Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File OPI measure. 01/07/09 as of 1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID) # D i s t Letting Type PID Cnty Project Name (ie CRS) Project Manager Work Category/Type Award Amount SPN Res. SFY Baseline File Actual File Current File Baseline Sale Current Sale Actual Sale Baseline Award Actual Award Current Award CO STIP Current Program Comment Local Let Program - District 1 1 1 Local Let 83268 DEF DEF CR 153 BRINKMAN, LORI A Bridge Replacement 06/13/08 06/13/08 12/15/08 12/31/08 2009 872,532 $ 1 1 Local Let 84764 HAN HAN CR 802-SUMMIT STRE BRINKMAN, LORI A Bridge Replacement 10/07/08 10/07/08 12/11/08 12/31/08 2009 470,394 $ Added 1 1 Local Let 81313 ALL ALL Lima Jameson Avenue BRINKMAN, LORI A Minor Widening 12/01/08 12/01/08 01/14/09 02/14/09 2009 1,387,980 $ 1 1 Local Let 24489 ALL ALL Eastown Rd. 0.00 BRINKMAN, LORI A New Construction 01/05/09 12/09/08 12/09/08 03/02/09 03/02/09 03/16/09 03/16/09 2009 5,080,354 $ 1 1 Local Let 83773 PUT PUT US 224-2.64 BRINKMAN, LORI A Resurfacing, Undivided System 12/16/08 02/16/09 02/28/09 2009 1,201,323 $ Added 1 1 Local Let 23870 HAN HAN TR 241 0.09 BRINKMAN, LORI A Bridge Replacement 12/19/08 02/20/09 03/13/09 2009 925,000 $ Added 1 1 Local Let 81299 HAN HAN CR 26-17.59 BRINKMAN, LORI A Bridge Replacement 12/22/08 03/02/09 03/23/09 2009 800,000 $ 1 1 Local Let 75593 ALL ALL TR 26 0.99 Fruend Rd. BRINKMAN, LORI A Bridge Replacement 01/12/09 03/16/09 03/31/09 2009 531,250 $ 1 1 Local Let 78111 HAN HAN East Melrose Avenue BRINKMAN, LORI A Major Rehabilitation 01/02/09 03/02/09 03/31/09 2009 1,900,000 $ 1 1 Local Let 75604 PAU PAU CR 115 5.16 BRINKMAN, LORI A Bridge Replacement 02/01/09 04/01/09 04/15/09 2009 437,950 $ 1 1 Totals - $ 13,606,783 $ ODOT Let Program - District 1 2 1 ODOT Let 84151 DEF DEF SR 15/66-14.77/7.37 SCHECKELHOFF, ERIC Bridge Repair $90,850.00 85007 05/23/08 05/23/08 06/18/08 06/18/08 06/23/08 06/23/08 2009 90,850 $ Added 2 1 ODOT Let 23833 VAN VAN US 224 0.00 SLONECKER, RUSSEL Resurfacing, Undivided System $1,616,163.53 80450 2008 02/15/08 02/15/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 1,616,164 $ 2 1 ODOT Let 80310 D01 D01 RPM FY09 SLONECKER, RUSSEL Raised Pavement Markers $157,000.00 80454 04/04/08 04/04/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 157,000 $ 2 1 ODOT Let 24511 PUT PUT/HAN US 224 20.68/0.00SLONECKER, RUSSEL Resurfacing, Undivided System $1,324,064.23 80471 2008 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,324,064 $ 2 1 ODOT Let 80462 PAU PAU SR 500/613 0.00/5.27/3. SLONECKER, RUSSEL Resurfacing, Undivided System $1,727,162.16 80494 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 1,727,162 $ 2 1 ODOT Let 80760 WYA WYA Carey Streetscape CLARK, BETH D Add Sidewalks $2,723,881.26 80496 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 2,723,881 $ Added 2 1 ODOT Let 78627 PUT PUT US 224/SR 114/189 0.00 SLONECKER, RUSSEL Resurfacing, Undivided System $1,578,531.24 80514 2008 05/23/08 05/23/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 1,578,531 $ 2 1 ODOT Let 83088 ALL ALL JAMPD PEDESTRIAN SCHECKELHOFF, ERIC New Bridge $417,801.00 80488 05/12/08 05/12/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 417,801 $ 2 1 ODOT Let 84748 ALL ALL US 30 5.47 Bridge Repa CLARK, JAMES R Bridge Repair $55,355.00 85009 08/04/08 08/04/08 08/27/08 08/27/08 09/02/08 09/02/08 2009 55,355 $ Added 2 1 ODOT Let 81457 ALL ALL SR 66 / 198 / 501 0.00/2 SLONECKER, RUSSEL Resurfacing, Undivided System $1,817,139.49 80541 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 1,817,139 $ 2 1 ODOT Let 25207 VAN VAN US 30 15.97 CLARK, BETH D Resurfacing, Divided System $2,456,365.17 80572 07/09/08 07/09/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 2,456,365 $ 2 1 ODOT Let 24123 HAN HAN US 30 15.95SR CLARK, BETH D Culvert Construction/Reconstr/Repair $126,065.63 80594 07/28/08 07/07/08 07/07/08 10/22/08 10/22/08 10/22/08 10/01/08 10/30/08 10/30/08 2009 126,066 $ 2 1 ODOT Let 25285 PAU PAU SR 114 0.00 SLONECKER, RUSSEL Resurfacing, Undivided System $1,387,028.14 80622 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 1,387,028 $ 2 1 ODOT Let 78584 HAN HAN US 30-WILLIAMSTOW SCHECKELHOFF, ERIC Relocation $2,157,634.13 80640 09/08/08 09/08/08 09/08/08 01/14/09 12/10/08 12/10/08 01/22/09 12/22/08 12/22/08 2009 2,157,634 $ 2 1 ODOT Let 80464 HAR HAR SR 81/235- 0.00/15.94/1 SLONECKER, RUSSEL Resurfacing, Undivided System $1,309,489.53 80641 09/15/08 09/15/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 1,309,490 $ 2 1 ODOT Let 80497 PUT PUT SR 65 16.41 SLONECKER, RUSSEL Resurfacing, Undivided System $680,978.57 80655 07/14/08 07/14/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 680,979 $ 2 1 ODOT Let 83894 DEF DEF SR 66 8.40 SLONECKER, RUSSEL Preventive Maintenance 11/03/08 11/03/08 01/28/09 02/05/09 2009 759,181 $ 2 1 ODOT Let 82150 D01 D01 GR FY09 SLONECKER, RUSSEL Guardrail Rebuilding 11/07/08 11/07/08 02/04/09 02/12/09 2009 132,200 $ 2 1 ODOT Let 82172 HAN HAN SR 103 15.28 CLARK, BETH D Culvert Construction/Reconstr/Repair 10/30/08 10/30/08 02/04/09 02/12/09 2009 168,105 $ 2 1 ODOT Let 75824 HAN HAN/WYA US 30 11.24/8.18SCHECKELHOFF, ERIC Bridge Repair 01/01/09 12/01/08 12/01/08 01/01/09 02/25/09 01/01/09 03/05/09 2009 667,641 $ 2 1 ODOT Let 80301 D01 D01 BM FY09 CLARK, JAMES R Bridge Maintenance 12/01/08 12/01/08 02/25/09 03/05/09 2009 520,453 $ 2 1 ODOT Let 80303 D01 D01 HS FY09 SLONECKER, RUSSEL Herbicidal Spraying 11/26/08 11/26/08 02/25/09 03/05/09 2009 194,245 $ 2 1 ODOT Let 80305 D01 D01 PM FY09 SLONECKER, RUSSEL Pavement Marking 11/26/08 11/26/08 02/25/09 03/05/09 2009 1,037,615 $ 2 1 ODOT Let 25242 WYA WYA SR 103 6.59 SLONECKER, RUSSEL Resurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 242,821 $ 2 1 ODOT Let 76876 HAN HAN SR 37 1.36/6.54 SLONECKER, RUSSEL Resurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 1,138,918 $ 2 1 ODOT Let 82152 WYA WYA SR 67-11.03/11.51 SCHECKELHOFF, ERIC Bridge Repair 12/15/08 12/15/08 03/11/09 03/19/09 2009 244,884 $ 2 1 ODOT Let 25156 HAR HAR SR 31/53/67/68/309 11. SLONECKER, RUSSEL Resurfacing, Undivided System 12/29/08 12/29/08 03/25/09 04/02/09 2009 1,302,187 $ 2 1 ODOT Let 84496 WYA WYA US 23 6.69 SCHECKELHOFF, ERIC Mill and Fill 12/31/08 12/31/08 03/25/09 04/02/09 2009 2,816,335 $ Added 2 1 ODOT Let 81832 ALL ALL Spencerville Streetscape CLARK, JAMES R Design Aesthetics 01/12/09 04/08/09 04/16/09 2009 1,109,298 $ 2 1 ODOT Let 25167 HAR HAR SR 53 11.80 CLARK, BETH D Drainage Improvement 01/26/09 04/22/09 04/30/09 2009 139,614 $ 2 1 ODOT Let 81837 ALL ALL Bluffton Streetscape GASSER, JENNIFER L Design Aesthetics 01/26/09 04/22/09 04/30/09 2009 1,164,412 $ 2 1 ODOT Let 83598 ALL ALL 309 CURB REPLACEM SCHECKELHOFF, ERIC Drainage Improvement 02/09/09 05/06/09 05/14/09 2009 247,000 $ 2 1 ODOT Let 84439 ALL ALL/HAN 75/68 MEDIAN B CLARK, JAMES R Guardrail Maintenance/Repair (NEW) 02/09/09 05/06/09 05/14/09 2009 839,000 $ Added 2 1 ODOT Let 80412 HAN HAN SR 568 3.15 SCHECKELHOFF, ERIC Section Improvement 02/23/09 05/20/09 05/28/09 2009 590,444 $ Added 2 1 ODOT Let 83190 HAN HAN ODNR DISTRICT 2 HQ CRONEBACH, MICHA Parking Lot 02/23/09 05/20/09 05/28/09 2009 60,000 $ 2 1 Totals 19,625,509 $ 32,999,862 $
Transcript
Page 1: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 11 1 Local Let 83268 DEF DEF CR 153 BRINKMAN, LORI A Bridge Replacement 06/13/08 06/13/08 12/15/08 12/31/08 2009 872,532$

1 1 Local Let 84764 HAN HAN CR 802-SUMMIT STREETBRINKMAN, LORI A Bridge Replacement 10/07/08 10/07/08 12/11/08 12/31/08 2009 470,394$ Added

1 1 Local Let 81313 ALL ALL Lima Jameson Avenue BRINKMAN, LORI A Minor Widening 12/01/08 12/01/08 01/14/09 02/14/09 2009 1,387,980$

1 1 Local Let 24489 ALL ALL Eastown Rd. 0.00 BRINKMAN, LORI A New Construction 01/05/09 12/09/08 12/09/08 03/02/09 03/02/09 03/16/09 03/16/09 2009 5,080,354$

1 1 Local Let 83773 PUT PUT US 224-2.64 BRINKMAN, LORI A Resurfacing, Undivided System 12/16/08 02/16/09 02/28/09 2009 1,201,323$ Added

1 1 Local Let 23870 HAN HAN TR 241 0.09 BRINKMAN, LORI A Bridge Replacement 12/19/08 02/20/09 03/13/09 2009 925,000$ Added

1 1 Local Let 81299 HAN HAN CR 26-17.59 BRINKMAN, LORI A Bridge Replacement 12/22/08 03/02/09 03/23/09 2009 800,000$

1 1 Local Let 75593 ALL ALL TR 26 0.99 Fruend Rd. BRINKMAN, LORI A Bridge Replacement 01/12/09 03/16/09 03/31/09 2009 531,250$

1 1 Local Let 78111 HAN HAN East Melrose Avenue BRINKMAN, LORI A Major Rehabilitation 01/02/09 03/02/09 03/31/09 2009 1,900,000$

1 1 Local Let 75604 PAU PAU CR 115 5.16 BRINKMAN, LORI A Bridge Replacement 02/01/09 04/01/09 04/15/09 2009 437,950$ 1 1 Totals -$ 13,606,783$

ODOT Let Program - District 12 1 ODOT Let 84151 DEF DEF SR 15/66-14.77/7.37 SCHECKELHOFF, ERIC JBridge Repair $90,850.00 85007 05/23/08 05/23/08 06/18/08 06/18/08 06/23/08 06/23/08 2009 90,850$ Added

2 1 ODOT Let 23833 VAN VAN US 224 0.00 SLONECKER, RUSSELL LResurfacing, Undivided System $1,616,163.53 80450 2008 02/15/08 02/15/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 1,616,164$

2 1 ODOT Let 80310 D01 D01 RPM FY09 SLONECKER, RUSSELL LRaised Pavement Markers $157,000.00 80454 04/04/08 04/04/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 157,000$

2 1 ODOT Let 24511 PUT PUT/HAN US 224 20.68/0.00SLONECKER, RUSSELL LResurfacing, Undivided System $1,324,064.23 80471 2008 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,324,064$

2 1 ODOT Let 80462 PAU PAU SR 500/613 0.00/5.27/3.25SLONECKER, RUSSELL LResurfacing, Undivided System $1,727,162.16 80494 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 1,727,162$

2 1 ODOT Let 80760 WYA WYA Carey Streetscape CLARK, BETH D Add Sidewalks $2,723,881.26 80496 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 2,723,881$ Added

2 1 ODOT Let 78627 PUT PUT US 224/SR 114/189 0.00SLONECKER, RUSSELL LResurfacing, Undivided System $1,578,531.24 80514 2008 05/23/08 05/23/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 1,578,531$

2 1 ODOT Let 83088 ALL ALL JAMPD PEDESTRIAN BRIDGESCHECKELHOFF, ERIC JNew Bridge $417,801.00 80488 05/12/08 05/12/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 417,801$

2 1 ODOT Let 84748 ALL ALL US 30 5.47 Bridge RepairCLARK, JAMES R Bridge Repair $55,355.00 85009 08/04/08 08/04/08 08/27/08 08/27/08 09/02/08 09/02/08 2009 55,355$ Added

2 1 ODOT Let 81457 ALL ALL SR 66 / 198 / 501 0.00/2.39SLONECKER, RUSSELL LResurfacing, Undivided System $1,817,139.49 80541 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 1,817,139$

2 1 ODOT Let 25207 VAN VAN US 30 15.97 CLARK, BETH D Resurfacing, Divided System $2,456,365.17 80572 07/09/08 07/09/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 2,456,365$

2 1 ODOT Let 24123 HAN HAN US 30 15.95SR CLARK, BETH D Culvert Construction/Reconstr/Repair $126,065.63 80594 07/28/08 07/07/08 07/07/08 10/22/08 10/22/08 10/22/08 10/01/08 10/30/08 10/30/08 2009 126,066$

2 1 ODOT Let 25285 PAU PAU SR 114 0.00 SLONECKER, RUSSELL LResurfacing, Undivided System $1,387,028.14 80622 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 1,387,028$

2 1 ODOT Let 78584 HAN HAN US 30-WILLIAMSTOWN OVERPASSSCHECKELHOFF, ERIC JRelocation $2,157,634.13 80640 09/08/08 09/08/08 09/08/08 01/14/09 12/10/08 12/10/08 01/22/09 12/22/08 12/22/08 2009 2,157,634$

2 1 ODOT Let 80464 HAR HAR SR 81/235- 0.00/15.94/18.66SLONECKER, RUSSELL LResurfacing, Undivided System $1,309,489.53 80641 09/15/08 09/15/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 1,309,490$

2 1 ODOT Let 80497 PUT PUT SR 65 16.41 SLONECKER, RUSSELL LResurfacing, Undivided System $680,978.57 80655 07/14/08 07/14/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 680,979$

2 1 ODOT Let 83894 DEF DEF SR 66 8.40 SLONECKER, RUSSELL LPreventive Maintenance 11/03/08 11/03/08 01/28/09 02/05/09 2009 759,181$

2 1 ODOT Let 82150 D01 D01 GR FY09 SLONECKER, RUSSELL LGuardrail Rebuilding 11/07/08 11/07/08 02/04/09 02/12/09 2009 132,200$

2 1 ODOT Let 82172 HAN HAN SR 103 15.28 CLARK, BETH D Culvert Construction/Reconstr/Repair 10/30/08 10/30/08 02/04/09 02/12/09 2009 168,105$

2 1 ODOT Let 75824 HAN HAN/WYA US 30 11.24/8.18SCHECKELHOFF, ERIC JBridge Repair 01/01/09 12/01/08 12/01/08 01/01/09 02/25/09 01/01/09 03/05/09 2009 667,641$

2 1 ODOT Let 80301 D01 D01 BM FY09 CLARK, JAMES R Bridge Maintenance 12/01/08 12/01/08 02/25/09 03/05/09 2009 520,453$

2 1 ODOT Let 80303 D01 D01 HS FY09 SLONECKER, RUSSELL LHerbicidal Spraying 11/26/08 11/26/08 02/25/09 03/05/09 2009 194,245$

2 1 ODOT Let 80305 D01 D01 PM FY09 SLONECKER, RUSSELL LPavement Marking 11/26/08 11/26/08 02/25/09 03/05/09 2009 1,037,615$

2 1 ODOT Let 25242 WYA WYA SR 103 6.59 SLONECKER, RUSSELL LResurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 242,821$

2 1 ODOT Let 76876 HAN HAN SR 37 1.36/6.54 SLONECKER, RUSSELL LResurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 1,138,918$

2 1 ODOT Let 82152 WYA WYA SR 67-11.03/11.51 SCHECKELHOFF, ERIC JBridge Repair 12/15/08 12/15/08 03/11/09 03/19/09 2009 244,884$

2 1 ODOT Let 25156 HAR HAR SR 31/53/67/68/309 11.14SLONECKER, RUSSELL LResurfacing, Undivided System 12/29/08 12/29/08 03/25/09 04/02/09 2009 1,302,187$

2 1 ODOT Let 84496 WYA WYA US 23 6.69 SCHECKELHOFF, ERIC JMill and Fill 12/31/08 12/31/08 03/25/09 04/02/09 2009 2,816,335$ Added

2 1 ODOT Let 81832 ALL ALL Spencerville Streetscape CLARK, JAMES R Design Aesthetics 01/12/09 04/08/09 04/16/09 2009 1,109,298$

2 1 ODOT Let 25167 HAR HAR SR 53 11.80 CLARK, BETH D Drainage Improvement 01/26/09 04/22/09 04/30/09 2009 139,614$

2 1 ODOT Let 81837 ALL ALL Bluffton Streetscape GASSER, JENNIFER L Design Aesthetics 01/26/09 04/22/09 04/30/09 2009 1,164,412$

2 1 ODOT Let 83598 ALL ALL 309 CURB REPLACEMENTSSCHECKELHOFF, ERIC JDrainage Improvement 02/09/09 05/06/09 05/14/09 2009 247,000$

2 1 ODOT Let 84439 ALL ALL/HAN 75/68 MEDIAN BARRIERCLARK, JAMES R Guardrail Maintenance/Repair (NEW) 02/09/09 05/06/09 05/14/09 2009 839,000$ Added

2 1 ODOT Let 80412 HAN HAN SR 568 3.15 SCHECKELHOFF, ERIC JSection Improvement 02/23/09 05/20/09 05/28/09 2009 590,444$ Added

2 1 ODOT Let 83190 HAN HAN ODNR DISTRICT 2 HQCRONEBACH, MICHAEL DParking Lot 02/23/09 05/20/09 05/28/09 2009 60,000$ 2 1 Totals 19,625,509$ 32,999,862$

Page 2: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 23 2 Local Let 76270 SEN SEN CR 6 9.90 SUMMERSETT, JOREY JResurfacing, Undivided System $2,248,712.35 08N102 05/05/08 05/05/08 06/26/08 06/26/08 07/22/08 07/22/08 2009 2,248,712$

3 2 Local Let 81980 LUC LUC SR 184 1.86 Urban Pav FAHY, JULIE M Major Rehabilitation $2,891,350.10 08N103 06/03/08 06/03/08 07/08/08 07/08/08 07/29/08 07/29/08 2009 2,891,350$

3 2 Local Let 84094 LUC LUC Starr Ave Sidewalks FAHY, JULIE M Add Sidewalks $139,287.75 08N108 07/23/08 07/23/08 08/26/08 08/26/08 09/08/08 09/08/08 2009 139,288$ Added

3 2 Local Let 24320 LUC LUC SGNL5 FAHY, JULIE M Signals $1,271,353.73 08N130 07/07/08 07/07/08 09/23/08 09/23/08 10/29/08 10/29/08 2009 1,271,354$

3 2 Local Let 80638 SAN SAN CR 213 0.00 ResurfacingSUMMERSETT, JOREY JResurfacing, Undivided System 11/05/08 11/05/08 12/19/08 01/09/09 2009 466,000$ Added

3 2 Local Let 80045 LUC LUC Angola Rd Widening FAHY, JULIE M Turn Lane Addition 11/05/08 11/05/08 01/16/09 02/13/09 2009 1,765,000$

3 2 Local Let 82185 LUC LUC 65 4.40 Summit Enh CBS ErmrkFAHY, JULIE M Landscaping 12/04/08 12/04/08 02/06/09 03/06/09 2009 475,892$

3 2 Local Let 80044 LUC LUC Nebraska/King roundaboutFAHY, JULIE M Turn Lane Addition 12/12/08 12/12/08 02/13/09 03/13/09 2009 811,710$

3 2 Local Let 82711 LUC LUC Broadway St EnhancementFAHY, JULIE M Landscaping 09/24/08 09/24/08 04/30/09 05/29/09 2009 175,400$

3 2 Local Let 82769 WOO WOO Eckel Jct/Fort Meigs/SR-199SUMMERSETT, JOREY JIntersection Improvement 06/04/08 06/04/08 06/10/09 06/18/09 2009 567,000$

3 2 Local Let 80859 SEN SEN CR 7 4.00 Bridge Repl SUMMERSETT, JOREY JBridge Replacement 01/16/09 03/13/09 04/03/09 2009 830,000$

3 2 Local Let 84932 SAN SAN CR Var Pav Marking Phase 3SUMMERSETT, JOREY JPavement Marking 02/13/09 03/13/09 04/03/09 2009 157,000$ Added

3 2 Local Let 75578 LUC LUC Hill Ave FAHY, JULIE M Minor Widening 01/01/09 02/13/09 01/01/09 04/03/09 01/01/09 05/01/09 2009 6,540,000$

3 2 Local Let 81981 LUC LUC US 24 21.47 Urban Pav FAHY, JULIE M Mill and Fill 02/20/09 04/03/09 05/01/09 2009 580,000$

3 2 Local Let 84430 LUC LUC SR 184 1.860 Signal UpgradeFAHY, JULIE M Signals 02/27/09 04/17/09 05/08/09 2009 765,000$ Added

3 2 Local Let 80372 SEN SEN CR 62/CR 592 ResurfacingSUMMERSETT, JOREY JResurfacing, Undivided System 03/27/09 05/01/09 05/15/09 2009 2,653,000$ Added

3 2 Local Let 80527 SEN SEN Miami St Enh in Tiffin ErmkSUMMERSETT, JOREY JLandscaping 03/06/09 04/17/09 05/15/09 2009 827,796$

3 2 Local Let 80728 SEN SEN SR 18 12.11 Tiffin Urban PavSUMMERSETT, JOREY JMill and Fill 03/13/09 04/24/09 05/22/09 2009 560,000$

3 2 Local Let 80038 LUC LUC McCord Rd Widening Phase 2FAHY, JULIE M Minor Widening 03/20/09 05/08/09 05/29/09 2009 2,200,000$

3 2 Local Let 81978 FUL FUL VAR PM Ph 2 SUMMERSETT, JOREY JPavement Marking 04/10/09 05/08/09 05/29/09 2009 135,000$ Added

3 2 Local Let 84319 OTT OTT Ferry Terminal BuildingsSUMMERSETT, JOREY JDock Facilities 05/08/09 06/05/09 06/10/09 2009 431,250$ Added

3 2 Local Let 85295 WOO WOO Cedar Creeks Presrv Prkg LotSUMMERSETT, JOREY JParking Lot 04/03/09 05/22/09 06/12/09 2009 80,000$ Added

3 2 Local Let 84082 LUC LUC US20 Greenhouse Row FAHY, JULIE M Plant Trees 03/20/09 05/22/09 06/18/09 2009 1,230,000$ Added3 2 Totals 6,550,704$ 27,800,752$

ODOT Let Program - District 24 2 ODOT Let 81134 HEN HEN/LUC 24 Wetland MitigationBALDWIN, DEBORAH ACreate Wetlands $2,427,036.85 80419 01/01/09 03/24/08 03/24/08 01/01/09 06/18/08 06/18/08 01/01/09 06/26/08 06/26/08 2009 2,427,037$ Added

4 2 ODOT Let 25526 OTT OTT SR 19 3.10 FAHY, JULIE M Resurfacing, Undivided System $5,730,675.26 88021 10/12/07 10/12/07 07/09/08 07/09/08 07/17/08 07/17/08 2009 5,730,675$ Added

4 2 ODOT Let 82766 FUL FUL/LUC Hallett Demolition BALDWIN, DEBORAH ABuilding Demolition $232,350.50 82005 07/16/07 01/28/08 01/28/08 10/12/07 07/24/08 07/24/08 10/19/07 07/31/08 07/31/08 2009 232,351$ Added

4 2 ODOT Let 82658 D02 D02 PM FY2009 FAHY, JULIE M Pavement Marking $1,577,985.33 80499 05/12/08 05/12/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 1,577,985$

4 2 ODOT Let 83404 LUC LUC SR 65 5.35 Elect Maint FY09BRADLEY, JAMES T Electrical Maintenance $114,410.00 80504 05/12/08 05/12/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 114,410$

4 2 ODOT Let 81952 D02 D02 RPM FY2009 FAHY, JULIE M Raised Pavement Markers $201,573.96 80518 05/22/08 05/22/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 201,574$

4 2 ODOT Let 83403 D02 D02 GR FY2009 FAHY, JULIE M Guardrail Rebuilding $391,225.00 80517 05/20/08 05/20/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 391,225$

4 2 ODOT Let 21895 LUC LUC 280 2.34 BAKER, JEFF E Major Reconstruction $21,185,293.03 80493 03/03/08 03/31/08 03/31/08 07/09/08 08/27/08 08/27/08 07/17/08 09/03/08 09/03/08 2009 21,185,293$

4 2 ODOT Let 84053 LUC LUC IR 75 7.80 Noisewall repairBEHRMAN, AARON DNoise Wall Maintenance/Repair (NEW) $114,195.00 80539 06/13/08 06/13/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 114,195$ Added

4 2 ODOT Let 22245 WOO WOO SR 795 8.88 FAHY, JULIE M Bridge Replacement $3,747,760.66 88032 2007 03/05/07 02/25/08 02/25/08 08/29/07 09/24/08 09/24/08 09/06/07 10/03/08 10/03/08 2009 3,747,761$ Added

4 2 ODOT Let 25519 WOO WOO SR25 11.69 Mill & Fill FAHY, JULIE M Resurfacing, Divided System $2,268,232.59 80554 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 2,268,233$

4 2 ODOT Let 83272 D02 LUC/WOO-75/Var-1.30/Var BRADLEY, JAMES T Bridge Repair $549,757.00 88036 08/25/08 08/25/08 10/08/08 10/08/08 10/09/08 10/09/08 2009 549,757$

4 2 ODOT Let 83405 WOO WOO-420/280-0.00/0.00 FAHY, JULIE M Signs $191,575.00 80580 07/14/08 07/14/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 191,575$

4 2 ODOT Let 82656 D02 D02 LG FY2009 FAHY, JULIE M Lighting Maintenance $279,316.20 80592 07/28/08 07/28/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 279,316$

4 2 ODOT Let 84917 WOO WOO Mitchell Rd Sanitary SewerROMETO, ARTHUR C Lift Station $116,984.00 85012 10/07/08 10/07/08 11/06/08 11/06/08 11/10/08 11/10/08 2009 116,984$ Added

4 2 ODOT Let 83273 D02 WOO/LUC/HEN-75/6-19.92/1.99/11.4FAHY, JULIE M Section Improvement $1,806,154.50 80609 08/07/08 08/07/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 1,806,155$

4 2 ODOT Let 83614 D02 D02 TSG FY2008 ROGERS, DOUG A Signals $206,347.61 80637 09/15/08 09/15/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 206,348$ Added

4 2 ODOT Let 84927 SAN SAN SR 53 11.75 Slope repairROGERS, DOUG A Rock Slope Maintenance (NEW) $650,477.95 88042 10/21/08 10/21/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 650,478$ Added

4 2 ODOT Let 80849 SAN SAN SR 412 5.75 BRADLEY, JAMES T Culvert Construction/Reconstr/Repair 10/20/08 10/20/08 01/14/09 01/22/09 2009 206,000$

4 2 ODOT Let 83269 OTT OTT SR 163 20.89 Resurf FAHY, JULIE M Resurfacing, Undivided System 10/20/08 10/20/08 01/14/09 01/22/09 2009 1,200,000$

4 2 ODOT Let 80444 LUC LUC US 24 6.19 Part 3 F2P BALDWIN, DEBORAH ANew Construction 06/16/08 09/08/08 09/08/08 10/22/08 02/04/09 10/30/08 02/12/09 2009 76,450,000$

4 2 ODOT Let 83267 HEN HEN SR 108 17.60 Resurf/BridgeFAHY, JULIE M Resurfacing, Undivided System 11/07/08 11/07/08 02/04/09 02/12/09 2009 1,760,000$

4 2 ODOT Let 83271 SEN SEN US 224 19.83 Resurf FAHY, JULIE M Resurfacing, Undivided System 11/10/08 11/10/08 02/04/09 02/12/09 2009 2,680,000$

4 2 ODOT Let 83603 D02 SEN-SR19/SR228-9.58/0.00 ChpsealFAHY, JULIE M Preventive Maintenance 10/30/08 10/30/08 02/04/09 02/12/09 2009 385,000$

Page 3: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

4 2 ODOT Let 75937 LUC LUC 475 2.54 Salisb InterchgFAHY, JULIE M Interchange, Reconstruction 12/03/07 10/20/08 10/20/08 04/09/08 02/25/09 04/17/08 03/05/09 2009 27,364,000$

4 2 ODOT Let 80672 D02 FUL US20/SR109 13.79/5.80 ResurfFAHY, JULIE M Minor Rehabilitation - Pavement Gnrl Sys 01/01/12 12/15/08 12/15/08 01/01/12 03/11/09 01/01/12 03/19/09 2009 3,610,000$

4 2 ODOT Let 83219 OTT OTT East Harbor State Park PavngCRONEBACH, MICHAEL DParking Areas 12/12/08 12/12/08 03/11/09 03/19/09 2009 670,000$

4 2 ODOT Let 25522 WIL WIL SR 49 0.00 Resurf FAHY, JULIE M Resurfacing, Undivided System 12/23/08 12/23/08 03/25/09 04/02/09 2009 900,000$

4 2 ODOT Let 80446 D02 HEN/LUC US 24 15.85 Part 2 F2PBALDWIN, DEBORAH ANew Construction 04/01/09 12/08/08 12/08/08 04/01/09 04/15/09 04/01/09 04/23/09 2009 72,300,000$

4 2 ODOT Let 25494 WOO WOO SR 199 6.22 FAHY, JULIE M Resurfacing, Undivided System 2008 03/07/08 03/07/08 06/10/09 06/18/09 2009 2,270,000$

4 2 ODOT Let 83270 SAN SAN US 6 0.00/18.81 Resurf FAHY, JULIE M Resurfacing, Undivided System 11/03/08 11/03/08 06/10/09 06/18/09 2009 3,870,000$

4 2 ODOT Let 21052 LUC LUC SR 2 30.30/31.28 Yndta/TechtROMETO, ARTHUR C Intersection Improvement 04/01/09 01/12/09 04/01/09 04/08/09 04/01/09 04/16/09 2009 4,500,000$

4 2 ODOT Let 25447 SEN SEN SR 101 5.69 Resuf HUSS, JUANITA E Resurfacing, Undivided System 01/26/09 04/22/09 04/30/09 2009 3,000,000$

4 2 ODOT Let 84407 LUC LUC SR 2 9.83 EB lanes reconfigFAHY, JULIE M Resurfacing (safety related) 01/26/09 04/22/09 04/30/09 2009 157,000$ Added

4 2 ODOT Let 25528 LUC LUC IR 75 5.25 Prev Maint FAHY, JULIE M Preventive Maintenance 01/01/10 02/09/09 01/01/10 05/06/09 01/01/10 05/14/09 2009 500,000$ Added

4 2 ODOT Let 82416 WIL WIL SR 15 Culverts BRADLEY, JAMES T Culvert Construction/Reconstr/Repair 02/23/09 05/20/09 05/28/09 2009 824,000$

4 2 ODOT Let 23111 SEN SEN JONES ROAD Grade SeparationROGERS, DOUG A Railroad Grade Separation 11/09/07 03/16/09 02/13/08 06/10/09 02/21/08 06/18/09 2009 9,000,000$

4 2 ODOT Let 25555 LUC WOO/LUC IR75 32.6/0.15 Brdg OvlyBRADLEY, JAMES T Bridge Repair 01/01/09 02/02/09 01/01/09 06/10/09 01/01/09 06/18/09 2009 17,200,000$

4 2 ODOT Let 79026 WOO WOO SR 105 6.70 Curve SafetySUMMERSETT, JOREY JSection Improvement 01/01/09 03/16/09 01/01/09 06/10/09 01/01/09 06/18/09 2009 730,000$ 4 2 Totals 41,791,350$ 271,367,350$

Page 4: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 35 3 Local Let 76037 LOR LOR SR 0254 05.07 SHEPHERD, STEVEN ATurn Lane Addition $2,663,011.72 08N099 05/05/08 05/05/08 06/27/08 06/27/08 07/16/08 07/16/08 2009 2,663,012$

5 3 Local Let 83674 HUR HUR CR GR FY2009 SHEPHERD, STEVEN AGuardrail Rebuilding $328,975.00 08N110 07/22/08 07/22/08 08/29/08 08/29/08 09/02/08 09/02/08 2009 328,975$ Added

5 3 Local Let 79091 WAY WAY Beall Ave Phase 1 SHEPHERD, STEVEN ASection Improvement $7,122,383.30 08N116 09/24/08 06/11/08 06/11/08 11/26/08 08/05/08 08/05/08 12/24/08 10/03/08 10/03/08 2009 7,122,383$

5 3 Local Let 79279 ERI ERI CR 0007 00.90 (Strub Rd)SHEPHERD, STEVEN AMinor Rehabilitation - Pavement Gnrl Sys 07/19/08 07/19/08 12/17/08 01/07/09 2009 855,015$

5 3 Local Let 24811 ERI ERI SR 0004 11.03 SHEPHERD, STEVEN ABridge Repair 08/13/08 08/13/08 02/11/09 03/11/09 2009 1,430,686$

5 3 Local Let 77460 LOR LOR Ferndale Ave. Phase II SHEPHERD, STEVEN AMajor Rehabilitation 12/29/08 12/29/08 02/11/09 03/11/09 2009 3,233,750$

5 3 Local Let 80485 LOR LOR Black River Excursion BoatSHEPHERD, STEVEN AConstruct Ferry Boat 12/15/08 12/15/08 02/25/09 03/25/09 2009 1,711,144$ Added

5 3 Local Let 25703 WAY WAY SR 0003 17.61 SHEPHERD, STEVEN AResurfacing, Undivided System 10/20/08 10/20/08 05/18/09 06/01/09 2009 1,346,000$ Added

5 3 Local Let 78848 HUR HUR CR 0139 01.50 (Angling Rd)SHEPHERD, STEVEN ABridge Replacement 10/26/08 10/26/08 05/27/09 06/01/09 2009 604,994$

5 3 Local Let 79454 ERI ERI Mills Street SHEPHERD, STEVEN AMinor Rehabilitation - Pavement Gnrl Sys 08/28/08 08/28/08 05/18/09 06/01/09 2009 1,523,710$ Added

5 3 Local Let 80507 MED MED N. Huntington Street SHEPHERD, STEVEN AMajor Rehabilitation 08/27/08 08/27/08 05/18/09 06/01/09 2009 1,543,781$ Added

5 3 Local Let 77984 CRA CRA Park Road Bridge SHEPHERD, STEVEN ABridge Replacement 12/03/08 02/11/09 03/11/09 2009 222,568$

5 3 Local Let 22080 LOR LOR SR 0611 05.66 (Colorado Ave)SHEPHERD, STEVEN AMajor Widening 02/25/09 05/06/09 06/01/09 2009 4,781,700$

5 3 Local Let 77975 CRA CRA SR 0004 08.82 SHEPHERD, STEVEN AMajor Rehabilitation 03/18/09 05/06/09 06/01/09 2009 2,683,425$

5 3 Local Let 80506 MED MED Guilford Boulevard SHEPHERD, STEVEN AMajor Rehabilitation 03/11/09 05/18/09 06/01/09 2009 536,580$ Added

5 3 Local Let 81326 ASD ASD Bicycle Bridge SHEPHERD, STEVEN ABikeways 03/11/09 05/06/09 06/01/09 2009 328,581$

5 3 Local Let 82694 MED MED CR GR FY2009 SHEPHERD, STEVEN AGuardrail Rebuilding 03/11/09 05/06/09 06/01/09 2009 272,700$ 5 3 Totals 10,114,370$ 31,189,004$

ODOT Let Program - District 36 3 ODOT Let 24868 LOR LOR IR 0090 12.42 BROWN, CHRISTOPHER LBridge Repair $7,859,578.95 80421 03/24/08 03/24/08 03/24/08 06/18/08 06/18/08 06/18/08 06/26/08 06/26/08 06/26/08 2009 7,859,579$

6 3 ODOT Let 81140 LOR LOR SR 0162 01.98 BROWN, CHRISTOPHER LCulvert Construction/Reconstr/Repair $262,740.24 80406 02/29/08 02/29/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 262,740$ Added

6 3 ODOT Let 80179 ASD ASD SR 0003 00.00 BARATY, AHAD D Minor Rehabilitation - Pavement Gnrl Sys $2,746,861.83 80437 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 2,746,862$

6 3 ODOT Let 83527 CRA CRA SR 0019 27.78 BARATY, AHAD D Earthwork $143,920.50 80441 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 143,921$ Added

6 3 ODOT Let 19589 WAY WAY SR 0226 01.80 BROWN, CHRISTOPHER LBridge Replacement $317,980.43 80473 04/03/08 04/03/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 317,980$

6 3 ODOT Let 80050 D03 D03 CHIP FY2009 DALTON, BRUCE A Chip Seal $1,517,678.60 80477 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,517,679$

6 3 ODOT Let 80481 D03 D03 BH FY2009 (B) NUSSBAUM, RONALD DBridge Repair $183,213.91 80476 04/21/08 04/21/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 183,214$

6 3 ODOT Let 82983 D03 D03 PR FY2009 BARATY, AHAD D Pruning, Tree/Bush Removal $206,765.00 80478 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 206,765$

6 3 ODOT Let 18222 ASD ASD US 0042 06.38 NUSSBAUM, RONALD DIntersection Improvement $2,430,205.25 88022 03/03/08 02/25/08 02/25/08 10/01/08 08/06/08 08/06/08 10/01/08 08/18/08 08/18/08 2009 2,430,205$ Added

6 3 ODOT Let 76985 LOR LOR IR 0090 19.92 PM DALTON, BRUCE A Preventive Maintenance $1,141,617.61 88026 02/14/08 02/14/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 1,141,618$ Added

6 3 ODOT Let 80111 D03 D03 BH FY2009 (A) NUSSBAUM, RONALD DBridge Repair $545,745.00 80500 03/27/08 03/27/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 545,745$

6 3 ODOT Let 83134 LOR LOR US 0020 12.80 BROWN, CHRISTOPHER LSlide Repair $180,096.65 80503 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 180,097$

6 3 ODOT Let 16000 ASD ASD SR 0060 14.42 BROWN, CHRISTOPHER LBridge Replacement $240,069.00 80516 2008 03/31/08 03/31/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 240,069$

6 3 ODOT Let 25702 ERI ERI US 0006 27.72 BROWN, CHRISTOPHER LResurfacing, Undivided System $1,814,984.18 80520 05/09/08 05/09/08 08/20/08 08/20/08 09/03/08 09/03/08 2009 1,814,984$

6 3 ODOT Let 18226 ASD ASD SR 0604 02.94 NUSSBAUM, RONALD DBridge Deck Replacement $2,195,336.50 80522 03/18/08 03/18/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 2,195,337$

6 3 ODOT Let 80049 D03 D03 SMOOTH FY2009 DALTON, BRUCE A Preventive Maintenance $918,320.57 80536 06/16/08 06/16/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 918,321$

6 3 ODOT Let 80051 D03 D03 CRSEAL FY2009 DALTON, BRUCE A Crack Seal $489,884.17 80531 06/16/08 06/16/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 489,884$

6 3 ODOT Let 82985 D03 D03 GR FY2009 BARATY, AHAD D Guardrail Rebuilding $592,675.00 80532 06/12/08 06/12/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 592,675$

6 3 ODOT Let 84262 ERI ERI/LOR - 6/58 - 5.70/7.36 NUSSBAUM, RONALD DBuilding Demolition $27,911.00 82006 05/27/08 05/27/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 27,911$ Added

6 3 ODOT Let 23800 ERI ERI SR 0002 25.81 DALTON, BRUCE A Minor Rehabilitation - Pavement Prmy Sys $4,713,421.01 80545 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 4,713,421$

6 3 ODOT Let 77313 ASD ASD SYSSIGN FY2009 BARATY, AHAD D Signs $165,099.64 80555 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 165,100$

6 3 ODOT Let 83991 ERI ERI -6/VAR-9.5/VAR BARATY, AHAD D Signals $165,994.25 80546 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 165,994$ Added

6 3 ODOT Let 18946 MED MED SR 0606 03.30 NUSSBAUM, RONALD DCulvert Construction/Reconstr/Repair $225,622.00 80579 07/07/08 07/07/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 225,622$

6 3 ODOT Let 19568 HUR HUR SR 0060 02.82 BROWN, CHRISTOPHER LBridge Replacement $201,323.91 80548 2008 03/31/08 03/31/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 201,324$

6 3 ODOT Let 77312 MED MED US 0042 SYSSIGN FY2009BARATY, AHAD D Signs $259,578.89 80578 07/14/08 07/14/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 259,579$

6 3 ODOT Let 81067 ASD ASD SR 0058 03.41 BROWN, CHRISTOPHER LCulvert Construction/Reconstr/Repair $39,845.00 80573 07/02/08 07/02/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 39,845$

6 3 ODOT Let 16604 WAY WAY SR 0003 12.507 BROWN, CHRISTOPHER LBridge Replacement $224,695.88 80596 07/25/08 07/25/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 224,696$

6 3 ODOT Let 80183 ERI ERI US 0006 19.26 BARATY, AHAD D Minor Rehabilitation - Pavement Gnrl Sys $2,582,166.58 80602 08/11/08 08/11/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 2,582,167$

6 3 ODOT Let 80177 WAY WAY SR 0003 19.57 DALTON, BRUCE A Minor Rehabilitation - Pavement Gnrl Sys $2,305,134.30 80648 09/16/08 09/16/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 2,305,134$

6 3 ODOT Let 13363 MED MED SR 0252 09.951 BROWN, CHRISTOPHER LCulvert Construction/Reconstr/Repair 06/10/08 06/10/08 09/10/08 09/18/08 2009 1,148,225$

Page 5: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

6 3 ODOT Let 23799 LOR LOR SR 0002 03.50 DALTON, BRUCE A Minor Rehabilitation - Pavement Prmy Sys 10/20/08 10/20/08 01/14/09 01/22/09 2009 4,624,100$

6 3 ODOT Let 80173 ASD ASD SR 0060 00.68 BARATY, AHAD D Minor Rehabilitation - Pavement Gnrl Sys 09/16/08 09/16/08 01/14/09 01/22/09 2009 2,979,278$

6 3 ODOT Let 82991 D03 D03 RPM FY2009 BARATY, AHAD D Raised Pavement Markers 10/09/08 10/09/08 01/14/09 01/22/09 2009 220,563$

6 3 ODOT Let 84729 D03 D03 PR FY2009 (B) BARATY, AHAD D Pruning, Tree/Bush Removal 10/09/08 10/09/08 01/14/09 01/22/09 2009 122,951$ Added

6 3 ODOT Let 79449 CRA CRA SR 0019 01.18 DALTON, BRUCE A Resurfacing, Undivided System 11/03/08 11/03/08 01/28/09 02/05/09 2009 2,237,035$

6 3 ODOT Let 79489 WAY WAY SR 0057 02.19 DALTON, BRUCE A Resurfacing, Undivided System 11/07/08 11/07/08 02/04/09 02/12/09 2009 450,453$

6 3 ODOT Let 80169 LOR LOR SR 0301 21.82 DALTON, BRUCE A Minor Rehabilitation - Pavement Gnrl Sys 10/30/08 10/30/08 02/04/09 02/12/09 2009 945,700$

6 3 ODOT Let 23574 MED MED SR 0083 00.93 BARATY, AHAD D Minor Rehabilitation - Pavement Gnrl Sys 11/25/08 11/25/08 02/25/09 03/05/09 2009 5,462,725$

6 3 ODOT Let 79452 LOR LOR SR 0058 24.65 BROWN, CHRISTOPHER LResurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 1,544,806$

6 3 ODOT Let 85258 CRA CRA US 0030 05.25 NUSSBAUM, RONALD DBridge Repair 01/05/09 01/05/09 04/01/09 04/01/09 2009 57,845$ Added

6 3 ODOT Let 82986 D03 D03 LOOP FY2009 BARATY, AHAD D Loop Detector Repair 12/29/08 12/29/08 03/25/09 04/02/09 2009 70,867$

6 3 ODOT Let 80175 HUR HUR SR 0060 02.07 BARATY, AHAD D Resurfacing, Undivided System 12/24/08 12/24/08 04/08/09 04/16/09 2009 1,880,750$

6 3 ODOT Let 19656 ERI ERI SR 0060 08.92 BROWN, CHRISTOPHER LBridge Replacement 11/03/08 01/28/09 02/05/09 2009 516,622$

6 3 ODOT Let 82989 D03 D03 PM FY2009 BARATY, AHAD D Pavement Marking 01/29/09 04/22/09 04/30/09 2009 1,107,421$

6 3 ODOT Let 79425 HUR HUR US 0224 05.75 DALTON, BRUCE A Intersection Improvement 02/23/09 05/20/09 05/28/09 2009 1,432,957$

6 3 ODOT Let 83179 ERI ERI Castalia Fish Hatchery BROWN, CHRISTOPHER LParking Lot 03/16/09 06/10/09 06/18/09 2009 27,341$

6 3 ODOT Let 84949 D03 D03 TSG FY2009 BARATY, AHAD D Signals 03/16/09 06/10/09 06/18/09 2009 274,050$ Added6 3 Totals 34,698,466$ 59,802,155$

Page 6: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 47 4 Local Let 80669 STA STA Tremont Avenue (CR-510)ZUMBO, ANTHONY L Bridge Repair $3,735,809.67 08N123 03/10/08 03/10/08 07/03/08 07/03/08 07/17/08 07/17/08 2009 3,735,810$ Added

7 4 Local Let 83383 MAH MAH CR-18 Mahoning AvenueZUMBO, ANTHONY L Mill and Fill $2,527,727.95 08N125 07/07/08 07/07/08 09/10/08 09/10/08 09/25/08 09/25/08 2009 2,527,728$

7 4 Local Let 84400 STA STA Pavement Marking 2009 ZUMBO, ANTHONY L Pavement Marking $156,037.71 08n117 07/22/08 07/22/08 09/05/08 09/05/08 09/25/08 09/25/08 2009 156,038$ Added

7 4 Local Let 76047 TRU TRU Niles Bike Path ZUMBO, ANTHONY L Bikeways 02/13/06 02/13/06 07/01/08 07/01/08 2009 3,420,000$ Added

7 4 Local Let 78871 MAH MAH US 0062 20.53 ZUMBO, ANTHONY L Landscaping 07/26/08 07/26/08 07/01/08 07/01/08 2009 165,932$ Added

7 4 Local Let 80630 SUM SUM IR-77 Landscaping ZUMBO, ANTHONY L Landscaping 09/01/08 08/27/08 08/27/08 10/01/08 12/22/08 10/01/08 12/31/08 2009 630,000$

7 4 Local Let 80663 ATB ATB Harbor Streetscape ZUMBO, ANTHONY L Landscaping 08/03/08 08/03/08 12/15/08 12/31/08 2009 491,692$

7 4 Local Let 82128 MAH MAH CR-109 (Raccoon Rd.) ZUMBO, ANTHONY L Add Sidewalks 11/10/08 11/10/08 12/19/08 12/31/08 2009 208,137$

7 4 Local Let 82129 MAH MAH SR 0170 05.08 ZUMBO, ANTHONY L Add Sidewalks 06/27/08 06/27/08 12/19/08 12/31/08 2009 103,122$

7 4 Local Let 78270 SUM SUM Waterloo Rd Towpath ZUMBO, ANTHONY L Bikeways 11/24/08 11/24/08 03/23/09 03/31/09 2009 1,589,919$

7 4 Local Let 77557 POR POR SR 0014 05.12 ZUMBO, ANTHONY L Minor Widening 03/24/08 03/24/08 03/24/08 05/23/08 04/01/09 06/02/08 04/01/09 2009 726,234$ Added

7 4 Local Let 84394 SUM SUM Everett Road (CR47) ZUMBO, ANTHONY L Resurfacing, Undivided System 08/06/08 08/06/08 06/01/09 06/01/09 2009 941,079$ Added

7 4 Local Let 80549 POR POR Spaulding Drive ZUMBO, ANTHONY L Bridge Replacement 02/09/09 03/23/09 03/31/09 2009 520,875$

7 4 Local Let 80568 SUM SUM Atterbury Blvd. ZUMBO, ANTHONY L Bridge Replacement 02/16/09 03/23/09 03/31/09 2009 487,125$

7 4 Local Let 80677 TRU TRU Packard Museum ZUMBO, ANTHONY L Fairgrounds & Exposition Center 02/09/09 03/23/09 03/31/09 2009 1,045,800$

7 4 Local Let 82048 ATB ATB Union Cemetary Bridge ZUMBO, ANTHONY L Bridge Maintenance 02/16/09 03/16/09 03/31/09 2009 396,000$

7 4 Local Let 22867 STA STA Hills & Dales Road ZUMBO, ANTHONY L Major Widening 01/19/09 03/09/09 03/23/09 05/18/09 03/31/09 05/29/09 2009 6,516,000$

7 4 Local Let 78016 POR POR Brady Lake Road ZUMBO, ANTHONY L Bridge Replacement 04/01/09 05/18/09 06/01/09 2009 1,440,000$

7 4 Local Let 79518 ATB ATB Old Plank Road (TR 528C)ZUMBO, ANTHONY L Bridge Replacement 03/16/09 05/18/09 06/01/09 2009 925,500$

7 4 Local Let 79827 TRU TRU Mahoning Ave/SR45 ZUMBO, ANTHONY L Mill and Fill 03/09/09 05/22/09 06/01/09 2009 1,260,000$

7 4 Local Let 82549 MAH MAH Glenbridge ZUMBO, ANTHONY L Bridge Maintenance 03/02/09 05/18/09 06/01/09 2009 240,301$

7 4 Local Let 84103 SUM SUM Martha Avenue ZUMBO, ANTHONY L Minor Widening 04/20/09 06/01/09 06/01/09 2009 5,400,000$ Added

7 4 Local Let 84349 MAH MAH Four Mile Run (CH119)ZUMBO, ANTHONY L Signals 04/20/09 05/01/09 06/01/09 2009 171,000$ Added

7 4 Local Let 84561 MAH MAH Calvary Run Dr-Mill Creek PkZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 131,420$ Added

7 4 Local Let 84951 POR POR Guardrail Phase 3 - VariousZUMBO, ANTHONY L Guardrail upgrade/replace 04/20/09 05/01/09 06/01/09 2009 270,000$ Added

7 4 Local Let 84952 POR POR Guardrail Phase 2 - VariousZUMBO, ANTHONY L Guardrail upgrade/replace 04/20/09 05/01/09 06/01/09 2009 270,000$ Added

7 4 Local Let 84957 POR POR Hayes Road (CH138) ZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 144,900$ Added

7 4 Local Let 84959 POR POR Infirmary Road (CH164)ZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 89,010$ Added

7 4 Local Let 84960 POR POR Cleveland Road (CH171)ZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 70,380$ Added

7 4 Local Let 84961 POR POR Wall Street (CH159) ZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 103,500$ Added

7 4 Local Let 84962 POR POR Tallmadge Road (CH18)ZUMBO, ANTHONY L Resurfacing, Undivided System 04/20/09 05/01/09 06/01/09 2009 900,000$ Added

7 4 Local Let 84978 SUM SUM Waterloo Road (CH450)ZUMBO, ANTHONY L Mill and Fill 04/20/09 05/01/09 06/01/09 2009 1,237,500$ Added

7 4 Local Let 84989 SUM SUM Front Street ZUMBO, ANTHONY L Mill and Fill 04/20/09 05/15/09 06/01/09 2009 508,150$ Added

7 4 Local Let 84992 SUM SUM Portage Trail ZUMBO, ANTHONY L Mill and Fill 04/20/09 05/15/09 06/01/09 2009 476,100$ Added

7 4 Local Let 84993 SUM SUM Wyoga Lake Road ZUMBO, ANTHONY L Mill and Fill 04/20/09 05/15/09 06/01/09 2009 527,850$ Added

7 4 Local Let 14543 SUM SUM CR 0638 00.00 ZUMBO, ANTHONY L Bridge Replacement 03/02/09 03/02/09 05/22/09 05/22/09 06/05/09 06/05/09 2009 6,294,060$

7 4 Local Let 81696 POR POR Portage Hike & Bike ZUMBO, ANTHONY L Bikeways 03/16/09 05/25/09 06/08/09 2009 554,889$ Added7 4 Totals 6,419,575$ 44,676,050$

ODOT Let Program - District 48 4 ODOT Let 81364 TRU TRU Hallock-Young YARD, DOUGLAS A Mill and Fill $817,535.37 80427 04/23/07 04/23/07 06/18/08 06/18/08 06/26/08 06/26/08 2009 817,535$

8 4 ODOT Let 81528 SUM SUM SR 0008 07.94 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys $4,279,187.28 80426 03/24/08 03/18/08 03/18/08 06/18/08 06/18/08 06/18/08 06/26/08 06/26/08 06/26/08 2009 4,279,187$

8 4 ODOT Let 83495 D04 D04 PM FY2009 (LL-EAST) YARD, DOUGLAS A Pavement Marking $624,467.61 80430 03/21/08 03/21/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 624,468$

8 4 ODOT Let 83496 D04 D04 PM FY2009 (LL-WEST)YARD, DOUGLAS A Pavement Marking $431,744.99 80431 03/21/08 03/21/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 431,745$

8 4 ODOT Let 76342 STA STA SR 183/225 19.94/0.59 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys $1,154,793.66 80449 04/11/08 04/11/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 1,154,794$

8 4 ODOT Let 81571 ATB ATB SR 86/322/534 0.00/22.48/0.0YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys $2,666,980.00 80438 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 2,666,980$

8 4 ODOT Let 83497 D04 D04 LG FY2009 (EAST) YARD, DOUGLAS A Lighting $542,998.50 80455 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 542,999$

8 4 ODOT Let 82008 MAH MAH SR 0046 16.66 YARD, DOUGLAS A Signals $73,018.65 80483 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 73,019$

8 4 ODOT Let 25479 MAH MAH SR 0193 01.47 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys $994,646.92 80484 2007 02/06/06 02/06/06 08/06/08 08/06/08 08/18/08 08/18/08 2009 994,647$ Added

8 4 ODOT Let 83476 D04 ATB / TRU GR FY2009 POWELL, THOMAS J Guardrail Rebuilding $419,575.00 80497 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 419,575$

Page 7: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

8 4 ODOT Let 83477 MAH MAH / STA GR FY2009 POWELL, THOMAS J Guardrail Rebuilding $208,395.00 80505 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 208,395$

8 4 ODOT Let 83387 MAH MAH Coitsville Road YARD, DOUGLAS A Mill and Fill $538,808.05 80492 05/12/08 05/12/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 538,808$

8 4 ODOT Let 83281 TRU TRU SR 0011 06.23 YARD, DOUGLAS A Signals $38,023.85 80560 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 38,024$ Added

8 4 ODOT Let 25064 MAH MAH US 0062 19.69 MCGRATH, JAMES E Bridge Repair $6,618,000.00 80549 10/01/08 06/30/08 06/30/08 10/01/08 10/08/08 10/08/08 10/01/08 10/16/08 10/16/08 2009 6,618,000$

8 4 ODOT Let 25277 SUM SUM IR 0077 30.96 POWELL, THOMAS J Bridge Repair $10,073,110.00 83003 04/01/08 04/24/08 04/24/08 10/01/08 10/08/08 10/08/08 10/01/08 10/16/08 10/16/08 2009 10,073,110$

8 4 ODOT Let 78020 SUM SUM SR 0261 00.00 POWELL, THOMAS J Minor Rehabilitation - Pavement Gnrl Sys $1,328,672.36 80591 07/24/08 07/24/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 1,328,672$

8 4 ODOT Let 82802 MAH MAH IR 0680 04.03 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys $6,929,982.15 80567 07/14/08 07/14/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 6,929,982$

8 4 ODOT Let 23062 ATB ATB West Avenue RGS CUTLER, JEFFREY G Railroad Grade Separation $4,839,000.00 80542 04/01/08 06/30/08 06/30/08 07/01/08 11/05/08 11/05/08 07/01/08 11/13/08 11/13/08 2009 4,839,000$

8 4 ODOT Let 24507 SUM SUM SR 0008 13.30 ROSEN, ROBERT R Major Reconstruction $47,513,022.60 80581 04/01/08 06/12/08 06/12/08 10/01/08 11/05/08 11/05/08 10/01/08 11/13/08 11/13/08 2009 47,513,023$

8 4 ODOT Let 76347 SUM SUM SR 0008 04.30 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys $6,003,649.41 80608 2008 02/29/08 02/29/08 02/29/08 11/05/08 11/05/08 11/05/08 11/13/08 11/13/08 11/13/08 2009 6,003,649$

8 4 ODOT Let 82800 STA STA US 0062 25.49 POWELL, THOMAS J Resurfacing, Divided System $6,973,951.35 80607 08/07/08 08/07/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 6,973,951$

8 4 ODOT Let 76350 SUM SUM US 0224 12.71 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys $1,343,471.72 80625 08/21/08 08/21/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 1,343,472$ Added

8 4 ODOT Let 83348 SUM SUM SR 0059T 00.00 POWELL, THOMAS J Signs $127,110.79 80633 08/21/08 08/21/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 127,111$

8 4 ODOT Let 11661 SUM SUM SR 0008 10.66 FEUDNER, LORIE K Interchange, Reconstruction $4,223,167.86 80626 08/19/08 08/19/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 4,223,168$

8 4 ODOT Let 77855 MAH MAH SR 0014 00.00 YARD, DOUGLAS A Resurfacing, Undivided System $1,668,942.07 80644 09/12/08 09/12/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 1,668,942$

8 4 ODOT Let 83278 ATB ATB US 0020 18.17 YARD, DOUGLAS A Signals $29,292.00 80650 09/11/08 09/11/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 29,292$

8 4 ODOT Let 83328 TRU TRU SR 0011 12.60 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys $8,820,392.10 80647 09/15/08 09/15/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 8,820,392$

8 4 ODOT Let 84684 STA STA SR 0183 06.54 POWELL, THOMAS J Bridge Maintenance $46,528.00 88041 10/24/08 10/24/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 46,528$ Added

8 4 ODOT Let 76329 POR POR SR 0043 15.44 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 2008 02/29/08 02/29/08 11/05/08 11/13/08 2009 400,000$

8 4 ODOT Let 25534 POR POR SR 0014 03.68 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 08/25/08 08/25/08 11/19/08 11/26/08 2009 925,000$

8 4 ODOT Let 82011 ATB ATB SR 0011 14.40 YARD, DOUGLAS A Signs 09/15/08 09/15/08 12/10/08 12/18/08 2009 475,000$

8 4 ODOT Let 25769 ATB ATB US 0020 10.53 DEPTO, DANIEL K Spot Safety 10/20/08 10/16/08 10/16/08 01/14/09 01/14/09 01/22/09 01/22/09 2009 3,275,000$

8 4 ODOT Let 76178 MAH MAH US 0224 08.60 YARD, DOUGLAS A Earthwork 01/25/08 01/25/08 01/14/09 01/22/09 2009 1,100,000$

8 4 ODOT Let 77522 POR POR SR 0014 02.20 FEUDNER, LORIE K Bridge Replacement 10/17/08 10/17/08 01/14/09 01/22/09 2009 1,300,000$

8 4 ODOT Let 77837 POR POR SR 0044 14.91 YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys 10/16/08 10/16/08 01/14/09 01/22/09 2009 800,000$ Added

8 4 ODOT Let 84136 ATB ATB/TRU Chip Seal Various RoutesYARD, DOUGLAS A Preventive Maintenance 10/16/08 10/16/08 01/14/09 01/22/09 2009 675,000$ Added

8 4 ODOT Let 25238 STA STA SR 0241 07.67 MIESLE, NEAL C Bridge Repair 10/31/08 10/31/08 01/28/09 02/05/09 2009 2,600,000$

8 4 ODOT Let 25506 MAH MAH US 0224 16.17 POWELL, THOMAS J Bridge Deck Replacement 10/29/08 10/29/08 01/28/09 02/05/09 2009 975,000$

8 4 ODOT Let 25557 SUM SUM/POR IR 0480 03.72 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys 01/01/09 10/31/08 10/31/08 01/01/09 01/28/09 01/01/09 02/05/09 2009 6,305,000$

8 4 ODOT Let 77823 ATB ATB SR 0007 21.00 YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys 11/03/08 11/03/08 01/28/09 02/05/09 2009 1,600,000$ Added

8 4 ODOT Let 84052 POR POR SR 0082 05.07 YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys 11/03/08 11/03/08 01/28/09 02/05/09 2009 1,650,000$ Added

8 4 ODOT Let 25544 SUM SUM SR 0082 08.03 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys 11/07/08 11/07/08 02/04/09 02/12/09 2009 930,000$

8 4 ODOT Let 76326 MAH MAH SR 0616 05.24 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 11/10/08 11/10/08 02/04/09 02/12/09 2009 1,025,000$

8 4 ODOT Let 76354 TRU TRU SR 5/88 - 20.11/14.05 YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys 11/10/08 11/10/08 02/04/09 02/12/09 2009 1,710,000$ Added

8 4 ODOT Let 76437 SUM SUM SR 0093 06.92 DEPTO, DANIEL K Intersection Improvement 11/10/08 11/07/08 11/07/08 02/04/09 02/04/09 02/12/09 02/12/09 2009 5,275,000$

8 4 ODOT Let 77324 D04 MAH US 422/616 7.58/0.02 YARD, DOUGLAS A Preventive Maintenance 11/10/08 11/10/08 02/04/09 02/12/09 2009 200,000$ Added

8 4 ODOT Let 80560 STA STA/SUM IR 77 17.63/0.40 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys 01/01/09 11/06/08 11/06/08 01/01/09 02/04/09 01/01/09 02/12/09 2009 5,000,000$

8 4 ODOT Let 23460 TRU TRU West Park Avenue CUTLER, JEFFREY G Bridge Replacement 11/28/08 11/28/08 02/25/09 03/05/09 2009 1,355,000$

8 4 ODOT Let 77835 POR POR/TRU 305/305D/282 0.00/0.00/0YARD, DOUGLAS A Minor Rehabilitation - Pavement Gnrl Sys 02/25/08 02/25/08 03/11/09 03/19/09 2009 3,200,000$

8 4 ODOT Let 82009 SUM SUM SR 0091 00.62 YARD, DOUGLAS A Signals 12/12/08 12/12/08 03/11/09 03/19/09 2009 80,000$

8 4 ODOT Let 80686 STA STA SR 0172 08.83 POWELL, THOMAS J Resurfacing (safety related) 11/08/07 11/08/07 04/01/09 04/01/09 2009 2,600,000$ Added

8 4 ODOT Let 25446 SUM SUM SR 0008 18.05 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys 06/26/08 06/26/08 03/25/09 04/02/09 2009 1,000,000$

8 4 ODOT Let 79630 STA STA Deer Creek Park Ped BridgeMIESLE, NEAL C Parks 12/23/08 12/23/08 03/25/09 04/02/09 2009 1,650,000$

8 4 ODOT Let 82483 STA STA SR 0044 04.26 POWELL, THOMAS J Bridge Replacement 01/05/09 01/05/09 04/08/09 04/16/09 2009 275,000$

8 4 ODOT Let 82747 ATB ATB SR 0531 06.89 YARD, DOUGLAS A Mill and Fill 08/08/08 08/08/08 04/08/09 04/16/09 2009 850,000$

8 4 ODOT Let 84751 STA STA/SUM 62/225/76 37.88/.59/4.96POWELL, THOMAS J Bridge Repair 01/05/09 01/05/09 04/08/09 04/16/09 2009 235,000$ Added

8 4 ODOT Let 82753 D04 D04 Facilities WWTS project HUNT, JON B Waste Water Treatment Plant 01/15/09 04/01/09 04/01/09 2009 275,000$ Added

8 4 ODOT Let 85246 SUM SUM SR 0008 01.99 SICKER, DAVID E Bridge Maintenance 02/01/09 04/01/09 04/01/09 2009 800,000$ Added

8 4 ODOT Let 84809 SUM SUM SR 0091 07.90 POWELL, THOMAS J Bridge Repair 01/12/09 04/08/09 04/08/09 2009 350,000$ Added

8 4 ODOT Let 25430 STA STA SR 0172 11.91 / 15.55 YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 01/12/09 04/08/09 04/16/09 2009 1,700,000$ Added

8 4 ODOT Let 76297 ATB ATB 167/307 (0.06)(5.67)/(12.23)YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 01/12/09 04/08/09 04/16/09 2009 1,800,000$

Page 8: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

8 4 ODOT Let 83385 MAH MAH West Fifth Street YARD, DOUGLAS A Mill and Fill 01/12/09 04/08/09 04/16/09 2009 300,000$

8 4 ODOT Let 84735 STA STA IR 0077 08.40 POWELL, THOMAS J Bridge Maintenance 01/12/09 04/08/09 04/16/09 2009 3,250,000$ Added

8 4 ODOT Let 84872 POR POR SR 0261 01.19 POWELL, THOMAS J Bridge Repair 01/12/09 04/08/09 04/16/09 2009 750,000$ Added

8 4 ODOT Let 18466 POR POR Crain Avenue DEPTO, DANIEL K Relocation 01/01/09 01/12/09 04/01/09 04/22/09 04/01/09 04/30/09 2009 13,600,000$

8 4 ODOT Let 25589 TRU TRU SR 7/7D/62A 5.71/0.00/0.00YARD, DOUGLAS A Minor Rehabilitation - Pavement Prmy Sys 01/26/09 04/22/09 04/30/09 2009 1,650,000$

8 4 ODOT Let 76442 MAH MAH US 0224 16.33 FEUDNER, LORIE K Intersection Improvement 01/26/09 01/26/09 04/22/09 04/22/09 04/30/09 04/30/09 2009 3,600,000$

8 4 ODOT Let 77857 MAH MAH SR 0170 08.79 YARD, DOUGLAS A Reactive Maintenance 01/26/09 04/22/09 04/30/09 2009 690,000$ Added

8 4 ODOT Let 78399 ATB ATB West Avenue Brdg over RRMIESLE, NEAL C Bridge Maintenance 01/26/09 04/22/09 04/30/09 2009 1,375,000$

8 4 ODOT Let 81149 SUM SUM IR 0271 7.56/09.30 SlopePOWELL, THOMAS J Slide Repair 01/26/09 04/22/09 04/30/09 2009 1,100,000$ Added

8 4 ODOT Let 83373 STA STA IR 0077 Noise Walls DEPTO, DANIEL K Noise Wall 01/26/09 04/22/09 04/30/09 2009 700,000$

8 4 ODOT Let 83093 POR POR US 0224 12.01 POWELL, THOMAS J Slide Repair 02/09/09 05/06/09 05/14/09 2009 800,000$

8 4 ODOT Let 83320 STA STA SR 93 (9.94)(10.03)(11.87)POWELL, THOMAS J Minor Rehabilitation - Pavement Gnrl Sys 02/09/09 05/06/09 05/14/09 2009 2,040,000$

8 4 ODOT Let 84373 D04 D04 TSG FY 2009 YARD, DOUGLAS A Traffic Signals 02/09/09 05/06/09 05/14/09 2009 450,000$ Added

8 4 ODOT Let 23982 TRU TRU Fairport Street CUTLER, JEFFREY G Bridge Replacement 02/23/09 05/20/09 05/28/09 2009 475,000$

8 4 ODOT Let 77863 STA STA SR 0800 00.00 POWELL, THOMAS J Minor Rehabilitation - Pavement Gnrl Sys 02/23/09 05/20/09 05/28/09 2009 1,750,000$ Added

8 4 ODOT Let 78243 POR POR SR 0043 23.59 ROSEN, ROBERT R Widening 02/23/09 02/23/09 05/20/09 05/20/09 05/28/09 05/28/09 2009 10,250,000$

8 4 ODOT Let 82750 STA STA IR 0077 02.57 Slide POWELL, THOMAS J Slide Repair 02/23/09 05/20/09 05/28/09 2009 300,000$ Added

8 4 ODOT Let 77867 TRU TRU SR 193 (22.98)(24.27)(24.94)POWELL, THOMAS J Bridge Replacement 02/23/09 05/20/09 05/29/09 2009 700,000$ Added

8 4 ODOT Let 25549 STA STA US 62/250 0.00/1.28 POWELL, THOMAS J Minor Rehabilitation - Pavement Prmy Sys 03/16/09 06/10/09 06/18/09 2009 2,000,000$

8 4 ODOT Let 83027 TRU TRU SR 0193 02.15 POWELL, THOMAS J Bridge Replacement 03/16/09 06/10/09 06/18/09 2009 600,000$ 8 4 Totals 119,328,467$ 218,098,467$

Page 9: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 59 5 Local Let 81392 FAI FAI Columbus Street COMISFORD, RANDY SCulvert Construction/Reconstr/Repair $109,959.50 08N111 11/08/07 11/08/07 09/11/08 09/11/08 09/30/08 09/30/08 2009 109,960$ Added

9 5 Local Let 81811 GUE GUE Leatherwood ConnectorSMITH, STEVE S Bikeways $61,821.80 08N121 09/03/08 09/03/08 10/14/08 10/14/08 10/15/08 10/15/08 2009 61,822$

9 5 Local Let 77328 MUS MUS Jim Granger Drive SMITH, STEVE S New Construction $1,264,219.00 08N122 08/28/08 08/28/08 10/20/08 10/20/08 10/20/08 10/20/08 2009 1,264,219$

9 5 Local Let 75141 FAI FAI CR 49 00.06 COMISFORD, RANDY SResurfacing, Undivided System 12/09/08 12/09/08 03/31/09 03/31/09 2009 983,480$ Added

9 5 Local Let 78713 KNO KNO Big Run Bridge COMISFORD, RANDY SDesign Aesthetics 10/15/07 10/15/07 03/31/09 03/31/09 2009 1,036,118$ Added

9 5 Local Let 81912 COS COS/GUE GR2009 SMITH, STEVE S Guardrail Rebuilding 12/31/08 12/31/08 03/24/09 03/31/09 2009 449,531$

9 5 Local Let 75137 MUS MUS CR 500 0.00 SMITH, STEVE S Resurfacing, Undivided System 01/30/09 03/25/09 03/31/09 2009 861,159$

9 5 Local Let 83159 FAI FAI CR 56 00.00(Sheridan/Tiki)SMITH, STEVE S Mill and Fill 01/16/09 03/24/09 03/31/09 2009 805,265$

9 5 Local Let 81925 KNO KNO CR78/VAR GR2012 COMISFORD, RANDY SGuardrail Rebuilding 02/20/09 04/23/09 04/30/09 2009 293,265$ Added

9 5 Local Let 82238 GUE GUE CR 57 03.76 COMISFORD, RANDY SMill and Fill 03/31/09 05/29/09 05/29/09 2009 415,510$ Added9 5 Totals 1,436,000$ 6,280,328$

ODOT Let Program - District 510 5 ODOT Let 79086 GUE GUE SR 313 09.92 MORGAN, DOUGLAS NMill and Fill $954,680.30 80369 03/07/08 03/07/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 954,680$ Added

10 5 ODOT Let 83796 MUS LIC/MUS US 40 28.60/00.00 MORGAN, DOUGLAS NMinor Rehabilitation - Pavement Gnrl Sys $4,195,334.43 88019 04/28/08 04/28/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 4,195,334$

10 5 ODOT Let 83671 GUE GUE IR 70 10.54 MORGAN, DOUGLAS NResurfacing, Divided System $3,350,985.40 80445 04/07/08 04/07/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 3,350,985$

10 5 ODOT Let 76373 COS COS US 36 32.82 MORGAN, DOUGLAS NResurfacing, Divided System $551,986.06 80490 2009 05/07/08 05/07/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 551,986$ Added

10 5 ODOT Let 81089 PER Per 13/93/155 19.83/00.00/7.23MORGAN, DOUGLAS NPreventive Maintenance $2,049,941.88 80495 2008 02/25/08 02/25/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 2,049,942$

10 5 ODOT Let 82742 MUS MUS IR 70 05.70 MORGAN, DOUGLAS NMinor Rehabilitation - Pavement Prmy Sys $1,988,750.42 80513 05/23/08 05/23/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 1,988,750$

10 5 ODOT Let 81213 FAI FAI SR 37 04.07/04.16 GILBERT, HEATHER ABridge Replacement $373,695.80 80526 06/16/08 06/16/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 373,696$

10 5 ODOT Let 81220 PER PER/Mus SR 93 17.89/00.00 MORGAN, DOUGLAS NMill and Fill $3,281,289.60 80530 05/15/08 05/15/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 3,281,290$

10 5 ODOT Let 80077 MUS MUS SR 60 07.37 KADAKIA, NIKUNJ C Slide Repair $245,352.75 80551 06/26/08 06/26/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 245,353$

10 5 ODOT Let 84815 GUE GUE IR 70 09.43 FLOOD, DAVID T Bridge Vehicle Damage Repair (NEW) $51,320.00 88034 09/03/08 09/03/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 51,320$ Added

10 5 ODOT Let 81212 KNO KNO US 36 24.29 FLOOD, DAVID T Bridge Deck Replacement $764,544.35 80587 07/25/08 07/25/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 764,544$

10 5 ODOT Let 25687 KNO KNO SR 13/95 16.02/00.00 MORGAN, DOUGLAS NResurfacing, Divided System 10/20/08 10/20/08 01/14/09 01/22/09 2009 2,823,688$

10 5 ODOT Let 79607 D05 D05 GR FY2009/2010 MORGAN, DOUGLAS NGuardrail Rebuilding 10/28/08 10/28/08 01/28/09 02/05/09 2009 600,539$

10 5 ODOT Let 81211 KNO KNO SR 546 01.09 FLOOD, DAVID T Bridge Replacement 11/10/08 11/10/08 02/04/09 02/12/09 2009 1,024,283$

10 5 ODOT Let 79602 D05 D05 RPM FY2009 MORGAN, DOUGLAS NPavement Marking 11/26/08 11/26/08 02/25/09 03/05/09 2009 248,820$

10 5 ODOT Let 79603 D05 D05 PM FY2009(A) Fast DryMORGAN, DOUGLAS NPavement Marking 11/26/08 11/26/08 02/25/09 03/05/09 2009 140,307$

10 5 ODOT Let 85045 LIC LIC SR 16 19.68 DUNLAP, TROY D Crack Seal 11/26/08 11/26/08 02/25/09 03/05/09 2009 88,123$ Added

10 5 ODOT Let 85046 MUS D05 GCS FY2009 DUNLAP, TROY D Crack Seal 11/26/08 11/26/08 02/25/09 03/05/09 2009 198,288$ Added

10 5 ODOT Let 79145 KNO KNO US 62 10.23 FLOOD, DAVID T Bridge Replacement 12/15/08 12/15/08 03/11/09 03/19/09 2009 685,092$

10 5 ODOT Let 79604 D05 D05 PM FY2009(B) Poly MORGAN, DOUGLAS NPavement Marking 12/11/08 12/11/08 03/11/09 03/19/09 2009 324,461$

10 5 ODOT Let 81088 PER PER 22/13/93 00.00/26.88/11.58MORGAN, DOUGLAS NMinor Rehabilitation - Pavement Gnrl Sys 08/22/08 08/22/08 03/11/09 03/19/09 2009 1,774,486$

10 5 ODOT Let 82752 MUS MUS SR 60 16.75 Safety ProjectMORGAN, DOUGLAS NStudies 12/24/08 12/24/08 03/25/09 04/02/09 2009 820,952$

10 5 ODOT Let 84766 LIC LIC IR 70 08.73 (Cable Barrier)FISHER, DON P Delineation 12/29/08 03/25/09 04/02/09 2009 479,019$ Added

10 5 ODOT Let 25162 GUE GUE US 22 00.00 MORGAN, DOUGLAS NMinor Rehabilitation - Pavement Gnrl Sys 04/01/09 01/12/09 04/01/09 04/08/09 04/01/09 04/16/09 2009 4,030,384$

10 5 ODOT Let 81812 LIC LIC Bike/Ped Bridge FLOOD, DAVID T Bikeways 01/26/09 04/22/09 04/30/09 2009 776,934$

10 5 ODOT Let 83535 D05 FAI/LIC SR 37/US 40 14.14/04.59SMITH, STEVE S Signals 01/26/09 04/22/09 04/30/09 2009 399,350$

10 5 ODOT Let 23148 PER PER CR88 FLOOD, DAVID T Bridge Replacement 02/09/09 05/06/09 05/14/09 2009 600,000$

10 5 ODOT Let 81969 LIC LIC SR 16 21.00 (Hudson) GILBERT, HEATHER AIntersection Improvement 02/01/09 02/09/09 05/01/09 05/06/09 05/01/09 05/14/09 2009 4,985,260$

10 5 ODOT Let 78777 LIC LIC CR 42 01.75 MORGAN, DOUGLAS NWidening 02/23/09 05/20/09 05/28/09 2009 1,081,725$

10 5 ODOT Let 23147 PER PER CR 21 00.10 FLOOD, DAVID T Bridge Replacement 03/16/09 06/10/09 06/18/09 2009 275,000$

10 5 ODOT Let 80489 GUE GUE SR 662 00.10 KADAKIA, NIKUNJ C Slide Repair 03/16/09 06/10/09 06/18/09 2009 285,724$

10 5 ODOT Let 84294 MUS MUS SR 666 05.25/05.72 KADAKIA, NIKUNJ C Slide Repair 03/16/09 06/10/09 06/18/09 2009 650,000$ Added10 5 Totals 17,807,881$ 40,100,317$

Page 10: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 611 6 Local Let 77934 FRA FRA-MORSE RD IMPROVEMENTS-PH 2ALLEN, TRACY L Landscaping $9,442,506.66 08N113 03/15/08 03/14/08 03/14/08 04/01/08 05/20/08 05/20/08 06/01/08 06/23/08 06/23/08 2009 9,442,507$ Added

11 6 Local Let 81882 UNI UNI VARIES 2009GR ALLEN, TRACY L Guardrail Rebuilding $364,840.00 08N101 06/10/08 06/10/08 07/14/08 07/14/08 07/28/08 07/28/08 2009 364,840$

11 6 Local Let 83718 FRA FRA Prairie Oaks/Three CreeksALLEN, TRACY L Parking Areas 08/21/08 08/21/08 10/01/08 10/15/08 2009 195,377$ Added

11 6 Local Let 81548 UNI UNI CR 310 0.70 ALLEN, TRACY L Bridge Replacement 10/28/08 10/28/08 01/15/09 02/01/09 2009 605,625$

11 6 Local Let 75499 FRA FRA CR 125 5.02 ALLEN, TRACY L Major Widening 02/01/09 09/03/08 09/03/08 03/15/09 03/15/09 04/01/09 04/01/09 2009 6,990,966$

11 6 Local Let 79030 FRA FRA CR 29 7.34 ALLEN, TRACY L Bridge Deck Replacement 01/01/09 02/15/09 03/01/09 2009 794,546$ Added

11 6 Local Let 77235 PIC PIC CR 4 2.64 ALLEN, TRACY L Bridge Replacement 02/01/09 03/15/09 04/01/09 2009 4,545,500$ 11 6 Totals 9,807,347$ 22,939,361$

ODOT Let Program - District 612 6 ODOT Let 75293 FRA FRA INT'L GATEWAY (SECOND PROJ)BIRCH, BRUCE S Interchange, New $26,669,614.81 80436 12/17/07 03/03/08 03/03/08 04/23/08 07/16/08 07/16/08 05/01/08 07/17/08 07/17/08 2009 26,669,615$

12 6 ODOT Let 79940 MAR MAR SR 309 27.51 WAGNER, REBECCA LBridge Deck Replacement $1,444,923.56 80448 04/11/08 04/11/08 07/16/08 07/16/08 07/17/08 07/17/08 2009 1,444,924$

12 6 ODOT Let 81505 D06 D06 PME FY09 POLING, DAVID P Pavement Marking $874,925.68 80457 04/07/08 04/07/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 874,926$

12 6 ODOT Let 81508 D06 D06 PMP FY09 POLING, DAVID P Pavement Marking $421,427.91 80458 04/07/08 04/07/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 421,428$

12 6 ODOT Let 82374 FRA FRA US 40 12.270 POLING, DAVID P Bridge Repair $298,051.35 80444 2009 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 298,051$ Added

12 6 ODOT Let 83174 PIC PIC STAGES POND (FY09) SHEETS, DENNIS S Parking Areas $37,482.54 80463 03/13/08 03/13/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 37,483$

12 6 ODOT Let 81507 D06 D06 PMA FY09 POLING, DAVID P Pavement Marking $312,645.55 80479 04/24/08 04/24/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 312,646$

12 6 ODOT Let 81509 D06 D06 RPM FY09 POLING, DAVID P Raised Pavement Markers $110,000.00 80480 04/24/08 04/24/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 110,000$

12 6 ODOT Let 81823 FRA FRA SR 256 0.000 POLING, DAVID P Resurfacing, Undivided System $284,667.00 80465 03/25/08 03/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 284,667$

12 6 ODOT Let 83854 UNI UNI SR 739 0.000 POLING, DAVID P Mill and Fill $805,199.00 80486 04/28/08 04/28/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 805,199$

12 6 ODOT Let 81511 FRA FRA GR FY09 POLING, DAVID P Guardrail Rebuilding $1,284,209.00 80537 06/09/08 06/09/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 1,284,209$

12 6 ODOT Let 77453 FRA FRA IR 70 13.220 TAYLOR, ROBERT J Bridge Maintenance $1,449,940.95 80547 06/20/08 06/20/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 1,449,941$

12 6 ODOT Let 25721 MAD MAD SR 38 9.35 MAKRIS, THOMAS G Bridge Replacement $1,660,338.20 88038 08/25/08 08/25/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 1,660,338$

12 6 ODOT Let 79944 FRA FRA US 33 22.98 MAKRIS, THOMAS G Bridge Deck Replacement $2,919,545.95 80584 07/28/08 07/28/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 2,919,546$

12 6 ODOT Let 82855 D06 D06 ELEC FY09 POLING, DAVID P Electrical Maintenance $896,732.50 80629 04/14/08 04/14/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 896,733$

12 6 ODOT Let 85166 FRA FRA SR 315 11.66 (Type B) TAYLOR, ROBERT J Bridge Repair $164,563.50 85013 11/24/08 11/24/08 12/10/08 12/10/08 12/15/08 12/15/08 2009 164,564$ Added

12 6 ODOT Let 24805 FRA FRA CANAL 0.00 GRIMES, HOLLY G Bikeways $363,323.00 80639 09/11/08 09/11/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 363,323$ Added

12 6 ODOT Let 82862 FRA FRA LANDSCAPE MAINTENANCE FY09POLING, DAVID P Landscaping 09/03/08 09/03/08 01/14/09 01/22/09 2009 435,945$

12 6 ODOT Let 83763 FRA FRA US 62D 1.29 DEMO TAYLOR, ROBERT J Bridge Replacement 10/30/08 10/30/08 01/14/09 01/22/09 2009 1,475,495$ Added

12 6 ODOT Let 25811 MAD MAD US 40 0.00 POLING, DAVID P Minor Rehabilitation - Pavement Prmy Sys 10/30/08 10/30/08 01/28/09 02/05/09 2009 1,500,000$

12 6 ODOT Let 77564 FAY FAY US 22 16.560 POLING, DAVID P Bridge Repair 11/03/08 11/03/08 01/28/09 02/05/09 2009 863,000$

12 6 ODOT Let 77568 FRA FRA IR 71 11.520 POLING, DAVID P Bridge Repair 11/03/08 11/03/08 01/28/09 02/05/09 2009 947,000$

12 6 ODOT Let 81192 D06 D06 PPM FY09A POLING, DAVID P Preventive Maintenance 08/06/08 08/06/08 01/28/09 02/05/09 2009 1,425,885$

12 6 ODOT Let 22937 FAY FAY SR 753 12.87 HARRINGTON, GARY LNew Construction 01/01/09 11/10/08 11/10/08 01/01/09 02/04/09 01/01/09 02/12/09 2009 6,388,144$

12 6 ODOT Let 79445 FAY FAY WASHINGTON CH SIGNAL UPGRADEKATONA, MARK A Signals 11/06/08 11/06/08 02/04/09 02/12/09 2009 1,016,000$

12 6 ODOT Let 82739 D06 D06 ExtruSign FY09 POLING, DAVID P Sign Maintenance/Repair (NEW) 11/10/08 11/10/08 02/04/09 02/12/09 2009 1,200,000$

12 6 ODOT Let 25729 MRW MRW SR 19 5.72 MAKRIS, THOMAS G Bridge Replacement 12/01/08 12/01/08 02/25/09 03/05/09 2009 350,000$

12 6 ODOT Let 77562 DEL DEL SR 257 14.30 POLING, DAVID P Bridge Repair 11/28/08 11/28/08 02/25/09 03/05/09 2009 594,000$

12 6 ODOT Let 82663 PIC PIC SR 56 33.570 POLING, DAVID P Bridge Replacement 11/26/08 11/26/08 02/25/09 03/05/09 2009 436,000$

12 6 ODOT Let 76536 MAD MAD SR 142 13.08 MAKRIS, THOMAS G Intersection 12/29/08 12/29/08 03/25/09 04/02/09 2009 870,000$

12 6 ODOT Let 77566 FRA FRA IR 70 5.250 WAGNER, REBECCA LBridge Repair 12/29/08 12/29/08 03/25/09 04/02/09 2009 1,694,000$

12 6 ODOT Let 82813 FRA FRA US 23 5.68 SHEETS, DENNIS S Resurfacing, Undivided System 11/20/08 11/20/08 03/25/09 04/02/09 2009 772,000$

12 6 ODOT Let 20880 FRA FRA US 62 9.52 GRIMES, HOLLY G Section Improvement 10/15/07 10/09/08 10/09/08 01/09/08 03/25/09 01/17/08 04/04/09 2009 6,087,075$ Added

12 6 ODOT Let 81737 FRA FRA IR 270 24.430 HARRINGTON, GARY LMinor Widening 10/07/08 12/29/08 12/29/08 04/01/09 05/06/09 04/01/09 05/14/09 2009 3,900,000$

12 6 ODOT Let 82122 FRA FRA US 40 4.450 POLING, DAVID P 807 Treatment 01/26/09 04/22/09 04/30/09 2009 433,000$

12 6 ODOT Let 75810 FRA FRA US 33 BLACKLICK CRK GREENWAYGRIMES, HOLLY G New Bridge 02/09/09 05/06/09 05/14/09 2009 3,051,000$ Added

12 6 ODOT Let 76561 MAD MAD US 40 14.89 MAKRIS, THOMAS G Intersection 02/09/09 05/06/09 05/14/09 2009 3,400,000$

12 6 ODOT Let 24696 FRA FRA SR 315 2.40 HARRINGTON, GARY LResurfacing, Divided System 05/20/09 01/12/09 10/01/09 05/20/09 10/01/11 05/28/09 2009 22,000,000$

12 6 ODOT Let 81201 D06 D06 GRAFTI/EXPO FY09 POLING, DAVID P Clean & Sweep Roadways 02/23/09 05/20/09 05/28/09 2009 230,000$

12 6 ODOT Let 79357 FRA FRA US 40 8.590 SHEETS, DENNIS S Resurfacing, Undivided System 03/16/09 06/10/09 06/18/09 2009 939,000$

Page 11: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

12 6 ODOT Let 80748 UNI UNI US 33 24.870 BISHOP, MANDY K Interchange, Reconstruction 11/03/08 02/12/09 03/11/09 06/10/09 03/19/09 06/18/09 2009 24,100,000$ Added

12 6 ODOT Let 83638 D06 D06 PPM FY09B POLING, DAVID P 807 Treatment 03/16/09 06/10/09 06/18/09 2009 2,016,000$

12 6 ODOT Let 84976 FRA FRA IR 71 20.08 Sign POLING, DAVID P Freeway Surveillance 03/16/09 06/10/09 06/18/09 2009 235,000$ Added12 6 Totals 39,997,591$ 126,356,135$

Page 12: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 713 7 Local Let 83251 LOG LOG CR VAR PM Ph. 1 SLAGLE, DONNA J Pavement Marking $80,613.55 08N097 04/16/08 04/16/08 06/12/08 06/12/08 07/01/08 07/01/08 2009 80,614$

13 7 Local Let 81534 MOT MOT MCEWEN ROAD SLAGLE, DONNA J Signals $78,485.00 08N106 02/26/08 02/26/08 02/26/08 04/16/08 06/30/08 06/30/08 05/16/08 07/07/08 07/07/08 2009 78,485$ Added

13 7 Local Let 81559 SHE SHE VANDEMARK ROAD SLAGLE, DONNA J Intersection $121,400.00 08N098 04/16/08 04/16/08 07/10/08 07/10/08 07/10/08 07/10/08 2009 121,400$

13 7 Local Let 80319 MOT MOT US 35 5.21 SLAGLE, DONNA J Minor Rehabilitation - Pavement Gnrl Sys $560,264.56 08N104 05/16/08 05/16/08 06/19/08 06/19/08 07/15/08 07/15/08 2009 560,265$ Added

13 7 Local Let 80247 MIA MIA SR 718 3.79 SLAGLE, DONNA J Minor Rehabilitation - Pavement Gnrl Sys $983,484.10 08N105 05/14/08 05/14/08 07/10/08 07/10/08 08/11/08 08/11/08 2009 983,484$

13 7 Local Let 83361 MER MER PRAIRIE CREEK BRIDGESLAGLE, DONNA J Bikeways $206,502.00 08N115 05/30/08 05/30/08 07/31/08 07/31/08 08/20/08 08/20/08 2009 206,502$

13 7 Local Let 79660 LOG LOG CR 63 2.63 SLAGLE, DONNA J Bridge Replacement $883,000.00 08N114 04/09/08 04/09/08 08/07/08 08/07/08 08/26/08 08/26/08 2009 883,000$

13 7 Local Let 7674 CLA CLA TR 6 0.14 SLAGLE, DONNA J Widening $2,351,436.17 08N120 08/25/08 08/20/08 08/20/08 09/29/08 09/26/08 09/26/08 10/28/08 10/07/08 10/07/08 2009 2,351,436$

13 7 Local Let 82736 CLA CLA CR 68 0.82 SLAGLE, DONNA J Signals $57,269.45 08N124 08/05/08 07/24/08 07/24/08 09/16/08 10/24/08 10/24/08 10/16/08 10/28/08 10/28/08 2009 57,269$

13 7 Local Let 80028 MIA MIA SR 571 13.43 SLAGLE, DONNA J Signals 07/16/08 07/16/08 08/29/08 09/29/08 2009 1,077,835$

13 7 Local Let 80355 SHE SHE SR 29 15.73 SLAGLE, DONNA J Signals 09/17/08 09/17/08 12/30/08 12/30/08 12/03/08 2009 131,030$

13 7 Local Let 80235 MOT MOT SR 741 6.46 SLAGLE, DONNA J Landscaping 09/30/08 09/30/08 11/17/08 12/17/08 2009 140,806$

13 7 Local Let 75853 CLA CLA SR 334 1.07 SLAGLE, DONNA J Intersection 11/10/08 11/10/08 01/05/09 12/24/08 2009 2,758,762$

13 7 Local Let 78104 MOT MOT EDWIN C MOSES BLVD BRIDGESLAGLE, DONNA J Bridge Replacement 10/24/08 10/24/08 12/05/08 01/16/09 2009 4,988,884$

13 7 Local Let 75705 LOG LOG CR 12/VAR SLAGLE, DONNA J Resurfacing, Undivided System 11/26/08 11/26/08 01/19/09 02/19/09 2009 2,092,845$

13 7 Local Let 80265 MOT MOT TRAFFIC SIGNALS W. CARR.SLAGLE, DONNA J Signals 12/08/08 12/08/08 01/27/09 02/27/09 2009 672,100$

13 7 Local Let 81767 MER MER SOUTH MAIN STREETSLAGLE, DONNA J Environmental/Scenic 12/15/08 12/15/08 01/29/09 02/27/09 2009 839,057$

13 7 Local Let 81768 MER MER SOUTH EASTERN AVENUESLAGLE, DONNA J Environmental/Scenic 12/10/08 12/10/08 01/29/09 02/27/09 2009 350,002$

13 7 Local Let 81018 MOT MOT SIGNALS PH. 7 SLAGLE, DONNA J Signals 12/31/08 12/31/08 02/16/09 03/30/09 2009 1,575,000$

13 7 Local Let 82177 MER MER CR 99 1.18 SLAGLE, DONNA J Bridge Replacement 08/28/08 08/28/08 03/16/09 04/16/09 2009 822,610$

13 7 Local Let 84357 CLA CLA US40/SR4 11.70/15.09 SLAGLE, DONNA J Signals 03/11/09 12/08/08 12/08/08 04/22/09 04/22/09 05/22/09 05/22/09 2009 187,901$ Added

13 7 Local Let 79581 MER MER CR 170 8.14 SLAGLE, DONNA J Resurfacing, Undivided System 2010 12/22/08 02/02/09 03/02/09 2009 1,654,244$ Added

13 7 Local Let 77394 CHP CHP US 36 14.99 SLAGLE, DONNA J Minor Rehabilitation - Pavement Gnrl Sys 12/31/08 02/11/09 03/11/09 2009 1,730,000$

13 7 Local Let 81028 MOT MOT S. DIXIE PH. 3 KETTERINGSLAGLE, DONNA J Major Rehabilitation 01/06/09 02/19/09 03/19/09 2009 1,561,356$

13 7 Local Let 83168 MIA MIA SR 66 0.25 SLAGLE, DONNA J Minor Rehabilitation - Pavement Gnrl Sys 01/11/09 02/23/09 03/23/09 2009 1,100,500$

13 7 Local Let 80471 MOT MOT RIVERSCAPE Ph. 3 SLAGLE, DONNA J Bikeways 01/16/09 02/27/09 03/27/09 2009 3,709,545$

13 7 Local Let 81135 AUG AUG CR 152 13.51 SLAGLE, DONNA J Bridge Replacement 02/02/09 03/16/09 04/16/09 2009 2,161,367$

13 7 Local Let 77845 MOT MOT SHILOH SPRINGS/SALEM AVE.SLAGLE, DONNA J Spot Safety 02/09/09 03/23/09 04/23/09 2009 3,042,583$

13 7 Local Let 84118 MOT D07 SRTS MOT DELAINE AVENUESLAGLE, DONNA J Add Sidewalks 02/16/09 03/30/09 04/30/09 2009 169,091$ Added

13 7 Local Let 81765 DAR DAR BROADWAY/MAIN SLAGLE, DONNA J Environmental/Scenic 02/18/09 04/01/09 05/01/09 2009 796,188$

13 7 Local Let 82175 MER MER VAR PM PH. 4 SLAGLE, DONNA J Pavement Marking 02/18/09 04/01/09 05/01/09 2009 136,400$

13 7 Local Let 78823 MOT MOT CBD STREET CONVERSIONSLAGLE, DONNA J Spot Safety 02/19/09 04/01/09 05/15/09 2009 2,200,000$

13 7 Local Let 81022 MOT MOT WRIGHT-DUNBAR ENHANCEMENTSLAGLE, DONNA J Resurfacing, Undivided System 02/20/09 04/03/09 05/15/09 2009 1,700,000$

13 7 Local Let 81557 CLA CLA PLEASANT STREET BRIDGESLAGLE, DONNA J Bridge Replacement 03/04/09 04/15/09 05/15/09 2009 799,627$

13 7 Local Let 84935 MIA MIA SR 721 2.75 SLAGLE, DONNA J Major Rehabilitation 03/04/09 04/15/09 05/15/09 2009 1,056,883$ Added

13 7 Local Let 77861 MOT MOT SR 48 13.64 SLAGLE, DONNA J Turn Lane Addition 03/05/09 04/16/09 05/16/09 2009 1,460,135$

13 7 Local Let 81764 LOG LOG COURT AVENUE SLAGLE, DONNA J Design Aesthetics 03/09/09 04/20/09 05/20/09 2009 193,347$

13 7 Local Let 81026 MOT MOT KETTERING BIKEPATHSLAGLE, DONNA J Bikeways 03/11/09 04/22/09 05/22/09 2009 402,178$

13 7 Local Let 84075 MOT MOT MAIN STREET DAYTONSLAGLE, DONNA J Mill and Fill 02/27/09 04/10/09 05/22/09 2009 2,863,318$ Added

13 7 Local Let 83842 MIA MIA GR. MIA. BW Connection SOUTHSLAGLE, DONNA J Bikeways 04/16/09 04/27/09 05/27/09 2009 1,723,042$ Added13 7 Totals 5,322,455$ 49,419,090$

ODOT Let Program - District 714 7 ODOT Let 24678 MIA MIA SR 571 0.00 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $1,043,373.51 80434 2008 12/30/05 12/30/05 06/18/08 06/18/08 06/26/08 06/26/08 2009 1,043,374$

14 7 ODOT Let 25038 DAR DAR US 36 17.13 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $854,202.00 80414 2008 10/15/07 10/15/07 06/18/08 06/18/08 06/26/08 06/26/08 2009 854,202$

14 7 ODOT Let 75473 DAR DAR SR 47 0.00 CUMMINS, ROBERT BResurfacing, Undivided System $399,677.48 80415 03/21/08 03/21/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 399,677$

14 7 ODOT Let 75790 SHE SHE SR 29D 0.18 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $321,153.67 80425 2008 01/25/08 01/25/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 321,154$

14 7 ODOT Let 77421 DAR DAR SR 721 0.00/4.51 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $706,347.67 80416 03/21/08 03/21/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 706,348$

14 7 ODOT Let 77470 MOT MOT SR 725 11.06 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $248,660.42 80424 2008 01/04/08 01/04/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 248,660$

14 7 ODOT Let 82447 MOT MOT SR 202 3.19 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $578,764.51 80423 03/14/08 03/14/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 578,765$

Page 13: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

14 7 ODOT Let 82495 D07 D07 TSG MAINT79 FY09/10BUENING, BETTY A Signal Maintenance/Repair (NEW) $617,705.42 80432 03/21/08 03/21/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 617,705$

14 7 ODOT Let 19745 SHE SHE SR 48 3.03 SCHMIDT, AMY L Bridge Replacement $526,474.30 88020 05/12/08 05/12/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 526,474$

14 7 ODOT Let 25133 LOG LOG SR 366 6.03 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $938,588.30 80447 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 938,588$

14 7 ODOT Let 83570 CLA CLA Buck Creek State Park CUMMINS, ROBERT EParking Lot $1,826,853.84 80452 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 1,826,854$

14 7 ODOT Let 83940 CHP CHP SR 4 0.00/Various CUMMINS, ROBERT EResurfacing, Undivided System $164,289.30 80451 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 164,289$

14 7 ODOT Let 83941 DAR DAR SR 47 20.50/Various CUMMINS, ROBERT EResurfacing, Undivided System $785,000.00 80453 04/14/08 04/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 785,000$

14 7 ODOT Let 82494 D07 D07 LG FY09/10 BUENING, BETTY A Lighting $615,416.49 80481 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 615,416$

14 7 ODOT Let 83145 MIA MIA US 36 0.36 SLEMMONS, DARREN DCulvert Construction/Reconstr/Repair $212,775.30 80468 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 212,775$

14 7 ODOT Let 84728 MOT MOT SR 235 0.22 L NARTKER, PAUL R Bridge Repair $209,715.82 85011 08/11/08 08/11/08 09/03/08 09/03/08 09/04/08 09/04/08 2009 209,716$ Added

14 7 ODOT Let 83187 MOT MOT IR 75 18.32 LIVERMORE, LEILAH FBridge Repair $968,127.00 85010 03/21/08 03/21/08 08/29/08 08/29/08 09/11/08 09/11/08 2009 968,127$

14 7 ODOT Let 80855 D07 D07 GR FY09 CUMMINS, ROBERT EGuardrail Rebuilding $312,675.00 80524 06/12/08 06/12/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 312,675$

14 7 ODOT Let 79569 MOT MOT SR 4 7.12 SCHMIDT, AMY L Bridge Replacement $983,435.00 80550 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 983,435$

14 7 ODOT Let 84499 MIA MIA IR 75 14.15 L LIVERMORE, LEILAH FBridge Repair $78,846.70 80559 06/30/08 06/30/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 78,847$ Added

14 7 ODOT Let 77418 CLA CLA US 40 5.30 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $1,414,395.60 80582 07/28/08 07/28/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 1,414,396$

14 7 ODOT Let 77422 DAR DAR SR 571 6.73 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $1,120,095.01 80583 07/28/08 07/28/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 1,120,095$

14 7 ODOT Let 77426 LOG LOG SR 273/SR 366 0.00/0.00CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $838,128.74 80588 07/28/08 07/28/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 838,129$

14 7 ODOT Let 84441 MOT MOT IR 75 11.88 SCHULZE, JON B Signs $133,618.75 80595 07/28/08 07/28/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 133,619$ Added

14 7 ODOT Let 20018 MIA MIA SR 48 16.67 MCKNIGHT, MICHAEL SBridge Replacement $690,377.82 80604 2008 01/11/08 01/11/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 690,378$

14 7 ODOT Let 82615 D07 D07 URBAN HS IR FY09 BUENING, BETTY A Herbicidal Spraying $96,615.96 80612 08/08/08 08/08/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 96,616$

14 7 ODOT Let 82633 D07 D07 URBAN MOWING FY09/FY10BUENING, BETTY A Mowing $195,901.01 80613 08/08/08 08/08/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 195,901$

14 7 ODOT Let 83188 CLA CLA IR 70 4.81 FRANCIS, MICHAEL EBridge Repair $91,933.75 80601 08/08/08 08/08/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 91,934$

14 7 ODOT Let 77420 CHP CHP SR 559 0.27 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $1,001,063.53 80617 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 1,001,064$

14 7 ODOT Let 84724 DAR DAR US 127 13.97 LIVERMORE, LEILAH FBridge Vehicle Damage Repair (NEW) $137,885.71 80630 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 137,886$ Added

14 7 ODOT Let 77416 CHP CHP SR 560 2.76 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys $994,087.19 80651 09/12/08 09/12/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 994,087$

14 7 ODOT Let 82695 AUG AUG SR 66 17.30 MCKNIGHT, MICHAEL SBridge Replacement $189,815.18 80635 09/12/08 09/12/08 12/17/08 12/17/08 12/22/08 12/22/08 2009 189,815$

14 7 ODOT Let 82781 MER MER US 127 18.94 SCHMIDT, AMY L Bridge Replacement $581,316.00 80645 09/12/08 09/12/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 581,316$

14 7 ODOT Let 83205 MOT MOT IR 75 10.42 SCHULZE, JON B Bridge Repair $1,648,017.42 80646 09/12/08 09/12/08 12/17/08 12/17/08 12/22/08 12/22/08 2009 1,648,017$ Added

14 7 ODOT Let 19740 LOG LOG SR 274 3.19 SCHMIDT, AMY L Bridge Replacement 10/20/08 10/20/08 01/14/09 01/22/09 2009 848,127$

14 7 ODOT Let 25120 AUG AUG SR 197 0.00 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 2008 10/15/07 10/15/07 01/14/09 01/22/09 2009 912,771$

14 7 ODOT Let 77427 LOG LOG SR 638 0.00 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 02/08/08 02/08/08 01/14/09 01/22/09 2009 507,613$

14 7 ODOT Let 79448 CLA CLA SR 571 1.25 BERTKE, JENNIFER A Bridge Repair 10/31/08 10/31/08 01/28/09 02/05/09 2009 271,769$

14 7 ODOT Let 19596 DAR DAR SR 185 7.28 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 2008 10/10/07 10/10/07 02/04/09 02/12/09 2009 712,104$

14 7 ODOT Let 77454 MIA MIA SR 41 12.64 SNELL, SALLY S Intersection Improvement 01/01/09 11/07/08 11/07/08 01/01/09 02/04/09 01/01/09 02/12/09 2009 2,236,943$

14 7 ODOT Let 83117 MOT MOT SR 725 6.34 MCKNIGHT, MICHAEL SBridge Deck Replacement 11/07/08 11/07/08 02/04/09 02/12/09 2009 758,660$

14 7 ODOT Let 84311 D07 D07 MICRO PM FY09 CUMMINS, ROBERT EPreventive Maintenance 11/07/08 11/07/08 02/04/09 02/12/09 2009 1,502,152$ Added

14 7 ODOT Let 77246 MOT MOT IR 75 0.75 WAMPLER-LEY, SHERRY SInterchange, New 07/02/08 08/04/08 08/04/08 11/05/08 02/11/09 11/12/08 02/19/09 2009 29,666,269$

14 7 ODOT Let 77398 AUG AUG SR 364 9.73 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 07/14/08 07/14/08 02/25/09 03/05/09 2009 741,009$

14 7 ODOT Let 80354 SHE SHE RUSSELL RD, PH. 2 BOYER, SCOTT C Minor Widening 11/07/08 11/07/08 02/25/09 03/05/09 2009 3,345,506$

14 7 ODOT Let 82476 D07 D07 FDPM FY09 BUENING, BETTY A Pavement Marking 12/01/08 12/01/08 02/25/09 03/05/09 2009 757,481$

14 7 ODOT Let 25331 MOT MOT SR 725 0.34 MCKNIGHT, MICHAEL SCulvert Construction/Reconstr/Repair 12/15/08 12/15/08 03/11/09 03/19/09 2009 343,118$

14 7 ODOT Let 75914 MIA MIA CR 149 6.58 SNELL, SALLY S Bridge Replacement 12/15/08 12/15/08 03/11/09 03/19/09 2009 501,535$

14 7 ODOT Let 77417 CLA CLA SR 54 0.00 CUMMINS, ROBERT EResurfacing, Undivided System 02/08/08 02/08/08 03/11/09 03/19/09 2009 620,132$

14 7 ODOT Let 77430 MIA MIA SR 201 9.36 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 02/08/08 02/08/08 03/11/09 03/19/09 2009 442,969$

14 7 ODOT Let 82419 MOT MOT IR 70 6.49/VAR CUMMINS, ROBERT EMinor Rehabilitation - Pavement Prmy Sys 12/15/08 12/15/08 03/11/09 03/19/09 2009 534,400$

14 7 ODOT Let 83358 MOT D07 BH FY2009 BOYER, SCOTT C Bridge Repair 12/15/08 12/15/08 03/11/09 03/19/09 2009 569,578$

14 7 ODOT Let 84429 MOT MOT SR 235 0.22 L SCHMIDT, AMY L Bridge Repair 12/15/08 12/15/08 03/11/09 03/19/09 2009 40,140$ Added

14 7 ODOT Let 83895 MER MER US 33/SR 219 5.54/8.80CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 04/14/08 04/14/08 05/20/09 05/28/09 2009 618,556$

14 7 ODOT Let 75104 MOT MOT SR 48 0.45 MCKNIGHT, MICHAEL STurn Lane Addition 01/12/09 04/08/09 04/16/09 2009 1,603,407$

14 7 ODOT Let 75791 CLA CLA US 40 18.74 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 01/12/09 04/08/09 04/16/09 2009 1,337,298$

14 7 ODOT Let 77473 AUG AUG SR 67 2.94 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 01/12/09 04/08/09 04/16/09 2009 934,120$

14 7 ODOT Let 77493 CHP CHP SR 29 21.75 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 01/12/09 04/08/09 04/16/09 2009 1,457,295$

Page 14: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

14 7 ODOT Let 82491 D07 D07 PPM FY09 BUENING, BETTY A Pavement Marking 01/12/09 04/08/09 04/16/09 2009 388,739$

14 7 ODOT Let 77498 DAR DAR SR 319/SR 705 0.00/0.00CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 01/26/09 04/22/09 04/30/09 2009 1,358,601$

14 7 ODOT Let 77633 DAR DAR SR 49 16.36 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 01/26/09 04/22/09 04/30/09 2009 178,090$

14 7 ODOT Let 82706 AUG AUG SR 116 8.64 BOYER, SCOTT C Bridge Replacement 01/26/09 04/22/09 04/30/09 2009 485,237$

14 7 ODOT Let 76665 LOG LOG US 33 15.78 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Prmy Sys 02/09/09 05/06/09 05/14/09 2009 2,465,059$

14 7 ODOT Let 80854 MOT MOT SR 48 6.49 CUMMINS, ROBERT EMinor Rehabilitation - Pavement Gnrl Sys 02/09/09 05/06/09 05/14/09 2009 492,900$

14 7 ODOT Let 82481 D07 D07 RPM FY09 BUENING, BETTY A Pavement Marking 02/09/09 05/06/09 05/14/09 2009 220,000$

14 7 ODOT Let 82785 LOG LOG SR 274 4.78 SCHMIDT, AMY L Bridge Replacement 02/09/09 05/06/09 05/14/09 2009 1,042,355$ Added

14 7 ODOT Let 84353 DAR DAR US 36 16.58 HANKE, RYAN P Intersection Improvement 02/09/09 02/09/09 05/06/09 05/06/09 05/14/09 05/14/09 2009 153,066$ Added

14 7 ODOT Let 84391 MOT MOT SR 741 7.00 STORMER, PHILIP N Signals 02/09/09 02/09/09 05/06/09 05/06/09 05/14/09 05/14/09 2009 28,500$ Added

14 7 ODOT Let 84494 CLA CLA IR 675 0.00 BUENING, BETTY A Signs 02/09/09 05/06/09 05/14/09 2009 492,454$ Added

14 7 ODOT Let 76698 MIA MIA IR 75 0.00 CUMMINS, ROBERT EResurfacing, Divided System 02/23/09 05/20/09 05/28/09 2009 1,779,524$ Added

14 7 ODOT Let 79450 LOG LOG SR 368 2.02 LIVERMORE, LEILAH FBridge Repair 02/23/09 05/20/09 05/28/09 2009 189,270$

14 7 ODOT Let 80470 MIA MIA GR. MIA. BIKEWAY PH. 2BOYER, SCOTT C Bikeways 02/23/09 05/20/09 05/28/09 2009 546,737$ Added

14 7 ODOT Let 82322 MOT MOT US 40/SR 201 19.37/7.05CUMMINS, ROBERT EResurfacing, Undivided System 02/23/09 05/20/09 05/28/09 2009 932,910$

14 7 ODOT Let 85126 SHE SHE LOCKINGTON DAM RESERVECUMMINS, ROBERT EParks 02/23/09 05/20/09 05/28/09 2009 27,000$ Added

14 7 ODOT Let 78666 CLA CLA NEW CARLISLE BIKEWAYSNELL, SALLY S Bikeways 03/16/09 06/10/09 06/18/09 2009 644,487$

14 7 ODOT Let 80409 MOT MOT RIVERSIDE ENTRYWAYSSNELL, SALLY S Environmental/Scenic 03/16/09 06/10/09 06/18/09 2009 338,264$ 14 7 Totals 21,525,333$ 84,551,478$

Page 15: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 815 8 Local Let 75857 GRE GRE -Access Road Phase 1 MOORE, EDWARD B New Construction $1,323,207.00 08N129 05/30/08 05/30/08 10/14/08 10/14/08 10/22/08 10/22/08 2009 1,323,207$

15 8 Local Let 83659 CLI CLI Pavement Marking MOORE, EDWARD B Pavement Marking 07/18/08 07/18/08 08/29/08 09/19/08 2009 139,805$

15 8 Local Let 80226 WAR WAR-Cin-Day Rd Bridge RepMOORE, EDWARD B Bridge Replacement 06/27/08 06/27/08 09/01/08 10/01/08 2009 785,974$

15 8 Local Let 79005 CLE CLE CR 351-2.80 MOORE, EDWARD B Bridge Replacement 09/30/08 09/30/08 11/05/08 12/15/08 2009 1,487,500$

15 8 Local Let 77164 HAM HAM Banks Intermodal Bid Pack. 5MOORE, EDWARD B Inter-modal Facility 11/13/08 11/20/08 11/20/08 04/01/09 12/23/08 04/01/09 01/07/09 2009 8,487,890$ Added

15 8 Local Let 80629 HAM HAM Street Grid Phase 1 MOORE, EDWARD B Major Reconstruction 12/04/08 12/04/08 01/08/09 01/30/09 2009 4,486,186$ Added

15 8 Local Let 79082 CLI CLI CR 25/27-0.64/0.16 MOORE, EDWARD B Resurfacing, Undivided System 10/24/08 10/24/08 01/28/09 02/11/09 2009 660,006$

15 8 Local Let 5005 GRE GRE CR 142 0.36 MOORE, EDWARD B Major Reconstruction 09/19/08 09/19/08 01/08/09 02/26/09 2009 4,295,660$

15 8 Local Let 82612 PRE PRE Pavement Marking MOORE, EDWARD B Pavement Marking 12/01/08 12/01/08 02/02/09 03/20/09 2009 150,000$

15 8 Local Let 83146 WAR WAR Lebanon Streetscape MOORE, EDWARD B Landscaping 10/24/08 10/24/08 03/02/09 04/01/09 2009 2,148,000$

15 8 Local Let 78495 GRE GRE Beavercreek Signals MOORE, EDWARD B Signals 12/15/08 12/15/08 03/03/09 04/10/09 2009 1,004,320$

15 8 Local Let 78994 CLE CLE-CR181-0.32 MOORE, EDWARD B Bridge Replacement 11/18/08 11/18/08 02/13/09 04/15/09 2009 765,000$

15 8 Local Let 81784 HAM HAM Sharonville Signals MOORE, EDWARD B Signals 11/19/08 11/19/08 02/13/09 04/15/09 2009 820,261$

15 8 Local Let 84140 BUT BUT Liberty Twp Sidewalks MOORE, EDWARD B Add Sidewalks 12/24/08 12/24/08 03/01/09 04/29/09 2009 40,000$ Added

15 8 Local Let 84786 HAM Ham Banks Int Blks 16&20 MOORE, EDWARD B Other Modes Related 03/03/09 04/16/09 04/30/09 2009 9,000,000$ Added

15 8 Local Let 81798 HAM HAM Cheviot Signals MOORE, EDWARD B Signals 03/01/09 03/20/09 05/11/09 2009 632,725$

15 8 Local Let 83658 CLI CLI Raised Pavement MarkingMOORE, EDWARD B Pavement Marking 03/07/09 04/05/98 05/15/09 2009 70,000$ Added15 8 Totals 1,323,207$ 36,296,534$

ODOT Let Program - District 816 8 ODOT Let 75568 PRE GRE-35-20.95 SWAFFORD, MICHAEL JPreventive Maintenance $717,369.44 80417 03/13/08 03/13/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 717,369$

16 8 ODOT Let 83808 HAM HAM US 50 32.21 RUDD, GREGORY L Mill and Fill $915,485.34 80418 03/13/08 03/13/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 915,485$

16 8 ODOT Let 84293 HAM HAM IR 74 5.70 COLLETT, BRANDON SBridge Maintenance $275,000.00 89002 05/28/08 05/28/08 05/28/08 05/21/08 06/18/08 06/18/08 05/21/08 06/26/08 06/26/08 2009 275,000$ Added

16 8 ODOT Let 84321 HAM HAM IR 74 5.87 COLLETT, BRANDON SBridge Repair $318,134.13 85006 06/02/08 06/02/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 318,134$ Added

16 8 ODOT Let 75674 HAM D08 PCS FY2009 SWAFFORD, MICHAEL JPreventive Maintenance $421,449.88 80442 04/07/08 04/07/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 421,450$

16 8 ODOT Let 79014 HAM HAM US 42 13.23 SCANLON, TERI C Intersection Improvement $735,263.91 80446 10/03/08 04/03/08 04/03/08 01/01/09 07/09/08 07/09/08 01/01/09 07/17/08 07/17/08 2009 735,264$

16 8 ODOT Let 83549 BUT BUT US 27 16.40 RUDD, GREGORY L Minor Rehabilitation - Pavement Prmy Sys $327,712.00 80439 04/02/08 04/02/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 327,712$

16 8 ODOT Let 80435 CLI CLI Judy-Gano Bikepath SCANLON, TERI C Bikeways $141,500.00 80464 04/17/08 04/17/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 141,500$

16 8 ODOT Let 82743 CLI CLI US 68 19.25 OTIS, JOHN D Turn Lane Addition $475,818.01 80498 05/12/08 05/12/08 08/06/08 08/06/08 08/14/08 08/14/08 2009 475,818$

16 8 ODOT Let 24637 D08 D08 BS FY2009 OTIS, JOHN D Preventive Maintenance $757,927.77 80501 2008 02/15/08 02/15/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 757,928$

16 8 ODOT Let 82798 HAM HAM CR 457 11.07 CASSON, PAUL C Turn Lane Addition $2,198,551.44 80466 04/28/08 04/28/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 2,198,551$ Added

16 8 ODOT Let 83076 HAM HAM IR 71 1.10 SWAFFORD, MICHAEL JResurfacing (safety related) $249,617.44 88023 02/19/08 02/19/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 249,617$ Added

16 8 ODOT Let 83727 CLE CLE/HAM IR 275 11.01/35.07MATTHES, LEE G Environmental/Scenic $539,230.00 80509 03/10/08 03/10/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 539,230$ Added

16 8 ODOT Let 78570 CLI CLI SR 73 8.34-Phase 2 RelocateCASSON, PAUL C Relocation $29,178,034.14 80507 12/31/07 04/14/08 04/14/08 05/07/08 09/10/08 09/10/08 05/15/08 09/19/08 09/19/08 2009 29,178,034$

16 8 ODOT Let 79016 HAM HAM SR 125 5.31 SCANLON, TERI C Intersection Improvement $226,880.69 80564 06/27/08 06/26/08 06/26/08 10/01/08 10/08/08 10/08/08 10/01/08 10/16/08 10/16/08 2009 226,881$

16 8 ODOT Let 8347 HAM HAM US 127 14.17 KRAMER, RONALD S Major Widening $3,797,301.35 80565 12/10/07 12/07/07 12/07/07 03/05/08 10/08/08 10/08/08 03/13/08 10/16/08 10/16/08 2009 3,797,301$ Added

16 8 ODOT Let 25075 HAM HAM US 52 35.20 SWAFFORD, MICHAEL JResurfacing, Divided System $5,063,315.57 80603 02/19/08 02/19/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 5,063,316$

16 8 ODOT Let 77205 HAM HAM US 127 14.75 KRAMER, RONALD S Widening $2,296,440.45 80620 08/25/08 08/22/08 08/22/08 11/19/08 11/19/08 11/19/08 11/26/08 11/26/08 11/26/08 2009 2,296,440$

16 8 ODOT Let 84218 HAM HAM IR 71 1.51 SWAFFORD, MICHAEL JReactive Maintenance $870,262.00 80653 09/12/08 09/12/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 870,262$ Added

16 8 ODOT Let 13539 HAM HAM IR 75 11.59L KRAMER, RONALD S Bridge Replacement 10/20/08 10/20/08 01/14/09 01/22/09 2009 2,760,000$

16 8 ODOT Let 23302 HAM HAM IR 275 7.02 SMITHSON, JOSEPH ASlide Repair 08/01/08 08/01/08 01/14/09 01/22/09 2009 1,005,560$

16 8 ODOT Let 25259 CLI CLI SR 132 0.83 LOCKHART, PHILLIP JBridge Repair 09/19/08 09/19/08 01/14/09 01/22/09 2009 1,218,000$

16 8 ODOT Let 75567 HAM HAM IR 275 0.00 SCANLON, TERI C Minor Rehabilitation - Pavement Prmy Sys 01/01/09 08/26/08 08/26/08 01/01/09 01/14/09 01/01/09 01/22/09 2009 19,597,000$

16 8 ODOT Let 75907 D08 GRE US 68 12.46 SWAFFORD, MICHAEL JPreventive Maintenance 10/14/08 10/14/08 01/14/09 01/22/09 2009 59,000$

16 8 ODOT Let 84231 HAM HAM IR 275 22.99 HIVELY, RICKY M Noise Wall 10/17/08 10/17/08 01/14/09 01/22/09 2009 1,000,000$ Added

16 8 ODOT Let 25200 CLI CLI US 68 8.80 KRAMER, RONALD S Bridge Replacement 2008 03/05/08 03/05/08 01/28/09 02/05/09 2009 1,407,000$

16 8 ODOT Let 77136 CLE CLE SR 132 11.10 OTIS, JOHN D Geotechnical Services 10/24/08 10/24/08 01/28/09 02/05/09 2009 900,000$

16 8 ODOT Let 77484 HAM HAM US 27 6.29 MEYER, JOSEPH J Turn Lane Addition 10/31/08 10/31/08 01/28/09 02/05/09 2009 2,800,000$

16 8 ODOT Let 79384 BUT BUT US 127 0.00 RUDD, GREGORY L Resurfacing, Undivided System 10/20/08 10/20/08 01/28/09 02/05/09 2009 887,000$

16 8 ODOT Let 79386 BUT BUT SR 129 13.71 RUDD, GREGORY L Resurfacing, Undivided System 10/21/08 10/21/08 01/28/09 02/05/09 2009 370,000$

Page 16: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

16 8 ODOT Let 80813 HAM HAM SR 4 9.67 OTIS, JOHN D Intersection Improvement 10/30/08 11/03/08 11/03/08 01/23/09 01/28/09 02/02/09 02/05/09 2009 747,000$

16 8 ODOT Let 82930 CLI CLI SR 73 6.52-CLEAR & GRUBBINGCASSON, PAUL C Relocation 11/03/08 11/03/08 01/28/09 02/05/09 2009 75,000$

16 8 ODOT Let 25374 HAM HAM BH VAR LOCKHART, PHILLIP JBridge Repair 10/03/08 10/03/08 02/04/09 02/12/09 2009 9,200,000$

16 8 ODOT Let 77137 WAR WAR SR 123 16.65 GRUVER, DOUGLAS AErosion Protection 10/31/08 10/31/08 02/04/09 02/12/09 2009 376,000$

16 8 ODOT Let 79383 PRE PRE US 35 12.52 RUDD, GREGORY L Resurfacing, Undivided System 10/23/08 10/23/08 02/04/09 02/12/09 2009 142,000$

16 8 ODOT Let 79388 WAR WAR US 42 2.07 RUDD, GREGORY L Resurfacing, Undivided System 11/17/08 11/17/08 02/25/09 03/05/09 2009 290,000$

16 8 ODOT Let 79400 HAM HAM SR 4 8.33 RUDD, GREGORY L Resurfacing, Undivided System 11/06/08 11/06/08 02/25/09 03/05/09 2009 223,000$

16 8 ODOT Let 75906 D08 PRE CHIP FY2009 SWAFFORD, MICHAEL JPreventive Maintenance 12/11/08 12/11/08 03/11/09 03/18/09 2009 654,000$

16 8 ODOT Let 75880 HAM HAM US 22 17.56 (PHASE 3)MILESKY, JON D Major Widening 11/03/08 10/21/08 10/21/08 03/11/09 03/11/09 03/19/09 03/19/09 2009 12,100,000$

16 8 ODOT Let 81570 CLE CLE Buckwheat Road SidewalksOTIS, JOHN D Add Sidewalks 12/12/08 12/12/08 03/11/09 03/19/09 2009 132,000$

16 8 ODOT Let 10754 WAR WAR IR 75 3.40 MILESKY, JON D Major Reconstruction 08/25/08 11/05/08 11/05/08 01/01/09 03/18/09 01/01/09 03/26/09 2009 129,945,684$

16 8 ODOT Let 24585 D08 D08 PM/RPM FY2009 CAMPBELL, TAMMY KPavement Marking 12/29/08 12/29/08 03/25/09 04/02/09 2009 2,058,000$

16 8 ODOT Let 79393 CLE HAM/CLE US 50 35.73/0.00 RUDD, GREGORY L Resurfacing, Undivided System 12/05/08 12/05/08 03/25/09 04/02/09 2009 357,000$

16 8 ODOT Let 79403 GRE GRE US 68 8.75 RUDD, GREGORY L Resurfacing, Undivided System 12/10/08 12/10/08 03/25/09 04/02/09 2009 63,000$

16 8 ODOT Let 77784 D08 D08 BM FY2009 LOCKHART, PHILLIP JBridge Maintenance 12/23/08 12/23/08 04/08/09 04/16/09 2009 791,000$

16 8 ODOT Let 79396 BUT BUT US 27 15.08 RUDD, GREGORY L Resurfacing, Undivided System 12/08/08 12/08/08 04/08/09 04/16/09 2009 251,000$

16 8 ODOT Let 84256 PRE PRE US 40 7.38 BREHM, TAMI R Culvert Construction/Reconstr/Repair 12/01/08 12/01/08 04/08/09 04/16/09 2009 149,000$ Added

16 8 ODOT Let 78571 CLI CLI SR 73 6.52-Phase 3 RelocateCASSON, PAUL C Relocation 12/29/08 12/29/08 12/29/08 05/06/09 05/06/09 05/14/09 05/14/09 2009 23,400,000$

16 8 ODOT Let 84427 CLE CLE US 50 7.75 SWAFFORD, MICHAEL JSection Improvement 12/29/08 12/29/08 05/06/09 05/14/09 2009 236,000$ Added

16 8 ODOT Let 83810 PRE PRE US 35 2.75 SWAFFORD, MICHAEL JMinor Rehabilitation - Pavement Gnrl Sys 12/29/08 12/29/08 05/20/09 05/28/09 2009 1,760,000$

16 8 ODOT Let 75897 PRE PRE SR 732 0.00 SWAFFORD, MICHAEL JResurfacing, Undivided System 12/30/08 12/30/08 06/10/09 06/18/09 2009 2,148,000$ Added

16 8 ODOT Let 77928 BUT BUT US 27 18.61 SWAFFORD, MICHAEL JMinor Rehabilitation - Pavement Gnrl Sys 01/26/09 04/22/09 04/30/09 2009 2,952,000$ Added

16 8 ODOT Let 79381 GRE GRE SR 725 0.52 RUDD, GREGORY L Resurfacing, Undivided System 01/26/09 04/22/09 04/30/09 2009 354,000$

16 8 ODOT Let 81900 BUT BUT Fairfield Signals TAYLOR, RALPH G Signals 01/26/09 04/22/09 04/30/09 2009 2,236,000$

16 8 ODOT Let 78085 BUT BUT SR 747 0.25 MEYER, JOSEPH J Intersection Improvement 10/13/08 02/09/09 01/01/09 05/06/09 01/01/09 05/14/09 2009 600,000$

16 8 ODOT Let 83809 CLE CLE SR 276 0.51 SWAFFORD, MICHAEL JMinor Rehabilitation - Pavement Gnrl Sys 02/09/09 05/06/09 05/14/09 2009 1,954,000$

16 8 ODOT Let 84973 HAM HAM Artimis Equip Rep. OTIS, JOHN D Traffic Management System 02/09/09 05/06/09 05/18/09 2009 1,600,000$ Added

16 8 ODOT Let 75839 D08 D08 Signals FY2009/2010 CAMPBELL, TAMMY KSignals 02/23/09 05/20/09 05/28/09 2009 2,100,000$

16 8 ODOT Let 75303 CLE CLE SR 125 5.00 MEYER, JOSEPH J Intersection Improvement 03/16/09 06/10/09 06/18/09 2009 3,470,000$

16 8 ODOT Let 77791 PRE PRE SR 122 20.81 MEYER, JOSEPH J Culvert Construction/Reconstr/Repair 03/16/09 06/10/09 06/18/09 2009 415,000$

16 8 ODOT Let 79017 WAR WAR US 42 2.01 MATTHES, LEE G Intersection Improvement 06/23/08 03/16/09 10/01/08 06/10/09 10/13/08 06/18/09 2009 392,208$

16 8 ODOT Let 84126 HAM HAM Waldvogel RR RelocationSMITHSON, JOSEPH ARelocation 03/16/09 06/10/09 06/18/09 2009 4,500,000$ Added16 8 Totals 49,505,294$ 287,179,746$

Page 17: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 917 9 Local Let 82808 LAW LAW Ironton 3rd St Project MITTEN, CHAD T Drainage System Maintenance/Repair (NEW) 06/27/08 06/27/08 10/01/08 10/10/08 2009 735,646$ 17 9 Totals -$ 735,646$

ODOT Let Program - District 918 9 ODOT Let 84212 ROS ROS US 23 15.32 Emerg B HAUCK, MATTHEW RBridge Deck Replacement $1,540,853.30 86001 05/30/08 05/30/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 1,540,853$ Added

18 9 ODOT Let 25569 SCI SCI SR 73 0.00 WETZEL, JOHN K Resurfacing, Undivided System $1,462,077.88 80472 2008 03/06/08 03/06/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,462,078$

18 9 ODOT Let 83176 SCI SCI Shawnee State Park & ForestHUFF, JOHN T Resurfacing, Undivided System $899,756.60 80485 04/28/08 04/28/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 899,757$

18 9 ODOT Let 83266 LAW LAW CR 31 & CR 32 GuardrailHILLE, HAUKE J Guardrail Rebuilding $362,426.57 80467 04/28/08 04/28/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 362,427$

18 9 ODOT Let 19208 ADA ADA SR 136 5.89 HILLE, HAUKE J Resurfacing, Undivided System $590,325.90 80487 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 590,326$

18 9 ODOT Let 25475 HIG HIG US 50 14.98, SR 247 6.34HILLE, HAUKE J Minor Rehabilitation - Pavement Prmy Sys $1,217,052.46 80491 2008 01/10/06 01/10/06 08/20/08 08/20/08 09/02/08 09/02/08 2009 1,217,052$

18 9 ODOT Let 25547 ROS ROS US 50 11.27 WETZEL, JOHN K Minor Rehabilitation - Pavement Prmy Sys $1,948,360.85 80515 2008 02/06/06 02/06/06 08/20/08 08/20/08 09/02/08 09/02/08 2009 1,948,361$

18 9 ODOT Let 78901 ROS ROS Bike Path Bridge ProjectWILLS, LAWRENCE ABikeways $1,194,319.00 88030 06/30/08 06/30/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 1,194,319$

18 9 ODOT Let 78037 ROS ROS US 50 31.02 Turn LanesWILLS, LAWRENCE ATurn Lane Addition $541,702.85 80552 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 541,703$

18 9 ODOT Let 79993 LAW LAW SR 217 13.65 & SR218 0.00HILLE, HAUKE J Minor Rehabilitation - Pavement Gnrl Sys $824,747.75 80558 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 824,748$

18 9 ODOT Let 78603 ROS ROS CR 199 & CR 205 GuardrailHILLE, HAUKE J Guardrail Rebuilding $252,710.31 80590 07/23/08 07/23/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 252,710$

18 9 ODOT Let 80614 ADA ADA US 52 4.62 Slide RepairMITTEN, CHAD T Slide Repair $910,998.85 80599 08/11/08 08/11/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 910,999$

18 9 ODOT Let 80606 LAW LAW SR 7 1.50 Slide Repair MITTEN, CHAD T Slide Repair $85,135.00 80621 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 85,135$

18 9 ODOT Let 75446 HIG HIG SR 247 4.17 HAUCK, MATTHEW RBridge Repair $829,573.18 80632 08/25/08 08/25/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 829,573$

18 9 ODOT Let 78137 D09 D09 PM FY2009 (A) HILLE, HAUKE J Pavement Marking $154,722.26 80654 09/15/08 09/15/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 154,722$

18 9 ODOT Let 79523 BRO BRO US 52 8.65 Slide MITTEN, CHAD T Slide Repair $2,876,813.26 80636 09/11/08 09/11/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 2,876,813$ Added

18 9 ODOT Let 25579 ADA ADA SR 770 0.00 HILLE, HAUKE J Resurfacing, Undivided System 10/16/08 10/16/08 01/14/09 01/22/09 2009 1,402,001$

18 9 ODOT Let 25601 ROS ROS US 35 34.16 & JAC US 35 0.00RICE, CARL E Resurfacing, Divided System 07/10/08 07/10/08 01/14/09 01/22/09 2009 2,980,699$

18 9 ODOT Let 76474 ROS ROS SR 772 6.36 HILLE, HAUKE J Minor Rehabilitation - Pavement Prmy Sys 07/14/08 07/14/08 01/14/09 01/22/09 2009 1,107,431$

18 9 ODOT Let 80609 LAW LAW SR 7 4.50 Slide Repair HAUCK, MATTHEW RSlide Repair 10/20/08 10/20/08 01/14/09 01/22/09 2009 197,950$

18 9 ODOT Let 83178 BRO BRO Grant Lake Wildlife AreaHUFF, JOHN T Resurfacing, Undivided System 10/20/08 10/20/08 01/14/09 01/22/09 2009 253,468$

18 9 ODOT Let 25603 BRO BRO SR 505 6.75 & SR 756 0.00BEEKMAN, DAVID M Resurfacing, Undivided System 10/30/08 10/30/08 01/28/09 02/05/09 2009 686,545$

18 9 ODOT Let 78164 D09 JAC SR 139 0.00/LAW SR 141 8.43HILLE, HAUKE J Preventive Maintenance 11/03/08 11/03/08 01/28/09 02/05/09 2009 592,149$

18 9 ODOT Let 19267 PIK PIK SR 335 20.90 HILLE, HAUKE J Resurfacing, Undivided System 08/11/08 08/11/08 02/04/09 02/12/09 2009 509,000$

18 9 ODOT Let 25863 PIK PIK SR 32 0.00 RICE, CARL E Resurfacing, Divided System 07/23/08 07/23/08 02/04/09 02/12/09 2009 2,329,760$

18 9 ODOT Let 79964 D09 ROS US 23 12.82 BEEKMAN, DAVID M Preventive Maintenance 11/07/08 11/07/08 02/04/09 02/12/09 2009 2,947,112$

18 9 ODOT Let 22044 JAC JAC SR 327, SR 349, & SR 776BEEKMAN, DAVID M Resurfacing, Undivided System 09/15/08 09/15/08 02/25/09 03/05/09 2009 486,178$

18 9 ODOT Let 78593 LAW LAW CR 1 9.32 & 9.48 BridgesWILLS, LAWRENCE ABridge Replacement 09/16/08 09/16/08 02/25/09 03/05/09 2009 1,212,921$

18 9 ODOT Let 79996 BRO BRO SR 763 4.37 BEEKMAN, DAVID M Minor Rehabilitation - Pavement Gnrl Sys 09/11/08 09/11/08 02/25/09 03/05/09 2009 877,533$

18 9 ODOT Let 83184 ROS ROS SR 159 3.02 Signal BEEKMAN, DAVID M Signals 12/01/08 12/01/08 02/25/09 03/05/09 2009 289,532$

18 9 ODOT Let 19255 LAW LAW SR 775 16.55 & SR 790 0.00BEEKMAN, DAVID M Resurfacing, Undivided System 09/11/08 09/11/08 03/11/09 03/19/09 2009 935,102$

18 9 ODOT Let 25434 ADA ADA SR 348 0.00 HILLE, HAUKE J Minor Rehabilitation - Pavement Prmy Sys 2008 01/31/05 01/31/05 03/11/09 03/19/09 2009 1,545,588$

18 9 ODOT Let 25539 HIG HIG SR 134 5.25 HILLE, HAUKE J Resurfacing, Undivided System 12/11/08 12/11/08 03/11/09 03/19/09 2009 940,693$

18 9 ODOT Let 25612 JAC JAC SR 93 6.31 WETZEL, JOHN K Resurfacing, Undivided System 2008 01/14/08 01/14/08 03/11/09 03/19/09 2009 1,125,000$

18 9 ODOT Let 76029 JAC JAC SR 93 14.32 COCHENOUR, GARY ETurn Lane Addition 07/02/07 12/12/08 12/12/08 09/26/07 03/11/09 10/04/07 03/19/09 2009 1,488,000$ Added

18 9 ODOT Let 78135 D09 D09 HS FY2009 HUFF, JOHN T Herbicidal Spraying 12/11/08 12/11/08 03/11/09 03/19/09 2009 104,700$

18 9 ODOT Let 78136 D09 D09 RPM FY2009 HILLE, HAUKE J Raised Pavement Markers 12/11/08 12/11/08 03/11/09 03/19/09 2009 250,000$

18 9 ODOT Let 78991 PIK PIK CR 36, 0.45 Brdg PleasantHilHUFF, JOHN T Bridge Replacement 12/24/08 12/24/08 03/25/09 04/02/09 2009 492,606$

18 9 ODOT Let 85339 SCI SCI SR 104 9.70 Lock 48 FRANCIS, WILLIAM MEnvironmental/Scenic 04/01/09 2009 30,906$ Added

18 9 ODOT Let 13628 LAW LAW SR 217 9.300M HUFF, JOHN T Culvert Construction/Reconstr/Repair 01/12/09 04/08/09 04/16/09 2009 389,000$ Added

18 9 ODOT Let 77625 HIG HIG TR259 4.15 WILLS, LAWRENCE ABridge Replacement 01/12/09 04/08/09 04/16/09 2009 226,800$

18 9 ODOT Let 81910 ROS ROS Bainbridge Side Walk BARNITZ, THOMAS MAdd Sidewalks 01/12/09 04/08/09 04/16/09 2009 138,063$

18 9 ODOT Let 84828 LAW LAW US 52 10.58 Signs COCHENOUR, GARY ESpot Safety 01/12/09 04/08/09 04/16/09 2009 150,000$ Added

18 9 ODOT Let 19250 JAC JAC SR 93 23.07 & SR 788 0.49BEEKMAN, DAVID M Resurfacing, Undivided System 01/26/09 04/22/09 04/30/09 2009 1,062,111$

18 9 ODOT Let 19277 ROS ROS SR 327 (2.08)(4.66)(5.65)HILLE, HAUKE J Resurfacing, Undivided System 01/26/09 04/22/09 04/30/09 2009 790,000$

18 9 ODOT Let 76472 SCI SCI US 52 Bridge Repairs HAUCK, MATTHEW RBridge Repair 01/26/09 04/22/09 04/30/09 2009 3,109,650$

Page 18: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

18 9 ODOT Let 83771 PIK PIK US 23 4.52 (Seif Rd Int) BEEKMAN, DAVID M Turn Lane Addition 01/26/09 04/22/09 04/30/09 2009 251,000$

18 9 ODOT Let 19270 PIK PIK SR 335 7.90 HILLE, HAUKE J Resurfacing, Undivided System 02/09/09 05/06/09 05/14/09 2009 768,443$

18 9 ODOT Let 23022 JAC JAC SR 93 2.94 HUFF, JOHN T Bridge Replacement 02/09/09 05/06/09 05/14/09 2009 470,000$

18 9 ODOT Let 84820 D09 D09 PM FY2009 (B) HILLE, HAUKE J Pavement Marking 02/09/09 05/06/09 05/14/09 2009 1,400,000$ Added

18 9 ODOT Let 81915 BRO BRO US 52 12.23 2nd Street ScapeBARNITZ, THOMAS MEnvironmental/Scenic 02/23/09 05/20/09 05/28/09 2009 536,937$

18 9 ODOT Let 83303 ROS ROS SR 159 1.22 IntersectionBEEKMAN, DAVID M Intersection Improvement 02/23/09 05/20/09 05/28/09 2009 91,252$

18 9 ODOT Let 83786 JAC JAC SR 327 1.02 Safety BARNITZ, THOMAS MSpot Safety 02/23/09 05/20/09 05/28/09 2009 350,000$ Added

18 9 ODOT Let 80744 HIG HIG CR 79 0.00 Brdg ReplacementWILLS, LAWRENCE ABridge Replacement 04/01/09 06/01/09 06/01/09 2009 896,400$ Added

18 9 ODOT Let 21250 ROS ROS SR 104 14.40 BARNITZ, THOMAS MMajor Widening 11/03/08 02/02/09 03/11/09 06/10/09 03/19/09 06/18/09 2009 10,508,825$

18 9 ODOT Let 22051 HIG HIG SR73/124/247-7.64/8.54/11.69HILLE, HAUKE J Resurfacing, Undivided System 03/16/09 06/10/09 06/18/09 2009 250,000$

18 9 ODOT Let 25481 PIK PIK SR 104 0.00 HILLE, HAUKE J Minor Rehabilitation - Pavement Prmy Sys 03/16/09 06/10/09 06/18/09 2009 954,341$

18 9 ODOT Let 75721 BRO BRO CR 24 5.26 WILLS, LAWRENCE ABridge Replacement 03/16/09 06/10/09 06/18/09 2009 725,000$

18 9 ODOT Let 79847 LAW LAW SR 775 17.26 Brdg ReplaceHAUCK, MATTHEW RBridge Replacement 03/16/09 06/10/09 06/18/09 2009 317,000$

18 9 ODOT Let 84925 ADA ADA US 52 8.25 Manchester SRTSHUFF, JOHN T Add Sidewalks 03/16/09 06/10/09 06/18/09 2009 75,000$ Added18 9 Totals 15,691,576$ 61,936,273$

Page 19: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 1019 10 Local Let 83384 WAS WAS Marietta LED Signal WARNER, JILL A Signals $159,634.00 08N127 07/01/08 07/01/08 10/24/08 10/24/08 11/14/08 11/14/08 2009 159,634$

19 10 Local Let 83259 WAS WAS CR 9 8.550 WARNER, JILL A Major Rehabilitation 09/15/08 09/15/08 12/10/08 01/01/09 2009 593,400$

19 10 Local Let 84054 WAS WAS Beverly Sidewalk - SRTSWARNER, JILL A Add Sidewalks 01/26/09 04/22/09 04/30/09 2009 188,000$ Added19 10 Totals 159,634$ 941,034$

ODOT Let Program - District 1020 10 ODOT Let 76022 ATH ATH SR 681 7.280 JOHNSON, BRADY G Resurfacing, Undivided System $2,544,632.64 80413 03/24/08 03/24/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 2,544,633$

20 10 ODOT Let 76112 MOE MOE SR 26 5.59 YOST, CRAIG A Resurfacing, Undivided System $1,495,992.65 80422 2008 02/12/07 02/12/07 06/18/08 06/18/08 06/26/08 06/26/08 2009 1,495,993$

20 10 ODOT Let 81432 WAS WAS SR 7 28.200 YOST, CRAIG A Resurfacing, Undivided System $2,425,028.80 80429 02/13/08 02/13/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 2,425,029$

20 10 ODOT Let 83039 HOC HOC SR 93 7.310 YOST, CRAIG A Resurfacing, Undivided System $912,129.65 80420 03/13/08 03/13/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 912,130$

20 10 ODOT Let 76023 MOE MOE SR 255 0.00 BOOHER, JOSHUA D Resurfacing, Undivided System $2,216,198.00 80462 03/14/08 03/14/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 2,216,198$

20 10 ODOT Let 24891 NOB NOB SR 285 5.400 YOST, CRAIG A Resurfacing, Undivided System $1,029,090.30 80469 04/25/08 04/25/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,029,090$

20 10 ODOT Let 21845 ATH ATH SR0124 00.310 BUCKLEY, WESLEY ABridge Repair $899,809.26 80489 11/13/07 11/13/07 08/06/08 08/06/08 08/18/08 08/18/08 2009 899,809$

20 10 ODOT Let 24890 ATH ATH SR 56 4.270 BOOHER, JOSHUA D Resurfacing, Undivided System $2,574,536.23 80508 05/19/08 05/19/08 08/20/08 08/20/08 09/02/08 09/02/08 2009 2,574,536$

20 10 ODOT Let 25087 HOC HOC SR 93 6.63 BUCKLEY, WESLEY ABridge Replacement $189,104.04 80512 12/10/07 12/10/07 08/20/08 08/20/08 09/02/08 09/02/08 2009 189,104$

20 10 ODOT Let 77722 GAL GAL SR 588 1.640 BUCKLEY, WESLEY ABridge Repair $536,421.90 80538 04/09/08 04/09/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 536,422$

20 10 ODOT Let 79883 D10 D10 SIGN FY2009 REED, ERIC P Signs $239,905.03 80525 06/13/08 06/13/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 239,905$

20 10 ODOT Let 79905 D10 D10 GR FY2009 YOST, CRAIG A Guardrail upgrade/replace $688,931.21 80533 06/12/08 06/12/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 688,931$

20 10 ODOT Let 84223 ATH ATH US 33 1.570 MORELAND, ANDREW RSlide Repair $92,918.17 88033 07/22/08 07/22/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 92,918$ Added

20 10 ODOT Let 83807 ATH ATH Wetland CRAIG, ALAN L Create Wetlands $1,199,014.15 88037 05/21/08 05/21/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 1,199,014$

20 10 ODOT Let 25326 WAS WAS SR 821 4.85 WARNER, JILL A Bridge Replacement $296,112.55 80627 08/25/08 08/25/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 296,113$

20 10 ODOT Let 75660 MRG MRG SR 376 2.45 HUCK, JASON P Bridge Repair $240,084.74 88040 09/12/08 09/12/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 240,085$

20 10 ODOT Let 81451 MOE MOE SR 78 0.000 BOOHER, JOSHUA D Resurfacing, Undivided System 05/27/08 05/27/08 10/08/08 10/16/08 2009 349,000$

20 10 ODOT Let 84284 GAL GAL Mixing Shed FY 2009 ZWICK, ROBERT C Buildings - Mix Shed,etc. 07/03/08 07/03/08 11/05/08 11/13/08 2009 150,000$ Added

20 10 ODOT Let 22510 GAL GAL US 35 3.790 LAMBERT, WILLIAM HResurfacing, Divided System 10/17/08 10/17/08 01/14/09 01/22/09 2009 2,300,000$ Added

20 10 ODOT Let 22549 NOB NOB SR 147 10.76 COEN, JOHN D Bridge Replacement 09/23/08 09/23/08 01/14/09 01/22/09 2009 1,406,000$

20 10 ODOT Let 81395 WAS WAS SR 676 19.020 MORELAND, ANDREW RSlide Repair 10/14/08 10/14/08 01/14/09 01/22/09 2009 601,000$

20 10 ODOT Let 83534 MEG MEG Pavement Marking FY 2009WARNER, JILL A Pavement Marking 10/20/08 10/20/08 01/14/09 01/22/09 2009 137,400$

20 10 ODOT Let 84190 ATH ATH US 50 4.990 LAMBERT, WILLIAM HPreventive Maintenance 10/17/08 10/17/08 01/14/09 01/22/09 2009 671,000$ Added

20 10 ODOT Let 84192 GAL GAL SR 218 0.000 LAMBERT, WILLIAM HPreventive Maintenance 10/17/08 10/17/08 01/14/09 01/22/09 2009 785,000$ Added

20 10 ODOT Let 80394 MEG MEG SR 124 63.050 MORELAND, ANDREW RSlide Repair 11/03/08 11/03/08 01/28/09 02/05/09 2009 1,196,000$

20 10 ODOT Let 81668 MRG MRG 83 10.330 LAMBERT, WILLIAM HResurfacing, Undivided System 11/03/08 11/03/08 01/28/09 02/05/09 2009 2,253,000$

20 10 ODOT Let 25084 GAL GAL SR 218 5.010 MORELAND, ANDREW RBridge Replacement 11/07/08 11/07/08 02/04/09 02/12/09 2009 1,290,000$

20 10 ODOT Let 75653 NOB NOB IR 77 4.080 COEN, JOHN D Bridge Painting 09/03/08 09/03/08 02/04/09 02/12/09 2009 2,369,000$

20 10 ODOT Let 20256 WAS WAS SR0007 21.520 HUCK, JASON P Bridge Repair 11/10/08 11/07/08 11/07/08 02/04/09 02/25/09 02/12/09 03/05/09 2009 7,300,500$

20 10 ODOT Let 80150 ATH ATH SR 143 0.000 YOST, CRAIG A Resurfacing, Undivided System 11/24/08 11/24/08 02/25/09 03/05/09 2009 1,606,000$

20 10 ODOT Let 80395 NOB NOB IR 77 7.910 LATTURE, SCOTT W Slide Repair 12/05/08 12/05/08 03/11/09 03/19/09 2009 454,000$

20 10 ODOT Let 84447 WAS WAS SR 60 5.130 YOST, CRAIG A Resurfacing, Undivided System 12/29/08 12/29/08 03/25/09 04/01/09 2009 1,000,000$ Added

20 10 ODOT Let 77724 MOE MOE SR 7 23.100 CRAIG, ALAN L Bridge Maintenance 12/23/08 12/23/08 03/25/09 04/02/09 2009 1,008,000$

20 10 ODOT Let 78191 ATH ATH SR 682 4.000 HUCK, JASON P Spot Safety 12/15/08 12/29/08 12/29/08 03/20/09 03/25/09 04/02/09 04/02/09 2009 3,726,000$

20 10 ODOT Let 82837 MEG MEG SR 7 11.350 LAMBERT, WILLIAM HPreventive Maintenance 12/29/08 12/29/08 03/25/09 04/02/09 2009 815,000$ Added

20 10 ODOT Let 21904 ATH ATH US 33 15.050 BOOHER, JOSHUA D Minor Rehabilitation - Pavement Prmy Sys 12/01/08 12/01/08 04/22/09 04/30/09 2009 10,984,000$

20 10 ODOT Let 85082 WAS WAS IR 77 0.300 COEN, JOHN D Bridge Repair 12/16/08 12/16/08 06/10/09 06/18/09 2009 195,000$ Added

20 10 ODOT Let 83704 GAL GAL SR 588 11.200 BUCKLEY, WESLEY AIntersection Improvement 01/12/09 04/08/09 04/16/09 2009 213,000$

20 10 ODOT Let 79888 D10 D10 Pavement Marking FY2009REED, ERIC P Pavement Marking 01/26/09 04/22/09 04/30/09 2009 1,674,000$

20 10 ODOT Let 77976 MRG MRG SR 376 0.000 BOOHER, JOSHUA D Resurfacing, Undivided System 02/09/09 05/06/09 05/14/09 2009 1,387,000$ Added

20 10 ODOT Let 79899 D10 D10 RPM FY2009 BOOHER, JOSHUA D Raised Pavement Markers 02/09/09 05/06/09 05/14/09 2009 250,000$

20 10 ODOT Let 80323 NOB NOB IR 77 5.740 MORELAND, ANDREW RMajor Rehabilitation 02/09/09 05/06/09 05/14/09 2009 700,000$

20 10 ODOT Let 77971 MOE MOE SR 7 2.210 BOOHER, JOSHUA D Resurfacing, Undivided System 02/23/09 05/20/09 05/28/09 2009 1,748,000$ Added

20 10 ODOT Let 83289 MEG MEG US 33 8.660 LT and RTBOOHER, JOSHUA D Bridge Maintenance 02/23/09 05/20/09 05/28/09 2009 394,000$

Page 20: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

20 10 ODOT Let 79882 GAL GAL SR 325 13.870 REED, ERIC P Culvert Construction/Reconstr/Repair 03/16/09 06/10/09 06/18/09 2009 400,000$

20 10 ODOT Let 81806 WAS WAS Marietta River Trail Ph.2WARNER, JILL A Bikeways 03/16/09 06/10/09 06/18/09 2009 740,658$

20 10 Totals 17,579,909$ 65,682,468$

Page 21: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 1121 11 Local Let 82203 HOL HOL VAR GR Phase 2 KANE, ROXANNE R Guardrail Rebuilding $317,440.00 08N109 07/23/08 07/23/08 08/28/08 08/28/08 09/04/08 09/04/08 2009 317,440$

21 11 Local Let 81378 HOL HOL CR145 0.49 KANE, ROXANNE R Bridge Replacement $679,975.29 08N112 06/23/08 06/23/08 09/04/08 09/04/08 09/15/08 09/15/08 2009 679,975$

21 11 Local Let 80905 BEL BEL-Bikepath Bridge Rehab KANE, ROXANNE R Bridge Repair $570,730.00 08N128 06/01/07 06/01/07 09/16/08 09/16/08 10/06/08 10/06/08 2009 570,730$ Added

21 11 Local Let 81818 COL COL-Elysian Way KANE, ROXANNE R Resurfacing, Undivided System $106,284.00 08N126 10/06/08 10/06/08 11/14/08 11/14/08 11/19/08 11/19/08 2009 106,284$

21 11 Local Let 84031 TUS TUS Dennison Depot, Phase 6KANE, ROXANNE R Environmental/Scenic $112,900.00 08N32 10/28/08 10/28/08 11/25/08 11/25/08 12/04/08 12/04/08 2009 112,900$ Added

21 11 Local Let 82135 JEF JEF SR 43 3.45 KANE, ROXANNE R Signs 03/14/08 07/07/08 07/07/08 04/25/08 12/01/08 05/30/08 12/29/08 2009 326,955$ Added

21 11 Local Let 80906 BEL BEL-Bikepath Tunnel Rehab KANE, ROXANNE R Tunnel Improvement 12/19/08 12/19/08 02/02/09 02/16/09 2009 1,431,578$ Added

21 11 Local Let 19817 COL COL CR 403 1.96 (KNOX SCHOOL RD)KANE, ROXANNE R Relocation 03/15/06 03/15/06 05/08/09 06/05/09 2009 2,840,900$ Added

21 11 Local Let 78784 COL COL-Train Station KANE, ROXANNE R Environmental/Scenic 04/16/07 04/16/07 05/08/09 06/05/09 2009 723,701$ Added

21 11 Local Let 85079 COL COL-30-33.78 KANE, ROXANNE R Pavement/Shoulder Sealing and/or Repair 10/31/08 11/24/08 12/01/08 2009 107,419$ Added

21 11 Local Let 82206 HOL HOL VAR GR Phase 3 KANE, ROXANNE R Guardrail Rebuilding 02/15/09 04/30/09 05/30/09 2009 300,000$ Added

21 11 Local Let 82207 HOL HOL VAR GR Phase 4 KANE, ROXANNE R Guardrail Rebuilding 02/15/09 04/30/09 05/30/09 2009 300,000$ Added

21 11 Local Let 24453 COL COL CR 428 5.62 KANE, ROXANNE R Bridge Replacement 04/15/09 05/01/09 06/01/09 2009 418,182$

21 11 Local Let 81826 COL COL-Bradshaw Ave KANE, ROXANNE R Major Rehabilitation 04/15/09 05/01/09 06/01/09 2009 900,000$

21 11 Totals 1,787,329$ 9,136,065$

ODOT Let Program - District 1122 11 ODOT Let 22784 TUS TUS US0036 18.000 BARNHOUSE, JOHN PBridge Painting $510,501.50 80428 2008 07/11/07 07/11/07 06/18/08 06/18/08 06/26/08 06/26/08 2009 510,502$

22 11 ODOT Let 82224 D11 D11 CR FY2008 STILLION, TIMOTHY EDrainage System Maintenance/Repair (NEW) $416,613.67 80397 03/07/08 03/07/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 416,614$ Added

22 11 ODOT Let 83250 D11 D11-LG-FY2009 WARNER, SCOTT K Lighting Maintenance $313,987.00 80433 02/29/08 02/29/08 06/18/08 06/18/08 06/26/08 06/26/08 2009 313,987$

22 11 ODOT Let 81661 COL COL Park Ave/Rebecca StreetMARKER, JAMES N Resurfacing, Undivided System $618,416.55 80440 04/02/08 04/02/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 618,417$

22 11 ODOT Let 82377 D11 D11 CS FY2009 WARNER, SCOTT K Preventive Maintenance $617,779.28 80443 2008 02/25/08 02/25/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 617,779$

22 11 ODOT Let 82762 COL COL SR 45 1.220 STILLION, TIMOTHY ESlide Repair $336,433.63 86002 06/10/08 06/10/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 336,434$

22 11 ODOT Let 83229 D11 D11-PM-FY2009(B) TRIVOLI, RAYMOND PPavement Marking $1,727,710.10 80482 04/21/08 04/21/08 07/23/08 07/23/08 07/31/08 07/31/08 2009 1,727,710$

22 11 ODOT Let 75636 JEF JEF SR 7 22.00 WARNER, SCOTT K Slide Repair $1,866,000.00 88025 11/07/07 11/07/07 08/06/08 08/06/08 08/18/08 08/18/08 2009 1,866,000$ Added

22 11 ODOT Let 22766 COL COL SR0011 24.17 MARKER, JAMES N Bridge Repair $4,403,131.01 80543 06/27/08 06/27/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 4,403,131$

22 11 ODOT Let 80922 BEL BEL IR 70 0.000 MARKER, JAMES N Signs $422,150.00 83002 04/18/08 04/18/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 422,150$

22 11 ODOT Let 78202 HAS HAS SR 646 10.550 STILLION, TIMOTHY EResurfacing, Undivided System $769,602.60 80577 06/04/08 06/04/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 769,603$

22 11 ODOT Let 81675 CAR CAR SR 332 6.480 WARNER, SCOTT K Minor Rehabilitation - Pavement Gnrl Sys $911,467.23 80562 07/08/08 07/08/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 911,467$

22 11 ODOT Let 83264 D11 D11 MOW FY 2009A TRIVOLI, RAYMOND PMowing $226,340.00 80576 06/16/08 06/16/08 10/08/08 10/08/08 10/16/08 10/16/08 2009 226,340$

22 11 ODOT Let 83265 D11 D11 MOW FY 2009B TRIVOLI, RAYMOND PMowing $132,045.00 80593 06/16/08 06/16/08 10/22/08 10/22/08 10/30/08 10/30/08 2009 132,045$

22 11 ODOT Let 78235 BEL BEL SR 26 0.000 STILLION, TIMOTHY EPreventive Maintenance $655,439.91 80600 07/28/08 07/28/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 655,440$

22 11 ODOT Let 83227 D11 D11-PM-FY2009(A) TRIVOLI, RAYMOND PPavement Marking $209,078.12 80614 07/23/08 07/23/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 209,078$

22 11 ODOT Let 80116 COL COL 00164 21.81 BARNHOUSE, JOHN PBridge Deck Replacement $1,363,000.00 80618 08/20/08 08/20/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 1,363,000$

22 11 ODOT Let 81485 COL COL US 30 28.030 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Prmy Sys $4,534,730.73 80619 08/22/08 08/22/08 11/26/08 11/26/08 12/02/08 12/02/08 2009 4,534,731$

22 11 ODOT Let 81674 HOL HOL SR 557 0.000 WARNER, SCOTT K Minor Rehabilitation - Pavement Gnrl Sys $3,340,442.40 80642 08/28/08 08/28/08 12/17/08 12/17/08 12/22/08 12/22/08 2009 3,340,442$

22 11 ODOT Let 83277 D11 D11 HS FY 2009B TRIVOLI, RAYMOND PHerbicidal Spraying 05/30/08 05/30/08 09/24/08 10/02/08 2009 70,000$

22 11 ODOT Let 83276 D11 D11 HS FY 2009A TRIVOLI, RAYMOND PHerbicidal Spraying 05/30/08 05/30/08 10/08/08 10/16/08 2009 100,000$

22 11 ODOT Let 25575 TUS TUS IR 77 12.30 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Prmy Sys 10/16/08 10/16/08 01/14/09 01/22/09 2009 10,065,190$

22 11 ODOT Let 77350 BEL BEL SR 7 8.700 WARNER, SCOTT K Preventive Maintenance 09/22/08 09/22/08 01/14/09 01/22/09 2009 1,088,985$

22 11 ODOT Let 81591 TUS TUS US 250 0.000 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 09/24/08 09/24/08 01/14/09 01/22/09 2009 1,120,362$

22 11 ODOT Let 83616 TUS TUS SR 516 0.000 WARNER, SCOTT K Minor Rehabilitation - Pavement Gnrl Sys 10/10/08 10/10/08 01/28/09 02/05/09 2009 1,157,330$

22 11 ODOT Let 81676 JEF JEF SR 152 5.260 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 09/24/08 09/24/08 02/04/09 02/12/09 2009 1,189,992$

22 11 ODOT Let 81677 CAR CAR SR 644 0.000 STILLION, TIMOTHY EPreventive Maintenance 10/03/08 10/03/08 02/04/09 02/12/09 2009 348,315$

22 11 ODOT Let 22776 HOL HOL US0062 27.420 LOCKE, SHANE A Spot Safety 12/01/08 11/20/08 11/20/08 02/25/09 02/25/09 03/05/09 03/05/09 2009 3,829,516$

22 11 ODOT Let 83175 COL COL Zepernick Lake KUZMICH, ANNA M Parks 11/13/08 11/13/08 02/25/09 03/05/09 2009 46,149$

22 11 ODOT Let 83231 D11 D11-RPM-FY2009 WARNER, SCOTT K Pavement Marking 11/05/08 11/05/08 02/25/09 03/05/09 2009 270,000$

22 11 ODOT Let 19734 TUS TUS IR0077 24.50 STILLION, TIMOTHY EInterchange, Reconstruction 11/03/08 10/29/08 10/29/08 03/11/09 03/11/09 03/19/09 03/19/09 2009 18,989,339$

22 11 ODOT Let 25545 COL COL US 62 4.860 WARNER, SCOTT K Resurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 2,287,436$

Page 22: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

22 11 ODOT Let 77348 HAS HAS US 22 21.470 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Prmy Sys 12/09/08 12/09/08 03/11/09 03/19/09 2009 3,924,721$

22 11 ODOT Let 78237 D11 D11 CH FY 2009 BARNHOUSE, JOHN PCleaning/Sweeping Highways 11/14/08 11/14/08 03/11/09 03/19/09 2009 150,000$

22 11 ODOT Let 81673 COL COL US 30 17.700 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 11/24/08 11/24/08 03/11/09 03/19/09 2009 288,613$

22 11 ODOT Let 83615 HOL HOL SR 754 0.200 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 11/13/08 11/13/08 03/11/09 03/19/09 2009 816,322$

22 11 ODOT Let 75114 HAS HAS CR041 41.63 MARKER, JAMES N Bridge Replacement 2009 02/06/08 02/06/08 03/25/09 04/02/09 2009 999,000$ Added

22 11 ODOT Let 81687 TUS TUS US 250 23.460 WARNER, SCOTT K Minor Rehabilitation - Pavement Gnrl Sys 12/15/08 12/15/08 03/25/09 04/02/09 2009 1,074,865$ Added

22 11 ODOT Let 81790 COL COL Salem Signal Upgrade MARKER, JAMES N Signals 12/23/08 12/23/08 03/25/09 04/02/09 2009 853,458$

22 11 ODOT Let 81875 D11 HOL-62-11.02 STILLION, TIMOTHY EDrainage System Maintenance/Repair (NEW) 12/08/08 12/08/08 03/25/09 04/02/09 2009 349,386$

22 11 ODOT Let 84165 CAR CAR SR 183 0.000 STILLION, TIMOTHY EResurfacing, Undivided System 2009 12/02/08 12/02/08 05/06/09 05/14/09 2009 447,524$ Added

22 11 ODOT Let 80419 BEL BEL SR 147 14.380 STILLION, TIMOTHY EResurfacing, Undivided System 2009 12/29/08 12/29/08 04/16/09 05/28/09 2009 1,200,719$ Added

22 11 ODOT Let 81587 HAS HAS US 250 11.720 LOCKE, SHANE A Minor Rehabilitation - Pavement Gnrl Sys 06/30/08 12/10/08 12/18/08 2009 379,654$

22 11 ODOT Let 83606 COL COL SR 14 9.380 and VariousBARNHOUSE, JOHN PBridge Repair 01/12/09 04/08/09 04/16/09 2009 633,000$

22 11 ODOT Let 81266 BEL BEL SR 9 11.300 WARNER, SCOTT K Slide Repair 01/26/09 04/22/09 04/30/09 2009 611,000$

22 11 ODOT Let 81695 BEL BEL SR 149 31.390 WARNER, SCOTT K Minor Rehabilitation - Pavement Gnrl Sys 01/26/09 04/22/09 04/30/09 2009 1,016,508$ Added

22 11 ODOT Let 83275 D11 D11 GR FY 2009 WARNER, SCOTT K Guardrail Rebuilding 01/26/09 04/22/09 04/30/09 2009 750,000$

22 11 ODOT Let 84163 CAR CAR SR 39 23.410 WARNER, SCOTT K Resurfacing, Undivided System 2009 01/26/09 04/22/09 04/30/09 2009 1,486,660$ Added

22 11 ODOT Let 84788 HAS HAS SR 800 10.280 STILLION, TIMOTHY ECulvert Construction/Reconstr/Repair 01/26/09 04/22/09 04/30/09 2009 80,000$ Added

22 11 ODOT Let 80103 BEL BEL SR 148 12.000 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 02/09/09 05/06/09 05/14/09 2009 2,610,520$ Added

22 11 ODOT Let 82001 HAS HAS SR 342 3.96 TRIVOLI, RAYMOND PBridge Deck Replacement 02/09/09 05/06/09 05/14/09 2009 1,200,000$

22 11 ODOT Let 84342 HAS HAS SR 9 9.380 STILLION, TIMOTHY EMinor Rehabilitation - Pavement Gnrl Sys 02/09/09 05/06/09 05/14/09 2009 2,706,796$ Added

22 11 ODOT Let 84912 BEL BEL SR 379 0.000 MACADAM, LLOYD VPreventive Maintenance 02/09/09 05/06/09 05/14/09 2009 379,600$ Added

22 11 ODOT Let 84914 CAR CAR SR 9 15.820 MACADAM, LLOYD VPreventive Maintenance 02/09/09 05/06/09 05/14/09 2009 717,600$ Added

22 11 ODOT Let 78670 CAR CAR SR0164 10.470 BARNHOUSE, JOHN PBridge Deck Replacement 02/23/09 05/20/09 05/28/09 2009 465,480$

22 11 ODOT Let 81263 BEL BEL US 250 5.92 TRIVOLI, RAYMOND PSlide Repair 02/23/09 05/20/09 05/28/09 2009 561,500$

22 11 ODOT Let 24870 HAS HAS US0022 17.380 TRIVOLI, RAYMOND PBridge Replacement 2009 03/16/09 06/10/09 06/18/09 2009 1,750,000$ Added

22 11 ODOT Let 24944 HOL HOL SR0179 00.670 WARNER, SCOTT K Culvert Construction/Reconstr/Repair 03/16/09 06/10/09 06/18/09 2009 488,592$

22 11 ODOT Let 77275 TUS TUS-Tuscarawas Ave. MARKER, JAMES N Bridge Replacement 03/16/09 06/10/09 06/18/09 2009 3,825,000$

22 11 ODOT Let 83121 HOL HOL SR 179 4.09 WARNER, SCOTT K Bridge Replacement 03/16/09 06/10/09 06/18/09 2009 270,000$

22 11 ODOT Let 84162 COL COL SR 45 22.040 WARNER, SCOTT K Resurfacing, Undivided System 2009 03/16/09 06/10/09 06/18/09 2009 2,154,300$ Added

22 11 ODOT Let 84267 COL COL SR 154 10.92 BARNHOUSE, JOHN PBridge Replacement 03/16/09 06/10/09 06/18/09 2009 650,000$ Added

22 11 Totals 23,374,869$ 96,778,301$

Page 23: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

Local Let Program - District 1223 12 Local Let 80954 CUY CUY HIGHLAND RD PEDESTRIAN PATHSCHULZ, MATTHEW GAdd Sidewalks $634,210.70 08N107 06/10/08 06/10/08 07/18/08 07/18/08 07/30/08 07/30/08 2009 634,211$

23 12 Local Let 82569 GEA GEA CHAGRIN ROAD (A&B)HADDAD, KHALIL N Resurfacing, Undivided System $176,664.00 08N119 07/07/08 07/07/08 08/27/08 08/27/08 09/04/08 09/04/08 2009 176,664$

23 12 Local Let 82570 GEA GEA FAIRMOUNT ROAD (A&B)HADDAD, KHALIL N Resurfacing, Undivided System $484,995.00 08N118 07/07/08 07/07/08 08/27/08 08/27/08 09/04/08 09/04/08 2009 484,995$

23 12 Local Let 80862 CUY CUY US 006A 05.61/STREETSCAPEPESTA, RICHARD T Environmental/Scenic 06/25/08 06/25/08 08/06/08 08/13/08 2009 3,049,283$

23 12 Local Let 80978 CUY CUY PETTIBONE ROAD MORIARTY, MICHAEL KMajor Reconstruction 01/18/08 01/18/08 01/18/08 03/24/08 09/12/08 03/31/08 09/26/08 2009 12,610,000$ Added

23 12 Local Let 78716 CUY CUY ROCKSIDE ROAD PESTA, RICHARD T Bridge Replacement 01/31/08 01/31/08 08/26/08 10/02/08 2009 1,995,000$ Added

23 12 Local Let 80934 CUY CUY RIDGEBURY BLVD MORIARTY, MICHAEL KResurfacing, Undivided System 08/29/08 08/29/08 01/13/09 03/05/09 2009 3,147,345$

23 12 Local Let 21776 CUY CUY US 422 01.68 HADDAD, KHALIL N Resurfacing, Undivided System 07/22/08 07/22/08 02/25/09 03/31/09 2009 6,288,000$

23 12 Local Let 24128 CUY CUY ST CLAIR AVE PH1 HADDAD, KHALIL N Resurfacing, Undivided System 01/15/10 12/10/08 12/10/08 03/09/10 04/10/09 03/30/10 04/24/09 2009 10,587,502$ Added

23 12 Local Let 80981 GEA GEA SR 044 17.52 SCHULZ, MATTHEW GIntersection Improvement 12/15/08 12/15/08 05/01/09 05/15/09 2009 653,428$

23 12 Local Let 80975 CUY CUY LIBERTY ROAD KALLIO, ERIC M Resurfacing, Undivided System 09/03/08 09/03/08 05/08/09 05/22/09 2009 509,995$

23 12 Local Let 83401 LAK LAK SR 091 04.00 Slide MORIARTY, MICHAEL KSlide Repair 07/16/08 07/16/08 05/08/09 05/22/09 2009 244,125$

23 12 Local Let 78718 CUY CUY CANNON ROAD PITCHER, SHELLEY KBridge Replacement 11/25/08 11/25/08 05/18/09 06/01/09 2009 877,800$

23 12 Local Let 25482 CUY CUY SR 252 00.05 NOWAC, GARY J Railroad Grade Separation 11/07/08 11/07/08 01/16/09 01/16/09 01/30/09 01/30/09 2009 8,353,680$ Added

23 12 Local Let 82571 GEA GEA HEMLOCK ROAD (Y&Z)HADDAD, KHALIL N Resurfacing, Undivided System 01/12/09 03/13/09 03/27/09 2009 270,000$

23 12 Local Let 82654 GEA GEA PAVEMENT MARKINGS #4 FY2009HADDAD, KHALIL N Pavement Marking 03/06/09 05/01/09 05/15/09 2009 150,000$ Added

23 12 Local Let 78840 CUY CUY GCRTA P&R (Wtlk) HADDAD, KHALIL N Transfer Centers - PT 03/30/07 03/23/09 05/04/07 05/08/09 05/16/07 05/22/09 2009 1,000,000$ Added

23 12 Local Let 81773 CUY CUY/SUM/STA/TUS CanalWay SignageKONOPKA, FRANK L Scenic Byway 03/06/09 05/08/09 05/22/09 2009 500,000$

23 12 Local Let 84768 CUY CUY West 3rd Street PaintingWELCH, KERI J Major Rehabilitation 02/23/09 05/20/09 05/28/09 2009 4,318,182$ Added

23 12 Local Let 83293 CUY CUY WEST CREEK RESERVATIONMORIARTY, MICHAEL KParks 04/01/09 05/15/09 05/29/09 2009 250,000$

23 12 Local Let 85306 CUY CUY SRTS FY2009 CLE3 CHESLA, RONALD W Signals 2009 225,000$ Added

23 12 Totals 1,295,870$ 56,325,210$

ODOT Let Program - District 1224 12 ODOT Let 78673 LAK LAK US 020 06.61 BLAYNEY, BRIAN M Resurfacing, Undivided System $2,707,000.00 80460 04/11/08 04/11/08 07/09/08 07/09/08 07/17/08 07/17/08 2009 2,707,000$

24 12 ODOT Let 22896 CUY CUY SR 176 12.76 KALLIO, ERIC M Preventive Maintenance $605,236.06 80475 04/28/08 04/28/08 07/23/08 07/23/08 08/01/08 08/01/08 2009 605,236$

24 12 ODOT Let 83504 D12 D12 GR FY2009 GRMOVSEK, JOHN A Guardrail Rebuilding $245,375.00 80502 05/09/08 05/09/08 08/06/08 08/06/08 08/18/08 08/18/08 2009 245,375$

24 12 ODOT Let 80977 LAK LAK SR 283 02.60 Sidewalk HAMILTON, KEITH D Add Sidewalks $188,782.56 80528 06/13/08 06/13/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 188,783$

24 12 ODOT Let 83503 D12 D12 PM FY2009 KONOPKA, FRANK L Pavement Marking $1,632,129.19 80534 06/13/08 06/13/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 1,632,129$

24 12 ODOT Let 84096 CUY CUY IR 480 17.10 Slope RepairWISE, JASON T Slide Repair $516,339.00 88031 07/29/08 07/29/08 09/10/08 09/10/08 09/19/08 09/19/08 2009 516,339$ Added

24 12 ODOT Let 81520 LAK LAK US 020 20.85/27.95 KALLIO, ERIC M Minor Rehabilitation - Pavement Gnrl Sys $2,703,893.50 80557 06/30/08 06/30/08 09/24/08 09/24/08 10/03/08 10/03/08 2009 2,703,894$

24 12 ODOT Let 84833 CUY CUY IR 077 15.90 Slide WISE, JASON T Slide Repair $91,902.43 88035 09/03/08 09/03/08 10/08/08 10/08/08 10/15/08 10/15/08 2009 91,902$ Added

24 12 ODOT Let 77507 CUY CUY SR 174 00.23 WELCH, KERI J Bridge Repair $163,877.00 80611 08/05/08 08/05/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 163,877$

24 12 ODOT Let 83509 D12 D12 CB FY2009 GRMOVSEK, JOHN A Catch basins $208,382.00 80615 08/08/08 08/08/08 11/05/08 11/05/08 11/13/08 11/13/08 2009 208,382$

24 12 ODOT Let 83502 GEA GEA/LAK MOW FY2009 KONOPKA, FRANK L Mowing $175,850.00 80631 08/21/08 08/21/08 11/19/08 11/19/08 11/26/08 11/26/08 2009 175,850$

24 12 ODOT Let 21272 CUY CUY SR 237 04.93 FRONT Pt 1SCHULZ, MATTHEW GRailroad Grade Separation $17,891,502.88 80598 09/17/07 09/17/07 09/17/07 01/25/08 12/10/08 12/10/08 02/01/08 12/22/08 12/22/08 2009 17,891,503$ Added

24 12 ODOT Let 22859 LAK LAK IR 090 01.88 BLAYNEY, BRIAN M Resurfacing, Divided System $7,904,828.16 80643 09/12/08 09/12/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 7,904,828$

24 12 ODOT Let 83501 CUY CUY MOW FY2009 KONOPKA, FRANK L Mowing $250,011.60 80652 08/21/08 08/21/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 250,012$

24 12 ODOT Let 83514 CUY CUY NW FY2009 Repair SARLI, KATHLEEN A Noise Wall Maintenance/Repair (NEW) $247,036.70 80628 08/25/08 08/25/08 12/10/08 12/10/08 12/22/08 12/22/08 2009 247,037$

24 12 ODOT Let 82069 CUY CUY IR 090 15.24 Steel Repair #2DAR, NAUREEN I Bridge Repair 08/13/08 08/13/08 11/05/08 11/13/08 2009 9,976,578$ Added

24 12 ODOT Let 83498 CUY CUY IR 071 10.48 KALLIO, ERIC M Mill and Fill 10/20/08 10/20/08 01/14/09 01/22/09 2009 3,000,000$

24 12 ODOT Let 83508 D12 D12 FEN FY2009 GRMOVSEK, JOHN A Fence Repair 10/17/08 10/17/08 01/14/09 01/22/09 2009 500,000$

24 12 ODOT Let 13486 LAK LAK SR 002 03.33 TRAC SARLI, KATHLEEN A Major Widening 06/30/08 07/07/08 07/07/08 11/05/08 01/21/09 11/13/08 01/29/09 2009 98,685,000$

24 12 ODOT Let 21755 GEA GEA SR 306 00.00 Verglimit HAMILTON, KEITH D Minor Rehabilitation - Pavement Gnrl Sys 10/31/08 10/31/08 01/28/09 02/05/09 2009 1,770,000$

24 12 ODOT Let 83515 D12 D12 CS FY2009 HAMILTON, KEITH D Pavement/Shoulder Sealing and/or Repair 10/30/08 10/30/08 01/28/09 02/05/09 2009 570,000$

24 12 ODOT Let 23960 CUY CUY IR 271 09.73 KALLIO, ERIC M Minor Rehabilitation - Pavement Prmy Sys 02/01/08 11/10/08 11/10/08 01/01/09 02/04/09 01/01/09 02/12/09 2009 11,090,000$

24 12 ODOT Let 75181 LAK LAK SR 306 SIGNAL UPGRADEPESTA, RICHARD T Signals 11/10/08 11/10/08 02/04/09 02/12/09 2009 589,050$

24 12 ODOT Let 83511 GEA GEA SR 168 03.06/VAR MORIARTY, MICHAEL KCulvert Construction/Reconstr/Repair 11/06/08 11/06/08 02/04/09 02/12/09 2009 250,000$

24 12 ODOT Let 83512 D12 D12 SLOPE FY2009 Repair WISE, JASON T Slide Repair 11/10/08 11/10/08 02/04/09 02/12/09 2009 150,000$

Page 24: NOTE: Current SFY 2009 Program as of 1/7/2009 · Current SFY 2009 Program as of 1/7/2009 NOTE: DO NOT use the Baseline File date on this worksheet as your guideline for the Plan File

Current SFY 2009 Program as of 1/7/2009 NOTE:

DO NOT use the Baseline File date on this worksheet as your guideline for the Plan

File OPI measure.

01/07/09 ← as of

1 Color Legend -> Awarded Filed Mismatch / Missing Dates Added Project(PID)

#

D

i

s

t

Letting

TypePID Cnty Project Name (ie CRS) Project Manager Work Category/Type

Award

AmountSPN

Res.

SFY

Baseline

File

Actual

File

Current

File

Baseline

Sale

Current

Sale

Actual

Sale

Baseline

Award

Actual

Award

Current

Award

CO

STIP

Current

ProgramComment

24 12 ODOT Let 24856 GEA GEA SR 087 07.72/VAR KALLIO, ERIC M Preventive Maintenance 12/01/08 12/01/08 02/25/09 03/05/09 2009 1,300,000$

24 12 ODOT Let 78918 CUY CUY US 422 14.68/VAR PaintPITCHER, SHELLEY KBridge Painting 11/25/08 11/25/08 02/25/09 03/05/09 2009 3,600,000$ Added

24 12 ODOT Let 81071 CUY CUY SR 237 02.42 GRMOVSEK, JOHN A Resurfacing, Undivided System 12/15/08 12/15/08 03/11/09 03/19/09 2009 800,000$

24 12 ODOT Let 81405 CUY CUY SR 087 12.06 HAMILTON, KEITH D Mill and Fill 12/11/08 12/11/08 03/11/09 03/19/09 2009 674,000$

24 12 ODOT Let 83513 CUY CUY IR 071 16.79/VAR MORIARTY, MICHAEL KDrainage System Maintenance/Repair (NEW) 12/12/08 12/12/08 03/11/09 03/19/09 2009 225,000$

24 12 ODOT Let 13185 CUY CUY SR 174 02.37 SARLI, KATHLEEN A Bridge Repair 01/11/06 01/11/06 03/25/09 04/02/09 2009 1,500,000$

24 12 ODOT Let 19541 CUY CUY SR 043 03.69 NOWAC, GARY J Resurfacing, Undivided System 12/23/08 12/23/08 03/25/09 04/02/09 2009 920,000$

24 12 ODOT Let 75051 LAK LAK EASTLAKE SIGNAL UPGRADEPESTA, RICHARD T Signals 12/29/08 12/29/08 03/25/09 04/02/09 2009 513,550$

24 12 ODOT Let 83505 D12 D12 SIGN FY2009 Replace KONOPKA, FRANK L Sign Maintenance/Repair (NEW) 12/22/08 12/22/08 03/25/09 04/02/09 2009 1,200,000$

24 12 ODOT Let 83621 GEA GEA US 322 10.40 HAMILTON, KEITH D Minor Rehabilitation - Pavement Gnrl Sys 12/15/08 12/15/08 03/25/09 04/02/09 2009 1,200,000$

24 12 ODOT Let 77331 D12 D12 ITS TRAC SAYLOR, GEORGE W Traffic Management System 10/29/07 12/15/08 12/15/08 03/05/08 04/22/09 03/13/08 04/30/09 2009 21,200,000$ Added

24 12 ODOT Let 82072 CUY CUY IR 090 15.24 CCG3A1 BearingsDAR, NAUREEN I Bridge Repair 02/20/09 04/08/09 04/16/09 2009 1,000,000$ Added

24 12 ODOT Let 83506 D12 D12 SIGN FY2009 Structure RepairKONOPKA, FRANK L Sign Maintenance/Repair (NEW) 01/12/09 04/08/09 04/16/09 2009 115,000$

24 12 ODOT Let 83562 D12 D12 BH FY2009 Misc CALANNI, JAMES R Bridge Maintenance 01/12/09 04/08/09 04/16/09 2009 500,000$

24 12 ODOT Let 83561 D12 D12 BH FY2009 Fence BENEDICTIS-CONLEY, NATALIE RBridge Repair 01/26/09 04/22/09 04/30/09 2009 370,000$

24 12 ODOT Let 84483 CUY CUY IR 480 10.36 Ramps WISE, JASON T Preventive Maintenance 01/26/09 04/22/09 04/30/09 2009 800,000$ Added

24 12 ODOT Let 85049 CUY CUY IR 490 01.87WN/VAR TRACBENEDICTIS-CONLEY, NATALIE RMinor Widening 03/09/09 03/09/09 04/01/09 04/22/09 04/01/09 04/30/09 2009 1,000,000$ Added

24 12 ODOT Let 82793 CUY CUY LAKEWOOD SIGNALS (PH 1)PESTA, RICHARD T Signals 02/09/09 05/06/09 05/14/09 2009 2,063,500$

24 12 ODOT Let 79159 LAK LAK US 020 14.34 GRMOVSEK, JOHN A Resurfacing, Undivided System 02/23/09 05/20/09 05/28/09 2009 520,000$

24 12 ODOT Let 83142 D12 D12 BH FY2009 SEALING THREAT, JOHN W Bridge Repair 03/16/09 06/10/09 06/18/09 2009 1,000,000$

24 12 ODOT Let 83507 D12 D12 TSG FY2009 HAMILTON, KEITH D Signal Maintenance/Repair (NEW) 03/16/09 06/10/09 06/18/09 2009 150,000$ 24 12 Totals 35,532,146$ 202,763,824$