PRESENTATION FOR THE COURSE
CURRENT AFFAIRS WORKSHOP
EMPLOYMENT GUARANTEE AND THE RIGHT TO WORK
SHIVRAJ SINGH NEGI KOMMU VENKATA RAVI SHANKARS. DEEPUK
04/13/2023 2
POVERTY IN INDIA The India State Hunger Index 2008 by
the International Food Policy Research Institute. Punjab has the best nutritional situation, whereas malnutrition in Madhya Pradesh is worse than in Ethiopia or Sudan.
Percent of population living under the poverty line, which is 356.35 rupees or around $7 a month in rural areas.
04/13/2023 3
Employment Guarantee Act: The Basic Idea
The Employment Guarantee Act is a step towards the right to work, as an aspect of the fundamental right to live with dignity
04/13/2023 4
The right to work as a “fundamental right”
The “right to life” is a fundamental right of all citizens under Article 21 of the Indian Constitution.
“Right to life… includes the right to live with human dignity, it would include all these aspects which would make life meaningful, complete and living.” (Supreme Court)
04/13/2023 5
The right to work in the “Directive Principles” of the Constitution“The State shall… direct its policy
towards securing that the citizen, men and women equally, have the right to an adequate means of livelihood…” (Article 39A)
“The State shall … make effective provision for securing the right to work…” (Article 41)
04/13/2023 6
NREGA 2005 in a Nutshell
The National Rural Employment Guarantee Act 2005 is a law whereby:any adult who is willing to do unskilled manual work at the minimum wageis entitled to being employed on local public works within 15 days of applying.
04/13/2023 7
Employment Guarantee Scheme (EGS)
Each State has to launch an “employment guarantee scheme” within six months of the Act coming into force.
04/13/2023 8
EGS: Basic Implementation Principles
Block is the basic unit of implementation.
In each Block, a “Programme Officer” is to coordinate the implementation of EGS
Gram Panchayats are the main implementing agencies.
Accountability to Gram Sabhas.
04/13/2023 9
EGS: Implementing agencies Gram Panchayats (half of EGS works) Other Panchayati Raj Institutions (PRIs) Line departments (PWD, Forest Dept.) NGOs.
Note: Private contractors are banned.
04/13/2023 10
EGS: Decentralised planning
Programme Officer to maintain shelf of projects, based on proposals from the implementing agencies.
Gram Panchayats also supposed to prepare a shelf of works based on the recommendations of the Gram Sabha.
04/13/2023 11
EGS: Permissible works
Minor irrigation Water conservation, drought proofing, desilting of tanks, flood control, etc.
Land development Rural roads “Any other work which may be notified by the Central Government in consultation with the State Government”
04/13/2023 12
EGS is a “demand driven” programme
Employment to be provided on demand, within 15 days.
Programme Officer sanctions projects to ensure that all applicants get work.
Programme Officer to arrange payment of unemployment allowance to those who don’t get work.
04/13/2023 13
EGS: Applying for work
Step 1 (Registration): Gram Panchayat to “register” interested households, to facilitate advance planning.
Step 2 (Application): Adult members of registered households apply for work.
04/13/2023 14
EGS: The Registration Process
Unit of registration is the household.
Gram Panchayat to issue a “job card” to each applicant.
Special meeting of Gram Sabha to be held to invite applications.
04/13/2023 15
EGS: The Application Process
Any adult member of a registered household can apply for work at any time.
Applications should be for at least 14 days of continuous work.
Advance applications are allowed.
04/13/2023 16
EGS: Wage-material ratio
Wage-material ratio should not be less than 60:40
Wages of skilled and semi-skilled labourers to be included in material costs
04/13/2023 17
EGS: Cost sharing
Central Government to pay for: wage costs, 75% of material costs, and some administrative costs.
State governments to pay for: 25% of material costs other administrative costs, unemployment allowance.
04/13/2023 19
The National Employment Guarantee Act.,2005
Registration for Employment.
The adult member of every House hold who – Reside in rural area ; and Are willing to do unskilled
manual work may apply for registration of their household for issuance of Job Card.
04/13/2023 20
Employment in the scheme Within 15 days of receipt
of an application and within a radius of 5 kms. from their place of residence
AND If Employment is not
provided within 15 days of receipt of his application
he shall be entitled to a daily Unemployment allowance.
04/13/2023 21
Unemployment allowances Rates
For First 30 days
For the remaining period of the Financial year
Employment wage + Unemployment
allowance
One fourth of the wage rate.
Not less than one half of the wage rate
Equal to the wages for 100 days of work in a financial year
04/13/2023 22
Minimum Wage
A person working for 7 hours would normally earn a wage equal to a wage rate
Minimum wage fixed by the state Government under section 3 of the minimum wage Act,1948
Wage rate is fixed by the Central Govt.
Shall not be at a rate of less than Sixty rupees per day .
04/13/2023 23
Type of works under the scheme Water conservation and Water
harvesting Drought proofing(Aforestation
and tree plantation) Irrigation canals Provision of irrigation facility to
land owned by SC/ST/beneficiaries under Indira Aawas Yozna
Renovation of traditional water bodies
De-silting of tanks Land development
04/13/2023 24
Type of works under the scheme Flood control and
protection works including drainage in water logged areas
Rural connectivity to provide all weather access
Other works notified by the Central/State Government
04/13/2023 25
Application for work
Sarpanch/ward panch
Programme Officer
At Gram panchayat Level
At Block/Tehsil /Taluka Level (appointed specially for this scheme) GP/PO shall be bound to accept the valid
applications and to issue a dated receipt to the applicant .
04/13/2023 26
Employment Card
Gram Panchayat will issue a Job Card after registration
Job card containing the details of adult members of household such as ; Names ,age ,address and photographs.
Registration will be made for five years and may be renewed from time to time.
04/13/2023 27
Availability of employment Applicants will be
intimated by written letter and a public notice will be displayed at the office of GP and PO.
Priority shall be given to women and in such a way that at least one third of the beneficiaries shall be women.
04/13/2023 28
Availability of employment Continued………
Employment shall be provided within a radius of 5 Kms. from their residence.
If Employment is provided outside 5 Kms., it must be provided within Block with 10 % extra wage to meet additional transportation and living expenses.
04/13/2023 29
Facilities for laborers at work site
Safe drinking waterShade for children
and periods of restFirst-aid Box for
emergency treatment and minor injuries
Health hazards connected with work to be provided
04/13/2023 30
Facilities for laborers at work site
Depute one woman worker to look after five or more children below the age of six years of women laborers
Deputed woman shall be paid wage rate
04/13/2023 31
Gender-related provisions
Equal wages for women and men in all circumstances.
No gender discrimination of any kind.
Priority for women in the allocation of work: at least 33% of labourers should be women.
04/13/2023 32
Serious accidents at work site If any person employed under the scheme is or
child accompanying any person injured ; he/she shall be entitled to free of charge medical treatment
During the period of hospitalization of injured worker Accommodation, treatment and medicines Half of the wage per day to be paid to injured person
04/13/2023 33
Serious accidents at work site continued………..
If a person employed under a scheme dies or becomes permanent disabled by the
accident at site The legal heirs of the deceased or the
disabled shall be paid an ex gratia payment at the rate of Rs.25000 By the Central government.
04/13/2023 34
Wage payment of laborers
The wage under a scheme may be paid either wholly in cash or, in cash and kind But at least one fourth of the wages shall be paid in cash
only All payment of wages in cash and UA shall be
made to concerns in the presence of independent persons of the community on pre-announced dates.
04/13/2023 35
Wage payment to laborers Continued…….
The disbursement of daily wages Weekly basis or in any case not later than a fort night
specified under the scheme.
Laborers shall be entitled to receive payment of compensation as per the provisions of payment of wages Act,1936
04/13/2023 36
Selection of works,prepare project proposals and execution of works
The Gram Panchayat shall be responsible for Identification of projects in the GP area and prepare a development plan as recommended by Gram Sabha and ward Sabha
04/13/2023 37
Selection of works,prepare project proposals and execution of works
Gram Panchayat shall
Maintain a shelf of possible works to be taken up as and when demand for work arises
Execution and supervision of such works
04/13/2023 38
Sanctions and allotment of works
Programme officer (Not below the rank of BDO at block level)
GP shall forward its proposals in the order of priority to PO for approvals
PO shall allot at least 50% works in terms of cost to be implemented through GP
PO shall supply each GP MRs for the
worksA list of
employment opportunities.
04/13/2023 39
Social Audit “Hamara Paisa, Hamara Hisaab!”
All NREGA-related documents to be available for public scrutiny.
Copies of documents to be made available at nominal cost.
Muster rolls to be pro-actively displayed at Panchayat Bhawan.
Documents can also be obtained under the Right to Information Act.
04/13/2023 40
Social Audit “Hamaara Paisa, Hamara Hisaab”
The Gram Panchayat Shall make available all relevant documents;MRs,bills,vouchers,MBs, Sanction orders and other books of accounts and Paper to the Gram Sabha for the purpose of social Audit.Gram Sabhas to conduct social audits of all works
taken up within Gram Panchayat
All relevant documents to be provided to the Gram Sabha by the Gram Panchayat and other implementing agencies
04/13/2023 41
Social Audit continued….. “Hamaara Paisa, Hamara Hisaab”
The Gram Sabha Shall monitor the execution of works within the GP
Shall conduct regular social audit of all the works done by GP
04/13/2023 42
Social Audit continued….. “Hamaara Paisa, Hamara Hisaab”
All efforts should be made to ensure transparency and accountability
All accounts and records relating to work shall be made for public scrutiny
A copy of Muster Rolls of every work shall be made available in the office of PO and GP for inspection by any person after paying such fee
04/13/2023 43
Social Audit continued….. “Hamaara Paisa, Hamara Hisaab”
The DPO, PO and GP shall prepare annually report containing the facts and figures and achievements relating to scheme within its jurisdiction
All the above documents shall be made available to the public on demand and on payment of prescribed fees.
04/13/2023 44
Machines and Contractors are Banned
The Scheme shall not permit engaging any contractor for implementation the project under this scheme
Works under this schemes shall be performed by using manual labor and not by machines
04/13/2023 45
Grievance Redressal Mechanism The State Government shall makes rules
and regulations to deal with any complaint at block and the District level
If any dispute or complaint arises the scheme by GP the matter shall be referred to PO
The PO shall enter every complaint in a complaint register and shall dispose the disputes and complaints within 7 days of its receipt.
04/13/2023 46
How is NREGA doing?(200 districts, 2006-7)
04/13/2023 47
NREGA: Fundamental Principles
Employment on demand.Legal right.Universal entitlement.Participatory approach.Accountability to PRIs.Full transparency.
04/13/2023 48
NREGA: Basic Entitlements
Employment within 15 days of application. Unemployment allowance. Work within 5 kilometres. Minimum wages. Payment within 15 days. No gender discrimination. Basic worksite facilities.
04/13/2023 49
NREGA: Employment Generation, 2006-7
Total: 90 crore person-days
Per job card: 24 person-days
Per rural household: 17 person-days
Minimum “requirement”:a 200 crore person-days
a NAC estimate, 2004.
04/13/2023 50
NREGA Expenditure, 2006-7
Total: Rs. 8,813 crores
Per district: Rs. 44.06 crores
Estimated requirement for 200 districts: Rs. 20,000 crores
Budget allocation for 2007-8 (330 districts): Rs. 13,000 crores
04/13/2023 51
Number of NREGA works, 2006-7
Taken up: 8.3 lakh
Completed: 3.8 lakh
In progress: 4.5 lakh
Approximate number ofvillages in NREGA districts: 2 lakh
04/13/2023 52
NREGA Employment, 2006-7: Person-days per rural household
Rajasthan 77 Uttar Pradesh 11
Assam 70 Andhra Pradesh 10
Madhya Pradesh 56 Haryana 9
North-Easta 45 Tamil Nadu 9
Chhattisgarh 34 Bihar 8
Orissa 21 Gujarat 7
Himachal Pradesh 20 Punjab 7
Uttarakhand 20 West Bengal 6
Karnataka 17 Maharashtra 4
Jharkhand 14 Kerala 3
Jammu & Kashmir 13 INDIA 17
a Except Assam (approximate figure, based on incomplete data).
04/13/2023 53
Person-days per rural household
04/13/2023 54
Share of Disadvantaged Groups in NREGA Employment
Women: 40%
Scheduled Tribes (ST): 36%
Scheduled Castes (SC): 26%
SC/ST Combined: 62%
04/13/2023 55
Share of Women in NREGA Employment
National average: 40%
Highest shares: Tamil Nadu 81%Rajasthan 67%Kerala 66%Andhra Pradesh 55%
Lowest shares: Bihar 17% Uttar Pradesh 17% Himachal Pradesh 12% Jammu & Kashmir 4%
04/13/2023 56
Share of Women in NREGA Employment
04/13/2023 57
Average Expenditure and Labour Costs
Average Expenditure per Person-Day Rs. 98
Share of Wages in Total Expenditurea 66%
Average Wage Cost per Person-Daya Rs. 64
aUnskilled labour only.
04/13/2023 58
Average Wage Cost per Person-Day
Kerala 121 Jammu & Kashmir 69
Maharashtra 104 Assam 67
Haryana 97 Karnataka 67
Punjab 94 North-Easta 63
Andhra Pradesh 86 Chhattisgarh 63
Jharkhand 80 Madhya Pradesh 59
Tamil Nadu 80 Uttar Pradesh 56
Uttarakhand 72 Gujarat 56
Bihar 70 Orissa 53
West Bengal 70 Rajasthan 51
Himachal Pradesh 69 INDIA 64
a Except Assam (approximate figure, based on incomplete data).
04/13/2023 59
NREGA: Employment and Wages, 2006-7
0
20
40
60
80
100
120
140
0 10 20 30 40 50 60 70 80 90
Person-days of work per rural household
Wag
e ra
te (
Rs/
day
)
04/13/2023 60
CDE-IHD Survey, 2007
A field survey of NREGA was recently conducted by the Centre for Development Economics (CDE) and the Institute of Human Development (IHD), with students from Delhi University and Jawaharlal Nehru University.
Date: May-June 2007 Survey Districts: Ranchi (Jharkhand)
Surguja (Chhattisgarh) Number of Gram Panchayats:23 Number of worksites: 47
04/13/2023 61
Surguja: Positive Findings
Most families have a job card.Awareness levels have improved.Employment on a massive scale.Minimum wages are being paid.Contractors have disappeared.
Most of the works are productive.Corruption levels have gone down.
Where there is work, NREGA is a lifeline for the rural poor.
Massive progress compared with earlier years!
04/13/2023 62
Surguja: Areas of Concern
Work is not “demand-driven”. Long delays in wage payments. Shortage of staff at all levels. Poor worksite facilities (e.g. creches). Violations of the transparency
safeguards. Corruption persists.
04/13/2023 63
Survey Findings: Application Process
Were most labourers at this worksite employed in response to an application for work?
RanchiSurguja
Yes 4% 11%
No 96% 89%
04/13/2023 64
Survey Findings: Wage Payments
Proportion (%) of worksites where:Ranchi Surguja
Most labourers earned the minimum wage n/a 84
Wages were paid in front of the labourersa 54 79
Wages were paid within 15 days32 16
Labourers had complaintsabout wage payments 71 90a Excluding payments through Banks
04/13/2023 65
Survey Findings: Worksite Facilities
Proportion (%) of worksites with the following facilities:
Ranchi Surguja
Drinking water 64 100
Shade for periods of resta 68 (16)
“Medicine kit” 68 59
Crèche 4 11
a Not including natural shade.
04/13/2023 66
Survey Findings:Vigilance Committees
Proportion (%) of worksites with:
Ranchi Surguja
Vigilance committee 8984
Active vigilance committee 1121
04/13/2023 67
Survey Findings:Estimated “Leakages”
Earlier surveys:
Dungarpur, April 2006: (negligible)Garhwa, October 2006: 85%
CDE-IHD survey:
Ranchi 33%Surgujaa 5%
a Gram Panchayat works.
04/13/2023 68
The Future of NREGA: Critical Issues
Activating the work application process. Implementation of transparency safeguards Timely wage payments. Need for a wage policy. Women’s participation. Redressal systems!
04/13/2023 69
NREGA and Party Politics
04/13/2023 70
THANKS