+ All Categories
Home > Documents > NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior...

NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior...

Date post: 25-Feb-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
33
SLOPED STEEL EPDM R OO F ON SL OPED STE EL 1 /4": 12 " TYPIC AL ALUM. FASCIA MATCH LINE 'B' MATCH LINE 'A' EXISTING ROOF TO REMAIN ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP. MATCH LINE 'B' MATCH LINE 'A' NEW CANOPY 1" / 1' - 0" EXTENT OF EXISTING ROOF EPDM RO O F O N SLOPED STEEL 1 /4" :12 " TYPIC AL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1/4":12" TYPICAL EPDM ROOF ON SLOPED STEEL 1":12" TYPICAL TAPERED INSULATION TAPERED INSULATION EPDM ROOF ON SLOPED STEEL TAPERED INSUALTION EPDM ROOF ON SLOPED STEEL 1":12" TYPICAL PRE - FABRICATED LOUVERED ALUM. SUNSHADE PRE - FABRICATED LOUVERED ALUM. SUNSHADE TAPERED INSULATION ALUM. EDGE TRIM AND GUTTER TYPICAL ALUM. FASCIA ALUM. EDGE TRIM AND GUTTER TYPICAL ALUM. FASCIA ALUM. FASCIA ALUM. EDGE TYPICAL ALUM. EDGE TRIM WITH GUTTER TYPICAL ALUM. FASCIA ALUM. EDGE TYPICAL 4' HIGH LOUVERED METAL ROOF SCREEN TOP OF NEW PARAPET FLUSH TO ADJACENT EXISTING ROOF DEMO PORTION OF EXISTING ROOF 1 A1.10 1 A1.10 DS ROOF HATCH TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS 76'-6" 23'-0" PRE - FABRICATED ALUM. SUNSHADE 2' - 6" 72' - 0" 18' - 0" INFILL AND RE - ROOF EXISTING CURB 7 A1.10 Sim N 195 Scott Swamp Road Farmington, CT 06032 qamarch.com Issue Dates: Project #: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY A B C:\Revit Local\ROCKY HILL_CD_roccopetitto.rvt 4/21/2020 11:59:41 AM A1.3 ROOF PLAN CONSTRUCTION DOCUMENT SET MARCH 23, 2020 1934 Rocky Hill Senior Community Center NEW BUILDING FOR: ROCKY HILL, CT 1/16" = 1'-0" A1.3 1 ROOF PLAN Revisions ADDENDA 4 APRIL 21, 2020
Transcript
Page 1: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

SLOPED STEEL

EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

EXISTING ROOF TO REMAIN

ALUM. FASCIA

MATCH LINE 'B'MATCH LINE 'A'

EXTENT OF EXISTING ROOF

EXISTING ROOF TO REMAIN

ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP.

MATCH LINE 'B'MATCH LINE 'A'

NEW CANOPY

1" / 1'-0"

EXTENT OF EXISTING ROOF EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

EPDM ROOF ON

SLOPED STEEL

1/4":12" TYPICAL

EPDM ROOF ON SLOPED STEEL1/4":12" TYPICAL

EPD

M R

OO

F O

N

SLO

PED

STE

EL1/

4":1

2" T

YPIC

AL

EPDM ROOF ON

SLOPED STEEL

1":12" TYPICAL

TAPE

RED

INSU

LATI

ON

TAPE

RED

IN

SULA

TIO

N

EPD

M R

OO

F O

N

SLO

PED

STE

ELTA

PER

ED

INSU

ALTI

ON

EPD

M R

OO

F O

N

SLO

PED

STE

EL1"

:12"

TYP

ICAL

PRE-FABRICATED LOUVERED ALUM. SUNSHADE

PRE- FABRICATED LOUVERED ALUM. SUNSHADE

TAPERED INSULATION

ALUM. EDGE TRIM AND GUTTER TYPICAL

ALUM. FASCIA

ALUM. EDGE TRIM AND GUTTER TYPICAL

ALUM. FASCIA

ALUM. FASCIA

ALUM. EDGE TYPICAL

ALUM. EDGE TRIM WITH GUTTER TYPICAL

ALUM. FASCIA

ALUM. EDGE TYPICAL

4' HIGH LOUVERED METAL ROOF SCREEN

TOP OF NEW PARAPET FLUSH TO ADJACENT EXISTING ROOF

DEMO PORTION OF EXISTING ROOF

1

A1.10

1

A1.10

DS

ROOF HATCH

TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS

TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS

TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS

76'-6"

23'-0

"

PRE-FABRICATED ALUM. SUNSHADE

2' -

6"

72' - 0"

18' -

0"

INFILL AND RE-ROOF EXISTING CURB

7A1.10

Sim

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

21/2

020

11:5

9:41

AM

A1.3

ROOF PLAN

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/16" = 1'-0"A1.31 ROOF PLAN

Revisions

ADDENDA 4 APRIL 21, 2020

Page 2: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

SLOPED STEEL

EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

ALUM. FASCIA

ROOF DRAIN WITH INTEGRAL OVERFLOW, TYP.

MATCH LINE 'B'MATCH LINE 'A'

1" / 1'-0"

EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

EPDM ROOF ON SLOPED

STEEL

1/4":12" TYPICAL

EPDM ROOF ON SLOPED STEEL1/4":12" TYPICAL

EPD

M R

OO

F O

N S

LOPE

D S

TEEL

1/4"

:12"

TYP

ICAL

EPDM ROOF ON SLOPED STEEL

1":12" TYPICAL

TAPE

RED

INSU

LATI

ON

TAPE

RED

INSU

LATI

ON

PRE- FABRICATED LOUVERED ALUM. SUNSHADE

ALUM. EDGE TRIM AND GUTTER TYPICAL

ALUM. FASCIA

ALUM. EDGE TRIM AND GUTTER TYPICAL

ALUM. FASCIA

4' HIGH LOUVERED METAL ROOF SCREEN

1

A1.10

1

A1.10

DS

ROOF HATCH

TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS

76'-6"

23'-0

"

18' -

0"

TAPERED INSULATION

4A1.10

Sim

1

A1.10

EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

ROOF DRAIN WITH INTEGRAL

OVERFLOW, TYP.

MATCH LINE 'B'MATCH LINE 'A'

EPDM ROOF ON SLOPED STEEL

1/4":12" TYPICAL

TAPE

RED

INSU

LATI

ON

ALUM. EDGE TYPICAL

ALUM. COPING

ALUM. COPING

EPDM ROOF ON SLOPED STEEL

1":12" TYPICAL

ALUM. COPING

1

A1.10

1

A1.10

TAPER INSULATION AT EDGE TYPICAL OF SLOPED ROOFS

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

21/2

020

11:0

4:41

AM

A1.3B

ROOF PLAN-PART B

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A1.3B1 ROOF PLAN-PART B

Revisions

ADDENDA 4 APRIL 21, 2020

1/8" = 1'-0"A1.3B2 ROOF PLAN ADD ALT

Page 3: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

HVAC EQUIPMENT,SEE MEP DWGS.

PREFABRICATED VIBRATION ISOLATION EQUIPMENT CURB, SPACE & SIZE PER EQUIPMENT SPECIFICATIONS, SEE MEP DWGS.

RUN ROOF MEMBRANE UP & OVER CURB, TYP.

8" M

IN.

RIGID INSULATION

COVERBOARD

ROOF MEMBRANE

CLOSED CELL INSULATION

EPDM WALK PADS. REFER TO SPECS

ROOF STRUCTURE, REFER TO STRUCTURAL DRAWINGS

RIGID INSULATION

FULLY ADHERED ROOF MEMBRANE FULLY ADHERED ROOF

MEMBRANE

MIN.2"

COVERBOARD

CLOSED CELL INSULATION

ROOF SHEATHING

BI-FUNCTIONAL ROOF DRAIN

EPDM ROOF ASSEMBLY ANDMEMBRANE FLASHING TO

EXTEND UNDER CLAMPING RINGMEMBRANE FLASHING

FULLY ADHERED EPDM ROOFING SYSTEM

TOP OF DECK

RIGID INSULATION

5/8" COVERBOARD, TYP.

TAPERED FIBER CANT SET IN MASTIC

INSULATE BOWL AND DRAIN

4" 4" 2' - 0"6" 1' - 0" 6"

8" 8"

ROOF DRAIN PIPE-REFER TO PLUMBING DRAWINGS

STRAINER BASKET

ROOF SHEATHING

CLOSED CELL INSULATION

4" M

IN.

4"

24" PLUMBING VENT STACK

PIPE PENETRATION

FLASHING HOT AIR WELD

BASE FLASHING, HOT AIR WELD

MEMBRANE

SEALANT

TOP OF FLASHING

1/2" GALVANIZED WIRE SCREEN

ROOF STRUCTURE-REFER TO STRUCTURAL DRAWINGS

ROOF SHEATHING

RIGID INSULATION

COVERBOARD

CLOSED CELL INSULATION

PRE-FABRICATED INSULATED METAL CURB

FIRE RETARDANT WOOD BLOCKING STRUCTURE @ NEW DECK OPENING BOLTED THROUGH TRUSSES

CONTINUOUS BEAD OF SEALANT

GROMMETED FASTENERS @ 12" O.C

METAL FLASHING WITH CLEATS @ 24" O.C

8" RUSS AT BASE OF CURB

FLASHING STRIP, HOT AIR STRIP

FULLY ADHERED EPDM ROOF MEMBRANE, SEE SPECS

RIGID INSULATION

WEATHER BARRIER @ ROOF. SEE SPECS FOR REQUIREMENTS

ROOF SHEATHING

CONDENSING UNIT PENETRATION

ISOLATION APPARATUS PER MECHANICAL DRAWINGS

CLOSED CELL INSULATION

COVERBOARD

INSULATED COVER

ROOF SCUTTLE

SAFETY POLE

GALV. 1-1/4" PIPE RAILING

CURB W/ INTEGRAL CAP FLASHING & POSIFLASH

PREFAB INSULATEDCURB

RIGID INSULATION

ANCHOR POST TO DECK TYP.

ROOF HATCH ASSEMBLY. INSTALL PER

MANUFACTURERS REQUIREMENTS.

FULLY ADHERED EPDM ROOFING SYSTEM

2X6 BLOCKING TO ACCOMMODATE INSULATION HEIGHT

CANT STRIP

ATTACH TO WALL USING MFG. RECOMMENDED CONNECTIONS

LADDER

COVERBOARDROOF MEMBRANE

MIN. 2X8 IN WALLS SOLID BLOCKING @ ALL ANCHOR LOCATIONS

S.S. RING CLAMPS, TYP.

ROOF STRUCTURE, SEE STRUC. DWGS

EXISTING CURB

CONTINUOUS BEAD OF SEALANT

GROMMETED FASTENERS @ 12" O.C

NEW METAL FLASHING WITH CLEATS

FLASHING STRIP, HOT AIR STRIP

EXISTING EPDM ROOF MEMBRANE

NEW RIGID INSULATION R-38 MIN

NEW ADHERED EPDM ROOF MEMBRANE

FULLY ADHERED MEMBRANE FLASHING

NEW 3/4" ROOF DECKING

NEW VAPOR BARRIER

INFILL CURB AREA W/MIN 8" CFMF 12" O.C.

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

21/2

020

11:5

0:17

AM

A1.10

ROOF DETAILS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1 1/2" = 1'-0"A1.106 EQUIPMENT CURB

3/4" = 1'-0"A1.105 EPDM WALK PAD DETAIL

1 1/2" = 1'-0"A1.101 ROOF DRAIN

1 1/2" = 1'-0"A1.102 PLUMBING VENT DETAIL

1 1/2" = 1'-0"A1.103 ISOLATION CURB @ AC UNITS DETAIL

Revisions

ADDENDA 4 APRIL 21, 2020

1 1/2" = 1'-0"A1.104 ROOF HATCH DETAIL

1 1/2" = 1'-0"A1.107 CURB INFILL

Page 4: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

FIRST FLOOR0"

12

CLERESTORY14' - 4"

BULLNOSE3' - 8"

EXTERIORINTERIOR

A5.14

Sim

BULLNOSE BRICK COLOR "B"

LOWER FACE 4" BRICK VENEER COLOR 'B'

SLOPED BULLNOSE BRICK SILL COLOR 'B' @ CLERESTORY

4" BRICK VENEER COLOR "B"

EXPOSED STRUCTURAL STEEL TO BE COATED WITH HIGH PERFORMANCE

THERMAL RESISTIVE PAINT AT ALL THERMAL TRANSITIONS TYPICAL

4 1/2" ALUMINUM STOREFRONT CLERESTORY

RADIANT PANEL, SEE MEP

NOTE: SEE STRUCTURAL DRAWINGS FOR FOUNDATION AND UNDERSLAB DRAIN LOCATIONS

8'-3"

HSS BEAM, SEE STRUCTURAL DRAWINGS ENCAPSULATE W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL

GYPSUM SHEATHING W INTEGRAL MOISTURE BARRIER. FLASH ALL SEAMS. PROVIDE ALL REQUIRED BLOCKING.

WOOD LOOK METAL SOFFIT

PT BLOCKING AT ROOF EDGE1/2" COVER BOARD

TAPERED POLYISOCYANURATE INSULATION

PREFINISHED ALUMINUM GUTTER

FULLY ADHERED EPDM ROOFING MEMBRANE

METAL DECKING, SEE STRUCTURAL DRAWINGS

ALUMINUM DRIP EDGE

ALUMINUM FASCIA AND DRIP EDGE

CONTINUOUS MOISTURE BARRIER

STEEL OUTRIGGERS W/ SOLID BLOCKING ALONG BOTTOM. FILL ENTIRE VOID W/ CLOSED CELL SPRAY INSULATION

LAP MOISTURE BARRIER AROUND SOFFIT FRAMING, INTEGRATE W/ ROOF AND CLOSED CELL

INSULATED METAL PANEL

STEEL CHANNEL AND BLOCKING, SEE STRUCTURAL DRAWINGS

HSS TUBE, STRUCTURAL DRAWINGS

1/2" P.J.F.

ENCAPSULATE ALL EXTERIOR STRUCTURAL COMPONENTS W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL

STEEL ANGLE TO SUPPORT STOREFRONT

METAL STUD FRAMING, INFILL W/ CLOSED CELL SPRAY INSULATION

HOT DIPPED GALV. STEEL ANGLESUSPENDED GYPSUM CEILING @ PERIMETER, SEE RCP

2' HORIZONTAL RIGID INSULATION AROUND

PERIMETER

REFER TO CIVIL DRAWINGS FOR EXTERIOR CONDITION

WEEPS @ 24" O.C., TYP.

2" RIGID INSULATION EACH SIDE OF FOUNDATION WALL

THROUGH CAVITY FLASHING

SOLID GROUT UNDER FLASHING

CONTINUOUS MOISTURE BARRIER

2" POLYISOCYANURATE INSULATION

3 5/8" CFMF

ALIGN SLOPE WITH STRUCTURE

75° .

8" 24 1/2"

8 1/2"

FIRST FLOOR0"

12

CLERESTORY14' - 4"

BULLNOSE3' - 8"

SF19

MULTIPURPOSE C

122

2' HORIZONTAL RIGID INSULATION AROUND

PERIMETER

2" RIGID INSULATION EACH SIDE OF FOUNDATION WALL

CONTINUOUS MOISTURE BARRIER

EXPOSED STRUCTURAL STEEL TO BE COATED WITH HIGH PERFORMANCE THERMAL RESISTIVE PAINT AT ALL THERMAL TRANSITIONS TYPICAL

4 1/2" ALUMINUM STOREFRONT CLERESTORY

NOTE: SEE STRUCTURAL DRAWINGS FOR FOUNDATION AND UNDERSLAB DRAIN LOCATIONS

6" ALUMINUM STOREFRONT, SEE WINDOW ELEVATIONS

10"

8'-3"

HSS BEAM, SEE STRUCTURAL DRAWINGS ENCAPSULATE W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL

GYPSUM SHEATHING W INTEGRAL MOISTURE BARRIER. FLASH ALL SEAMS. PROVIDE ALL REQUIRED BLOCKING.

WOOD LOOK METAL SOFFIT

PT BLOCKING AT ROOF EDGE1/2" COVER BOARD

TAPERED POLYISOCYANURATE INSULATION

PREFINISHED ALUMINUM GUTTER

FULLY ADHERED EPDM ROOFING MEMBRANE

METAL DECKING, SEE STRUCTURAL DRAWINGS

ALUMINUM DRIP EDGE

ALUMINUM FASCIA AND DRIP EDGE

CONTINUOUS MOISTURE BARRIER

STEEL OUTRIGGERS W/ SOLID BLOCKING ALONG BOTTOM. FILL ENTIRE VOID W/ CLOSED CELL SPRAY INSULATION

LAP MOISTURE BARRIER AROUND SOFFIT FRAMING, INTEGRATE W/ ROOF AND CLOSED CELL

INSULATED METAL PANEL

STEEL CHANNEL AND BLOCKING, SEE STRUCTURAL DRAWINGS

6" ALUMINUM STOREFRONT CLERESTORY

HSS TUBE W/ METAL PLATE TO SUPPORT STOREFRONT

SEE SITE DRAWINGS FOR EXTERIOR CONDITION

THERMAL BREAK IN CONCRETE

ALUMINUM FILLER BY STOREFRONT MFG.

ENCAPSULATE ALL EXTERIOR STRUCTURAL COMPONENTS W/ CLOSED CELL SPRAY INSULATION, WRAP W/ ALUMINUM BRAKE METAL

STEEL ANGLE TO SUPPORT STOREFRONT

METAL STUD FRAMING, INFILL W/ CLOSED CELL SPRAY INSULATION

RADIANT PANEL, SEE MEP

SUSPENDED GYPSUM CEILING @ PERIMETER, SEE RCP

3 5/8" CFMF

ALIGN SLOPE WITH STRUCTURE

24 1/2"8"

75° .

8 1/2"

GWB SOFFIT

COMPRESSIBLE FILLER

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

20/2

020

3:34

:11

PM

A5.7

WALL SECTION

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

3/4" = 1'-0"A5.71 WALL SECTION @ MULTIPURPOSE ROOM #1

3/4" = 1'-0"A5.72 WALL SECTION @ MULTIPURPOSE ROOM

Revisions

ADDENDUM #4 APRIL 21, 2020

Page 5: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

48"GFI

ACGFI

ACGFI

CO2

OC

OC

CR CR

48"GFI

OC

D3D3 3 3

T

T

4

CO2D3 3 3

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

2' - 1

0"6'

- 4"

12

144

P- PAINTED ABOVE W AINSCOT, R.T.F.S

PW T- 76"H TILE W AINSCOT, (NO W ALL BASE) FULL W IDTH,R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

6' - 8

" 0812

6' - 4

"

4

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE) FULL

W IDTH, R.T.F.S

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITION BETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

0909

08

0404

6' - 8

"

1' - 5

"

6' - 4

" 10

2'-0

"

4

P- PAINTED (ABOVEW AINSCOT) FULL

W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT(NO W ALL BASE)

FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

6' - 4

"

46'

- 4"

2' - 1

0"

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT(NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITION BETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

12

14

5' - 8

"13

P- PAINTED ABOVEW AINSCOT, FULL

W IDTH R.T.F.S

PW T- 76"H TILE W AINSCOT(NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

6' - 4

"

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT (NO W ALL BASE), FULL W IDTH,R.T.F.S

6' - 8

"6'

- 4" 08

04 04

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

6' - 8

"6'

- 4"

P- PAINTED (ABOVE W AINSCOT) FULL

W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE) FULLW IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

08

04

12 4

A7.0

1813

823

P- PAINTED (ABOVEW AINSCOT) FULL

W IDTH R.T.F.S

PW T- 76"H TILE W AINSCOT ,

(NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITION BETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

6' - 4

"

BABY CHANGING STATION, REFER TO PRODUCT SPEC

4

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

6' - 4

"

2' - 1

0"

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE)

FULL W IDTH, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

0416

2'-1

0"1'

-6"

1'-8

"

6'-0

"

11

1502

01

4

4

P- PAINTED (ABOVEW AINSCOT) FULL

W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE)

FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

040706

01

036' - 4

"2'

- 10"

1' - 4

"1'

- 8"

4

P- PAINTED (ABOVEW AINSCOT) FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT, (NO W ALL BASE) FULLW IDTH, R.T.F.S

6' - 4

"

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

5' - 8

" 13

4

A7.024

9

14

19

A7.0 15

10

25

20

A7.0 12

7

22

17

WOMENS

118

A7.0

6

16

1121

MENS

119

1'-4" 2'-8" 2'-8"1'

- 8"

2' - 6

"2'

- 10"

P- PAINTED (ABOVEW AINSCOT) FULL

W IDTH, R.T.F.S

6' - 4

" 1' - 6

" 01

0704

06

02

PW T- 76"H TILE W AINSCOT,

(NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

1' - 8

"2'

- 10"

6' - 4

"

2' - 1

0"

6' - 0

"

3' - 1

0" 6' - 9

1/4"

PW T- W ET W ALL TILE (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

171511

1604

02

27"H W 30"W CLEAR KNEE

SPACE

PW T- 76"H TILE W AINSCOT,(NO W ALL

BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

4P- PAINTED (ABOVEW AINSCOT) FULLW IDTH, R.T.F.S

6' - 8

1/4"

176' - 4

"5'

- 8"

P- PAINTED (ABOVEW AINSCOT) FULL W IDTH, R.T.F.S

13

17

PW T- 76"H TILE W AINSCOT, (NO W ALL BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTER TRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

1' - 8

"2'

- 10"

1' - 6

"

2' - 1

0"

6' - 0

"3'

- 10"

PW T- W ET W ALL TILE (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT

(NO W ALL BASE)FULL W IDTH,

R.T.F.S11

16

15

04

02

01

27"H X 30"WCLEAR KNEE

SPACE

6' - 4

"

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

4

PW T- 76"H TILE W AINSCOT,

(NO W ALL BASE)FULL W IDTH,

R.T.F.S

P- PAINTED (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

6' - 4

"

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES4

6' - 4

"

P- PAINTED (ABOVEW AINSCOT) FULL W IDTH,R.T.F.S

PW T- 76"H TILE

W AINSCOT,(NO W ALL

BASE) FULL W IDTH, R.T.F.S

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES4

1' - 6

"

P- PAINTED (ABOVEW AINSCOT)

FULL W IDTH, R.T.F.S

PW T- 76"H TILE W AINSCOT,(NO W ALL BASE) FULL

W IDTH,R.T.F.S

01

070604

036' - 4

"

2' - 1

0"

2' - 6

"

1' - 8

"

PROVIDE METAL SCHLUTERTRIM PIECE TO TRANSITIONBETW EEN TILES & TERMINATE AT TOP OF MIRROR, REFER TO FINISH NOTES

4

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:05

PM

A7.0

INTERIOR ELEVATIONS-BATHROOMS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.06 MENS RESTROOM- ELEVATION A

1/4" = 1'-0"A7.011 MENS RESTROOM- ELEVATION B

1/4" = 1'-0"A7.016 MENS RESTROOM- ELEVATION C

1/4" = 1'-0"A7.021 MENS RESTROOM- ELEVATION D

1/4" = 1'-0"A7.07 WOMENS RESTROOM- ELEVATION A

1/4" = 1'-0"A7.012 WOMENS RESTROOM- ELEVATION B

1/4" = 1'-0"A7.017 WOMENS RESTROOM- ELEVATION C

1/4" = 1'-0"A7.022 WOMENS RESTROOM- ELEVATION D

1/4" = 1'-0"A7.03 ENLARGED UNISEX RESTROOM PLAN

1/4" = 1'-0"A7.08 UNISEX RESTROOM- ELEVATION A

1/4" = 1'-0"A7.013 UNISEX RESTROOM- ELEVATION B

1/4" = 1'-0"A7.018 UNISEX RESTROOM- ELEVATION C

1/4" = 1'-0"A7.023 UNISEX RESTROOM- ELEVATION D

1/4" = 1'-0"A7.04 ENLARGED HEALTH RESTROOM PLAN

1/4" = 1'-0"A7.05 ENLARGED MULTIPURPOSE RESTROOM PLAN

1/4" = 1'-0"A7.02 ENLARGED WOMENS RESTROOM PLAN

1/4" = 1'-0"A7.01 ENLARGED MENS RESTROOM PLAN

1/4" = 1'-0"A7.09 HEALTH RESTROOM- ELEVATION A

1/4" = 1'-0"A7.014 HEALTH RESTROOM- ELEVATION B

1/4" = 1'-0"A7.019 HEALTH RESTROOM- ELEVATION C

1/4" = 1'-0"A7.024 HEALTH RESTROOM- ELEVATION D

1/4" = 1'-0"A7.010 MULTI. RESTROOM- ELEVATION A

1/4" = 1'-0"A7.015 MULTI. RESTROOM- ELEVATION B

1/4" = 1'-0"A7.020 MULTI. RESTROOM- ELEVATION C

1/4" = 1'-0"A7.025 MULTI. RESTROOM- ELEVATION D

BATHROOM KEYNOTE...Key

Value Keynote Text

01 18" VERTICAL GRAB BAR02 36" GRAB BAR03 42" GRAB BAR04 WALL HUNG TOILET06 NAPKIN DISPOSAL CONTAINER07 TOILET TISSUE DISPENSER08 FLOOR MOUNTED TOILET PARTITION09 URINAL10 WALL HUNG PRIVACY SCREEN11 ADA FIXED TILTED MIRROR12 MIRROR WITH BORDER13 SEMI RECESSED PAPER TOWEL & TRASH

RECEPTICAL14 WALL HUNG SINK WITH SOAP DISPENSER15 SOAP DISPENSER16 ADA WALL HUNG SINK17 ADA SHOWER SURROUND

Page 6: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

16/2

020

9:59

:45

AM

A9.0

DOOR SCHEDULE

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

DOOR SCHEDULE

DO

OR

#

RO

OM

#

RO

OM

NAM

E

DO

UBL

E LE

AF D

OO

R DOOR HARDWARE FRAME RATING

COMMENTSWID

TH

HEI

GH

T

TYPE

MAT

ERIA

L

GLA

ZIN

G

SET

#

PAN

IC

ADA

TYPE

MAT

ERIA

L

GLA

ZIN

G

HEA

D

JAM

B

SILL

UL

STC

100A 100 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y S2 NA NA FOB ACCESS CONTROL WITH ACCESSIBLE OPERATOR101 100 CORRIDOR 3' - 0" 7' - 0" EX EX EX 2 EX EX EX EX EX EX EX EX EX EX ADD ALARM ACTIVATED MAGNETIC HOLD OPEN TO EXISTING DOOR102 102 CORR. 3' - 0" 7' - 0" FG AL Y 4 y y AL Y NA NA103 103 VEST 3' - 0" 7' - 0" FG AL Y 4 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR105 144 HEALTH 3' - 0" 7' - 0" FG WD Y 5 N Y HM N H1 J1 20 NA106 106 TLT 3' - 0" 7' - 0" F WD N 6 N Y HM N H1 J1 S1 NA NA

108A 108 HUMAN SERVICES 3' - 0" 7' - 0" HG WD Y 7 N Y HM N H1 J1 20 NA FOB ACCESS CONTROL FAIL SECURE108B 108 HUMAN SERVICES 3' - 0" 7' - 0" F WD N 8 N Y HM N H1 J1 45 NA FOB ACCESS CONTROL FAIL SECURE WITH ALARM ACTIVATED MAGNETIC HOLD OPEN108C 108 HUMAN SERVICES 3' - 0" 7' - 0" HG WD Y 7 N Y HM N H1 J1 20 NA FOB ACCESS CONTROL FAIL SECURE109 109 OFFICE 3' - 0" 7' - 0" FG WD Y 7 N Y HM N H1 J1 NA 55 FOB ACCESS CONTROL FAIL SECURE110 108 HUMAN SERVICES 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55 FOB ACCESS CONTROL FAIL SECURE111 111 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55112 108 HUMAN SERVICES 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55114 114 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55115 115 OFFICE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 NA 55116 108 HUMAN SERVICES ● 6' - 0" 7' - 0" F WD N 10 N Y HM N H1 J1 45 NA117 117 THRIFT STORE 3' - 0" 7' - 0" FG WD Y 9 N Y HM N H1 J1 20 NA118 118 WOMENS 3' - 0" 7' - 0" F WD N 11 N Y HM N H1 J1 S1 20 NA119 119 MENS 3' - 0" 7' - 0" F WD N 11 N Y HM N H1 J1 S1 20 NA

120A 120 MULTI PURPOSE A 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA120B 120 MULTI PURPOSE A ● 6' - 0" 7' - 0" FG AL Y 13 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR121A 121 MULTIPURPOSE B 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA121B 121 MULTIPURPOSE B ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y S2 NA NA FOB ACCESS CONTROL WITH ACCESSIBLE OPERATOR121C 121 MULTIPURPOSE B 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA122A 122 MULTIPURPOSE C 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA122B 122 MULTIPURPOSE C ● 6' - 0" 7' - 0" FG AL Y 13 Y Y AL Y S2 NA NA ACCESSIBLE OPERATOR123A 123 STOR. ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA123B 123 STOR. ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA124A 124 MULTI-PURPOSE 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA124B 124 MULTI-PURPOSE 3' - 0" 7' - 0" HG WD Y 12 Y Y HM N H1 J1 20 NA125A 125 MULTI-PURPOSE 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA125B 125 MULTI-PURPOSE 3' - 0" 7' - 0" HG WD Y 12 Y Y HM N H1 J1 20 NA126 125 MULTI-PURPOSE 3' - 0" 7' - 0" F WD N 17 N Y HM N H1 J1 NA NA

127A 127 KITCHEN 3' - 0" 7' - 0" HG WD Y 16 N Y HM N H1 J1 20 NA127B 120 MULTI PURPOSE A 3' - 0" 7' - 0" HG WD Y 18 N Y HM N H1 J1 20 NA127C 127 KITCHEN 3' - 0" 7' - 0" FG AL Y 19 Y Y AL Y S2 NA NA FOB ACCESS CONTROL128A 128 KITCHEN STOR. 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA128B 128 KITCHEN STOR. 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA131A 131 STAGE 3' - 0" 7' - 0" F WD N 12 N N EX N EX EX 20 NA FIELD VERIFY DIMENSIONS131B 131 STAGE 3' - 0" 6' - 8" CL1 CL1 CL1 45 NA CHAIR LIFT FRAME AND DOOR WITH VISION PANEL, AUTOMATIC OPENER. SEE A8.0 & SPEC131B1 100 CORRIDOR 3' - 0" 6' - 8" CL1 CL1 CL1 45 NA CHAIR LIFT FRAME AND DOOR WITH VISION PANEL, AUTOMATIC OPENER. SEE A8.0 & SPEC

135 135 CUST. LCKR 3' - 0" 7' - 0" F WD N 20 N Y HM N H1 J1 45 NA136 136 MECH ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA

201A 201 ENTRY ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y NA NA201B 201 ENTRY ● 6' - 0" 7' - 0" FG AL Y 1 Y Y AL Y NA NA203 203 COAT 3' - 0" 7' - 0" F WD N 22 N N BN N NA NA 2 LEAF BARN DOOR SYSTEM204 210 CORRIDOR ● 6' - 0" 7' - 0" F WD N 23 N Y HM N H1 J1 NA

205A 210 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 24 N Y AL N 20 NA206 206 IT 3' - 0" 7' - 0" F WD N 12 N Y HM N H1 J1 45 NA209 209 EXERCISE/ DANCE 3' - 0" 7' - 0" FG WD Y 12 Y Y HM N H1 J1 20 NA210 210 CORRIDOR ● 6' - 0" 7' - 0" FG AL Y 26 Y Y AL Y S2 NA NA FOB ACCESS CONTROL FAIL SECURE

300B 300 GAMES 3' - 0" 7' - 0" F HM N 14 Y Y HM N H2 J2 S2 NA NA FOB ACCESS CONTROL FAIL SECURE NO ENTRY ACCESS301 301 STOR. 3' - 0" 7' - 0" F WD N 28 N Y HM N H1 J1 45 NA302 302 TLT 3' - 0" 7' - 0" F WD N 27 N Y HM N H1 J1 20 NA

310A 310 ARTS/CRAFTS 3' - 0" 7' - 0" FG WD Y 16 N Y HM N H1 J1 20 NA310B 310 ARTS/CRAFTS 3' - 0" 7' - 0" FG WD Y 16 N Y HM N H1 J1 20 NA311 310 ARTS/CRAFTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM N H1 J1 45 NA

DOOR SCHEDULE ADD ALTERNATE

a209B 209 EXERCISE/ DANCE 3' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROLa210 ● 6' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROLa301 a301 STORAGE ● 6' - 0" 7' - 0" F WD N 5 N Y HM H1 J1 N 45 NA

a302A a302 ACTIVITY/ ARTS 3' - 0" 7' - 0" FG WD Y 25 N Y HM H1 J1 N 20 NAa302B a302 ACTIVITY/ ARTS 3' - 0" 7' - 0" F WD N 25 N Y HM H1 J1 N 45 NAa303 a303 STORAGE ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa304 a302 ACTIVITY/ ARTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa305 a310 ARTS/ CRAFTS ● 6' - 0" 7' - 0" F WD N 15 N Y HM H1 J1 N 45 NAa306 a306 TLT 3' - 0" 7' - 0" F WD N 24 N Y HM H1 J1 S1 N 20 NA

a310A a310 ARTS/ CRAFTS 3' - 0" 7' - 0" FG WD Y 25 N Y HM H1 J1 N 20 NAa310B a310 ARTS/ CRAFTS 3' - 0" 7' - 0" FG AL Y 26 Y Y AL S2 Y NA NA FOB ACCESS CONTROL

Page 7: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

SEE SCHEDULE

SEE

SCHE

DULE

SEE

SCHE

DULE

SEE SCHEDULE

AL F HG

SEE SCHEDULE

SEE

SCHE

DULE

FG

BD

SEE

SCHE

DULE

SEE SCHEDULE

EQ. EQ.

WD O

SEE SCHEDULE

SEE

SCHE

DULE

2' - 1

0"8"

10"

6"6" 6"

INSULATED GLASS, TEMPERED. TYPICAL @ ALL EXTERIOR STOREFRONT LOCATIONS

TEMPERED GLAZING, TYPICAL

6"10

"

6" 6"

TEMPERED GLAZING, TYPICAL. FIRE-RATED SAFETY GLASS @ RATED DOORS, TYPICAL

SEE

SCHE

DULE

EQ EQ

SEE SCHEDULE

SEE

SCHE

DULE

TEMPERED GLAZING, TYPICAL

6"3'

- 2"

6" 6"

SEE SCHEDULE

EQ. EQ.

SEE

SCHE

DULE

AL

6" 6"

6"10

"2'

- 10"

8"

INSULATED GLASS, TEMPERED. TYPICAL @ALL EXTERIOR STOREFRONT LOCATIONS

COORDINATE HANDING WITH FLOOR PLANS

COORDINATE HANDING WITH FLOOR PLANS

COORDINATE HANDING WITH FLOOR PLANS

AL

WD-X

F

FG

ALUMINUM

WOOD

FLUSH

FULL GLASS

HG HALF GLASS

TYPES OF DOOR

O OVERHEAD

BD BARN DOOR

GENERAL NOTES:

DOOR SIZES ARE APPOINTED FOR PURPOSES OF BIDDING AND ARE FOR REFERENCE ONLY. GENERAL CONTRACTOR AND DOOR SUPLIER TO FIELD VERIFY ALL OPENINGS PRIOR TO ORDERING AND INSTALLING NEW DOOR AND FRAMES. DOOR MUST BE SIZED TO ACCOMMODATE CHANGE IN FLOOR THICKNESS.

GENERAL CONTRACTOR AND DOOR SUPLIER TO VERIFY ALL FINAL SIZES AND QUANTITIES OF DOORS PRIOR TO INSTALLATION.

REMOVE EXISTING DOORS AS REQUIRED, PREPARE OPENING TO RECEIVE NEW DOOR UNIT, SEE DETAILS.

ALL INTERIOR DOORS TO BE PREHUNG ON ROT RESISTANT FRAMES WITH HINGES, MILL COMPOSITE ADJUSTABLE SILL, SWEEPS & FULL WEATHER STRIPPING.

GENERAL CONTRACTOR TO PATCH, REPAIR & REPAINT ADJACENT FINISHES DISTURBED BY DOOR INSTALLATION AS REQUIRED.

SEE ARCHITECTURAL PLANS FOR ALL DOOR SWINGS.

REFER TO SPECIFICATIONS AND FINISH DRAWINGS FOR ALL FINISH INFORMATION.

PROVIDE AND INSTALL PAN FLASHING OVER ROUGH SILL FRAMING, INCLUSIVE OF THE CORNERS OF THE SILL FRAMING; SIDE FLASHING THAT EXTENDS OVER THE PAN FLASHING; TOP FLASHING THAT EXTENDS OVER THE SIDE FLASHING OR EQUIVALENT DETAILS FOR STRUCTURAL MASONRY WALLS.

AL HM

ALUMINUM

WOOD

HOLLOW METAL

FIBERGLASS

AL-X

WD-X

HMF-X

FG-X

HM HM

"SID

ELIG

HT

1"

2" SEE SCHEDULE 2"

SEE

SCHE

DULE

2"

2" SEE SCHEDULE 2"

SEE

SCHE

DULE

4"

2" 1' - 6" 2" SEE SCHEDULE 2"

SEE

SCHE

DULE

2"

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

21/2

020

2:36

:02

PM

A9.1

DOOR ELEVATIONS & FRAMES

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/2" = 1'-0"DOOR ELEVATIONS

1/2" = 1'-0"FRAME TYPES

Revisions

ADDENDA 4 APRIL 21, 2020

Page 8: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

P- PAINTED (ABOVE W AINSCOT), FULL W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

MONITOR PROVIDEDBY OW NER

MONITOR PROVIDEDBY OW NER

36" P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.SP- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT), FULL W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED (W AINSCOT), FULL W IDTH,R.T.F.S

DR-DRAPERY, FULL HT. &

W IDTH,R.T.F.S

36"

CH- 36"H CHAIR RAIL, R.T.F.S

DR-DRAPERY, FULL HT. &

W IDTH,R.T.F.S

DR-DRAPERY, FULL HT. &

W IDTH,R.T.F.S

P- PAINTED (ABOVE W AINSCOT) FULL W IDTH, R.T.F.S

3' - 4"

5' - 4

"

RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4

W F- W INDOW FILM@ STOREFRONTS

R.T.F.S

RB- RUBBER W ALL BASE,

R.T.F.S

P- PAINTED (ABOVE

W AINSCOT),FULL W IDTH,

R.T.F.S

36"

CH- 36"H CHAIRRAIL, R.T.F.S

P- PAINTED (W AINSCOT),FULL W IDTH,

R.T.F.S

W F- W INDOW FILM@ STOREFRONTS

R.T.F.S

P- PAINTED W ALL (ABOVE

W AINSCOT), FULL W IDTH,

R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

CH- 36"H CHAIRRAIL, R.T.F.S

36" P- PAINTED W ALL

(W AINSCOT), FULL W IDTH,

R.T.F.S

MONITOR PROVIDEDBY OW NER

2' - 1

0"

3' - 0" 9' - 0" 3' - 0" 6' - 0"

2' - 8

"

AW C- ACOUSTIC W OOD SOFFIT, R.T.F.S

BR1- BRICK ACCENT W ALLFULL W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOPSW ITH W ATERFALL EDGE, R.T.F.S

PL- PLASTICLAMINATE VERTICALCASEW ORK, R.T.F.S

PL- PLASTIC LAMINATEFLOATING SHELVING, PROVIDE PROPER SUPPORT, R.T.F.S

8' - 0

"

TRASH & RECYCLINGPULL OUT

CW T- FIREPLACE TILE SURROUND W RAPPED ON

ALL SIDES, FULL HT. & W IDTH, R.T.F.S

FIREPLACE

1' - 8

3/4"

CW T- CERAMIC TILE FRONTW ITH BUILT OUT BENCH SEATING,W RAPPED ON ALL SIDES, R.T.F.S

PGB- PAINTED ACCENT SOFFIT, R.T.F.S

CUSHIONS ON ALLSIDES, R.T.F.S

45"

56 1/2"

QZ- QUARTZCOUNTERTOP, R.T.F.S

RS1- ROLLER SHADES, TYPICAL, R.T.F.S&

DR- CUSTOM DRAPERY,FULL HT. & W IDTH,

R.T.F.S

3' - 4" 3' - 2" 3' - 2" 3' - 2" 3' - 2" 3' - 2" 3' - 4"

22' - 6"

9' - 6

"

4

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOP, R.T.F.S

CH- 36"H CHAIRRAIL, R.T.F.S

P- PAINTED (W AINSCOT),FULL W IDTH, R.T.F.S

ALIGN TOP OF COUNTERTOPW ITH BOTTOM OF CHAIR RAIL

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED(ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

36" P- PAINTED

(W AINSCOT)FULL W IDTH, R.T.F.S

P- PAINTED W ALL (ABOVE W AINSCOT), FULL W IDTH, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

REFER TO DOOR SCHEDULE

36"

CH- 36"H CHAIR RAIL, R.T.F.S

P- PAINTED W ALL (W AINSCOT)FULL W IDTH, R.T.F.S

CW T- CURVED BAR FRONT TILE SURROUND,FULL HT. & W IDTH, R.T.F.S

INSTALLATION: RUN VERTICALLY31"

QZ- QUARTZCOUNTERTOP,R.T.F.S

AW C- ACOUSTIC W OOD SOFFIT, R.T.F.S

P- PAINTED, FULL HT. & W IDTH (ABOVE AND BELOW

W AINSCOT) R.T.F.S

QZ- QUARTZCOUNTERTOP, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

DECORATIVE CORBELS, REFER TO FINISH NOTES

RB- RUBBER W ALL BASE,R.T.F.S

MONITORPROVIDED BY

OW NER

PGB- PAINTED SOFFIT, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED FULL HT. & W IDTH, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED FULL HT.& W IDTH, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

OPEN TO LOBBY

3' - 0

"

P- PAINTED (ABOVE W AINSCOT) FULL

W IDTH, R.T.F.S

CH- 36"H CHAIRRAIL, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

PGB- PAINTED SOFFIT, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH, R.T.F.S

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:13

PM

A7.1

INTERIOR ELEVATIONS- LOBBY,LIBRARY & GAMES LOUNGE

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.11 GAMES LOUNGE- ELEVATION A

1/4" = 1'-0"A7.16 GAMES LOUNGE- ELEVATION B

1/4" = 1'-0"A7.114 GAMES LOUNGE- ELEVATION D

1/4" = 1'-0"A7.12 GAMES LOUNGE- ELEVATION E

1/4" = 1'-0"A7.17 COFFEE BAR- ELEVATION A1/4" = 1'-0"A7.1

15 FIREPLACE SURROUND ELEVATION

1/4" = 1'-0"A7.13 LIBRARY- ELEVATION A

1/4" = 1'-0"A7.18 LIBRARY- ELEVATION B

1/4" = 1'-0"A7.110 GAMES LOUNGE- ELEVATION C

1/4" = 1'-0"A7.112 LIBRARY- ELEVATION C

1/4" = 1'-0"A7.111 COFFEE BAR- ELEVATION B

1/4" = 1'-0"A7.116 LIBRARY- ELEVATION D

1/4" = 1'-0"A7.15 VESTIBULE- ELEVATION A

1/4" = 1'-0"A7.19 VESTIBULE- ELEVATION B

1/4" = 1'-0"A7.113 VESTIBULE- ELEVATION C

1/4" = 1'-0"A7.117 VESTIBULE- ELEVATION D

1/4" = 1'-0"A7.14 LIBRARY- ELEVATION E

Page 9: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

W F2- W INDOW FILM @ FITNESS

STOREFRONTR.T.F.S

W F2- W INDOW FILM @ FITNESS

STOREFRONTR.T.F.S

P- PAINTED, FULL HT.& W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

P- PAINTED ACCENT W ALL,FULL HT. & W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S RB- RUBBER W ALL

BASE, R.T.F.S

RS1- ROLLER SHADE,TYPICAL, R.T.F.S3' - 4"

6' - 8

"

4

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

PGB- PAINTED ACCENT SOFFIT, R.T.F.S

MIRRORS- REFER TO FINISH NOTESMIRRORS- REFER TO FINISH NOTES

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

7' -

0"

3' - 6" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0"

P- PAINTED W ALL, FULL HT. & W IDTH, R.T.F.S

P- PAINTED W ALL,

FULL HT. & W IDTH, R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

W F2- W INDOW FILM @ FITNESS

STOREFRONTR.T.F.S

W F2- W INDOW FILM @ FITNESS

STOREFRONTR.T.F.S

PGB- PAINTED ACCENT SOFFIT, R.T.F.S

P- PAINTED, FULLHT. & W IDTH, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

P- ACCENT #2STRIPING

P- ACCENT #2STRIPING

P- ACCENT #2STRIPING

P- ACCENT #2STRIPING

P- ACCENT #2STRIPING

P- ACCENT #1 W ALL,FULL HT. & W IDTH

(BEHIND STRIPING)

P- ACCENT #1 W ALL,FULL HT. & W IDTH

(BEHIND STRIPING)

P- ACCENT #2 W ALL,FULL HT. & W IDTH

(BEHIND STRIPING)

PGB- PAINTED ACCENT SOFFIT, R.T.F.S

P- ACCENT #1 W ALL,FULL HT. & W IDTH

(BEHIND STRIPING)

RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

PGB- PAINTED ACCENT SOFFIT, R.T.F.S

P- PAINTED, FULL HT. & W IDTH, R.T.F.S

3' - 4"

10' -

8"

RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:19

PM

A7.2

INTERIOR ELEVATIONS-EXERCISE & FITNESS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.21 FITNESS- ELEVATION A

1/4" = 1'-0"A7.24 FITNESS- ELEVATION B

1/4" = 1'-0"A7.25 FITNESS- ELEVATION C

1/4" = 1'-0"A7.28 FITNESS- ELEVATION D

1/4" = 1'-0"A7.26 EXERCISE/ DANCE- ELEVATION B

1/4" = 1'-0"A7.23 EXERCISE/ DANCE- ELEVATION C

1/4" = 1'-0"A7.27 EXERCISE/ DANCE- ELEVATION D

1/4" = 1'-0"A7.22 EXERCISE/ DANCE- ELEVATION A

Page 10: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

CW T- RECEPTION DESK TILE FRONT,FULL HT. & W IDTH, R.T.F.S

PGB- PAINTED SOFFIT,FULL HT. & W IDTH, R.T.F.S

HUMAN SERVICES

POST MOUNTED SIGNAGECENTERED ABOVE OPENING,REFER TO SIGNAGE SCHEDULE

PENDANT LIGHTS, REFER TOLIGHTING SCHEDULE

QZ- QUARTZ TRANSACTIONCOUNTERS, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

15" 36" 15"

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

34"

RS1- ROLLER SHADE,TYPICAL, R.T.F.S

4

42"

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

15" 40" 15" 40" 15"EQ.

P- PAINTED UNDER CASEW ORK, FULL W IDTH,R.T.F.S

QZ- QUARTZ TRANSACTION COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

34"

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PENDANT LIGHTING, REFERTO LIGHTING SCHEDULE

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE CASEW ORK, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

RB- RUBBER W ALLBASE, R.T.F.S

15"

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

34"

15"

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

34"

126"

34"

P- PAINTED W ALLS,

FULL HT. & W IDTH,R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

36" PL- PLASTIC LAMINATE

CASEW ORK SHELVES, R.T.F.S

SS- SOLID SURFACECOUNTERTOP, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH, R.T.F.S

36"

36" 36" 36"

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

33"

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

36"36"

36"

PL- PLASTIC LAMINATECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE CASEW ORK, R.T.F.S

33 1/2"

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S RB- RUBBER W ALL BASE, R.T.F.S

SS- SOLID SURFACEW INDOW SILL, TYPICAL R.T.F.S4'

- 4"

3' - 4"RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.SRB- RUBBER W ALLBASE, R.T.F.S36

"

TS1- TACKABLE W ALLSURFACE, R.T.F.S

4

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

PTB- TILE BASE, R.T.F.S

P- PAINTED W ALL,(ABOVE W AINSCOT)FULL HT. & W IDTH,R.T.F.S

W P- W ALL PROTECTION(W AINSCOT) FULL W IDTH,R.T.F.S

36"

CH- 36"H CHAIRRAIL, R.T.F.S

8' - 1 1/4"

9' - 6

"

RS2- ROLLER SHADES,R.T.F.S

34"

PTB- TILEBASE, R.T.F.S

P- PAINTED W ALLS,(ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

SS- SOLID SURFACECOUNTERTOP W ITH4"H BAKSPLASH, R.T.F.S

PL- PLASTIC LAMINATEADA SINK SKIRT, R.T.F.S

REFER TO PLUMBINGSPEC

18"

30"

LOCKABLE PLASTICLAMINATE CABINETS

W PP- W ALL PROTECTION

(W AINSCOT) FULL W IDTH, R.T.F.S

36"

CH- 36"H CHAIR RAIL, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

40"

PTB- TILE BASE, R.T.F.S

P- PAINTED W ALLS,(ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

34"

CH- 36"H CHAIR RAIL,R.T.F.S18

"32

"W PP- W ALL PROTECTION(W AINSCOT) FULL W IDTH,

R.T.F.S

P- PAINTED W ALLS, (ABOVE

W AINSCOT)FULL W IDTH,

R.T.F.S

PTB- TILEBASE, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

W PP- W ALL PROTECTION(W AINSCOT) FULL W IDTH,

R.T.F.S

36"

P- PAINTED W ALLS, (ABOVE

W AINSCOT)FULL W IDTH,

R.T.F.S

W PP- W ALL PROTECTION(W AINSCOT) FULL W IDTH,

R.T.F.S

6' - 0

"

3' - 0"

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

PTB- TILE BASE,R.T.F.S

LOCKERS, REFERTO FINISH NOTES

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:25

PM

A7.3

INTERIOR ELEVATIONS- HUMANSERVICES & HEALTH

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.31 HUMAN SERVICES- ELEVATION A

1/4" = 1'-0"A7.36 HUMAN SERVICES- ELEVATION B

1/4" = 1'-0"A7.311 HUMAN SERVICES- ELEVATION C

1/4" = 1'-0"A7.315 HUMAN SERVICES- ELEVATION D

1/4" = 1'-0"A7.32 HUMAN SERVICES- ELEVATION E

1/4" = 1'-0"A7.35 THRIFT STORE- ELEVATION A

1/4" = 1'-0"A7.37 HUMAN SERVICES- ELEVATION F

1/4" = 1'-0"A7.312 HUMAN SERVICES- ELEVATION G

1/4" = 1'-0"A7.33 TYPICAL OFFICE- ELEVATION A

1/4" = 1'-0"A7.38 TYPICAL OFFICE- ELEVATION B

1/4" = 1'-0"A7.313 TYPICAL OFFICE- ELEVATION C

1/4" = 1'-0"A7.316 TYPICAL OFFICE- ELEVATION D

1/4" = 1'-0"A7.34 HEALTH- ELEVATION A

1/4" = 1'-0"A7.39 HEALTH- ELEVATION B

1/4" = 1'-0"A7.314 HEALTH- ELEVATION C

1/4" = 1'-0"A7.317 HEALTH- ELEVATION D

1/4" = 1'-0"A7.310 CUSTODIAN CLOSET- ELEVATION A

Page 11: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

3' - 0

"

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),FULL W IDTH, R.T.F.S

CH- 36"H CHAIRRAIL, R.T.F.S

P- PAINTED (W AINSCOT),FULL W IDTH, R.T.F.S

REFER TO FFE SCOPEREFER TO FFE SCOPEREFER TO FFE SCOPE

P- PAINTED (ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

PGB- PAINTED ACCENT SOFFIT,FULL HT. & W IDTH, R.T.F.S

7' - 2

"

RB- RUBBER W ALL BASE, R.T.F.S

RS2- ROLLER SHADES,TYPICAL, R.T.F.S

&DR- CUSTOM DRAPERY,

FULL HT. & W IDTH,R.T.F.S

RS2- ROLLER SHADES, TYPICAL, R.T.F.S

&DR- CUSTOM DRAPERY,

FULL HT. & W IDTH,R.T.F.S

3' - 0

"

CH- 36"H CHAIR RAIL, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH, R.T.F.S

6' - 0"

44

RB- RUBBER W ALL BASE, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

REFER TO LIGHTINGSPECS

PGB- PAINTED ACCENT SOFFIT,FULL HT. & W IDTH, R.T.F.S

PGB- PAINTED ACCENT SOFFIT,FULL HT. & W IDTH, R.T.F.S

77"

FOLDING PARTITIONS,REFER TO PRODUCT SPECS

RS2- ROLLER SHADES,TYPICAL, R.T.F.S

&DR- CUSTOM DRAPERY,

FULL HT. & W IDTH,R.T.F.S

RS2- ROLLER SHADES,TYPICAL, R.T.F.S

&DR- CUSTOM DRAPERY,

FULL HT. & W IDTH,R.T.F.S

RS2- ROLLER SHADES,TYPICAL, R.T.F.S

&DR- CUSTOM DRAPERY,

FULL HT. & W IDTH,R.T.F.S

3' - 0

"

CH- 36"H CHAIR RAIL, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT),

FULL W IDTH, R.T.F.S

12' - 0"

14' -

4"

4

44

PGB- PAINTED ACCENT SOFFIT, FULL HT. & W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

OPENING TO KITCHEN

P- PAINTED (ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOP,R.T.F.S

RB- RUBBER W ALL BASE, R.T.F.S

156"

W ALL SCONCES, REFER TO LIGHTING SCHEDULE

DECORATIVE CORBELS, REFER TO FINISH NOTES

CH- 36"H CHAIRRAIL, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH, R.T.F.S

FR. FR. REF.

W P- W ALL PANELS,FULL HT. & W IDTH,

R.T.F.S

QTB- QUARRY TILE BASE, R.T.F.S

QZ- QUARTZ COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

36" 21"

REFER TO KITCHEN EQUIP. SCHEDULE

RAKKS BRACKET,REFER TO FINISHNOTES

REFER TO PLUMBING DW GS

34"

3" 33"

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

PLASTICLAMINATE FILLER& SINK SKIRT TO MATCH CABINETFINISH, R.T.F.SOPEN TO

MULTIPURPOSE

W P- W ALL PANELS,FULL HT. & W IDTH, R.T.F.S

QTB- QUARRY TILE BASE, R.T.F.S

QZ- QUARTZCOUNTERTOP,R.T.F.S

134"

27"H X 30"WCLEAR KNEE

SPACE

34"

RAKKS BRACKET,REFER TO FINISHNOTES

W P- W ALL PANELS,FULL HT. & W IDTH,

R.T.F.S

QZ- QUARTZ COUNTERTOP,R.T.F.S

OPENING TOMULTIPURPOSE

ROOM

34"

W P- W ALL PANELS,

FULL HT. & W IDTH, R.T.F.S

27"H X 30"WCLEAR KNEE

SPACE

QTB- QUARRY TILEBASE, R.T.F.S

RAKKS BRACKET,REFER TO FINISH NOTES

18"36" 95 1/2"

DW

REFER TO KITCHENEQUIP. SPECS

OPENING TO CORRIDOR

QZ- QUARTZ COUNTERTOP,R.T.F.S

QTB- QUARRYTILE BASE, R.T.F.S

W P- W ALL PANELS,

FULL HT. & W IDTH, R.T.F.S

150"

NEW SS JAMBS FOR EXISTING KITCHEN COIL SHUTTER TO BE REUSED

INSULATE ALL PLUMBING, TYPICALRAKKS BRACKETAS NEEDED,REFER TO FINISHNOTES

34"

P- PAINTED W ALLSFULL HT. & W IDTH,

R.T.F.S

OPENING TOKITCHEN

CAFE

POST MOUNTED SIGNAGECENTERED ABOVE OPENING,REFER TO SIGNAGE SCHEDULE

77"

1 1/2"

PTB- TILE BASE,R.T.F.S

QZ- QUARTZ SERVINGCOUNTER, R.T.F.S

W ALL SCONCE, REFER TOLIGHTING SCHEDULE

98 1/2"

RE-USE EXISTING ROLL DOW N FIRE SHUTTER.

VERIFY EXISTING OPENING.

DECORATIVE CORBELS,REFER TO FINISH NOTES

34"

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:31

PM

A7.4

INTERIOR ELEVATIONS-MULTIPURPOSE A, B, C &KITCHEN

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.41 MULTIPURPOSE A, B & C- ELEVATION A

1/4" = 1'-0"A7.42 MULTIPURPOSE A, B & C- ELEVATION B

1/4" = 1'-0"A7.44 MULTIPURPOSE A, B & C- ELEVATION C

1/4" = 1'-0"A7.43 MULTIPURPOSE A, B & C- ELEVATION D

1/4" = 1'-0"A7.45 KITCHEN- ELEVATION A

1/4" = 1'-0"A7.46 KITCHEN- ELEVATION B

1/4" = 1'-0"A7.47 KITCHEN- ELEVATION C

1/4" = 1'-0"A7.48 KITCHEN- ELEVATION D

1/4" = 1'-0"A7.49 CORRIDOR SERVICE COUNTER- ELEVATION A

Page 12: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

2' - 1

0"

OPENING TO KITCHEN QZ- QUARTZ

COUNTERTOP, R.T.F.S

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED (ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT),FULL W IDTH, R.T.F.S

CAFE

POST MOUNTED SIGNAGE CENTERED ABOVE OPENING, REFER TO SIGNAGE SCHEDULE

6' - 5

"

W ALL SCONCE, REFER TO LIGHTING SCHEDULE

CH- 36"H CHAIR RAIL, R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

DECORATIVE CORBELS,REFER TO FINISH NOTES

RB- RUBBER W ALLBASE, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

P- PAINTED (ABOVE

W AINSCOT)FULL W IDTH,

R.T.F.S

3' - 0

"

P- PAINTED (ABOVE W AINSCOT)

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT)

FULL W IDTH, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH,

R.T.F.S

FOLDING PARTITION,REFER TO FINISH NOTES

P- PAINTED (ABOVE W AINSCOT)

FULL W IDTH, R.T.F.SQZ- QUARTZ

COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE

CASEW ORK, R.T.F.S

18' - 0"3' - 5 1/4" 3' - 7 3/4" 3' - 7" 3' - 7" 3' - 9"

9' - 0

"

18' - 0"3' - 9" 3' - 7" 3' - 7" 3' - 7" 3' - 6"

RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4RS1- ROLLER SHADES,

TYPICAL, R.T.F.S

4

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED (W AINSCOT)FULL W IDTH, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

36"

P- PAINTED (ABOVE W AINSCOT)

FULL W IDTH, R.T.F.S

P- PAINTED (ABOVE W AINSCOT)

FULL W IDTH, R.T.F.S

3' - 4"

5' - 4

"

RS1-ROLLER SHADES,TYPICAL, R.T.F.S

4FOLDING PARTITIONS,REFER TO PRODUCT SPEC

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,(ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

P- PAINTED W ALLS,(ABOVE W AINSCOT)FULL W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOP, R.T.F.S

CH- 36"H CHAIR RAIL, R.T.F.S

3'-0

" P- PAINTED W ALLS,(W AINSCOT)

FULL W IDTH, R.T.F.S

P- PAINTED W ALLS,(W AINSCOT)

FULL W IDTH, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

SS- SOLID SURFACECOUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE OPEN SHELF CASEW ORK, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH,

R.T.F.S

RS1- ROLLER SHADESTYPICAL, R.T.F.S

36"

6' - 8

"

3' - 4"

4

36"

P- PAINTED W ALLS, FULL HT. & W IDTH, R.T.F.S

SS- SOLID SURFACECOUNTERTOP, R.T.F.S

PL- PLASTICLAMINATE OPEN SHELF CASEW ORK, R.T.F.S

RS1- ROLLER SHADES,TYPICAL, R.T.F.S

4

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH, R.T.F.S

PL- PLASTIC LAMINATE CASEW ORK, R.T.F.S

SS- SOLID SURFACE COUNTERTOP &8"H BACKSPLASH,R.T.F.S

REFER TO PLUMBING SPECS

34"

10"

36"

27"H X 30"WCLEAR KNEE

SPACE

27"H X 30"WCLEAR KNEE

SPACE

RB- RUBBER W ALLBASE, R.T.F.S

P- PAINTED W ALLS,FULL HT. & W IDTH, R.T.F.S

36"

34"

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:36

PM

A7.5

INTERIOR ELEVATIONS-MULTIPURPOSE ROOMS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.51 MULTIPURPOSE- ELEVATION A

1/4" = 1'-0"A7.55 MULTIPURPOSE- ELEVATION B

1/4" = 1'-0"A7.52 MULTIPURPOSE- ELEVATION C

1/4" = 1'-0"A7.56 MULTIPURPOSE- ELEVATION D

1/4" = 1'-0"A7.53 TYPICAL ARTS & CRAFTS- ELEVATION A

1/4" = 1'-0"A7.57 TYPICAL ARTS & CRAFTS- ELEVATION B

1/4" = 1'-0"A7.54 TYPICAL ARTS & CRAFTS- ELEVATION C

1/4" = 1'-0"A7.58 TYPICAL ARTS & CRAFTS- ELEVATION D

Page 13: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

2'-0

"4'

-8"

EXISTING CRASH PADS

P- 2'H PAINTED W ALL STRIPE BANDING @ 4'-8", FULL W IDTH, ALL W ALLS,

R.T.F.S

OPENING TO STAGE

P- 2'H PAINTED W ALL STRIPE BANDING @ 4'-8", FULL W IDTH, ALL W ALLS,

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

AW P- ACOUSTIC W ALL PANELS, R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED (STAGE W ALLS)FULL HT. & W IDTH, ALL W ALLS,

R.T.F.S

P- 2'H PAINTED W ALL STRIPE BANDING@ 4'-8", FULL W IDTH, ALL W ALLS, R.T.F.S2'

- 0"

4' - 8

"

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

RS1- ROLLER SHADES, TYPICAL, R.T.F.S

AW P- ACOUSTIC W ALL PANEL, R.T.F.S

5' - 0"

4' - 0

"

4

P- 2'H PAINTED W ALL STRIPE BANDING @ 4'-8", FULL W IDTH, ALL W ALLS,

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S4' - 6

"2'

- 0"

P- 2'H PAINTED W ALL STRIPE BANDING@ 4'-8", FULL W IDTH, ALL W ALLS,

R.T.F.S

4' - 8

"2'

- 0"

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

P- PAINTED W ALLS, FULL HT. & W IDTH (ABOVE & BELOW STRIPING)

R.T.F.S

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:29

:39

PM

A7.6

INTERIOR ELEVATIONS- GYM

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/4" = 1'-0"A7.61 GYMNASIUM- ELEVATION A

1/4" = 1'-0"A7.62 GYMNASIUM- ELEVATION C

1/4" = 1'-0"A7.63 GYMNASIUM- ELEVATION D

1/4" = 1'-0"A7.64 GYMNASIUM- ELEVATION B

Page 14: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

3' - 0" 2' - 10" 2' - 8" 3' - 0" 2' - 10" 2' - 10" 3' - 2" 2' - 6" 3' - 0" 3' - 2" 2' - 4" 5' - 8"2' - 6" 2' - 10"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

ALIGN MULLIONS WITH LOWER SYSTEM, TYPICAL

SF06

METAL PANEL

42'-4"

2' - 1

0 1/2"

2' - 0

"

2' - 1

1" +/

-

8

A9.11

11A9.11

Sim 6A9.11

Sim

13

A9.11

ALIGN W/ ROOF SLOPE

2' - 11"2' - 9"2' - 9"3' - 2"2' - 9"2' - 9"3' - 2"2' - 9"2' - 9"3' - 2"2' - 8"2' - 8"2' - 8"2' - 8"

39' - 7"

9 1/2"

2' - 0

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

ALIGN MULLIONS WITH LOWER SYSTEM, TYPICAL

SF07

2' - 1

0 1/2"

2' - 0

"

4' - 1

0 1/2"

6A9.11

Sim

8

A9.11

2' - 9

1/2"

+/-

13

A9.11

ALIGN W/ ROOF SLOPE

CLERESTORY14' - 4"

6" 5' - 10" 3' - 2" 3' - 2" 3' - 2" 3' - 2" 2' - 9" 2' - 11" 3' - 2" 3' - 8"

31' - 6"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

SF08

ALIGN MULLIONS WITH LOWER SYSTEM, TYPICAL

SEE ALTERNATE STOREFRONT ELEVATIONS FOR LOWER SYSTEM. USE ALTERNATE SILL AS NEEDED

METAL PANEL

8

A9.116

A9.11

Sim

2'-9 1

/2" +/

-

13

A9.11

1' - 2

" +/-

3' - 4"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

5"1'

-6"

4'-1

1"6"

2'-1

0"6"

10'-8

"

SF05

9

A9.11

SF09a

3'-2 5/8"

5"1'

-5"

5'-0

"6"

2'-1

0"6"

EXTERIOR STOREFRONT

ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB

601T OR EQUAL

10'-8

"

5"5'

-0"

6"2'

-10"

1'-5

"

SF09b

3'-2 3/4"

10'-8

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

6"

NOTES:

- UPPER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL, TYP. @ALL

- LOWER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 601T OR EQUAL, TYP @ ALL

- STOREFRONT COLOR SHOULD MATCH EXISTING TOWN HALL. REFER TO SPECIFICATIONS.

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

20/2

020

3:53

:01

PM

A9.4

STOREFRONT ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/2" = 1'-0"A9.42 SF06-ELEVATION

1/2" = 1'-0"A9.43 SF07-ELEVATION

1/2" = 1'-0"A9.46 SF08-ELEVATION

1/2" = 1'-0"A9.41 SF05- ELEVATION

1/2" = 1'-0"A9.44 SF09a - ELEVATION

1/2" = 1'-0"A9.45 SF09b - ELEVATION

Revisions

ADDENDA 4 APRIL 21, 2020

Page 15: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

ALL GLAZING IN SF10 TO BE SPANDREL GLASS

SF10

8

A9.11

9' - 9"

4" EQ. EQ. 4"

5"1'

-10"

2'-9

"3'

-10"

6"2'

-8"

6"

12'-6

"

LOWER SYSTEM TO BE

TEMPERED GLAZING

6' - 0"

SF11

5"1'

- 5"

5' - 0

"6"

3' - 4

"6"

2' - 8

"6"

2' - 8" 2' - 8"

8

A9.11

4" 4"

14'-4

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

7' - 0

"

LAMINATED SAFETY GLAZING

7'-11"

REF. TO DOOR SCHEDULE

8

A9.11

LAMINATED SAFETY GLAZING

127C

LAMINATED SAFETY GLAZING

LAMINATED SAFETY GLAZING

4" 4"EQ 3'-1 1/2" +/- EQ

5"2'

-6 1

/2"

2'-0

1/2

"6"

3'-4

"6"

3'-2

"

12'-6

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

9

A9.11

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451 OR EQUAL

METAL PANELMETAL PANEL

3' - 10 1/2" 2' - 0" 2' - 10" 2' - 10" 2' - 0"

8

A9.11

3'-6"

+/- 11

A9.11

Sim

14A9.11

Sim

13

A9.11

ALIGN W/ ROOF SLOPE

13' - 8"

103

12

A9.11

2' - 0

"6"

7' - 0

"

6' - 2"

9

A9.11

8

A9.11

4" 3' - 0" 2' - 6" 4"

LAMINATED SAFETY GLAZING

2 1/

2"1'

-9 1

/2"

6"3'

-4"

6"2'

-8"

6"

9'-6

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

LAMINATED SAFETY GLAZING

SF21a

3'-9" .

2'-1

0"6"

2'-1

0"6"

6'-8

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF

DESIGN : KAWNEER TRIFAB 451T OR EQUAL

SF21b

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN :KAWNEER TRIFAB 601T OR EQUAL

3'-9" .

2'-1

0"6"

2'-1

0"6"

6'-8

"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

14'-8"

2'-10" 3'-0" 2'-10" 2'-0" 3'-10" +/-

METAL PANELMETAL PANEL

14A9.11

Sim 3'-6"

+/-

8

A9.11

13

A9.11

ALIGN W/ ROOF SLOPE

NOTES:

- UPPER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL, TYP. @ALL

- LOWER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 601T OR EQUAL, TYP @ ALL

- STOREFRONT COLOR SHOULD MATCH EXISTING TOWN HALL. REFER TO SPECIFICATIONS.

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

20/2

020

4:44

:34

PM

A9.5

STOREFRONT ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 21, 2020

1/2" = 1'-0"A9.55 SF10-ELEVATION

1/2" = 1'-0"A9.56 SF11-ELEVATION

1/2" = 1'-0"A9.57 SF16-ELEVATION

1/2" = 1'-0"A9.52 SF12a-ELEVATION

1/2" = 1'-0"A9.58 SF19- ELEVATION

1/2" = 1'-0"A9.51 SF21a

1/2" = 1'-0"A9.53 SF21b1/2" = 1'-0"A9.5

4 SF12b - ELEVATION

Page 16: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

SFa07

5" 2'-3 1/2" 2'-5" 2'-5" 2'-5" 2'-5" 2'-3" +/- 3'-4" 2'-4" 2'-4" 3'-4" 2'-4" 2'-4" 3'-8"

3'-0

"2'

-3"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

14A9.11

Sim8

A9.11

13

A9.11

5'-3

"

3'-1

0" +

/-

ALIGN W/ ROOF SLOPE

SFa05

2'-4"2'-3"2'-4"2'-4"2'-4"2'-4"2'-4"2'-4"2'-4"2'-4"3'-8" 3'-4" 3'-4" 5"3'-4"3'-4"

2'-3

"1'

-0".

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

13

A9.11

14A9.11

Sim

11A9.11

Sim

3' - 4

"

8

A9.11

ALIGN W/ ROOF SLOPE

5' - 3

"

SFa06

3'-7"3'-4"3'-4"3'-4"3'-4"3'-4"6'-5"6'-5"5"

33'-6"

EXTERIOR STOREFRONT ASSEMBLY, TYP. BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL

3'-4

" +/- 8

A9.11

14A9.11

Sim

14A9.11

Sim

ALIGN W/ ROOF SLOPE

NOTES:

- UPPER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 451T OR EQUAL, TYP. @ALL

- LOWER SYSTEM: EXTERIOR STOREFRONT ASSEMBLY, BASIS OF DESIGN : KAWNEER TRIFAB 601T OR EQUAL, TYP @ ALL

- STOREFRONT COLOR SHOULD MATCH EXISTING TOWN HALL. REFER TO SPECIFICATIONS.

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_r

occo

petit

to.rv

t4/

20/2

020

4:43

:56

PM

A9.10

STOREFRONT ELEVATIONS

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 21, 2020

1/2" = 1'-0"A9.101 SFa07

1/2" = 1'-0"A9.102 SFa05

1/2" = 1'-0"A9.103 SFa06

Page 17: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

DN

UP

UPUP

DN

FR FR RF

A7.31

A7.0

6

16

1121A7.0 12

7

22

17

MATCH LINE 'B'MATCH LINE 'A'

STAGE

131

GYMNASIUM

130

OFFICE

110

MECH

136

KITCHEN

127

STOR.

116

WOMENS

137

ENTRY

201

STOR.

123

CUST. LCKR

135

KITCHEN STOR.

128

ELEC.

138

THRIFT STORE

117

WOMENS

118

MENS

119

OFFICE

115

OFFICE

112

OFFICE

111

MENS

107

OFFICE

109

CORR.

102

PATIO

MULTI PURPOSE A

120

MULTIPURPOSE C

122MULTIPURPOSE B

121

EXIT

139

COAT

203CORRIDOR

210

CORRIDOR

101CORRIDOR

100

LIBRARY

202

MULTI-PURPOSE

125

GAMES

300

TLT

106

OFFICE

113

MULTI-PURPOSE

124

TLT

126

VEST

103

STOR.

301

HUMAN SERVICES

108

CPT- CARPET TILE, R.T.F.S,INSTALLATION: TBD

LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD

PTF- PORCELAIN TILE,INSTALLATION: TBD,

R.T.F.S

PTF- PORCELAIN TILE,INSTALLATION: TBD,

R.T.F.S

LVT- VINYL TILE,INSTALLATION: TBD

R.T.F.S

OFFICE

114

A7.4

1

2

4

3

A7.3

7

12

A7.3 11

6

15

2

A7.3

5

A7.316

3

8

13

A7.5 5

1

2

6

A7.3

14

17

4

9

A7.04

A7.02

A7.01

A7.05

A7.024

9

14

19

A7.0 15

10

25

20

A7.48

5

6

7

PTF- PORCELAIN TILE, R.T.F.S,INSTALLATION: TBD

CW T- CERAMIC TILE,FULL HT. & W IDTH OFDESK FRONT, R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD

LVT- VINYL TILE, R.T.F.SINSTALLATION: TBD

PTF- TILE FLOOR, R.T.F.SINSTALLATION: TBD

EXISTING TO REMAIN

EXISTING STAGE FLOOR TO BE REPAIRED, REFINISHED

& PAINTED W ITH P15

QTF- QUARRY TILE,INSTALLATION: TBD

R.T.F.S

SC- SEALED CONCRETE,

R.T.F.SQTF- QUARRY TILE,INSTALLATION: TBD

R.T.F.S

EXISTING TO REMAIN

PTF- PORCELAIN TILE,INSTALLATION: TBD

R.T.F.S

EXISTING TO REMAIN

EXISTING TO REMAIN

SC- SEALED CONCRETE,

R.T.F.S

PTF- PORCELAIN TILE,INSTALLATION: TBD

R.T.F.S

PTF- TILE FLOOR,INSTALLATION: TBD,

R.T.F.S

A7.3

10

QZ- QUARTZ TRANSACTION COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATE COUNTERTOP, R.T.F.S

A7.4 9

WORK RM

133

SC- SEALED CONCRETE,R.T.F.S

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

HEALTH

144

A7.6

1

A7.62 A7.6 3A7.6

4

REFER TO FFE SCOPE REFER TO FFE SCOPE REFER TO FFE SCOPE

EXISTING FLOOR TO REMAIN

2

TRANSITION IN DOORW AYFROM PTF TO EXISTING

2

PTF-PORCELAIN

TILE,INSTALLATION:

TBDR.T.F.S

2

EM1- ENTRANCE MAT,INSTALLATION: TBD

2

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS2- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS1- TYPICAL ROLLER SHADESIN ALL OFFICE SUITES,

R.T.F.S & INTERIOR ELEVATIONS

4

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS2- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

TS1- TACKABLE W ALL SURFACE, R.T.F.S

4

TS1- TACKABLE W ALLSURFACE, R.T.F.S

4

TS1-TACKABLE W ALLSURFACE, TYPICAL IN ALL OFFICES, R.T.F.S

4

TS1-TACKABLE W ALLSURFACE, TYPICAL IN ALL OFFICES, R.T.F.S

4

TS1- TACKABLE W ALLSURFACE, TYPICAL INALL OFFICES, R.T.F.S

4

4

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:44

:51

PM

A10.1A

ENLARGED FINISH PLANS-PART A

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"A10.1A1 FIRST FLOOR FINISH PLAN- PLAN A

Revisions

ADDENDA 2 APRIL 6, 2020ADDENDA 4 APRIL 17, 2020

Page 18: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

A7.1

7MATCH LINE 'B'MATCH LINE 'A'

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

CPT- CARPET TILE,INSTALLATION: TBD

R.T.F.S

EM1- ENTRANCE MAT,INSTALLATION: TBD

LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD

PTF- PORCELAIN TILE, R.T.F.S

INSTALLATION: TBD

PTF- PORCELAIN TILE,R.T.F.S,

INSTALLATION: TBD

PTF- PORCELAIN TILE INSET ACCENT

(TO FOLLOW CEILING CLOUD

PERIMETER), R.T.F.S

INSTALLATION: TBD

PTF- PORCELAIN TILE INSET ACCENT INSIDE BAR, R.T.F.S

INSTALLATION: TBD

SC- SEALED CONCRETE,R.T.F.S

SV- SHEET VINYL, R.T.F.SINSTALLATION: TBD

SV- SHEET VINYL, R.T.F.S,INSTALLATION: TBD

PTF- PORCELAIN TILE INSET ACCENT

(TO FOLLOW CEILING CLOUD PERIMETER),

R.T.F.S INSTALLATION: TBD

CW T- CERAMIC TILEFIREPLACE FRONT,ALL SIDES FULL HT. & W IDTH, R.T.F.S

RUN LVT FROM ARTS/ CRAFTS

BR- BRICK ACCENT W ALL, ALL SIDES,FULL HT. & W IDTH,R.T.F.S

A7.16

12

A7.114

A7.1

15

A7.1

3 8

A7.2

1

4

5

8

FITNESS

205

STORAGE

204

LIBRARY

202

CORRIDOR

210

GAMES

300

WOMENS

118 MENS

119THRIFT STORE

117

HUMAN SERVICES

108

EXERCISE/ DANCE

209

A7.2

3

7 6

A7.03

A7.0

1813

823

RUN CPT FROM GAMES ROOM

A7.5

3

A7.5

4

A7.57

A7.58

P- PAINTED ACCENT W ALL,FULL HT. & W IDTH, R.T.F.S

A7.2

2

P- PAINTED TW O COLORACCENT W ALL, FULL HT. & W IDTH, R.T.F.S

5' - 4"

4' - 0 3/4"

10

12

A7.1

11

A7.1

16

PTF- PORCELAIN TILE, R.T.F.S,INSTALLATION: TBD

A9.8

1

ENTRY

201A7.1

5 9

1317

CW T- CERAMIC TILEBAR FRONT ONLY,FULL HT. & W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOP, R.T.F.S

PL- PLASTIC LAMINATEMILLW ORK & FLOATING

SHELVING, R.T.F.S

RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS

DR- DRAPERY, FULL HT. & W IDTH, R.T.F.S

QZ- QUARTZ COUNTERTOP, R.T.F.S

4

DR- DRAPERY, FULL HT.& W IDTH, R.T.F.S

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

W F- W INDOW FILM,TYPICAL @ STOREFRONTS,R.T.F.S

STOR.

301STOR.

311

TLT

302

RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS

PL- PLASTIC LAMINATECASEW ORK, R.T.F.S

SS- SOLID SURFACECOUNTERTOP, R.T.F.S

W F- W INDOW FILM, TYPICAL @ ALL STOREFRONT, R.T.F.S

RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS

RS1- ROLLER SHADES, R.T.F.S & INTERIOR ELEVATIONS

MIRRORS- FULL W IDTH. REFER TO ELEVATIONS AND FINISH NOTES

A9.82

COAT

203

ARTS/CRAFTS

310

4

4

4

4

4

TS1- TACKABLE W ALLSURFACE, R.T.F.S

4

A7.16

12

A7.114

A7.5

3

A7.5

4

A7.57

A7.58

10

CORRIDOR

210

MENS

119

EXIT

139

STORAGE

a303

STORAGE

a301

ACTIVITY/ ARTS

a302

ARTS/ CRAFTS

a310

2' - 8"

STORAGE

a304STORAGE

a305

TLT

a306

GAMES

300

LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD

RUN LVT FROMARTS/ CRAFTS

LVT- VINYL TILE, R.T.F.S,INSTALLATION: TBD

RUN LVT FROMACTIVITY/ ARTS

PTF- PORCELAIN TILE,R.T.F.S,

INSTALLATION: TBD

PTF- PORCELAIN TILE,R.T.F.S, INSTALLATION: TBD

PTF- PORCELAIN TILE INSET ACCENT

(TO FOLLOW CEILING CLOUD PERIMETER),

R.T.F.S INSTALLATION: TBD

A7.5

3Sim

7 Sim

4Sim

8 Sim

RUN LVT FROMACTIVITY/ ARTS

CPT- CARPET TILE, R.T.F.S,INSTALLATION: TBD

RUN CPT FROMGAMES

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4

RS1- ROLLER SHADES,R.T.F.S & INTERIOR ELEVATIONS

4TS1- TACKABLE W ALLSURFACE, R.T.F.S

4

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

4:44

:58

PM

A10.1B

ENLARGED FINISH PLANS-PART B

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

Revisions

ADDENDA 4 APRIL 17, 2020

1/8" = 1'-0"A10.1B1 FIRST FLOOR FINISH PLAN- PLAN B

1/8" = 1'-0"A10.1B2 FIRST FLOOR FINISH PLAN- PART B ADD ALT

Page 19: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

N

UP

FR FR RF

LIBRARY

202COAT

203

GAMES

300

STOR.

311

STOR.

301

TLT

302

ARTS/CRAFTS

310

MENS

119

WOMENS

118THRIFT STORE

117

MULTI PURPOSE A

120

MULTIPURPOSE B

121

MULTIPURPOSE C

122

STOR.

123

CUST. LCKR

135

MECH

136

KITCHEN STOR.

128

KITCHEN

127

MULTI-PURPOSE

125

TLT

126

MULTI-PURPOSE

124

GYMNASIUM

130

STAGE

131

HEALTH

144

ELEC.

138

WOMENS

137

TLT

106

MENS

107 STOR.

116

OFFICE

109

OFFICE

110

OFFICE

111

OFFICE

112

HUMAN SERVICES

108

HUMAN SERVICES

108

OFFICE

115

OFFICE

114

1 SGN 1.2

1SGN 1.12

2

2

1SGN 1.3

2

44

CORR.

102

SIGN TYPE # SIGN LEGEND

1 DIRECTIONAL SIGNAGE

2 POST MOUNTED SIGNAGE

3 SUSPENDED SIGNAGE

4 FLAG MOUNTED SIGNAGE

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

11:2

3:17

AM

SGN1.14

SIGNAGE PLAN

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"SGN1.141 SIGNAGE - FIRST FLOOR PLAN A

Revisions

ADDENDUM #4 APRIL 21, 2020

Page 20: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

ARTS/CRAFTS

310

CORRIDOR

210

LIBRARY

202

STORAGE

204

FITNESS

205

EXERCISE/ DANCE

209

THRIFT STORE

117

HUMAN SERVICES

108

MENS

119

WOMENS

118

GAMES

300

STOR.

311

STOR.

301

TLT

302

COAT

203

IT

206

2

1SGN 1.0

1 SGN 1.1

4

4

SIGN TYPE # SIGN LEGEND

1 DIRECTIONAL SIGNAGE

2 POST MOUNTED SIGNAGE

3 SUSPENDED SIGNAGE

4 FLAG MOUNTED SIGNAGE

1SGN 1.0

4

4

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

NOT FOR CONSTRUCTION

ISSUED FOR REVIEW ONLY

A

30' - 0 25/32"47' - 6"

B

C:\R

evit

Loca

l\RO

CKY

HIL

L_C

D_a

carls

on.rv

t4/

20/2

020

11:2

3:21

AM

SGN1.15

SIGNAGE PLAN

CONSTRUCTION DOCUMENT SETMARCH 23, 2020

1934

Rocky Hill SeniorCommunity

Center

NEW BUILDING FOR:

ROCKY HILL, CT

1/8" = 1'-0"SGN1.151 SIGNAGE - FIRST FLOOR PLAN B

Revisions

ADDENDUM #4 APRIL 21, 2020

1/8" = 1'-0"SGN1.152 SIGNAGE - FIRST FLOOR PLAN B ADD ALT

Page 21: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

4" S

4" 8" S

T4" S

T

2" W2" W

UP

RD

-2

RD

-2

6" O

RL

4" O

RL

6" O

RL

4" O

RL

4" S

T

4" O

RL

EW

C-1

1 1

/2" V

DN

1 1

/2" V

2" W D

WN

195 Scott S

wam

p Road Farm

ington, CT

06032

Dra

wn

By

:S

tate

Pro

ject #

:

Sh

eet #

:

Issu

e D

ate

:

C:\_Revit Projects\MEP_19-270 Rocky Hill Senior Center_R19_fmendykE3J5Y.rvt

PL

AC

EH

OL

DE

RD

ate

1

SK

P-1

1934

EW

C-1

AL

TE

RN

AT

E B

ID W

AS

TE

AN

D V

EN

T P

IPIN

G

Ro

ck

y H

ill Se

nio

r / Co

mm

un

ityC

en

ter

NE

W B

UIL

DIN

G F

OR

:

OL

D M

AIN

ST

RE

ET

RO

CK

Y H

ILL

, CT

FS

M

1/8

" = 1

'-0"

1P

LU

MB

ING

UN

DE

RS

LA

B P

LA

N -

PA

RT

'B' -

AD

D A

LT

RF

I#1

1/8

" = 1

'-0"

2P

LU

MB

ING

DR

AIN

AG

E P

LA

N -

PA

RT

'B' -

AD

D A

LT

RF

I#1

4/10/2020

Page 22: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

4

EXISTING EXHAUST FAN

EXISTING RTU-4

EXISTING RTU-5

EXISTING KEF-1

3

1

1

2

2

5 6

HVAC DEMOLITION GENERAL NOTES

1. BEFORE SUBMITTING BID, THE CONTRACTORS SHALL VISIT THE JOB SITE AND BECOME FULLY FAMILIAR WITH THE EXISTING CONDITIONS AND THE DOCUMENTS OF OTHER TRADES UNDER WHICH THEIR WORK WILL BE ACCOMPLISHED. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT OF FAILURE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.

2. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ANY DAILY INTERRUPTIONS OR SHUTDOWNS OF THE EXISTING SYSTEMS IN ADVANCE WITH OWNER'S DESIGNATED REPRESENTATIVE. THIS SHALL INCLUDE SERVICES INTERRUPTIONS, CONNECTIONS AND DISRUPTIONS EFFECTING OTHER TRADES (MECHANICAL AND ELECTRICAL). INCLUDE ALL WORK REQUIRED TO ALLOW PHASED CONSTRUCTION WHERE NECESSARY.

3. DEMOLITION DRAWINGS ARE STRICTLY DIAGRAMMATIC AND SHOW GENERAL ARRANGEMENT AND APPROXIMATE LOCATION OF EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT. IT IS NOT THE INTENT OF THESE DRAWINGS TO SHOW ALL EQUIPMENT, PIPING OR CONDUIT TO BE REMOVED. EQUIPMENT NOT BEING REUSED SHALL BE REMOVED, INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, PIPES, CONDUITS, WIRES, AND CONTROLS BACK TO THE POINT OF ORIGIN.

4. REFER TO THE ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS. THE FULL EXTENT OF THE DEMOLITION AND RECONSTRUCTION SCOPE OF WORK SHALL BE DETERMINED BY THE ENTIRE SET OF BID DOCUMENTS.

5. THE CONTRACTORS SHALL COORDINATE THE DEMOLITION SCOPE OF WORK WITH THE GENERAL CONTRACTOR'S OR CONSTRUCTION MANAGER'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF WORK. CARE MUST BE TAKEN SO AS NOT TO DESTROY, REMOVE OR DEMOLISH ANY EQUIPMENT, APPURTENANCES OR DEVICES INTENDED TO REMAIN. PROVIDE TEMPORARY SERVICES AND SYSTEM MODIFICATIONS TO ACCOMMODATE CONTINUOUS OPERATION OF ACTIVE SYSTEM.

6. THE LOCATION OF EXISTING HVAC SYSTEM SHOWN ON FLOOR PLANS, IS BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO COMMENCEMENT OF CONSTRUCTION, EXACT QUANTITY AND LOCATION(S) OF EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REMOVED AND ADJUST AS NECESSARY.

7. ALL EQUIPMENT, AND ASSOCIATED PIPING INDICATED TO BE REMOVED OR RELOCATED, SHALL BE DISCONNECTED AND REMOVED, INCLUDING HANGERS AND OTHER COMPONENTS, UP TO NEAREST EXISTING ACTIVE MAIN OR BRANCH LINE AND CAPPED AS CLOSE TO THE ACTIVE LINE AS POSSIBLE. NO EQUIPMENT, PIPING, OR CONDUIT SHALL BE ABANDONED IN PLACE, UNLESS SPECIFICALLY NOTED.

8. ALL SYSTEMS TO BE REMOVED SHALL BE REMOVED BACK TO THE POINT OF SOURCE. THE CONTRACTOR SHALL VERIFY WHICH SYSTEMS MUST REMAIN ACTIVE TO SERVE ADJACENT SPACES DURING CONSTRUCTION. SHOULD THE CONTRACTOR ENCOUNTER, DURING DEMOLITION OF EXISTING WALLS OR CHASES, ANY PIPING OR CONDUIT WHICH MUST REMAIN ACTIVE, HE SHALL IMMEDIATELY GIVE NOTICE TO THE ENGINEER, GENERAL CONTRACTOR OR CONSTRUCTION MANAGER.

9. ALL SALVAGEABLE MATERIALS OR EQUIPMENT TO BE REMOVED SHALL BE TURNED OVER TO THE OWNER AT THE END OF EACH DAY. ITEMS REMOVED AND NOT REUSED OR CLAIMED BY THE OWNER SHALL BECOME PROPERTY OF THE TRADE CONTRACTOR AND SHALL BE TRANSPORTED FROM THE SITE. SITE STORAGE OF REMOVED ITEMS WILL NOT BE PERMITTED.

10. PROPERLY DISPOSE OF ALL DEMOLISHED EQUIPMENT IN COMPLIANCE WITH CODES AND REGULATIONS; THIS APPLIES TO HAZARDOUS MATERIALS AND CONTAMINATED ITEMS TO BE DEMOLISHED.

11. THE CONTRACTOR SHALL OBTAIN EXISTING MECHANICAL DRAWINGS FROM THE OWNER IF AVAILABLE TO HELP DETERMINE FULL SCOPE OF WORK.

HVAC DEMOLITION KEY NOTES

REMOVE EXISTING ROOFTOP UNIT RTU-4 AND ALL ASSOCIATED DUCTWORK, GRILLES, DIFFUSERS, CONTROLS, WIRING AND SUPPORTS. CAP GAS PIPING AT MAINS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

REMOVE EXISTING ROOFTOP UNIT RTU-5 AND ALL ASSOCIATED DUCTWORK, GRILLES, DIFFUSERS, CONTROLS, WIRING AND SUPPORTS. CAP GAS PIPING AT MAINS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

REMOVE EXISTING EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, GRILLES, CONTROLS, WIRING AND SUPPORTS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

EXISTING KITCHEN EXHAUST FAN AND ALL ASSOCIATED GREASE HOOD, DUCTWORK AND CONTROLS TO REMAIN AS IS. VERIFY EXACT EXTENT OF WORK IN FIELD.

REMOVE EXISTING TOILET EXHAUST FAN AND ALL ASSOCIATED DUCTWORK, GRILLES, CONTROLS, WIRING, AND SUPPORTS. VERIFY EXACT EXTENT OF WORK IN FIELD. CAP & SEAL EXISTING ROOF OPENING, MATERIALS AND COLOR TO MATCH EXISTING, SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

EXISTING SUPPLY DUCTWORK AND DIFFUSERS TO REMAIN, RELOCATE EXISTING DIFFUSERS INTO NEW CEILING, EXTEND DUCTWORK AS NECESSARY.

1

3

2

4

5

6

MECHANICAL, ELECTRICAL, AND

STRUCTURAL ENGINEERING750 OLD MAIN STREET

SUITE 202

ROCKY HILL, CT 06067

P: (860) 436-4336

F: (860) 436-4450

www.rzdesignassociates.com

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

A

30' - 0 25/32"47' -6"

B

4/2

1/2

020 1

1:4

1:0

3 A

M

MD1.1

MECHANICAL DEMOLITIONPLAN

CONSTRUCTION DOCUMENT SET

MARCH 23, 2020

1934

Rocky Hill Senior/ Community

Center

NEW BUILDING FOR :

ROCKY HILL, CT

Revisions

ADDENDA #4 APRIL 21, 2020

Page 23: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

ACAC48"GFI

AC AC

F

84"

M

CR

CR CR

DLDL

48"GFI

TS

J

HUMAN SERVICES108

OFFICE110

OFFICE109

STOR.116

TLT106

MENS107

WOMENS137

ELEC.138

H1L1

NEW PANEL 'H1' - 250A MLO, 480/277V, FED FROM BUILDING MAIN DISTRIBUTION PANEL

NEW PANEL 'L1' - 225A MCB, 208/120V, FED FROM TRANSFORMER 'T1'

TRANSFORMER 'T1' - 75kVA, 480-208/120V, FED FROM PANEL 'H1'.

L1-6L1-9

L1-8

L1-10

L1-7

L1-37,39ACU-1

L1-38MDP

P2

P1 T-EX

HEALTH144

L1-52

RTU-5

CUH-3

CONNECTION FOR LULA LIFT. INSTALL AND WIRE RAISE LOWER CONTROLS AT EACH DOOR (PROVIDE WITH LIFT)

L1-69

L1-71

BUILDING MAIN C/B AND CT CABINET. 800A, 480/277V

BUILDING AUTOMATIC TRANSFER SWITCH. 800A, 480/277V

PANEL HV-MDB-A. 800A, 480/277V

MAINELEC.ROOM

ELEC.ROOM

FIRE ALARM CONTROL PANEL

OLD MAIN ST. ENTRANCE

MECHANICAL, ELECTRICAL, AND

STRUCTURAL ENGINEERING750 OLD MAIN STREET

SUITE 202

ROCKY HILL, CT 06067

P: (860) 436-4336

F: (860) 436-4450

www.rzdesignassociates.com

N

195 Scott Swamp RoadFarmington, CT 06032

qamarch.com

Issue Dates:

Project #:

A

30 ' -0 25/32 "47 ' -6 "

B

4/1

7/2

020 2

:10:4

7 P

M

SKE-1

EXISTING ELECTRICAL ROOMLOCATIONS

CONSTRUCTION DOCUMENT SET

MARCH 23, 2020

1934

Rocky Hill Senior/ Community

Center

NEW BUILDING FOR :

ROCKY HILL, CT

Revisions

Page 24: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'
Page 25: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

F F

GFIWP

GFIWP

DLDL

J J

MULTI PURPOSE A120

MULTIPURPOSE B121

MULTIPURPOSE C122

PATIO150

MDP-26,28,30

SK

SKSK

SK

ALTERNATE #3: POWER FOR OPERABLE PARTITIONSPROVIDE 3#12+#12G~3/4"C FOR OPERABLE PARTITIONCONTROLLERS. INSTALL OPERATING KEY SWITCHES(PROVIDED WITH CONTROLLERS) AND ROUTE 5#18TO KEY SWITCHES.(20A-3P)

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-3

1934

POWER FOR OPERABLE PARTITIONS - ALTERNATE #3

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTDSL

Page 26: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

+66"

ACGFI

ACGFI

ACGFI

ACGFI

66"

48"GFI

SD

+24"

66"

+66"

STOR.301

GAMES300

CORRIDOR210

STORAGE204

TLT302

STOR.311

ARTS/CRAFTS145

SA

L1-59

L1-60

L1-61

RTU-3

IT206

COAT203

L1-63

L1-68

ELECTRIC WATER COOLER:ROUTE 2#12+#12G~3/4"C TO 20A-1PGFCI C/B IN PANEL 'L1'

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-4

1934

ADD CIRCUIT FOR ELECTRIC WATER COOLER

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor

NOTE: SEE 2/P1.1B FOR ADD ALTERNATE LOCATION OF ELECTRIC WATER COOLER

Page 27: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

84"

+66"

U

U

U

U

U

+66"

GFIW

P

J

FITNESS205

LIBRARY202

STORAGE204

L1-46

CUH-5

L1-53

L1-54

L1-55

L1-56

IT206

COAT203

L1-63

CONNECTION FOR FIREPLACE CIRCUIT

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-5

1934

Revised Power/Data at Library Monitor

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTDSL

Page 28: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

GFIWP

+66"

ACGFI

ACGFI

ACGFI

ACGFI

66"

F DL

48"GFI

SD

SD

+24"

66"

+66"

STOR.301

GAMES300

EXIT139

MENS119

L1-23L1-24

L1-25

TLT302

STOR.311

L1-58

SA

L1-59

L1-60

RTU-2

RTU-3

COAT203

L1-68

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-6

1934

Revised Power/Data at Games Rm Monitors

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor

Note: Revision is typical for 2/E2.1B

Page 29: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

U

U

U

U

ACGFI

ACGFI

ACGFI

ACGFI

J

SD

SD

SD

+66"66"

MENS119

WOMENS118

L1-21

L1-22

L1-17L1-18

L1-19 L1-23

L1-46

CUH-5

L1-53

RTU-1A

RTU-2

RTU-3

COAT203

CONNECTION FOR FIREPLACE CIRCUIT

L1-68

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-7

1934

Additional Power/Data Coffee Bar

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTDSL

Page 30: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

OS

OS OS

OC

3

4

A2E

A2

A2E

A2

A2E

A2

A1

A1E

A1

A1

A1

A1

A2F A2F A2F

A2E

MULTI-PURPOSE125

TLT126

KITCHEN127

KITCHEN STOR.128

C1 C1 C1 C1 C1

C1 C1 C1

A2F A2F A2F A2F

K K

K

K

TYPE 'K' WALL SCONCE TO BE KUZCO#WS8016-3500K, WITH 277-120VLIGHTING AUTOTRANSFORMER (TYP.)

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-8

1934

Add Type K Light Fixtures @ Kitchen Pass-Throughs

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor

Page 31: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

OS

OS

3

D3D3

33

OD

4

A2

A2

D2ED2

D2D2E

D2ED2

D2D2E

A1

A1A1

A1

MULTI PURPOSE A120

THRIFT STORE117

STOR.123

EX1

WP1 WP1

EX1

C1C1

C1E

C2

C2 C2 C2 C2

C2

C2

C2

C2

C2

C2

C2

C2

C2C2C2C2

C2

C2

C2

C2

C2

C2

C2

H1-4

H1-6

H1-1

VIA LCP

WP2 INV

K

K

KK

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-9

1934

Add Type K Light Fixtures - Multipurpose Room 120

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor

Page 32: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

OS

OS

D3D3 3 3

4

D2 D2E

D2E D2

D2 D2E

D2E D2

A1 A1

WOMENS118

MULTIPURPOSE B121

EX1

C1 C1

C2

C2

C2

C2

C2

C2

C2

C2

C2 C2 C2 C2

C2

C2

C2

C2

C2

C2

C2

C2

C2 C2 C2 C2

WP1 WP1

INV K K

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-10

1934

Add Type K Light Fixtures - Multipurpose Room 121

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor

Page 33: NOT FOR CONSTRUCTION ISSUED FOR REVIEW ONLY...Apr 21, 2020  · 14' - 4" bullnose 3' - 8" interior exterior a5.1 4 sim bullnose brick color "b" lower face 4" brick veneer color 'b'

OS

OS

D3D3 3 3

D2 D2E

D2E D2

D2 D2E

D2E D2

A1 A1

MENS119

MULTIPURPOSE C122

EX1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2 C2 C2 C2

C2

C2

C2

C2

C2

C2

C2

C2

C2C2C2C2

WP1 WP1

INVK K

195 Scott Swamp Road Farmington, CT 06032

Drawn By:State Project #:

Sheet #:

Issue Date:

C:\_

Revit P

roje

cts

\ME

P_

19

-27

0 R

ocky H

ill S

en

ior

Cen

ter_

R1

9_d

luch

ini@

rzde

sig

nassocia

tes.c

om

.rvt

ADDENDA #4APRIL 21,

2020

SKE-11

1934

Add Type K Light Fixtures - Multipurpose Room 122

Rocky Hill Senior / CommunityCenter

NEW BUILDING FOR :

OLD MAIN STREET

ROCKY HILL, CTAuthor


Recommended