PREFERRED ROUTE ALIGNMENT
CONSTRAINTS PLAN
SHEET 7 OF 9
FOR INFORMATION S2
1:2500 IM
23/02/17
CM
23/02/17
CM
23/02/17
RG
24/02/17
P01 IM CM CM 24/02/17
FIRST ISSUE
H_MLZZZ_ZZ - DR - RD - 0007
A9P11 - AMJ - HML -
P01
Reproduced by permission of Ordnance Survey on behalf of
HMSO. © Crown copyright and database right 2017. All rights
reserved. Ordnance Survey Licence number 100046668.
Date
Designed / DrawnScale
Drawing Number
Drawing Title
Drawing Status
DO
N
OT
S
CA
LE
Date Date Date
Checked Approved
Client
Original Size
Suitability
Millim
etre
s1
00
10
0
A1
Plo
tte
d: F
eb
2
7, 2
01
7 - 3
:3
4p
m b
y: M
AIR
49
44
Drawn / Des DateCheckedRev Approved
Description
Authorised
Location Type Role Number
Originator VolumeProject
Revision
GENERAL LEGEND
EARTHWORK IN CUT
EARTHWORK IN FILL
GRADING
BRIDGE ABUTMENTS
NOTE:
1. THIS DRAWING SHOWS THE OUTCOME OF THE STAGE 2
OPTIONS ASSESSMENT AND IS SUBJECT TO CHANGE
DURING FURTHER DESIGN DEVELOPMENT.
Crannaich
Tie-in to
existing A938
Black Mount
junction