1 Norwalk Tank Farm Update Defense Energy Support Center- Americas West Norwalk Tank Farm Restoration Advisory Board October 26, 2006
Transcript
Page 1: Norwalk Tank Farm Update

1

Norwalk Tank Farm Update

Defense Energy Support Center-

Americas West

Norwalk Tank Farm

Restoration Advisory Board

October 26, 2006

Page 2: Norwalk Tank Farm Update

2

Presentation Overview

Topics to be Covered

• SVE System Modifications

• Groundwater Treatment System Upgrades and Expansion

• Hollifield Park & Dolland Elementary School Investigation Activities

• General Site Activities

Page 3: Norwalk Tank Farm Update

3

Central Plume Remediation

• SVE System Upgrades– System modified for use as Biovent or SVE

(September 22, 2006)

– Repaired pipe fittings and piping to enhance system efficiency

– SVE System was momentarily operated to evaluate system performance

– Currently SVE system is non-operational, but it is in ready-to-operate state

Page 4: Norwalk Tank Farm Update

4

Page 5: Norwalk Tank Farm Update

5

Central Plume Remediation

• -GWT System Upgrades– Use of Programmable Server for remote data

access – Modified system piping for air strippers and

the surge tank)

• -Surge tank water recycled to reduce arsenic concentrations below the NPDES discharge limits. However no discharge to storm drain

• GWT system currently non-operational

Page 6: Norwalk Tank Farm Update

6

Central Plume Remediation

• System Performance since April 1996– Total Hydrocarbons Mass Removed:

310,532 gallons.• Approx. 162,374 gallons recycled and destroyed

– 55,538 gallons of free product recovered

– 1,397 gallons of dissolved-phase hydrocarbons recovered

– 105,439 gallons of volatile hydrocarbons recovered through SVE

• Estimated 148,158+ gallons of hydrocarbons destroyed due to enhanced biodegradation

– 42.2 M gallons of water treated

– No Change since 2nd Quarter 2006

Page 7: Norwalk Tank Farm Update

7

Eastern Boundary /Hollifield Park Update

–Hollifield Park Soil & Groundwater Investigation Work

–Submitted a Soil & Groundwater Investigation Report

–Golden West/ Thrifty Oil Pipeline Update

–Discussion with regulator regarding Eastern Boundary

Page 8: Norwalk Tank Farm Update

8

Weed Abatement

Page 9: Norwalk Tank Farm Update

9

Planned Activities

• Fourth Quarter Groundwater Sampling

• Expand the capacity of the current GWT system

• Upgrades of the current GWT system will be concurrent with the system expansion activities

• Backflow pipe testing scheduled

• Hollifield Park/School Investigation Activities

Page 10: Norwalk Tank Farm Update

10

Discussion


Recommended