PROJECT INFORMATION
Contractor: Strider Construction
Construction Start Date: April 2018
Est. Completion Date: October 2019
Project Description: The US 101 segment
spans 11.6 mi (MP 220 to appx. MP 231)
from East Beach Rd to Fairholme Hill. The
East Beach segment begins at the Spruce
Railroad trail parking lot, continues over
the Lyre river bridge, and continues appx.
3.3 mi towards US HWY 101.
Improvements include cleaning and
replacing drainage culverts, pavement
subgrade, turnouts, asphalt paving, and
rockfall mitigation.
Work Schedule: Monday - Friday, from 2
hours after sunrise to 2 hours before
sunset. Approximate start/end times, 8:30 a.m. to 5:30 p.m.
TRAFFIC DELAYS
Expect up to half hour delays.
CURRENT AND
UPCOMING WORK
MSE Wall under construction at MP223. Traffic signal lights in place for after hours traffic. Guard-rail will be worked on starting Tuesday at MP231.
HIGHLIGHTS:
Northwind Traders Newsletter
NEWSLETTER
September 7, 2018
WESTERN FEDERAL LANDS HWY DIVISION
LAKE CRESCENT & EAST BEACH RD
WA NPS OLYMP 11(9)
WA CLALLAM 92210(1)
Project Engineer: Marty Flores 360-831-3540 [email protected] 216-A E. 5th St. Port Angeles, WA 98362
• MSE wall
Guard-rail
Traffic signal lights•
•
Ground work to be done before installation of MSE wall.
Strider Safety Meeting