NOTICE OF MEETING NORTHGATE CROSSING MUNICIPAL UTJLITY DISTRICT NO. l
Notice is hereby given pursuant to V.T.C.A., Government Code §551, that the lJoard ofDireetors ofNorthgate Crossing Municipal Utility District No. I will meet in regular session, open to the public via video/audio confercnc£, at 7:00 o'clock p.m. on THURSDAY, August 12, 2021. To participate using ZOOM, use the following link: http~://us(gweb.zoom.usf.i/84~707~4529?pytd=VWI WazMxdFh20GRLTWdBSk5.khEtTUT09. The meeting lD is 843 7075 4529 and the password is 648564. To participate by audio only, dial the following number: l-346-248-7799 the meeting ID is 843 7075 4529 and the password 648564. Electronic copies of the meeting materials are available at https://www.sldawdistrictdnta.org/Harrls-County-Northgate-Crossing-Municipal-utility-district-no-1/ at such time as the meeting occurs, or by contacting (llc>r> C't,@sklaw.us. At such meeting the following items will be considered:
I. Hear from Public. 2. Peace Ofl1cer Report. 3. Tax Assessor/Colleclor's Report, including: (a) approval of tax checks and report, (b) status of collections of delinquent taxes, (c) consider approving requests for Payout Agreements, as necessary, (d) authorize termination of service to delinquent tax accounts, (e) authorize placing delinquent uncollectable accounts to Uncollectable Tax Roll, 4. Financial Advisor's Report, discussion and taking action on 2021 tax rate, including calling public hearing. 5. Bookkeeper's Report, including: (a) authorizing payment of District bills and issuance of checks, (b) approve Investment Report, and (c) approve changes to budget for fiscal year ending December 31, 2021. (i. Attorney's Report, consider taking any action thereon, including: (a) approve minutes of meeting of July 8, 2021; (b) amend Rate Order, (c) discuss and take action on lnterlocal Agreement with Northgate Crossing MUD No. 2 regarding sharing of park facilities, (d) legislative update, (e) discuss and take action on bond election, including approval of Order Calling Bond Election, (t) approve Resolution Regarding Annual Review of Investment Policy, and (g) approve Resolution Regarding Cybersecurily. 7. Engineer's Report, including: (a) discussion of 5-year maintenance and repair program and take necessary action thereon, (b) discuss and take necessary action relating to levee and storm water pump station, (c) approve preparation of plans and specifications for District projects and authorize advertisement of bids relating thereto, (d) approve award of contract for construction projects, (e) approve pay estimates and change orders, (t) consider and approve requests for water and sanitary sewer service, (g) report on water study and take action related thereto including, authorizing water well 3, and (h) consider and take action on Emergency Action Plan. 8. Operator's Report, including: (a) report on status of operating District facilities, (b) approve termination list, (c) approve repairs to water and sanitary sewer systems as necessary, and (d) approve CPI rate increase. 9. In formation Technology Report and take action thereon. 10. Landscape Architect's Report, including: (a) report on status of walking trails, (b) discuss and take action on maintaining facility sites, (c) receive bids and award contract for landscaping, and (d) discuss and take action on Master Plan.
Pursuant to the March 16, 2020, Declaration by the Governor of the State of Texas, certain requirements of Chapter 551 V.T.C.A. Government Code, have been suspended in response to the Coronavirus (COVrD-19) disaster. This action allows governmental bodies to conduct meetings by telephone or videoconference to advance the public health goal of limiting face to face meetings (also called social distancing) to slow the spread of the Coronavirus.
Pursuant to V .T.C.A. Government Code §55 I, the Board of Directors may convene in closed session in relation to any agenda item included in this Notice with such closed session to be held at the date, hour, and place given in this Notice concerning any and all subjects for any and all purposes permitted by V.T.C.A Government Code Chapter 551, including but not limited to, private consultation with the District's Attorney's on any or all matters or subjects authorized by law, pending or contemplated litigation, perso11nel matters, real estate transactions, security devices, economic development negotiations and/or gifts and donations.
5005.1/Agenda 3.10.11
Page 1
NORTHGATE CROSSING MUD #1 TAX ASSESSOR/COLLECTOR'S REPORT
7/31/2021
Taxes Receivable: 8/31/2020
Reserve for Uncollectables
Adjustments
Original 2020 Tax Levy
Adjustments
Total Taxes Receivable
$
Prior Years Taxes Collected $
2020 Taxes Collected ( 99.6%)
Taxes Receivable at: 7/31/2021
2020 Receivables:
Debt Service
Maintenance
$ 18,090.94
1,293.76)
14.68
2,131,808.42
145,768.20
4,612.32
2,270,568.40
3,009.67
3,998.55
$ 16,811.86
2,277,576.62
$ 2,294,388.48
2,275,180.72
$ 19,207.76
bob teared interests
11111 Katy Freeway, Suite 725 Houston, Texas 77079-2197
Phone: (713) 932-9011 Fax: (713) 932-1150
Page 2
NORTHGATE CROSSING MUD #1
Beginning Cash Balance
Receipts:
Current & Prior Years Taxes Penalty & Interest Additional Collection Penalty Funds Pending Certification Refund - due to adjustments Notice to Purchaser Rendition Penalty
TOTAL RECEIPTS
Disbursements:
Atty's Fees, Delq. collection CAD Quarterly Assessment Refund - due to adjustments Tax A/C Bond Premium Transfer to Debt Service Fund Transfer to General Fund Tax Assessor/Collector Fee Bank Charge Postage Supplies Records Maintenance Copies Envelopes - Original stmts Notice to Purchaser Duplicate Statements Envelopes - Feb Delinq Stmts Envelopes - May Del Stmts Tax Lien Transfers Exemption Assistance Positive Pay SB 2 Compliance
TOTAL DISBURSEMENTS
CASH BALANCE AT: 7/31/2021
- 2 -
$
$
($
Month of 7/2021
273,739.21
12,379.89
3 .37
12,383.26
10.92
51,116.63 523.00
140.50
94.94
25.00
51,910.99)
$ 234,211.48 ==:::::::::==
Fiscal to Date 1/01/2021 - 7/31/2021
1,011,963.12
1,224,307.99 1,555.43
404. 3 6 88,611.10-5,373.19
10.00 50.66
1,143,090.53
404. 3 6 7,792.00 5,516.52
100.00 690,000.00
1,211,192.96 3,661.00
307.83 723.78 109.07
60.00 337.05
62.10 10.00 90.80
9 .30 5.40
25.00 150.00 175.00 110. 00
1,920,842.17)
234,211.48
Page 3
NORTHGATE CROSSING MUD #1
Disbursements for month of August, 2021
Check# Payee Description Amount
W/T to General Fund 08/05/21 Transfer to General Fund $ 7,065.29 1270 Element Fleet Corporation Refund - due to adjustments 3.37 1271 Bob Leared Tax Assessor/Collector Fee 667.96
TOTAL DISBURSEMENTS $ 7,736.62
Remaining Cash Balance $ 226,474.86
Wells Fargo Bank, N.A.
- 3 - Page 4
NORTHGATE CROSSING MUD #1
HISTORICAL COLLECTIONS DATA
Collections Adjustments To Total Tax Total Taxes Month Of Collections Collections Receivable Collection
Year 7/2021 7/2021 at 7/31/2021 at 7/31/2021 Percentage
2020 12,383.26 2,270,568.40 7,008.22 99.692 2019 3.37- 2,009,974.31 4,304.15 99.786 2018 1,924,160.28 1,597.91 99. 917 2017 1,823,202.88 1,663.45 99.909 2016 1,543,268.55 1,870.09 99.879 2015 1,191,974.04 1,774.14 99.851 2014 1,052,421.15 176.20 99.983 2013 883,688.01 170.56 99.981 2012 879,106.01 181. 52 99.979 2011 860,822.01 181. 52 99.979 2010 845,352.06 143.96 99.983 2009 854,994.36 35.14 99.996 2008 897,714.25 33.49 99. 996 2007 914,159.35 35.21 99. 996 2006 822,689.89 32.20 99.996 2005 686,610.97 100.000 2004 570,211.59 100.000 2003 417,480.52 100.000 2002 154,595.84 100.000 2001 70,377.59 100.000 2000 21,390.60 100.000 1999 21,242.51 100.000 1998 20,043.54 100.000 1997 20,847.69 100.000 1996 39,278.25 100.000 1995 39,279.69 100.000 1994 39,680.10 100.000 1993 42,840.09 100.000 1992 41,080.53 100.000 1991 160,574.60 100.000 1990 161,783.90 100.000 1989 189,015.38 100.000 1988 181,642.32 100.000
(Percentage of collections same period last year 99.449
- 4 - Page 5
NORTHGATE CROSSING MUD #1
HISTORICAL TAX DATA
Taxable Tax Reserve for Adjusted Year Value SR/CR Rate Adjustments Uncollectibles Levy
2020 232,881,044 10 / 10 .978000 145,768.20 2,277,576.62 2019 205,958,942 23 I 23 .978000 25,865.20 2,014,278.46 2018 198,531,767 30 I 30 .970000 1,851.69 1,925,758.19 2017 182,486,633 35 / 35 1.000000 23,604.09- 1,824,866.33 2016 140,467,129 46 / 46 1.100000 166,354.70 1,545,138.64 2015 105,641,438 30 / 30 1.130000 231,745.91 1,193,748.18 2014 84,563,140 51 / 51 1. 245000 122,887.04 213. 92 1,052,597.35 2013 71,009,826 52 / 52 1. 245000 61,027.65 213. 92 883,858.57 2012 66,407,050 22 /22 1.325000 50,535.41 606.18 879,287.53 2011 64,998,562 33 I 33 1.325000 41,882.02 2~7.67 861,003.53 2010 63,811,502 01 I 18 1.325000 43,855.71 6.63 845,496.02 2009 66,179,270 01 / 24 1.292000 73,908.79 6.46 855,029.50 2008 72,869,636 02 / 37 1. 232000 87,192.44 6.16 897,747.74 2007 70,594,664 01 / 46 1. 295000 112,430.42 6.48 914,194.56 2006 64,883,943 01 / 59 1. 268000 106,851.28 6.34 822,722.09 2005 55,105,208 01 / 20 1. 246000 74,557.43 686,610.97 2004 45,873,800 01 / 18 1.243000 23,848.89 570,211.59 2003 35,349,740 04 / 17 1.181000 90,073.75 417,480.52 2002 14,354,300 01 / 13 1. 077000 45,175.74 154,595.84 2001 7,285,460 10 / 15 . 966000 2,064.55 70,377.59 2000 2,297,590 07 / 04 .931000 13,156.16 21,390.60 1999 2,308,970 06 I 01 . 920000 4,713.32 21,242.51 1998 2 ,-227, 060 05 / 05 .900000 173.97- 20,043.54 1997 2,316,410 02 I 02 .900000 77.85- 20,847.69 1996 4,364,250 oo I oo .900000 26,933.67 39,278.25 1995 4,364,410 oo I oo .900000 25,532.28 39,279.69 1994 4,408,900 oo I oo .900000 5,422.86 39,680.10 1993 4,760,010 oo I oo .900000 6,615.63 42,840.09 1992 5,405,330 oo I oo .760000 22,956.71- 41,080.53 1991 21,128,240 oo I oo .760000 4,811.08 160,574.60 1990 21,287,360 oo I oo .760000 211. 58- 161,783.90 1989 21,725,900 03 / 03 .870000 8,458.76 189,015.38 1988 18,726,010 02 I 02 .970000 3,334.47 181,642.32
- 5 - Page 6
NORTHGATE CROSSING MUD #1
TAX RATE COMPONENTS
Debt Service Debt Service Maintenance Maintenance Year Rate Levy Rate Levy
2020 .420000 978,100.50 .558000 1,299,476.12 2019 .460000 947,411.04 .518000 1,066,867.42 2018 .470000 933,099.36 .500000 992,658.83 2017 .512000 934,331.56 .488000 890,534.77 2016 .700000 983,269.99 .400000 561,868.65 2015 .650000 686,669.26 .480000 507,078.92 2014 .760000 642,549.42 .485000 410,047.93 2013 .700000 496,948.60 .545000 386,909.97 2012 .790000 524,254.44 .535000 355,033.09 2011 .815000 529,598.36 .510000 331,405.17 2010 .825000 526,440.91 .500000 319,055.11 2009 .789000 522,150.36 .503000 332,879.14 2008 . 715000 521,014.27 .517000 376,733.47 2007 .725000 511,807.80 .570000 402,386.76 2006 . 772000 500,900.19 .496000 321,821.90 2005 . 896000 493,742.70 .350000 192,868.27 2004 1. 031000 472,959.10 .212000 97,252.49 2003 .931000 329,106.16 .250000 88,374.36 2002 1. 077000 154,595.84 2001 .966000 70,377.59 2000 .931000 21,390.60 1999 . 920000 21,242.51 1998 .900000 20,043.54 1997 .900000 20,847.69 1996 .900000 39,278.25 1995 .900000 39,279.69 1994 .900000 39,680.10 1993 .900000 42,840.09 1992 .760000 41,080.53 1991 .760000 160,574.60 1990 .760000 161,783.90 1989 .870000 189,015.38 1988 .970000 181,642.32
- 6 - Page 7
NORTHGATE CROSSING MUD #1
Notes:
$ 3.37 - REPORTED AS TAXES COLLECTED ON 01/20 REPORT. TRANSFERRED TO OVERPAYMENTS ON 07/21 REPORT DUE TO CAD C/R #23. 2019 TAXES ACCOUNT #9900-021-0477.
- 7 - Page 8
NORTHGATE CROSSING MUD #1
Tax Exemptions: 2020 2019 2018
Homestead .200 .200 .200
Over 65 15,000 15,000 10,000
Disabled 15,000 15,000 10,000
Last Bond Premiwn Paid:
Payee Date of Check Amount McDonald & Wessendorff Ins. 3/04/2021 100.00 03/31/2021-03/31/2022
Adjustment Swnmary: 2020
10/2020 I CORR 001 13,016.33
11/2020 I CORR 003 23,715.46
12/2020 I CORR 004 3,737.86
1/2021 I CORR 005 8,043.31
2/2021 I CORR 006 1,879.21-
3/2021 I CORR 007 595.02-
4/2021 I CORR 008 379.64-
5/2021 I CORR 009 859.27-
6/2021 I CORR 010 100,968.38
TOTAL 145,768.20
- 8 - Page 9
Account no.
*Total Count 0
(I) - BLI Contract
Account no.
*Total Count 0
Tax Year
NORTHGATE CROSSING MUD #1 Homestead Payment Plans
Last Payment
Amount
Last Payment
Date Balance
~
(A) - Delinquent Attorney Contract
Tax Year
Last Payment
Amount
Standard Payment Plans
Last Payment
Date
- 9 -
Balance Due
Page 10
NORTHGATE CROSSING MUD #1
Top Delinquent Taxpayers
8/03/21 (Maximum of 4 O)
Taxpayer
S VISTA PARTNERS S ALEJANDRO FEDERICO S KWONG THOMAS
GONZALEZ RAMOGNINO LAURA PARK AT NORTHGATE LTD BALJIT SINGH SPRING HARDY 125 LC MMJ PROPERTY INVESTMENTS HUSSAIN NASIR BB PLASTICS GREGORY SHAW ERIKS ROOFING HUGO ZAMORE Report Totals
Total delinquent
2020
1,670.64 1,611.28 1,269.61 1,101.58
537.48 159.36 48.81 17.20
6,415.96
6,415.96
Page 1
Code B
Prior Years
7,370.98 1,581.91 1,174.56
1,052.93
669.51 17.20
143.06 79.83 56.25 37 .16 16.15
12,199.54
12,199.54
C D s p
Q L H
*
Description Bankrupt Payment Contract Deferred Over 65 Suit Pending Partial Payment Quarter Payments CAD Law Suit Homestead Contract Over 65/Disabled
This Month Totals
9,041.62 ,,3, 193. 19 2,444.17 1,101.58 1,590.41
159.36 718.32
34.40 143.06
79.83 56.25 37.16 16.15
18,615.50
18,615.50
Page 11
Mel Myrtle Cruz, Inc.
3401 Louisiana St Ste 400 Houston, Texas 77002
713-759-1368 fax-1264 [email protected]
NORTHGATE MUD# 1
Summary for Cash Report of August 12, 2021
PREVIOUS CASH BALANCE
CASH RECEIPTS
INTEREST
TRANSFERS
DISBURSEMENTS
ENDING CASH BALANCE
PREVIOUS INVESTMENTS
DEPOSITS
INTEREST/SC
TRANSFERS
ENDING INVESTMENTS
CURRENT BALANCE
Debt Service
Fund
1,284, 114.68 0.00
20.36 0.00
1,284,135.04
1,284,135.04
Capital Projects
Fund
2,081.78 0.00 0.00 0.00 0.00
2,081.78
7,048,661.99 0.00
1,338.60 0.00
7,050,000.59
7,052,082.37
LESS SKANSKA WATER IMPROVEMENT
LESS 2021 ANNUAL BUDGET
General Operating
Fund
22,090.29 142,913.24
0.00 0.00
{125,179.48} 39,824.05
5, 186,268.50 0.00
.74.36 0.00
5, 186,342.86
5,226,166.91
($72,000.00)
($2,115,683.00) including Capital Projects/Park Improvements
AVAILABLE FUNDS $3,038,483.91
-1- Page 12
Myrtle Cruz, Inc. 3401 Louisiana St, STE 400 .Houston, Tx 77002-9552. (713)759-1368. fax 759-1264. email [email protected]
NORTHGATE CROSSING MUD #1
cash Report for Meeting of August 12th, 2021
DEBT SERVICE FUND (135BF) : NO CHECKING ACCOUNT
Previous cash balance, July 8th, 2021
. DEMAND DEPOSIT INVESTMENTS: TexPool XXXXX-XXXXX-XX0003 ................................. .
previous balance 1,269,644.48 07/31 interest · 20.36
BBVA Bank; XXXXXX3597 ...................................... . balance last report 14,470.20
previous investments interest
ending investments
DEBT SERVICE FUNDS AVAILABLE August 12th, 2021
Debt service Requirements 2021: TOTAL $979,822.50
Int. 6/1/2021 2012 R $ 38,331.25 2014 $ 69,048.75 2017 $110,031.25
$217,411.25
Principal 12/1/21 $435,000.00 $ 0 $110,000.00
$545,000.00
-2-
1,284,114.68 20.36
Int. 12/1/21 $ 38,331.25 $ 69,048.75 $110,031.25
$217,411.25
0.00
1,269,664.84
14,470.20
1,284,135.04
$1,284,135.04
Page 13
NORTHGATE CROSSING MUD #1
cash Report for Meeti~g of August 12th, 2021
CAPITAL PROJECTS (135CA) : BBVA BANK x8208
Previous cash balance, July 8th, 2021
previous cash balance ending cash balance
TIME DEPOSIT INVESTMENTS:
2,081.78
Texan Bank; 11/26/20 due 11/26/21@ .50% ................... . Third coast Bank; 05/27/21 due 05/27/22@ .50% ............. . Texas citizens Bank; 6/29/21 due 6/29/22@ .25% ............ .
previous balance 247,182.84 interest earned 1,238.32
DEMAND DEPOSIT INVESTMENTS: BBVA Bank X3031 Escrow Account ............................ .
previous balance 59,250.19 TexPool XXXXX-XXXXX-X0002 ................................. .
previous balance 6,250,983.98 07/31 interest 100.28
previous investments interest
ending investments
CAPITAL PROJECTS FUNDS AVAILABLE August 12th, 2021
-3-
7, 048, 661. 99 1,338.60
2,081.78
2,081.78
245,348.33 245,896.65 248,421.16
59,250.19
6,251,084.26
7,050,000.59
$7,052,082.37
Page 14
NORTHGATE CROSSING MUD 1 $6,650,000.00 SERIES 2017 BONDS
CONSTRUCTION COSTS APPROVED DISBURSED BALANCE
PURCHASE OF WATER CAPACITY 122,296.00 122,296.00 0.00 LEASE OF WASTEWATER CAPACITY 268,000.00 268,000.00 0.00 WATER WELL 2 REHABILITATION 54,124.00 41,340.64 12,783.36 WATER PLANT 1 IMPROVEMENTS 133,479.00 123,306.04 10,172.96 WATER PLANT 3 IMPROVEMENTS 1,868,750.00 0.00 1,868,750.00 WASTEWATER TREATMENT PLANT EXPAN 2,457,000.00 0.00 2,457,000.00 CONTINGENCIES 439,249.00 0.00 439,249.00 ENGINEERING 742,890.00 21,715.71 721,174.29
TOT AL CONSTRUCTION COSTS 6,085,788.00 576,658.39 5,509,129.61
NON CONSTRUCTION COST
BOND COUNSEL ( 2.00% ) 133,000.00 133,000.00 0.00 FINANCIAL ADVISOR 89,000.00 89,000.00 0.00 BOND DISCOUNT (3.00%) 199,500.00 199,500.00 0.00 DEVELOPER INTEREST (5.00%) 40,352.00 28,093.00 12,259.00 ATIORNEY GENERAL (0.25%) 6,650.00 6,650.00 0.00 TCEQ FEE (0.25%) 16,625.00 16,625.00 0.00 BOND APPLICATION REPORT 47,613.00 48,379.30 -766.30 COST OF ISSUANCE 31,472.00 38,959.94 -7,487.94
TOTAL NON CONSTRUCTION COST 564,212.00 560,207.24 4,004.76
TOTAL BOND ISSUE REQUIREMENT 6,650,000.00 1,136,865.63 5,513,134.37
SERIES 2014 CONSTRUCTION COST STRM WTR PUMP STATION REHAB 407,138.00 ADDITIONAL WW PLANT CAPACITY 600,000.00 ENGINEERING,PERMITS &SURVEYING 75,013.29
1,082,151.29
SERIES 2014 SURPLUS 43,904.00
SURPLUS FUNDS PRIOR ISSUE DESIGNATED FOR BOOSTER PUMPS 111,402.40
INTEREST/SERVICE CHARGE 301,490.31
BALANCE IN CAPITAL PROJECTS FUND 08/12/21 7,052,082.37
-4- Page 15
NORTHGATE CROSSING MUD #1
cash Report for Meeting of August 12th, 2021
GENERAL OPERATING (1350P) : BBVA BANK xxxxxx3937
Previous cash balance, July 8th, 2021
water & sewer revenue ................................ . customer meter deposits .............................. . reconnection fees .................................... . inspection fees ...................................... . reg wtr auth revenue ................................. . penalties & interest-svc accts ....................... . Texas Mutual Funds - ck #262780 - Dividends .......... .
plus: 1150: plus: 2161: plus: 4120: plus: 4202: plus: 4300: plus: 4330: plus: 07/08
Total Deposits :
less: Return item/fee ............................................ .
less checks completed at or after last meeting : 7344 Jason Williams; 07/08 Meeting Expense ...................... . 7345 Jason Williams; 6/20,6/29,6/30 Dir Fees .................... .
6310 Montly calls/text 150.00 6310 district tour 150.00 6310 siren Intall 150.00 6514 payroll taxes 34.43-6514 Add'l payroll tax 120.00-
7346 Jason Williams; Inv #21v03717 License & support ............ .
Beginning cash balance, August 12th, 2021
less checks to be presented at this meeting : 7347 Jason Williams; 7/8,7/ll,7/18,7/24,7/31,8/6 Dir Fee ........ .
6310 Board Meeting 150.00 6310 storm station 150.00 6310 Inspect Facility 150.00 6310 Tour District 150.00 6310 Monthly call/text 150.00 6310 Meeting attorney 150.00 6514 payroll taxes 68.85-6514 additional taxes 240.00-
7348 Shane Holman; 7/8,7/10,7/17,7/25,7/31,8/8 Dir Fees ......... . 6310· Board Meeting 150.00 6310 Bridge Lighting 150.00 6310 Levee/Dist 150.00 6310 Dist walk Thru 150.00 6310 Levee Inspection 150.00 6310 Levee/Landscape 150.00 6514 payroll taxes 68.85-
7349 Jim Helfrich; 7/8,7/24,8/6,8/7 Dir Fees .................... . 6310 Board Meeting 150.00 6310 District Inspect 150.00 6310 Meeting Attorney 150.00 6310 District Inspect 150.00 6514 payroll taxes 45.90-
7350 Michael Lopez; 7/8 Dir Fee ................................. . 6310 Board Meeting 150.00 6514 payroll taxes 11.48-
7351 Kenny Boeckelman; 7/8 Dir Fee .............................. . 6310 Board Meeting 150.00 6514 payroll taxes 11.48-
7352 Sanford Kuhl Hagan Kugle Parker Kahn, LLP;0718/19 Legal ..... 6320 Legal Fees 6,987.48 6325 election expenses 150.00
7353 Myrtle cruz,Inc; July Bookkeeping & Expenses ............... . 6333 Bookkeeping 1,450.00 6340 office expenses 163.54 6333 Attend mtg 65.00
7354 Inframark, LLC; Inv #66304 July operations ................. . 6332 Lift station 206.54
-5-
22,090.29
103,491.67 500.00 326.09 240.00
35,171.28 3,156.69
27.51
142,913.24
13,998.94
236.82 295.57
1,592.74
148,879.46
591.15
831.15
554.10
138.52
138.52
7,137.48
1,678.54
4,771.17
Page 16
NORTHGATE CROSSING MUD #1
cash Report for Meeting of August 12th, 2021
6332 1297 * 2.58 3,346.26 6332 217 * 2.07 449.19 6340 AVR 271. 21 6332 BB&T ureceivables 12.60 6332 Delinquent Letters 232.35 6332 service Transfers 61.96 6332 confidential Letters 61.96 6332 Return check/pymt 129.10
7355 Inframark, LLC; #1133711 July R&M .......................... . 6332 Admin serv 36.88 6335 R&M-L/S#2 1,958.85 6275 Grease Trap Insp 123.92 6335 R&M-water 7,549.57 6324 laboratory expenses 248.40
7356 Murr Inc.; Master Plan-Landscape design #LD001524 .......... . 7395 Master Plan Dev. 1,968.75 7395 Expenses 242.30 7395 splash Pad Permit 575.00 7395 Bridge Lighting 26,250.00
7357 Park Rangers, LLC; Inv #PR0002051507a ...................... . 6335 Park consultation/Ma 625.00 6335 Expenses 289.50 6335 Esplanade Maint 3,174.00 ~ 6335 Fountain @ Lake 520.00
7358 Northgate Joint Facilities; July Billing ................... . 7359 Apollo IT consulting, LLC; NGl 2021-06-08 website .......... .
7395 Jun-Aug virt Mt9 3,937.60 7395 May-Aug IT Webs1t 950.00
7360 DSHS Central Lab MC2004; Acct# CEN.CD1939_072020 Lab ....... . 7361 Harris county Treasurer; sept V00003857 Inv #PS022021201 ... . 7362 Harris county Treasurer; July-sept P2021070/80/90 .......... .
6400 July 295.00 6400 August 8,853.00 6400 September 8,853.00
7363 Badger Meter; #80076350/78317 orion cellular Meters ........ . 7395 orion 429* .89 381.81 7395 orion 435* .89 387.15
7364 Tamara Wiltz; 719 slate valley Ln., dep refund ............. . 2161 customer meter depos 150.00 1150 less final bill 68.19-
7365 Stephen Glass; 24206 Kingbriar Dr., dep refund ............. . 2161 customer meter depos 100.00 1150 less final bill 42.66-
7366 Heidi Cristo; 907 Saginaw Bay ct., dep refund .............. . 2161 customer meter depos 250.00 1150 less final bill 134.62-
7367 AT & T; 6/23-8/22@ 281-288-5432 .......................... . 7368 Direct Energy; 06/25-07/26@ 23738 Northgate crossing Blvd .. 7369 Blue Guardian; #14 Bike patrol ........ , .................... . 7370 Texas Pride; July Garbage ................................. .. 7371 A T & T; @ 281-288-5432 .................................. .
07/01-07/29 previous cash balance
94 receipts 25 current checks
other disbursements ending cash balance
TIME DEPOSIT INVESTMENTS:
< <
22,090.29 142,913.24 109,055.41 >
16,124.07 >
Bancorpsouth; 11/27/20 due 11/27/21@ .70% ................. . spirit of Texas Bank; 05/4/21 due 05/4/22@ .25% ........... .
-6-
9,917.62
29,036.05
4,608.50
11,470.53 4,887.60
106.96 13,199.00 18,001.00
768.96
81.81
57.34
115.38
894.37 69.66
39,824.05
246,686.83 246,454.85
Page 17
NORTHGATE CROSSING MUD #1
cash Report for Meeting of August 12th, 2021
DEMAND DEPOSIT INVESTMENTS: TexPool XXXXX-XXXXX-XOOOl. ................................ .
previous balance 4,635,984.14 07/31 interest 74.36 8/11 Tsfr fm BBVA 55,000.00
BBVA Bank; XXXXXX8399 ...................................... . previous balance 57,142.68 8/11 Trf Txpool 55,000.00-
previous investments interest
transfers withdrawals
ending investments <
GENERAL OPERATING FUNDS AVAILABLE August 12th, 2021
LESS SKANSKA WATER IMPROVEMENTS
LESS 2021 ANNUAL BUDGET (Including Capital Projects/District Projects)
AVAILABEL FUNDS
-7-
5,186,268.50 74.36
55,000.00 55,000.00 >
4,691,058.50
2,142.68
5,186,342.86
$5,226,166.91
($72,000.00)
($2,115,683.00)
$3,038,483.91
Page 18
Revenue: Water Revenue Sewer Revenue Water Taps Swr/Grease Trap Inspections Interest Earned NHCRWA Revenue Maintenance Tax SPA Revenue *Due from Construction (Surplus)
Expenses: Purchase Water/Sewer Service Sewer Plant Water Plant -Reg Water Authority Joint Facilites Billing Directors Fees Payroll Taxes Legal Fees Auditing Fees Engineering Fees Election Expense Lab Fees Operator Fees Bookkeeping Fees Repairs & Maintenance Sewer Line Televise/Cleaning Valve Survey & Repairs Office Expense Park Rangers - Esplanades TCEQ Permit Fees Legal Publications Utilities: 23738 Ng Cross Blvd Insurance & Bonds Travel Expense Security Security-Blue Guardian/Brent *Miscellaneous Exp/Sales Tax Coor Capital Plan (lights) Master Plan Dev. (design) Park Monitoring - Park Rangers Trash Exp Taps/Inspections Texas Network (website )/Apollo Nixie (Communications) Smart Meter Monthly Cost Water Smart Storm Sewer Replacement
DISTRICT PROJECTS
Fountain Maintenace
Park Improvements/Splash pad Northwood Pine Park/Play Area Bike Trail
Net Surplus or (Deficit)
Previous Cash Balance Customer Deposits /Bldr deposits Northgate MUD 2-Sec Share Eng-Park Parking Due From Joint Facilities/Insurance North gate MUD 2 - WWTP Rehab Funds Available as of
08/12/21
Actual MTD 31,455.20 61,765.78
0.00 240.00 74.36
35,171.28 0.00 0.00 0.00
128,706.62
Actual MTD 0.00 0.00 0.00 0.00
11,470.53 3,150.00 -600.99 6,987.48
0.00 0.00
150.00 355.36
4,536.84 1,515.00
10,277.38 0.00 0.00
434.75 3,174.00
0.00 0.00
964.03 -27.51 0.00
31,200.00 o.oo
1,829.56 26,250.00 2,211.05 914.50
0.00 123.92
4,887.60 0.00 0.00 0.00 0.00
109,803.50
520.00
575.00 0.00 0.00
1,095
17,808.12
5,208,358.79 0.00 0.00 0.00 0.00 0.00
5,226,166.91
NORTHGATE CROSSING MUD#l Budget for Fiscal Year Ending December 31st, 2020
08/12/21
7 months Budget MTD Actual YTD BudgetYTD
36,000.00 214,258.20 252,000.00 45,500.00 334,916.45 318,500.00
0.00 0.00 0.00 416.67 1,680.00 2,916.67
1,333.33 1,390.92 9,333.33 31000.00 199,066.63 217,000.00 289 610.68 1,211,192.96 1,211,192.96
500.00 123.99 3,500.00 0.00 0.00 o.oo
404,360.68 1,962,629.15 2,014,442.96
Budget MTD Actual YTD BudgetYTD 41250.00 241405.34 288 750.00 9,166.67 55,737.23 64,166.67 7,916.67 39,637.73 55,416.67 24166.67 146 030.38 169 166.67 22,602.75 _ 106,366.23 158,219.25 2,916.67 19,500.00 20,416.67 416.67 907.28 2,916.67
6,250.00 45,389.54 43 750.00 0.00 10,980.91 10 950.00
3,750.00 18,129.67 26 250.00 0.00 150.00 0.00
250.00 1,386.73 1,750.00 5,000.00 32,108.79 35,000.00 1,833.33 10,800.00 12,833.33 8,333.33 41,001.62 58,333.33
0.00 0.00 0.00 1,250.00 0.00 8,750.00 666.67 3,136.23 4,666.67
5 175.00 22,218.00 36 225.00 0.00 0.00 0.00 o.oo 0.00 0.00
416.67 4,143.62 2 916.67 5 000.00 4,885.59 5 000.00
916.67 o.oo 6,416.67 13,200.00 110,394.00 92,400.00 1,925.00 13,440.00 13,475.00 458.33 10,468.51 3,208.33
35 ODO.OD 26,405.00 35 000.00 2,083.33 23,833.58 14,583.33 833.33 6,439.64 5,833.33 166.67 34,058.45 1,166.67
5,750.00 743.52 40,250.00 833.33 10,190.85 5 833.33
0.00 0.00 0.00 391.67 1,154.33 2,741.67
0.00 0.00 0.00 0.00 0.00 0.00
166,669.42 799,637.43 937,635.92
1,083.33 3,640.00 7,583.33
23,058.33 3,250.00 161,408.33 12,500.00 0.00 87,500.00 5,833.33 4,542.50 40,833.33
42,475 11,433 297,325
1,151,559.22
4,154,375.13 410.00
-15,493.35 -26,310.00
0.00 -38,374.09
5,226,166.91
-8-
'21 Budget variance %Remain I 432,000 -37,742 77% 546,000 +16,416 -61%
0 $0.00 0% 5,000 0.00 286% 16,000 -7,942 2316%
372,000 -17,933 287% 1,266,446 0.00 -95%
6,000 -3,376 -2% 0 0.00 0%
2,643,446 150,577) -74%1
Annual Budget variance %Remain I 495,000 -47 345 -27% 110,000 -8,429 36% 95,000 -15,779 264% 290 000 -23 136 43% 271,233 -51,853 -26% 35,000 -917 -41% 5,000 -2,009 1482%
75,000 +1,640 -46% 10,950 0.00 311% 45,000 -8,120 -40%
0 150.00 0% 3,000 -363 1954% 60,000 -2,891 -17% 22,000 -2,033 405% 100,000 -17,332 -41%
0 0.00 0% 15,000 -8,750 53% 8,000 -1,530 737% 62,100 -14,007 -28% 5,000 0.00 0%
0 0.00 0% 5,000 +1,227 117%
10,000 -114 61% 11,000 -6,417 1440%
158,400 +17,994 -66% 23,100 -35 202% 5,500 +7,260 901%
60,000 -8,595 -2% 25,000 +9,250 -55% 10,000 +606 -44% 2,000 +32,892 1747%
69,000 0.00 13% 10,000 +4,358 -102%
0 0.00 0% 4,700 -1,587 -25%
0 0.00 0% 0 0.00 0%
1,605,983 -98 523 9231%1
13,000 -3,943 2100%
276,700 -158,158 53% 150,000 -87,500 340%
70,000 -36,291 722%
509,700
527,763
Page 19
Jason date ck# Amount Shane date ck# amount Jim date ck# Amount 1/14/2021 7163 $600.00 1/14/2021 7164 $600.00 1/14/2021 7165 $600.00
2/11/2021 7188 $750.00 2/11/2021 7189 $900.00 2/11/2021 7190 $600.00
3/11/2021 7221 $750.00 3/11/2021 7222 $900.00 3/11/2021 7223 $750.00
4/8/2021 7246 $750.00 4/8/2021 7247 $750.00 4/8/2021 7248 $900.00
5/13/2021 7270 $750.00 5/13/2021 7271 $450.00 5/13/2021 7272 $600.00
6/10/2021 7297 $750.00 6/10/2021 7298 $600.00 6/10/2021 7299 $750.00
7/8/2021 7319 $150.00 7/8/2021 7320 $750.00 7/8/2021 7321 $600.00
7/8/2021 7345 $450.00 8/12/2021 7348 $900.00 8/12/2021 7349 $600.00 8/12/2021 7347 $900.00
TOTAL $1,350.001 I TOTAL $1,350.001 !TOTAL $1,800.00
I (0
I Michael date ck# amount Kenny date ck# amount
1/14/2021 7166 $600.00 1/14/2021 7167 $150.00 2/11/2021 7191 $750.00 5/13/2021 7274 $150.00 3/11/2021 7224 $750.00 6/10/2021 7301 $150.00 4/8/2021 7249 $150.00 8/12/2021 7351 $150.00
5/13/2021 7273 $1,050.00 6/10/2021 7300 $750.00 7/8/2021 7322 $150.00
8/12/2021 7350 $150.00
TOTAL $2,850.00 TOTAL $6,600.00
Page 20
...... 0 I
INVESTMENT REPORT, AUTHORIZATION AND REVIEW Report for TEXPOOL RATING AAAm
NORTHGATE CROSSING MUD #1 to 71112021 to 713112021
Investment Pools Rate Ending Value for Period Interest earned Deposits or Ending Value for Period Book N.A.V. Market this period (Withdrawals) Book N.A.V. Market
BF TexPool 0.0189% 1,269,644.48 1.00010 1,269,771.44 20.36 0.00 1,269,664.84 1.000100 1,269,791.81
CA TexPool 0.0189% 6,250,983.98 1.00010 6,251,609.08 100.28 0.00 6,251,084.26 1.000100 6,251,709.37
OP TexPool 0.0189% 4,635,984.14 1.00010 4,636,447.74 74.36 55,000.00 4,691,058."50 1.000100 4,691,527.61 0.0189% 12,156,612.60 12,157,828.26 195.00 55,000.00 12,211,807.60 12,213,028.78
Cerlificates of Deposits
fund
CA Texas Citizens Bank
CA Texas Citizens Bank
CA Third Coast Bank
CA Texan Bank
OP BancorpSouth
OP Spirit of Texas Bank
Federal Obligations
N/A
total investments
Compliance Statement.
Review.
Signatures. Myrlie Cruz, Inc. Vnvest.xfs version 2.4a
Rate Purchase Value
for Period
0.50% 247,182.84
0.25% 248,421.16
0.50% 245,896.55
0.50% 245,348.33
0.70% 246,686.83
0.25% 245,963.86
0.4390% 1,479,499.57
Simple Ending Period
APR Market Value
0.0000% 0.00
0.00 0.0569% 13,636,112.17
Term in
Davs
365
365
365
365
362
365
365
Term in
Davs
0
0 365
Begin Value
for Period
247,395.62
0.00
246,014.45
246,077.65
247,708.72
246,061.57
1,233,258.01
Begin Period
Market Value
0.00
0.00 13,391,086.27
Interest accrued
this oeriod
-6.77
52.75
104.42
104.19
146.66
52.23
453.47
Gain (Loss) to
Market Value
0.00
0.00 648.47
Deposits or
<Withdrawals)
(248,421.16)
248,421.16
0.00
0.00
0.00
0.00
0.00
Deposits or
(Withdrawals)
0.00
0.00 55,000.00
The investments (reported on above) for the Period are in compliance with the investment strategy expressed in the District's Investment Policy and the Public Funds Investment Act.
This report and the District's Investment Policy are submitted to the Board for its review and to make any changes thereto as determined by the Board to be necessary and prudent for the management of Distri~ds.;
,~i Investment Officer-Mary Jarman (10/2019) (please sign & date)
Ending Value
for Period
0.00
248,473.91
246,118.87
246,181.84
247,855.38
246,113.80
1,234,743.80
Ending Period
Market Value
0.00
0.00 13,446,551.40
Date of
Purchase
06/29/20
06/29/21
05/27/21
11/26/20
11/27/20
05/04/21
Date of
Purchase
)
IL-/
warn:
Date of
Maturitv
06129/21
06/29/22
05/27/22
11/26/21
11/24/21
05/04/22
229
Date of
Maturitv
22
Page 21
·~ -.,·. .•:: .
Deposit/ Collateral Report by District
NORTHGATE CROSSING MUD 1 BBVA Tax ID - Pledge: 742425139-20119 Pledge Date: 07/01/2021
1st. Consultant: MCI-MYRTLE CRUZ, INC. Accounts Through: 6/30/2021 10:00 PM
2nd. Consultant: Memo Posts Through: NO MEMO POSTS
Deposits
Interest Account
Acct No Funds T):De 0000038208 Interest Account
0000046128 Interest Account
0000073031 Interest Account
2514453937 Interest Account
2526328399 Interest Account
Subtotal Interest Account
Bond Fund
Acct No Funds Type 2514453597 Bond Fund
Subtotal Bond Fund
Total Deposits
Securities
Class Balance $2,081.78
$15,557.55
$59,250.19
$175,428.04
$6,026.05
$258,343.61
Balance $14,470.20
$14,470.20
$272,813.81
Interest $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Interest $0.00
$0.00
$0.00
A2:ency Custodian CUSIP FHLB-A-LO CH 156758
Maturity Date 09/21/2021
Date Pledged 05/04/2021 01:10 PM
Total Securities Pledged
DEPOSIT/ COLLATERAL POSITION CALCULATION
Subtotal Interest Deposits Subtotal Non-Interest Deposits Subtotal Bond Fund Deposits
TOTAL DEPOSITS LESS APPLICABLE FDIC
Subtotal Interest Deposits Subtotal Non-Interest Deposits Subtotal Bond Fund Deposits
Deposits Requiring Collateral TOTAL SECURITIES PLEDGED DEPOSIT COLLATERAL POSITION-100% DEPOSIT COLLATERAL POSITION-105%
$258,343.61 $0.00
$14,470.20
$272,813.81
$250,000.00 $0.00
$14,470.20
$8,343.61 $800,000.00 $791,656.39 $791,239.21
9,588%
-11-
Total $2,081.78
$15,557.55
$59,250.19
$175,428.04
$6,026.05
$258,343.61
Total $14,470.20
$14,470.20
$272,813.81
Units Pledged 800,000
800,000
Market Value $800,000.00
$800,000.00
Page : 234 / 303 Page 22
Myrtle Cruz, Inc. 3401 Louisiana St, STE 400 .Houston, Tx 77002-9552. (713)759-1368. fax 759-1264. email [email protected]
NORTHGATE JOINT FACILITIES
cash Report for Meeting of August 12th, 2021
OPERATING (2060P) : BBVA BANK 46128
Previous cash balance, July 8th, 2021
plus: 07/12 NGCMUD #1 - ck #7330 - June Billing .................. . plus: 07/12 NGCMUD #2 - ck #3121 - June Billing .................. .
Total Deposits :
less checks completed at or after last meeting : 2732 Comcast; 7/19-8/18 Acct #8777 70 216 4244829 ............... .
Beginning cash balance, August 12th, 2021
less checks to be presented at this meeting : 2733 Myrtle Cruz, Inc; July Bookeeping/Expense .................. .
6333 Bookkeeping 325.00 6340 office expense 45.10
2734 rnframark; operation@ storm station Inv #66305 ............ . 2735 Inframark, LLC; Inv #1133712 07/23/21 ...................... .
6335 general repair 2,624.80 6335 SWP 1 maintenance 690.00 6335 Preventive Maint 213.44 6275 facility & sewer ins 762.56 6335 Predictive Maint 214.23
2736 Park Rangers, LLC; Levee Maintenance #PR002051508b ......... . 6335 Levee Maintenance 2,162.00 6335 Pond Mowing 1,748.00 6335 Fuel char~e 134.23 6335 Pump station Maint 2,645.00
2737 Innovative communication Systems; Inv #260699/261833 ....... . 6351 June service 230.00 6351 July service 229.91
2738 Today's Integration, Inc.; Inv #21384/21460 ................ . 2739 Freese & Nichols; Inv# 1325085 Levee & PS Inspection ....... . 2740 Direct Energy; 06/25-07/24@ 710 creek Knoll ............... . 2741 Comcast; Internet svc Acct# 8777 70 216 4244829 ........... .
previous cash balance 2 receipts 9 current checks
other disbursements ending cash balance
OPERATING FUNDS AVAILABLE August 12th, 2021
-12-
< <
21,547.69-40,034.69 20,536.93 >
318. 58 >
21,547.69-
22,019.08 18,015.61
40,034.69
318.58
18,168.42
370.10
774.54 4,505.03
6,689.23
459.91
307.36 7,049.15
381.61
2,368.51-
$2,368.51-
Page 23
Revenue:
Northgate MUD #1 (55%) Northgate MUD #2 (45%)
Interest earned
Expenses:
Legal Fees
Auditing Fees
Engineering Fees
Security Monitoring/Todays Integration
Permit / Assessments
Operator Fee
Bookkeeping Fees
Park Rangers - levee mowing
R & M - Storm Station R & M - Emergency Repairs/Storm Events
Office Exp
Utilites (including Comcast Internet)
Insurance & Bonds
Freese & Nichols - Levee Inspection
Emergency Operation Center
Beginning Balance
Net Profit or (Loss)
Prior Year Levee Maint
Funds Available as
August 12, 2021
July billing
Reserve
Northgate MUD 1
Northgate MUD 2
8/12/2021
Reserve balance
10,168.00
8,319.00
Actual MTD
22,019.08
18,015.61
0.00
40,034.69
Actual MTD
0.00
0.00
7,049.15
767.27
0.00
774.54
325.00
6,689.23
4,505.03
0.00
45.10
700.19
0.00
0.00
0.00
20,855.51
NORTHGATE MUD #1 JOINT FACILITES
Budget for Fiscal Year Ending December 31, 2021
July Billing
August 12, 2021
7 months
Budqet MTD Actual YTD Budqet YTD
22,602.71 110,688.74 158,219
18,493.13 90,563.53 129,452
0.00 0.00 0
41,095.83 201,252.27 287,671
Budget MTD Actual YTD Budget YTD
0.00 0.00 0 I 0.00 0.00 I 1 050 I
3,666.67 7,049.15 25,667
416.67 3,262.27 2,917
0.00 0.00 50
783.33 5,421.78 5,483
333.33 2,275.00 2,333
9,795.83 46,280.58 68,571
12,500.00 105,804.57 87,500
8,333.33 0.00 58,333
50.00 433.12 350
958.33 6,257.26 6,708
15,000.00 14,981.90 I 15,000 I 2,916.67 0.00 20,417
0.00 1 627.53 0
54,754.17 193,393.16 294,379
Annual Budget
271,233 221,918
0
493,150
Budget
0
1,050
44,000
5,000
50
9,400
4,000
117,550
150,000
100,000 600
11,500
15,000
35,000
0
493,150
(21,547.69) 19,179.18
PUMP STATION
0.00
{2,368.51)
20,855.51
-2,368.51
18,487.00
18,487.00
TOTAL
-13-
NGATE 1 NGATE2
share share
55.0% 45.0%
11,470.53 9,384.98
0.00
11,410.sa I I 9,384.98
variance %remain
(47,530.22) 59%
(38,888.35) 59%
0 0%
(86,4191 59%
variance %remain
0 0%
1,050 100%
18,618 63%
(346) 82%
50 100%
62 0%
58 56%
22,290 68%
(18,305) 80%
58,333 -1%
(83) 62%
451 100%
18 100%
20,417 100%
(1 628) 0% 100,986 61%
Page 24
MINUTES OF MEETING OF THE BOARD OF DIRECTORS
NORTHGATE CROSSING MUNICIPAL UTILITY DISTRICT NO. 1
July 8, 2021
THE STATE OF TEXAS §
COUNTY OF HARRIS §
NORTHGATE CROSSING MUNICIPAL UTILITY DISTRICT NO. 1 §
The Board of Directors (the "Board") of Northgate Crossing Municipal Utility District No. 1 (the
"District") met in regular session, open to the public, on July 8, 2021. Due to the concerns regarding the
Coronavirus (COVID-19), the Board met via video conference. The video conference meeting is
authorized by the suspension of certain provisions of Chapter 551, Texas Government Code as
described below. The roll was called of the members of the Board, to-wit:
Jason Williams President
Shane Holman Vice President
Jim Helfrich Secretary
Michael Lopez Assistant Secretary/Assistant Vice President
Kenny Boeckelman Assistant Secretary
All members of the Board were present, thus constituting a quorum.
Also attending the meeting were Angela Helfrich, resident of the District; Jeff Conti, director of
Northgate Crossing MUD No. 2 (“NG2”); Jeremy Roach and Carlos Medina with Apollo IT Consulting,
LLC ("Apollo"); Bill Blitch with Blitch Associates, Inc. ("BAI") and Bob Leared Interests ("BLI"), Financial
Advisor and Tax Assessor/Collector, respectively to the District; Michael Murr with Murr Incorporated,
landscape architect for the District; Chris Linn with Myrtle Cruz, Inc. ("MCI"), Bookkeeper for the District;
Juan Montano with Inframark, Operator for the District, Robert Atkinson with Edminster Henshaw Russ &
Associates ("EH"), Engineer for the District; and Maria Salinas Parker and Michael R. Willis of Sanford
Kuhl Hagan Kugle Parker Kahn LLP ("SK Law"), Attorneys for the District.
CALL MEETING TO ORDER
The meeting was called to order and the following business was transacted.
HEAR FROM THE PUBLIC
The Board noted that there were no members of the public present at the meeting wished to address
the Board.
PEACE OFFICER'S REPORT/ADDITIONAL DEPUTY
The Board received the Peace Officer's Report, a copy of which is on file in the official records
of the District.
Upon motion duly made and seconded, the Board voted unanimously to approve the Peace
Page 25
Officer’s Report, and to contract with Harris County for a full time deputy.
TAX ASSESSOR/COLLECTOR'S REPORT
The Board next reviewed the Tax Assessor/Collector's Report, a copy of which is attached hereto.
The Board noted that the District has collected 99.149% of its 2020 taxes.
Upon motion duly made and seconded, the Board voted unanimously to (i) approve the Tax
Assessor/Collector's Report, (ii) authorize payment of the invoices presented for payment from the District's
Tax Account, and (iii) to change depository bank for the Tax Account to Allegiance Bank.
DEPOSITORY PLEDGE AGREEMENT
Consideration was then given to a proposed Depository Pledge Agreement with Allegiance Bank.
Upon motion duly made and seconded, the Board voted unanimously to approve the Depository Pledge
Agreement with Allegiance Bank, a copy of which is on file in the official records of the District.
BOOKKEEPER'S REPORT
The Board then reviewed the Bookkeeper's Report and Investment Report. Copies of such reports
are attached hereto.
The Board reviewed the balances in each of the District's accounts and noted investments in each
account. The Board also reviewed the activity in each account. The Board reviewed the invoices and the
checks prepared in payment thereof.
Upon motion duly made and seconded, the Board voted unanimously to approve (i) the Bookkeeper's
Report, (ii) the bills submitted for payment, and (iii) the Investment Report.
DEPOSITORY PLEDGE AGREEMENT OPERATING ACCOUNT
Consideration was then given to a proposed Depository Pledge Agreement with Central Bank. Ms. Linn
advised the Board that the current depository bank for the Operating Funda, BBVA Compass Bank, will no
longer be accepting public funds. She stated that MCI recommends the District change the Operating Account
depository bank to Central Bank.
Upon motion duly made and seconded, the Board voted unanimously to change the depository bank for
the Operating Account to Central Bank, and to approve the Depository Pledge Agreement with Central Bank, a
copy of which is on file in the official records of the District.
ATTORNEY'S REPORT
The Board recognized Mr. Willis, who presented the Attorney's Report.
Upon motion duly made and seconded, the Board voted unanimously to approve the Attorney's Report.
Approval of Minutes
Proposed minutes of the meetings of the Board held May 5, 2021, and May 13, 2021, previously
distributed to the Board, were presented for consideration and approval.
Page 26
Upon motion duly made and seconded, the Board voted unanimously to approve the minutes of May 5, 2021, and May 13, 2021as presented.
Amend Rate Order
No action was taken on amending the Rate Order.
Actions Related to COVID-19
The Board took no action related to COVID-19.
Interlocal Agreement with Northgate Crossing MUD No. 2
No action was taken on an Interlocal Agreement with Northgate Crossing MUD No. 2 (“NG2”).
Legislative Update
Mr. Willis updated the Board on legislative matters.
Bond Election
Consideration was next given to calling a bond election for November 2 2021. The Board agreed to
place Order Calling Bond Election on the August agenda.
ENGINEER'S REPORT
The Board recognized Mr. Atkinson, who presented the Engineer's Report, a copy of which is on file
in the official records of the District.
Levee Inspection
The levee was inspected on July 1, 2021. There were no deficiencies noted. The drainage channel from
the Hardy Toll Road to the detention basin has some erosion and sink holes. Spring Creek will continue to be
monitored and immediately reported to HCFCD if any erosion is present. The annual levee inspection was
conducted on May 5, 2021, and May 27, 2021.
Bond Election Report
A draft bond report was presented for Board review.
Water Plant 3 / Wastewater Plant Expansion
EHRA had a meeting with the Engineer for NG2 regarding the wastewater plant expansion and Water
Plant 3. New wastewater plant utilization was calculated utilizing the plant rerating value of 200 GPD/ESFC.
The District has an adequate supply of wastewater capacity for the existing development. It has been determined
that the District lease requirements have dropped to 50,000 GPD from NG2. A cost estimate and analysis of the
wastewater treatment plant expansion will be prepared by the Engineer for NG2. NG2 will lease wastewater
capacity to the District as necessary until the construction of the wastewater treatment plant expansion is
completed.
Page 27
The NG2 Engineer will prepare a cost estimate for Water Plant 3. This water plant project will include
another interconnection across the Hardy Toll Road between the Districts. The additional interconnect will
provide additional redundancy for District interconnect and supply purposes.
Levee Analysis and Certification
EHRA continues to work with Freese and Nichols in preparation of the Levee Analysis Report. A
meeting was held on June 17, 2021 to discuss the scope of the analysis. Harris County Flood Control District
has provided the 100-year Base Flood Elevations as well as the hydrology model. Mr. Atkinson also discussed
performing a topographic study of a portion of the levee. The Board deferred action on this matter.
Northwood Pines Park
EHRA has prepared plans for the bridge lighting and the splash pad. The plans have been submitted to
Harris County for approval.
Upon motion duly made and seconded, the Board voted unanimously to approve the Engineer’s Report.
OPERATIONS REPORT/TERMINATION OF SERVICE
The Board next recognized Mr. Montano, who submitted to and reviewed with the Board the
Operations Report, a copy of which is attached hereto.
Mr. Montano also presented a report on the Storm Station, which report is attached to the Operations
Report.
Mr. Montano reported as noted below.
-The billed to pumped ratio was 9 9 . 5 2 %.
- There are 415 active connections in the District.
- There was one account finalized with a balance under $25, and one account finalized with a
balance greater than $25.
- There was an excursion at the wastewater treatment plant caused by an ammonia violation.
- There are 21 accounts on the water termination list.
Upon motion duly made and seconded, the Board voted unanimously to (1) approve the Operation's
Report, and (2) turn over the accounts finalized with a balance in excess of twenty-five dollars, if any, for
collection.
Termination of Water Service
Consideration was then given to the termination of water service to the accounts listed on the
Termination List. The Board noted that there were no customers present at the meeting who wished to address
the Board regarding their water bills or to protest termination of water service.
Upon motion duly made and seconded, the Board voted unanimously to proceed with the service
terminations, and if a customer contacts Inframark concerning inability to pay, Inframark is authorized to offer
a sixty (60) day installment plant and in extreme cases a ninety (90) day installment plan.
IT REPORT/WEBSITE
The Board recognized Mr. Roach, who presented the IT/Website Report. Apollo will present at the
August meeting a proposal for a digital alert notification system.
Page 28
Mr. Medina then reported on the Maraki System. Mr. Medina reviewed with the Board various
updates and changes to the Maraki system. The Board concurred with the changes.
Upon motion duly made and seconded, the Board voted unanimously to approve the IT/Website
Report, a copy of which is on file in the official records of the District.
LANDCAPE ARCHITECT REPORT/ PARK RANGERS LEVEE MAINTENANCE REPORT
The Board recognized Mr. Murr, who presented the Landscape Architect's report, a copy of which is
on file in the official records of the District. Mr. Murr reported as follows.
Lighting
Photo cells on the street lighting have been synchronized. The contractor is substantially complete on
the bridge lighting. Mr. Murr suggested painting the railing on the bridge. He estimated a cost of $8,884 to
continue with the same paint color and $12, 825 for a new color. If the Board elects to perform only touch up
painting it will cost approximately $750. The Board agree to go with the touch up painting.
Landscape Maintenance
Planting on the medians has commenced. The fountain was checked and is operational.
Bike Connection
Mr. Murr has completed the Interlocal Agreement with TXDOT, and is looking at alternate design
options. A switchback would cost approximately $185,000, plus sidewalk costs of $ 64,000 and $36,000. Mr.
Murr suggested that the switchback could be performed with the levee improvements in the next year. Mr.
Atkinson stated that the levee improvements are not likely to occur before 2022. Mr. Atkinson added that the
switchback may need to be removed when the levee improvements are undertaken. The Board then discussed
whether to proceed with the switchback, noting that the bikers along the bike trail, are entering upon the levee,
which is of concern. This project is on hold.
Levee
There were no issues to report on the Levee.
Design
Kraftsman Commercial Playgrounds & Waterpark (“Kraftsman”) submitted a timeline to complete
Phase 1 in 14.5 weeks. Plans for the splashpad have been resubmitted to Harris County for approval.
Park/Landscape Budget
Mr. Murr then reviewed with the Board the budget to date for the Park projects.
Upon motion duly made and seconded, the Board voted unanimously to approve the
landscape Architects Report.
THE REMAINDER OF THIS PAGE LEFT INTENTIONALLY BLANK
Page 29
THERE BEING NO FURTHER BUSINESS TO COME BEFORE THE BOARD, the meeting
was adjourned.
PASSED, APPROVED and ADOPTED this ______________________.
Secretary, Board of Directors
Page 30
~
EHRA '--/
ENGINl!:IIRING THIE FtnUNIE SINCE 1936
TBPE No. f-726 TBPLS No. 10092300
NORTHGATE CROSSING MUNICIPAL UTILITY DISTRICT NO. 1 MONTHLY ENGINEERING REPORT
August 12> 2021
LEVEE INSPECTION
The levee was inspected on July 28, 2021. There arc minor deficiencies noted on the levee inspection form. The drainage channel from Hardy Toll Road to the detention basin has some erosion and sink holes. Spring Creek will continue to be monitored and immediately reportt:d to HCl-1CD if any erosion is present.
BOND ELECTION
EHRA has prepared a bond election cost summary. The projects include replacement of a portion of the wate~ distribution system, storm water pump station updates, levee improvements, water and wastewater facility improvements. The list of address ranges within the boundaries of the District was reviewed.
NORTHWOOD PINES PARK
EHRA Engineering has a prepared plan set for use in Harris County submittal of the splash pad project. Adequate detention was provided in the plans. The project was approved by Harris County. EHRA requests permission to prepare plans for the parking in the area adjacent to the splash pad.
LEVEE ANALYSIS AND CERTIFICATION
E.f IRA continues work with Freese and Nichols in pn:paration of the Levee Analysis Report. A draft preliminary findings report was prepared by freese and Nichols. After reviewing the report contents. it was determined to collect additional topographic survey information around the entry road and pump station. The topographic information has been collected and is being processed.
P:\111-064-00\Do«\F.ngineer', Reporr\202!\8.,\ugusr 12, 2021.,locx
EHRA Engineering 110011 Meadowglen Lane I Houston, Texas 77042 I 1713.784.4SOO I f 713 784.4577
R EA l I Z I N G Y I S I O N S • D E S I G N I N G C O M M U N I J I E S • E N G I N E f R I N G TH E F UT U R E WWW EHRAlnc.com Page 31
11
i1
um.tm
---·---E] --®-- -·---
~ r~Ck(~
~
400 200 0 l=3 ........
t ~
1} Guard rail over drainage outfall is out of alignment.
2) Dead tree on side slope of the pond.
3) Channel near sluice gates is becoming oyergrown with vegetation.
Daniel Hayden
7128/2021
400
/"""- 10555 Wuol!;,, O,i,o
EHRA """'°'·'·=770A2 713.7S.uSOO
'-../ ~.~-~:'"'
lllrl!IGAlE ams u ao. 1
;. ~ .. -; .... L..~~~n:·~·z~~~ I I IL _____________ ..=r .. ~~.P::::,W.=··:f,~~=i}:::::~ ::===:: _______ ......... ___ _____._ .:
m'!I INSl'[CllQI IUlM
Page 32
Juan G. MontanoAccount Manager, Inframark
Northgate Crossing M.U.D. #1Manager Report for the Month of
June 2021Board Meeting 8/12/2021
Submitted by:
1
Page 33
Item Location Description Status
Evacuation Siren update Storm Pumping Station Discuss siren replacement Completed
Replace control panel
screen
Storm Station Upgrading screen, existing
screen stopped working
Completed
Item Location Description Status/Est. Cost
Pond Feed Channel repairs Feed Channel Multiple sink holes Waiting on Estimate
Operations Summary:Potable Water Production
Sanitary Sewer Collection
EXECUTIVE SUMMARYPrevious Meeting Action Item Status
Potable Water Distribution
• Wastewater Collection – All Compliant
Current Items Requiring Board Approval
Compliance Summary:• Water Distribution-Monthly Bacteriological Samples were taken throughout the district
• Current Annual Avg. CL2 Res. 1.94 Mg/l
• Total water Billed for the month: 6,839,000
• Total water Pumped for the month: 7,698,000 gallons
• Accountability: 99.21%
Builder Services / Inspection
Customer Care
• Delinquent letters mailed 15
• Delinquent tags hung 14
• Disconnects for Non-Payment 1
• Consideration to write off $0.00
• Consideration to collections $362.43
2
Page 34
Client: Northgate Crossing MUD 1
Adjustment Date
BLS Index Table CUUR0000SEHG01 Prior Index 583.204 Change %
BLS Index Month June Current Index 602.795
Monthly Fees - per
Station
Lift
Station
Storm
Station
Annual Fees - per
Station
Lift
Station
Storm
Station Connnection Fees Residential Commercial
Previous Rate 206.54 774.54 Previous Rate 2,478.48 9,294.48 Previous Rate 2.58 2.07
API Adjustment 6.94 26.02 API Adjustment 83.28 312.24 API Adjustment 0.09 0.07
New Rate 213.48$ 800.56$ New Rate 2,561.76$ 9,606.72$ New Rate 2.67$ 2.13$
August 1, 2021
3.359%
3
Page 35
Client: Northgate Crossing MUD 1
Adjustment Date
BLS Index Table CUUR0000SEHG01 Prior Index 583.204 Change % 3.359%
BLS Index Month June Current Index 602.795
Prior Rate New Rate Prior Rate New Rate
16.52$ 17.08$ 981.09$ 1,014.05$
33.05$ 34.16$ 1,290.91$ 1,334.27$
33.05$ 34.16$ 51.64$ 53.37$
33.05$ 34.16$ 36.15$ 37.36$
33.05$ 34.16$ 30.98$ 32.02$
30.98$ 32.02$ 30.98$ 32.02$
56.80$ 58.71$ 56.80$ 58.71$
61.96$ 64.04$ 51.64$ 53.37$
25.82$ 26.69$ 103.27$ 106.74$
10.33$ 10.67$ 61.96$ 64.04$
11.88$ 12.28$
113.60$ 117.42$
123.93$ 128.09$
185.89$ 192.13$
201.38$ 208.15$ 15.49$ 16.01$
15.49$ 16.01$
25.82$ 26.69$
15.49$ 16.01$
15.49$ 16.01$
25.82$ 26.69$
51.64$ 53.37$
Meter Disconnects/Reconnects
Meter Removal/Installation/Reinstallation
Vactor/Jet Unit-OT Delinquency Notices
Confidentiality Letters
Returned Check/Payment Reversal
Service Account Transfer
New Account Setup
New RateVactor/Jet Unit
Backhoe w/Trailer Final Site Survey Inspection
Shoring Equipment Backflow Prevention Inspection
Utility Trailer Grease Trap Inspection
Lowboy (Gooseneck) Trailer
Air Scouring Unit
Televising Unit
Other Service Fees Prior Rate
Chlorination Truck Slab Residential Inspection
Crew Truck Wall Residential Inspection
Crane Truck Fixture Residential Inspection
Electrical Vehicle ARM Non-Typical Residential Meters 1"
Maintenance Truck Sanitary Sewer Inspection - Residential
Mechanical Truck Pre-Site Residential Inspection
Utility Truck ARM Residential Meters 5/8" x 3/4"
August 1, 2020
Vehicles &
Equipment
Installation &
Inspection
4
Page 36
NORTHGATECROSSINGM.U.D. #1Operations and MaintenanceFor the Month of
OPERATIONS EXPENSES JUNE 2021BASIC OPERATIONS $4,741.89BASIC OPERATIONS OF JOINT STORM STATION $774.54WATER TAPS 0 RESIDENTIAL / 0 COMMERCIAL $0.00SEWER TAPS 0 RESIDENTIAL / 0 COMMERCIAL $0.00LOT INSPECTIONS/FINAL BUILDER LOT INSPECTIONS $0.00WATER LINE MAINTENANCE $7,797.96SEWER LINE MAINTENANCE $123.92LIFT STATION MAINTENANCE $1,958.85STORM WATER PUMPING STATION MAINTENANCE $4,505.03TEMPORARY METERS $0.00ADMINISTRATIVE $36.88CREDIT $0.00TOTAL AMOUNT INVOICED $19,939.07
FINANCIAL RECAP REPORTLAST MONTH RECEIVABLES $117,469.02ADJUSTMENTS $471.72PAYMENTS ($102,179.51)NHCRWA ($3,316.75)CURRENT BILLING $114,344.17TOTAL RECEIVABLES $132,015.65
ARREARS BREAKDOWNCURRENT $114,344.1730 DAYS $18,547.2560 DAYS $133.3890 DAYS $46.13120 DAYS $692.97
DAMAGE RECEIVABLE REPORTCURRENT 30-60 DAYS 60-90 DAYS OVER 90 DAYS TOTAL
Homewood Suites -$ -$ -$ 75.00$ 75.00$
TAP ACTIVITIESWATER TAP FEES 0 RESIDENTIAL / 0 COMM $0.00SEWER TAP FEES 0 RESIDENTIAL / 0 COMM $0.00FACILITY INSPECTION FEES 0 PRESITE / 0 FACILITY/ 0 CSI $0.00OTHER FEES 0 RESIDENTIAL / 0 COMM $0.00ENDING NUMBER OF WATER CONNECTIONS BILLED 408ENDING NUMBER OF SEWER CONNECTIONS BILLED 396IRRIGATION CONNECTIONS (PARKS/REC WATER) 13
JUNE 2021
5
Page 37
Description Jun-20 Jun-21
Number of Accounts Billed 414 408
Avg Water Use for Accounts Billed in gallons 18,853$ 17,055$
Total Billed 113,542$ 114,344$
Total Aged Receivables 3,558$ 17,671$
Total Receivables 117,100$ 132,016$
Date Total Receivable Total 30 Day Total 60 Day Total 90 Day Total 120+
Jul-20 155,508.90$ 27,622.54$ 549.40$ 284.33$ 390.05$
Aug-20 154,370.96$ 18,702.14$ 1,103.42$ 233.82$ 365.64$
Sep-20 178,211.35$ 11,422.04$ 443.63$ 488.51$ 599.46$
Oct-20 132,259.91$ 1,770.46$ 2,423.95$ 94.56$ 829.43$
Nov-20 136,929.24$ 26,287.86$ 681.65$ 106.70$ 458.05$
Dec-20 107,497.61$ 4,387.38$ 674.21$ 565.26$ 405.58$
Jan-21 124,870.33$ 23,125.37$ 826.69$ 409.52$ 970.84$
Feb-21 107,837.68$ 3,709.36$ 836.78$ 471.54$ 1,053.06$
Mar-21 103,627.08$ 2,523.95$ 387.79$ 592.01$ 1,468.71$
Apr-21 115,667.91$ 3,136.33$ 135.67$ 202.70$ 550.08$
May-21 117,469.02$ 7,454.41$ 46.13$ 63.47$ 752.78$
Jun-21 132,015.65$ 18,547.25$ 133.38$ 46.13$ 692.97$
Board Consideration to Write Off $0.00
Board Consideration Collections $362.43 6/10/2021
Delinquent Letters Mailed 15 6/3/2021
Delinquent Tags Hung 14 6/10/2021
Disconnects for Non Payment 1 6/16/2021
12 Month Billing History by Category
12 Month Accounts Receivable and Collections Report
$-
$5,000.00
$10,000.00
$15,000.00
$20,000.00
$25,000.00
$30,000.00
$35,000.00
$40,000.00
$45,000.00
$50,000.00
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
Water Wastewater
$- $10,000.00 $20,000.00 $30,000.00 $40,000.00 $50,000.00 $60,000.00 $70,000.00 $80,000.00 $90,000.00
$100,000.00 $110,000.00 $120,000.00 $130,000.00 $140,000.00 $150,000.00 $160,000.00 $170,000.00 $180,000.00
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21 Apr-21 May-21 Jun-21
Total Receivable Total 30 Day Total 60 Day Total 90 Day Total 120+
6
Page 38
1.
Cost: 1,822.62$
Lift Station Cleanup; Sched#: 7178 SchedType: CSEM DateSched: 04/01/21
NORTHGATE CROSSING M.U.D #1
STORM SEWER MAINTENANCE
STORM WATER PUMP STATION
MAJOR MAINTENANCE SUMMARY
JUNE 2021
ADMINISTRATIVE
SEWER MAINTENANCE
WATER MAINTENANCE
LIFT STATION MAINTENANCE
7
Page 39
Annual Average 1.94
Date CL2 Avg.
7/20 2.58/20 2.549/20 2.34
10/20 1.8811/20 2.2812/20 1.881/21 1.882/21 1.53/21 1.724/21 1.625/21 1.566/21 1.57
Report
DateBilling Dates
# of
Connections
NOC1
BilledSold
Flushed/
Loss
Purchased
IC
Gallons
Pumped
Accountability
Metered %
Jul-20 6-24-20 / 7-23-20 419 9,605,000 0 376,650 0 9,611,000 103.86%
Aug-20 7-24-20 / 8-23-20 425 10,959,000 0 297,000 0 10,335,000 108.91%
Sep-20 8-24-20 / 9-23-20 418 8,649,000 0 372,000 0 9,168,000 98.40%
Oct-20 9-24-20 / 10-23-20 416 7,117,000 0 442,500 0 8,078,000 93.58%
Nov-20* 10-24-20 / 11-23-20 414 6,756,000 0 538,000 0 7,845,000 92.98%
Dec-20* 11-24-20 / 12-23-20 411 5,570,000 0 293,750 0 6,410,000 91.48%
Jan-21* 12-24-20 / 1-23-21 412 5,274,000 0 412,500 0 6,248,000 91.01%
Feb-21* 1-24-21 / 2-23-21 411 5,755,000 0 133,750 0 6,174,000 95.38%
Mar-21* 2-24-21 / 3-23-21 408 4,996,000 0 410,000 0 6,103,000 88.58%
Apr-21* 3-24-21 / 4-23-21 414 6,599,000 0 456,750 0 7,639,000 92.36%
May-21* 4-24-21 / 5-22-21 411 6,302,000 0 805,000 0 7,141,000 99.52%
Jun-21* 5-24-21 / 6-23-21 408 6,839,000 0 797,900 0 7,698,000 99.21%
Water Accountability Report Historical
Water Accountability Report
Water Quality Report - Disinfection Monitoring
Water Production and Quality NOC1
Monthly Average
*Includes estimated water loss due to leak by Storm Stations.
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20* Dec-20* Jan-21* Feb-21* Mar-21* Apr-21* May-21* Jun-21*
NOC1 Billed Gallons Pumped
0
0.5
1
1.5
2
2.5
3
7/20 8/20 9/20 10/20 11/20 12/20 1/21 2/21 3/21 4/21 5/21 6/21
CL2 Avg.
8
Page 40
Report
DateBilling Dates
NOC2
BilledSold
Flushed/
Loss
Purchased
IC
Gallons
Pumped
Accountability
Metered %
Jul-20 6-8-20 / 7-8-20 13,999,000 0 0 0 14,088,000 99.37%
Aug-20 7-8-20 / 8-7-20 14,447,000 0 0 0 15,202,000 95.03%
Sep-20 8-7-20 / 9-7-20 16,213,000 0 0 0 17,172,000 94.42%
Oct-20 9-7-20 / 10-9-20 13,145,000 0 0 0 12,719,000 103.35%
Nov-20 10-9-20 / 11-9-20 9,862,000 0 0 0 10,445,000 94.42%
Dec-20* 11-9-20 / 12-10-20 9,486,000 0 0 0 8,690,000 109.16%
Jan-21* 12-10-20 / 1-11-21 8,296,000 0 0 0 8,339,000 99.48%
Feb-21* 1-11-21 / 2-9-21 10,961,000 0 0 0 10,226,000 107.19%
Mar-21* 2-9-21 / 3-10-21 9,505,000 0 0 0 9,682,000 98.17%
Apr-21* 3-10-21 / 4-10-21 9,293,000 0 0 0 9,294,000 99.99%
May-21* 4-10-21 / 5-10-21 10,583,000 0 0 0 10,582,000 100.01%
Jun-21* 5-10-21 / 6-11-21 8,926,000 0 0 0 8,926,000 100.00%
Water Production and Quality NOC2
Water Accountability Report
Water Accountability Report Historical
*Interconnect not calculated
Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20*
Jan-21* Feb-21*Mar-21*Apr-21* May-21*
Jun-21*
NOC2 Billed Gallons Pumped
9
Page 41
Sample PWS Sample Collection Collection Analysis System Sample Chlorine Total
ID Name Site Date Time Time Type Type mg/L Coliform
6210721 1013077 Northgate Crossing MUD 1 814 Autumn Point Harris 6/4/2021 10:53 KWM 23:00 Public Distribution Well 2.3 not found not found
6210722 1013077 Northgate Crossing MUD 1 731 Cape Cottage Ln Harris 6/4/2021 11:00 KWM 23:00 Public Distribution Well 2.13 not found not found
6210723 1013077 Northgate Crossing MUD 1 902 Morley Park Ln Harris 6/4/2021 11:15 KWM 23:00 Public Distribution Well 2.18 not found not found
6210724 1013077 Northgate Crossing MUD 1 903 Colechester Ct Harris 6/4/2021 11:22 KWM 23:00 Public Distribution Well 2.3 not found not found
June 2021 Bacteriological Data
E. coliPWSID County Collector Source
10
Page 42
5
Permit Information Permit Number Expiration Date
T.N.R.C.C. PERMIT WQ0012979004 04/26/23
N.P.D.E.S. TX0119181
Permit Parameter Measured Value Excursion
AVERAGE PERMITTED FLOW 0.75 M.G.D. 0.428 M.G.D. NO
AVERAGE PERMITTED B.O.D. 10.0 mg/l 2.2 mg/l NO
AVERAGE PERMITTED T.S.S. 15.0 mg/l 1.1 mg/l NO
AVERAGE PERMITTED NH3 3.00 mg/l 1.35 mg/l NO
MINIMUM CL2 RESIDUAL 1.00 mg/l 2.6 mg/l NO
MAXIMUM FINAL CL2 RESIDUAL 4.00 mg/l 3.9 mg/l NO
JUNE
Wastewater Production and Quality
Wastewater Flows
JUNE
Sewage Treatment Plant Summary
0.000
1.000
2.000
3.000
4.000
5.000
6.000
7.000
8.000
9.000
10.000
11.000
12.000
13.000
14.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL DISCHARGE RAINFALL EFFLUENT FLOW #1 EFFLUENT FLOW #2
11
Page 43
PERMITTEE NAME/ADDRESS: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FORM APPROVED
Name: Northgate Crossing MUD 2 DISCHARGE MONITORING REPORT (DMR) OMB No.2040-0004
001 A
Facility: Northgate Crossing MUD 2
FROM 21/06/01 TO 21/06/30 *** ***
(YY/MM/DD) (YY/MM/DD) NOTE: Read instructions before completing this form.
PARAMETER (3 Card Only) Quantity or Loading (4 Card Only) Quality or Concentration NO. Frequency of Sample
(32-37) (46-53) (54-61) (38-45) (46-53) (54-61) EX analysis Type
Average Maximum Unit Minimum Average Maximum Unit (62-63) (64-68) (69-70)
Oxygen, dissolved (DO)
00300 1 0 0
4
Effluent Gross Value ****** ****** Mo. MIN ****** ******
pH
00400 1 0 0
6 9
Effluent Gross Value ****** ****** Mo. MIN ****** Mo. MAX
Solids, total suspended
00530 1 0 0
94 15 40
Effluent Gross Value Mo. AVG ****** ****** Mo. AVG Mo. MAX
Nitrogen, ammonia total (as N)
00610 1 0 0
19 3 10
Effluent Gross Value Mo. AVG ****** ****** Mo. AVG Mo. MAX
Flow, in conduit or thru treatment plant
50050 1 0 0
0.75 REQ
Effluent Gross Value Mo. AVG Mo. MAX ****** ****** ******
Chlorine, Total Residual
50060 1 0 0
1 4
Effluent Gross Value ****** ****** Mo. MIN ****** Mo. MAX
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER TELEPHONE DATE
21/07/09
WWTP Director
TYPED OR PRINTED AREA CODE NUMBER YEAR MO DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA FORM 3320-1 (REV. 9-88) Previous editions may be used. Page 1 of 2
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR WITH
THE INFORMATION SUBMITTED HEREIN AND BASED ON MY INQUIRY OF THOSE INDIVIDUALS IMMEDIATELY
RESPONSIBLE FOR OBTAINING THE INFORMATION. I BELIEVE THE SUBMITTED INFORMATION IS TRUE,
ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE
INFORMATION INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT SEE 18 USC ,1001 AND 33 USC
,1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO $10,000 AND OR MAXIMUM
IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.)
SIGNATURE OF PRINCIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
05/wk GR
PERMIT
REQUIREMENT 05/WK GR
TM
SAMPLE
MEASUREMENT ****** ****** 2.580 ****** 3.900 mg/L 0
****** 0 99/99 TM
PERMIT
REQUIREMENT 99/99
SAMPLE
MEASUREMENT 0.4280 0.6000 MGD ****** ******
5/30 CS
PERMIT
REQUIREMENT 01/07 CS
CS
SAMPLE
MEASUREMENT <40.0 ****** lbs/day ****** <1.35 6.34 mg/L 0
1.37 mg/L 0 4/30 CS
PERMIT
REQUIREMENT 01/07
SAMPLE
MEASUREMENT <9.64 ****** lbs/day ****** <1.09
4/30 GR
PERMIT
REQUIREMENT 01/30 GR
GR
SAMPLE
MEASUREMENT ****** ****** 7.38 ****** 7.99 SU 0
****** mg/L 0 4/30 GR
PERMIT
REQUIREMENT 01/07
SAMPLE
MEASUREMENT ****** ****** 7.21 ******
TX0119181
PERMIT NUMBER DISCHARGE NUMBER
MONITORING PERIOD
NO DISCHARGE [ ]
12
Page 44
PERMITTEE NAME/ADDRESS: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) FORM APPROVED
Name: Northgate Crossing MUD 2 DISCHARGE MONITORING REPORT (DMR) OMB No.2040-0004
001 A
Facility: Northgate Crossing MUD 2
FROM 21/06/01 TO 21/06/30 *** ***
(YY/MM/DD) (YY/MM/DD) NOTE: Read instructions before completing this form.
PARAMETER (3 Card Only) Quantity or Loading (4 Card Only) Quality or Concentration NO. Frequency of Sample
(32-37) (46-53) (54-61) (38-45) (46-53) (54-61) EX analysis Type
Average Maximum Unit Minimum Average Maximum Unit (62-63) (64-68) (69-70)
E. coli
51040 1 0 0
63 200
Effluent Gross Value ****** ****** ****** Geo Mean Mo. MAX
BOD, carbonaceous (5 day, 20 C)
80082 1 0 0
63 10 25
Effluent Gross Value Mo. AVG ****** ****** Mo. AVG Mo. MAX
NAME/TITLE PRINCIPAL EXECUTIVE OFFICER TELEPHONE DATE
21/07/09
WWTP Director
TYPED OR PRINTED AREA CODE NUMBER YEAR MO DAY
COMMENT AND EXPLANATION OF ANY VIOLATIONS (Reference all attachments here)
EPA FORM 3320-1 (REV. 9-88) Previous editions may be used. Page 2 of 2
I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR WITH
THE INFORMATION SUBMITTED HEREIN AND BASED ON MY INQUIRY OF THOSE INDIVIDUALS IMMEDIATELY
RESPONSIBLE FOR OBTAINING THE INFORMATION. I BELIEVE THE SUBMITTED INFORMATION IS TRUE,
ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE
INFORMATION INCLUDING THE POSSIBILITY OF FINE AND IMPRISONMENT SEE 18 USC ,1001 AND 33 USC
,1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO $10,000 AND OR MAXIMUM
IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.)
SIGNATURE OF PRINCIPAL EXECUTIVE
OFFICER OR AUTHORIZED AGENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
SAMPLE
MEASUREMENT
PERMIT
REQUIREMENT
CS
SAMPLE
MEASUREMENT
2.80 mg/L 0 4/30 CS
PERMIT
REQUIREMENT 01/07
SAMPLE
MEASUREMENT <23.7 ****** lbs/day ****** <2.22
MPN/100m
L 0 2/30 GR
PERMIT
REQUIREMENT 02/30 GR
MONITORING PERIOD
NO DISCHARGE [ ]
SAMPLE
MEASUREMENT ****** ****** ****** <1 <1
TX0119181
PERMIT NUMBER DISCHARGE NUMBER
13
Page 45
NORTHGATE CROSSING MUD #1 STORM STATIONJuly 2021
DATE: August 6, 2021
Present Status
Generator: Yes Exercised
Pump No. 1: Not Exercised
Pump No. 2: Not Exercised
Pump No. 3: Not Exercised
Pump No. 4: Not Exercised
Flapper Gates: Operational (Automatic)
Sluice Gates: Operational
All three gates operate properly in the automatic mode
Controls
Operational (Automatic) exercised weekly
Generator: Yes Exercised
Pumps: Not Exercised
Sluice Gate: Not Exercised
Auto Dialer: Not Exercised
Other Equipment
Level Sensors: (pond and creek) Operational
Chart Recorder: Operational
Other Repairs in progress
Siren installed waiting on programming.
Recommended repairs
Levee Inspection
All good
14
Page 46
15
~---8
RIP RAP OCATIDN
I ' ... ,
400 200 0
lilspoct!on performod by: Date:
' -
400
• ~ A
: <'1--------:------------__;_ ___ .:__ __ _L __
Scanned wiitlh CamScanner Page 47
16
t j
3
~---8]
RIP RAP LOCATION
(
l .....
400 200 0
... A:ll o~
·. Cf!:, lnspoatlon porformod by; =r---=--_,..__
n~t•,__,2: ....... Hx..._o" 1.,.=.;..1 _
400
Scanned w]th CamScann,er Page 48
17
t ' L._
400 200 0 "=c:~=!aasea=sai400
liCm:. . •. {lj 1 {) l.<...
t
,.,.
~---8 .. ~. )
:
= ·-----------:----------------__;. _________ .i_ __ _
S,canned w~ith CamScann,er Page 49
DispositionFirst Call
Resolution
Number of
CallsPercentage
General Account Inquires 6 8 75.00
Delinquency 3 7 42.86
Do Not Select 0 7 0.00
Billing Inquiries 1 6 16.67
MVO 2 3 66.67
Service Outages/Leaks 0 3 0.00
MVI 1 2 50.00
MVI/MVO 1 2 50.00
Miscellaneous 1 1 100.00
New Service/Follow-Up 1 1 100.00
Water Quality Concern 1 1 100.00
Adjustment Requests
Call Back no Answer
Escalation
IVR/AVR Payment Inquiries
Misapplied Payment
Password Reset
Policy Dispute
Reread
Smart Meter Inquiries
Tax Assessor
Trash Inquiry
TOTAL 17 41 41.46
Reporting on date: 6/1/2021 through 6/30/2021
District Call Report
Northgate Crossing M.U.D. 1
19
Page 51
Sched# District Asset ID Asset Description Asset Address Activity Code Activity Description Interval Last CompNext
Sched
7383 NOC1DNOC1D-
SWP1
Northgate Crossing MUD # 1 -
Storm Water Pump Station # 1
710 Creek Knoll
Blvd PM1MGENLD
One Month Generator
Load Test PM
(Mechanical) must verify
work type
1-M 7/22/2021 9/1/2021
June 2021
NOC1D - InfraSMART (Scheduled Maintenance Asset Reliability Tracker)
20
Page 52
Date
Complete
WO
Number
Address Task Details Equipment
Costs
Labor
Costs
Materials/Other
Service Costs
Sales Tax
Total
Total Costs B/C
Administrative
Services
7/2/2021 2595372 NOC1D District
Area
Deliver or Post Notices in a District
Area; Delivered posting to lift station
$8.26 $23.93 $4.69 $0.00 $36.88 N
Administrative Services Total $8.26 $23.93 $4.69 $0.00 $36.88
AD Total $8.26 $23.93 $4.69 $0.00 $36.88
General
Maintenance &
Repairs
7/19/2021 2607150 23738 Northgate
Crossing Blvd
General Repair or Maintenance of an
Asset at a Lift Station;
$4.13 $19.64 $4.69 $0.00 $28.46 N
General Maintenance & Repairs Total $4.13 $19.64 $4.69 $0.00 $28.46
Other
Maintenance
4/29/2021 2499510 23738 Northgate
Crossing Blvd
Lift Station Cleanup; Sched#: 7178
SchedType: CSEM DateSched:
04/01/21
$1,077.18 $439.08 $306.36 $0.00 $1,822.62 N
Other Maintenance Total $1,077.18 $439.08 $306.36 $0.00 $1,822.62
Preventative
Maintenance
6/11/2021 2556688 23738 Northgate
Crossing Blvd
Three Month Communication & Alarm
System PM (Electrical); Sched#: 2020
SchedType: ELEC DateSched:
06/01/21
$33.05 $73.16 $1.56 $0.00 $107.77 N
Preventative Maintenance Total $33.05 $73.16 $1.56 $0.00 $107.77
LS2 Total $1,114.36 $531.88 $312.62 $0.00 $1,958.85
LS Total $1,114.36 $531.88 $312.62 $0.00 $1,958.85
Grease Trap
Inspections
7/13/2021 2587752 23535 Northgate
Crossing Blvd
Monthly Grease Trap Inspections -
Commercial; HILTON GARDEN END -
1 GT - JULY
$0.00 $0.00 $61.96 $0.00 $61.96 N
LS2
Maintenance, Sewer
INVOICE DATE: 7/23/2021
Work Type / Sub
Category
Administrative
Maintenance, Lift
Station
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
21
Page 53
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
7/13/2021 2587756 23535 Northgate
Crossing Blvd
Monthly Grease Trap Inspections -
Commercial; HOMEWOOD SUITES -
1 GT - JULY
$0.00 $0.00 $61.96 $0.00 $61.96 N
Grease Trap Inspections Total $0.00 $0.00 $123.92 $0.00 $123.92
MS Total $0.00 $0.00 $123.92 $0.00 $123.92
General
Maintenance &
Repairs
6/2/2021 2562327 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 06/02/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/2/2021 2562878 914 Chapwood Ct Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/2/2021 2563327 906 Chapwood Ct Investigate a Water System Problem;
cs email reporting low pressure
$8.26 $23.28 $0.68 $0.00 $32.22 N
6/2/2021 2563750 23311 Adambury
Ct
Flushing of a Water System;
MONTHLY Dead End Flushing.
$16.52 $46.56 $0.68 $0.00 $63.76 N
6/10/2021 2571030 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thurs
DateSched: 06/10/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/11/2021 2572256 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 06/11/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/14/2021 2572258 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 06/14/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/12/2021 2572268 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 06/12/21
$4.13 $29.46 $0.90 $0.00 $34.49 N
6/13/2021 2572269 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 06/13/21
$8.26 $40.16 $0.90 $0.00 $49.32 N
6/10/2021 2572369 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$16.52 $58.20 $0.00 $0.00 $74.72 N
6/11/2021 2573433 NOC1D District
Area
Hang Tags in District Area (Delinquent,
NSF, customer service notice, boil
water notices (active & resend), VWU);
Red Tags
$37.17 $104.76 $4.07 $0.00 $146.00 N
Maintenance, Water
22
Page 54
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
6/14/2021 2573650 NOC1D District
Area
Check for Zero Usage (Stuck or
Broken Meter, Separate WO to
Replace) Multi-Address WO - See Bulk
Accounts tab for list of Addresses;
DateSched: 06/14/21
$37.17 $104.76 $0.68 $0.00 $142.61 N
6/15/2021 2574942 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due tues
DateSched: 06/15/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/14/2021 2575020 NOC1D District
Area
Flushing of a Water System; $82.60 $244.44 $0.68 $0.00 $327.72 N
6/14/2021 2575021 826 Slate Valley
Ln
Repair, Replace or Adjust a Water
Meter Box Assembly; Meter was was
sticking to far out of ground creating
trip hazard, reset box
$8.26 $23.28 $0.68 $0.00 $32.22 N
6/14/2021 2575509 914 Ivycroff Ln Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/16/2021 2576568 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 06/16/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/15/2021 2576695 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing, water stayed brown
for about 45 minutes before it cleared
up.
$24.78 $69.84 $0.68 $0.00 $95.30 N
6/17/2021 2577811 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thurs
DateSched: 06/17/21
$4.13 $13.39 $0.90 $0.00 $18.42 N
6/16/2021 2577865 NOC1D District
Area
Hang Tags in District Area (Delinquent,
NSF, customer service notice, boil
water notices (active & resend), VWU);
Pass out notices for future repair.
$41.30 $116.40 $10.34 $0.00 $168.04 N
6/17/2021 2577960 906 Chapwood Ct Turn Off, Disconnect Water Service for
Non Payment - Vacant With Usage,
NSF Returned Check, or Delinquent
List - From Billing Department; DLQ
DateSched: 06/17/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/17/2021 2578247 1011 Backland Ct Investigate Water System Leak; leak
near meter
$8.26 $23.28 $0.68 $0.00 $32.22 N
6/17/2021 2578536 906 Chapwood Ct Turn On Water Service After
Disconnect for Non Payment; Re-
connect from turn off
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/17/2021 2578601 715 Cape
Cottage Ln
No Water Call, Investigate Problem; cs
email reporting no water
$8.26 $29.10 $0.68 $0.00 $38.04 N
23
Page 55
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
6/17/2021 2578673 718 Silver Cliff Ln No Water Call, Investigate Problem;
cci no water
$8.26 $29.10 $0.68 $0.00 $38.04 N
6/18/2021 2578905 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 06/18/21
$4.13 $13.39 $0.90 $0.00 $18.42 N
6/21/2021 2578907 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 06/18/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/19/2021 2578925 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 06/18/21
$8.26 $40.16 $0.90 $0.00 $49.32 N
6/20/2021 2578926 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 06/18/21
$8.26 $40.16 $0.90 $0.00 $49.32 N
6/17/2021 2579044 NOC1D District
Area
Meet and/or Assist Consultants or
Contractors at a Water System; Assist
contractors on main break
creek knoll and cape cottage NOC1
$61.95 $282.20 $0.68 $0.00 $344.83 N
6/18/2021 2579049 NOC1D District
Area
Investigate Poor Water Quality of a
Water System; Flushing for pwq
$57.82 $263.38 $0.68 $0.00 $321.88 N
6/18/2021 2579401 1122 Turnberry
Park Ln
Meet and/or Assist Consultants or
Contractors at a Water System; met
Third Coast Environmental to pull
samples for state testing
$12.39 $40.16 $0.68 $0.00 $53.23 N
6/18/2021 2580011 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$28.91 $101.85 $0.68 $0.00 $131.44 N
6/22/2021 2581244 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due tues
DateSched: 06/22/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/21/2021 2581714 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$45.43 $139.68 $0.68 $0.00 $185.79 N
6/23/2021 2583532 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 06/23/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/24/2021 2584625 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thurs
DateSched: 06/24/21
$4.13 $19.64 $0.90 $0.00 $24.67 N
6/25/2021 2584637 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 06/24/21
$8.26 $26.77 $0.90 $0.00 $35.93 N
6/28/2021 2584638 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 06/24/21
$8.26 $27.31 $0.90 $0.00 $36.47 N
24
Page 56
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
6/26/2021 2584658 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 06/24/21
$20.65 $147.32 $0.22 $0.00 $168.19 N
6/27/2021 2584659 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 06/24/21
$8.26 $40.16 $0.90 $0.00 $49.32 N
6/23/2021 2585175 NOC1D District
Area
Flushing of a Water System; $20.65 $58.20 $0.68 $0.00 $79.53 N
6/24/2021 2585743 914 Ivycroff Ln Customer Move In - Read Meter,
Reconnect or Turn On Service;
DateSched: 06/25/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/25/2021 2586593 914 Ivycroff Ln No Water Call, Investigate Problem; $24.78 $69.84 $0.68 $0.00 $95.30 N
6/27/2021 2587300 NOC1D District
Area
Investigate a Water System Problem;
Sinkhole located performed dye test.
Found die in storm line. Notified lead
and account manager
$49.56 $209.52 $0.68 $0.00 $259.76 N
6/25/2021 2587577 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$33.04 $116.40 $0.68 $0.00 $150.12 N
6/28/2021 2587961 918 Millstone
Valley Ct
Customer Move In - Read Meter,
Reconnect or Turn On Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
6/28/2021 2589936 NOC1D District
Area
Create a Survey for Water System
Asset; Survey area for future
maintenance and repairs
$33.04 $93.12 $0.68 $0.00 $126.84 N
6/30/2021 2590639 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 06/30/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/1/2021 2592344 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thurs
DateSched: 07/01/21
$4.13 $13.66 $0.80 $0.00 $18.59 N
6/25/2021 2593816 NOC1D District
Area
AMR Administrative Duties; $0.00 $55.96 $0.00 $0.00 $55.96 N
7/2/2021 2593853 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 07/02/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/5/2021 2593854 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 07/02/21
$8.26 $40.97 $4.91 $0.00 $54.14 N
7/3/2021 2593861 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 07/02/21
$8.26 $40.97 $4.91 $0.00 $54.14 N
7/4/2021 2593862 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 07/02/21
$4.13 $29.46 $0.43 $0.00 $34.02 N
25
Page 57
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
7/6/2021 2593868 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due tues
DateSched: 07/02/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/1/2021 2593932 NOC1D District
Area
Investigate Water System Leak; 906
Hyland Green
Id:17083704 read 166
Located leaking blow off valve,
tightened valve, stopped leak.
$16.52 $46.56 $0.59 $0.00 $63.67 N
7/2/2021 2595338 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$33.04 $93.12 $5.55 $0.00 $131.71 N
7/2/2021 2595373 NOC1D District
Area
Investigate a Water System Problem;
Performed dye test on sinkhole near
shire field no dye present in storm
system
$24.78 $71.80 $27.12 $0.00 $123.70 N
7/7/2021 2596488 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 07/07/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/6/2021 2596573 1011 Backland Ct Meet and/or Assist Consultants or
Contractors at a Water System; Met
with customer and addressed issue
about b/o NOT being the cause of their
high water usage
$8.26 $29.10 $4.69 $0.00 $42.05 N
7/6/2021 2596574 23911 Kingmont
Knoll Ct
Investigate a Water System Problem;
Investigated issue with canted and
leaking b/o valve Created new w/o to
be repaired by CD crew
$8.26 $29.10 $4.69 $0.00 $42.05 N
7/6/2021 2596596 NOC1D District
Area
Meet and/or Assist Consultants or
Contractors at a Water System;
Went to meet with contractors at storm
station
$16.52 $47.87 $4.69 $0.00 $69.08 N
26
Page 58
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
7/6/2021 2596904 NOC1D District
Area
Investigate Water System Leak;
Mwinvl/ (Sw corner) park Heath / north
gate crossing Loc running into street
from meter box , pumped out water ,
loc irr control box inside, no leak ,
followed water trail further up front
easement and loc
leak from back flow preventer
$8.26 $29.10 $4.69 $0.00 $42.05 N
7/6/2021 2596905 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$41.30 $145.50 $4.69 $0.00 $191.49 N
7/8/2021 2597898 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thurs
DateSched: 07/08/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/8/2021 2598445 914 Chapwood Ct Customer Move In - Read Meter,
Reconnect or Turn On Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/9/2021 2598975 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 07/09/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/12/2021 2598976 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 07/09/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/10/2021 2598983 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 07/09/21
$24.78 $176.78 $4.91 $0.00 $206.47 N
7/11/2021 2598984 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 07/09/21
$8.26 $40.97 $4.91 $0.00 $54.14 N
7/9/2021 2599868 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing.
$74.34 $238.62 $6.41 $0.00 $319.37 N
7/12/2021 2600092 24206 Kingbriar
Dr
Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
DateSched: 07/12/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/12/2021 2600093 907 Saginaw Bay
Ct
Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
DateSched: 07/12/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/9/2021 2600296 NOC1D District
Area
Hang Tags in District Area (Delinquent,
NSF, customer service notice, boil
water notices (active & resend), VWU);
Pass out red tags
$41.30 $116.40 $9.52 $0.00 $167.22 N
7/12/2021 2600463 907 Saginaw Bay
Ct
Customer Move In - Read Meter,
Reconnect or Turn On Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
27
Page 59
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
7/13/2021 2601016 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due tues
DateSched: 07/13/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/14/2021 2602152 1030 Turnberry
Park Ln
Chlorine Residual in the Water
System; district residual due wed
DateSched: 07/14/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/14/2021 2602404 23906 Kingmont
Knoll Ct
Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
DateSched: 07/14/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/13/2021 2602511 NOC1D District
Area
Flushing of a Water System; monthly
dead end flushing
$16.52 $46.56 $4.91 $0.00 $67.99 N
7/15/2021 2603251 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due thur
DateSched: 07/15/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/15/2021 2603385 NOC1D District
Area
Billing Turn Off Multi-Address WO-
See Bulk Accounts tab for list of
Addresses; DateSched: 07/15/21
$0.00 $0.00 $103.28 $0.00 $103.28 N
7/15/2021 2603924 24206 Kingbriar
Dr
Customer Move In - Read Meter,
Reconnect or Turn On Service;
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/16/2021 2604272 907 Colewick Ct Investigate a Water System Problem;
cci flushings creating infiltration in yard
exposing tree roots.
$28.91 $81.48 $12.53 $0.00 $122.92 N
7/16/2021 2604308 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due fri
DateSched: 07/16/21
$8.26 $27.31 $4.91 $0.00 $40.48 N
7/19/2021 2604309 731 Cape
Cottage Ln
Chlorine Residual in the Water
System; district residual due mon
DateSched: 07/16/21
$4.13 $19.64 $4.91 $0.00 $28.68 N
7/17/2021 2604317 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sat
DateSched: 07/16/21
$8.26 $40.97 $4.91 $0.00 $54.14 N
7/18/2021 2604318 NOC1D District
Area
Chlorine Residual in the Water
System; district residual due sun
DateSched: 07/16/21
$16.52 $117.86 $4.91 $0.00 $139.29 N
7/16/2021 2604634 910 Ballardwood
Ct
Turn On Water Service After
Disconnect for Non Payment;
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/16/2021 2604664 24031 Pinecreek
Pt
Turn On Water Service After
Disconnect for Non Payment; cs email
request
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/15/2021 2604820 NOC1D District
Area
Flushing of a Water System; monthly
flush
$16.52 $58.20 $4.91 $0.00 $79.63 N
7/16/2021 2604934 907 Slate Valley
Ln
Turn On Water Service After
Disconnect for Non Payment;
$0.00 $0.00 $25.82 $0.00 $25.82 N
28
Page 60
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:04:34PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133711 - DETAIL
7/18/2021 2605213 706 Slate Valley
Ln
Investigate Water System Leak; water
leaking pump house behind his home
on the service road
$24.78 $109.02 $4.69 $0.00 $138.49 N
7/19/2021 2606372 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$20.65 $72.75 $4.69 $0.00 $98.09 N
7/20/2021 2606537 814 Autumn
Point Ln
Chlorine Residual in the Water
System; district residual due tues
DateSched: 07/20/21
$4.13 $19.64 $4.91 $0.00 $28.68 N
7/20/2021 2606931 719 Slate Valley
Ln
Customer Move Out - Read Meter,
Disconnect or Turn Off Service;
DateSched: 07/20/21
$0.00 $0.00 $25.82 $0.00 $25.82 N
7/20/2021 2607373 723 Slate Valley
Ln
No Water Call, Investigate Problem;
issue unknown
jeff 281-381-8137
$12.39 $34.92 $4.69 $0.00 $52.00 N
7/20/2021 2607757 NOC1D District
Area
Flushing of a Water System; Monthly
dead end flushing
$66.08 $186.24 $6.89 $0.00 $259.21 N
7/20/2021 2607770 906 Chapwood Ct Repair, Replace or Adjust a Water
Meter Box Assembly; Id:17083996
read 908
Replaced blow off valve box.
$8.26 $23.28 $20.41 $0.00 $51.95 N
General Maintenance & Repairs Total $1,474.41 $5,283.11 $792.04 $0.00 $7,549.56
Lab Fees or
Laboratory
Sampling
6/30/2021 2561916 NOC1D District
Area
Purchase Laboratory Services for
Water System Asset;
$0.00 $0.00 $248.40 $0.00 $248.40 N
Lab Fees or Laboratory Sampling
Total
$0.00 $0.00 $248.40 $0.00 $248.40
MW Total $1,474.41 $5,283.11 $1,040.44 $0.00 $7,797.96
Invoice Total $2,597.03 $5,838.92 $1,481.67 $0.00 $9,917.62
29
Page 61
Date
Complete
WO
Number
Address Task Details Equipment
Costs
Labor
Costs
Materials/Other
Service Costs
Sales Tax
Total
Total Costs B/C
General
Maintenance &
Repairs
6/17/2021 2578501 710 Creek Knoll
Blvd
Meet and/or Assist Consultants or
Contractors at a Storm Water Pumping
Facility; assisted contractor with valve
replacement
$45.43 $227.64 $0.68 $0.00 $273.75 N
6/18/2021 2579972 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Painted yellow caution
areas
$33.04 $93.12 $0.68 $0.00 $126.84 N
6/19/2021 2580346 710 Creek Knoll
Blvd
Investigate a Problem at a Storm
Water System Asset; intrusion alarm
storm station
$20.65 $147.32 $0.68 $0.00 $168.65 N
6/18/2021 2580386 710 Creek Knoll
Blvd
Meet and/or Assist Consultants or
Contractors at a Storm Water Pumping
Facility; Bring paint supplies to James
and assist with painting
$16.52 $46.56 $0.68 $0.00 $63.76 N
6/21/2021 2581308 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Noc1 storm station
Painted yellow caution areas
$33.04 $93.12 $0.68 $0.00 $126.84 N
6/22/2021 2583501 710 Creek Knoll
Blvd
Meet and/or Assist Consultants or
Contractors at a Storm Water Pumping
Facility; met contractor Texas Hot
Taps to walk feed channel leading to
storm station to get quote for sinkhole
repairs
$28.91 $113.78 $0.68 $0.00 $143.37 N
6/22/2021 2583630 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Paint Yellow caution
areas
$66.08 $186.24 $0.68 $0.00 $253.00 N
6/23/2021 2585108 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Painted yellow caution
areas
$66.08 $186.24 $0.68 $0.00 $253.00 N
6/25/2021 2587631 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; painted safety lines and
assets with district paint
$57.82 $162.96 $0.68 $0.00 $221.46 N
6/24/2021 2587831 710 Creek Knoll
Blvd
Investigate a Problem at a Storm
Water System Asset; intrusion alarm
$12.39 $58.93 $0.68 $0.00 $72.00 N
INVOICE DATE: 7/23/2021
Work Type / Sub
Category
Storm Water System
SW1
INFRAMARK, LLC 05 Aug 2021 12:08:18PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133712 - DETAIL
30
Page 62
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:08:18PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133712 - DETAIL
7/1/2021 2594169 710 Creek Knoll
Blvd
Meet and/or Assist Consultants or
Contractors at a Storm Water Pumping
Facility; met contractors to train on and
test evacuation siren
$115.64 $416.48 $0.59 $0.00 $532.71 N
7/7/2021 2598152 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Assisted operator at
storm station.
$8.26 $23.28 $4.69 $0.00 $36.23 N
7/9/2021 2599867 710 Creek Knoll
Blvd
General Repairs of a Storm Water
System Asset; Pull weeds and clean
storm station.
$33.04 $93.12 $4.69 $0.00 $130.85 N
7/14/2021 2604699 710 Creek Knoll
Blvd
Meet and/or Assist Consultants or
Contractors at a Storm Water Pumping
Facility;
$16.52 $201.08 $4.69 $0.00 $222.29 N
General Maintenance & Repairs Total $553.42 $2,049.87 $21.52 $0.00 $2,624.81
Inspections
7/9/2021 2599209 710 Creek Knoll
Blvd
Backflow Prevention Inspection -
Commercial; INSPECT AFTER
REPAIR
$0.00 $0.00 $103.27 $0.00 $103.27 N
Inspections Total $0.00 $0.00 $103.27 $0.00 $103.27
Maintenance
7/13/2021 2601901 710 Creek Knoll
Blvd
General Repair of a Storm Water
Facility Asset; Jaguar Fueling Tank
Rental July
$0.00 $0.00 $690.00 $0.00 $690.00 N
Maintenance Total $0.00 $0.00 $690.00 $0.00 $690.00
Predictive
Maintenance
6/17/2021 2556690 710 Creek Knoll
Blvd
One Month Generator Load Test PM
(Mechanical) must verify work type;
Sched#: 7383 SchedType: ELEC
DateSched: 06/01/21
$66.10 $145.50 $2.63 $0.00 $214.23 N
Predictive Maintenance Total $66.10 $145.50 $2.63 $0.00 $214.23
Preventative
Maintenance
6/11/2021 2556689 710 Creek Knoll
Blvd
Three Month Communication & Alarm
System PM (Electrical); Sched#: 2021
SchedType: ELEC DateSched:
06/01/21
$66.10 $146.31 $1.03 $0.00 $213.44 N
Preventative Maintenance Total $66.10 $146.31 $1.03 $0.00 $213.44
Taps &
Inspections
31
Page 63
INVOICE DATE: 7/23/2021
INFRAMARK, LLC 05 Aug 2021 12:08:18PM CST
DISTRICT : NORTHGATE CROSSING MUD 1 Go Green! Think before you print.
INVOICE NO. 1133712 - DETAIL
7/9/2021 2599207 710 Creek Knoll
Blvd
Backflow Prevention Repairs -
Commercial; REPAIR CALLED IN BY
CHAD BUCKLEY (OPERATOR) 2 IN
BACKFLOW PREVENTER MAY
HAVE TRASH AND DEBRIS IN THE
DEVICE CAUSING IT TO WATER
OUT OF THE BOTTOM EVERY FEW
MINUTES.
$82.60 $425.44 $151.25 $0.00 $659.29 N
Taps & Inspections Total $82.60 $425.44 $151.25 $0.00 $659.29
SW1 Total $768.22 $2,767.12 $969.69 $0.00 $4,505.03
SW Total $768.22 $2,767.12 $969.69 $0.00 $4,505.03
Invoice Total $768.22 $2,767.12 $969.69 $0.00 $4,505.03
32
Page 64
Juan G. MontanoAccount Manager, Inframark
Northgate Crossing M.U.D. #1Confidentiality Delinquent Report
June 2021Board Meeting 8/12/2021
Submitted by:
for the month of
1 Page 65
DELINQUENT LETTER ACCOUNTS LISTING - DUE 08/18/2021
District: 661 NORTHGATE CROSSING MUD #1 Select Status... Arrears Only Date: 08/10/2021 Page: 1
Account * Name Service Address Original Arrears Current Balance Letter Due Last Paid Deposit TD Rent/Own
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
661-00033-00 NORTHWOOD PINES HOA NORTHGATE CROSSNG/HAR 129.91 129.91 227.28 372.19 372.19 06/22/2021 .00 2 Owner
661-00034-00 NORTHWOOD PINES HOA NORTHGATE CROSSNG/KIN 183.28 183.28 172.69 370.97 370.97 06/22/2021 .00 3 Owner
661-00035-03 OBANDO JUAN 24327 HYLAND GREENS LN 109.16 109.16 109.39 233.55 233.55 06/15/2021 100.00 1 Owner
661-00055-07 DISHONGH MICHELLE 907 MORLEY PARK LN 103.60 103.60 84.09 202.69 202.69 06/25/2021 250.00 14 Renter
661-00080-09 * LAWSON JAUNICIA 1022 TURNBERRY PARK LN 134.74 134.74 109.39 259.13 259.13 07/01/2021 150.00 3 Renter
661-00102-02 MCCAULEY MICHAEL 24235 PINECREEK PT 98.03 98.03 94.21 207.24 207.24 06/24/2021 50.00 11 Owner
661-00106-02 ANTOINE ROGER/ANTOINE SABRIN 910 PINECREEK POINT CT 108.87 108.87 89.15 213.02 213.02 06/16/2021 150.00 36 Owner
661-00117-02 ANTERI DIAZ MAURICIO 906 CHAPWOOD CT 818.99 818.99 89.15 923.14 923.14 06/18/2021 200.00 7 Owner
661-00120-13 TURNER TIESE 910 CHAPWOOD CT 86.90 86.90 73.97 175.87 175.87 06/12/2021 250.00 16 Renter
661-00126-04 RIDDICK ALTHEA 918 CHAPWOOD CT 86.90 86.90 79.03 180.93 180.93 06/23/2021 250.00 27 Owner
661-00167-05 BOSTICK JORDAN 907 PARSONFIELD CT 81.33 81.33 68.91 165.24 165.24 06/24/2021 150.00 1 Renter
661-00184-00 NORTHWOOD PINES HOA NW CRNR NGATE CRSNG/S 123.23 123.23 130.24 268.47 268.47 06/22/2021 .00 4 Owner
661-00201-05 KENT BRIAN 923 SHIREFIELD LN 78.06 78.06 84.09 177.15 177.15 07/01/2021 200.00 7 Renter
661-00242-00 NORTHWOOD PINES HOA 120' W OF WHITECROFT/N SID 536.83 536.83 494.14 1,045.97 1,045.97 06/22/2021 .00 3 Owner
661-00274-08 GONZALEZ JESUS/GOMEZ MODESTA 803 SLATE VALLEY LN 86.90 86.90 73.97 175.87 175.87 06/26/2021 100.00 3 Owner
661-00297-02 CLEMONS TIFFANY 814 SLATE VALLEY LN 90.00 90.00 89.15 194.15 194.15 07/15/2021 200.00 16 Owner
661-00328-09 MARBLEY TONI 23906 BONNYBROOK CT 120.30 120.30 115.96 131.26 131.26 06/16/2021 150.00 4 Renter
661-00375-07 MEJIA CLAUDIA 1010 STILLGATE CT 98.03 98.03 89.15 202.18 202.18 06/19/2021 200.00 11 Owner
661-00411-08 JAMISON TAMARA 914 SLATE VALLEY LN 81.33 81.33 73.97 170.30 170.30 06/15/2021 150.00 14 Owner
661-00415-02 * DAVINI ANTHONY 726 SLATE VALLEY LN 68.91 68.91 68.91 152.82 152.82 06/22/2021 150.00 9 Owner
661-00423-05 MARSHALL ODELL 915 SLATE VALLEY LN 113.03 113.03 84.09 212.12 212.12 06/11/2021 250.00 11 Renter
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Items Count: 21 3,338.33 3,338.33 2,500.93 6,034.26 6,034.26
2 Page 66
661 NORTHGATE CROSSING MUD #1 COLLECTION ACCOUNTS LISTING Date:06/10/2021 Page: 1
Account Name Service Address Status TOA Curr. Bal Arrears Pay/Adj Balance* Sec. Deposit Day Deql Fin.Date--------------------------------------------------------------------------------------------------------------------------------------------------------------------------661-00419-14 MARION JEANINE 919 SLATE VALLEY LN OFIN R .00 362.43 .00 362.43 0.00 120 Days 01/21/21
---------------------------------------------------------------------------------------------------------------------------------------------------------------- Total: 362.43
3 Page 67
CUT OFF LISTING - DUE 06/16/2021 District: 661 NORTHGATE CROSSING MUD #1 Date: 06/16/2021 Page: 1
Account Name Service Address Delq. Due Deposit Meter #
--------------------------------------------------------------------------------------------------------------------------------
661-00117-02 ANTERI DIAZ MAURICIO 906 CHAPWOOD CT 2,701.09 200.00 17083996
Rent/Own: Owner Rte._661 Seq._ 20290 Last Read: 720.0
________________________________________________________________________________________________________________________________
Items Count: 1
4 Page 68
1
11803 Grant Road, Suite 208 Cypress, TX 77429 281.257.3375 ~ www.parkrangersllc.com
N O R T H G A T E M U D N O . 1 AUGUST 12, 2021
Landscape Management Report
LIGHTING Bridge lighting – Contractor has completed the installation of the bridge lighting. We still need to touch up conduit painting on the leads to lamps on bridge. TFH availability LANDSCAPE MAINTENANCE Trees blocking stop signs to be trimmed. Fountain checked and working. LEVEE No issues.
DESIGN
SplashPad/detention Pre-Con held. Start date is 16th of Sept.
Budget to Date: in budget SCHEDULE Rev July. 2021 Parking Engineer’s est 250K TBD
Splash Park* 206K 2021 approved late Summer 2021
Utilities* (elec, drng) 12K 2021 approved late Summer 2021
Pergola 122K TBD TBD
Switchback est. 185K ON HOLD
Bridge lighting* 27K 2021 COMPLETE
Lighting* 253K 2020 COMPLETE
Raising Cane’s
Lines unburied on Blvd.
Page 69