STICKER
NorthWind | External Pile Cleaning
GeoSea | June - July 2013
DIVING ENGINEERING & CONSULTANCY OFFICE N.V.www.deco-diving.com | [email protected] 5 | 8000 Brugge | Belgiumtel. +32 50 31 10 92 | fax +32 50 31 13 80
| ProJect ScoPe
•NorthWind | Noordzee
•Wind farm installation project | GeoSea
•High pressure water jet cleaning
•Cleaning of 80 monopiles
•Marine growth removal
| Pile cleaninG SPecificationS
•4.2m pile diameter
•13.85m pile circumference
•8m cleaning height
•14m water depth
| timeline
•In-housecleaningframeworkflow:4weeks ▸ design & production
▸ assembly & live test
▸ mobilisation
| cleaninG frame featureS
•Outrunner type robot
•30min cleaning operation
•Fast and easy installation procedure
•Hydraulically driven seesaw motion
•Remote control operation