Northwest Arm Drive Bridge Long-Term Rehabilitation NEBPP Meeting, September 10, 2019 Christopher Dyck, M.Sc., P.Eng. Nova Scotia Transportation and Infrastructre Renewal (NSTIR)
Transcript
Page 1: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive BridgeLong-Term Rehabilitation

NEBPP Meeting, September 10, 2019Christopher Dyck, M.Sc., P.Eng.Nova Scotia Transportation and Infrastructre Renewal (NSTIR)

Page 2: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive BridgesHFX244A & HFX244B

• Built in 1975

• 5 span concrete AASHTO girders (‘I’ shaped Girders)

• 6 girders per span

• Each span approximately 16.6m long

• 83.2m total length

• Supported on concrete hammerhead piers on spread footings

• Pier height ranges from 6m to 10m tall

Page 3: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Chain of Lakes Trail

HFX244B (NB)

HFX244A (SB)

First Chain Lake (Halifax Water Backup Supply)

Crown DriveHalifax Water Access Rd (gated – goes under bridges)

Halifax Water Spillway (under bridges)

St. Margaret’s Bay Rd

Walter Havill Dr.Northwest Arm Drive

Access to Trail

Page 4: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

HFX244A & HFX244B

Page 5: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING GIRDER CONDITIONS

Page 6: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING GIRDER CONDITIONS

Page 7: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING GIRDER CONDITIONS

Page 8: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING PIER CONDITION

Page 9: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING PIER CONDITION

Page 10: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

EXISTING DECK & BARRIER

Page 11: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive Bridges HFX244A & HFX244B

Rehabilitation Approach

Page 12: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

TRADITIONAL REHABILITATION

• Traditional Method and Typical Longevity:

• Bearing Repairs / Replacement (15-20 years?)

• Girder End Repairs (7-10 years?)*

• Diaphragm Repairs (10- 15 years?) *governs

• Deck End Repair (20 years?) life of repairs

• Joint Replacement (5-10 years?)*

• Depends on Multitude of Factors Both During Construction and Afterwards.

Page 13: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

TRADITIONAL REHABILITATION

• 5-10 years maximum before rehabilitation required again.

• Additional traffic delays

• Additional expenditure

• Poor Performance

Page 14: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PROJECT GOALS• Long Lasting Rehabilitation

• Cost Effective

• Addresses all Concerns with Bridge Condition

• Minimize Traffic Disruption

• Prevent Future Water Damage

Page 15: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

NEW BRIDGE DESIGN MEASURES FOR LONGEVITY

• Integral or Semi-Integral Abutments

• Continuous Girders and deck

• Improved materials and construction practices

Page 16: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

REHABILITATION APPROACH• Trial a new approach to rehabilitating concrete bridges that have

multiple simple spans and expansion joints

• Eliminate all joints in bridge through engineering design

• Integrate all piers with the bridge girders and deck

• Convert abutments to semi-integral

• First application of this approach in Nova Scotia

Page 17: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

FROM THIS TO THIS

Page 18: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

FROM THIS

Page 19: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

TO THIS

Page 20: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION & SEMI-INTEGRAL ABUTMENTS

• Eliminates need to jack and support girders during rehab

• Eliminates the need to replace existing bridge bearings

• Reduces quantity of girder repairs

• Eliminates LEAKING JOINTS

• Improves surface smoothness

Page 21: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION & SEMI-INTEGRAL ABUTMENTS

• Will lead to a longer lasting repair (perhaps 40 years + with minimal maintenance)

• Minimal increase in cost

Page 22: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive Bridges HFX244A & HFX244B

Analysis

Page 23: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach

• Analysis Scope

• To assess the feasibility of joining (integrating) the pier cap with the girders to form a fully continuous bridge

• 16.3 m becomes 83 m+

• Temperature effects become very important

• To determine the load effects on all structures in the bridge as well as their resistances upon integration

Page 25: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach

• Finite Element (FE) Models:

• Beam and shell models in SFrame

• Simple span model

• Uncracked properties, Dead Loads

• Continuous span model

• Uncracked properties, SLS Cracking check

• Continuous span model

• Cracked properties over pier, Full assessment of load effects

• Pier and footing models – shell models

• Capture settlement effects and new shear and bending effects

• Tangent girders with curved deck

Page 26: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach• Finite Element (FE) Model:

Page 27: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach• Finite Element (FE) Model: Concrete Dead Load (Continuous)

Page 28: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach• Finite Element (FE) Model: Live Load Truck

Page 29: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach• Finite Element (FE) Model: Transverse Wind Load Bending

Page 30: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Analysis Approach• Finite Element (FE) Model: Forced Settlement of Piers on

Different Soils

Page 31: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive Bridges HFX244A & HFX244B

Tendering

Page 32: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Tendering

• Major effort was put into defining the scope of the work and detailing it:

• 23 detailed drawings

• Full procedures for all repairs

• Extents and boundaries for all key repairs

• First application, so contractors not familiar with new approach

Page 33: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Tendering• Example of Girder End Repair level of detail:

Page 34: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Tendering• Example of Girder End Repairs outside integration

Page 35: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive Bridges HFX244A & HFX244B

Construction

Page 36: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Crossovers

Page 37: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Concrete Removal

Page 38: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Concrete Removal

Page 39: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Concrete Removal

Page 40: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Barrier Refacing

Page 41: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Barrier Refacing

Page 42: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Barrier Refacing

Page 43: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Deck Repairs

Page 44: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Crack Injection

Page 45: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 46: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 47: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 48: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 49: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 50: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 51: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

PIER INTEGRATION

Page 52: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

Page 53: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

Page 54: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

Page 55: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

Page 56: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

SEMI-INTEGRAL ABUTMENTS

Page 57: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Girder Repairs

Page 58: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Girder Repairs

Page 59: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Girder Repairs

FRP

Page 60: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Northwest Arm Drive Bridges HFX244A & HFX244B

Finished Condition Comparison December 2018

Page 61: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Girder Repairs + Wrapping

From This:

To This:

Page 62: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Pier Repairs

From This:

To This:

Page 63: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Semi-Integral Abutments

From This:

To This:

Page 64: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Barrier Repairs

From This:

To This:

Page 65: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Resurfacing

From This:

To This:

Page 66: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

So why not use this everywhere?• This procedure is broadly applicable

• Applications will need to be carefully chosen

• Traffic maintained in workzone?

• Continuous conversion does not favour lane-by-lane construction

• Design effort is more extensive and complex

Page 67: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Summary - Life Cycle Cost

• Low bid was Cdn$2.1Million (US$1.6Million) for both bridges

• Significant life cycle cost savings

• Significantly less impact on the public over the remaining life of the structure

Page 68: Northwest Arm Drive Bridge Long-term Rehabilitationpavementvideo.s3.amazonaws.com/2019-NEBPP-Burlington-VT/201… · •Uncracked properties, Dead Loads •Continuous span model •Uncracked

Questions?