+ All Categories
Home > Documents > November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project.

November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project.

Date post: 06-Jan-2016
Category:
Upload: sevita
View: 27 times
Download: 2 times
Share this document with a friend
Description:
Announcements. November 6 th Exam November 13 th Tom Rossby Seminar Early Dec– Class Project. Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link : http://marine.rutgers.edu/dmcs/ms451/2006/exam/ - PowerPoint PPT Presentation
Popular Tags:
14
ovember 6 th Exam ovember 13 th Tom Rossby Seminar arly Dec– Class Project. problem 2 answer key is posted course website? I promised them ll have it by today. Here is the direct link //marine.rutgers.edu/dmcs/ms451/2006/exam/ Donglai Announcements
Transcript
Page 1: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

November 6th Exam

November 13th Tom Rossby Seminar

Early Dec– Class Project.

Exam 1 problem 2 answer key is posted on the course website? I promised them that I'll have it by today. Here is the direct link: http://marine.rutgers.edu/dmcs/ms451/2006/exam/

Thanks. Donglai

Announcements

Page 2: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

fuHt

v

fvHt

u

bysy

bxsx

Solution to these timeDependent equations fora constant wind stress for three different depths

H=100m

H=20m

H=5m

Page 3: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

H=100 meter

fuHt

v

fvHt

u

bysy

bxsx

H=100 meter

Wind turns off after1 inertial period

Page 4: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

H=10 meter

Wind turns off after1 inertial period

fuHt

v

fvHt

u

bysy

bxsx

Page 5: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.
Page 6: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

Drifter Trajectory in North Sea (van Aken DSR 2002)

Page 7: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

Conservation of Angular Momentum (Vorticity!!)

Page 8: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.
Page 9: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

x

z

Baroclinic (Depth Dependent) Pressure Gradient

Page 10: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

Density from RU COOL Glider Across NJ Shelf

Page 11: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

Thanks to Paul Linden.

Page 12: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-15

-10

-5

0

m

20 25 30 35 40 45 50 55 60-20

-10

0

m

km north of the Battery

Along Channel salt/dye sections

Dye Conc10-11

May 4th

May 6th

May 7th

May 8th

Page 13: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

10,000 particles on a Random Walk

Page 14: November 6 th   Exam  November 13 th  Tom Rossby Seminar Early Dec– Class Project.

2-D Random walk2-D Random Walk with Advection


Recommended