert replacements n/a 2018
11 Planned Kaministiquia River Bridge at Kakabeka Falls
Bridge rehabilitation n/a 2017
11 Planned Helen Lake and East Shamrock Lake Culverts, north of Nipigon
Culvert replacements n/a 2016
11 Planned Flynne Creek, Suckle, and Mineral Creek Culverts, near Longlac
Culvert replacements n/a 2016
17 Planned Rae Lake Arch Culvert east of Kenora
Culvert replacement n/a 2016
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
10
NORTHWESTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
17 Planned Little Firesteel River Bridge west of Upsala
Bridge replacement n/a 2016
17 Planned Brule Creek and Oskondaga River, west of Thunder Bay
Culvert replacements n/a 2016
17 Underway Ozone Creek Bridge, east of Nipigon
Bridge rehabilitation n/a 2016
17 Underway Gravel River Bridge, east of Nipigon
Bridge replacement n/a 2016
17 Underway Pays Plat River Bridges, east of Nipigon
Bridge replacements n/a 2017
17 Underway CPR overhead, west of Schreiber Bridge rehabilitation n/a 2016
17 Underway Marathon westerly Resurfacing 29 2016
17 Underway Pic River Bridge, east of Marathon
Bridge replacement n/a 2016
61 Planned Neebing River Bridge in Thunder Bay
Bridge rehabilitation n/a 2016
61 Underway Park Road overhead, near U.S. Border Bridge removal n/a 2016
71 Planned Hwy 17 southerly, east of Kenora Resurfacing 21 2016
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
11
NORTHWESTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
71 Underway Nestor Falls southerly Resurfacing 29 2016
105 Underway Ear Falls southerly Resurfacing 40 2016
105 Planned Pickerel Creek Culvert north of Vermilion Bay
Culvert replacement n/a 2016
105 Underway North of Hwy 609 northerly, north of Vermilion Bay Resurfacing 31 2016
502 Planned Hwy 594 southerly, Dryden Resurfacing 12 2016
502 Planned 66 km north Hwy 11 northerly, south of Dryden Resurfacing 37 2017
502 Planned Kawawiag Creek Culvert, north of Fort Frances
Culvert replacement n/a 2016
527, 811 Planned East Dog and Kabitotikwia River Culverts, north of Thunder Bay
Culvert replacements n/a 2016
589 Planned Mcintyre River Culvert, north of Thunder Bay
Culvert replacement n/a 2016
595 Underway Sitch and Cedar Creeks, west of Thunder Bay
Culvert replacements n/a 2017
602 Planned Rainy River Tributary culvert #2, west of Fort Frances
Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
12
NORTHWESTERN ONTARIO REHABILITATION 2016†
Hwy Status Location Type of Work
Project Length (km)
Target Completion
Date
614 Planned Black River Bridge, north of Hwy 17, Manitouwadge
Bridge rehabilitation n/a 2016
7125 Planned Culvert Replacement (Rockeries Road), west of Kenora
Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
13
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
6 North of Hwy 542 northerly to 10 Mile Point Lookout, Manitowaning Resurfacing 22 2017
11 North of south junction 592 interchange at Novar northerly Resurfacing 8 2017
11
Hwy 11B / Lakeshore Drive interchange northerly to south junction Hwy 17 interchange, North Bay
Resurfacing 7 2018
11 ONR overhead at Earlton Bridge rehabilitation n/a 2017
11 South of Hwy 579, south of Cochrane Resurfacing 17 2017
11 Cochrane to Driftwood Resurfacing 30 2017
11 Opasatika River Bridge westerly, Opasatika
Resurfacing/culvert replacements 30 2017
11 West of Hwy 631, west of Calstock Culvert replacements n/a 2018
17 North of Harmony Lake Bridge northerly, Sault Ste. Marie
Resurfacing / bridge rehabilitations / culvert rehabilitation
27 2018
17 Garden River to Echo Bay Resurfacing 13 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
14
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
17, 546
Hwy 546 easterly, Iron Bridge to Blind River
Resurfacing / culvert replacements 24 2018
17 Serpent River easterly to Cutler Resurfacing 11 2017
17 West of Hwy 17 / Municipal Rd. 55 interchange at Sudbury, westerly
Resurfacing / bridge rehabilitations / culvert replacement
20 2019
17 East junction Municipal Rd. 55 easterly to Hwy 535, Sudbury to Hagar
Resurfacing / bridge rehabilitations 39 2018
17 CPR overhead, west of Hwy 537, Coniston Bridge rehabilitation n/a 2017
60 Station Road easterly, Algonquin Park Resurfacing 14 2017
60 Hwy 127 westerly, Whitney Resurfacing 27 2018
64 Hwy 539 northerly, Field Resurfacing / bridge removal 12 2017
67 North junction Hwy 11 easterly, Iroquois Falls Resurfacing 10 2017
69 Still River Bridge, north of 529, Britt Bridge rehabilitation n/a 2017
112, 650
Blanche River Bridge, north Hwy 11, south of Kirkland Lake
Bridge rehabilitation / culvert rehabilitations n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
15
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
144 Whitson Creek, Vermillion River, CPR overhead, Chelmsford northerly
Bridge rehabilitation / bridge replacement / culvert replacement
n/a 2018
144 Hwy 101 southerly, west of Timmins Resurfacing 14 2017
519 Hwy 17 easterly, Dubreuilville Resurfacing / culvert replacement 31 2017
522, 522B
Hwy 11 and McFadden Line interchange westerly, Trout Creek
Resurfacing / bridge replacement 5 2017
526 Hwy 69 westerly, Britt Resurfacing 4 2017
529 Naiscott River culverts and bridge, CPR overhead, north of Pointe au Baril
Bridge rehabilitations / culvert replacements n/a 2017
540 Little Current westerly Resurfacing 18 2017
542 Bluejay Creek, south of Sandfield Culvert replacements n/a 2017
551 Mindemoya Creek Bridge at Providence Bay Bridge replacement n/a 2017
560 Michiwakenda Lake Culvert, east of Shinning Tree Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
16
NORTHEASTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
634 Hog Creek and three un-named creeks, north of Hwy 11, north of Smooth Rock Falls
Culvert rehabilitations n/a 2017
639 Christian Creek and Boland Creek Bridge, north of Elliot Lake
Bridge rehabilitation / culvert replacement n/a 2017
7044 Culvert, south of North Entrance Cartier Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
17
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
Nungesser Rd.
Pinder and South Berens Creeks, north of Red lake Culvert replacements n/a 2017
11 Westovers, Dilke #1 and Ramsdale Creek Culverts, west of Fort Frances
Culvert replacements n/a 2017
11, 602 Kitchen, Turner, Lyon Creek Culverts, west of Fort Frances Culvert replacements n/a 2017
11 Mine Centre easterly Resurfacing 21 2017
11 Flood Creek West and East, Mills Creek, Caribus and Gagne Lake Culverts, near Atikokan
Culvert replacements n/a 2018
11 Keemle, Shamrock, Shamrock West Lakes, north of Nipigon Culvert replacements n/a 2017
11 Fish and Sandlink Creek Culverts, near Longlac Culvert replacements n/a 2017
11 Flynne Creek East and Chowder Creek Culverts, east of Longlac Culvert replacements n/a 2017
17 Hwy 665 near Dryden Westerly Resurfacing 19 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
18
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
17 Revell curve realignment west of Hwy 622, west of Ignace Realignment 4 2018
17 CPR overhead, west of Upsala Bridge rehabilitation n/a 2017
17 Schreiber westerly Resurfacing 19 2017
17 Sawmilll Creek Culvert east of Terrace Bay Culvert replacement n/a 2017
17 Prairie River Bridge east of Terrace Bay Bridge replacement n/a 2017
17 White Lake Narrows Bridge, east of Marathon Bridge replacement n/a 2017
61 CNR Subway Bridges in Thunder Bay Bridge rehabilitations n/a 2017
61 Jarvis River and Slate River Tributary, south of Thunder Bay Culvert replacements n/a 2017
71 South of Sioux Narrows southerly Resurfacing 24 2017
72 Moose Creek Bridge, south of Sioux Lookout Bridge rehabilitation n/a 2018
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
19
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
105, 17 Vermilion Bay northerly and Hwy 17 near Triangle Lake Resurfacing 31 2017
130 Hwy 61 northerly, west of Thunder Bay Resurfacing 16 2017
516, 642 Deception Lake and Minnikau River, east of Sioux Lookout Culvert replacements n/a 2017
516 Mills Creek Culvert east of Sioux Lookout Culvert replacement n/a 2017
527 North and South Current River Culverts, north of Thunder Bay Culvert replacements n/a 2017
584 Murky Creek Bridge, north of Geraldton Bridge rehabilitation n/a 2017
590, 588 Hwy 588 and 590, and Cedar, Whitewood, and Pitch Creek Culverts west of Thunder Bay
Reconstruction / culvert replacements 31 2018
595 Pine River Bridge, north of Hwy 597, west of Thunder Bay Bridge rehabilitation n/a 2017
596 Alice Creek Culvert, south of Minaki Culvert replacement n/a 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
20
NORTHWESTERN ONTARIO REHABILITATION 2017†
Hwy Location Type of Work
Project Length (km)
Target Completion
Date
599 Albany River (Osnaburg, Main, Overflow) Bridges, south of Pickle Lake Bridge rehabilitation n/a 2017
601, 603 Wabigoon River and Melgund Creek Culverts, north of Hwy 17 near Dryden
Culvert replacements n/a 2017
614 Chicken Farm Lake Culvert south of Manitouwadge Culvert replacement 0.1 2017
618 Hwy 105 near Red Lake southerly Resurfacing 12 2017
619, 621 Gerhard, Peterson, and Brusvine Creeks, east of Rainy River
Culvert replacements n/a 2017
622 Moose Creek Culvert, north of Atikokan Culvert replacement n/a 2017
627 North of Heron Bay Culvert replacement n/a 2017
642 Sturgeon River Bridge, east of Sioux Lookout Bridge rehabilitation n/a 2017
658 Hwy 17A northerly, north of Kenora Resurfacing 21 2017
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
21
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
6 South Baymouth Ferry northerly to north of Hwy 542 Resurfacing 24
6 Little Current southerly Resurfacing / culvert rehabilitation 20
6, 7041
Little Current Swing Bridge northerly, Little Current Resurfacing 17
11, 124 South River to Trout Creek Resurfacing / culvert
rehabilitation 12
11 South of Hwy 654 interchange northerly to Hwy 11B/Lakeshore Dr. interchange, Callander northerly
Resurfacing 11
11 Lavase River/CPR overhead, CNR overhead, south of North Bay Bridge rehabilitations n/a
11 North junction Hwy 17/11B northerly, North Bay Resurfacing 7
11 North of north junction Hwy 17/11B northerly, north of North Bay Resurfacing 10
11 Chippewa Creek, north of North Bay Culvert replacement n/a
11 Calamity Creek Culvert, north of Hwy 11B, New Liskeard Culvert replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
22
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
11 Whitney Creek Culvert, south of Latchford Culvert replacement n/a
11 Crooked Creek Bridge, south of Kenogami Lake Bridge rehabilitation n/a
11 North of Hwy 570 to east junction Hwy 101, Ramore
Resurfacing / culvert rehabilitation and replacement
24
11, 101 West of Matheson easterly to Hwy 572
Resurfacing / bridge rehabilitations / culvert rehabilitations
21
11 West junction Hwy 101 northerly, Nellie Lake southerly Resurfacing 34
11 West of Cochrane easterly Resurfacing 4
11 West of Hwy 636, west of Cochrane Culvert replacements n/a
11 Mattagami River Bridge at Smooth Rock Falls Bridge rehabilitation n/a
11 Moonbeam Creek Culvert, east of Moonbeam Culvert replacement n/a
11 Groundhog River Bridge, Fauquier Bridge replacement / culvert replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
23
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
11, 581
East Lilly Creek Bridge and Culvert, west and north of Moonbeam
Bridge replacement / culvert replacement n/a
11 Holland Creek Culvert, west of Hearst Culvert replacement n/a
11, 663 East of Hwy 631 to Hwy 663, Calstock
Resurfacing / culvert rehabilitation / culvert replacements
26
11 Fraser River Bridge and various culverts, west Hwy 631, west of Hearst
Bridge rehabilitation / culvert replacements / culvert rehabilitation
n/a
17 Hwy 631 easterly, White River Resurfacing 59
17 Old Woman River Bridge, south of Wawa Bridge rehabilitation n/a
17 Sand River and Barrett River Bridges, south of Wawa Bridge rehabilitations n/a
17 Coldwater River Bridge, north of Montreal River Bridge coating n/a
17 North of Hwy 556 northerly, north of Heyden Resurfacing 4
17 Echo River Rd. easterly to Bar River Rd., Echo Bay Resurfacing 12
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
24
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
17, 548, 638
Bruce Mines easterly Resurfacing / culvert rehabilitation / replacement 18
17, 546 Thessalon to Iron Bridge Resurfacing / culvert
replacements 34
17, 538
CPR Subway and Lauzon Creek, east of Blind River
Bridge rehabilitation / culvert replacement n/a
17 Spragge Creek Culvert, Spragge Culvert replacement n/a
17 Hwy 553 easterly, Massey easterly Resurfacing 22
17 Birch Creek Culvert, west of Hwy 6, Webbwood Culvert rehabilitation n/a
17 East of Hwy 6 easterly, Nairn Centre easterly Resurfacing / culvert replacement 20
17 CPR Subway, west of Hwy 144, west of Sudbury Bridge rehabilitation n/a
17 Hwy 69 interchange westerly, Sudbury Resurfacing / bridge / culvert rehabilitation 12
17 Little Cache Creek Culvert, west of Sturgeon Falls Culvert rehabilitation n/a
17 Hwy 17 and Hwy 94, Corbeil Intersection improvement 4
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
25
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
17B Bar River Rd. to Sault Ste. Marie southeast limits Resurfacing 21
17B Duchesnay Creek Bridge, CNR overhead, North Bay
Resurfacing / bridge replacement / bridge removal
1
63 North of Hwy 533 northerly to Ontario/Quebec Boundary
Resurfacing / bridge rehabilitations / culvert rehabilitation
23
64 Riberdy Tributary Culvert, south of Verner Culvert replacement n/a
64 Hwy 69 easterly to Hwy 528, west of Noelville Reconstruction / culvert replacement / culvert rehabilitation
18
64 Northwest Arm Narrows Bridge, Lake Nipissing, north of Noelville Bridge rehabilitation n/a
64 South of Field Culvert rehabilitation n/a
64 North of Hwy 539 to Hwy 11, Marten River southerly
Resurfacing / bridge rehabilitations 23
65 Makobe River Bridge, east of Elk Lake Bridge replacement n/a
65, 560
East junction Hwy 560 Elk Lake to east of Hwy 562 Resurfacing 48
66 Hwy 566 easterly, east of Matachewan Resurfacing 16
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
26
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
66 Kirkland Lake easterly to west of Hwy 624 Resurfacing / bridge rehabilitation 23
69 North of Estaire Rd. interchange northerly, Sudbury Resurfacing 6
94 Hwy 654 westerly, South CNR overhead, Hwy 94/CNR underpass, Burford Creek, Callander
Resurfacing / bridge replacement / bridge rehabilitation / culvert rehabilitation
3
101, 129
Sideburned, Nemegosenda, Nebskawashi Bridges, Chapleau
Bridge rehabilitation / bridge replacements n/a
101 Jackpine Creek, west of Folyet Culvert rehabilitation n/a
101 Ivanhoe River Bridge at Folyet Bridge rehabilitation n/a
101, 7172 West of Hwy 144 easterly, east of Foleyet Resurfacing 11
101 Anthony Creek, Unknown Creek, Shillington Creek, west of Hwy 11, Shillington Culvert replacements n/a
124 Hwy 400 easterly, Parry Sound to McKellar Resurfacing / culvert rehabilitation 20
129 Cummings Creek and Stoney Creek, north of Warncliffe
Culvert replacement / culvert rehabilitation n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
27
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
129 Gravel River, Snowshoe Creek and Missisagi River Bridges, east of Ranger Lake Bridge rehabilitations n/a
129 Wenebegon River Culvert, north of Hwy 556 Culvert rehabilitation n/a
129 South of Hwy 667 southerly, south of Chapleau
Resurfacing / culvert replacements 22
129 South junction Hwy 101 southerly, south of Chapleau
Resurfacing / culvert replacements 27
129 Big Pine Lake, west of Chapleau Culvert replacement n/a
141 Broad River Bridge, east of Humphrey Bridge rehabilitation n/a
141 Shadow River Bridge, west of Hwy 632, west of Rosseau Bridge replacement n/a
144 Municipal Roads 35 and 15 northerly, Chelmsford Resurfacing 5
144 Kenetogami Creek, north of Hwy 661, Gogama Culvert replacement n/a
400 Healey Lake Rd. underpass northerly to north of Hwy 141 interchange, north of MacTier Resurfacing 14
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
28
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
400 North of Hwy 141 interchange northerly, south of Parry Sound Resurfacing 17
518 Hwy 400 easterly to west of Orrville Resurfacing 14
518 Bear Creek and Sequin River, Bear Lake Culvert rehabilitations n/a
520, 7162 Ontario St. westerly, Burk's Falls Resurfacing 3
523 Moore Creek Bridge, south of Madawaska Bridge rehabilitation / culvert rehabilitation n/a
524 Commanda Creek Bridge, northwest of Commanda Bridge replacement n/a
532, 556
Achigan Creek, Aubinadong River, Mississagi River Bridges and various culverts, west of Glendale and east of Ranger Lake
Bridge rehabilitation /bridge replacement / culvert rehabilitations / culvert replacement / culvert removal
n/a
535 North of Hwy 64 northerly, north of Noelville Resurfacing 6
537 Jumbo Creek, south of Hwy 17, south of Wahnapitae
Reconstruction / culvert replacement 1
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
29
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
540, 542
Indian Point Bridge, Manitou River Bridge, Manitoulin Island Bridge rehabilitations n/a
540 West of Hwy 551 easterly, Kagawong easterly Resurfacing 27
546 White River Tributary, north of Hwy 554 Culvert rehabilitation n/a
546 Little White River Bridge, north of Hwy 554, Iron Bridge Bridge replacement n/a
546, 554 Hwy 546 and Hwy 554 northerly, Iron Bridge Resurfacing 27
546 Kindiogami River and Camp 8 Creek Bridges, east of Hwy 639 Bridge rehabilitations n/a
548 Richardson Creek Bridge, north of Kentville, St. Joseph Island Bridge replacement n/a
548 St. Joseph Island Skyway, St. Joseph Island Bridge rehabilitation n/a
550, 565 Sault Ste. Marie westerly to Gros Cap Resurfacing 11
553, 810
River aux Sables Bridges and Cameron Creek Bridge, north Hwy 17, Massey Bridge replacements n/a
560 Opikinimika River Bridge, west of Hwy 560A, Westree Bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
30
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
564 Boston Creek Bridge, Boston Creek Bridge replacement n/a
566 Montreal River Bridge, west of Matachewan Bridge replacement n/a
569 Blanche River Bridge at Hilliardton Bridge replacement n/a
572 Pike River Bridge, north of Holtyre Bridge replacement / culvert replacement n/a
577 Driftwood River Bridges, north of Shillington Bridge rehabilitation / bridge replacement n/a
579, 668
Deception Creek, Smith Creek, Gilles Creek Bridges, north of Cochrane Bridge replacements n/a
583 Ste. Therese Creek north and south and Un-named Creek, north of Hearst Culvert rehabilitations n/a
592 Little East River Bridges, north of Hwy 11, Novar Bridge replacements n/a
592 CNR overhead Bridge and Ragged Creek Bridge, north of Novar Bridge replacements n/a
631 Hornepayne Creek, south of Hornepayne Culvert replacement n/a
631 Negagamisis Narrows Bridge, West Beaton River Bridge and Shekak River Bridge, north and south of Hornepayne
Bridge rehabilitations / bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
31
NORTHEASTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
637 Killarney eastery to Massey Creek, west ofHwy 69
Reconstruction / culvert replacement 29
637 Wanapitei River and Wolf Creek, east ofKillarney Bridge rehabilitations n/a
638 Thessalon River Bridge at Rydal Bank Bridge replacement n/a
638 Thessalon River Bridge, north of Hwy 670,Ophir Bridge rehabilitation n/a
651 Ogasiwi and Windermere River Bridges, westChapleau Bridge rehabilitations n/a
652 South Branch Louis River and Louis River,east of Cochrane Culvert rehabilitations n/a
655 South of Hwy 11 southerly, south ofDriftwood Resurfacing 14
7289, 7290
Silver Lake and Blackstone River, south of Horseshoe Lake Culvert rehabilitations n/a
7300 Sagamok Access Road, south of Massey Reconstruction 5
†The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval,
property acquisition and construction requirements.
32
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
Lac La Croix Rd.
Namakan River Bridge south, south of Hwy 11 (Lac La Croix Rd.) Bridge rehabilitation n/a
Lac La Croix Rd.
Namakan River Bridge north, south of Hwy 11 (Lac La Croix Rd.) Bridge rehabilitation n/a
Nungesser Rd. Bak Creek Bridge, north of Red Lake Bridge rehabilitation n/a
Nungesser Rd. Alweli Creek Bridge, north of Red Lake Bridge replacement n/a
Pickle Lake Rd. Crow River Bridge, north of Pickle Lake Bridge rehabilitation n/a
11 Baudette Rainy River International Bridge to U.S. Bridge replacement n/a
11 Sturgeon River Bridge, east of Kenora Bridge rehabilitation n/a
11 Windy Point Bridge, east of Fort Frances Bridge rehabilitation n/a
11 Bear Passage Bridge, west of Fort Frances Bridge replacement n/a
11 Hwy 502 easterly, Mine Centre Resurfacing 36
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
33
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
11, 623, 622
East of Hwy 11B Atikokan easterly, Hwys 623 and 622, and Niobe Lake Culvert
Resurfacing / culvert replacement 43
11 West of Hwy 802 westerly, Shabaqua Corners Resurfacing 29
11 Kashabowie River Bridge, west of Shebandowan Bridge replacement n/a
11 Rossmere and Wawiag Creeks, west of Shebandowan Culvert replacements n/a
11 West of Shebandowan westerly Resurfacing 27
11 Shabaqua westerly Resurfacing 31
11 Mignet Creek, Indian Bay, Mission Bay, north of Nipigon Culvert replacements n/a
11 Camproad and Gorge Creek, north of Nipigon Culvert replacements n/a
11 Nissiamkikan Creek Culverts, east of Beardmore Culvert replacements n/a
11 Watson and Norami Creeks, Blackwater and Postogoni Rivers, west of Jellicoe Culvert replacements n/a
11 Geraldton westerly to Longlac Resurfacing 33
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
34
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
11 Phipps Lake and Rockyshore Creek Culverts, east of Longlac Culvert replacements n/a
11 Hoiles Creek Bridge, east of Longlac Bridge rehabilitation n/a
17 Winnipeg River East and West Bridges, Ritchie Road Overpass on Kenora Bypass, north of Kenora
Bridge replacements n/a
17, 596 Hwy 17A West Connection easterly and part of Hwy 596 near Kenora Resurfacing 17
17 Hwy 17A West Connection westerly, near Kenora Resurfacing 22
17 Kenora bypass Resurfacing 24
17 CPR overhead at Dinorwic Bridge replacement n/a
17 McKenzie and Moose Creeks, Dinorwic and Chadwick Lakes, near Dryden Culvert replacements n/a
17 Hwy 72 easterly, Dinorwic Resurfacing 25
17 West of English River westerly, west of Upsala Resurfacing 19
17 English River, Sisson and Baker Creeks, west of Upsala Culvert replacements n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
35
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
17 West of Upsala westerly Resurfacing 19
17 Raith Creek and Savanne River Tributary, west of Shabaqua Culvert replacements n/a
17 West of Shabaqua westerly Resurfacing 27
17 Dublin and Fire Hill Creeks, east of Nipigon Culvert replacements n/a
17 MacLean Creek Culvert, west of Schreiber Culvert replacement n/a
17 Rossport westerly Reconstruction / truck climbing lanes 16
17 West of Rossport westerly Resurfacing 21
17 Hewitson Creek Culvert, west of Schreiber Culvert replacement n/a
17 Aguasabon River Bridge, near Terrace Bay Bridge replacement n/a
17 Blackbird Creek Culvert #2, east of Terrace Bay Culvert replacement n/a
17 Mink Creek Culvert west of Marathon Culvert replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
36
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
17 Angler Creek Culvert west of Marathon Culvert replacement n/a
17 Dunc Lake, Alder Creek East and Angler Creek Culverts, west of Marathon Culvert replacements n/a
17 Wabikoba Creek Bridge east of Hwy 614, east of Marathon Bridge replacement n/a
17 Bertrand Creek and West White River Bridges, east of Hwy 614, White River Bridge replacements n/a
17 White River Bridge, east of Hwy 614, east of Marathon Bridge rehabilitation n/a
61 Arthur Street southerly to Kaministiquia River Bridge, Thunder Bay Resurfacing 5
61 Kaministiquia River Bridge in Thunder Bay Bridge rehabilitation n/a
61 Rosslyn Road and CPR overheads in Thunder Bay Bridge rehabilitation n/a
61 North of Canada/US border northerly Resurfacing 19
71 South of Kenora southerly Resurfacing 28
71 Reed Narrows, Rushing River, Berry Creek Bridges north of Sioux Narrows Bridge rehabilitations n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
37
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
71 Maximillian and Toby Hill Creek Culverts, north of Hwy 600, north of Emo Culvert replacements n/a
71 Hwy 11 northerly, Finland Reconstruction 26
71, 11, 617
Dilke and Sims Creeks, Pinewood River, west of Fort Frances Culvert replacements n/a
72, 664 Sioux Lookout southerly and Hwy 664 to Hudwon Resurfacing 23
72, 664, 642
Finlayson Creek, Sam and Aubrey Lakes, south of Sioux Lookout Culvert replacements n/a
72 South of Sioux Lookout southerly Resurfacing 25
102 CNR and CPR (Kaministiquia River) overheads east of Hwy 17 at Sistonen's Corners
Bridge replacements n/a
102 McIntyre and Shebandowan Culverts, west of Thunder Bay Culvert replacements n/a
105 Red Lake Southerly Resurfacing 17
105 Sandy Creek, north of Ear Falls Culvert replacement n/a
105 Ear Falls northerly Resurfacing 30
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
38
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
125 Chukuni River Bridge near Red Lake Bridge replacement n/a
502 South of Dryden southerly Resurfacing 37
502 Crowrock Inlet Bridge north of Hwy 11 Bridge replacement n/a
502 Hwy 11 northerly, northeast of Fort Frances Resurfacing 29
516 Marchington River Bridge, east of Sioux Lookout Bridge rehabilitation n/a
527 Wabikon Creek and Waweig Lake Culverts, north of Thunder Bay Culvert replacements n/a
527 Max Creek, Rousseau and Rinker Lake Culverts, north of Thunder Bay Culvert replacements n/a
527 72 km north of Hwy 11/17 northerly, north of Thunder Bay Reconstruction 26
527 Eaglehead River, Trans Canada Pipeline and Little Max Creek Culverts, north of Thunder Bay
Culvert replacements n/a
527 Hwy 11/17 northerly, north of Thunder Bay Resurfacing 11
527 North of Thunder Bay northerly Resurfacing 29
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
39
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
584 North of Geraldton northerly Resurfacing 27
589 North of Hwy 102 northerly to Hwy 591, Lappe Resurfacing 12
590 Cedar Creek Culvert #2 west of Kakabeka Falls Culvert replacement n/a
595, 588 Sitch and Whitewood Creek Culverts, south of Kakabeka Falls Culvert replacements n/a
599 Cobb Bay, Tug and Mile Creek Culverts, north of Ignace Culvert replacements n/a
599 English River Bridge north of Ignace Bridge replacement n/a
599 Asinn and Wiggle Creeks, Graystone and Savant Lakes, Low River, north of Ignace Culvert replacements n/a
599 Kekwanzik Lake, Agimac and Pratt Creek Culverts, north of Ignace Culvert replacements n/a
600 Lathe Mill Culvert north of Rainy River Culvert replacement n/a
602 LaVallee River Bridge south of Emo Bridge rehabilitation n/a
617 Pinewood River Bridge, north of Hwy 11, Thunder Bay Bridge replacement n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
40
NORTHWESTERN ONTARIO REHABILITATION 2018-2020†
Hwy Location Type of Work
Project Length (km)
622 Big Turtle River Bridge, southeast of Dryden Bridge replacement n/a
627 Pic River Bridge, south of Hwy 17, Heron Bay Bridge replacement n/a
641 Louise Lake, north of Hwy 17, Kenora Culvert replacement n/a
658 Black Sturgeon River Bridge north of Kenora Bridge replacement n/a
811 Mooseland River Bridge west of Hwy 527, north of Thunder Bay Bridge rehabilitation n/a
811 Heaven Creek and Grew River Culverts, north of Thunder Bay Culvert replacements n/a
† The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
41