NRT, CDM and Safety Central Update
Transcript

NRT, CDM and Safety Central

Update

Where we are as of April 2016

• NRT has completed the rollout of its CDM 2015 Briefing Sessions – 200+ people have been briefed

• In support of this it has also completed a total review of all the documents and templates that were provided to:

– assist delivery teams – aid compliance with the law and our

own standards

• All documents take fully into account our experiences over the last 12 months

• They are now on Safety Central and appear in the order in which they should be considered if you’re setting up a project.

The NRT page on Safety Central.

First, our own new management procedure

• This document explains how NRT

meets its obligations under CDM

• It is new and having been formally

issued it is now on Safety Central

• It affects everyone that is involved at

any stage of a project’s delivery

• It contains valuable guidance

• It has been signed off at the highest

level so compliance with it is expected.

Managing CDM in Network Rail

Telecom.

The CDM Compliance Checklist

• It’s new - it is taken from the Management Procedure featured on the previous slide

• It gives a Project Manager a simple checklist of what is needed to deliver a project that is compliant with CDM 2015

• It is a deliverable for every project with effect from now

• The items in the checklist are also deliverables.

The CDM Compliance Checklist.

4

The NRT Construction Assessment & Checklist

Documentation

Is it

a c

onst

ruct

ion

activ

ity?

F10

**

Prin

cipa

l Con

tract

or's

Li

cenc

e (o

r sup

ervi

sion

by)

Pre

-Con

stru

ctio

n In

form

atio

n P

ack

(Sup

plie

d by

NW

R)

Con

stru

ctio

n P

hase

H

ealth

& S

afet

y P

lan

Qua

lity

Pla

n

Suppliers Only project works

Suppliers Only maint works

Network Rail Only

Anc

illar

y P

aper

wor

k /

Lice

nces

etc

.

Env

ironm

enta

l Im

pact

s &

Asp

ects

/ R

isk

Reg

iste

r (S

uppl

ied

by N

WR

)

Env

ironm

enta

l M

anag

emen

t Pla

n

Was

te M

anag

emen

t Pla

n

Task (click + to the left to expand that section)

Wor

k Pa

ckag

e Pl

an

Task

Brie

fing

Shee

t

Ris

k As

sess

men

t

Met

hod

Stat

emen

t

Task

Ris

k C

ontro

l She

et

Wor

k Ac

tivity

R

isk

Asse

ssm

ent

Construction/Installation tasks Y Any excavation Y ü ü ü ü ü ü ü ü ü ü ü

Troughing routes / cable trays Y ü ü ü ü ü ü ü ü ü ü ü Cable pulling Y ü ü ü ü ü ü ü ü ü ü ü

Concrete bases Y ü ü ü ü ü ü ü ü ü ü ü Location cabinets Y ü ü ü ü ü ü ü ü ü ü ü

Masts Y ü ü ü ü ü ü ü ü ü ü ü Transmitters Y ü ü ü ü ü ü ü ü ü ü ü

Power supplies Y ü ü ü ü ü ü ü ü ü ü ü Fibre optic inc. connecting / splicing Y ü ü ü ü ü ü ü ü ü ü ü

Signal post telephones Y ü ü ü ü ü ü ü ü ü ü ü Customer information systems Y ü ü ü ü ü ü ü ü ü ü ü

Level crossing telephones Y ü ü ü ü ü ü ü ü ü ü ü DOO CCTV Y ü ü ü ü ü ü ü ü ü ü ü

Fixed cabinet for any of the above Y ü ü ü ü ü ü ü ü ü ü ü

5

This new spreadsheet defines what is and isn’t “construction” so you can see: • if CDM applies – which in turn influences whether or not you need a Principal Designer or Principal Contractor • what documentation is needed to control risk and demonstrate compliance.

The NRT Construction Assessment and Checklist.

Competency assessments

• We have processes to assess the competence of anyone acting as a “representative” for the Client and / or the Principal Designer

– NRT Client Reps Point of Contact Assessment Record

– NRT Principal Designers Reps Point of Contact Form.

• These two forms are substantially unchanged – only the front pages are updated to include a few more details about the person being appointed.

6

NRT RACI Chart and CDM Plan

• Precisely how we deliver a project and exactly who is responsible for doing what is described in two documents:

– NRT Client RACI Chart

– NRT CDM Plan.

• Both templates have been updated

• Both should be reviewed at the commencement of any project to make sure that the contents “fit” what is proposed.

7

Before a project starts ….

8

• At the start of every project we have to agree with the National Records Group what we are going to hand over in the Health and Safety File at the end of the work

• The form that is the basis of that process is

NRT H&S Document File Matrix.

• For every project we provide our contractor with project and site-specific details

• The document that is used is the NRT Pre-Construction Information Pack

• This is a template that must be reviewed to ensure it is project-specific.

Site Surveys and Designs

9

• Contractors should always survey any site they are going to work at

• We have provided a template to record such surveys

• It is mandated in the Pre-Construction Information Pack

NRT Pre-Work Survey Checklist.

• Safety is a major consideration in the design phase of any project

• Things that should / shouldn’t feature in a design are highlighted in a checklist

NRT Red, Amber, Green Design Checklist.

Summary

• NRT has its own suite of documents that are designed to help anyone managing a project

– deliver it in accordance with Network Rail Standards

– comply with the Construction (Design and Management) Regulations, 2015

• They can all be found on Safety Central

• Most of them are templates – they are substantially completed on your behalf but they should all be reviewed at the start of the project to make sure they are project-specific

• They get reviewed annually or as and when some sort of change occurs

• However, they are “live” documents so suggestions for improvement will be welcome. This applies particularly to:

– the NRT Construction Assessment and Checklist (where we may not have captured all work activities) and

– the NRT Red, Amber, Green Design Checklist (where we continue to learn what is and isn’t desirable from a design point of view).

10

Contacts

Neil Marsh [email protected] 07967 667982

Neil Emmison [email protected] 07917 857221

Simon Budd [email protected] 07515 621215

Ian Lawlor [email protected] 07515 621190

Aaron Neil [email protected] 07515 628241

Stephen Peltier [email protected] 07713 301651

11 CDM Awareness Course - Update Workshop - Issue 1


Recommended