NORTHERN RAILWAY
AN OVERVIEW AN OVERVIEW
1
NORTHERN NORTHERN RAILWAYRAILWAY
ROUTE MAPROUTE MAP
22
SALIENT FEATURESSALIENT FEATURESDIVISIONS 5
Delhi, Firozpur, Lucknow, Moradabad, Ambala
STATES / UT 8 / 1
Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Delhi, Uttar Pradesh, Rajasthan, Uttarakhand and Chandigarh
ROUTE KM 7125
BG 6864, NG 261
RUNNING KM 9239
BG 8978, NG 261
ELEC RKM 2126
NORTHERN RAILWAY – AN OVERVIEWNORTHERN RAILWAY – AN OVERVIEW
3
SALIENT FEATURESSALIENT FEATURESLOCOMOTIVES 894
ELECTRICAL 345, DIESEL 549
COACHES 5543
WAGONS 15511
WORKSHOPS 4 (JUDW, ASR, AMV & KLK)
DISASTER MANAGEMENT
16 ART, 15 ARMV, 8 CRANES (140 TONNES)
STAFF STRENGTH
SANCTIONED ON ROLL
OFFICER 1680 1424
STAFF 176449 155554(12572 recruited in 2012-13)
NORTHERN RAILWAY – AN OVERVIEWNORTHERN RAILWAY – AN OVERVIEW
4
NORTHERN RAILWAY – PASSENGER SERVICESNORTHERN RAILWAY – PASSENGER SERVICES
AT A GLANCEAT A GLANCE
TRAINS 1569
Mail/Exp 847, Passenger 722
Rajdhani 11 daily
10 weekly
Shatabdi 13
Jan Shatabdi 04
Duranto 04 daily
09 weekly
3350 SPECIALS & 9299 COACHES AUGMENTED IN APR-Sept 2013
5
NORTHERN RAILWAY – PASSENGER SERVICESNORTHERN RAILWAY – PASSENGER SERVICES
MAIN TERMINALSMAIN TERMINALS
S.N. TERMINAL TRAINS PER DAY
TYPE OF TRAINS PASSENGERS HANDLED(2012-13)(IN LACS)
PASSENGER EARNINGS(2012-13)
(RS. IN CR.)MAIL/EXP PASS.
1 NEW DELHI 313 208 105 341 1601
2 DELHI 243 112 131 201 361
3 NIZAMUDDIN 245 174 71 149 626
4 JAMMU TAWI 80 70 10 92 334
5 LUCKNOW 248 204 44 189 291
6
EARNINGS OVER NORTHERN RAILWAY (in crores)
YEAR YEAR (APRIL-SEPT) (APRIL-SEPT)
RECORD RECORD ORIGINATING ORIGINATING
TOTAL TOTAL EARNINGS EARNINGS
RECORD RECORD FREIGHT FREIGHT
EARNINGS EARNINGS
PASSENGERPASSENGEREARNINGSEARNINGS
OTHER OTHER CHGCHG
SUNDRY SUNDRY
2012-13 6299.99 2744.10 3029.56 337.08 189.25
2013-14 7704.99 3681.35 3368.20 364.10 262.62
Improvement 22.30% 34.16% 11.18% 16.54% 38.77%
7
8
FREIGHT OPERATIONS
YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) TOTAL FREIGHT LOADINGTOTAL FREIGHT LOADING2012-13 22.25 MT
2013-14 27.19 MT
Record incremental growth 22.20%
YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) TOTAL FOODGRAIN LOADINGTOTAL FOODGRAIN LOADING2012-13 9.65 MT
2013-14 13.65 MT
Improvement 43.23%
Freight loading of 27.19 MT during April to September 2013, is a new record.
PUNCTUALITY OF MAIL/EXPRESS TRAINS
YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) OVERALL M/EXP PUNCTUALITY OVERALL M/EXP PUNCTUALITY % %
2012-13 82
2013-14 89 (Record)
YEAR (APRIL-SEPT) YEAR (APRIL-SEPT) PUNCTUALITY % OF MR TRAINSPUNCTUALITY % OF MR TRAINS
2012-13 84
2013-14 93 (Record)
9
PUNCTUALITY OF MAIL/EXPRESS TRAINS
PUNCTUALITY ABOVE 90% ACHIEVED FOR THE MONTHS OF MAY, AUGUST AND SEPTEMBER 2013.
A NEW RECORD OF 92.65% PUNCTUALITY OF MAIL/EXPRESS TRAINS WAS MADE IN THE MONTH OF SEPTEMBER 2013.
INTENSIVE MONITORING, SIGNIFICANT REDUCTION IN ASSET FAILURES AND RATIONALIZATION OF TRAIN MOVEMENT THROUGH TIME TABLING CHANGES, BROUGHT ABOUT THIS PERCEPTIBLE IMPROVEMENT IN PUNCTUALITY OF M/EXP TRAINS.
NR HAS THE HEAVIEST PASSENGER OPERATION OVER IR WITH 505 MAIL/EXPRESS TRAINS DAILY.
PASSENGER AND SUBURBAN PUNCTUALITY ALSO IMPROVED OVER LAST YEAR.
10
NORTHERN RAILWAY – SAFETYNORTHERN RAILWAY – SAFETY
CONSEQUENTIAL ACCIDENTSCONSEQUENTIAL ACCIDENTS
YEAR COLLISION DERAILMENT LC FIRE IN TRAINS MISC. TOTAL
TRAIN ACCIDENTS
PER MILLION TRAIN KMS
2010-11 1 12 9* - 1 23 0.19
2011-12 - 12 14* - 1 22 0.17
2012-13 - 5 15* - - 20 0.16
(Apr-Sept)2013-14
- 5 4 1 - 10 0.14
(* includes 13 accidents at unmanned crossings each in 2011-12 & 2012-13 and 7 in 2010-11 due to negligence of road users.)
11
12
ASSET RELIABILITY
ITEMITEMCumulative Cumulative
up to Sept’2012up to Sept’2012Cumulative Cumulative
up to Sept’2013up to Sept’2013% Variation% Variation
- Imp.- Imp. / / + Det.+ Det.
RAIL FAILURE 276 148 -46.37
DSL LOCO FAILURE 267 282 +5.61
ELEC LOCO FAILURE 29 26 -10.34
ROADSIDE WAGON DETACHMENTS
68 46 -32.35
COACH DETACHMENTS
4 3 -25.00
OHE FAILURES 4 7 +75.00
SIGNAL FAILURES 20284 17513 -13.66
13
NEW LINES COMMISSIONED (IN 2012-13 AND 2013-14):
Qazigund – Banihal 18 Km ( Rs 1700 cr.)
Abohar – Fazilka 43 Km ( Rs 230 cr. )
Rewari – Rohtak 75 Km ( Rs 603 cr. )
Chandigarh – Ludhiana 68 Km ( Rs 680 cr. )
TOTALTOTAL 204 Km ( Rs 3,213 cr.)204 Km ( Rs 3,213 cr.)
DOUBLING COMPLETED:18 Km Doubling between Mansa - Maur Completed in 2013-14.
(Commissioning will be done after non-interlocking in Yards)
NEW INITIATIVES
LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN
RAILWAY PORTION. COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13) SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13) MACP – 6092 (BETWEEN APR TO SEPT’13) LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR
EFFECTIVE MONITORING OF COURT CASES. LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13) IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED DEVELOPMENT OF YARD CLEANING MACHINE
14
NEW INITIATIVES – Contd….
SELECTION CALENDER FINALISED COMPLETE SWITCH OVER TO E-AUCTION W.E.F. 01.06.2013 IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING
AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS. CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE
AREAS. SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION
STARTED.
15