1 HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT 1. The Principal Secretary (AR ) to the Govt. of HP, Shimla-2 alongwith C.D. for information and necessary action please. NOTIFICATION In exercise of powers vested under Section-4 of the Right to Information Act, 2005 (Act No. 22 of 2005, I hereby publish the following information pertaining to Himachal Pradesh Public Works Department as required under the provision of Sub-Section (1) (b) of Section-4 of the Right to Information Act 2005 as per annexure-“A” Engineer-in-Chief, HP.PWD., Shimla-171001. No:-PW (B )-R.T.I.Act-2005 /WS- dated:- Copy forwarded for information and necessary action to:- The Principal Secretary (PW ) to the Govt. of HP,Shimla-2 for information and necessary action please. 2. All the Chief Engineers in HP,PWD with the request that a copy of this Notification may be circulated to all the Superintending Engineers / Executive Engineers under your zones for its compliance as per the provision prescribed under Right to Information Act, 2005. 3. All the Superintending Engineers under South Zone. 4. The Controller Printing &Stationary, HP Govt. Press, Shimla-5 alongwith C.D.for publication in the Rajpatra (Extra Ordinary).After publication ten(10) copies of Rajpatra may kindly be supplied to this office please. 5. The Director, Information and Public Relations, HP, Majitha House, Shimla-2 alongwith C.D. for publication in the news papers (Hindi / English ), Copy of the Same be sent to this office. 6. The Sr. Chief Architect, Shimla-1. 7. All the Land Acquisition Officers in HP,PWD. 8. The Superintending Engineers, Nahan Foundary,HP,PWD, Nahan. 9. Superintending Engineer,Mech.Circle,HP,PWD,Dhalli. Engineer-in-Chief, HP.PWD., Shimla-171001.
Transcript
Page 1: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

1

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

1. The Principal Secretary (AR ) to the Govt. of HP, Shimla-2 alongwith C.D. for information and necessary action please.

NOTIFICATION In exercise of powers vested under Section-4 of the Right to Information Act, 2005 (Act No.

22 of 2005, I hereby publish the following information pertaining to Himachal Pradesh Public

Works Department as required under the provision of Sub-Section (1) (b) of Section-4 of the Right

to Information Act 2005 as per annexure-“A”

Engineer-in-Chief, HP.PWD., Shimla-171001.

No:-PW (B )-R.T.I.Act-2005 /WS- dated:-

Copy forwarded for information and necessary action to:-

The Principal Secretary (PW ) to the Govt. of HP,Shimla-2 for information and necessary action please.

2. All the Chief Engineers in HP,PWD with the request that a copy of this Notification may be circulated to all the Superintending Engineers / Executive Engineers under your zones for its compliance as per the provision prescribed under Right to Information Act, 2005. 3. All the Superintending Engineers under South Zone. 4. The Controller Printing &Stationary, HP Govt. Press, Shimla-5 alongwith C.D.for publication in the Rajpatra (Extra Ordinary).After publication ten(10) copies of Rajpatra may kindly be supplied to this office please. 5. The Director, Information and Public Relations, HP, Majitha House, Shimla-2 alongwith C.D. for publication in the news papers (Hindi / English ), Copy of the Same be sent to this office. 6. The Sr. Chief Architect, Shimla-1. 7. All the Land Acquisition Officers in HP,PWD. 8. The Superintending Engineers, Nahan Foundary,HP,PWD, Nahan. 9. Superintending Engineer,Mech.Circle,HP,PWD,Dhalli.

Engineer-in-Chief, HP.PWD., Shimla-171001.

Page 2: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

2

INFORMATION REGARDING IMPLEMENTATION OF SECTION 4(1) OF THE RIGHT TO INFORMATION ACT 2005 PERTAINING TO PUBLIC WORKS DEPARTMENT IS AS UNDER: ITEM No. 1 TO IV THE PARTICULARS OF ORGANISATION, FUNCTIONS, DUTIES AS WELL AS THE POWERS OF THE OFFICERS AND ITS EMPLOYEES WHILE TAKING DECISIONS AS PER PROCEDURES ESTABLISHED UNDER VARIOUS RULES AND REGULATIONS ISSUED BY GOVT. OF H. P. INCLUDING CHANNELS OF SUPERVISION AND ACCOUNTABILITY ARE AS UNDER: The Particulars of organization, of Public Works Deptt. state of HP is as under:-

1. Civil Engineering Wing (Buildings, Roads & Bridges)

OVER ALL ORGANISATIONAL LEVEL: Minister-in-Charge- Sh. Virbhadra Singh Hon’ble Chief Minister, H. P. Secretary- Sh. Narinder Chauhan, Pr. Secy. (PW), to the Govt. of H. P. Head of the Department- Er. Pradeep Chauhan, Engineer-in-Chief, HP.PWD., Niram Bhawan,Nigam Vihar, Shimla-2.

The Department of Public works in its organizational set-up is divided into following four wings.

2. Civil Engineering (Design & Quality Control) 3. Architectural wing 4. Mechanical wing. 5. Electrical wing. The Govt. of HP in order to get the work done smoothly and efficiently further established three zonal offices beside separated National Highway wing from Roads & Bridges Wing and further declared these offices as head of the Deptt. which are as follow in Civil Engineering Wing :- 1. Chef Engineer (SZ) Nirman Bhawan, Nigam Vihar, Shimla consisting of Distt.

Kinnour, Shimla, Solan and Sirmour comprising 3rd ,4th, 11th, 12th, 14th, Arb..and Nahan Foundry Circles.

2. Chief Engineer (MZ) Mandi 3. Chief Engineer(KZ) Dharamshala 4. Chief Engineer(HZ) Hamirpur 5. Chief Engineer (NH) U.S. Club, Shimla 6. Chief Engineer Design & Quality Control.

Page 3: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

3

Beside this even Chief Engineer (D) office has also been entrusted to monitor and Control the design and quality control wing of the entire State. The entire functioning by the organizational set up is carried out on behalf

of State of H.P as per the directions issued by administrative Secretary who exercise powers under articles 164 of the constitution of India on behalf of Governor of Himachal Pradesh This authorization (here-in-after called the Himachal Pradesh Govt. or Govt.). Exercise full financial control over the affaires of the Public works Deptt., except those in connection with the residence of the Governor expenditure of which is charged within the limits fixed by the Secretary of the State on the revenue of the province. (1) The establishment of the Deptt. is further divided into following two

establishment. i. Office establishment ii. Field establishment The entire organization is governed under Centre Civil Service rules adopted by state of HP Being purely an Engineering Department the PWD has varied functions and duties to perform with its own system of accounting & administrative procedure and execution of works. Economy & efficiency and quality works are important factors, which the Department is required to keep in view at each stage in execution of various Projects entrusted to it by the Govt. of H.P. By following this proper procedure, delays could be avoided bottlenecks removed in the planning & execution of works more effectively and efficiently are carried out so as to avoid price escalation beside achieving the targeted work within budgeted allocation with quality work. At execution level the organizational step up is as under:- 1. Zonal office headed by Chief Engineer 2. Circle office headed by Superintending Engineer. 3. Divisional level headed by Executive Engineer. 4. Sub Divisional level headed by Assistant Engineer. 5. Section level headed by Junior Engineer.

Normally under an Division four Sub Division are established and under one Sub Divn four sections are established which can be very as per workload.

Page 4: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

4

FUNCTIONS AND DUTIES OF THE ORGANIZATION

The organization is known as Himachal Pradesh Public Works Department. The functions of the department is construction, maintenance & repair of buildings, road, bridges of State & National Highways. In addition to this department also construct & maintain Government Residential & Non-Residential buildings of other Govt. Departments. THE POWERS AND DUTIES OF ITS OFFICERS AND EMPLOYEES The duties & powers of the departmental officers & its employees have been discussed in detail in the Punjab PWD manual of orders-1962 vide chapter No. 5, which is applicable in the HPPWD, with the time to time amendments issued by Government of Himachal Pradesh.

1. HPPWD Schedule of rates 1999(CIVIL WORKS)

MANUAL AND RECORDS HELD BY THE ORGANIZATION

2. HPPWD Schedule of rates 1996(ELECTRICAL WORKS) 3. HPPWD Specifications 1990(CIVIL WORKS) 4. HPPWD Specifications 1996(ELECTRICAL WORKS) 5. PWD Manual of Orders 6. PMGSY & World Bank Guidelines and specifications for preparation of DPR,

execution of works & Accounts Manual 7. HPFR & Treasury Rules. 8. For N. H. works the specifications & Data Book published by MORTH (Receipt

& Payment Manual) ITEM NO.V

1. F.R.S.R.

The Rules & Regulations, instructions, manual and records applicable in function of PWD & lying under its control are on follow:-

2. CCS&CCA Rules 3. CCSCA Rules 4. GPF Rules 5. Pension Rules 6. All Engineering side books based All India Engineering Level for

structure and designing. 7. Financial Rule of state of HP Vol-I,II,II-1971 Rules. 8. PWD manual and code, Punjab manual and code 9. Code & specification of state PWD.

Page 5: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

5

10. Procedure of PMGSY, NABARD, World Bank & others centrally sponsored scheme & projects.

11. National Highway: MORTH (Receipt & Payment) Part-I – Compendium of orders & Directives issued by MORTH. Part-II – Payments & Accounting Procedure, Internal Audit, Post checking of National Highway.

All these books readily available in the open market as well as in the office at U.S. club.

ITEM NO.VI :

1. F.R.S.R.

The statement of various categories of documents applicable in functioning of PWD and lying under its control are as follow:-

2. CCS&CCA Rules 3. CCSCA Rules 4. GPF Rules 5. Pension Rules 6. All Engineering side books based All India Engineering Level for

structure and designing. 7. Financial Rule of state of HP Vol-I,II,II-1971 Rules. 8. PWD manual and code, Punjab manual and code 9. Code & specification of state PWD. 10. Procedure of PMGSY, NABARD, World Bank & others centrally

sponsored scheme & projects. 11. For National Highway works : MORTH Rules are applicable.

The above document, manual of orders specification codes are readily available with the Public works department.

ITEM NO. VII THE PARTICULARS OF THE ARRANGEMENTS FOLLOWED BY THE PUBLIC WORKS DEPARTMENT FOR CULTATION WITH OR REPRESENTATION BY, THE MEMBERS OF THE PUBLIC IN RELATION TO FORMULATION OF ITS VARIOUS POLICY OR ADMINISTRATION THEREOF ARE AS UNDER:

Page 6: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

6

PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY) INCLUDING WORLD BANK FUNDED PROJECTS:

Guiding Principles of PMGSY: 1. The primary objective of the PMGSY is to provide connectivity by way of an all

weather road to the eligible un-connected habitations in the rural area, in such a

way that all un-connected habitations with a population of 1000 persons and above are

covered in three year (2000-2003) and all un-connected habitations with a

population of 500 persons and above by the end of the Tenth Plan Period (2007). In

respect of Hill State (North-East, Sikkim, Himachal Pradesh, Jammu & Kashmir,

Uttranchal) and the desert areas (as identified in the Desert Development Programme) as

well as the ribal (Schedule-V) area, the objective would be to connect habitations with a

population of 250 persons and above.

2. The PMGSY will permit the upgradation (to the prescribed standards) of the

existing roads in those districts where all the eligible habitations of the designated

population size have been provided all weather road connectivity. However, it must be

noted that upgradation is not central to the programme and can not exceed 20% of the

state’s allocation as long as eligible un connected habitations in the state still exist.

3. The spirit and objective of the PMGSY is to provide all weather road connectivity

to un-connected habitations. A habitation which was earlier provided all weather road

connectivity would not be eligible even if the present condition of road is bad.

4. The unit of this programme is a habitation and not a revenue village or a

panchayat.

5. An un-connected habitation is one with a population of designated size (250

person and above in case of hill state) located at a distance of atleast 1.5 Km. of path

distance in case of hills from an all weather road.

Page 7: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

7

6. The population of all habitations within a radius of 500 meters (1.5 Km of path

distance in case of hills) may be clubbed together for the purpose of determining the

population size.

7. The PMGSY envisages only single road connectivity to be provided. If a

habitation is already connected by way of an all weather road, then no new work can be

taken under PMGSY for that habitation.

8. Land should be made available by the State Govt. free from all encumbrances.

9. PMGSY does not permit repairs to black topped roads, even if the surface

condition is bad.

10. Priority of State Govt. is to connect the un-connected Panchayat Headquarters.

Planning Funding Construction: Connecting rural habitations through good quality all weather roads, which

provide access to services and also opportunities for the rural population to increase their

income, is an important part of the socio-economic development process. For sustainable

development through rural roads, it is necessary that a proper Master Plan is prepared in

order that all activities relating to rural roads such as Construction, Up gradation and

Maintenance can be taken up systematically within the frame work of this Master Plan.

For implementation of PMGSY, the National Rural Roads Development Agency

has issued a Operation Manual which gives the full details for the implementation of this

programme and lays down the various steps in the planning process and the role of

difference Agencies including the Intermediate Panchayat, the District Panchayat as well

as the State Level Standing Committee. In the identification of the Core Network, the

priorities of elected representatives, including MPs and MLAs, are expected to be duly

taken into account and given full consideration. The Rural Roads Plan and the Core

Network would constitute the basis for the planning exercises under the PMGSY.

Page 8: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

8

District Rural Roads Plan: DRRP would indicate the entire existing road network system in the district and

also clearly identify the proposed roads for providing connectivity to Unconnected

Habitations.

The block level Master Plan and the core network are then placed before the

Intermediate Panchayat for consideration and approval of the core network. They are

simultaneously sent, along with the list of all unconnected habitations to the Members of

Parliament and MLAs, for their comments, if any. After approval by the Intermediate

Panchayat, the Plans would be placed before the District Panchayat for its approval. It

will be incumbent on the District Panchayat to ensure that the suggestions given by the

Members of Parliament are given full consideration within the framework of these

Guidelines. Once approved by the District Panchayat, a copy of the core network would

Core Network: The core network will identify the roads required to assure each eligible

Habitation with a Basic Access (single all-weather road connectivity) to essential social

and economic services. Accordingly, the core network would consist of some of the

existing roads as well as all the roads proposed for new construction under the PMGSY.

The Plan would first be prepared at the Block level, in accordance with the

directions contained in the Manual and the priorities spelt out by the District Panchayat.

In short, the existing road network would be drawn up, unconnected Habitations

identified and the roads required to connect these unconnected Habitations prepared. This

constitutes the Block level Master Plan.

Once this exercise is completed, the core network for the Block is identified, by

making best use of the existing and proposed road facilities in such a manner that all the

eligible Habitations are assured of a Basic access. It must be ensured that every eligible

Habitation is within 500 metres (1.5 km of Path length in the Hills) of a connected

habitations or an-All-weather road (either existing or planned). In drawing up the

proposed road links, the requirements of the people must be taken into account, through

the socio-economic/infrastructure values (Road Index) suitably weighted and the

alignment having the higher Road Index ought to be considered for selection.

Page 9: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

9

be sent to the State Level Agency as well as the National Rural Roads Development

Agency. No road work may be proposed under the PMGSY for New Connectivity or Up

gradation (where permitted) unless it forms part of the core network.

All districts having eligible unconnected habitations are to prepare block and

district level comprehensive new connectivity priority lists (CNCPL) for those districts,

of all proposed road links under PMGSY, grouping them in the following general Order

of Priority.

Priority# Population size of Habitations being connected

I 1000+

II 500-999

III 250-499 (for Hill States)

The work of preparing the Comprehensive Up gradation Priority will be taken up

only in those districts which are likely to complete new connectivity to eligible

habitations within the next 1 year. The comprehensive up-gradation priority list (CUPL)

list will be prepared district wise for each priority class.

Consultation with the Members of Parliament: The comprehensive new-connectivity priority list (CNCP list) identified to

connect unconnected habitations (along with names of habitations and population served

and length) or the comprehensive up gradation priority list (CUPL) as the case may be,

should be sent to the Members of Parliament, to facilitate the Members of Parliament in

making their suggestions. It will be incumbent upon the District Panchayat to ensure that

full consideration is given to the proposals received from the Members of Parliament.

Implementation/Execution: 1. State Level Agency – HP.PWD is the Nodal Department for execution of this PMGSY

works.

2. State Rural Roads Development Agency

– The Agency shall receive the funds from

the Ministry of Rural Development for the PMGSY Programme.

Page 10: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

10

3. State Level Standing Committee – The State Level Standing Committee (SLSC) under

the Chairmanship of the Chief Secretary of State is responsible for close and effective

monitoring of the Programme and to oversee the timely and proper execution of works.

The committee shall vet the core network, the CNCPL & CUPL and shall clear the

annual project proposals.

4. State Technical Agencies – The National Institute of Technology (NIT) Hamirpur is

the State Level Technical Agency for the PMGSY in the State to provide outsourced

technical support to the PIUs. The STAs would vet the District Roads Plan and core

network, check the CNCPL and CUPL and scrutinize the DPRs prepared under the

Annual proposals.

S.No.

Programme Implementation Unit (PIU): The Programme Implementation Units (PIU) are the basic units for project

planning, execution and accounting. A PIU may consist of one or more Engineering

Division, appropriately headed by an Executive Engineer or Superintending Engineer.

The PIU would be directly responsible for contracting implementation and Quality

Management of PMGSY works. The PIU would also be the financial and accounting

centre at the field level.

Pradhan Mantri Gram Sadak Yojana (PMGSY) has been started by G.O.I. in the

year 2000-2001. The details of roads for our State approved under this programme till

date and their cost are as under:-

Name of programme. No.of roads sanctioned.

Cost of roads (in crore)

1 PMGSY 2000-2001 (Phase-I) 127 60.00 2 PMGSY 2001-2002 (covering two years of this Yojana

i.e.2001-2002 & 2002-2003 (Phase-II) 245 128.93

3 PMGSY 2003-2004 (Phase-III) 370 254.01 4 PMGSY funded by World Bank (Phase-I)(2004-05) 115 89.98 5 PMGSY 2004-05 (Phase-IV) 105 138.30 6 PMGSY 2005-06 (Phase-V). 105 141.27

7 PMGSY Funded by World Bank (Phase-II)(2005-06) 66 117.38 8 PMGSY Funded by World Bank (Phase-III)(2007-08) 13 22.83 Upgradation(2007-08) 31 75.63

Page 11: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

11

9 PMGSY 2006-07 391 530.06 Upgradation 2006-07 175 320.37 10 PMGSY 2007-08 74 156.16 Upgradation 2007-08 47 111.75 11 PMGSY 2008-09 13 34.23 Upgradation 2008-09 6 14.47 12 PMGSY 2009-10 190 231.95 Upgradation 2009-10 4 12.02 13 PMGSY2010-11 Upgradation 2010-11 Total:-

Year

NABARD PROJECTS The Government of India created Rural Infrastructure fund in the year 1995-96 with NABARD, which is subsidiary of Reserve Bank of India for providing funds on loan basis to State Government for creating durable assets in the rural areas of the country. However, during the first year impetus remained of Agriculture, Horticulture and minor and medium irrigation sectors. From the year 1996-97 onwards Roads and Bridges sector was included in RIDF Scheme. A Total of 1020 Road and Bridge Projects (790 Road projects and 230 Bridge projects) have been sanctioned till March 2011 from RIDF-II to RIDF-XVI i.e. from 1996-97 to 2010-11. During the year 2011-12(Upto 30-06-2011), 20 Road and Bridge Projects (17 Road project and 3 Bridge Projects) have been sanctioned under RIDF-XVII with a total project cost of Rs.4630.66 lacs having Rs.4273.90 lacs NABARD loan and Rs. 356.76 lacs as State share. The brief position of year wise/RIDF tranche wise sanction with project cost is as under:-

RIDF Trenche

No. of sanctioned Projects.

Nabard Loan State Share

Total

Road Bridge 1 2 3 4 5 6 7

1996-97 II 2 - 2442.00 122.00 2564.00 1997-98 III 8 2 4641.03 466.29 5107.32 1998-99 IV 19 13 7621.65 218.61 7840.26

1999-2000 V 22 7 6732.75 221.07 6953.82 2000-2001 VI 30 21 6809.57 356.12 7165.69 2001-2002 VII 69 16 11695.09 476.11 12171.20 2002-03 VIII 77 59 12830.13 644.59 13474.72 2003-04 IX 47 2 7430.82 1172.57 8603.39 2004-05 X 38 3 4220.13 626.24 4846.37 2005-06 XI 48 11 8215.80 1529.37 9745.17

Page 12: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

12

2006-07 XII 86 25 13187.98 2094.18 15282.16 2007-08 XIII 99 19 16087.75 2336.12 18423.87 2008-09 XIV 61 7 13935.39 1237.19 15172.58 2009-10 XV 121 23 35014.99 2790.99 37805.98 2010-11 XVI 63 22 17198.90 1885.63 19084.53 2011-12

(Upto 30-06-2011)

XVII 17 3 4273.90 356.76 4630.66

Total: 807 233 172337.88 16533.84 188871.72 During the year 2010-11 efforts were made to complete the works sanctioned under various trenches and an expenditure of Rs.12614.04 lacs was incurred during the year 2010-11 and 37 Road Projects and 14 Bridge projects have been completed. Till March 2011 in all an amount of Rs.110440.81 lacs has been incurred on various NABARD works and 353 Roads and 153 Bridge Projects have been completed. The trench wise physical achievement during the year 2010-11 is as per Annexure attached as NABARD-1.Two works has been De-Sanctioned by the NABARD one in RIDF-VI & another in RIDF-VIII. One work has been withdrawn in RIDF-VI. Two Nos. likely withdrawn against RIDF-XIII regarding the letter has been written to CGM NABAD by Planning department, regarding RIDF-XII land dispute in 2 Nos. projects and 1 No. sanctioned and under PMGSY, the proposal for dropping has been sent on dated 20-07-2011 to Pr. Secy.(Plg.) to Govt. of H.P.

Sr.No.

CRF / ISC WORKS Government of India has been revamped the Central road Fund earmarked for development /Improvement of State roads under CRF. From the year 2001-2002 onwards 55 No. projects have been sanctioned under CRF amounting to Rs.27317.23 lacs , out of which 32 No. projects have been completed upto 31-03-2011 and remaining 23 No. projects are in progress and expenditure amounting to Rs.12572.10 lacs has been incurred upto 31-03-2011 against the total release of funds amounting to Rs.11002.89 lacs. An amount of Rs.2443.20 lacs was utilized during the year 2010-11. The brief year wise financial status is as under:-

Year No. of Projects

sanctioned

Allocation (Rs. In lacs)

Amount of A/A

(Rs. In lacs.)

Funds released (Rs. In lacs).

Exp. During the year

(Rs. In lacs.)

1. 2000-01 - 1045.00 - 348.00 - 2. 2001-02 7 1045.00 1922.02 394.55 671.05 3. 2002-03 4 1045.00 880.67 1189.02 1186.06 4. 2003-04 11 1045.00 2573.29 630.32 659.62 5. 2004-05 3 975.00 591.68 975.00 1196.62 6. 2005-06 8 1650.00 2570.75 1316.00 1183.05 7. 2006-07 2 1723.00 424.95 1216.00 1039.69

Page 13: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

13

8. 2007-08 4 1840.00 1280.00 1548.00 1105.05 9. 2008-09 7 1934.00 5200.00 201.00 1001.04 10. 2009-10 4 2859.00 7330.87 1206.00 2806.72 11 2010-11 5 2583.00 4543.00 1744.00 2443.20 Total:- 55 Nos 17744.00 27317.23 11002.89 12572.10

Page 14: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

14

The Physical and financial Status of CRF/ISC works upto 31/3/2010 is as under :-

Year of Sanction

S.No. Name of work Sanctioned amount (Rs. in lacs)

Exp. during 2009-10 (Rs. in lacs)

Exp. upto 31/3/2010 (Rs. in lacs)

Physical progress during 2009-10

Physical progress till 31/3/10.

1 2 3 4 5 6 7 8 2001-02 1 Strengthening and Imp. Of riding quality of

M.R.R. Shimla. 162.31 - 163.52 - 100%

2. Strengthening of Mehatpur Una Mubarkpur Talwara road km. 5/600 to 18/0 (Mehatpur sector ).

374.67 - 370.15 - 100%

3 Strengthening of road crust on Pathankot Banikhet Chamba road km. 49/0 to 83/0.

603.69 - 648.13 - 100%

4 Strengthening of road crust on Mubarkpur Rantital Kangra road km. 85/550 to 103/0.

287.17 - 280.50 - 100%

5 Improvement and Upgradation of Una Aghar Mandi road km. 45/0 to 69/0 .Extension of existing X-drainage work on double lane standard and P/L M/T on extra width.

328.68 - 329.41 - 100%

6. Assistance to IRC Council Meeting 2001-02

5.00 - 5.00 - 100%

7. Improvement/Upgradation of Una Aghar Mandi Road (km. 4/0 to 45/0 ) (SH:- Imp. of geometrics by widening of existing road to double lane standard, extension of culverts and providing soling wearing and tarring km. 8/0 to 28/0.

160.50 - 161.22 - 100%

Page 15: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

15

2002-03 1 Strengthening of Jallandhar Hoshiarpur Dharampur road km. 71/0 to 84/750 (Mubarkpur to Bharwain)

206.67 --- 211.04 0 % 100%

2 C/O 90.0 m single span double lane steel truss bridge over river Giri at Sataun on Lal Dhank Paunta Rajban Rohru road at km. 28/060 in Sirmour Distt.

302.10 0.91 301.96 1 % 100 %

3. C/O 154 m span double lane prestressed concrete bridge over Neogal khad on Praur Lahla Chachian Kandi Lugri Bhutti Bandle Palampur road at km. 1/315.

242.90 24.29 267.19 0 % 100 %

4. C/) 225.27 m span bridge over Tara Khad on Indpur Tappa road in Tehsil Indora in Distt. Kangra.

129.00 - 131.75 - 100%

2003-04 1 Stengthening and Improvement riding quality of Chhota Shimla Kasumpti Panthanghati road km. 0/0 to 2/370.

58.03 - 57.00 - 100%

2 Improvement of riding quality of Kal Amb Nerwa via Suketi Park Nahan Dadhu Haripurdhar Kupvi Rainjit road km. 0/0 to 61/0.

381.47 - 329.28 - 100%

3 Strengthening and Imp. of riding quality of Bhakra to Thanakalan road km. 0/0 to 28/675.

150.30 --- 149.44 0 % 100 %

4 C/O 74.00 m PSC girder bridge across Gambhar Khad on Malaun Khusri road.

190.00 - - - Being executed

under NABARD

5 C/O 30.00 m span PSC bridge over Dagroh Khad on Dharampur Sabathu road.

66.00 - 30.00 - 100%

Page 16: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

16

6 Strengthening /Imp. of riding quality of MRR via Lakkar Bazar km. 149/645 to 154/045 (Portion Bus stand to Dhalli Tunnel ).

127.29 - 121.45 - 100%

7 C/O 135.0 m span RCC T_beam bridge over Kunah khad on Ranjus Rail Jalari via Fatehpur road.

104.26 - 113.04 - 100%

8 Strengthening of Mubarkpur Talwara road km. 38/800 to 50/200.

193.13 --- 201.04 - 100%

9 Strengthening road crust on Dharamshala Kangra Mubarkpur Hoshiarpur H.P. boundary road (Portion Mataur to Dharamshala to Mecleodganj km. 153/0 to 168/250 ) i/c Holma road km. 0/0 to 2/040.

371.00 - 371.14 25% 100%

10 Improvement and strengthening of existing road crust from km. 0/0 to 11/0 in Jawalamukhi Dehra Nehran Pukhar road.

528.67 17.69 390.74 3 % 93 %

11 C/O Theog Hatkoti-byepass road km. 0/0 to 7/0 i.e. realignment between km. 5/0 to 8/0 in Theog Kotkhai Hatkoti road.

403.14 --- 231.46 --- 55%

2004-05 1 Improvement and Upgradation of Theog Kotkhai Hatkoti road km. N0/0 to 19/705 (SH:- Imp. and Upgradation in km. 8/0 to 13/255).

207.46 --- 75.11 --- 36 %

2 Improvement and Upgradation of Theog Kotkhai Hatkoti road km. 23/705 to 72/800 (SH:- Improvement / Up gradation in reach km. 34/0 to 39/0).

288.32 --- 152.04 - 8%

3 Improvement and Strengthening of Holta Rajpur Kalu-Di-Hatti road km. 0/0 to 4/330.

95.90 - 82.90 - 100%

Page 17: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

17

2005-06 1 Balance work i.e. Metaling etc. of const. of Kangra Bye Pass road km. 0/0 to 4/487.

234.60 ---- 258.06 ---- 100%

2 Imp. of Banethi Bagthan Rajgarh Chandol road km. 61/0 to 95/0.

244.99 52.49 243.84 15 % 100 %

3 Imp. and upgradation of Theog Kotkhai Hatkoti road from km. 68/0 to 72/800.

227.29 --- 53.40 --- 14 %

4 Imp/ and strengthening of Mataur / Gagal road to Sakoh km. 145/300 to 153/0 and 0/0 to 2/ 435 in HP.

308.09 150.54 338.89 33 % 95 %

5 Upgradation/ Imp. of Kandraur Bamta road km. 0/0 to 6/660.

250.91 --- 248.55 --- 100 %

6 Imp. and strengthening of Dharamshala Yol Dadh road km. 0/0 to 7/350 and 8/830 to 15/180 i/c Dadhmalan road km. 0/0 to 4/330.

551.95 201.56 607.14 22 % 95 %

7 Strengthening of crust of Mubarikpur Ranital Kangra road (section Dehra to Ranital ) km. 103/0 to 124/0.

532.09 145.53 414.00 25 % 77 %

8 Imp./Upgradation of Theog Kotkhai Hatkoti road km. 63/0 to 68/0 in HP.

220.83 --- 59.12 --- 12 %

9 Imp./Strengthening of Hoshiarpur Una road (MDR) in km. 19/0 to 34/300 in the Distt. of Una in H.P.

429.20 55.99 472.12 3 % 100 %

10 Imp. of Damtal Kandwal road km. 0/0 to 11/870 in Kangra Distt. of H.P.

604.37 42.45 553.45 2 % 100 %

Page 18: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

18

2006-07 1 Strengthening and Imp. i/c widening to 2 lane of Nalagarh Bharatgarh road km. 0/0 to 9/400 in Solan Distt. under ISC.

462.83 182.08 435.05 45 % 100 %

2 Imp./ widening and strengthening of Dharampur Subathu road km. 0/0 to 13/240.

327.05 74. 782 289.00 37 % 88 %

3 Realignment of Shimla Mandi road km. 19/280 to 20/745 near Naldehra.

97.30 46.55 68.89 62.80 % 70.80 %

2007-08 1 Improvement of Dharamshala Khara Dhnda Mclegodganj road (ODR) from Km. 0/0 to 3/510

104.00 ---- 114.40 100 % ---

2 Upgradation / Improvement of Shri Naina Devi Jee Toba road (MDR) Km. o/o to 12/0.

650.00 ---- 498.29 86 % 10 %

3. Upgradation / Improvement of Nauni- Kunihar via Braham Pukhar(ODR) road Km. 0/0 t0 7/0

231.00 ---- 254.10 75 % 2 %

4 Improvement of Nangal- Mubarikpur-Talwara road (SH) from Km. 65/0 to 72/555 in H.P.

295.00 ---- 314.61 61 % 39 %

2008-09 1 Imrovement/ Widening of Joginder Nadar-Sarkaghat road(Phase-1) Km. 10/0 to 21/500 in H.P.

1411.00 ----- 810.11 65 % 35 %

2 C/O Kangra Tanda road Km. 1/600 to 6/0 along with 40.00 mtr. Span Bridge Sukand Khad.

643.00 ---- 141.85 21 % 79 %

3 C/O Bridge on Tung Khad on Hamirpur Sujanpur Thural road.

240.00 ---- ---- ---- 100 %

4 Upgradation / Improvement of Nadaun Sujanpur road Km. 0/0 to 20/870 in H.P.

1543.00 ---- 96.57 4 % 96 %

5 Upgradation / Improvement of Kaloha pragpur Nehranpukhar road Km. 0/0 to 11/200.

588.00 ---- 40.06 73 % 27 %

Page 19: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

19

6 Improvement of Chetru Sheela Dari Km. 0/0 to 6/0

383.00 ---- 337.93 82 % 18 %

7 Imrovement & Strengthening of Dharamshala Town to Bypass road Km. 0/0 to 2/195

392.00 ---- 141.37 34 % 66 %

2009-10 1 Imrovement/ Widening of Joginder Nagar Sarkaghat road (Phase-II)(Portion Km. 21/500 to 34/300 in H.P.

1138.98 ---- 73.35 10 % 90 %

2 Imrovement/ Widening of Mandi Gagal Chail Janjehli Chhatri Rana Bag road Km. 0/0 to 82/0(MDR-24,55 of Mandi Distt.)

2301.82 ---- 377.17 35 % 65 %

3 Strenthening of Kumarhatti Bagor-Solan road Km. 0/0 to 10/115 (MDR-9,10,115) of Solan Distt.

380.07 ---- 91.13 24 % 76 %

4 Imrovement and widening of Baroti-Rakehra_Dharampur-Marhi Kamlah-Gallu road from Km. 0/0 to 30/375.

3310.00 ---- ---- ---- 100 %

2010-11 1 C/O Masobra Bhakhelti road Km. 0/0 to 18/360

600.00 ---- ---- ---- ----

2 Widening and strengthening of Gumma Bagi road Km. 0/0 to 20/0

10.09 ---- ---- ---- ----

3 Imp. And Widening of Kullu-Shilli Badhani road Km. 0/0 to 15/0

12.05 ---- ---- ---- ----

4 Imp. And widening of Jogindernagar- Sarkaghat road Km. 0/0 to 106/0 portion 36/645 to 40/420 (Kandapatan to Saroli)

5-02 ---- ---- ---- ----

5 Awah Devi Tihra Gaddidhar Sandhole road length 10.35

12.27 ---- ---- ---- ----

Page 20: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

20

YEAR WISE / COMPONENT WISE PHYSICAL ACHIEVEMENT OF NABARD WORK DURING THE YEAR 2010-11 UPTO 31/03/2011

S.No. RIDF Physical Achievement

FC (in km) FD (in km) CD (in km) Sub base (in km)

Base course (in km)

BT (in km) Drain (in km) Parapets (In km)

Bridges comple-ted (In Nos).

1 2 3 4 5 6 7 8 9 10 11

1 II

2 III

3 IV

4 V

5 VI

6 VII

7 VIII

8 IX --- --- ---- ----- ----- ---- 2.000 2.500 1

9 X 0.270 ----- 5.895 0.984 0.100 7.360 5.160 5.660 0

10 XI 3.930 3.614 24.855 1.100 24.435 21.525 23.590 24.750 0

11 XII 4.950 8.575 34.865 15.845 35.510 45.724 52.801 31.135 4

12 XIII 23.830 19.884 57.990 50.030 45.700 46.930 61.061 23.100 2

13 XIV 27.730 45.675 107.400 61.358 68.803 65.433 34.293 43.171 1

Page 21: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

21

14 XV 48.650 71.095 75.165 46.726 45.025 2.660 4.000 0.500 2

Total:- 109.36 148.843 306.170 176.043 219.573 189.632 182.905 130.816 10

Page 22: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

22

ITEM NO VIII THIS ITEM DOES NOT PERTAIN TO THE FUNCTIONING OF THE PUBLIC WORKS DEPARTMENT ITEM NO. IX Following is the Directory of Officers of Public Works Department

upto the level of Division in entire State of Himachal Pradesh.

Sr. No

Name of Office Designation of the Officer Telephone No Office Residence

1 2 3 4 1 Engineer-in-Chief, HP, PWD, Nirman Bhawan,Nigam Vihar,Shimla-2 Engineer-in-Chief 2621401 2652127 Engineer-in-Chief (D & Quality

Control)HP, PWD, U.S. Club, Shimla-171001

2658706 2658706

Chief Engineer(Shimla Zone) 2620474 2626426 Note:- Since the Establishment of Chief Engineer (Shimla Zone) with

Engineer-in-Chief office is common as such the list of offiers as mentioned above are same which may be referred again in case any information from these officers pertaining to Public Works Department Shimla Zone is required.

Chief Engineer(PMGSY) 2621402 Chief Engineer(N.H.)HP, PWD,

U.S.Club,Shimla-171001 2801416 2633088

Superintending Engineer (Works) 2625821 Superintending Engineer (D-III) 2629320 2673112 Superintending Engineer (WBP) 2628238 2670861 Superintending Engineer(D-I) (N.H.) 2652568 Superintending Engineer(Q. Control &

Design) 2652438

Executive Engineer(D) (N.H.) 2805870 Executive Engineer( Q. Control & Design) 2808108 Executive Engineer(I.T.) 2629315 2807200 Executive Engineer(Buildings) 2629314 Executive Engineer(Roads) 2620474 2623547 Executive Engineer(Project) 2629317 2658952 Executive Engineer(Mech.)/ (S.P.) 2624781 Conservator of Forest 2651348 Registrar 2621403

Page 23: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

23

Dy. Controller(F&A) 2629313 F.C.(PMGSY) 2628237 2621310 Dy. Distt. Attorney 2621404 Law Officer 2628635 2 Chief Architect, HP,PWD, Nirman Bhawan, Nigam Vihar,Shimla-2 Chief Architect 2628000 2620088 Sr. Architect 2625392 2623775 Sr. Architect 2622231 2835684 Architect 2625392 2657410

3. Chief Engineer(Shimla Zone),HP,PWD, Shimla-2 Superintending Engineer, 3rd Cirlce,HP,PWD,Solan 220675 220676 Executive Engineer(D)O/O S.E., 3rd Circle,

Solan 223802 221333

Executive Engineer, HP,PWD, Solan Division

223811 223720

Executive Engineer, HP,PWD, Kasauli Division

272067 272076

Executive Engineer, HP,PWD, Nalagarh Division

222199 222298

Executive Engineer, HP,PWD, Arki Division

220714 220713

Superintending Engineer, 4th Circle, HP,PWD, Winter Field, Shimla.

2653455 2626426

Executive Engineer, HP,PWD, Shimla Division No.-I, Shimla.

2658385

Executive Engineer, HP,PWD, Shimla Division No.-II, Shimla.

2804134 2651037

Executive Engineer, HP,PWD, Shimla Division No.-III, Shimla.

2652832

Executive Engineer, HP,PWD, Theog Division.

238376 237999

L.A.O., HP,PWD, Winter Field, Shimla. 2801055 Superintending Engineer, 11th Circle, HP,PWD, Rampur. 233044 233169 Executive Engineer(D)O/O S.E., 4th Circle,

Shimla. 233167 233381

Executive Engineer, HP,PWD, Rampur Division.

233017 233016

Executive Engineer, HP,PWD, Kumarsain Division.

240075 240071

Executive Engineer, HP,PWD, Kalpa Division.

226027 226028

Executive Engineer, HP,PWD, BhawanagarDivision.

253303 253584

Executive Engineer, HP,PWD, Spiti Division at Kaza.

222252 222301

Page 24: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

24

Executive Engineer, HP,PWD, Outer Seraj Division at Nirmand

255140 255147

Executive Engineer, HP,PWD, Mech. Division Rampur.

Superintending Engineer, 12th Circle, HP,PWD, Nahan 222826 224007 Executive Engineer(D)O/O S.E. 12th Cirlce,

HP, PWD, Nahan. 222370

Executive Engineer, HP,PWD, Nahan Division.

222260 222460

Executive Engineer, HP,PWD, Paonta Division.

222373 222393

Executive Engineer, HP,PWD, Rajgarh Division

221023 221024

Executive Engineer, HP,PWD, Sangrah Division

248207 248008

Executive Engineer, HP,PWD, Shillai Division

278524 278501

Superintending Engineer, 14th Circle, HP,PWD,Rohroo. 240921 241006 Executive Engineer(D)O/O S.E. 14th Cirlce,

HP, PWD,Rohroo. 241713

Executive Engineer, HP,PWD, Rohroo Division.

240087 240021

Executive Engineer, HP,PWD, Jubbal Division.

252004 252005

Executive Engineer, HP,PWD, Dodrakawar Division.

272016

Executive Engineer, HP,PWD, Chopal Division.

260033 260592

Executive Engineer, HP,PWD, Mech. Division Rohroo.

Superintending Engineer, Mech. Circle, HP,PWD,Dhalli, Shimla-12.

2842353 2626109

Executive Engineer(D) O/O S.E.(Mech.) Circle, HP,PWD, Shimla.

2843273

Executive Engineer, HP,PWD, Mech. Division, Shimla.

2841169 2620807

Executive Engineer, HP,PWD, Mech. Division, Bilaspur.

222392

Superintending Engineer, Elect. Circle, HP,PWD, Kasumpti, Shimla-9.

2620055 2670510

Executive Engineer(D) O/O S.E.(Elect.) Circle, HP,PWD, Kasumpti.

2621494 2650554

Executive Engineer, HP,PWD, Elect. Division No.-I, Kasumpti.

261398 2625885

Executive Engineer, HP,PWD, Elect. Division No.-II, Shimla.

2658918 2627857

Page 25: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

25

Executive Engineer, HP,PWD, Elect. Division, Mandi.

222172 223453

Executive Engineer, HP,PWD, Elect. Division, Una.

223484 223568

Executive Engineer, HP,PWD, Elect. Division, Palampur.

230563 231803

Superintending Engineer, Arbitration Circle, HP,PWD, Solan

226719

Superintending Engineer, Nahan Foundary, HP,PWD & IPH, Nahan.

224053

Executive Engineer, HP,Public Works Department O/O Nahan Foundary.

222395

4. Chief Engineer(Kangra Zone),HP,PWD, Dharamshala.

224948 226551

Superintending Engineer(D)O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

224891 226659

Superintending Engineer (W) O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

223189 226264

Executive Engineer(D-I) O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

223167 236001

Executive Engineer(D-II) O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

223177 265877

Executive Engineer(Q.C.) O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

223167

Registrar O/O Chief Engineer (K.Z.) HP,PWD, Dharamshala.

224949 227661

Dy. Controller(F&A) O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

223151 202034

Dy. Distt. Attorney O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

224949

Vigilance Officer O/O Chief Engineer(K.Z.) HP,PWD, Dharamshala.

Superintending Engineer, 5th Circle, HP,PWD, Palampur. 230566 230565 Executive Engineer(D) O/O S.E. 5th Circle,

HP,PWD, Palampur. 230562 233271

Executive Engineer, HP,PWD, Palampur Division.

230561 230515

Executive Engineer, HP,PWD, Dharamshala Division.

224946 226275

Executive Engineer, HP,PWD, Kangra Division.

265028 265248

Executive Engineer, HP,PWD, Mech. Division, DharamShala.

Executive Engineer, HP,PWD, BalakRupi Division (Distt. Kangra)

Page 26: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

26

L.A.O., HP,PWD, Kangra. 265109 213154 Superintending Engineer, 7th Circle, HP,PWD,Dalhousie. 240606 240630 Executive Engineer(D) O/O S.E. 7th Circle,

HP,PWD, Dalhousie. 242187

Executive Engineer, HP,PWD, Chamba Division.

222229 222731

Executive Engineer, HP,PWD, Salooni Division.

233287 233289

Executive Engineer, HP,PWD, Dalhousie Division.

240618 240601

Executive Engineer, HP,PWD, Pangi Division at Killar.

222223 222225

Executive Engineer, HP,PWD, Bharmour Division.

225003 225007

Superintending Engineer, 9th Circle, HP,PWD, Nurpur. 220098 220097 Executive Engineer(D) O/O S.E. 9th Circle,

HP,PWD, Nurpur. 220102 220201

Executive Engineer, HP,PWD, Nurpur Division.

220033 220030

Executive Engineer, HP,PWD, Fatehpur Division.

256602 250028

Executive Engineer, HP,PWD, Dehra Gopipur Division.

233116 233122

Executive Engineer, HP,PWD, Jawali Division.

264186 264106

5 Chief Engineer(Mandi Zone),HP,PWD, Mandi. 224850 224851 Superintending Engineer(D)O/O Chief

Engineer(M.Z.) HP,PWD,Mandi. 222536 225783

Superintending Engineer (W) O/O Chief Engineer(M.Z.) HP,PWD,Mandi.

221146

Executive Engineer(D-I) O/O Chief Engineer(M.Z.) HP,PWD,Mandi.

223913 237667

Executive Engineer(D) O/O Chief Engineer(M.Z.) HP,PWD, Mandi.

223913

Executive Engineer(Q.C.) O/O Chief Engineer(M.Z.) HP,PWD,Mandi.

Registrar O/O Chief Engineer (M.Z.) HP,PWD, Mandi.

225929

Dy. Controller(F&A) O/O Chief Engineer(M.Z.) HP,PWD, Mandi.

Dy. Distt. Attorney O/O Chief Engineer(M.Z.) HP,PWD, Mandi.

223913

Superintending Engineer, 1st Circle, HP,PWD, Mandi. 224129 225871 Executive Engineer(D) O/O S.E. 1st Circle,

HP,PWD, Mandi. 221656

Page 27: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

27

Executive Engineer, HP,PWD, Gohar Division.

251236 251236

Executive Engineer, HP,PWD, Mandi Division No.-II,Mandi.

222051 224928

Executive Engineer, HP,PWD, Karsog Division.

222229 222239

Executive Engineer, HP,PWD, SunderNagar Division.

266245 266346

L.A.O., HP,PWD, Mandi 222147 222227 Superintending Engineer, Joginder Nagar Circle, HP,PWD,

Joginder Nagar. 224598

Executive Engineer(D) O/O S.E. Joginder Nagar Circle, HP, PWD, Joginder Nagar.

Executive Engineer, HP,PWD, Baijnath Division.

263035 263069 262704

Executive Engineer, HP,PWD, Mandi Division No.-I, Padhar.

260665

Executive Engineer, HP,PWD, Joginder Nagar Division.

222033 224237

Superintending Engineer, 6th Circle, HP,PWD, Kullu. 222530 222242 Executive Engineer(D) O/O S.E. HP,PWD,

Kullu. 222515

Executive Engineer, HP,PWD, Kullu.Division No.-I, Kullu.

222426 222474

Executive Engineer, HP,PWD, Kullu.Division No.-II, Kullu.

222561 222472

Executive Engineer, HP, PWD, Chenab Vally Division, Udaipur.

222238 222242

Executive Engineer, HP, PWD, Mech. Division, Kullu.

6 Chief Engineer(Hamirpur Zone),HP,PWD, Hamirpur.

222925

Superintending Engineer(D) O/O Chief Engineer, HP,PWD, Hamirpur.

222926

Executive Engineer(D-I) O/O Chief Engineer, HP,PWD, Hamirpur.

222961

Executive Engineer(D-II) O/O Chief Engineer, HP,PWD, Hamirpur.

Superintending Engineer, 8th Circle, HP,PWD, Hamirpur. 223965 222228 Executive Engineer, HP,PWD, Hamirpur

Division. 222510 222230

Executive Engineer, HP,PWD, Barsar Division.

288041 288022

Executive Engineer, HP,PWD, Tauni-devi Division.

278422 222845

Page 28: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

28

Executive Engineer, HP,PWD, Sarkaghat Division.

230034 230037

Executive Engineer, HP,PWD, Dharampur Division.

272269 272210

Superintending Engineer, 10th Circle, HP,PWD, Bilaspur. 223466 223848 Executive Engineer, HP,PWD,

Bilaspur.Division No.-I, Bilaspur. 222550 222422

Executive Engineer, HP,PWD, Bilaspur.Division No.-II, Bilaspur.

222551 222462

Executive Engineer, HP,PWD, Ghumarwin Division.

255281 255282

Superintending Engineer, 15th Circle, HP,PWD, Una. 225883 225882 Executive Engineer, HP,PWD, Una

Division. 226036 223131

Executive Engineer HP,PWD, Bhaewain Division.

255822 255997

Executive Engineer HP,PWD, Bangana Division.

262283 262284

Superintending Engineer, National Highway Circle, HP,PWD, Shahpur.

238663 239311

Executive Engineer(D) O/O S.E. N.H. Circle, HP,PWD, Shahpur

239007 230684

Executive Engineer HP,PWD, N.H. Division Jogindernagar.

222135

Executive Engineer HP,PWD, N.H. Division Pandoh.

282059 282060

Executive Engineer HP,PWD, N.H. Division Hamirpur.

222783 224911

Superintending Engineer, National Highway Circle, HP,PWD, Shimla.

2657551

Executive Engineer, HP,PWD, N.H. Division Rampur.

233214 233216

Executive Engineer HP,PWD, N.H. Division Solan.

223804 229648

Page 29: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

29

ITEM No. X

Sr. No.

Following is the pay scales applicable to the employees working in the Public Works Department on the basis of which monthly remuneration are paid.

Name of Class/Category Pay scale as on 31.03.2011

Class-I 1 Engineer-in-Chief 37400-67000+10000 Grade Pay 2 Chief Engineers 37400-67000+ 10000 Grade pay 3 Chief Architect 37400-67000+ 10000 Grade pay 4 Superintending Engineers 37400-67000+ 8700 Grade pay 5 Senior Architect 37400-67000+ 8700 Grade pay 6 Executive Engineers 15600-39100+ 7600 Grade pay 7 Architect 15600-39100+ 7600 Grade pay 8 Joint Controller 15600-39100+ 7600 Grade pay 9 Assistant Engineers 15600-39100+ 5400 Grade pay 10 Assistant Architect 15600-39100+ 5400 Grade pay

11 Deputy Controller 10300-34800+ 5000 Grade pay

12 Land Acquisition Officer 10300-34800+ 5000 Grade pay 13 Conservator of Forests 37400-67000+ 8700 Grade pay 14

Dy. Distt. Attorney-cum-Law Officer 15600-39100

Class-II 1 Registrar

10300-34800+ 5400 Grade pay 2 Vigilance Officers 10300-34800+ 5000 Grade pay 3 Superintendents Grade-I 10300-34800+ 5000 Grade pay 4 Planning Assistants 10300-34800+4400 Grade pay 5

Senior Research Officer 10300-34800+4400 Grade pay 6 Research Officer 10300-34800+ 4200 Grade pay 7

Private Secretary 10300-34800 + 5000 Grade pay

8 Assistant Consolidation Officer 10300-34800 + 4200 Grade pay Class-III 1 Junior Engineers 10300-34800 +3800 Grade Pay /

10300-34800 + 4800 Grade pay 2 Circle Head Draughtsman 10300-3480 + 4400 Grade pay 3 Head Draughtsman 10300-34800 + 4200 Grade pay 4 Superintendent Grade-II 10300-34800 + 4200 Grade pay

Page 30: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

30

5 Senior Assistant 10300-34800 + 3800 Grade pay 6 Junior Assistant/Clerk 5910-20200 + 1900 Grade pay / 5910-

20200 + 2800 Grade pay 7 Store Clerk/Keeper 5910-20200 + 1950 Grade pay 8 Personal Assistant 10300-34800 + 4200 Grade pay 9 Senior Scale Stenographer 10300-34800 + 3800 Grade pay 10 Steno Typist 5910-20200 + 2000 Grade pay 11 Draughtsman 10300-34800 + 3800 Grade pay 12 Legal Assistant 10300-34800 + 4200 Grade pay 13 Junior Draughtsman 5910-20200 + 2400 Grade pay 14 Senior Draughtsman (Arch.) 10300-34800+ 4200 Grade pay 15 Architectural Assistant 10300-34800+ 4200 Grade pay 16 Naib Tehsildar 10300-34800+ 4200 Grade pay 17 Kanongo 5910-70200 + 3000 Grade pay / 10300-

34800 + 3600 Grade pay 18 Patwari 5910-20200 + 1900 Grade pay 19 Laboratory Attendant 5910-20200 + 1900 Grade pay 20 Assistant Laboratory Attendant 5910-20200 + 1900 Grade pay 21 Laboratory Assistant 5910-20200 + 2000 Grade pay 22 Research Assistant 10300-34800 + 4200 Grade pay 23 Driver 5910-20200 + 2000 Grade pay 24 Plan Printing Machine Operator 5910-20200 + 1900 Grade pay 25 Ferro Printer 4900-10880 + 1650 Grade pay / 5910-

20200 + 1900 Grade pay 26 Restorer 5910-20200 + 1900 Grade pay 27 Mechanic 5910-20200 + 1900 Grade pay 28 Gestatnor Operator 4900-10880 + 1650 Grade pay / 5910-

20200 + 1900 Grade pay 29 Techanical. Assistant 10300-34800 + 3800 Grade pay 30 Interior Decorator 10300-34800 + 4200 Grade pay 31 Computer Operator 5910-20200 + 1900 Grade pay 32 Surveyor 5910-20200 + 2400 Grade pay / 10300-

34800 + 3800 Grade pay 33 Architectural HDM 10300-34800 + 4400 Grade pay 34 Architectural JDM 10300-34800 + 4200 Grade pay 35 Divisional Accountant 10300-34800 + 3200 Grade pay 36 Work Inspector 5910-20200 + 1900 Grade pay 37 Electrician Gr.-II 5910-20200 + 1900 Grade pay

Class-IV 1 Cook 4900-10680 + 1300 Grade pay 2 Daftri 4900-10880 +1650 Grade pay 3 Jamadar 4900-10680 + 1400 Grade pay 4 Peon 4900-10680 + 1300 Grade pay 5 Chowkidar 4900-10680 + 1300 Grade pay

Page 31: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

31

6 Sweeper 4900-10680 + 1300 Grade pay 7 Frash 4900-10680 + 1300 Grade pay 8 Chainman 4900-10680 + 1300 Grade pay 9 Process-Server 4900-10680 + 1300 Grade pay 10 Mali 4900-10680 + 1300 Grade pay 11 Helper 4900-10680 + 1300 Grade pay

Annexure-II

Total Sanction Strength of HP. PWD as on 31.03.2011

Sr. No.

Name of Category Sanctioned Strength

Existing Vacant

Class – I 1. Engineer-in-Chief 2 2 - 2. Chief Engineer 7 7 - 3. Chief Architect 1 1 - 4. Superintending Engineer 31 31 - 5. Senior Architect 4 4 - 6. Executive Engineer 113 109 4 7. Architect 8 4 4 8. Joint Controller (F&A) 1 1 - 9. Assistant Engineer 376 326 50 10. Social Development Officer 1 1 - 11. Assistant Architect 13 13 - 12. Assistant Architect (Interior Decorator) 1 1 - 13. Deputy Controller (F&A) 3 3 - 14. Land Acquisition Officer 3 3 - 15. Conservator of Forest 1 1 - 16. Registrar 3 1 2 17. Vigilance Officer 3 - 3 18. Superintendent Gr. I 36 36 - 19. Planning Assistant 13 7 6 20. Senior Research Officer 1 1 - 21. Private Secretary 1 1 - 22. Architectural Assistant 9 8 1

Total : - 631 561 70

Page 32: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

32

1. 2. 3. 4. 5. II CLASS-II 1. Research Officer 1 1 - 2. Law Officer 5 - 5 3. Asstt./Consolidation Officer 2 2 - 4. Circle HDM 17 14 3 5. Sr. D/Man (Arch.) 20 10 10 6. HDM 120 110 10(Arch.) 7. Superintendent Gr. II 184 177 7 8. Personnel Assistant 10 10 - 9. Arch. HDM 1 1 - Total : - 360 325 35

III CLASS-III 1. Junior Engineer 1341 1157 184 2. Sr. Assistant 806 803 3 3. Jr. Asstt./Clerk 857 534 323 4. Store clerk/Keeper 4 4 - 5. Sr. Scale Stenographer 35 34 1 6. Steno Typist 82 4 78 7. D/man 181 180 1 8. Jr. D/man 257 145 112 9. Naibtehsildar 9 9 - 10. Kanungo 22 22 - 11. Patwari 79 74 5 12. Lab. Assistant 2 2 - 13. Research Asstt. 8 8 - 14. Driver 45 44 1 15. PPMO 2 2 - 16. Ferro Printer 3 3 - 17. Restorer 2 2 - 18. Mechanic 1 1 - 19. Tech. Asstt. 1 - 1 20. Computer Operator 1 - 1 21. Surveyor 4 4 - 22. Arch. (JDM) 1 1 - 23. Divisional Accountant 101 65 36

Total : - 3844 3099 745 IV CLASS-IV 1. Cook 8 8 - 2. Daftri 20 18 2 3. Jamadar 19 17 2 4. Peon 796 775 21 5. Chowkidar 348 308 40

Page 33: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

33

6. Sweeper 164 145 19 7. Frash 24 23 1 8. Chainman 2 2 - 9. Process Server 1 1 - 10. Mali 4 4 - 11. Helper 1 1 - 12. Lab. Asstt. 1 1 - 13. Asstt. Lab. Attendant 2 - 2 14. Gestatoner Operator 4 3 1

Total : - 1394 1306 88 Grand Total : - 6229 5291 938

Category wise sanctioned srtength of Class-III & Class-IV Industrial & Non-Industrial categories which were earlier work Charged and work Charged brought on Reqular Cadre. SL.No. Category Sanctioned

strength before 23.11.2006

Posts created on or after 23.11.2006

Total Sanctioned strenght

1 2 3 4 5 Industrial Categories Class-III

1 Driver 624 0 624 2 Operator Gr-II 357 0 357 3 Road Roller Driver 150 0 150 4 Bulldozer Driver 143 0 143 5 Foreman Gr.-I (Mech) 22 0 22 6 Carpenter Gr-III 52 0 52 7 Auto Electrician 61 0 61 8 Mason Gr-II 1345 345 1690 9 Lab Assistant 2 0 2

10 Plumber Pipe Fitter Gr-II 136 21 157

11 Painter Gr-II 104 3 107 12 Pump Operator 10 0 10 13 Blacksmith Gr-ll 390 38 428 14 Mech.-Cum-Fitter Gr-ll 662 0 662 15 Welder Gr-II 33 5 38 16 Mech-Cum-Ftter Gr-I 9 0 9 17 Painter Gr-I 13 0 13 18 Welder Gr-I 4 0 4 19 Carpenter Gr-ll 28 0 28 20 Granthi 1 0 1 21 Rock Driller-Cum-Blast man 16 20 36

22 Foroman Gr.-I (Elect.) 7 2 9

Page 34: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

34

23 Electrician Gr-l 75 0 75 24 Excavator Operator 2 3 5 25 Turner Gr-ll 12 0 12 26 Plumber Pipe Fitter Gr-I 14 0 14 27 Mason Gr-I 48 0 48 28 Blacksmith Gr-l 9 0 9 29 Assistant Driller 7 0 7 30 Turner Gr-l 2 0 2 31 Carpenter Gr-l 1 0 1 32 Jr. Research Assistant 2 0 2 33 Electrician Gr-ll 192 0 192

Total 4533 437 4970 1 2 3 4 5

NON INDUSTRIIAL CLASS-III 1 Work Inspector 1798 207 2005 2 Store Clerk 212 34 246 3 Receptionist 68 22 90 4 Water Works Clerk 1 0 1 5 Surveyor 285 43 328

Total 2364 306 2670 INPUSTRLAR CLASS-IV

1 Belder 17782 5923 23705 2 Mali 120 14 134 3 Cleaner 345 60 405 4 T-Mate 228 44 272 5 Upboister 6 0 6 6 Boatman 25 0 25 7 Mate 2478 93 2571 8 Carpenter Gr-IV 149 44 193 9 Helper 131 173 304

Total : 21264 6351 27615 NON INPUSTRLAR CLASS-IV

1 Chowkider 866 192 1058 2 Cook 58 10 68 3 Sweeper 155 22 177

Total 1079 224 1303 ABSTRACT

1 Industrial Class-III 4533 437 4970 2 NoN-INDUSTRLAL Class-lll 2364 306 2670

3 Industrial Class-IV 21264 6351 27615 4 NoN-INDUSTRLAL Class-lV 1079 224 1303

Grand Total 29240 7318 36558

Page 35: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

35

ITEM NO. XI THE BUDGET ALLOCATED TO ALL THE WINGS OF THE STATE PUBLIC WORKS DEPARTMENT INDICATING THE PARTICULARS OF THE PLANS, PROPOSED EXPENDITURES AND ITS DISBURSEMENTS UPTILL 3/2011 IS AS UNDER:

Budget allotment/Expenditure for the year 2010-2011

Head Sanctioned Budget

Proposed Allotment & Expenditure Budget Expenditure

Non-Residential Building. (Rupees in lacs) Establishment 13427.03 13427.03 13427.103 9060.00

Repair & Maintenance 2046.69 2046.69 2046.69 728.96 Works. 2403.22 2403.22 2403.22 1144.96 Residential Buildings Repair & Maintenance 149.70 149.70 149.70 117.06 Works. 1029.98 1029.98 1029.98 500.30

Judiciary Deptt.

Non-Residential Building Repair and Maintenance 29.15 29.15 29.15 13.85 Residential Buildings Repair and Maintenance 24.15 24.15 24.15 18.91

Works 2347.00 2347.00 2347.00 635.90 Road & Bridges Works 63884.84 63884.84 63884.84 37643.59 Establishment 32119.75 32119.75 32119.75 17659.97 Maintenance 39811.46 39811.46 39811.46 29259.01

Page 36: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

36

DRAFT ANNUAL PLAN

2010-2011

FOR

ROADS & BRIDGES

INCLUDING CABLEWAYS

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

Page 37: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

37

DRAFT ANNUAL PLAN 2010-11: ROADS & BRIDGES 1 BACKGROUND:

1.1 Roads are the only means of communication in predominantly hill state of

Himachal Pradesh in absence of Railways and Water Transport. Out of its 55,673 Sq.Kms. area,

36,700 Sq.Kms. is inhabited and its 17449 villages are scattered over slopes of hill ranges and

valleys. There are 47 towns and 93% of population is rural.

1.2 Although Himachal Pradesh has been blessed with excellent agro-climatic

conditions for horticulture, growing of cash crops, off-season vegetables and seeds, it has big

potential for dairy development, tourism, establishment of horticulture/forest produce & mineral

based industries and generation of hydel power, yet this potential for economic growth could not

be exploited in the past due to lack of means of communication. There were just 288 Kms.

Motorable roads in the State at the time of its formation in 1948. Inaccessibility of the area was

not only handicap for exploitation of its resources but had kept population isolated from

progressive influences resulting in social, cultural & political backwardness as well as poverty

and leaving this hilly part of the country, quite far behind in development from plains at the time

of independence.

2. Road Development Plans & Achievements during the Period 1951-2006:

2.1 Realising importance of construction of roads for connecting production areas

with market centers and for providing much needed employment to rural population so that

marginal farmers with cash income from employment on road works could sustain themselves as

well as invest a little bit in development of their agro-horticulture based economy till the time it

could be remunerative, Himachal Pradesh Government with inception of Five Year Plan gave

first priority to road construction programme.

2.2 Considering need for construction of roads all over the inhabited area and meagre

resources available, to start with, plan was drawn for construction of main arterial roads

connecting major valleys, administrative centers and production areas. Initially work on

construction of tracks on Motorable road alignments on these roads was taken up and these tracks

were developed in phased manner to Jeepable, single lane Motorable road standards, providing of

cross-drainage, construction of bridges, metalling and tarring and then widening of few roads to

double lane standards according to needs and resources. This programme was gradually extended

to construction of rural roads and link roads to minor valleys and production areas.

Page 38: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

38

2.3 Starting practically from scratch, 30302 Kms., Motorable roads have been

constructed in Himachal Pradesh till March 2009 and over-all status of roads in the State

including National Highways, as on 31.3.2010 is in following page.

Category. Motorable Road Length (in Kms) Single I/L Double Total. Lane. Lane. 1 2 3 4 5 . 1. Motorable road (Formation)

a) State Roads i) State Highways 1050 --- 576 1626

` ii) Major Distt. Roads 1026 --- 727 1753 ii) Rural Roads 25646 --- --- 25646

Total:- 27722 --- 1303 29025

b) Central Roads i) National Highways 353 306 812 1471

ii) Border road with DGBR 451 269 720

Total: - 805 306 1081 2191 Total length of Motorable roads = 31216 Kms. 2. Road density achieved = 56.07 Kms/100 Sq.Kms. 3. Length provided with cross-drainage/bridges, = 22,304 Kms. (71.45 %) Out of total length of 31,216 Kms. 4. Metalled & tarred length, out of total length of = 18,333 Kms. (58.54 %)

31,216 Kms. 5. Permanent bridges of different types of = 1674 Nos.

Construction 6. Villages connected with either Katcha or Pucca = 9,541Nos. (54.68 %)

Motorable Roads (out of total 17449 Nos.census villages)

Population wise breakup of connected villages is as under: (a) Above 1500 Population = 205 (b) Above 1000 to 1500 Population = 266

(c) Above 500 to 1000 Population = 1208

(d) Above 200 to 500 Population = 3191 (e) Less than200 Population = 4671 Total: 9541

Page 39: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

39

Total expenditure incurred in Road & Bridge sector since independence and progress of

development of roads in State Sector during various Plan periods is as under:-

Plan Period. Expenditures in lakhs Motorable road (only State Roads)

State Plan Investment

Exp.incurred on roads

%age During Plan Period

Cumulative at the end of Plan Period.

Upto 1948 - - - - 288 Kms. Ist Plan 1951-56

527.25 225.40 42.75% 216 504

2nd Plan 1956-61

1602.80 533.84 33.30% 796 1300

3rd Plan 1961-66

3384.47 1018.11 30.08% 814 2114

Three-Annual Plans 1966-69 4000.82 1228.57 30.70% 2439

6196 Addition due to Merged areas in the State in Year 1966

3500.00 - 1643

4th Plan 1969-74

11340.00 2800.00 24.7% 2846 9042

5th Plan 1974-79

23450.00 4700.00 20.0% 1352 10394

Annual Plan 1979-80

7880.00 1497.00 19.0% 573 10967

6th Plan 1980-85

62833.00 10176.00 16.19% 2670 13637

7th Plan 1985-90

117422.00 15889.13 13.53% 1867 15560

Annual Plan 1990-91

36000.00 4388.58 12.19% 411 15971

1991-92 41000.00 5064.80 12.35% 405 16376 8th Plan 1992-97

325058.00 32122.28 11.60% 2000 18376

9th Plan 1997-2002

760058.54 90892.84 11.96% 3003 20837 Note:- During 1998-99 &

1999-2000, 542 Kms.length State

Highways were declared as National Highways.

2002-2003 184000.00 23528.73 12.79% 673 21510 2003-2004 217100.00 20817.06 9.59% 556 22066 2004-2005 140000.00 22672.97 16.19% 521 22587 2005-06 160000.00 28464.13 17.79% 504 23091 2006-07 180000.00 19169.32 10.65% 498 23589 2007-08 210000.00 31852.25 15.16 655 24244 2008-09 240000 40420 16.84 % 728 24972 2009-10 504 25476

The figure of allocation and expenditure is exclusive PMGSY & WORLD Bank.

Page 40: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

40

2.5 From above mentioned details, it is clear that expenditure on road

construction programme has progressively come down from 42.75% of total plan

expenditure during Ist Five Year Plan to 16.84% in the year 2007-2008. Only 52.97 %

villages of the State have been connected with Motorable roads by 3/2010, giving a road

density of 56.07 Kms./100 Sq.Kms. area. As linking of an area by modern means of

communication proceeds all developmental activities, therefore the population of about

45.32 % villages of the State has remained quite backward as most of the developmental

programmes of the Govt. could not provide the desired satisfaction in the absence of road

links to such villages. 3. Requirement of Roads in Himachal Pradesh:

3.1 According to Policy of Govt.of India, all villages are ultimately to be connected

with all weather Motorable roads in phased manner. As per master plan prepared, about 39045

Kms roads in total, are required to be constructed in Himachal Pradesh to connect all villages,

giving density of about 70 Kms per 100 Sq.Kms. area. District-wise requirement of Motorable

roads to connect villages of the Pradesh has been assessed on the basis of detailed survey

conducted in the years 1999 & 2000 and the details of the same alongwith achievements upto

March 2010 are given as under;

S.No. Name of

District.

Area in

Sq.Kms.

Population

as per

2001

census.

For

providing

complete

connectivity,

length of

Roads

required in

KMS.

After-complete

connectivity the density

of roads would be

(Kms)

Status of Motorable Roads as on

31-03-2010

Per 100

Sq.Kms.of

Area.

Per 1000

Population.

Length

in

Kms.

Density

Per 100

Sq.Kms.

Density Per

1000

Population.

1 Bilaspur 1167 340885 1561 133.76 4.58 1473 130.08 4.45 2 Chamba 6528 460887 4564 69.91 9.90 2085 33.18 4.70 3. Hamirpur 1118 412700 1892 169.23 4.58 1714 156.35 4.24 4 Kangra 5739 1339030 6705 116.83 5.01 5268 93.40 4.00 5 Kinnaur 6401 78334 891 13.91 11.37 739 11.69 9.55 6 Kullu 5503 381571 2244 40.77 5.88 1489 28.77 4.15 7 L&Spiti 13835 33224 1421 10.27 42.77 1159 8.63 35.94 8 Mandi 3950 901344 6210 157.23 6.89 4605 120.96 5.30 9 Shimla 5131 722502 5293 103.16 7.33 4843 96.98 6.88

10 Sirmour 2825 458593 3294 116.61 7.18 2764 100.42 6.19 11 Solan 1936 500557 3210 165.81 6.41 2507 134.40 5.26 12 Una 1540 448273 1760 114.29 3.93 1669 110.78 3.81

Total: 55673 6077900 39045 70.13 9.65 30302 56.07 5.14

Page 41: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

41

3.2 As such about 39045 Kms total road length is required in the State of H.P. to provide maximum possible connectivity to all the census 17449 villages of the State, out of it, lot of work has already been done. The approximate cost requirement, on 2009-2010 prices, for constructing the balance road length in the State, as all Weather roads, is in the following table.

S.No. Major items of road works in Kms.

Total requirement in

Kms.

Already provided or constructed in Kms. (as

on 31-3-2010)

Balance work in Kms.

Cost requirement in Crore.

1 Formation/Cutting. 39045 31216 7829 939.48 2 Cross-drainage

including bridges. 39045 22304 16741 999.44

3 Metalling/tarring 39045 18333 20712 1946.93 Total:- 3885.85

Total approximate Cost:-3886 Crore 3 ACHIEVEMENTS DURING ANNUAL PLAN 2009-2010: The State Planning Department had approved outlay of Rs. 59520.96 lacs for annual Plan 2009-2010. With this outlay, following achievements has been made by 3/2010.

S.No. Item of Work. Unit. Target Achievements Remarks. State Roads:

1 Single lane Motorable Kms 650 914 1.The figures of target is excluisive of PMGSY. 2.The figures of achievement is inclusive of PMGSY &World B4

2 Jeepable Kms 30 27 3 Cross-drainage Kms 700 1556 4 Metalling & tarring Kms 760 1043 5 Bridges Nos. 30 70 6 Villages connected Nos. 45 298

Against the outlay of Rs.59520.96 lacs, an expenditure of Rs.49004.02 lacs has been incurred up to 3/2010 5. PROPOSALS FOR ANNUAL PLAN 2000-2011: During the year 2010-11, it is proposed to construct 650 Kms of new roads.

Besides, work on up- gradation and improvement of State Highways & Arterial roads

shall also be continued to meet the demands of growing traffic. The detailed break-up of

proposed activities is in following paras. In addition to plan activities, work under this

sector would also be continued under PMGSY programme.

Page 42: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

42

5.1 Rural Roads: It is proposed to construct about 650 Kms new roads under Annual Plan 2009-10

which includes assistance from NABARD and CRF. During the year, 709 Nos. Census Villages

are proposed to be linked with Motorable roads.In addition to this during the year 2008-09, it has

been proposed to complete approximate 1260 Kms of road length under PMGSY & World Bank

aided PMGSY including 260 habitations at the cost of 400 crore.

5.2 State Highways: The existing 19 No. State Highways of the Pradesh need lot of improvement and upgradation. During 2010-11, 7.500 Kms length of State Highways is proposed to be metalled/tarred, besides carrying out other improvement of these roads, with provision of Rs. 650.00 lacs for the year 2010-11.The Government of Himachal Pradesh has applied for a loan/credit financing in the amount of about US$ 303.43 million equivalent from the World Bank toward the cost of the proposed up-gradation of about 447.00 km to double or intermediate lane traffic standards and improvements mainly in the form of periodic renewal on about 2000 km of State Highways and Major District Roads under State Road Project in Himachal Pradesh and this project would be prepared and implemented in 5 years period as per World Bank guidelines. The State Government has also identified and approved the “ HP Road and other infrastructure Development Corporation Ltd. (HPRIDC) headed by Managing Director;” as the implementation agency for this project.The project will be executed through field divisions of Public Works Department. All the financial matters will be dealt in HPRIDC.

6 SUB HEAD WISE PROPOSED BREAKUP OF ANNUAL PLAN ACTIVITIES DURING 2010-2011:

6.1 An outlay of Rs. 53010.00 lacs for Roads & Bridges and cableways has been proposed

during 2010-11. The sub-head wise breakup of this outlay is proposed as under;

Annual Plan 2010-2011, proposed break up of outlay (Rs.in lacs) S.No. Sub-head. Gen.Plan Special

Component Plan(SOOS)

Tribal Area Sub-Plan.

B.A.S.P Total

I 5054-ROADS & BRIDGES: 1 State Highways 500.00 100.00 50.00 -- 650.00 (a) Machinery &

Equipment. 100.00 0.00 80.00 -- 180.00

2 Periodical Renewal -- -- -- -- -- 3 Bridges (Soon) 300.00 100.00 --- -- 400.00 4 Arterial Road -- -- -- -- -- 5 NABARD (Soon)/

RIDF 7556.00 2818.00 1026.00 -- 11400.00

6 C.R.F. 1466.00 546.00 -- -- 2212.00 7 Rural Road OTMNP. 2040.00 2614.00 3384.00 1500.00 9538.00 8 Rural Road (i) Land

Compensation (V) -- -- 160.00 -- 160.00

(ii) Land -- -- -- -- --

Page 43: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

43

Compensation (Charged)

9 Staff in Rural road.(Staff Permanent)

- -- -- -- --

10 Link road to unconnected Panchayat with Highways.

80.00 50.00 10.00 -- 140.00

11 Training 5.00 --- -- -- 5.00 12 Payment compulsarry

afforstration & NPV roads of industrial importance Major district roads.

1195.00 445.00 -- -- 1640.00

13 Road side facility plantation

75.00 --- -- -- 75.00

3054-R&B Plan: 14 (i) District other

Roads Maintenance & Repair (Soon)

9810.00 3585.00 1305.00 -- 14700.00

(ii) World Bank State Rural Road Project

7623.00 2842.00 1035.00 -- 11500.00

15 Sanjauli Bye Pass --- -- -- -- -- 16 Up gradation of raod

Industrial importance 400.00 --- --- --- 400.00

16 Cableways -- -- 10.00 -- 10.00 Total:- 31150.00 13100.00 7260.00 1500.00 53010.00

6.2 PHYSICAL TARGETS:

With above-mentioned sub-head wise outlay, the following physical targets are likely to be achieved during 2010-11. S.No. Item of Sub-head of work. Unit. Targets Remarks.

Non-tribal.

Tribal. Total.

(A) ROADS & BRIDGES: 1 Motorable road Kms 600 50 650 The figures of target are

exclusive of PMGSY. 2 Jeepable Kms 15 15 30 3 Cross-drainage Kms 640 60 700 4 Metalling/tarring Kms 540 60 600 5 Bridges Nos 25 5 30 6 Villages Nos 65 5 70 B Cableways Nos - 1 1

7 Information on the prescribed proformas is appended in the following page

Page 44: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

44

GN-I DRAFT ANNUAL PLAN 2010-11

HEAD OF DEVELOPMENT WISE OUTLAY AND EXPENDITURE (RS.IN LACS)

Code No.

Major Heads/Minor Heads of

Development

Eleventh Plan (2007-

2012) Projected Outlay (at 2006-07 prices)

Annual Plan

(2007-08)

(Actual Exp.)

Annual Plan 2009-10 Annual Plan 2010-11

Approved Outlay

Anticipated expenditure Proposed outlay

Gen.Plan S.C.P. T.S.P. BASP Total.

outlay. outlay. outlay. outlay outlay

1 2 3 4 7 8 9 10 11 12 13 5454-CAPITAL OUTLAY

(A) Roads & Bridges 1936.45 40559.46 59520.96 49004.02 31150.00 13100.00 7250.00 1500.00 53000.00

(B) Cableways 80 0.74 10.00 10.00 --- --- 10.00 --- 10.00

Page 45: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

45

GN-II DRAFT ANNUAL PLAN ( 2010-11)

DEMAND NUMBER/ HEAD OF ACCOUNT/ HEAD OF DEVELOPMENT/ SCHEME WISE OUTLAY AND EXPENDITURE. General Plan

Sr.No. Demand No.

Major/ Sub-Maj/ Minor/ Sub-Minor Code.

Sec/ Head of Dev./ Scheme.

Eleventh Plan 2007-2012 Proposed

outlay. (at 2006-07

Prices)

Annual Plan (2008-

2009) (Actual Exp.)

Annual Plan (2009-2010)

Annual Plan (2010-2011)

Proposed Outlay.

Approved Outlay

Expendit

ure. ( Tentative

) 1 2 3 4 5 6 7 8 9 10 3054 Roads & Bridges 126594.00 25112.17 37667.00 30257.54 31150.00

04-800-04

Soon Minor Work 2624.00 191.23 0.00 0.00 200.00

80-001-01-

Soon Establishment 5787.00

(i) Staff in Rural road

----- ---- ---- ---- ---- (ii) Staff Permanent Maintenance 9200.00 9240.20 9610.00

5054 Capital Outlay on Roads &

Bridges 03 State Highway 767.00 052 Machinery & equipment 345.26 100.00 99.90 100.00 01 Soon State Highway 101 Bridges

01 Soon C/O Bridges (Major/Minor)

SOON 1809.00 2164.38 550.00 577.23 300.00 337 Road Works ----- - 01 Soon State Highways 613.00 2607.10 381.30 352.85 500.00 Rural Road OTMNP SOON ----- ---- ---- ---- ----

Page 46: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

46

02 Soon Arterial State Roads 166.00 --- --- --- --- 03 Soon C/O roads under NABARD 29977.00 7473.21 13500.00 13637.10 7556.00 04 SOONA C/O roads under CRF 13035.00 1426.91 1618.70 1621.47 1466.00

05 Soon C/O Sanjauli Bye-Pass Road

under 12th Finance Comm. 4984.00 250.06 ----- ----- -----

07 Soon Upgradation of road of

Industrial importance - - - 400.00

06 Soon World Bank State Road

Project. 38340.00 7125.00 7500.00 7623.00 4 Distt. and other Roads

337 Periodical Renewal -1 Minor

works ---- ----- ----- ----- -----

02 Soon C/O Rural Roads

maintenance and repair. 22629.00 3385.09 2147.00 2167.41 2040.00 ---- ---- ---- ---- ----

05 Soon Link roads to un-connected

panchyats with State-highways 3833.00 20.78 50.00 46.09 80.00

06 Soon Compensatory afforestation

(NPV) of forest land 1953.00 123.15 2550.00 2467.58 1195.00

Road of industrial

importence. Major District Roads 80-003 Training --- --- --- --- 01 Soon Training programme 77.00 5.00 0.00 5.00 800 Other Expenditure 03Soon Road side facility/plantation ---- ----- 65.00 47.71 75.00 Road Safety ;- ;- ;- De-centralized Planning. ----- --- --- --- --- Backward area Sub Plan ----- --- --- --- --- Consutancy Services ----- ----- Total:- 126594.00 25112.17 37667.00 30257.54 31150.00

Page 47: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

47

HEAD OF DEVELOPMENT/SCHEME WISE PHYSICAL TARGETS & ACHIEVEMENTS

S.No. Item. Unit. Eleventh Five Plan Annual Plan (2009-10) Annual Plan

(2007-2012)

Annual Plan (2008-2009) Target Achievement

Total 2010-11

Actual State PMGSY/WORLD

Bank Targets Targets Achievement 1 2 3 4 5 6 7 8 9 10

I. 5054-CAPITAL OUTLAY ON ROADS & BRIDGES

I) Motorable Kms 3000 728 650 504 410 914 650

ii) Jeepable Kms 100 45 30 17 0 17 30

iii) Cross-drainage Kms 3200 753 700 645 911 1556 700

iv) Metalling & tarring Kms 3500 455 760 564 479 1043 600

v) Bridges Nos 170 55 30 60 10 70 30

vi) Village connectivity Nos 200 92 45 137 161 298 70

vii) Cableways Nos 5 0 1 1 0 1 1

Page 48: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

48

EMP-I ANNUAL PLAN 2008-2009

Employment Content of Sectoral Programme- Head of Development wise outlay and expenditure. (Rs.in lakh)

S.No. Major Head/Minor

Eleventh Plan Annual Plan Annual Plan Annual Plan Proposed outlay

Head of Development. 2007-12 2007-08 2008-09 2009-10 for Annual Plan Proposed Actual Actual Actual (2010-2011) Outlay. Expenditure. Expenditure. Expenditure. 1 2 3 4 5 6 7 I 5054-CAPITAL OUTLAY Roads & Bridges 95313.00 15671.00 19831.00 24110 26061.00

EMP-II Annual Plan 2009-2010

Employment Content of Sectoral Programme S.No. Name of Sector. 11th Plan (2007-12)

(Targets) Actual achievements during Annual Plan(2007-08)

Actual achievements during Annual Plan(2008-09)

Achievements 2009-10 Proposed out lay forAnnual Plan 2010-11

Construction person days

Continuing person years

Construction person days

Continuing person years

Construction person days

Continuing person years

Achievement Continuing person years

Construction person days

Continuing person years

1 2 3 4 5 6 7 8 9 10 11 12 I 5054-CAPITAL OUTLAY Roads & Bridges 158855 588.35 26188 96.73 33051.66 122.48 40183 148.82 43468 160.99

Page 49: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

49

Page 50: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

50

DRAFT ANNUAL PLAN

(2010-2011)

FOR

BUILDING (PW) HOUSING (PW)

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

Page 51: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

51

DRAFT ANNUAL PLAN 2009-10 I. Buildings (PW) (Non-Residential) 1. Background: As Himachal Pradesh was formed by integration of 30 small Princely Hill States, there were practically no suitable public buildings for administrative offices, Judiciary/other departments, Schools, Hospitals etc. at the District Head Quarters and other places. Need increased with opening and strengthening of new departments for developmental activities launched under subsequent Five YearPlans.Position of accommodation worsened on integration of hilly areas of Punjab when new District, Sub-Divisions and Tehsils were created, because there were practically no suitable public buildings at headquarters of these new administrative units. After attainment of Statehood, there was need for proper accommodation at the State head quarters, which included buildings for High Court, Secretariat, Vidhan Sabha and other newly opened Directorates. 2 Requirement of Public Buildings: Buildings of General Administration, H.P. Secretariat Administration, Judiciary, Public Works Department, District Administration, Land Revenue Department, Excise Taxation, Home Guard, Public Service Commission, Treasury and Accounts etc. are covered under the head “Building (PW)”. Demand for proper office buildings through out the State is immense and a large number of offices are functioning in either old dilapidated govt. buildings or unsuitable hired accommodation. There were about 135 buildings under construction after closure of 10th Five Year Plan in 3/2010 and about 75 new buildings were proposed to be included in the 11th Five Year Plan. 3 Review of Achievements during 10th Five Year Plan (2002-2007) : Although requirement of construction of buildings is great, a modest outlay of Rs.3900.00 lacs only was approved during 10th Five Year Plan, out of which a sum of Rs.1900 lacs was earmarked for Tribal Areas. Approved outlay and targets/achievements during the 9th Five Year Plan, are given as under:-

Sr.No. Description Unit Outlay/Targets 10th Plan(2002-2007)

Achievement during 2002-2007

I Financial Rs.in lacs 3900.00

6550.12

II Physical Nos. 50 65 Against the target of 50 buildings, 65 buildings were completed during 10th Five Year Plan upto 3/2007, out of which 20 buildings were completed in Tribal Areas. 4 Spill-over Scheme to 11th five Year Plan (2007-2012):

135 buildings, construction of which was taken-up, upto March 2007 could not be completed by 3/2007 and construction cost of these buildings got spilled over to 11th Plan. A sum of about Rs.40.00 crore approximate is required to complete these buildings. Some of the important buildings which were in progress as on 3/2010 are expected to be completed during 2010-11,such as Mini Secretrate Building at SunderNagar, Combind office building at Mandi,Combind

Page 52: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

52

office building Mini Seccretrate at Baijnath, Combind office building at Nurpur, Mini Secretate at palampur,Rest house at Tecklech etc.

5 11th Five-Year Plan (2007-20012) (Non-Residential Govt.Buildings): During 11th Five Year Plan 2007-2012a provision of Rs.15434.00 lacs has been approved by Planning Department for execution of Non-Residential Buildings in the State. Out of it, Rs.2718.00 lacs has been approved for tribal areas. An additional provision of Rs.14408.00 lacs has been approved for Judiciary (C.S.S.) State Share. Details of approved outlay and proposed targets are given as under:-

SL. No.

Description. Unit Targets (2007-2012) Total State Plan (Rs.in lacs) Other than

tribal area. Tribal area.

I Financial Proposed Outlay

Rs.in lacs 12716 2718.00 15434.00

II Physical Targets (Buildings)

Nos. 45 20 65

6 ANNUAL PLAN 2009-10: The following were the targets and achievements under head Buildings (PW) 4059; Sr.No. Description Unit Outlay/Target Achievements

I Financial Rs.in lacs 4514.04

4408.25

II Physical Nos 15 10 7. DRAFT ANNUAL PLAN 2010-11

An outlay of Rs.3074.00 lacs has been proposed by Planning Department for the Annual Plan 2010-11. Out of which Rs400.00 lacs has been proposed for tribal area and Rs.547.00 for SCCP.Targets likely to be achieved are as under: -

Sr.No. Description. Unit Annual Plan 2010-2011 Total.

Other than Tribal area.

Tribal area.

SCCP

4059-Building (PW)

1 Pooled Non-Residential Govt.Buildings.

Rs.in lacs.

2127.00 400.00 547.00 3074.00

Page 53: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

53

2 Judiciary Infrastructure.

2000.00 - - 2000.00

1 Physical Targets a) Pooled Non- Residential.

Nos. 11 5 0 16

Many ongoing important building works like Mini Secretrate Building at SunderNagar, Combind office building at Mandi,Combind office building Mini Seccretrate at Baijnath, Combind office building at Nurpur, Mini Secretate at palampur,Rest house at Tecklech etc.are expected to be completed during 2010-11.

II Housing (PW) Residential Housing Activities In Himachal Pradesh 1 Housing is one of the basic necessities of mankind. The gap between the requirement in this sector and the availability is so large that efforts of various organizations, whether in public or private sector, have so far failed to make substantial headway to bridge it. 1.1 Providing houses to its employees to a reasonable satisfactory level is a primarily a concern of an employer. For State Govt.employees, the responsibility lies on the State Govt. The aims indicated by Govt.of India in providing houses to employees suggest that the Govt.should endeavour to provide housing satisfaction to atleast 40% employees stationed at State Head-quarters, 53% in the Towns and 70% in the remote areas. As against above, the overall present level of housing satisfaction of State employees in our State is merely about 7%. 1.2 For achieving the aims enunciated by Govt.of India, an outlay of about 1500 crores is required at present day price level. This would involve adding about 35000 housing units of various categories to the existing strength. 1.3 With respect to the capital town of Shimla, the position is rather acute both in Govt. and Private Housing. Large number of corporate bodies, Banking Industry, Central Govt.Offices and other commercial concerns have opened their offices here in last couple of years which has aggravated already acute problem of availability of houses and the rent of private units has become so exorbitant that a Govt.employees can not afford to hire reasonable accommodation within available resources with him even by cutting down his other needs. As per statistics published by the department of Economics and Statistics of Himachal Pradesh, there were 2360 Gazetted employees and 24694 Non-

Page 54: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

54

Gazetted employees in District Shimla as on 1-1-1998. With this as base, it is expected that the number of total employees in Shimla District may now be more than 27,000. 2 Review of Achievements during 10th Five Year Plan (2002-2007):

Originally an outlay of Rs.1853.00 lacs was approved for Housing (PW) in the 10th Five Year Plan. Out of this a sum of Rs.1053 lacs was earmarked for tribal areas. Targets and achievements during the 10th Five Year Plan are given as under:-

Sr.No. Description Unit 10th Plan

(Year 2002-07) Targets

Achievements during 2002-07

A Financial Rs.in lacs 1853.00

1535.77

B Physical Nos. 300 (Revised

163

Against target of 300units, 163 units have been completed during 10th Five Year Plan upto 3/2007, out of which 88 units have been completed in tribal areas. 3 Spill-over Schemes to 11th Five Year Plan (2007-2012): 137Housing Units remained in progress at the end of March 2007, completion of which has get spilled over to 11th Five Year Plan period. A sum of Rs.8.00 crores would be required to complete these buildings. 4 11th Five-Year Plan (2007-2012)

(Pooled Govt.Housing) Although demand for construction of houses (PW) is great, however a sum of Rs.1338.00 lacs has been approved by Planning Department for the 11th Five Year Plan. Out of this, Rs.1022.00 lacs have been proposed for tribal areas. Proposed outlay and targets are given as under:- Sl.No. Description Unit 10th Five Year Plan 2002-2007

Other than tribal.

Tribal area.

Total.

FINANCIAL Pooled Govt.Housing

Rs.in lacs. 316.00 1022.00 1338.00

PHYSICAL TARGETS

Pooled Govt.Housing

Nos. 80 120.00 200

The department has proposed a target of completion of 80buildings in Non-Tribal Areas and 120 Buildings in Tribal Area.

Page 55: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

55

5 ANNUAL PLAN 2009-10: The following were the targets and achievements under head Housing (PW) 4216:- Sr.No. Description Unit Outlay/Target Achievements

I Financial Rs.in lacs 927.42

924.31

II Physical Nos 57 32 6 DRAFT ANNUAL PLAN 20010-11: An outlay of Rs.1004.00 lacs has been proposed by the State Planning Department for Annual Plan 2010-2011. Out of which Rs.270.00 lacs has been proposed to tribal area, which is more than 26.99% of total outlay. Targets likely to be achieved are given as under: -

SL. No.

Description. Unit. Annual Plan 2010-2011 Total.

Other than tribal area.

Tribal Area.

4216-Building (PW)

I Financial Outlay a)Pooled Govt.Housing

Rs.in lacs.

734.00 270.00 1004.00

II Physical Targets Nos. 34 25 59

Information on the prescribed proforma is appended in the following pages.

Page 56: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

56

ANNUAL PLAN-2010-11 PROPOSED OUTLAYS (From State Budget) GN STATEMENT-B (Part -I)

(Rs.in Lakhs) Sr.No. Major Head/ Minor Head of

Development Eleventh Plan 2007-12 approved Outlay ( At 2006-07 Prices)

Annual Plan 2009-10 Annual Plan 2010-11 Proposed Outlay

Agreed Outlay

Anticipated Expt.

1 2 3 4 5 6 1 5054 C.O.L ON ROADS & BRIDGES

193645.00 47950 47950 53000.00

2 Cableways 80.00 10.00 10.00 10.00

3 15435.00 2614.04 2558.82 2771.00 Pooled Non-Residential Govt. Building 4 4216 Housing (PW) 2360.00 927.42 924.31 1004.00 Pooled Govt. Housing 5 Judiciary

Upgradation of Judiciary infrastructure 11377.00 1900.00 1897.78 2000.00

Page 57: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

57

DRAFT ANNUAL PLAN 2010-11 PROPOSED OUTLAY HEAD OF DEVELOPMENT WISE OUTLAY AND EXPENDITURE

(Rs.in lakh) Sr. No.

Major Head/Sub-

Head/Scheme

11th Year 2007-12

Projected Outlay(At 2006-07 Prices).

Annual Plan 2008-09.

Annual Plan 2009-10 Annual Plan 2010-11 Proposed Outlay.

Approved Outlay.

Expenditure (Tentative)

Total Outlay

Actual expenditure

Total Outlay

Gen. Plan Outlay

S.C.P. outlay

T.S.P. outlay

BASP Outlay

Total Outlay

1 2 3 4 5 6 7 8 9 10 11

I. 4059-BUILDING (PW) 01-796-02 SOON

400.00

A. Pooled Non-Residential 15434 1849.88 4514.04 4408.25 2127.00 547.00 ---

3074.00

Govt.Buildings.

II. 4216-HOUSING (PW)

A. Pooled Govt.Housing. 2360 646.52 927.42 924.31 734.00 --- 270.00 ---

1004.00

Judiciary Upgradation of Judiciary Infrastructure 11377 1941.22 1900.00 1897.78 2000.00 --- --- ---

2000.00

Page 58: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

58

DRAFT ANNUAL PLAN( 2010-11) DEMAND NUMBER/HEAD OF ACCOUNT/HEAD OF DEVELOPMENT/SCHEME WISE OUTLAY AND EXPENDITURE.

Sr. No.

Demand No.

Major/ Sub-Maj/ Minor/ Sub-Minor

Code.

Sec/ Head of Dev./ Scheme. Eleventh Plan

2007-12 Proposed

outlay. (at 2006-07 Prices)

Annual Plan

(2008-09)

(Actual Exp.)

Annual Plan (2009-2010)

Annual Plan

(2010-11) Proposed

Outlay.

Approved Outlay

Tentative Expenditure

1 2 3

4

5 6 7 8 9 10 4059-BUILDING (PW) Pooled Non-Residential 12716.00 1900.00 1859.62 1824.00 Capital outlay on PW - - - Excise and Taxation 636.00 0.00 01-051-04-SOON District Admn.(DC offices & SDM offices) 81.95 1.00 0.90 90.00 01-051-07-SOON Public Works Deptt. - - - a) Nirman Bhawan at Shimla 2476.00 428.05 250.00 253.98 250.00 b) Other Buildings 235.00 244.00 230.00 01-051-12-SOON General Admn. - - -

a) C/O Sarai Bhawan near PGI Chandigarh. 368.00 59.67 200.00 200.00 240.00

b) Other buildings 50.00 49.98 50.00

01-051-24-SOON Vidhan Sabha Bldg. At Dharamsala 803.00 128.00 50.00 50.00 10.00 01-051-03-SOON C/O Rest Houses/Circuit Houses 2510.00 372.12 350.00 315.62 340.00 01-051-05-SOON Other Admn. Services/ Mini Sectt. 5789.00 760.04 609.00 589.28 434.00 4059-01-051-27 Home Guards and Fire Services 150.00 135.98 160.00 2059-80-051-01-SOON Maintenance a) Minor Works 134.00 20.00 20.00 19.88 20.00 Total:- 12716.00 1849.83 1915.00 1859.52 1824.00

Page 59: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

59

3 4059 Admn. Of Justice UPGRADATION OF JUDICIARY 10408.00 1900.00 1897.78 2000.00

01-051-15-SOON (I) JUDICIARY INFRASTRUCTURE. 8728.00 1922.64 1710.00 1880.75 1970.00 01-051-15-SOON (ii) FAST TRACK COURT 1330.00 18.88 190.00 17.03 30.00 01-051-02 SOON iii) C/O Distt. Attorney office Total:- 10058.00 1941.62 1900.00 1897.78 2000.00 10 4216-HOUSING (PW) Pooled Govt.Housing 1338.00 700.00 691.68 1004.00 - - 01-106-01-SOON General Pool Accommodation 1275.00 660.00 658.62 694.00

01-Govt Residential Bldgs. - - -

106-General pool accom. 01-Construction of resi. Bldgs. 646.52 - - -

01-SOON Residential Bldgs. in various Distts. R.N.S. - - -

2216-Housing - - - 01-GAD Maintenance - - -

106-GPA Minor works 63.00 0.000 40.00 33.06 40.00 Total:- 1338.00 646.52 700.00 691.68 734.00

Page 60: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

60

GN-III

HEAD OF DEVELOPMENT/SCHEME WISE PHYSICAL TARGETS & ACHIEVEMENTS Sr.No.

Item Unit Eleventh Plan (2007-12)

Annual Plan (2009-10 )

Annual Plan 2009-10 Annual Plan

(2010-11) Targets Targets (Actual

achievement) Targets Achievement

1 2 3 4 5 6 7 8 I. 4059-BUILDING (PW) A. Pooled Non-Residential Nos. 65 15 15 10 16 Govt.Buildings. Upgradation of Judiciary Nos. --- 2 ---

II. Infrastructure A. Pooled Govt.Housing. Nos. 200 24 50 29 52 Judiciary Upgradation of Judiciary Infrastructure Nos. 20 9 7 3 7

Page 61: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

61

EMP-I ANNUAL PLAN 2008-2009

Employment Content of Sectoral Programme- Head of Development wise outlay and expenditure.

(Rs.in lakh)

S.No. Eleventh

Plan Annual Plan Annual Plan Proposed outlay Annual Plan

Major Head/Minor 2007-12 2007-08 2008-09 for annual Plan 2010-11 Head of Development. Approved Actual Actual (2009-2010) Outlay. Expenditure. Expenditure. 1 2 3 4 5 6 7

I 4059-Building (PW) A Non-Residential Govt.buildings. 3164.18 607.68 607.68 588.55 630.17 II 4216-Housing (PW) A Pooled Govt.Housing. 483.80 87.80 173.03 198.03 205.82

III Judiciary Upgradation of Judiciary Infrastructure 394.14 410 410

Page 62: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

62

EMP-II Annual Plan 2010-2011

Employment Content of Sectoral Programme S. No.

Name of Sector. 11th Plan (2007-12) Actual achievements Annual Plan(2008-09) Annual Plan 2009-10

Annual Plan 2010-11

(Targets) during Annual Plan(2007-

08) Achievements

Targets Targets

Construction Continuing Construction Continuing Construction Continuing Construction Continuing Construction Continuing

person days person years person days

person years person days

person years

person days

person years

person days

person years

1 2 3 4 5 6 7 8 9 10 9 10

I 4059-Building (PW)

A Non-Residential 5273.62 19.32 934.25 3.46 1012.8 3.75

980.92 3.63 1050.28 3.9

Govt. Buildings.

II 4216-Housing (PW)

A Pooled Govt. Housing. 806.33 2.98 146.35 0.54 288.38 1.07

330.05 1.22 343.03 1.27

III Judiciary

Upgradation of Judiciary Infrastructure 656.9 2.43

656.9 2.43 683.33 2.53

Page 63: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

63

Page 64: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

64

TRIBAL SUB PLAN

DRAFT ELEVENTH FIVE YEAR PALN (2001-12)

AND ANNUAL PLAN

2010-2011

FOR

ROADS & BRIDGES

INCLUDING CABLEWAYS

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

Page 65: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

65

DRAFT ANNUAL PLAN 2010-2011 SUB HEAD: TRIBAL SUB PLAN 1. Background: Himachal Pradesh has an area of 55673 Sq.Kms. out of which 23655 Sq.Kms. is tribal area, which constitutes nearly 42.5% of entire area. It is sparsely populated having 3.13% of the total population. This tribal area is mostly adjoining to the International Border. However, remotely located or difficult or sparsely populated this tribal area may be, it is essential to connect habitations in this area by providing essential net work of roads for the economic development as well as for strategic reasons. Government, has, therefore, decided to earmark separate funds out of overall plan outlay for Roads & Bridges specifically for tribal areas. 2 Road Development Plans and Achievements during the Period 1951 to 2010 Starting from scratch, 2355 Kms. Motorable roads have been constructed in tribal area of Himachal Pradesh till 3/10 and overall achievements including central roads are as under: -

Category Motorable road length in Kms. Total length in Kms. 1 Motorable roads

(Formation) Single lane Double

lane Total

a) State Roads i) State Highways 45 193 238

ii) Distt.& other Rural Roads. 1642 3 1645

Total:- 1687 196 1883 1883 b) Central Roads

i) National Highways - 28 28 ii) Border road with DGBR. 297 220 517

Total:- 297 248 545 545 Total length of Motorable roads (Formation) = 2428Kms.

2 Road density achieved = 10.26 Kms/100 Sq.Km. 3 Length provided with cross-drainage/bridges = 1431 (58.93%) Out of 2428 Kms. 4 Metalled & tarred length out of total length of = 1123 (46.25%)

2428Kms. 5 Villages connected upto 3/2010out of 480 Nos. = 232 Nos. (48.33%) 3 Requirement of Roads in Tribal Areas & Plan:

According to Policy of Govt.of India, all villages are ultimately to be connected with all weather Motorable roads. The requirement of roads in tribal areas of the State, and as well achievements made in this regard upto 3/10, are as under:-

Page 66: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

66

S.No. Name of Tribal District.

Area in Sq.Kms.

Population as per 2001

census.

For providing completed

connectivity, length of roads

required

(in Kms).

After complete connectivity, the density of roads

would be

Status of motorable roads as on 31/3/2010

Required length in Km.

Per 100

Sq.Km.

Per 1000 Population.

Length in

Kms.

Density per 100 Sq.Km.

Density per 1000

population.

1 Kinnaur 6401 78334 891 13.91 12.50 748 11.69 9.54

2 Lahaul & Spiti 13835 33224 1421 10.27 45.41 1194 8.63 35.94

3 Chamba (only Pangi & Bharmour Block)

3419 54844 964 28.19 14.54 486 14.21 8.86

Total:- 23655 166402 3276 13.85 19.40 2428 10.26 1459

4 Spill over works to Eleventh Five Year Plan: Apart from National Highway & Border roads, work on 127 State Highways and Rural roads was taken in hand in tribal area by the end of March 2010, having total length of 2000 Kms. Out of this length 1823 Kms.(excluding Central Roads) was made Motorable by March 2010, leaving spill over of 382 Kms.length to be constructed under 11th Plan period. The approximate cost of completion of this 2000 Km.road length to All weather motorable standards is about Rs.182 crore, details of which are as under;

S.No Particulars/Sub-head. Position of works initiated upto

3/2010

Spill over to

11th Plan

(Kms)

Cost of spill over works)

(Rs. In lacs)

Total

length.

Achievements upto

3/2009.

Rate

(per kms.)

Amount.

1 Single lane Motorable. 2000 1873 127.00 13.31 1690

2 Cross-drainage 2000 1431 569 4.24 2412

3 Metalling/tarring

(existing length).

2000 1123 877 12.10 10612

4 Bridges Lump-sum 3500

Total:- 18214 lacs

Say: - 182 Crores

Page 67: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

67

5 11th Five-Year Plan (2007-12):

5.1 State Planning Department has earmarked an outlay of Rs.30306 lacs

including 80 lacs for cableways for tribal sub-plan 2007-2012, sub-head wise breakup of

the proposed outlay is given as under: -

Sr.No. Item. Amount (in lacs)

A ROADS & BRIDGES:

1 State Highways 1500.00

2 Rural Roads 24476.00

3 Bridges (Major/Minor) 2000.00

4 Staff in Tribal Area. ----

5 RIDF/NABARD 2250.00

B PMGSY ----

C- Cableways 80.00

Total:- 30306.00

5.2 With the proposed outlay of 30306.00 lacs i/c 80.00 lacs for cableways during the

11th Five Year Plan 2007-12, following targets were likely to be achieved:-

S.No. Item/sub-head of work. Unit. Targets. Remarks.

A- ROADS & BRIDGES:

1 Motorable road Kms. 250

2 Jeepable Kms. 75

3 Cross-drainage Kms. 300

4 Metalling/tarring Kms. 300

5 Bridges Nos. 20

6 Villages Nos. 20 B- Cableways Nos. 2

By construction of 250 Kms. motorable length during 11th Five Year Plan, road density of 8.96 kms.per 100 sq.kms. will be achieved.

Page 68: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

68

6 Annual Plan 2009-2010: The State Planning/Tribal Development Department had earmarked an outlay of Rs.9805.830 lacs for 2005-06. The breakup of this outlay is as under: -

Sr.No. Item. Amount (in lacs) A ROADS & BRIDGES: 1 State Highways 3577.08 2 Rural Roads(Major Works) 3539.01 3 Bridge (Major / Minor) 484.81 4 NABARD/RIDF 161.03 5 Distt. & other roads (Maintenance & Repair)(Soon) 1382.50

6 Machinery and aquipments 200.00

7 Land Compensation(NPV) 52.00

8 Payment Compensation 395.00

9 Link Road to un-connected Panchyats 10.00

10 Periodical renewal ------ 11 Minor Works

Total: - 9801.43

Cable Way 4.40

Against the outlay of Rs. 9805.83 lacs an expenditure of Rs. 9842.78(tentative) lacs has been incurred up to 3/2010. With the above mentioned outlay, following achievements have been made during 2008-09.

S.NO. Item/sub-head. Targets for the year 2009-10.( Kms)

Physical achievement during the year 2009-10 i.e. ending 31/3/2010. (Kms)

I. 5054-CAPITAL OUTLAY ON ROADS & BRIDGES:

State Plan PMGSY/WB/Deposit

Total

1 Motorable 50 50 23 73 2 Jeep able 15 7 -- 7 3 Cross-drainage 60 22 30 52 4 Metalling & Tarring 60 22 15 37 5 Villages 5 14 1 15 6 Bridges 5 8 -- 8

Page 69: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

69

7 ANNUAL PLAN 2010-2011: The State Planning/Tribal Development Department has earmarked an outlay of Rs.7260.00 lacs for 2010-11. The breakup of this outlay is proposed as under:-

Sr.No. Item. Amount (in lacs) A ROADS & BRIDGES: 1 State Highways 50.00 2 Major Bridges 0.00 3 Rural Roads 3384.00 4 Rural Roads/ Renewal ---- 5 Nabard/RIDF (Soon) 1026.00 6 Link Road to un-connected Panchayat 10.00 7 Land Compensation(V) 160.00 8 Machinary and Equipment 80.00 9 C.R.F. 200.00 10 District other roads Maintenance & Repair 1305.00 11 World Bank State Road Project 1035.00 Total: - 7250.00

B. Cableway --- With this earmarked outlay of Rs.6860.00 lacs for Roads & Bridges, cableways during the year 2009-10, following targets are likely to be achieved. S.No. Item/sub-head of work. Unit. Targets. Remarks.

A- ROADS & BRIDGES: 1 Motorable road Kms. 60 2 Jeepable Kms. 20 3 Cross-drainage Kms. 70 4 Metalling/tarring Kms. 60 5 Bridges Nos. 5 6 Villages Nos. 5

8 Information on prescribed proformas is appended in following pages :-

Page 70: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

70

Page 71: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

71

ANNEXURE VI-A TRIBAL SUB-PLAN(TSP) -I

ANNUAL PLAN 2008-09- FINANCIAL OUTLAYSL:PROPOSALS FOR TSP (Rs.in lakh)

Sr. No.

Major Head/Sub-Head/Sche

me

Eleventh Plan 2007-12 Projected Outlay

(At 2006-07 Prices).

Annual Plan

2008-09.

Annual Plan 2009-10 Approved Outlay.

Annual Plan 2009-10 Proposed Outlay.

Total Outlay

Of which flow to TSP.

SCA Actual expenditure Under TSP.

Total Outlay Of which flow to TSP.

SCA Total Expenditure of which

flow to TSP

Total Outlay

Of which flow to TSP.

SCA Total

1 2 3 4 4a 5 6 7 7a 7b 8 9 10 10a 10b 5054

Capital Outlay on Roads & Bridges (TSP)

193725.00 30226.00 200.00 5133.57 59520.00 6750.00 0.00 6750.00 6750.00 53000.00 7250.00 0.00 7250.00

3054 Roads & Bridges Maintance

200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

G.Total 193725.00 30226.00 400.00 5133.57 59520.00 6750.00 0.00 6750.00 6750.00 53000.00 7250.00 0.00 7250.00

Expendirure on Ropeway and Cableway

80.00 0.74 10.00 0.00 10.00 10.00 0.10 10.00 0.00 10.00

Page 72: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

72

ANNEXURE VI-B

TRIBAL SUB-PLAN(TSP) -I

(Rs.in lakh)

Sr. No.

Major Head/Sub-Head/Scheme

Eleventh Plan 2007-12 Projected Outlay

(At 2006-07 Prices).

Annual Plan 2008-09.

Annual Plan 2009-10 Approved Outlay.

Annual Plan 2010-11 Proposed Outlay.

Total Outlay Of which flow to TSP.

SCA Actual expenditure Under TSP.

Total Outlay

Of which flow to TSP.

SCA Total Expenditure of which flow to TSP

Total Outlay

Of which flow to TSP.

SCA Total

1 2 3 4 4a 5 6 7 7a 7b 8 9 10 10a 10b

5054 C.O.L. ON ROADS AND BRIDGES

193725.00 30226.00 400.00 5133.57 59520.00 9805.83 0.00 9805.83 9842.78 53000.00 7250.00 0.00 7250.00

(I) 03 State Highway 1500.00 632.10 3577.08 3577.08 3615.74 50.00 50.00

(ii) 796-Tribal Sub Plan -01 Expenditure on State Highways other than MNP

200.00 200.00

(iii) 01 AOOS Expenditure on C/o Roral Roads

257.74 395.00 395.00 391.25 0.00 0.00

(iv) 01 SOON M Expenditure on C/o Rural Roads

22800.00 200.00 3454.19 59520.00 3539.01 3539.01 3538.92 3384.00 3384.00

(v) 03 SOONM C/ORural Roads under RIDF Nabard

750.00 154.83 161.03 161.03 161.01 1026.00 1026.00

(vi) 04 Exp. On Land compensation i/c NPV

576.00 138.25 52.00 52.00 52.01 160.00 160.00

(vii) 05 Link Road to Un-Connected Panchyats.

100.00 8.08 10.00 10.00 10.02 10.00 10.00

Page 73: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

73

(viii) 01-796 Tribal Sub-Plan 01 staff in Tribal Area.

(ix) 03 Tools and Plants (Machinery and Equipments)

1000.00 169.33 200.00 200.00 200.00 80.00 80.00

(x) Expenditure on Major Bridge Work.

2000.00 224.75 309.64 309.64 310.94 0.00 0.00

(xi) Expenditure on Major Bridge under RIDF Nabard.

1500.00 94.30 175.17 175.17 174.22

Major Distt. Road 0.00 0.00 0.00 0.00

1035.00 1035.00

5054 Capita Outlay on Roads & Bridges (TSP)

193725.00 30226.00 200.00 59520.00 8418.93 0.00 8418.93 8454.11 0.00 5945.00 5945.00

3054Roads & Bridges Maintance

200.00 1382.50 0.00 1382.50 1383.62 1305.00 1305.00

G.Total 193725.00 30226.00 400.00 5133.57 59520.00 9801.43 0.00 9801.43 9837.73 0.00 7250.00 0.00 7250.00

Expendirure on Ropeway and Cableway

80.00 0.74 4.4 4.4 5.05 10.0 10.0

Page 74: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

74

ANNEXURE VI-C TRIBAL SUB-PLAN(TSP) -II

ANNUAL PLAN 2009-10- PHYSICAL TARGETS AND ACHIEVEMENTS:PROPOSALS FOR TSP

Sr.No. Major Head/Sub-Head/Scheme

Unit Eleventh Plan

2007-12.

Annual Plan 2008-09

Annual Plan 2009-10 Annual plan 2010-11

Targets Actual achievement

Target achivement Target

Plan PMGSY/W/Bank

Total

1 2 3 4 5 6 7 8 9 10 I. 5054-CAPITAL OUTLAY ON ROADS & BRIDGES A Roads and Bridges I) Motorable Kms 250 55 60 50 23 73 70

ii) Jeepable Kms 75 10 20 7 0 7 15

iii) Cross-drainage Kms 300 27 70 22 30 52 55

iv) Metalling & tarring Kms 300 22 60 22 15 37 50

v) Bridges Nos 20 7 5 8 0 8 7

vi) Village connected Nos 20 2 5 14 1 15 5

B. Cableways Nos 2 0 0 1 0 1 1

Page 75: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

75

EMP-I DRAFT ANNUAL TRIBAL SUB PLAN (2009-2010)

EMPLOYMENT CONTENT OF SECTORAL PROGRAMME HEAD OF DEVELOPMENT WISE OUTLAY & EXPENDITURE

S.No. Major Heads/Minor Heads of Development.

Eleventh Plan (2007-2012)

Proposed Outlay

Annual Plan (2008-2009) Expenditure.

Annual Plan (2009-2010) Expenditure

Proposed outlay for Annual Plan 2010-2011

1 2 3 4 5 6

I Roads & Bridges 14910.00 2525.71 4842.64 3371.92 II Cableways

Page 76: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

76

Page 77: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

77

Page 78: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

78

DRAFT TRIBAL SUB PLAN

2010-2011

FOR

BUILDING (PW) HOUSING (PW)

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

Page 79: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

79

DRAFT ANNUAL PLAN 2009-2010

SUB-HEAD-TRIBAL SUB PLAN 1. Building (PW) (Non-Residential)

Background: 43% of the total area of Himachal Pradesh constitutes tribal area under districts of Lahaul & Spiti, Kinnaur and partly under Chamba District. For Administrative needs, suitable Public Buildings for various departments at the District, Sub-Divisional and Tehsil Head Quarters are essentially required in these difficult mountainious tribal areas. Separate funds under various plan heads are being earmarked and public building construction programme has accordingly been taken-up in hand to meet needs of the tribal area. 2. Requirement of Public Buildings:

Buildings of General Administration, Judiciary, Public Works, District Administration, Land Revenue, Excise Taxation, Treasury & Accounts etc. are covered under the Head Buildings (PW). Demand for proper office buildings throughout the tribal area is immense and a large number of offices are functioning in improper or hired accommodation. There were 10 buildings under construction after closure of 10th Five Year Plan in 3/2009 and about 20 new buildings are proposed to be included in the 10th Five Year Plan. 3. Review of achievement during 10th Five Year Tribal Sub-Plan 2002-2007: Although requirement of funds for construction of buildings is quite high, however an outlay of only Rs.1900 lacs was earmarked for the tribal areas during 10th Plan. Targets and achievements during this plan were as under:-

SL.No. Description. Unit Target of 10th Plan

2002-2007.

Achievement during 10th Plan

2002-2007. I. BUILDINGS (PW) 4059

(a) Financial Rs.in lacs. 1900

6550.12

(b) Physical Nos. 30 20 Against target of 30 buildings, 20 buildings have been completed during 10th Five Year Plan upto 3/2007. 4. Spill-over Scheme to 11th Five Year Plan (2007-2012): 10 buildings, construction of which were taken upto March 2007 could not be completed by 3/2007 and construction cost of these buildings would spill over to the 11th Plan. A sum of about Rs.10.00 crore is required to complete these buildings. Some of the important buildings which remained incomplete on 31-3-2007 are Treasury building at Killar. Lahaul Bhawan at Bhunter and PWD Divisional Store at Reckong Peo etc.

Page 80: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

80

5. Critical Review: During the period 1974-75 to 2009-2010, 298 Nos. Non-Residential buildings for offices alongwith quarters, Rest Houses etc., have been constructed in the entire tribal belt. 6. 11th Five Year Plan 2007-2012: An outlay of Rs.15434.00 lacs has been approved for the entire State by the Planning Department for 11th Five Year Plan 2007-2012, out of which 2718.00 lacs has been approved for tribal areas under Tribal Sub-Plan. The details of proposed outlay and target are given below:- S.No. Description. Unit. Target (2007-2012)

Total State Plan.

Tribal Sub-Plan.

I. Financial A Pooled Non-Residential

Buildings. Rs.in lacs. 15434 2718.00

II.Targets: (i) Pooled Non-Residential

Buildings. Nos. 65 20

7. Annual Plan 2009-2010

The following were the targets and achievements under head Buildings (PW) 4059;

S. No.

Description Unit Outlay/Target Achievements

I Financial Rs.in lacs 451.09 450.39

II Physical Nos. 5 3

8 Draft Annual Plan 2010-11: An outlay of Rs.2771.00 lacs has been proposed by the State Planning Department for whole of the state for the Annual Plan 2010-11 for the entire state, out of which Rs.396.00 lacs has been provided for tribal areas under Tribal Sub-Plan. Proposed outlay and targets are as under:-

S.No. Description. Unit. Total State Plan.

Tribal Sub Plan.

I. Building (PW) 4059: A Pooled Non-Residential

Govt.buildings. Rs.in lacs. 2771.00 396

II Physical Targets i) Pooled Non-Residential

Buildings Nos. 16 5

.

Page 81: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

81

II. HOUSING (PW) (RESIDENTIAL): 1. Background:

Housing satisfaction for the Government employees in Himachal Pradesh is merely about 7% and employees posted in the remote and difficult area are facing acute problem and discomfort for want of accommodation as there are simply no private houses available on rental basis in these far off areas. Accordingly separate funds for housing in tribal area are earmarked and programme for construction of houses has been taken in hand according to the outlays.

2. Requirement of Housing (PW):

As per norms laid by the Govt.of India Housing satisfaction of atleast 40% at State Capital Shimla, 55% in Distt., Towns and 70% in remote areas has to be provided necessitating construction of more than 4000 units only in tribal areas requiring an outlay of Rs.340 crores at the present day cost. The present level of satisfaction in housing sector in tribal areas is far below the above norms.

3. Review of achievements during 10th Five Year Tribal Sub-Plan 2002-2007:

Originally an outlay of Rs.1853 lacs was approved for Housing (PW) for whole of the State in the 10th Five Year Plan, out of which Rs.1053 lacs were earmarked for tribal areas with a target for construction of 150 units. Achievements made during 10th Five Year Plan in tribal area are as under:-

S.No. Description. Unit. Target of 10th

Plan 2002-2007. Achievement

during 10th Plan 2002-2007.

Housing (PW) 4216 1 Financial Rs.in lacs. 1053.00 1533.77 2 Physical Nos. 150 88

Against revised targets of 150 units, 88 units have been completed during 10th Five Year Plan upto 3/2007. 4. Spill-over Scheme to 11th Five Year Plan (2007-2012):

62 Housing units remained in progress by end of March, 2007 in tribal area, completion of which has get spilled over to 11th Five Year Plan period. A sum of about Rs.310 lacs would be required to complete these buildings. 5. Critical Review:

During 1974-75 to 2009-2010, 644 Nos. residential units have been constructed in the entire tribal belt.

Page 82: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

82

6. 11th Five Year Plan 2007-2012:

An outlay of Rs.2360.00 lacs has been approved for the entire State by Planning Department for 11th Five Year Plan 2007-2012 out of which 1022.00 lacs has been approved for tribal areas by the tribal development department. Approved outlay and targets are given below:-

S.No. Description. Unit. (Target (2007-2012) Total State

Plan. Tribal Sub-

Plan. 4216-Housing (PW) I. Financial:

A Pooled Govt. Housing. Rs.in lacs. 2360.00 1022.00 II.Physical:

i) Pooled Govt. Housing. Nos. 200 120 7. Annual Plan 2009-2010:

The following were the targets and achievements under head Housing (PW) 4216;

S.No.

Description Unit Outlay/Target Achievements

I Financial Rs.in lacs 266.00 226.20

II Physical Nos. 15 50

8 DRAFT ANNUAL PLAN 2010-11:

An outlay of Rs.1004.00 lacs has been proposed for the entire state by the State Planning Department for the Annual Plan 2010-11 out of which Rs.270.00 lacs has been provided for Tribal Areas. Proposed outlay & targets are given below: -

S.No. Description. Unit. Total

State Plan. Tribal Sub-Plan.

I Housing (PW) 4216: A Pooled Govt.Housing. Rs.in lacs. 1004. 00 270.00 B Physical

Pooled Govt.Housing. Nos. 59 25

Information on the prescribed proforma is appended in the following pages.

Page 83: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

83

TRIBAL SUB-PLAN(TSP) -I (Building)

ANNUAL PLAN 2008-09- FINANCIAL OUTLAYSL:PROPOSALS FOR TSP (Rs.in lakh)

Sr. No.

Major Head/Sub-Head/Scheme

11th Year 2007-12 Projected Outlay(At

2006-07 Prices).

Annual Plan 2008-

09.

Annual Plan 2009-10 Annual Plan 2010-11 Proposed Outlay.

Approved Outlay. Expenditure

Total Outlay

Of which flow to TSP.

Actual expenditure

Total Outlay

Of which flow to TSP.

SCA Total Total Outlay

Of which flow to TSP.

SCA Total Total Outlay

Of which flow to TSP.

SCA Total

1 2 3 4 5 6 7 7(a) 7(b)

8 9 9 (a) 9 (b)

10 11 11 (a) 11 (b)

I.

4059-BUILDING (PW) 01-796-02 SOON

A. Pooled Non-Residential 15434 2718 406.88 4514.00 441.09 10.00 451.09 4426.33 450.39 0.00 450.39 4771.00 396.00 --- 395.00

Govt.Buildings.

796-02 AOOS

0.00

II.

4216-HOUSING (PW) 01 Govt. Bldg. 796 PAPS 02 Buildings.

A. Pooled Govt.Housing. 2360 1022 192.69 927.42 227.42 --- 227.42 924.31 226.20 --- 226.20 1004.00 270.00 --- 270.00

Page 84: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

84

Page 85: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

85

Page 86: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

86

SPECIAL COMPONENT SUB PLAN

DRAFT ELEVENTH FIVE YEAR PLAN (2007-12) AND ANNUAL

PLAN

2010-2011

FOR

ROADS & BRIDGES

INCLUDING CABLEWAYS

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

Page 87: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

87

DRAFT ANNUAL PLAN 2010-2011 SUB HEAD: SPECIAL COMPONENT SUB PLAN FOR SCHEDULED CASTE: ROADS & BRIDGES: Introduction: According to 2001 census there are 15.02 lakhs Scheduled Castes in Himachal Pradesh comprising 1.97 lakhs families, which accounts for 28.44% of the total population of the State. This is the 2nd highest concentration in the country after Punjab. The Scheduled Castes are not concentrated in specific regions but are widely dispersed. Therefore, to takeup developmental and infra-structural activity under Special Component Plan (SCP). 5837 predominantly Scheduled Caste villages have been identified out of total 17449 villages in the State which have 50% or more S.C. population. In order to promote Welfare on Development of the Scheduled Castes, being weaker sections of the Society, the Govt.gave a real thrust from the 6th Five Year Plan earmarking separate funds under S.C.P. within the main plan. 1 Achievements under Special Component Plan upto March 2009:

2.1 Special Component Plan for Scheduled Castes, is, therefore a sub plan within the main plan like Tribal Sub-Plan in which such developmental schemes are taken which are of direct benefit to the Scheduled Caste habitations or predominantly SC villages with the following criteria as far as roads are concerned. If link roads are constructed to link Scheduled Caste concentration villages with the main roads, the expenditure involved may be booked under the Special Component Plan.

2.2 Road which will connect predominantly Scheduled Caste villages are being identified and work on 510 Rural Roads having Scheduled Caste villages has been initiated.

2.3 Overall achievements upto 3/2010 are as under:- i) Single lane Motorable roads = 6583 Kms.

ii) Cross drainage works = 2657 Kms.

iii) Metalling & tarring length = 2685 Kms.

iv) Predominantly Scheduled Caste = 1484 Nos. villages connected.

2.4 During 10th Five Year Plan a sum of Rs.7800 lakhs was earmarked under Special Component Plan. Achievement during this plan period are given as under:-

S.No. Particulars. Unit Targets (2002-2007)

Achievement (2002-2007)

A- Financial Rs.in lacs 7800.00 16218.03 B- Physical: i) Motorable Kms 250 389 ii Jeepable Kms -- -- iii Cross-drainage Kms 300 395 iv Metalling & tarring Kms 300 445 V Bridges Nos 10 10 Vi Predominantly SC villages Nos 40 35

Page 88: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

88

2.5 Many roads were in progress as on 31-3-2010 & cost required for their

completion is required to be met from 11th Five Year Plan, approximate particulars of such roads including cost requirement, is as under;

S.No. Particulars/Sub-head. Position of works

initiated upto 3/2010 Spill over

to 11th Plan.

Cost of spill over works in lakhs

Total length.

Achi.upto 3/2010

Rate Amount

1 Single lane Motorable formation.

Kms 7350

Kms 6583

Kms 767

13.31

10209

2 Cross-drainage 7350 2657 4693 4.24 19898 3 Metalling/tarring

(existing roads) 5546 2685 2861 12.10 34618

4 Bridges Lump-sum 1980 Total:- 66705

lacs Say: 667 crores. 3 Annual Plan 2009-2010:

The Govt.had approved revised outlay of Rs.11248.13 lacs for Roads & Bridges for the annual Plan 2009-10. Against this outlay of Rs.8903.70 lacs, an expenditure of Rs.9746.38 lacs was incurred during the year.

With these available funds, the following physical progress has been achieved;

i) Single lane Motorable = 175 Kms.

ii) Jeepable = - iii) Cross drainage = 156 Kms. iv) Metalling/Tarring = 133 Kms. v) Bridges = 3 Nos.

vi) Connectivity to Predominantly S.C.villages. = 17 Nos.

4 Draft Annual Plan 2010-2011: 4.1 The Welfare Department has proposed an outlay of Rs.10400 lacs for Roads & Bridges for the Annual Plan 2010-11. Sub-head wise proposed break up of this outlay is as under:-

S.No. Item. Amount in lacs ROADS & BRIDGES: 5054-R&P Plan.

1 Rural Roads MNP (Soon) 2614.00 District other road maintenance & Repair(Soon) 3585.00 2 RIDF/NABARD 2818.00 3 Maintenance/compensation of & NVP of Rural roads. 445.00

Page 89: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

89

4 Link road to unconnected Panchayats 50.00 5. World Bank(Sytate Road Project) 2842.00 6 CRF 546.00

7. Training 0.00 8. Road Side Facility 0.00 9. Bridges 100.00 10. State Highways 100.00

Total:- 13100.00 Targets likely to be achieved during 2008-2009 are proposed as under:-

i) Single lane Motorable = 160 Kms.

ii) Cross drainage = 150 Kms.

iii) Metalling/Tarring = 170 Kms.

iv) Bridges = 4 Nos

v) Predominantly S.C.villages = 20 Nos

5 Information on the prescribed proformas is appended in the following pages.

Page 90: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

90

ANNEXURE VII-A

SCHEDULED CASTE SUB-PLAN (SCSP)-I

ANNUAL PLAN 2009-10 FINANCIAL OUTLAYSL:PROPOSALS FOR SCSP

(Rs.in lakh)

Sr. No.

Demand No.

Major Head/Sub -head/Schemes Eleventh Plan 2007-2012 Projected

outlay. (At 2006-07 Prices)

Annual Plan 2008-098

Annual Plan 2009-10 Annual Plan 2010-11

Actual Expenditure

Under SCSP

Approved Outlay Anticipated Expenditur

e

Proposed Outlay.

Total Outlay

Of Which flow to SCSP

Total Outlay

of which flow to SCSP

of which flow to SCSP

Total Outlay

of which flow to SCSP

1 2 3 4 5 6 7 8 9 10 11

5054 C.O.L ON ROADS & BRIDGES INCLUDING CABLEWAYS

1 Roads and Bridges 193725 35000 9736.50 47950.00 11248.13 8903.70 53000.00 13100.00

32

3054. Roads & Bridges

80-001-Estab.

107-01 Minor Works

Maint.

Capital Outlay on Roads & Bridges (SCSP) 294.31

State Highway

100.00

Machinery & equipment 700 657.25

125.00 126.75 0.00

State Highway ---

-

Page 91: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

91

C/O roads under NABARD 7000 ---

2000.00 2061.05 2818.00

Bridges 1553.13

124.00 101.18 100.00

C/O roads under CRF ---

375.00 367.00 546.00

World Bank 2403

2500.00 0.00 2842.00

Sanjauli bye Pass ----

Link roads to unconnected panchyats with highways

24500 508.13

84.86 109.85 50.00

Distt. and other Roads (Major Works) ---

--- 3585.00

Road Works ---

---

Land compensation. 4.23

---

Maintance/Compensatory afforestation (NPV) for rural roads

---

50.00 50.00 445.00

Const.of rural Roads. 4160.77

2689.27 2782.73 2614.00

Const.of rural Roads. (Aoos)

Bridges

C/O Bridges 210 133.70

0.00 0.00 0.00

Road side facility 2590 21.98

0.00 0.00 0.00

Training

0.00 0.00 0.00

Roads of industrial Importance

0.00 0.00 0.00

Road safety

0.00 0.00 0.00

Maintenace 3300.00 3305.14 ---

Total:- 193725 35000.00 9736.50 47950.00 11248.13 8903.70 53000.00 13100.00

Page 92: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

92

ANNEXURE VIII-C SCHEDULED CASTE SUB-PLAN (SCSP)-II

ANNUAL PLAN 2010-11- PHYSICAL TARGETS AND ACHIEVEMENTS:PROPOSALS FOR SCSP Sr.No. Major Head/Sub-Head/Scheme Unit Eleventh

Plan 2007-12.

Annual Plan 2008-09 actual Achievement

Annual Plan 2009-10 Annual Plan 20010-11

Targets Actual Achievement

Targets Achievement

Proposed Target

1 2 3 4 5 6 7 8 1 5054 C.O.L ON ROADS &

BRIDGES

A Roads and Bridges I) Motorable Kms 350 310 126 175 160

ii) Cross-drainage Kms 350 168 119 156 150

iii) Metalling & tarring Kms 400 95 45 133 170

iv) Bridges Nos 10 4 2 3 4

v) Village connected Nos 50 32 21 17 20

Page 93: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

93

ANNEXURE VI-A (SCP) -I (Building)

ANNUAL PLAN 2010-11- FINANCIAL OUTLAYSL:PROPOSALS FOR SCP (Rs.in lakh)

Sr. No.

Major Head/Sub-Head/Scheme

11th Year 2007-12 Projected

Outlay (At 2006-07

Prices).

Annual Plan 2008-09

Annual Plan 2009-10 Annual Plan 2010-11

Proposed Outlay.

Total Outlay

SCP Actual achievement

Total Outlay

SCSP Total Expenditure

SCSP Total Outlay

SCP

1 2 3 4 5 6 7 8 9 I. 4059-BUILDING (PW)

01-796-02 SOOS

A. Pooled Non-Residential - - 625.59 2871.00 247.95 2871.00 245.79 2771.00 547.00

Govt.Buildings.

Page 94: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

94

EMP-II DRAFT ANNUAL TRIBAL SUB PLAN (2009-2010)

EMPLOYMENT CONTENT OF SECTORAL PROGRAMME S.No. Name of Sector. Eleventh Plan 2007-2012 Actual Achievements during Annual Plan (2009-2010) Annual Plan (2010-2011) Construction Continuing Annual Plan (2008-2009) Achievement Targets

Person days Person years Construction Continuing Construction Continuing Construction Continuing

Person days Person years Person days

Person years Person days

Person years

1 2 3 4 5 6 7 8 9 10

I Roads & Bridges 24850 92.04 4209.5 15.59 8071 29.99 5953.2 22.04 II Cableways

Page 95: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

95

ANNEXURE VI-B TRIBAL SUB-PLAN(TSP) -II (Building)

ANNUAL PLAN 2010-11- PHYSICAL TARGETS AND ACHIEVEMENTS:PROPOSALS FOR TSP Sr.No. Major Head/Sub-

Head/Scheme Unit Eleventh Plan

2007-12. Annual Plan 2008-

09 Annual Plan 2009-10 Annual

Plan 2010-11 Targets Targets Actual

achievement Targets Achievement

1 2 3 4 5 6 7 8 I. 4059-BUILDING (PW) A. Pooled Non-Residential Nos. 20 4 5 3 5 Govt.Buildings.

II. 4216-HOUSING (PW) A. Pooled Govt.Housing. Nos. 120 0 15 5 25

Page 96: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

96

ANNUAL PLAN 2010-11- PHYSICAL TARGETS AND ACHIEVEMENTS:PROPOSALS FOR SCP Sr.No.

Major Head/Sub-Head/Scheme

Unit 11th Plan (2007-12)

ANNUAL PLAN

2008-09

Annual Plan 2009-10 Annual Plan

2010-11 Targets Targets Actual

Achievement Targets Achievement

upto 9/2007

1 2 3 4 5 6 7 8 I. 4059-BUILDING (PW) A. Pooled Non-Residential Nos. - - 5 0 4 Govt.Buildings.

Annexure-IV (Rs. Crore)

Annual Plan (2010-11) Bharat Nirman Programmes-Proposed outlays Sr. No.

Name of items/ Programme

Eleventh Plan 2007-12

Annual Plan 2008-09 Annual Plan 2009-10 Annual Plan 2010-11

Projected outlay Actual Exependiture Agreed Outlay

Anticipated Expenditure

Prloposed Outlay

1 2 3 4 5 6 7 1 Rural Roads

PMGSY+ PMGSY (W.B.)

1750 crore 245.77 crore 650.00 crore 350 crore 250.00 crore

Page 97: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

97

Page 98: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

98

ITEM NO XII THIS ITEM DOES NOT PERTAIN TO PUBLIC WORKS DEPARTMENT ITEM NO XIII THE PUBLIC WORKS DEPARTMENT UNDER THE H. P. LAND CONTROL ACT AND ALSO AS PER THE RECENTLY ENACTED ACT, KNOWN AS H.P. ROAD INFRASTRUCTURE PEOTECTION ACT, NO OBJECTION CERTIFICATE TO THE CITIZENS FOR MAKING CONSTRUCTION ALONG THE ROAD SIDE. THIS INFORMATION IS AVAILABLE IN THE DIVISIONAL OFFICE AS THE EXECUTIVE ENGINEER CONCERNED AFTER FOLLOWING THE PROCEDURE PRESCRIBED UNDER THESE ACTS GRANTS THESE AUTHORISATION. THESE OFFICERS ARE ALREADY APPOINTED AS PUBLIC INFORMATION OFFICERS HENCE THE PARTICULARS CAN BE OBTAINED FROM RESPECTIVE OFFICERS. ITEM NO XIV THE DETAIL OF INFORMATION AVAILABLE STOOD REDUCED IN ELECTRONIC FORM AND SHALL BE UPDATED FROM TIME TO TIME. NO INFORMATION UPTILL NOW HAS BEEN WITH HELD. ITEM NO XV SINCE THE INFORMATION IS PRESENTLY REDUCED IN ELECRONIC FORM AND LIKELY TO BE DISPLAYED ON H. P. GOVT. WEBSITE. THEREFORE THIS INFORMATION CAN BE OBTAINED BY CITIZEN FROM THE SAME. HOWEVER, THE PROVISION OF LIBRARY OR READING ROOM FOR PUBLIC USE IS NOT PROVIDED IN THE PUBLIC WORKS DEPARTMENT.

Page 99: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

99

ITEM NO XVI THE NAMES AND DESIGNATION OF THE APPELLATE AUTHORITIES, PUBLIC INFORMATION OFFICERS AND ASSTT. PUBLIC INFORMATION OFFICERS OF THE PUBLIC WORKS DEPARTMENT ARE AS UNDER:

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

RIGHT TO INFORMATION ACT- 2005 INFORMATION REGARDING LIST OF APPELLATE AUTHORITIES, PUBLIC INFORMATION OFFICERS & ASSISTANT PUBLIC INFORMATION OFFICERS WITH RESPECT TO PUBLIC WORKS DEPARTMENT IS AS UNDWER:

Himachal Pradesh Public Works Deaprtment

Notification

In supersession of this office Notification No:- PW-ROIA/WS- 534-763, dated 11-10-2005 and this office further order No. PW(B)-RTI Act 2005/WS-8745-8820, dated 07-11-2006. I, The Engineer-in-Chief HP, PWD in exercise of the powers conferred upon me under sub-section (1) and (2) of section-5 of the RTI Act,05 re-designate the following officers of the Himachal Pradesh Public Works Department as appellate Authorities, Public Information Officers and Asstt. Public Information Officers with immediate effect in the public interest,

(A) Appellate Authorities

Sr. No

Designation Of Authority States under the Act Telephone No Office Residence

1. Superintending Engineer (Works) O/O E-in-C, HP, PWD, Nigam Vihar, Shimla- 171 002.

For O/O E-in-C, HP, PWD, Shimla-2, O/O Chief Engineer (South) HP, PWD, Shimla-2 and for O/O Land Acquisition Officer, HP, PWD, Winter Field, Shimla-3.

2625821 2626426

2. Superintending Engineer (Q.C.&D) O/O E-in-C(Q.C.) Office, HP, PWD,U.S.Club, Shimla.

For O/O E-in-C (Q.C.) Office, HP, PWD,U.S.Club, Shimla-1.

2652438 2622914

3 Superintending Engineer (Works) O/O Chief Engineer (CZ) HP, PWD, Mandi.

For O/O Chief Engineer(CZ) HP, PWD, Mandi and for O/O Land Acquisition Officer, HP, PWD, Mandi.

221621 221154

Page 100: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

100

4 Superintending Engineer (Works) O/O Chief Engineer (NZ) HP,PWD,Dharamshala.

For O/O Chief Engineer (NZ) office HP,PWD, Dharamshala and for O/O Land Acquisition Officer, HP.PWD Kangra

223189 226264

5 Superintending Engineer(D) (NH)HP,PWD,U.S.Club Shimla-1.

For O/O Chief Engineer (NH) HP, PWD, U.S.Club Shimla-1.

2652568 2671807

6 Chief Engineer (Elect) HP PWD, Kasumpti, Shimla-9.

For O/O Chief Engineer(Elect) HP PWD, Kasumpti, Shimla-9 and Divisional offices of Executive Engineer(Elect.) PWD at Shimla-I, Shimla-II, Mandi, Una & Palampur.

2620055 2670510

7 Senior Architect O/O Chief Architect U.S.Club HPPWD Shimla-1.

For Chief Architect, HPPWD office at U.S.Club Shimla-1 and for Zonal offices of Architects at Mandi & Dharamshala.

2805352 2623775

8 Superintending Engineer (Mech) HPPWD, Shimla-12

For Mechnical Circle office Shimla, Mechnical Division Offices at Shimla & Bilaspur.

2842353 2624571

9 Superintending Engineer 1st. Circle, HPPWD Mandi

For O/O 1st Circle, HP,PWD, Mandi , Divn. No-I Mandi, Sunderagar Divn, Karsog Divn, Sarkaghat Divn, Dharmpur Divn. & Jogindernagar Division

224129 225871

10 Superintending Engineer 3rd Circle, HPPWD, Solan

For O/O 3rd Circle, HPPWD, Solan, Divisions at Solan, Kasauli, Nalagarh & Arki.

220675 220676

11 Superintending Engineer, 4th Circle, HPPWD, Shimla.

For office of 4th Circle, HPPWD, Shimla, Divisions at Shimla Divn No-I,II,III & Theog.

2653455 2658771

12 Superintending Engineer, 5th Circle, HPPWD, Palampur

For office of 5th Circle, HPPWD, Palampur, Divisions at Dharamshala, Palampur, Baijnath, Kangra & Mech. Divn. Dharamshala

230566 230565

13 Superintending Engineer 6th Circle, HPPWD, Kullu

For office of 6th Circle, HPPWD, Kullu, Divisions at Kullu No-I & II Chenab Valley Divn. Udiapur & Mechanical Divn. Kullu

222530 222242

14 Superintending Engineer 7th Circle, HPPWD, Dalhousie .

For office of 7th Circle, HPPWD, Dalhousie, Divisions at Chamba, Salooni, Dalhousie, Bharmour, Pangi at Killar.

240606 240630

Page 101: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

101

15 Superintending Engineer 8th Circle, HPPWD, Hamirpur

For office of 8th Circle, HPPWD, Hamirpu, Divisions at Hamirpur, Barsar & Tauni Devi.

223065 222228

16 Superintending Engineer 9th Circle, HPPWD, Nurpur

For office of 9th Circle, HPPWD, Nurpur, Divisions at Nurpur, Fatehpur, Dehra Gopipur & Jawali.

220098 220097

17 Superintending Engineer 10th Circle, HPPWD, Bilaspur

For office of 10th Circle, HPPWD, Bilaspur, Divisions at Bilaspur No-I, II & Ghumarwin.

223466 223848

18 Superintending Engineer 11th Circle, HPPWD, Rampur

For office of 11th Circle, HPPWD, Rampur, Divisions at Rampur , Kumarsain, Kalpa, Bhawanagar, Spiti Division at Kaza, Outer Seraj Division Nirmand & Mechanical Division Rampur.

233044 233169

19 Superintending Engineer 12th Circle, HPPWD, Nahan

For office of 12th Circle, HPPWD, Nahan, Divisions at Nahan, Poanta, Rajgarh, Sangrah & Shillai .

222826 224007

20 Superintending Engineer, 14th Circle, HPPWD, Rohru

For office of 14th Circle, HPPWD, Rohru, Divisions at Rohru, Jubbal, DodraKawar, Chopal & Mech. Divisions Rohru.

240921 241006

21 Superintending Engineer,15th Circle, HPPWD, Una

For office of 15th Circle, HPPWD, Una, Divisions at Una, Bangana, Bharwain

225883 225882

22 Superintending Engineer National Highway Circle, HP,PWD, Shimla

For office of National Highway Circle, HP,PWD, Shimla, NH Divisions Rampur & Solan.

2657551 2812614

23 Superintending Engineer, National Highway Circle, HP,PWD, Shahpur

For office of National Highway Circle, Shahpur, NH Divisions at Jogindernagar Pandoh & Hamirpur

238663 239311

24. Superintending Engineer Arbitration Circle, HPPWD Solan

For O/OArbitration Circle , HP.PWD, Solan.

226719 226718

25. Superintending Engineer Nahan Foundry, HPPWD, Nahan

For PWD & IPH works Shop at Nahan. 224053 222570

Page 102: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

102

(B) Public Information Officers

Sr. No Designation Of Authority States under the Act Telephone No Office Residence

1 Executive Engineer(M&P) O/O Engineer-in-Chief, HP, PWD,Nigam Vihar,Shimla-2

For O/O Engineer-in-Chief, HPPWD, Nigam Vihar, Shimla-2 and O/O Chief Engineer (South Zone), HPPWD, Nigam Vihar, Shimla-2.

2625821

2 Executive Engineer (Quality Control & Design) O/O E-in-Chief (Q. Control), HP, PWD, U.S.Club, Shimla-1.

For O/O E-in-C(Q.C.&D), HP, PWD, U.S.Club, Shimla-1.

2808108

3 Executive Engineer (Design) O/O Chief Engineer (CZ) HPPWD,Mandi.

For O/O Chief Engineer (CZ) HPPWD,Mandi.

223913

4 Executive Engineer (Design) O/O Chief Engineer(NZ), HPPWD, Dharamshala.

For O/O Chief Engineer (NZ), HPPWD, Dharamshala.

223167 265877

5 Executive Engineer (Design) O/O Chief Engineer(NH), HPPWD, Shimla-171 001.

For O/O Chief Engineer(NH), HP, PWD,U.S. Club, Shimla-171 001.

2805870

6 Architect, O/O Chief Architect, HPPWD,Shimla-171 001.

For O/O Chief Architect, HPPWD, U.S. Club, Shimla-171 001.

2805392

7 Architect, Architectural wing, HP, PWD at Mandi.

For O/O Architect, HP, PWD at Mandi.

222701

8 Architect, Architectural wing, HP, PWD at Dharamshala.

For O/O Architect, HP, PWD at Dharamshala.

222861 22710

I 1st Circle Mandi

1 Executive Engineer (Design) O/O Superintending Engineer,1st Circle,HP,PWD Mandi .

For O/O Superintending Engineer,1st Circle,HP,PWD Mandi .

221656 224928

2 Executive Engineer, HP, PWD Division No-I, Mandi.

For O/O HP,PWD Division No-I Mandi.

222151 224170

3 Executive Engineer, HP, PWD Mandi Division No-II, Mandi.

For O/O HP,PWD Division No-II, Mandi

222051 223074

4 Executive Engineer HP, PWD, Karsog Division, Karsog.

For O/O HP,PWD Karsog Division, Karsog.

222229 222239

5 Executive Engineer HP, PWD Sarkaghat Division, Sarkaghat.

For O/OHP,PWD, Sarkaghat Division, Sarkaghat.

230034 230037

Page 103: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

103

6 Executive Engineer HP, PWD Sundernagar Division, Sundernagar.

For O/O HP,PWD Sundernagar Division, Sundernagar

266245 266346

7 Executive Engineer HP, PWD, Jogindernagar Division, Jogindernagar.

For HP,PWD, Jogindernagar Division, Jogindernagar.

222033

II 3rd Circle Solan

1 Executive Engineer(Design) O/O S.E. 3rd Circle, HP, PWD, Solan.

For O/O S.E. 3rd Circle, HP, PWD, Solan.

223802 229648

2 Executive Engineer HP, PWD Solan Division, Solan.

For O/O HP,PWD Solan Division, Solan

223811 223720

3 Executive Engineer HP, PWD Kasauli Division, Kasauli.

For O/O HP,PWD Kasauli Division , Kasauli.

272067 272076

4 Executive Engineer HP, PWD Nalagarh Division, Nalagarh.

For O/O HP,PWD Nalagarh Division, Nalagarh

222199 222298

5 Executive Engineer HP, PWD Arki Division, Arki

For O/O HP,PWD Arki Division, Arki 220714 220713

III 4th Circle Shimla 1 Engineer Officer O/O S.E. 4th

Circle, HP, PWD, Shimla For O/O S.E. 4th Circle, HP, PWD, Shimla

2653455

2 Executive Engineer HP, PWD,Shimla Division No- I, Shimla.

For O/O HP,PWD Shimla Division No-I, Shimla.

2658385 2804654

3 Executive Engineer HP, PWD Shimla Division No-II Shimla.

For O/O HP,PWD Shimla Division No-II, Shimla.

2804134 2623292

4 Executive Engineer HP, PWD, Shimla Division No-III, Shimla.

For O/O HP,PWD Shimla Division No-III, Shimla.

2652832 2620584

5 Executive Engineer HP, PWD Theog Division,Theog.

For HP,PWD Theog Division, Theog. 238376 237999

IV 5thCircle Palampur 1 Executive Engineer(Design),

O/O S.E. 5th Circle, HP, PWD, Palampur.

For O/O S.E. 5th Circle, HP, PWD, Palampur.

230562 230753

2 Executive Engineer, HP, PWD, Dharamshala Division Dharamshala.

For O/O Dharamshala Division HP, PWD, Dharamshala

224946 226275

Page 104: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

104

3 Executive Engineer HP, PWD Palampur Division , Palampur.

For O/O HP,PWD, Palampur Division, Palampur

230561 230515

4 Executive Engineer HP, PWD, Division Baijnath.

For O/O HP,PWD Baijnath Division, Baijnath.

263053 263069

5 Executive Engineer HP, PWD, Division Kangra.

For O/O HP,PWD Kangra Division, Kangra.

265028 265248

6 Executive Engineer(Mech.) HP, PWD, Division Dharamshala.

For O/O HP,PWD Mechanical Division Dharamshala.

222111 223273

V 6th Circle Kullu

1 Engineer Officer, O/O S.E. 6th Circle, HP, PWD, Kullu.

For O/O S.E. 6th Circle, HP, PWD, Kullu.

222530

2 Executive Engineer HP, PWD Kullu Division No-I Kullu

For O/O HP,PWD Division No-I Kullu

222426 222474

3 Executive Engineer, Kullu Division No-II, Kullu.

For O/O HP,PWD Division No-II Kullu

222561 222472

4 Executive Engineer HP, PWD, Chenab Valley Division, Udaipur

For O/O HP,PWD Chenab Valley Division Udaipur

222238 222242

5 Executive Engineer, HP, PWD (Mech.) Division Kullu

For O/O HP,PWD (Mech.) Division Kullu

260104 226175

VI 7th Circle Dalhousie

1 Executive Engineer(Design), O/O S.E. 7th Circle, HP, PWD, Dalhousie.

For O/O S.E. 7th Circle, HP, PWD, Dalhousie.

242187 242419

2 Executive Engineer HP, PWD, Chamba Division , Chamba.

For O/O HP,PWD, Chamba Division, Chamba.

222229 222731

3 Executive Engineer, HP, PWD, Salooni Division, Salooni.

For O/O HP,PWD Salooni Division , Salooni.

233287 233289

4 Executive Engineer HP, PWD, Dalhousie Division, Dalhousie.

For O/O HP,PWD Dalhousie Division, Dalhousie.

240618 240601

5 Executive Engineer HP, PWD, Pangi Division at Killar

For HP,PWD Pangi Division at Killar. 222223 222225

6 Executive Engineer HP, PWD, Bharmour Division, Bharmour.

For O/O HP,PWD, Bharmour Division, Bharmour

225003 225007

VII 8th Circle Hamirpur

1 Engineer Officer, O/O S.E. 8th Circle, HP, PWD, Hamirpur

For O/O S.E. 8th Circle, HP, PWD, Hamirpur.

223965 222228

Page 105: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

105

2 Executive Engineer HP, PWD, Hamirpur Division, Hamirpur

For O/O HP,PWD, Hamirpur Division, Hamirpur.

222510 222230

3 Executive Engineer, HP, PWD, Barsar Division, Barsar

For O/O HP, PWD, Barsar Division, Barsar.

288041 288022

4 Executive Engineer, HP, PWD, Tauni Devi Division, Tauni Devi

For O/O HP,PWD Tauni Devi Division, Tauni Devi

278422 222843

VIII 9th Circle Nurpur

1 Executive Engineer(Design) O/O S.E., 9th Circle, HP, PWD, Nurpur.

For O/O S.E., 9th Circle, HP, PWD, Nurpur.

220102 220201

2 Executive Engineer HP, PWD, Nurpur Division, Nurpur.

For O/O HP,PWD, Nurpur Division, Nurpur.

220033 220030

3 Executive Engineer HP, PWD Fatehpur Division, Fatehpur.

For O/O HP,PWD Fatehpur Division, Fatehpur.

256602 250028

4 Executive Engineer HP, PWD, Dehra Gopipur Division, Dehra Gopipur.

For O/O HP,PWD Dehra Gopipur Division, Dehra Gopipur.

233116 233122

5 Executive Engineer HP, PWD, Jawali Division, Jawali.

For O/O HP,PWD Jawali Division, Jawali.

264186 264206

IX 10th Circle Bilaspur

1 Engineer Officer O/O S.E., 10th Cricle, HP, PWD, Bilaspur.

For O/O S.E., 10th Cricle, HP, PWD, Bilaspur.

223466

2 Executive Engineer HP, PWD, Bilaspur Division No-I, Bilaspur.

For O/O HP,PWD Bilaspur Division No-I, Bilaspur.

222550 222422

3 Executive Engineer HP, PWD, Bilaspur Division No-II, Bilaspur.

For O/O HP,PWD Bilaspur Division No-II, Bilaspur.

222551 222462

4 Executive Engineer HP, PWD, Ghumarwin Division, Ghumarwin

For O/O HP,PWD, Ghumarwin Division, Ghumarwin.

255281 255282

X 11th Circle Rampur 1 Executive Engineer(Design)

O/O S.E.,11th Circle, HP, PWD, Rampur.

For O/O S.E.,11th Circle, HP, PWD, Rampur.

233167 233381

2 Executive Engineer, HP, PWD, Rampur division, Rampur.

For O/O HP,PWD Rampur division, Rampur.

233017 233016

Page 106: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

106

3 Executive Engineer HP, PWD Kumarsain Division, Kumarsain.

For O/O HP,PWD Kumarsain division, Kumarsain.

240075 240071

4 Executive Engineer, HP, PWD, Kalpa Division, Kalpa.

For O/O HP,PWD Kalpa Division, Kalpa.

226027 226028

5 Executive Engineer HP, PWD, Bhawanagar Division, Bhawanagar(Distt. Kinnaur)

For O/O HP,PWD Bhawanagar Division, Bhawanagar.

253303 253434

6 Executive Engineer HP, PWD Spiti Divn. at Kaza

For O/O HP,PWD Spiti Divn. at Kaza. 222252 222301

7 Executive Engineer HP, PWD, Outer Saraj Division Nirmand (Distt. Kullu)

For O/O HP,PWD Outer Saraj Division Nirmand.

255140 255147

8 Executive Engineer(Mech.) HP, PWD,Division Rampur

For O/O HP,PWD Mechnical Division Rampur

233265 233349

XI 12th Circle Nahan

1 Executive Engineer (Design) O/O S.E., 12th Circle, HP, PWD, Nahan.

For O/O S.E., 12th Circle, HP, PWD, Nahan.

222370

2 Executive Engineer HP, PWD, Nahan Division, Nahan.

For O/O HP,PWD, Nahan Division, Nahan.

222260 222460

3 Executive Engineer HP, PWD, Poanta Division, Poanta Sahib.

For O/O HP,PWD Poanta Division, Poanta Sahib.

222373 222393

4 Executive Engineer HP, PWD, Rajgarh Division, Rajgarh.

For O/O HP,PWD Rajgarh Division, Rajgarh.

221023 221024

5 Executive Engineer HP, PWD, Sangrah division, Sangrah.

For O/O HP,PWD Sangarh Division, Sangarh.

248207 248008

6 Executive Engineer HP, PWD, Shillai Division, Shillai.

For O/O HP, PWD, Shillai Division, Shillai.

278524 278501

XII 14th Circle Rohru

1 Engineer Officer O/O S.E., 14th Circle, HP, PWD, Rohru.

For O/O S.E., 14th Circle, HP, PWD, Rohru.

241713

2 Executive Engineer,HP, PWD, Rohru Division, Rohru.

For O/O HP,PWD Rohru Division, Rohru.

240087 240021

3 Executive Engineer, HP, PWD, Jubbal Division, Jubbal.

For O/O HP,PWD, Jubbal Division , Jubbal.

252004 252005

4 Executive Engineer HP, PWD, Dodra Kawar Division, Dodra Kawar.

For O/O HP,PWD Dodra Kawar Division, Dodra Kawar.

276216 272097

5 Executive Engineer, HP, PWD, Chopal Division, Chopal.

For O/O HP,PWD, Chopal Division, Chopal.

260033 260592

Page 107: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

107

6 Executive Engineer(Mech.), HP,PWD, Rohru Divn. Rohru

For O/O HP,PWD Mechanical Divn., Rohru.

240261 241019

XIII 15th Circle Una 1 Engineer Officer O/O S.E. 15th

Circle, HP, PWD, Una. For O/O S.E. 15th Circle, HP, PWD, Una.

225883

2 Executive Engineer HP, PWD, Una Division , Una.

For O/O HP,PWD Una Division, Una. 226036 223131

3 Executive Engineer HP, PWD, Bangana Divn, Bangana,

For O/O HP,PWD, Bangana Divn, Bangana.

262283 262284

4 Executive Engineer HP, PWD, Bharwain Divn. , Bharwain.

For O/O HP,PWD Bharwain Divn., Bharwain.

255822 255757

XIV Mech. Circle Shimla

1 Executive Engineer(Design) O/O Superintending Engineer, Mechnical Circle, HP,PWD, Dhalli,Shimla-12.

For O/O Superintending Engineer, Mechanical Circle, HP,PWD, Dhalli,Shimla-12.

2843273 2645426

2 Executive Engineer(Mech.), HP,PWD, Divn. Shimla-12.

For O/O HP,PWD, Mechanical Divn., Dhalli, Shimla- 171 0012.

2841169 2620807

3 Executive Engineer(Mech.) HP,PWD Divn Bilaspur.

For HP,PWD, Mechnical Divn Bilaspur.

222392 222399

XV Electrical Circle Shimla

1 Executive Engineer (Design) O/O Chief Engineer, Electrical Circle, HP, PWD, Kasumpti, Shimla-171 009.

For O/O Chief Engineer, Electrical Circle, HP, PWD, Kasumpti, Shimla-171 009.

2621494 2627857

2 Executive Engineer, HP, PWD, Electrical Divn NO-I, Shimla.

For O/O HP,PWD,Electrical Divn No-I, Shimla.

2621398 2620554

3 Executive Engineer HP, PWD, Electrical Divn. No-II, Shimla.

For O/O HP,PWD, Electrical Divn. No-II, Shimla.

2658918 2670093

4 Executive Engineer HP, PWD Electrical Divn. Mandi

For O/O HP,PWD Electrical Divn., Mandi

222172 283453

5 Executive Engineer HP, PWD, Electrical Divn. Una

For O/O HP,PWD ,Electrical Divn, Una.

223484 283568

6 Executive Engineer HP, PWD , Electrical Divn Palampur.

For HP,PWD, Electrical Divn. Palampur

230563 231803

Page 108: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

108

XVI NH Circle Shimla

1 Engineer Officer O/O Superintending Engineer, National Highway Circle, HP,PWD, Shimla- 3.

For O/O Superintending Engineer, National Highway Circle, HP,PWD, Shimla-3.

2657551

2 Executive Engineer National Highway HP,PWD , Divn. Rampur

For O/O HP,PWD, National Highway, Divn. Rampur.

233214 233216

3 Executive Engineer National Highway HP,PWD, Divn. Solan

For O/O HP,PWD, National Highway, Divn. Solan

223804 223717

XVII National Highway Circle

Shahpur

1 Executive Engineer (Design) O/O Superintending Engineer, National Highway Circle, HP,PWD, Shahpur.

For O/O Superintending Engineer, National Highway Circle, HP,PWD, Shahpur.

239007 230684

2 Executive Engineer, National Highway, HP,PWD, Divn. Jogindernagar.

For O/O HP,PWD, National Highway, Divn Jogindernagar.

222135 224273

3 Executive Engineer, National Highway, HP,PWD, Divn. Pandoh

For O/O HP,PWD, National Highway,Divn Pandoh

282059 282080

4 Executive Enginee National Highway, HP,PWD Divn. Hamirpur.

For O/O HP,PWD, National Highway, Divn Hamirpur.

222783 224911

XXI Nahan Foundry

1 Executive Engineer, Nahan Foundry, HP,PWD Nahan.

For O/O S.E. Nahan Foundry, HP,PWD, Nahan.

222395

XXII Arbitration Circle, Solan

1 Executive Engineer (Design) O/O Superintending Engineer, 3rd Circle, HP,PWD, Solan.

For O/O S.E. Arbitration Circle, HP, PWD, Solan.

223802 229648

Page 109: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

109

XXIII Land Acquisition Officer (SZ)Winter field, Shimla

1 Land Acquisition Officer, HP,PWD, Winter Field, Shimla- 171 003.

For O/O Land Acquisition Officer, (SZ) HP,PWD, Winter Field, Shimla- 171 003.

2801055

XXIV Land Acquisition Officer (CZ) Mandi

1 Land Acquisition Officer, HP,PWD Mandi

For O/O Land Acquisition Officer, (CZ) HP,PWD, Mandi.

222147

XXV Land Acquisition Officer

(NZ) Kangra

1 Land Acquisition Officer, HP,PWD, Kangra.

For O/O Land Acquisition Officer, (NZ) HP,PWD , Kangra..

265109

(c) Assistant Public Information Officers.

1 Registrar O/O E-in-Chief, HP, PWD, Nigam Vihar Shimla

For office of Engineer-in-Chief, HP.PWD, Nigam Vihar, Shimla-2 and O/O Chief Engineer (South Zone), HP,PWD, Nigam Vihar Shimla-2.

2652029 2653162

2 Superintendent O/O E-in- Chief (Q.C. & D.), HP, PWD, U.S. club, Shimla-1

For O/O E-in-Chief, (Q.C. & D.)HP, PWD, U.S. Club Shimla-1

2652438

3 Registrar O/O Chief Engineer (Central Zone) HP, PWD, Mandi

For O/O Chief Engineer (CZ), HP,PWD, Mandi

225929 221995

4 Registrar O/O Chief Engineer (North Zone), HP, PWD, Dharamshala

For O/O Chief Engineer (NZ), HP,PWD, Dharamshala

225949 227671

5 Superintendent (G-I) O/O Chief Architect, HP,PWD, U.S. Club Shimla-I.

For office of Chief Architect at Shimla 2805392

6 Superintendent(G-I), O/O Chief Engineer, National Highway, HP,PWD, U.S. Club Shimla-I.

For O/O Chief Engineer, National Highways, HP, PWD, U.S. Club Shimla-1

2805870

1st Circle Mandi

Page 110: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

110

1 Superintendent (Gr.I) O/O S.E.,

1st Circle, HP,PWD, Mandi For O/O S.E., 1st Circle, HP,PWD, Mandi

224129

2 Superintendent (Gr.-II) O/O E.E., HP, PWD, Mandi Division No.-I, Mandi.

For O/O E.E., HP, PWD, Division No-1 Mandi.

222151

(i) Assistant Engineer, HP,PWD Panarsa.

For O/O HP, PWD, Sub-Division No.1, Panarsa.

287576

(ii) Assistant Engineer, HP, PWD, Padhar.

For O/O HP, PWD, Padhar Sub-Division Padhar.

260242

(iii) Assistant Engineer, HP, PWD, Bridge ,Const. Sub-Division Kamand.

For O/O HP, PWD, Bridge ,Const. Sub-Division Kamand.

269896

(iv) Assistant Engineer, HP,PWD Horticulture Sub-division Pandoh.

For O/O HP, PWD, Horticulture Sub-division Pandoh.

282597

(v) Assistant Engineer, HP,PWD Project Sub-Division Mandi.

For O/O HP, PWD Project Sub-Division Mandi.

-

3 Superintendent(Gr.-II) O/O EE, HP, PWD, Mandi Division No.II Mandi.

For O/O E.E. HP PWD, Division NO.II Mandi.

222051

(i) Assistant Engineer, HP, PWD, Kotli Sub-Division, Kotli.

For O/O HP,PWD, Kotli Sub- Division Kotli.

281234

(ii) Assistant Engineer, HP, PWD, Sub-Division No. IV, Mandi.

For O/O HP, PWD, Sub- Division No. IV, Mandi.

225560

(iii) Assistant Engineer, HP, PWD, Rewalsar Sub-Division Rewalsar.

For O/O HP,PWD, Rewalsar Sub- Division Rewalsar.

240250

(iv) Assistant Engineer, HP, PWD, Chakkar Sub-Division Ner- Chowk, Mandi.

For O/O HP, PWD, Chakkar sub-division Ner-Chowk.(Mandi)

242262

(v) Assistant Engineer, HP, PWD, Sub-Division No.-III Mandi

For O/O HP, PWD, Sub- Division No.-III Mandi

221683

4 Superintendent(Gr. II)O/O EE HP, PWD, Karsog Division Karsog.

For O/O E.E. HP, PWD, Karsog Division, Karsog.

22229

(i) Assistant Engineer, HP, PWD, Karsog Sub-Division Karsog

For O/O HP, PWD, Karsog Sub- Division, Karsog.

222312

(ii) Assistant Engineer, HP, PWD, Churag, Sub-Division, Churag.

For O/O HP, PWD, Churag Sub- Division, Churag.

224037

(iii) Assistant Engineer, HP, PWD, Pangna Sub-Division Pangna

For O/O HP, PWD, Pangna Sub- Division, Pangna.

225021

(iv) Assistant Engineer, HP, PWD, Chattri Sub-Division Chattri.

For O/O HP, PWD, Chattri Sub- Division, Chattri.

243225

(v) Assistant Engineer, HP, PWD, Project Sub-Division Karsog

For O/O HP, PWD, Project Sub- Division, Karsog.

----

Page 111: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

111

5 Superintendent (Gr. II) O/O EE HP, PWD, Sarkaghat Division, Sarkaghat.

For O/O E.E. HP, PWD, Sarkaghat Division, Sarkaghat.

230034

(i) Assistant Engineer, HP, PWD, Sub-Division, Baldwara.

For O/O HP, PWD, Sub-Division, Baldwara.

258046

(ii) Assistant Engineer, HP, PWD, Sub-Division, Sarkaghat

For O/O HP, PWD, Sub-Division, Sarkaghat.

230409

6 Superintendent (Gr. II) O/O EE HP, PWD, Sundernagar , Division, Sundernagar.

For O/O E.E. HP, PWD, Sundernagar , Division, Sundernagar.

266245

(i) Assistant Engineer, HP, PWD, Suket Sub-Division, Suket.

For O/O HP, PWD, Suket Sub-Division, Suket.

266611

(ii) Assistant Engineer, HP, PWD, Project Sub-Division, Sundernagar.

For O/O HP, PWD, Project Sub-Division, Sundernagar.

266945

(iii) Assistant Engineer, HP, PWD, Project Sub-Division,Dhanotu, Distt. Mandi.

For O/O HP, PWD, Project Sub-Division, Dhanotu.

263703

7 Superintendent (Gr. II) O/O EE HP, PWD, Dharampur, Division Dharampur( Distt. Mandi.)

For O/O E.E. HP, PWD, Dharampur , Division, Dharampur.

272269

(i) Assistant Engineer, HP, PWD, Dharampur Sub-Division, Dharampur.

For O/O HP, PWD, Dharampur Sub-Division, Dharampur.

272040

(ii) Assistant Engineer, HP, PWD, Mandap Sub-Division,Mandap.

For O/O HP, PWD, Mandap Sub-Division,Mandap.

265177

(iii) Assistant Engineer, HP, PWD, Marhi Sub-Division, Marhi.

For O/O HP, PWD, Marhi Sub-Division, Marhi.

270028

(iv) Assistant Engineer, HP, PWD, Tihra Sub-Division, Tihra.

For O/O HP, PWD, Tihra Sub-Division, Tihra.

8 Superintendent (Gr. II) O/O EE HP, PWD, Jogindernagar Division, Jogindernagar (Distt. Mandi)

For O/O E.E. HP, PWD, Jogindernagar Division, Jogindernagar.

222033

(i) Assistant Engineer, HP, PWD, Laddbhrol Sub-Division Laddbhrol

For O/O HP, PWD, Laddbhrol Sub-Division Laddbhrol.

278147

(ii) Assistant Engineer, HP, PWD, Jogindernagar Sub-Division, Jogindernagar.

For O/O , HP, PWD, Jogindernagar Sub-Division, Jogindernagar.

224205

9 Superintendent(Gr. II)O/O EE HP, PWD, Gohar, Division, Gohar

For O/O EE HP, PWD, Gohar, Division, Gohar

251236

(i) Assistant Engineer, HP, PWD, Gohar Sub-Division, Gohar.

For O/O HP, PWD, Gohar, Division, Gohar

250236

(ii) Assistant Engineer, HP, PWD, Janjehli Sub-Division, Janjehli.

For O/O HP, PWD, Janjehli Sub-Division, Janjehli.

256727

Page 112: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

112

(iii) Assistant Engineer, HP, PWD,

Bali-Chowki Sub-Division, Bali-Chowki.

For O/O HP, PWD, Bali-Chowki Sub-Division, Bali-Chowki.

229131

3rd Circle, Solan. 1 Superintendent (Gr. I) O/O SE, 3rd

Circle, HP, PWD, Solan For O/O S.E., 3rd Circle, HP, PWD, Solan

223802

2 Superintendent (Gr. II) O/O EE, HP, PWD, Solan , Division, Solan.

For O/O E.E., HP, PWD, Solan , Division, Solan.

223811

(i) Assistant Engineer, HP, PWD, Solan Sub-Division, Solan

For O/O , HP, PWD, Solan Sub-Division, Solan.

223805

(ii) Assistant Engineer, HP, PWD, Oachghat Sub-Division, Oachghat

For O/O HP, PWD, Oachghat Sub-Division, Oachghat

252157

(iii) Assistant Engineer, HP, PWD, Kandaghat Sub-Division, Kandaghat.

For O/O HP, PWD, Kandaghat Sub-Division, Kandaghat.

256142

(iv) Assistant Engineer, HP, PWD, Horticulture Sub-Division, Solan.

For O/O HP, PWD, Horticulture Sub-Division, Solan.

(v) Assistant Engineer, HP, PWD,Mech. Sub-Division, Dharampur.

For O/O HP, PWD,Mech. Sub-Division, Dharampur.

265193

3 Superintendent (Gr. II) O/O E.E., HP, PWD,Kasauli , Division Kasauli.(Distt. Solan)

For O/O E.E., HP, PWD,Kasauli , Division Kasauli.

272067

(i) Assistant Engineer, HP, PWD, Kasauli Sub-Division, Kasauli.

For O/O HP, PWD, Kasauli Sub-Division, Kasauli.

273663

(ii) Assistant Engineer, HP, PWD,Sabathu Sub-Division, Sabathu.

For O/O HP, PWD,Sabathu Sub-Division, Sabathu.

275057

(iii) Assistant Engineer, HP, PWD,Parwanoo Sub-Division, Parwanoo.

For O/O HP, PWD,Parwanoo Sub-Division, Parwanoo.

233250

4 Superintendent (Gr. II) O/O E.E., HP, PWD, Nalagarh Division, Nalagarh.(Distt. Solan)

For O/O E.E., HP, PWD, Nalagarh Division, Nalagarh.

222199

(i) Assistant Engineer, HP, PWD, Nalagarh Sub-Division, Nalagarh.

For O/O HP, PWD, Nalagarh Sub-Division, Nalagarh.

223456

(ii) Assistant Engineer, HP, PWD,Ramshaher Sub-Division, Ramshaher.

For O/O HP, PWD, Ramshaher Sub-Division, Ramshaher.

258534

(iii) Assistant Engineer, HP, PWD,Baddi Sub-Division, Baddi.

For O/O HP, PWD, Baddi Sub-Division, Baddi.

247866

5 Superintendent (Gr. II) O/O E.E., For O/O O/O E.E., HP, PWD, Arki 220714

Page 113: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

113

HP, PWD, Arki Division, Arki (Distt. Solan)

Division, Arki.

(i) Assistant Engineer, HP, PWD, Arki Sub-Division, Arki.

For O/O HP, PWD, Arki Sub-Division, Arki.

220765

(ii) Assistant Engineer, HP, PWD,Kunihar Sub-Division, Kunihar.

For O/O HP, PWD,Kunihar Sub-Division, Kunihar.

262301

(iii) Assistant Engineer, HP, PWD, Darlaghat Sub-Division, Darlaghat.

For O/O HP, PWD, Darlaghat Sub-Division, Darlaghat.

248369

4th Circle, Shimla

1 Superintendent (Gr.-I) O/O Supereintending Engineer HP.PWD., 4th Circle Shimla.

For O/OSuperintending Engineer, 4thCircle HP.PWD.,Shimla.

2805097

2 Superintendent(Gr.II) O/O Executive Engineer HP.PWD., Shimla Division No.I Shimla.

For O/O Execcutive Engineer, HP.PWD., Shimla Division No.I Shimla.

2658385

(i) Assistant Engineer, HP.PWD.,Sub-Division Shogi

For O/O Assistant Engineer, HP.PWD.,Sub-Division Shogi.

2860292 2624734

(ii) Assistant Engineer, Shimla Sub-Division No.I., HPPWD., Shimla.

For O/O Shimla Sub-Division No.I., HPPWD., Shimla.

26558385

(iii) Assistant Engineer,Junga Sub-Division, HPPWD, Junga.

For O/O Sub-Division, HPPWD, Junga

2752385

3 Superintendent(Gr.II) O/O Executive Engineer HP.PWD., Shimla Division No.II Shimla.

For O/O Executive Engineer HP.PWD., Shimla Division No.II Shimla

2804134

(i) Assistant Engineer, HP.PWD Jatogh Sub-Division, Jatogh.

For O/O HP.PWD Jatogh Sub-Division, Jatogh.

2837276

(ii) Assistant Engineer, HP.PWD Vidhan Sabha Sub-Division, Shimla.

For O/O HP.PWD Vidhan Sabha Sub-Division, Shimla.

2658185 222286

(iii) Assistant Engineer, HP.PWD Shimla Sub-Division No-VIII, Kasumpti, Shimla.

For O/O HP.PWD Shimla Sub-Division No-VIII, Kasumpti, Shimla.

2624691 2671478

(iv) Assistant Engineer, HP, PWD, Medical Sub-Division (IGMC), Shimla

For O/O HP, PWD, Medical Sub-Division (IGMC), Shimla

2650709

4 Superintendent (Gr.II) O/O Executive Engineer HP, PWD, Shimla Division No -III, Shimla.

For O/O Executive Engineer HP, PWD, Shimla Division No.III, Shimla.

2652832

(i) Assistant Engineer, HP.PWD For O/O HP.PWD Shimla Sub- 2652832

Page 114: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

114

Shimla Sub-Division No.-II, Benmore, Shimla-1.

Division No.-II, Benmore, Shimla-1.

(ii) Assistant Engineer, HP.PWD Shimla Sub-Division No.-V, Barnes Court, Shimla- 2.

For O/O HP.PWD Shimla Sub-Division No.-V, Barnes Court, Shimla- 2.

2624108

(iii) Assistant Engineer, HP,PWD Shimla Sub-Division No.-VII, Shimla – 171 003.

For O/O HP.PWD Shimla Sub-Division No.-VII, Shimla – 171 003.

2652832

(iv) Assistant Engineer, HP.PWD Shimla Sub-Division No.-IX,H.P. Sectt., Shimla-2.

For O/O HP.PWD Shimla Sub-Division No.-IX,H.P. Sectt., Shimla-2.

2880507

5 Superintendent(Gr.II) O/O Executive Engineer HP, PWD,Theog Division, Theog

For O/O Executive Engineer HP, PWD,Theog Division, Theog

238376

(i) Assistant Engineer, HP, PWD, Matiana Sub-Division, Matiana

For O/O HP, PWD, Matiana Sub-Division, Matiana.

225231

(ii) Assistant Engineer, HP, PWD, Theog Sub-Division, Theog.

For O/O HP, PWD, Theog Sub-Division, Theog.

238377

(iii) Assistant Engineer, HP, PWD,Sainj Sub-Division, Sainj.

For O/O HP, PWD,Sainj Sub-Division, Sainj.

235301

5th Circle, Palampur 1 Superintendent(Gr.I) O/O S.E., 5th

Cirlce, HP,PWD, Palampur (Distt. Kangra)

For O/O S.E., 5th Cirlce, HP,PWD, Palampur.

230562

2 Superintendent(Gr.II) O/O Executive Engineer HP, PWD, Dharamshala Division, Dharamshala.

For O/O Executive Engineer HP, PWD, Dharamshala Division, Dharamshala.

224946

(i) Assistant Engineer, HP, PWD, Dharamshala Sub-Division No.-I, Dharamshala

For O/O HP, PWD, Dharamshala Sub-Division No.-I, Dharamshala

227101

(ii) Assistant Engineer, HP, PWD, Dharamshala Sub-Division No.-II, Dharamshala

For O/O HP, PWD, Dharamshala Sub-Division No.-II, Dharamshala.

223254

(iii) Assistant Engineer, HP, PWD, Nagrota Sub- Division, Nagrota .

For O/O HP, PWD, Nagrota Sub- Division, Nagrota .

252219

(iv) Assistant Engineer, HP, PWD, Project Sub-Division, Dharamshala.

For O/O HP, PWD, Project Sub-Division, Dharamshala.

222065

3 Superintendent(Gr.II) O/O Executive Engineer, HP, PWD, Palampur Division, Palampur. (Distt. Kangra)

For O/O Executive Engineer, HP, PWD, Palampur Division, Palampur.

230561

(i) Assistant Engineer, HP, PWD, For O/O HP, PWD, Palampur Sub- 230561

Page 115: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

115

Palampur Sub-Division, Palampur.

Division, Palampur.

(ii) Assistant Engineer, HP, PWD, Thural Sub-Division, Thural

For O/O HP, PWD, Thural Sub-Division, Thural

276638

(iii) Assistant Engineer, HP, PWD, Bhawarna Sub-Division, Bhawarna.

For O/O HP, PWD, Bhawarna Sub-Division, Bhawarna.

247205

(iv) Assistant Engineer, HP, PWD,Dhira Sub-Division, Dhira.

For O/O HP, PWD,Dhira Sub-Division, Dhira.

222252

4 Superintendent(Gr.II) O/O Executive Engineer HP, PWD, Baijnath Divison, Baijnath, (Distt. Kangra)

For O/O Executive Engineer HP, PWD, Baijnath Divison, Baijnath.

263035

(i) Assistant Engineer, HP, PWD, Baijnath Sub-Division, Baijnath.

For O/O , HP, PWD, Baijnath Sub-Division, Baijnath.

262327

(ii) Assistant Engineer, HP, PWD,Panchrukhi Sub-Division, Panchrukhi.

For O/O HP, PWD,Panchrukhi Sub-Division, Panchrukhi.

(iii) Assistant Engineer, HP, PWD,Jaisinghpur Sub-Division, Jaisinghpur.

For O/O HP, PWD,Jaisinghpur Sub-Division, Jaisinghpur.

228237

(iv) Assistant Engineer, HP, PWD,Project Sub-Division, Baijnath..

For O/O HP, PWD,Project Sub-Division, Baijnath.

262327

5 Superintendent(Gr.II) O/O Executive Engineer, HP, PWD, Kangra Divison, Kangra.

For O/O Executive Engineer, HP, PWD, Kangra Divison, Kangra.

265028

(i) Assistant Engineer, HP, PWD, Kangra Sub-Division, Kangra.

For O/O HP, PWD,Kangra Sub-Division, Kangra.

264060

(ii) Assistant Engineer, HP, PWD, Shahpur Sub-Division, Shahpur.

For O/O HP, PWD,Shahpur Sub-Division, Shahpur.

238028

(iii) Assistant Engineer, HP, PWD, ,Lunj Sub-Division, Lunj.

For O/O HP, PWD,Lunj Sub-Division, Lunj.

273531

(iv) Assistant Engineer, HP, PWD, Gaggal Sub-Division, Gaggal.

For O/O HP, PWD,Gaggal Sub-Division, Gaggal.

232213

(v) Assistant Engineer,HP, PWD, Project Sub-Division, Kangra.

For O/O HP, PWD,Project Sub-Division, Kangra.

6 Superintendent(Gr.II) O/O Executive Engineer, HP, PWD, Mechnical Divison, Dharamshala. (Distt. Kangra)

For O/O Executive Engineer, HP, PWD, Mechnical Divison, Dharamshala.

222111

(i) Assistant Engineer, HP, PWD, Mech. Sub-Division No.-I, Dharamshala.

For O/O HP, PWD,Mech. Sub-Division No.-I, Dharamshala.

227111

Page 116: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

116

(ii) Assistant Engineer HP, PWD, Mech. Sub-Division No.-II, Dharamshala.

For O/O HP, PWD,Mech. Sub-Division No.-II, Dharamshala.

222111

(iii) Assistant Engineer HP, PWD, Mech. Sub-Division Nurpur.

For O/O HP, PWD, Mech. Sub-Division Nurpur.

220228

7 Superintendent(Gr.II) O/O Executive Engineer, HP, PWD, Medical College Divison,Tanda (Distt. Kangra)

For O/O Executive Engineer, HP, PWD, Medical College Divison, Tanda.

267900

(i) Assistant Engineer HP,PWD Sub-Division at Medical College Tanda.

For O/O HP,PWD Sub-Division at Medical College Tanda.

267600

(ii) Assistant Engineer HP,PWD, Elect. Sub-Division at Medical College, Tanda.

For O/O HP,PWD, Elect. Sub-Division at Medical College, Tanda.

267200

6th Circle, Kullu.

1 Superintendent(Gr.-I) O/O S.E., 6th Circle, HP, PWD,Kullu.

For O/O S.E., 6th Circle, HP, PWD, Kullu.

222515

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Kullu Division No.-I, Kullu.

For O/O E.E., HP, PWD, Kullu Division No.-I, Kullu.

222426

(i) Assistant Engineer HP,PWD, Bhunter Sub-Division, Bhunter.

For O/O Engineer HP,PWD, Bhunter Sub_Division, Bhunter.

266555

(ii) Assistant Engineer HP,PWD, Banjar Sub-Division, Banjar.

For O/O HP,PWD, Banjar Sub-Division, Banjar.

222231

(iii) Assistant Engineer HP,PWD, Manikaran Sub-Division, Manikaran.

For O/O HP,PWD, Manikaran Sub-Division, Manikaran.

278110

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Kullu.

For O/O HP,PWD, Project Sub-Division, Kullu.

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Kullu Division No.-II, Kullu.

For O/O E.E., HP, PWD, Kullu Division No.-II, Kullu.

222561

(i) Assistant Engineer HP,PWD, Manali Sub-Division, Manali

For O/O HP,PWD, Manali Sub-Division, Manali.

252340

(ii) Assistant Engineer HP,PWD, Sub-Division No.-I, Katrian.

For O/O HP,,PWD,Sub-Division No.1 Katrian.

240125

(iii) Assistant Engineer HP,PWD, Sub-Division No.-III, Kullu.

For O/O HP,PWD, Sub-Division No.-III, Kullu.

222761

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Shamshi.

For O/O HP,PWD, Project Sub-Division, Shamshi.

4 Superintendent(Gr.-II) O/OE.E. For O/O E.E., HP, PWD, Chenab 222238

Page 117: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

117

HP, PWD,Chenab Valley Division, Udiapur,Distt. Lahaul & Spiti.

Valley Division, Udiapur.

(i) Assistant Engineer HP,PWD, Keylong Sub-Division, Keylong.

For O/O HP,PWD, Keylong Sub-Division, Keylong.

222276

(ii) Assistant Engineer HP,PWD, Udiapur Sub-Division, Udiapur

For O/O HP,PWD, Udiapur Sub-Division, Udiapur

222237

(iii) Assistant Engineer HP,PWD, Sissu Sub-Division, Koksar.

For O/O HP,PWD, Sissu Sub-Division, Koksar.

(iv) Assistant Engineer HP,PWD, Mech. Sub-Division, Karga.

For O/O HP,PWD, Mech. Sub-Division, Karga.

5 Superintendent(Gr.-II) O/O E.E (Mech.) Division, HP, PWD, Kullu.

For O/O E.E.(Mech.) Division, HP, PWD, Kullu.

260104

(ii) Assistant Engineer HP,PWD, Mech.Sub-Division No.-II, Shamshi.

For O/O HP,PWD, Mech.Sub-Division No.-II, Shamshi.

260094

(iii) Assistant Engineer HP,PWD, Mech.Sub-Division, Mandi.

For O/O HP,PWD, Mech.Sub-Division, Mandi.

225024

(iv) Assistant Engineer HP,PWD, Mech.Sub-Division, Jogindernagar.

For O/O HP,PWD, Mech.Sub-Division, Jogindernagar.

222725

7th Circle, Dalhousie 1 Superintendent(Gr.-I) O/O S.E.,

7th Circle, HP, PWD, Dalhousie, Distt. Chamba.

For O/O S.E., 7th Circle, HP, PWD, Dalhousie.

222229

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Chamba Division, Chamba.

For O/O E.E., HP, PWD, Chamba Division, Chamba.

222229

(i) Assistant Engineer HP,PWD, Sub-Division No.-I, Chamba.

For O/O HP,PWD, Sub-Division No.-I, Chamba

222229

(ii) Assistant Engineer HP,PWD, Sub-Division No.II, Chamba.

For O/O HP,PWD, Sub-Division No.-II, Chamba

223460

(iii) Assistant Engineer HP,PWD, Tissa Sub-Division, Tissa.

For O/O HP,PWD, Tissa Sub-Division, Tissa.

227025

(iv) Assistant Engineer HP,PWD, Trella Sub-Division, Bairagorli.

For O/O HP,PWD, Trella Sub-Division, Bairagorli.

(v) Assistant Engineer HP,PWD, Project Sub-Division, Chamba.

For O/O HP,PWD, Project Sub-Division, Chamba.

(vi) Assistant Engineer HP,PWD, Mech.Sub-Division, Chamba.

For O/O HP,PWD, Mech.Sub-Division, Chamba.

222328

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Salooni Division, Salooni, Distt. Chamba.

For O/O E.E., HP, PWD, Salooni Division, Salooni.

233287

Page 118: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

118

(i) Assistant Engineer HP,PWD, Salooni Sub-Division, Salooni.

For O/O HP,PWD, Salooni Sub-Division, Salooni.

(ii) Assistant Engineer HP,PWD, Bhalai Sub-Division, Bhalai.

For O/O HP,PWD, Bhalai Sub-Division, Bhalai.

236688

(iii) Assistant Engineer HP,PWD, Koti Sub-Division, Koti.

For O/O HP,PWD, Koti Sub-Division, Koti.

242225

(iv) Assistant Engineer HP,PWD, Project.Sub-Division, Salooni.

For O/O HP,PWD, Project.Sub-Division, Salooni.

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Dalhousie Division, Dalhousie Distt. Chamba.

For O/O E.E., HP, PWD, Dalhousie Division, Dalhousie.

240618

(i) Assistant Engineer HP,PWD, Dalhousie Sub-Division, Dalhousie.

For O/O HP,PWD, Dalhousie Sub-Division, Dalhousie.

242064

(ii) Assistant Engineer HP,PWD, Chowari Sub-Division, Chowari.

For O/O HP,PWD, Chowari Sub-Division, Chowari.

266325

(iii) Assistant Engineer HP,PWD, Banikhet Sub-Division, Banikhet.

For O/O HP,PWD, Banikhet Sub-Division, Banikhet.

254260

(iv) Assistant Engineer HP,PWD, Sinhunta Sub-Division, Sinhunta.

For O/O HP,PWD, Sinhunta Sub-Division, Sinhunta.

265428

(v) Assistant Engineer HP,PWD, Project Sub-Division, Dalhousie..

For O/O HP,PWD, Project Sub-Division, Dalhousie..

5 Superintendent(Gr.-II) O/O E.E., HP, PWD, Pangi Division at Killar, Distt. Chamba.

For O/O E.E., HP, PWD, Pangi Division at Killar.

222223

(i) Assistant Engineer HP,PWD, Killar Sub-Division No.-I, Killar.

For O/O HP,PWD, Killar Sub-Division No.-I, Killar.

222245

(ii) Assistant Engineer HP,PWD, Killar Sub-Division No.-II at Sach.

For O/O HP,PWD, Killar Sub-Division No.-II at Sach.

(iii) Assistant Engineer HP,PWD, Store Sub-Division, Shour.

For O/O HP,PWD, Store Sub-Division, Shour.

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Alwas(Strundi)

For O/O HP,PWD, Project Sub-Division, Alwas(Strundi)

6 Superintendent(Gr.-II) O/O E.E., HP, PWD, Bharmour Division, Bharmour, Distt. Chamba.

For O/O E.E., HP, PWD, Bharmour Division, Bharmour.

225003

(i) Assistant Engineer HP,PWD, Holi Sub-Division, Holi.

For O/O HP,PWD, Holi Sub-Division, Holi.

232219

(ii) Assistant Engineer HP,PWD, Rakh Sub-Division, Rakh.

For O/O HP,PWD, Rakh Sub-Division, Rakh.

236542

(iii) Assistant Engineer HP,PWD, For O/O HP,PWD, Bharmour Sub- 225037

Page 119: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

119

Bharmour Sub-Division, Bharmour.

Division, Bharmour.

(iv) Assistant Engineer HP,PWD, Garola Sub-Division, Garola.

For O/O HP,PWD, Garola Sub-Division, Garola.

224023

8th Circle, Hamirpur. 1 Superintendent(Gr.-I) O/O S.E.,

8th Circle, HP, PWD, Hamirpur. For O/O S.E., 8th Circle, HP, PWD, Hamirpur.

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Hamirpur Division, Hamirpur.

For O/O E.E., HP, PWD, Hamirpur Division, Hamirpur.

222510

(i) Assistant Engineer HP,PWD, Hamirpur Sub-Division, Hamirpur.

For O/O HP,PWD, Hamirpur Sub-Division, Hamirpur.

225333

(ii) Assistant Engineer HP,PWD, Nadaun Sub-Division, Nadaun.

For O/O HP,PWD, Nadaun Sub-Division, Nadaun.

232399

(iii) Assistant Engineer HP,PWD, Sujanpur Tihra Sub-Division, Sujanpur.

For O/O HP,PWD, Sujanpur Tihra Sub-Division, Sujanpur.

272034

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Barsar Division, Barsar, Distt. Hamirpur.

For O/O E.E., HP, PWD, Barsar Division, Barsar.

288041

(i) Assistant Engineer HP,PWD, Barsar Sub-Division, Barsar.

For O/O HP,PWD, Barsar Sub-Division, Barsar.

288041

(ii) Assistant Engineer HP,PWD, Bhoranj ub-Division, Bhoranj.

For O/O HP,PWD, Bhoranj sub-Division, Bhoranj.

266037

(iii) Assistant Engineer HP,PWD, Dhaneta Sub-Division, Dhaneta.

For O/O Engineer HP,PWD, Dhaneta Sub-Division, Dhaneta.

234053

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Bhota.

For O/O HP,PWD, Project Sub-Division, Bhota.

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Tauni Devi Division, Tauni Devi Distt. Hamirpur.

For O/O E.E., HP, PWD, Tauni Devi Division, Tauni Devi.

278422

(i) Assistant Engineer HP,PWD, Tauni Devi Sub-Division, Tauni Devi.

For O/O HP,PWD, Tauni Devi Sub-Division, Tauni Devi.

278302

(ii) Assistant Engineer HP,PWD, Samirpur Sub-Division, Samirpur.

For O/O HP,PWD, Samirpur Sub-Division, Samirpur.

275459

(iii) Assistant Engineer HP,PWD, Lambloo Sub-Division, Lambloo.

For O/O HP,PWD, Lambloo Sub-Division, Lambloo.

248505

9th Circle, Nurpur. 1 Superintendent(Gr.-I) O/O S.E.,

9th Circle, HP, PWD, Nurpur, Distt. Kangra.

For O/O S.E., 9th Circle, HP, PWD, Nurpur.

220102

2 Superintendent(Gr.-II) O/O E.E., For O/O E.E., HP, PWD, Nurpur 220033

Page 120: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

120

HP,PWD, Nurpur Division, Nurpur,(Distt. Kangra)

Division, Nurpur.

(i) Assistant Engineer HP,PWD, Nurpur Sub-Division, Nurpur.

For O/O HP,PWD, Nurpur Sub-Division, Nurpur.

221258

(ii) Assistant Engineer HP,PWD, Rehan Sub-Division, Rehan.

For O/O HP,PWD, Rehan Sub-Division, Rehan.

252609

(iii) Assistant Engineer HP,PWD, Sulyali Sub-Division, Sulyali.

For O/O HP,PWD, Sulyali Sub-Division, Sulyali.

234531

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Fatehpur Division, Fatehpur, Distt. Kangra.

For O/O E.E., HP, PWD, Fatehpur Division, Fatehpur.

256602

(i) Assistant Engineer HP,PWD, Fatehpur Sub-Division, Fatehpur.

For O/O HP,PWD, Fatehpur Sub-Division, Fatehpur.

256602

(ii) Assistant Engineer HP,PWD, Indora Sub-Division, Indora.

For O/O HP,PWD, Indora Sub-Division, Indora.

241336

(iii) Assistant Engineer HP,PWD, Dhameta Sub-Division, Dhameta.

For O/O HP,PWD, Dhameta Sub-Division, Dhameta.

(iv) Assistant Engineer HP,PWD, Badukhar Sub-Division, Badukhar.

For O/O HP,PWD, Badukhar Sub-Division, Badukhar.

257430

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Dehra Gopipur Division, Dehra Gopipur, Distt. Kangra.

For O/O E.E., HP, PWD, Dehra Gopipur Division, Dehra Gopipur.

233116

(i) Assistant Engineer HP,PWD, Dehra Gopipur Sub-Division, Dehra Gopipur.

For O/O HP,PWD, Dehra Gopipur Sub-Division, , Dehra Gopipur.

233116

(ii) Assistant Engineer HP,PWD, Jawalimukhi Sub-Division, Jawalimukhi.

For O/O HP,PWD, Jawalimukhi Sub-Division, Jawalimukhi.

222270

(iii) Assistant Engineer HP,PWD, Dada-Siba Sub-Division, Dada-Siba.

For O/O HP,PWD, Dada-Siba Sub-Division, Dada-Siba.

289231

(iv) Assistant Engineer HP,PWD, Pragpur Sub-Division, Pragpur.

For O/O HP,PWD, Pragpur Sub-Division, Pragpur.

245056

5 Superintendent(Gr.-II) O/O E.E HP, PWD,Jawali Division, Jawali, Distt. Kangra.

For O/O E.E., HP, PWD, Jawali Division, Jawali.

264186

(i) Assistant Engineer HP,PWD, Jawali Sub-Division, Jawali.

For O/O HP,PWD, Jawali Sub-Division, Jawali.

264260

(ii) Assistant Engineer HP,PWD, Kotla Sub-Division, Kotla.

For O/O HP,PWD, Kotla Sub-Division, Kotla.

236268

(iii) Assistant Engineer HP,PWD, Nagrota Sub-Division, Nagrota.

For O/O HP,PWD, Nagrota Sub-Division, Nagrota.

Page 121: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

121

10th Cricle, Bilaspur

1 Superintendent(Gr.-I) O/O S.E., 10th Circle, HP,PWD, Bilaspur.

For O/O S.E., 10th Circle, HP, PWD,Bilaspur.

222435

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Bilaspur Division N0.-I, Bilaspur.

For O/O E.E., HP, PWD, Bilaspur Division N0.-I, Bilaspur.

222550

(i) Assistant Engineer HP,PWD, Bilaspur Sub- Division N0.-II, Bilaspur.

For O/O HP,PWD, Bilaspur Sub-Division N0.-II, Bilaspur.

222421

(ii) Assistant Engineer HP,PWD, Beri Sub-Division, Beri.

For O/O HP,PWD, Beri Sub-Division, Beri.

244165

(iii) Assistant Engineer HP,PWD, Horticulture Sub-Division, Bilaspur.

For O/O HP,PWD, Horticulture Sub-Division, Bilaspur..

222955

3 Superintendent(Gr.-II) O/O E.E HP, PWD, Bilaspur Division N0.-II, Bilaspur.

For O/O Bilaspur Division N0.-II, Bilaspur.

222551

(i) Assistant Engineer HP,PWD, Namhol Sub-Division, Namhol.

For O/O HP,PWD, Namhol Sub-Division, Namhol.

240034

(ii) Assistant Engineer HP,PWD, Swarghat Sub-Division, Swarghat.

For O/O HP,PWD, Swarghat Sub-Division, Swarghat.

284029

(iii) Assistant Engineer HP,PWD, Naina Devi Sub-Division, Naina Devi.

For O/O HP,PWD, Naina Devi Sub-Division, Naina Devi.

288024

(iv) Assistant Engineer HP,PWD, Bilaspur Sub- Division N0.-III, Bilaspur.

For O/O Engineer HP,PWD, Bilaspur Sub- Division N0.-III, Bilaspur.

222551

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Ghumarwin Division, Ghumarwin, Distt. Bilaspur.

For O/O E.E., HP, PWD, Ghumarwin Division, Ghumarwin.

255281

(i) Assistant Engineer HP,PWD, Ghumarwin Sub-Division, Ghumarwin.

For O/O HP,PWD, Ghumarwin Sub-Division, Ghumarwin.

252222

(ii) Assistant Engineer HP,PWD, Barthi Sub-Division, Barthi.

For O/O HP,PWD, Barthi Sub-Division, Barthi.

266032

(iii) Assistant Engineer HP,PWD, Bharari Sub-Division, Bharari.

For O/O HP,PWD, Bharari Sub-Division, Bharari.

273043

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Kalol.

For O/O HP,PWD, Project Sub-Division, Kalol.

11th Circle, Rampur 1 Superintendent(Gr.-I) O/O S.E.,

10th Circle, HP, PWD,Rampur, Distt. Shimla.

For O/O S.E., 11th Circle, HP, PWD,Rampur.

233167

Page 122: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

122

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Rampur Division, Rampur.

For O/O E.E., HP, PWD, Rampur Division, Rampur.

233017

(i) Assistant Engineer HP,PWD, Sub-Division No.-I, Rampur.

For O/O HP,PWD, Sub-Division No-I, Rampur.

(ii) Assistant Engineer HP,PWD, Sub-Division , Nankhari.

For O/O HP,PWD, Sub-Division , Nankhari.

225624

(iii) Assistant Engineer HP,PWD, Sarahan Sub-Division, Sarahan.

For O/O HP,PWD, Sarahan Sub-Division, Sarahan.

274229

(iv) Assistant Engineer HP,PWD, Horticulture Sub-Division, Nirth.

For O/O HP,PWD, Horticulture Sub-Division, Nirth.

(v) Assistant Engineer HP,PWD, Taklech Sub-Division, Taklech.

For O/O HP,PWD, Taklech Sub-Division, Taklech.

272208

(vi) Assistant Engineer HP,PWD, Project Sub-Division, Rampur.

For O/O HP,PWD, Project Sub-Division, Rampur.

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Kumarsain Division, Kumarsain, Distt. Shimla.

For O/O E.E., HP, PWD, Kumarsain Division, Kumarsain.

240075

(i) Assistant Engineer HP,PWD, Kumarsain Sub-Division, Kumarsain.

For O/O HP,PWD, Kumarsain Sub-Division, Kumarsain.

240075

(ii) Assistant Engineer HP,PWD, Thanedhar Sub-Division, Thanedhar.

For O/O HP,PWD, Thanedhar Sub-Division, Thanedhar.

222252

(iii) Assistant Engineer HP,PWD, Suni Sub-Division, Suni.

For O/O HP,PWD, Suni Sub-Division, Suni.

2786628

(iv) Assistant Engineer HP,PWD, Jalog Sub-Division, Jalog.

For O/O HP,PWD, Jalog Sub-Division, Jalog.

2767208

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Kalpa Division, Kalpa, Distt. Kinnaur.

For O/O E.E., HP, PWD, Kalpa Division, Kalpa.

226027

(i) Assistant Engineer HP,PWD, Kalpa Sub-Division, Kalpa..

For O/O HP,PWD, Kalpa Sub-Division, Kalpa..

226558

(ii) Assistant Engineer HP,PWD, Reokong Peo Sub-Division, Reokong Peo.

For O/O HP,PWD, Rekong Peo Sub-Division, Reokong Peo.

222398

(iii) Assistant Engineer HP,PWD, Pooh Sub-Division, Pooh.

For O/O HP,PWD, Pooh Sub-Division, Pooh.

232310

(iv) Assistant Engineer HP,PWD, Moorang Sub-Division, Moorang.

For O/O HP,PWD, Moorang Sub-Division, Moorang.

252258

5 Superintendent(Gr.-II) O/O E.E., HP, PWD, Bhawanagar Division, Bhawanagar, Distt. Shimla, Distt. Kinnaur.

For O/O E.E., HP, PWD, Bhawanagar Division, Bhawanagar.

253303

(i) Assistant Engineer HP,PWD, Tapri Sub-Division, Tapri.

For O/O HP,PWD, Tapri Sub-Division, Tapri.

Page 123: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

123

(ii) Assistant Engineer HP,PWD, Ponda Sub-Division, Ponda.

For O/O HP,PWD, Ponda Sub-Division, Ponda.

253434

(iii) Assistant Engineer HP,PWD, Sangla Sub-Division, Sangla.

For O/O HP,PWD, Sangla Sub-Division, Sangla.

242317

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Bhawanagar.

For O/O HP,PWD, Project Sub-Division, Bhawanagar.

6 Superintendent(Gr.-II) O/O E.E., HP, PWD, Spiti Division at Kaza, Distt. Lahaul & Spiti.

For O/O E.E., HP, PWD, Spiti Division at Kaza.

222252

(i) Assistant Engineer HP,PWD, Hurling Sub-Division, Hurling.

For O/O HP,PWD, Hurling Sub-Division, Hurling.

(ii) Assistant Engineer HP,PWD, Sichling Sub-Division,Sichling.

For O/O HP,PWD, Sichling Sub-Division, Sichling.

(iii) Assistant Engineer HP,PWD, Kaza Sub-Division, Kaza..

For O/O HP,PWD, Kaza Sub-Division, Kaza..

222572

(iv) Assistant Engineer HP,PWD, Losar Sub-Division, Losar.

For O/O HP,PWD, Losar Sub-Division, Losar.

7 Superintendent(Gr.-II) O/O E.E. Outer Seraj, HP, PWD, Division Nirmand, Distt. Kullu.

For O/O E.E. Outer Seraj, HP, PWD,Division Nirmand.

255140

(i) Assistant Engineer HP,PWD, Nirmand Sub-Division, Nirmand.

For O/O HP,PWD, Nirmand Sub-Division, Nirmand.

255151

(ii) Assistant Engineer HP,PWD, Anni Sub-Division, Anni.

For O/O HP,PWD, Anni Sub-Division, Anni.

253343

(iii) Assistant Engineer HP,PWD, Neethar Sub-Division, Neethar.

For O/O HP,PWD, Neethar Sub-Division, Neethar.

265542

(iv) Assistant Engineer HP,PWD, Brow Sub-Division, Brow.

For O/O HP,PWD, Brow Sub-Division, Brow.

(v) Assistant Engineer HP,PWD, Project Sub-Division, Dalash

For O/O HP,PWD, Project Sub-Division, Dalash

8 Superintendent(Gr.-II) O/O E.E.Mechnical, HP, PWD, Division Rampur.

For O/O E.E.Mechnical, HP, PWD, Division Rampur.

233265

(i) Assistant Engineer HP,PWD, Mechnical Sub-Division, Rampur.

For O/O HP,PWD, Mechnical Sub-Division, Rampur.

271341

(ii) Assistant Engineer HP,PWD, Mechnical Sub-Division , Bhawanagar.

For O/O HP,PWD, Mechnical Sub-Division , Bhawanagar.

(iii) Assistant Engineer HP,PWD, Mechnical Sub-Division, Kaza.

For O/O HP,PWD, Mechnical Sub-Division, Kaza.

222252 PP

(iv) Assistant Engineer HP,PWD, Mechnical Sub-Division, Kumarsain.

For O/O HP,PWD, Mechnical Sub-Division, Kumarsain.

240236

Page 124: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

124

(v) Assistant Engineer HP,PWD, Mechnical Sub-Division, Reokong-Peo.

For O/O HP,PWD, Mechnical Sub-Division, Reokong-Peo.

222134

12th Circle, Nahan.

1 Superintendent(Gr.-I) O/O S.E., 12th Circle, HP, PWD, Nahan, Distt. Sirmour

For O/O S.E., 12th Circle, HP, PWD,Nahan.

222260

2 Superintendent(Gr.-II) O/O E.E HP, PWD, Nahan Division Nahan.

For O/O E.E., HP, PWD, Nahan. Division Nahan.

222260

(i) Assistant Engineer HP,PWD, Nahan Sub-Division, Nahan.

For O/O HP,PWD, Nahan Sub-Division, Nahan.

222260

(ii) Assistant Engineer HP,PWD, Dadahu Sub-Division, Dadahu.

For O/O HP,PWD, Dadahu Sub-Division, Dadahu.

(iii) Assistant Engineer HP,PWD, Mech.Sub-Division, Nahan.

For O/O HP,PWD, Mech.Sub-Division, Nahan.

223541

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Poanta Division, Poanta Sahib, Distt. Sirmour

For O/O E.E., HP, PWD, Poanta Division, Poanta Sahib.

222373

(i) Assistant Engineer HP,PWD, Dhaulakaun Sub-Division, Dhaulakaun.

For O/O HP,PWD, Dhaulakaun Sub-Division, Dhaulakaun.

257827

(ii) Assistant Engineer HP,PWD, Sub-Division No.-I, Poanta Sahib.

For O/O HP,PWD, Sub-Division No.-I, Poanta Sahib.

222329

(iii) Assistant Engineer HP,PWD, Sub-Division No.-II, Poanta Sahib.

For O/O HP,PWD, Sub-Division No.-II, Poanta Sahib.

222329

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Rajgarh Division, Rajgarh, Distt. Sirmour.

For O/O E.E., HP, PWD,Rajgarh Division, Rajgarh.

221023

(i) Assistant Engineer HP,PWD, Rajgarh Sub-Division, Rajgarh.

For O/O HP,PWD, Rajgarh Sub-Division, Rajgarh.

221023

(ii) Assistant Engineer HP,PWD, Habban Sub-Division, Habban.

For O/O HP,PWD, Habban Sub-Division, Habban.

266167

(iii) Assistant Engineer HP,PWD, Sarhan Sub-Division, Sarhan.

For O/O HP,PWD, Sarhan Sub-Division, Sarhan.

236726

(vi) Assistant Engineer HP,PWD, Dilman Sub-Division, Dilman.

For O/O HP,PWD, Dilman Sub-Division, Dilman.

277353

(v) Assistant Engineer HP,PWD, Project Sub-Division, Rajgarh.

For O/O HP,PWD, Project Sub-Division, Rajgarh.

5 Superintendent(Gr.-II) O/O E.E HP, PWD,Sangrah Division, Sangrah, Distt. Sirmour.

For O/O E.E., HP, PWD, Sangrah Division, Sangrah.

248207

Page 125: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

125

(i) Assistant Engineer HP,PWD, Haripurdhar Sub-Division, Haripurdhar.

For O/O HP,PWD, Haripurdhar Sub-Division, Haripurdhar.

243331

(ii) Assistant Engineer HP,PWD, Renuka Sub-Division, Renuka.

For O/O HP,PWD, Renuka Sub-Division, Renuka.

267326

(iii) Assistant Engineer HP,PWD, Nauradhar Sub-Division, Nauradhar.

For O/O HP,PWD, Nauradhar Sub-Division, Nauradhar.

240668

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Sangrah.

For O/O HP,PWD, Project Sub-Division, Sangrah.

6 Superintendent(Gr.-II) O/O E.E HP, PWD,Shillai Division, Shillai, Distt. Sirmour.

For O/O E.E., HP, PWD, Shillai Division, Shillai.

278524

(i) Assistant Engineer HP,PWD, Kamroo Sub-Division, Kamroo.

For O/O HP,PWD, Kamroo Sub-Division, Kamroo.

271222

(ii) Assistant Engineer HP,PWD, Shillai Sub-Division, Shillai.

For O/O HP,PWD, Shillai Sub-Division, Shillai.

278524

(iii) Assistant Engineer HP,PWD, Sataun Sub-Division, Sataun.

For O/O HP,PWD, Sataun Sub-Division, Sataun.

262515

(iv) Assistant Engineer HP,PWD, Menus Sub-Division, Menus.

For O/O HP,PWD, Menus Sub-Division, Menus.

(v) Assistant Engineer HP,PWD, Project Sub-Division, Shillai.

For O/O HP,PWD, Project Sub-Division, Shillai.

14th Circle, Rohru

1 Superintendent(Gr.-I) O/O S.E., 14th Circle, HP, PWD, Rohru, Distt. Shimla.

For O/O S.E., 14th Circle, HP, PWD, Rohru.

241713

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Rohru Division, Rohru.

For O/O E.E., HP, PWD, Rohru Division, Rohru.

240087

(i) Assistant Engineer HP,PWD, Rohru Sub-Division, Rohru.

For O/O HP,PWD, Rohru Sub-Division, Rohru.

240087

(ii) Assistant Engineer HP,PWD, Chirgaon Sub-Division, Chirgaon.

For O/O HP,PWD, Chirgaon Sub-Division, Chirgaon.

277246

(iii) Assistant Engineer HP,PWD, Tikkar Sub-Division, Tikkar.

For O/O HP,PWD, Tikkar Sub-Division, Tikkar.

233054

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Rohru.

For O/O HP,PWD, Project Sub-Division, Rohru.

3 Superintendent(Gr.-II) O/O E.E, HP, PWD, Jubbal Division, Jubbal.Distt. Shimla.

For O/O E.E, HP, PWD, Jubbal Division, Jubbal.

252004

(i) Assistant Engineer HP,PWD, Jubbal Sub-Division, Jubbal.

For O/O HP,PWD, Jubbal Sub-Division, Jubbal.

252004

Page 126: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

126

(ii) Assistant Engineer HP,PWD, Kotkhai Sub-Division, Kotkhai.

For O/O HP,PWD, Kotkhai Sub-Division, Kotkhai.

255338

(iii) Assistant Engineer HP,PWD, Kalbog Sub-Division, Kalbog.

For O/O HP,PWD, Kalbog Sub-Division, Kalbog.

240018

4 Superintendent(Gr.-II) O/O E.E HP, PWD, Dodra Kawar, Division, Dodra Kawar, Distt. Shimla.

For O/O E.E., HP, PWD, Dodra Kawar Division, Dodra Kawar.

276216

(i) Assistant Engineer HP,PWD, Sub-Division No.-I, Dodra Kawar.

For O/O HP,PWD, Sub-Division No.-I, Dodra Kawar.

272016

(ii) Assistant Engineer HP,PWD, Project Sub-Division, Larot.

For O/O HP,PWD, Project Sub-Division, Larot.

(iii) Assistant Engineer HP,PWD, Larot Sub-Division, Larot.

For O/O HP,PWD, Larot Sub-Division, Larot.

5 Superintendent(Gr.-II) O/O E.E., HP, PWD, Chopal Division Chopal, Distt. Shimla.

For O/O E.E., HP, PWD, Chopal Division Chopal.

260033

(i) Assistant Engineer HP,PWD, Chopal Sub-Division, Chopal.

For O/O HP,PWD, Chopal Sub-Division, Chopal.

260262

(ii) Assistant Engineer HP,PWD, Nerwa Sub-Division, Nerwa.

For O/O HP,PWD, Nerwa Sub-Division, Nerwa.

264439

(iii) Assistant Engineer HP,PWD, Kupvi Sub-Division, Kupvi.

For O/O HP,PWD, Kupvi Sub-Division, Kupvi..

270181

(iv) Assistant Engineer HP,PWD, Project Sub-Division, Nerwa.

For O/O HP,PWD, Project Sub-Division, Nerwa.

264074

(v) Assistant Engineer HP,PWD, Project Sub-Division,Chopal.

For O/O HP,PWD, Project Sub-Division,Chopal.

260262

6 Superintendent(Gr.-II) O/O E.E. Mech., HP, PWD, Division Rohru, Distt. Shimla.

For O/O E.E. Mech., HP, PWD, Division Rohru.

240261

(i) Assistant Engineer HP,PWD, Mech. Sub-Division, Rohru.

For O/O HP,PWD, Mech. Sub-Division, Rohru.

240261

(ii) Assistant Engineer HP,PWD, Mech Sub-Division, Kotkhai.

For O/O HP,PWD, Mech Sub-Division, Kotkhai.

255420

(iii) Assistant Engineer HP,PWD, Mech Sub-Division, Nerwa.

For O/O HP,PWD, Mech Sub-Division, Nerwa.

264018

15th Circle, Una.

1 Superintendent(Gr.-I)O/O S.E., 15th Circle,HP,PWD,Una

For O/O S.E., 15th Circle, HP, PWD, Una.

224802

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Una Division, Una.

For O/O E.E., HP, PWD, Una Division, Una.

226036

(i) Assistant Engineer HP,PWD, Sub-Division No.-I, Una

For O/O HP,PWD, Sub-Division No.-I, Una

225205

Page 127: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

127

(ii) Assistant Engineer HP,PWD, Sub-Division No.-II, Mehatpur.

For O/O HP,PWD, Sub-Division No.-II, Mehatpur.

232673

(iii) Assistant Engineer HP,PWD, Tahliwal Sub-Division, Tahliwal.

For O/O HP,PWD, Tahliwal Sub-Division, Tahliwal.

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Bangana Division, Bangana, Distt. Una.

For O/O E.E., HP, PWD, Bangana Division, Bangana.

262283

(i) Assistant Engineer HP,PWD, Bangana Sub-Division, Bangana.

For O/O HP,PWD, Bangana Sub-Division, Bangana.

262047

(ii) Assistant Engineer HP,PWD, Jole Sub-Division, Jole.

For O/O HP,PWD, Jole Sub-Division, Jole.

275778

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Bharwain Division, Bharwain, Distt. Una.

For O/O E.E., HP, PWD, Bharwain Division, Bharwain.

255822

(i) Assistant Engineer HP,PWD, Bharwain Sub-Division, Bharwain.

For O/O HP,PWD, Bharwain Sub-Division, Bharwain.

255795

(ii) Assistant Engineer HP,PWD, Gagret Sub-Division, Gagret.

For O/O HP,PWD, Gagret Sub-Division, Gagret.

241362

(iii) Assistant Engineer HP,PWD, Amb Sub-Division, Amb.

For O/O HP,PWD, Amb Sub-Division, Amb.

260054

Mechnical Circle, Dhalli,

Shimla-12.

1 Superintendent(Gr.-II) O/O S.E., Mech. Circle, HP, PWD, Dhalli, Shimla-12.

For O/O S.E., Mech. Circle, HP, PWD, Dhalli, Shimla-12.

2843273

2 Superintendent(Gr.-II) O/O E.E., HP, PWD,Mech. Divn., Shimla.

For O/O E.E., HP, PWD,Mech. Divn., Shimla.

2841169

(i) Assistant Engineer HP,PWD, Mech.Sub-Division No.-II, Bhattakuffar, Dhalli.

For O/O HP,PWD, Mech.Sub-Division No.-II, Bhattakuffar, Dhalli.

2841916

(ii) Assistant Engineer HP,PWD, Steel Bridge Const..Sub-Division, Bhattakuffar, Dhalli..

For O/O HP,PWD, Steel Bridge Const. Sub-Division, Bhattakuffar, Dhalli.

2841916

(iii) Assistant Engineer HP,PWD, Mech.Sub-Division, Taradevi.

For O/O HP,PWD, Mech.Sub-Division, Taradevi.

2830369

3 Superintendent(Gr.-II) O/O E.E., HP, PWD,Mech. Divn.,Bilaspur

For O/O E.E., HP, PWD,Mech. Divn.,Bilaspur.

222392

(i) Assistant Engineer HP,PWD, Mech.Sub-Division, Bilaspur.

For O/O HP,PWD, Mech.Sub-Division, Bilaspur.

222392

(ii) Assistant Engineer HP,PWD, Mech.Sub-Division, Hamirpur.

For O/O HP,PWD, Mech.Sub-Division, Hamirpur.

222483

Page 128: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

128

(iii) Assistant Engineer HP,PWD, Mech.Sub-Division, Parchhu.

For O/O HP,PWD, Mech.Sub-Division, Parchhu.

252008

(iv) Assistant Engineer HP,PWD, Mech.Sub-Division, Una.

For O/O HP,PWD, Mech.Sub-Division, Una.

238156

Electrical Circle, Kasumpti, Shimla- 9.

1 Superintendent(Gr.-II) O/O C..E., Electrical Circle, HP, PWD Kasumpti, Shimla- 9.

For O/O Chief Engineer, Electrical Circle, HP, PWD Kasumpti, Shimla- 9.

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, Elect. Divn. No.-I, Kasumpti, Shimla- 9.

For O/O E.E., HP, PWD, Elect. Divn. No.-I, Kasumpti, Shimla- 9.

2621398

(i) Assistant Engineer HP,PWD, Elect.Sub-Division, Vidhan Sabha, Shimla.

For O/O HP,PWD, Elect.Sub-Division, Vidhan Sabha, Shimla.

2651765

(ii) Assistant Engineer HP,PWD, Elect.Sub-Division No.-II, Kasumpti, Shimla- 9.

For O/O HP,PWD, Elect.Sub-Division No.-II, Kasumpti, Shimla- 9.

2621398

(iii) Assistant Engineer HP,PWD, Elect.Sub-Division, Solan.

For O/O HP,PWD, Elect.Sub-Division, Solan.

223860

(iv) Assistant Engineer HP,PWD, Elect.Sub-Division, Nahan.

For O/O HP,PWD, Elect.Sub-Division, Nahan.

224573

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, Elect. Divn.No.-II, Shimla.

For O/O E.E., HP, PWD, Elect. Divn.No.-II, Shimla.

2658918

(i) Assistant Engineer HP,PWD, Elect.Sub-Division, IGMC, Shimla.

For O/O HP,PWD, Elect.Sub-Division, IGMC, Shimla.

2653087

(ii) Assistant Engineer HP,PWD, Elect.Sub-Division, Rampur.

For O/O HP,PWD, Elect.Sub-Division, Rampur.

223834

(iii) Assistant Engineer HP,PWD, Elect.Sub-Division, Theog.

For O/O HP,PWD, Elect.Sub-Division, Theog.

238273

(iv) Assistant Engineer HP,PWD, Elect.Sub-Division, ReoKong-Peo.

For O/O HP,PWD, Elect.Sub-Division, ReoKong-Peo.

223068

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, Elect. Divn.,Mandi.

For O/O E.E., HP, PWD, Elect. Divn.,Mandi.

222172

(i) Assistant Engineer HP,PWD, Elect.Sub-Division, Mandi.

For O/O HP,PWD, Elect.Sub-Division, Mandi.

223020

(ii) Assistant Engineer HP,PWD, Elect.Sub-Division, Sundernagar.

For O/O HP,PWD, Elect.Sub-Division, Sundernagar.

266527

Page 129: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

129

(iii) Assistant Engineer HP,PWD, Elect.Sub-Division, Kullu.

For O/O HP,PWD, Elect.Sub-Division, Kullu.

222389

(iv) Assistant Engineer HP,PWD, Elect.Sub-Division, Udaipur.

For O/O HP,PWD, Elect.Sub-Division, Udaipur.

222436

5 Superintendent(Gr.-II) O/O E.E., HP, PWD, Elect. Divn. Una.

For O/O E.E., HP, PWD, Elect. Divn. Una.

223484

(i) Assistant Engineer HP,PWD, Elect.Sub-Division, Bilaspur.

For O/O HP,PWD, Elect.Sub-Division, Bilaspur.

222221

(ii) Assistant Engineer HP,PWD, Elect.Sub-Division, Una.

For O/O HP,PWD, Elect.Sub-Division, Una.

225479

(iii) Assistant Engineer HP,PWD, Elect.Sub-Division, Hamirpur.

For O/O HP,PWD, Elect.Sub-Division, Hamirpur.

222439

6 Superintendent(Gr.-II) O/O E.E., HP, PWD, Elect. Divn. Palampur, Distt. Kangra.

For O/O E.E., HP, PWD, Elect. Divn. Palampur.

230563

(i) Assistant Engineer HP,PWD, Elect.Sub-Division, Palampur..

For O/O HP,PWD, Elect.Sub-Division, Palampur..

232548

(ii) Assistant Engineer HP,PWD, Elect.Sub-Division, Chamba.

For O/O HP,PWD, Elect.Sub-Division, Chamba.

222696

(iii) Assistant Engineer HP,PWD, Elect.Sub-Division, Dharamshala.

For O/O HP,PWD, Elect.Sub-Division, Dharamshala.

223150

(iv) Assistant Engineer HP,PWD, Elect.Sub-Division, Nurpur.

For O/O HP,PWD, Elect.Sub-Division, Nurpur.

220189

(v) Assistant Engineer HP,PWD, Elect.Sub-Division, Dehra.

For O/O HP,PWD, Elect.Sub-Division, Dehra.

233660

National Highway Circle,

Shimla-3.

1 Superintendent(Gr.-I) O/O S.E., National Highway Circle, HP, PWD, Shimla-3.

For O/O S.E., National Highway Circle, HP, PWD, Shimla-3..

2653062

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, National Highway Divn., Rampur.

For O/O E.E., HP, PWD, National Highway Divn., Rampur.

233214

(i) Assistant Engineer HP,PWD, Narkanda.National Highway Sub-Division, Narkanda.

For O/O HP,PWD, Narkanda.National Highway Sub-Division, Narkanda

242454

(ii) Assistant Engineer HP,PWD, Rampur National Highway Sub-Division, Rampur.

For O/O HP,PWD, Rampur National Highway Sub-Division, Rampur.

233214

(iii) Assistant Engineer HP,PWD, Jeori National Highway Sub-Division, Jeori.

For O/O HP,PWD, Jeori National Highway Sub-Division, Jeori.

278219

Page 130: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

130

(iv) Assistant Engineer HP,PWD, Negulsari National Highway Sub-Division, Negulsari.

For O/O HP,PWD, Negulsari National Highway Sub-Division, Negulsari.

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, National Highway Divn. Solan.

For O/O E.E., HP, PWD, National Highway Divn. Solan.

223804

(i) Assistant Engineer HP,PWD, Nalagarh National Highway Sub-Division, Nalagarh.

For O/O HP,PWD, Nalagarh National Highway Sub-Division, Nalagarh.

220211

(ii) Assistant Engineer HP,PWD, Chambaghat National Highway Sub-Division, Chambaghat.

For O/O HP,PWD, Chambaghat National Highway Sub-Division, Chambaghat.

220806

(iii) Assistant Engineer HP,PWD, Dhalli National Highway Sub-Division, Dhalli.

For O/O HP,PWD, Dhalli National Highway Sub-Division, Dhalli.

2841145

(iv) Assistant Engineer HP,PWD, Shallaghat National Highway Sub-Division, Shallaghat.

For O/O HP,PWD, Shallaghat National Highway Sub-Division, Shallaghat.

249050

(v) Assistant Engineer HP,PWD, Majra National Highway Sub-Division, Majra.

For O/O HP,PWD, Majra National Highway Sub-Division, Majra.

258116

National Highway Circle,

Shahpur

1 Superintendent(Gr.-I) O/O S.E., National Highway Circle, HP, PWD,Shahpur.

For O/O S.E., National Highway Circle, HP, PWD,Shahpur.

238663

2 Superintendent(Gr.-II) O/O E.E., HP, PWD, National Highway Divn. Jogindernagar, Distt. Mandi.

For O/O E.E., HP, PWD, National Highway Divn. Jogindernagar.

222135

(i) Assistant Engineer HP,PWD, Gumma National Highway Sub-Division, Gumma.

For O/O HP,PWD, Gumma National Highway Sub-Division, Gumma.

268554

(ii) Assistant Engineer HP,PWD, Baijnath National Highway Sub-Division, Baijnath.

For O/O HP,PWD, Baijnath National Highway Sub-Division, Baijnath.

262802

(iii) Assistant Engineer HP,PWD, Shahpur National Highway Sub-Division, Shahpur.

For O/O HP,PWD, Shahpur National Highway Sub-Division, Shahpur.

237677

(iv) Assistant Engineer HP,PWD, Nurpur National Highway Sub-Division, Nurpur.

For O/O HP,PWD, Nurpur National Highway Sub-Division, Nurpur.

220377

(v) Assistant Engineer HP,PWD, Drang National Highway Sub-Division, Drang.

For O/O HP,PWD, Drang National Highway Sub-Division, Drang.

266512

Page 131: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

131

3 Superintendent(Gr.-II) O/O E.E., HP, PWD, National Highway Divn. Pandoh, Distt. Mandi.

For O/O E.E., HP, PWD, National Highway Divn. Pandoh.

282059

(i) Assistant Engineer HP,PWD, Bilaspur National Highway Sub-Division, Bilaspur.

For O/O HP,PWD, Bilaspur National Highway Sub-Division, Bilaspur.

222551

(ii) Assistant Engineer HP,PWD, Kullu National Highway Sub-Division, Kullu.

For O/O HP,PWD, Kullu National Highway Sub-Division, Kullu.

225450

(iii) Assistant Engineer HP,PWD, Katrain National Highway Sub-Division, Katrain.

For O/O HP,PWD, Katrain National Highway Sub-Division, Katrain.

240289

(iv) Assistant Engineer HP,PWD, Pandoh National Highway Sub-Division, Pandoh

For O/O HP,PWD, Pandoh National Highway Sub-Division, Pandoh

282659

(v) Assistant Engineer HP,PWD, Kotli National Highway Sub-Division, Kotli.

For O/O HP,PWD, Kotli National Highway Sub-Division, Kotli.

281212

4 Superintendent(Gr.-II) O/O E.E., HP, PWD, National Highway Divn. Hamirpur.

For O/O E.E., HP, PWD, National Highway Divn. Hamirpur.

222783

(i) Assistant Engineer HP,PWD, Amb National Highway Sub-Division, Amb.

For O/O HP,PWD, Amb National Highway Sub-Division, Amb.

261789

(ii) Assistant Engineer HP,PWD, Jawaamukhi National Highway Sub-Division, Jawaamukhi.

For O/O HP,PWD, Jawaamukhi National Highway Sub-Division, Jawaamukhi.

223651

(iii) Assistant Engineer HP,PWD, Samirpur National Highway Sub-Division, Samirpur.

For O/O HP,PWD, Samirpur National Highway Sub-Division, Samirpur.

227546

(iv) Assistant Engineer HP,PWD, Jukhala National Highway Sub-Division, Jukhala.

For O/O HP,PWD, Jukhala National Highway Sub-Division, Jukhala.

286750

Nahan Foundary, Nahan Superintendent(Gr.-I) O/O

S.E., Nahan Foundary , HP, PWD, Nahan.

For O/O S.E., Nahan Foundary , HP, PWD, Nahan.

222395

Arbitration Circle 1 Superintendent(Gr.II),O/O

Arbitration Circle,HP, PWD, Solan

For O/O S.E.,Arbitration Circle, HP, PWD, Solan.

226719

Page 132: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

132

LAO (SZ) Shimla 1 Superintendent(Gr.-II)O/O

Land Acquisition Officer, HP, PWD, Shimla

For O/O Land Acquisition Officer, HP, PWD, (SZ) Shimla

2801055

LAO (CZ) Mandi 1 Superintendent(Gr.-II) O/O

Land Acquisition Officer, HP, PWD, Mandi

For O/O Land Acquisition Officer, HP, PWD, LAO (CZ) Mandi

222147

LAO (NZ) Kangra Superintendent (Gr.-II)O/O

Land Acquisition Officer, HP, PWD, Kangra

For O/O Land Acquisition Officer, (NZ) Kangra.

265109

Explanatory Note:- Where any information under RTI Act is required to be supplied by more than one Public Information Officer then in such case, the Public Information Officer of the higher office shall be responsible for supplying the information by collecting it from the PIOs of the subordinate offices. For example, Engineer Officer has been designated as PIO in many Circle Offices for providing any information relating to the matter pertaining to Circle Office. In case any information being sought by the applicant pertains to more than one division under that circle then in such case the PIO would be Engineer Officer of the Circle rather than the concerned Executive Engineer.

Engineer-in-Chief, HP.PWD.,Shimla-2.

Page 133: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

133

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

NOTIFICATION

In addition to the notification issued vide letter No. PW (B)-RTI Act/05-11914-

43, dated 24-01-2009, the

following officers are also notified as Public Information Officer with immediate effect in the

public interest:-

Sr. No

Designation Of Authority

States under the Act Now read as under Telephone No Office Residence

Remarks

1 Executive Engineer

HP, PWD, Dharampur Division, Dharampur.

Public Information Officer For HP, PWD, Dharampur Division, Dharampur.

272269 Left out earlier. 2 Executive Engineer

HP, PWD, Gohar Division, Gohar.

Public Information Officer For HP, ,PWD, Gohar Division, Gohar.

251336

3 Superintending Engineer 1st. Circle, HPPWD Mandi

For O/O 1st Circle, HP,PWD, Mandi , Divn. No-I Mandi, Sundernagar Divn, Karsog Divn, Sarkaghat Divn, Dharmpur Divn. & Jogindernagar Division

Appellate Authority For O/O 1st Circle, HP, PWD, Mandi , Divn. No-I Mandi, Divn. No-II Mandi, Sunderagar Divn, Karsog Divn, Sarkaghat Divn, Dharmpur Divn., Jogindernagar Division & Gohar Division

224129 225871 Reference already issued Notification No 11914-43, dated 24-01-09 vide Sr.No.-9 of page-2 in column No.-3.

4 Executive Engineer (Design) O/O Chief Engineer(NZ), HPPWD, Dharamshala.

Public Information Officer For O/O Chief Engineer(NZ), HP, PWD, Dharamshala.

Executive Engineer (Design-II)O/O Chief Engineer (NZ), HPPWD, Dharamshala.

2223177 2265877 Reference already issued Notification No 11914-43, dated 24-01-09 vide Sr.No.-4 of page-3.

Engineer-in-Chief, HP.PWD.,Shimla-2.

No:-PW (B )-R.T.I.Act-2005 /WS- dated:-

Page 134: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

134

HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT

CORRIGENDUM

Please read as Executive Engineer (Design-II)O/O Chief

Engineer(N.Z.),HP, PWD, Dharamshala [Phone No- 01892223167 (O),

01892236008(Resi)]as Public Information Officer at Sr. No. 4 of page-3 instead of

Executive Engineer(Design) O/O Chief Engineer(N.Z.) HP, PWD, Dharmshala of the

Notification No. PW (B)-RTI Act/05-11914-43, dated 24-01-2009 with immediate effect

in the public interest.

Engineer-in-Chief, HP.PWD.,Shimla-2.

No:-PW (B )-R.T.I.Act-2005 /WS- dated:-

Page 135: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

135

HIMACHAL PRADESH

PUBLIC WORKS DEPARTMENT

NOTIFICATION In continuation to the notifications issued vide this office letter No. PW (B)-RTI

Act/05-11914-43, dated 24-01-2009 and 3658-80, dated 23-07-2009 the following officers are

notified as Appellate Authorities, Public Information Officer and Asstt. Public Information

Officer with immediate effect in the public interest :-

Sr. No

Designation Of Authority

States under the Act Telephone No Office Residence

Remarks

1 2 3 4 5 Appellate Authorities

1 Superintending Engineer

(D) O/O Chief Engineer (H.Z.), HP, PWD, Hamirpur.

Appellate Authority for O/O Chief Engineer (H.Z.), HP, PWD, Hamirpur.

222925 Newly Created Zone.

2. Superintending Engineer HP, PWD, Joginder Nagar Circle, Joginder Nagar.

Appellate Authority for O/O HP, PWD Joginder Nagar Circle, Divisions at Baijnath, Jogindernagar and Padhar.

224598 Joginder Nagar Division earlier under the control of 1st Circle, Mandi vide Sr. No. 7 of page-4, Padhar Sub-Divsion earlier under the control of 1st Circle, Mandi vide Sr. No. 2 (ii) of page-11 and Baijnath Division earlier under the control of 5th Circle, Palampur vide Sr. No.4 of page-5 now under the control of newly created Joginder Nagr Circle.

Public Information Officer

1 Executive Engineer(D-II) HP, PWD, Chief Engineer (H.Z.), HP, PWD, Hamirpur.

Public Information Officer For O/O Chief Engineer (H.Z.), HP, PWD, Hamirpur.

Newly Created Zone.

2 Executive Engineer(D) HP, PWD, Joginder Nagar Circle, Joginder Nagar.

Public Information Officer for O/O Joginder Nagar Circle, HP, PWD, Joginder Nagar.

Newly Created Circle.

3. Executive Engineer HP,PWD, Padhar, Division, Padhar.

Public Information Officer For O/O Padhar, Division, HP,PWD, Padhar..

260665 Earlier the Division was situated at Mandi under the control of Superintending

Page 136: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

136

Engineer, Mandi. Now office shifted at Padhar the control of this Division is under Joginder Nagar Circle.

Asstt. Public Information Officer

1. Registrar O/O HP, PWD, Chief Engineer (H.Z.), HP, PWD, Hamirpur.

Asstt. Public Information Officer for Chief Engineer (H.Z.), HP, PWD, Hamirpur.

Newly Created Zone.

2 Superintendent(Gr.-I) O/O HP, PWD, Joginder Nagar Circle, Joginder Nagar.

Asstt. Public Information Officer for O/O Joginder Nagar Circle, Joginder Nagar.

Newly Created Circle.

Engineer-in-Chief, HP.PWD.,Shimla-2.

No:-PW (B )-R.T.I.Act-2005 /WS-(Vol-VI)- 11670-11700- dated:-15-03-2011.

Page 137: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works
Page 138: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works
Page 139: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

137

ITEM NO XVII WHATEVER INFORMATION AS PRESCRIBED BY THE GOVT. IN THE

FUNCTIONING OF PUBLIC WORKS DEPARTMENT SHALL BE UPDATED

IN ELECTRONIC FORM MAINTAINED BY THE PUBLIC WORKS

DEPARTMENT.

The Organizational and Administrative set up of HPPWD is as under:-

Himachal Pradesh Public Works Department is headed by the Engineer-in-Chief with Head quarter at Shimla. On Administrative and functional considerations the department has been divided in four zones namely Kangra, Mandi, Hamirpur and Shimla zones. All the four zones are headed by separate Chief Engineers. Whereas headquarter of Simla Zone is at Shimla, those of Kangra, Mandi and Hamirpur zone respectively are at Dharamshala, Mandi and Hamirpur. Besides these, the Chief Engineer (NH) with Head quarter at Shimla controls exclusively the planning and execution of works of National Highways traversing through the state. Works regarding Planning and Monitoring for the entire State and also the entire establishment of PWD is controlled by the Engineer-in-Chief. The work of ensuring quality control in various works being executed by the department including those of NHs, is being looked after by Engineer-in-Chief (Quality Control & Designs). There is one Chief Engineer (PMGSY), who is exclusively looking after the Planning, monitoring of PMGSY works in the State.

GENERAL ADMINISTATIVE AND FUNCTIONAL SET UP

KANGRA ZONE:- Controls works in the Districts of Chamba and Kangra. SHIMLA ZONE:- Controls works in the Districts of Sirmour, Solan, Shimla, Kinnaur and Spiti area of L&S Distt. and Nirmand Division of Kullu Distt. MANDI ZONE:- Controls works in the Districts of Mandi and Kullu(except Nirmand) and Lahual Area of L&S Distt. HAMIRPUR ZONE:- Controls works in the Districts of Bilaspur, Una and Hamirpur and two divisions of Mandi Distt. i.e. Dharampur and Sarkaghat. NATIONAL HIGHWAYS:- Controls works of all National Highways in the State.

Page 140: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

138

CHIEF ARCHITECT:- Controls Architect Wing of the department. ARBITRATION CELL:- Headquarter at Solan. The four zones and National Highways Units are further divided into 19 field Circles each headed by a Superintending Engineer and in addition there are 11 Superintending Engineers working in the office of Engineer-in-Chief and zonal offices. Following are the details:- OFFICE OF THE ENGINEER-IN-CHIEF:- Engineer-in-Chief (Q/C& D) Shimla Superintending Engineer(W) Shimla Superintending Engineer(D-I) Shimla Superintending Engineer(World Bank Project) Shimla Superintending Engineer(D-III) Shimla Superintending Engineer(D) Quality Assurance Shimla 1-SIMLA ZONE, SHIMLA 3rd Circle Solan 4th Circle Shimla 11th Circle Rampur 12th Circle Nahan 14th Circle Rohru Arb. Circle Solan Besides above one Mechanical Circle and one Electrical Circle are also functioning from Shimla. The Mechanical Circle is headed by a Superintending Engineer and the Electrical Circle by a Superintending Engineer. 2-KANGRA ZONE, DHARAMSHALA 5th Circle Palampur 7th Circle Dalhousie 9th Circle Nurpur Superintending Engineer (Works) Dharamsala Superintending Engineer (D) Dharamsala 3-MANDI ZONE, MANDI 1st Circle Mandi. Jogindernagar Circle Jogindernagar. 6th Circle Kullu Superintending Engineer (W) Mandi Superintending Engineer (D) Mandi.

Page 141: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

139

4- HAMIRPUR ZONE, HAMIRPUR 8th Circle Hamirpur 10th Circle Bilaspur 15TH Circle Una Superintending Engineer (D) Hamirpur NATIONAL HIGHWAY UNITS NH Circle Shimla NH Circle Shahpur Field circles are further divided into divisions. Each Division is headed by an Executive Engineer. There are in all 73 Civil, Mech. and Elect. Division in the Pradesh. i) Civil 62 Divisions ii) Mechanical 6 Divisions iii) Electrical 5 Division Each civil, Mechanical and Electrical field Division is further divided into Sub Divisions headed by Assistant Engineers. There are in all 281 Civil, Mech., Hort. & Elect. Sub Divisions in the Pradesh with the following break-up:- i)Civil 230 Sub Divisions. ii)Mechanical 26 Sub Divisions. iii) Hort. 4 Sub-Divisions iii)Electrical 21 Sub Divisions. (Details of field Circles, Divisions and Sub Divisions are given in Annexure I ) Total Strength of Officers/ officials and other staff of the department as on 31-3-2010 is 6213(Detail are given in Annexure-B) & besides these, there are 36558 field employees ( Class III & Class-IV) brought on regular cadre (Detail are given in Annexure-C) ARCHITECTURAL WING Architectural Wing at Shimla headed by Chief Architect, is assisted by four Senior Architects, 13 Assistant Architect and other supporting staff. This wing deals with all the Architectural Planning for buildings undertaken by PWD under Kangra, Shimla, Hamirpur and Mandi Zone. In addition, the Architectural wing also undertakes consultancy jobs for Corporate bodies and Institutions. Architectural Units also exist at Kangra and Mandi under Chief Engineer Kangra and Chief Engineer Mandi Zone respectively for day to day planning of minor works of these zones.

Page 142: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

140

ENGINEER-in-Chief(D&Q/C) The Engineer-in-Chief (Design and Quality Control) is assisted by one Superintending Engineer (D) and other supporting staffs. This wing deals with the matters pertaining to assuring quality control on the works being executed, Standardization of Designs, Drawing for building & bridges, Common technical instructions, Codes and Specification, Manual etc. In addition the Schedule of Rates and allied yard stick for roads bridges and buildings, quality control checks through out the state, arranging workshops, seminars and training courses for all levels and sponsoring names of officers for training course, workshop, seminar etc. are also being done by this wing. DESIGN CELL-I A Superintending Engineer (D-I) heads this cell. The cell is responsible to look after the works of National Highways. Besides Store Purchase, legal/ court cases are also handled by it, This cell also deals with Codes & Manuals, Works specification, revision of Schedule of Rates, updating of cost indices for whole of the state. DESIGN CELL-II (WORLD BANK) A Superintending Engineer controls this cell. At present this cell is looking after the works of Pradhan Mantri Gram Sadak Yojna (PMGSY). DESIGN CELL-III A Superintending Engineer controls this cell. A Senior Research Officer also works under this cell and this cell also examines the Quality Control aspects of works of Shimla Zone. The execution of all roads and bridge works of Shimla Zone including their estimating and tender processing are also handled by this cell. DESIGN CELL DHARAMSHALA One Superintending Engineer (D) assisted by three Executive Engineers and requisite subordinate staff functions at Dharamsala under the control of Chief Engineer (Kangra) to deal with the above subject except Planning Codes and Specification, Schedule of Rates etc. which are handled by design wing at Shimla. DESIGN CELL MANDI One Superintending Engineer (D) assisted by two Executive Engineers and requisite subordinate staff functions at Mandi under the control of Chief Engineer (MZ) to deal with the above subject except Planning Codes and Specification, Schedule of Rates etc. which are handled by design wing at Shimla. DESIGN CELL HAMIRPUR

Page 143: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

141

One Superintending Engineer (D) assisted by two Executive Engineers and requisite subordinate staff functions at Hamirpur under the control of Chief Engineer (HZ) to deal with the above subject except Planning Codes and Specification, Schedule of Rates etc. which are handled by design wing at Shimla. HPRIDC The Govt. has also decided to implement the World Bank State Road Project through HPRIDC for which following posts of HPPWD have been decided to be utilized for implementation of projects as part of HPPWD cadre:- 1. Chief Engineer-cum-PD 1 No. 2.Superintending Engineer 1 No. 3.Social Development officer 1 No. 4.Executive Engineer 7 Nos. 5.Assistant Engineer 13 Nos. 6.Planning Assistant 1 No. 7.Junior Engineer 13 Nos. 8.HDM/Draughtsman 3 Nos. 9.Sr.Assistant/ Jr.Assistant 8 Nos. 10.Accounts( Sr.Asstt./Jr.Asstt. 3 Nos. /Clerks) 11.Comp. Operator/ Steno 12 Nos. 12.Private Secretary/ Personal Asstt. 2 Nos. 13.Record keeper 1 No. 14.Naib Tehsildar 2 Nos. 15.Kanoongo 3 Nos. 16.Patwari 8 Nos. 17.I.T. Personals 2 Nos.

Page 144: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

142

ANNEXURE-I DETAILED OF CIRCLE/ DIVISIONS/SUB DIVISIONS OF HPPWD

ANNEXURE-A DETAIL OF CIRCLES/DIVISIONS/SUB-DIVISION IN HP. PWD.

DETAIL OF CIRCLES/DIVISIONS/SUB-DIVISION IN HP. PWD. AS ON 31.03.2011.

SR. NO.

NAME OF OFFICE NAME OF DIVISION NAME OF SUB-DIVISION.

(SHIMLA ZONE)

1. 3RD CIRCEL SOLAN 1. SOLAN DIVISION

1. SOLAN

2. OCHGHAT 3. KANDAGHAT 4. SOLAN (HORTICULTURE) 5. DHARAMPUR (Mech.) 2. KASAULI 1. KASAULI 2. SABATHU 3. PARWANOO 3. NALAGARH 1. NALAGARH 2. RAMSHAHAR 3. BADDI 4. ARKI 1. ARKI 2. KUNIHAR 3. DHARLAGHAT

2. 4TH CIRCLE SHIMLA 1. SHIMLA DIVN. NO. I

1. SHIMLA SUB-DIVISION NO. I

2. SHOGHI 3. JUNGA 2. SHIMLA DIVN.

NO.II 1. JATOGH

2. VIDHAN SABHA 3. SHIMLA S/DIVN. NO. VIII. 4. MEDICAL COLLEGE SUB-DIVN

SHIMLA.

3. SHIMLA DIVN. 1. SHIMLA S/DIVN. NO.II

Page 145: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

143

NO. III 2. SHIMLA S/DIVN. V 3. SHIMLA S/DIVN NO. VII 4. SHIMLA S/DIVN NO. IX. 4. THEOG 1. MATIANA 2. THEOG 3. SAINJ

3. 11TH CIRCLE

RAMPUR 1. RAMPUR 1. RAMPUR S/DIVN. NO.I

2. NANKHARI NO. II 3. SARAHAN 4. NIRTH (HORT.) 5. TAKLECH 6. PROJECT S/DIVN. RAMPUR 2. KUMARSAIN 1. KUMARSAIN 2. THANEDHAR 3. SUNI 4. JALOG 3. KALPA 1. KALPA 2. R/PEO 3. POOH 4. MOORANG 4. BHAWANAGAR 1. TAPRI 2. PONDA 3. SANGLA 4. PROJECT S/DIVN. BHAWA NAGAR 5. SPITI DIVISION

AT KAZA 1. HURLLING

2. SICHLING 3. KAZA 4. LOSSAR 6. OUTER SERAJ

DIVN. NIRMAND 1. NIRMAND

2. ANNI 3. NEETHER 4. BROW 5. PROJECT S/DIVN. DALASH

Page 146: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

144

7. MECH. DIVN. RAMPUR

1. RAMPUR (MECH.)

2. BHAWANAGAR (MECH.) 3. KAZA(MECH.) 4. KUMARSAIN (MECH.) 5. R/PEO (MECH.)

4. 12TH CIRCLE NAHAN 1. NAHAN 1. NAHAN S/DIVN. NO. I 2. DADAHU 3. MECH. S/DIVN. NAHAN 2. PAONTA 1. DHAULAKUAN 2. PAONTA S/DIVN. NO. I 3. PAONTA S/DIVN. NO II 3. RAJGARH 1. RAJGARH 2. HABBAN 3. SARAHAN 4. DILMAN 5. PROJECT S/DIVN. RAJGARH 4. SANGRAH 1. HARIPURDHAR 2. RANUKA 3. NAURADHAR 4. PROJECT S/ DIVN. SANGRAH 5. SHILLAI 1. KAMRAO 2. SHILLAI 3. SATAUN 4. MEENUS 5. PROJECT S/DIVN. SHILLAI

5. 14TH CIRCLE ROHRU

1. ROHRU 1. CHIRGAON

2. TIKKAR. 3. ROHRU 4. PROJECT S/DIVN. NO. I ROHRU 2. JUBBAL 1. JUBBAL 2. KOTKHAI 3. KALBOG 4. SARASWATI NAGAR. 3. DODRAKAWAR 1. DODRAKWAR S/DIVN. NO. I 2. PROJECT S/DIVN. LAROT

Page 147: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

145

4. CHOPAL 1. CHOPAL 2. NERWA 3. KUPVI 4. PROJECT S/DIVN. NERWA 5. PROJECT S/DIVN. CHOPAL 5. MECH. DIVN.

ROHRU 1. MECH. S/DIVN ROHRU

2. –DO- KOTKHAI 3. –DO- NERWA

6. MECHNICAL CIRCLE SHIMLA (UNDER THE CONTROL OF E-IN-C)

1. MECH. DIVISION SHIMLA

1. MECH. S/DIVN. NO. II SANJAULI (BHATAKUFAR)

2. STEEL BRIDGE CONST. DHALLI 3. MECH. S/DIVN TARADEVI 2. MECH. DIVN.

BILASPUR 1. MECH. BILASPUR

2. –DO- HAMIRPUR 3. –DO- PARCHHU 4. –DO- UNA

7. (i) 1st ELECTRICAL CIRCLE KASUMPTI SHIMLA (UNDER THE CONTROL OF E-IN-C

1. ELECT. DIVN. NO. I KASUPTI

1. ELECT. S/DIVN. VIDHAN SABHA

2. ELECT. S/DIVN NO. II KASUPTI 3. ELECT. SOLAN 4. ELECT. NAHAN 2. ELECT. DIVN.

NO. II SHIMLA 1. ELECT. S/DIVN. SNOWDON

2. –DO- RAMPUR 3. –DO- THEOG 4. –DO R/PEO 3. ELECT. DIVN

MANDI 1. ELECT. MANDI

2.–DO-SUNDERNAGAR 3. –DO- KULLU 4. UDAIPUR

Page 148: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

146

(ii) 2nd ELECTRICAL CIRCLE DHARAMSHALA, KANGRA (UNDER THE CONTROL OF E-IN-C

1. ELECT. DIVN. UNA

1. ELECT. S/DIVN. BILASPUR

2. –DO- UNA 3. –DO- HAMIRPUR 2. ELECT. DIVN.

PALAPUR 1. ELECT. S/DIVN. PALAMPUR

2. –DO- CHAMBA 3. –DO- DHARAMSHALA 4. –DO- NURPUR 5. –DO- DEHRA 6. ELECT. S/DIVN. TANDA

8. (ARBITRATION CIRLCE SOLAN)

- -

(KANGRA ZONE DHARAMSHALA)

1. 5TH CIRCLE PALAMPUR

1. DHARAMSHALA 1. D/SHALA S/DIVN. NO. I

2. –DO- NO. II 3. NAGROTA 4. PROJECT S/DIVN. D/SHALA 2. PALAMPUR 1. PALAMPUR 2 BHWARNA 3 DHERA 4 PROJECT S/DIVN. DARANG

(KANGRA) 3. KANGRA 1. KANGRA 2. SHAHPUR 3. LUNJ 4. GAGGAL 5. PROJECT S/DIVN. KANGRA 4. MECH. DIVN.

D/SHALA 1. MECH. S/DIVN. NO. I D/SHALA

2. –DO – NO. II D/SHALA 3. –DO- NURPUR 5. BALAKRUPI 1. JAISIGHPUR S/DIVN.

Page 149: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

147

DIVN., HP. PWD (DISTT.KANGRA)

2. THRUAL S/DIVN. 3. BALAKRUPI S/DIVN.

2. 7TH CIRLCE DALHAOUSIE

1. CHAMBA 1. S/DIVN. NO. I CHAMBA

2. –DO- NO. II CHAMBA 3. TISSA 4. TRELLA S/DIVN. BAIRAGARH 5. PROJECT S/DIVN. CHAMBA 6. MECH. S/DIVN. CHAMBA 2. SALOONI 1. SALOONI 2. BHALAI 3. KOTI 4. PROJECT S/DIVN. SALOONI 3. DALHOUSIE 1. DALHAOUSIE 2. CHOWARI 3. BANIKHET 4. SIHUNTA 5. PROJECT S/DIVN DALHOUSIE 4. PANGI DIVN. AT

KILLAR 1. KILLAR S/DIVN. NO. I

2. SACH 3. STORE S/DIVN SHOUR 5. BHARMOUR 1. HOLI 2. RAKH 3. BHARMOUR 4. GAROLA

3. 9TH CIRCLE NURPUR

1. NURPUR 1. NURPUR

2. REHAN 3. SULYALI 2. FATEHPUR 1. FATEHPUR 2. INDORA 3. DHEMTA 4. BADUKHAR 3. DEHRAGOPIPUR 1. DEHRA

Page 150: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

148

2. JWALAMUKHI 3. DADASIBA 4. PARAGPUR 4. JAWALI 1. JAWALI 2. KOTLA 3. NAGROTA (MANDI ZONE, MANDI)

1. IST CIRCLE MANDI

1. GOHAR 1. GOHAR

2. JANJEHLI 3. BALICHOWKI 2. MANDI DIVN. NO.

II 1. KOTLI

2. S/DIVN. NO. IV MANDI

3. REWALSAR 4. CHAKKAR 5. S/DIVN. NO III MANDI

3. KARSOG 1. KARSOG 2. CHURAG 3. PANGNA 4. CHATTRI 5. PROJECT S/DIVN. KARSOG 4. SUNDERNAGAR 1. SUKET 2. PROJECT S/DIVN. SUNDERNAGAR 3. –DO- DHANOTU 2 JOGINDERNAGAR

CIRCLE 1. JOGINDERNAGAR DIVISION

1. LADDHARBHROL

2. JOGINDERNAGAR 2. MANDI DIVN. NO. I

AT PADHAR 1. S/DIVN. NO. I PANARSA

2. PADHAR 3. BRIDGE CONST. S/DIVN. KAMAND 4. HORTICULTURE S/DIVN. PANDOH 5. PROJECT S/DIVN. MANDI 3. BAIJNATH 1. BAIJNATH

Page 151: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

149

2. PANCHRUKHI 3. PROJECT S/DIVN. BAIJNATH 3. 6TH CIRCLE

KULLU 1. KULLU DIVN. NO. I 1. BHUNTAR

2. BANJAR 3. MANIKARAN 4. PROJECT S/DIVN. KULLU 2. KULLU DIVN. NO.

II 1. MANALI

2. SUB/DIVN. NO. I KATRAIN 3. SUB-DIVN. NO. III KULLU 4. PROJECT SUB/DIVN. SHAMSHI 3.CHENAB VALLY

DIVN. UDAIPUR 1. KEYLONG

2. UDAIPUR

3. SISSU S/DIVN. KOKSAR 4. MECH. S/DIV. KARGA 4. MECH. DIVN.

KULLU 1. MECH. S/DIVN. NO. I SHAMSHI

2. –DO- NO. II SHAMSHI 3. –DO- MANDI 4. –DO- JOGINDERNAGAR (HAMIRPUR ZONE, HAMIRPUR) 1. 8TH CIRCLE

HAMIRPUR 1. HAMIRPUR DIVN 1. HAMIRPUR

2. NADAUN 3. SUJANPURTIHRA 2. BARSAR 1. BARSAR 2. BHORANJ 3. DHENTA 4. PROJECT S/DIVN BHOTA

3. TAUNI DEVI 1. TAUNI DEVI 2. SAMIRPUR 3. LAMBLOO

Page 152: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

150

4. SARKAGHAT 1. SARKAGHAT 2. BALDWARA 5. DHARAMPUR 1. DHARAMPUR 2. MANDAP 3. MARHI 4. TIHRA 2. 10TH CIRCLE

BILASPUR 1. BILASPUR DIVN. NO. I

1. S/DIVN. NO. II BILASPUR

2. BARRI 3. HORTICULTURE S/DIVN.

BILASPUR 2. BILASPUR DIVN.

NO. II 1. NAMHOL

2.SWARGHAT 3. NAINADEVI JI 4. S/DIVN. NO. III BILASPUR 3. GHUMARWIN 1. GHUMARWIN 2. BARTHI 3. BHARARI 4. PROJECT S/DIVN. KALOL

3. 15TH CIRCLE UNA 1. UNA 1. S/DIVN NO. I UNA 2. –DO- NO. II MEHATPUR 3. TAHLIWALA 2. BHARWAIN 1. BHARWAIN 2. GAGRET 3. AMB 3. BANGANA 1. BANGANA 2. JOLE

(NATIONAL HIGHWAY ) 1. SHAHPUR

CIRCLE 1. JOGINDERNAGAR 1. GUMA

2. BAIJNATH 3. SHAHPUR 4. NURPUR 5. DARANG (MANDI)

Page 153: NOTIFICATION - hppwd.gov.inhppwd.gov.in/Links/ARRTI2011.pdf · 2 . information regarding implementation of section 4(1) of the right to information act 2005 pertaining to public works

151

2. PANDOH 1. KULLU 2. KATRIAN 3. PANDOH 4. KOTLI 3. HAMIRPUR 1. AMB 2. JWALAMUKHI 3. SAMIRPUR 4. JUKHALA 2. NH CIRCLE

SHIMLA 1. RAMPUR 1. NARKANDA

2. RAMPUR 3. JEORI 4. NEGUNSARI 2. SOLAN 1. NALAGARH 2. CHAMBAGHAT 3. DHALLI 4. SHALAGHAT 5.DHAULAKUAN (NOW MAJRA) 6. NH SUB-DIVN. SHILLAI


Recommended