8 7 6 5 4 3 2 1 1 VICTORIA ROAD RAVENSCRAIG ROAD ARMADALE STREET N Retail Refuse Room Transformer room Big Box Female WC's Disabled WC Male WC's ATM'S 323 m² Circulation 202 MASH TUN Big Box Retail Management Office IT server room Retail Security server room Retail Retail 2000 2680 2905 2320 2035 4315 4135 1485 4090 SCALE CHECKED DRAWN ISSUE DATE PROJECT NO. DRAWING NO. DRAWING PROJECT: REVISION NO. THIS DRAWING REMAINS THE COPYRIGHT OF OBJEK (PTY) LTD. ALL DIMENSIONS ARE IN "mm" UNLESS OTHERWISE INDICATED. DO NOT SCALE THIS DRAWING. ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK RC STRUCTURE TO STRUCTURAL ENGINEER'S DETAIL AND SPECIFICATION ALL PENETRATIONS THROUGH STRUCTURAL ELEMENTS TO BE VERIFIED WITH RELEVANT CONSULTANTS. ALL WORK TO BE CARRIED OUT STRICTLY IN ACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS. THE ARCHITECT ACCEPTS NO RESPONSIBILITY FOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS ANY DISCREPENCIES TO BE REPORTED TO THE ARCHITECT IMMEDIATELY NOTES : INFORMATION CLIENT: PROJ DESCRIP: ERF: OBJEK (PTY) LTD 2015 c STATUS A0 REVISIONS REV DATE 114 bree street | 8001 021 461 3759 [email protected] ARCHITECTS | INTERIORS | DESIGN LOCATION: 07/08/2018 3:00:09 PM 1 : 100 6 C:\Users\OBJEKU03\Documents\1512_Ironworks_Central_2019_OBJEKU03.rvt GROUND FLOOR PLAN 1512 THE IRON WORKS Author Checker 20_701 TENDORITE (PTY) LTD MIXED USE DEVELOPMENT CONSOLIDATED ERF 178263 (12054, 12055, 12056, 12057) 1 ARMADALE ROAD, WOODSTOCK 1 2015_06_15 Design Concept - Layouts 2 2016_10_10 General update 3 2016_10_26 General Update 4 2017_04_26 General revisions. Drainage channel along north facade 5 2017_05_17 Revised toilet block position 6 2017_05_22 Sleeves and penetrations in concrete slab shown. Ground floor bathroom position revised
Transcript
Page 1: NOTES : A0 · 2018-11-20 · MASH TUN Big Box Retail Management Office IT server room Retail Security server room Retail Retail 2000 2680 2905 2320 2035 4315 4135 1485 4090 ... OBJEK

8

7

6

5

4

3

2

1

1

VICTORIA ROAD

RA

VE

NS

CR

AIG

RO

AD

ARMADALE STREET N

Retail

Refuse Room

Transformer room

Big Box

Female WC's

Disabled WC

Male WC's

ATM'S

323 m²Circulation

202

MASH TUN

Big Box

Retail

Management Office

IT server room

RetailSecurity server room

Retail

Retail

2000

2680

2905

2320

2035

4315

4135

1485

4090

SCALE CHECKEDDRAWN

ISSUE DATE

PROJECT NO. DRAWING NO.

DRAWING

PROJECT:

REVISION NO.

THIS DRAWING REMAINS THE COPYRIGHT OF OBJEK (PTY) LTD.

ALL DIMENSIONS ARE IN "mm" UNLESS OTHERWISE INDICATED.

DO NOT SCALE THIS DRAWING.

ALL RELEVANT DETAILS, LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK

RC STRUCTURE TO STRUCTURAL ENGINEER'S DETAIL AND SPECIFICATION

ALL PENETRATIONS THROUGH STRUCTURAL ELEMENTS TO BE VERIFIED WITH RELEVANT CONSULTANTS.

ALL WORK TO BE CARRIED OUT STRICTLY IN ACCORDANCE WITH NATIONAL BUILDING REGULATIONS AND LOCAL AUTHORITY REGULATIONS.

THE ARCHITECT ACCEPTS NO RESPONSIBILITY FOR ERRORS RESULTING FROM MISINTERPRETATION OF THE DRAWINGS

ANY DISCREPENCIES TO BE REPORTED TO THE ARCHITECT IMMEDIATELY

NOTES :

INFORMATION

CLIENT:

PROJ DESCRIP:

ERF:

OBJEK (PTY) LTD 2015 c

STATUS

A0

REVISIONSREV DATE

114 bree street | 8001021 461 3759

[email protected]

ARCHITECTS | INTERIORS | DESIGN

LOCATION:

07/08/2018 3:00:09 PM

1 : 100

6

C:\

Users

\OB

JE

KU

03\D

ocu

men

ts\1

512_Ir

on

wo

rks_C

en

tral_

2019_O

BJE

KU

03.r

vt

GROUND FLOOR PLAN

1512

THE IRON WORKS

Author Checker

20_701

TENDORITE (PTY) LTD

MIXED USE DEVELOPMENT

CONSOLIDATED ERF 178263 (12054, 12055,12056, 12057)

1 ARMADALE ROAD, WOODSTOCK

1 2015_06_15 Design Concept - Layouts2 2016_10_10 General update3 2016_10_26 General Update4 2017_04_26 General revisions. Drainage channel along north

facade5 2017_05_17 Revised toilet block position6 2017_05_22 Sleeves and penetrations in concrete slab shown.

Ground floor bathroom position revised