The only official copy of this document is the one online in the NSLS-II Document and Records Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
Doc No: NSLSII-7ID-PRC-001
NSLS-II PROCEDURE: BEAMLINES SST-1 AND SST-2 (7-ID)
RADIATION SURVEY PROCEDURE
January 5, 2018
Rev. 1
S. Chitra
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
ii
ESH Review:
1/10/2018
X Kim WehuntKim WehuntFacility Support RepresentativeSigned by: Wehunt, Kimberly
By signing this Procedure I acknowledge that it complies with all ESH requirements and if performed correctly, will not present a significant hazard to personnel or equipment.
Beamline Review:
1/9/2018
X Cherno JayeCherno JayeSST-1 Lead Beamline ScientistSigned by: Jaye, Cherno
1/10/2018
X Conan WeilandConan WeilandSST-2 Lead Beamline ScientistSigned by: Weiland, Conan
By signing this Procedure I acknowledge that it is comprehensive and can be performed as written at the beamline.
Authorization Basis Review:
1/8/2018
XSteve MossAuthorization Basis ManagerSigned by: Moss, Steven H
By signing this Procedure I acknowledge that a USI Screening/Evaluation has been performed and this Procedure does not adversely impact the NSLS-II Authorization Basis Documents.
Approved:
1/12/2018
XRobert LeeESH ManagerSigned by: Lee, Robert J
By approving this Procedure I agree that the appropriate personnel have reviewed this document and I authorize this work to commence as written.
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
ii
REVISION HISTORY
REVISION SECTION(S) PAGE
DATE List of Reviewers DESCRIPTION
1 All All 05JAN2018
Ackerman, A Benmerrouche, M Broadbent, A Fischer, D Quackenbush, N Robinson, H
First Issue.
ACRONYMS
ALARA As Low as Reasonably Achievable ARM Area Radiation Monitor BSS Bremsstrahlung Shield BST Bremsstrahlung Stop C Center DCM Double Crystal Monochromator DS Downstream EPU Elliptically polarized Undulator ESH Environment, Safety and Health FE Front End FM Fixed Mask FOE First Optical Enclosure FS Fluorescent Screen GB Gas Bremsstrahlung GeV Giga Electron Volts H Horizontal ID Insertion Device IFB Indistinguishable From Background Ln nth Mirror On L Branch. m Meter Mn nth mirror On M Branch. mrad Millirad mrem/hr millirem per hour
NSLS-II National Synchrotron Light Source II PBS Pink Beam Stop PGM Plane Grating Monochromator PSD Photon Science Division PSH Photon Shutter RCT Radiological Control Technician RSC Radiation Safety Components SAF Safety Approval Form SBMS Standards Based Management System SBS Secondary Bremsstrahlung Shield SLT XY Slit SR Synchrotron Radiation SST Spectroscopy Soft and Tender TLD Thermo Luminescent Dosimeter U Undulator US Upstream V Vertical WBS White Beam Stop
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A1
1 PURPOSE AND SCOPE
The purpose of this procedure is to perform a comprehensive commissioning radiation survey on the 07-ID beamline, as directed by PS-C-XFD-PRC-004, NSLS-II Beamlines Radiation Safety Commissioning Plan.
The survey scenarios are covered in the Beamlines SST-1 and SST-2 (07-ID, U42 and EPU60) Comprehensive Commissioning Radiation Survey, provided as Attachment A.
2 PREREQUISITES
2.1 Authorization/approval from the NSLS-II Director to initiate commissioning of the beamline has been received.
2.2 A Beamline System Readiness Checklist has been completed in accordance with PS-C-XFD-PRC-003, Enabling Beamlines for Operations.
2.3 The area(s) around the beamline are posted in accordance with SBMS Program Description: Radiological Control Manual.
2.4 All shutters are closed.
2.5 FE slits are fully open (near maximum extent range).
Note: If FE slits cannot be fully open, record the FE slits parameter here: _________________
2.6 All beamline slits are fully open.
2.7 All mirrors and filters are retracted out from beam.
3 HAZARDS, CONTROLS AND LIMITS
3.1 If at any point during performance of this procedure a radiation dose rate of 5 mrem/hr or higher on contact is identified, the radiation survey shall be terminated and the cause investigated, and any hazards shall be mitigated before continuing.
3.2 Minor deviations on Attachment A are allowed in the field; however the deviation shall be documented and submitted to the PSD Director and the ESH Manager for review after the survey.
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A2
4 PROCEDURE
Note: Execution of this Comprehensive Commissioning Radiation Survey, along with the evaluation of the data collected, may only be used as a basis by the PSD Director and the ESH Manager to approve commissioning activities at an electron beam current of up to 3 times the electron beam current measured during this survey. Approval of commissioning of the beamline at a higher electron beam current requires re-execution of this Comprehensive Commissioning Radiation Survey.
Note: The step sequences of the survey may be completed out of sequence.
4.1 Authorized Beamline Staff and RCTs establish the initial conditions and record them on Attachment A, Beamline SST-1 and SST-2 (07-ID, U42 AND EPU60) Comprehensive Commissioning Radiation Survey.
4.2 Authorized Beamline Staff and RCTs complete the Comprehensive Commissioning Radiation Survey in accordance with Attachment A.
4.3 Throughout the radiation survey, Authorized Beamline Staff ensure that the photon beam is where it should be using the appropriate diagnostic tools AND ensure that the FE shutter remains open.
Note: Attachment A, with the filled information from the measurements, acts as the Beamline Radiation Survey Interim Report.
4.4 After the survey, the RCT provides the completed Beamline Radiation Survey Interim Report to the PSD Director and the ESH Manager for review.
5 REFERENCES
5.1 NSLSII-DPT-PDN-001, Management of NSLS-II Documents and Records
5.2 PS-C-XFD-PRC-003, Enabling Beamlines for Operations
5.3 PS-C-XFD-PRC-004, NSLS-II Beamlines Radiation Safety Commissioning Plan
5.4 PS-C-XFD-PRC-024, Beamline Photon Shutter Centrally Controlled Lockout/Tagout Procedure
5.5 SBMS Program Description: Radiological Control Manual
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A3
6 ATTACHMENTS
Attachment A, Beamline SST-1 and SST-2 (07-ID, U42 AND EPU60) Comprehensive Commissioning Radiation Survey
Attachment B, Beamline Enclosure Diagram for07-ID-A
Attachment C, Diagram of the beamlines on the floor
7 DOCUMENTATION
The following records are generated as a result of this procedure, and shall be maintained in accordance with NSLSII-DPT-PDN-001, Management of NSLS-II Documents and Records:
Completed Comprehensive Commissioning Radiation Surveys/Beamline Radiation Survey Interim Report
8 DEFINITIONS
None.
If you have any questions or feedback regarding this document, please click this link.
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A4
Attachment A
Beamlines SST-1 and SST-2 (07-ID, U42 and EPU60)
Comprehensive Commissioning Radiation Survey
Date: _______________
ThefollowingscenariosarecoveredforGB/SR Radiation Survey:
1. Integrity of the 07-ID-A, transport pipe, RSCs and PSH with GB and SR (white and pink beam) on beamline fixed/moveable components.
SurveyConditions:
HOLDPOINT:Evaluateandensurethatallapplicablecontrols listed intheCommissioningSAFare inplace, including LOTO requirements for the beamline photon shutters (in accordancewithPS‐C‐XFD‐PRC‐024,BeamlinePhotonShutterCentrallyControlledLockout/TagoutProcedure).HOLDPOINT:Beforeopeningsafetyshutters intheFE,surveytheupstreamwallof theFOEtomakesurenoradiationcomesthrough.RSLstoBeIdentified: FESlits,ElectronBeamCurrentNOTE:
If the photon shutter PSH6 is not present/installed, the survey should be carried out up to the SS flange that replaces it. Certain steps should be carried out when the PSH is installed.
GeneralAreaSurveys:Forgeneralarea surveys, the followingsteps identify the “key targets” touseduring the surveysat aminimum(seetheappropriatesectionsbelowfordetails):
1.2,1.6,2.1,2.3,3.2,3.6
Placeneutronmonitors;
(1) OutsidethesidewallwheretheARMislocated.(2) Outsidethedownstreamwallnexttotheguillotine,inboardsidewheretheadditionalshieldis
installed.
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A5
1 ScatterTargetsinsidetheFOEKeepFEslitsfullyopenandFEphotonshutteropen.
1.1 L1andM1asscattertargetsforGasBremsstrahlung(GB)
With IDgaps fullyopen, insertL1andM1. Surveyoutside thewalls and roofof07‐ID‐Aand thebeamline up to the downstream photon shutters PSH2, PSH5, PSH6 and PSH7 on the floor (seeAttachmentsBandC).
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: In In Out Closed Closed Closed Closed Closed Closed
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A6
1.2 WBSasscattertargetforGB
WithIDgaps fullyopen,retractL1andM1.Surveyoutsidethewallsandroofof07‐ID‐Aandthebeamline up to the downstream photon shutters PSH2, PSH5, PSH6 and PSH7 on the floor (seeAttachmentsBandC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: Out Out Out Closed Closed Closed Closed Closed Closed
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A7
1.3 WBSasscattertarget
WiththeIDgapsatitsminimum,andL1andM1retracted,dumpbothofthewhitebeamsonWBS.Survey outside the walls and roof of 07‐ID‐A and the beamline up to the downstream photonshuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: Out Out Out Closed Closed Closed Closed Closed Closed
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A8
1.4 L1andM1asscattertargets
With the ID gaps at its minimum, insert L1 and M1 and dump both white beams on these mirrors. Surveyoutside the walls and roof of 07‐ID‐A and the beamline up to the downstream photon shuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: In In Out Closed Closed Closed Closed Closed Closed
StraightSectionVacuumConditions:________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A9
1.5 FM2andFM4asscattertarget
Use L1 and M1 to deflect the pink beams to the outboard side of FM2 and FM4. Surveyoutside thewalls and roof of 07‐ID‐A and the beamline up to the downstreamphoton shutters PSH2, PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC)
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: In In NA Closed Closed Closed Closed Closed Closed
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A10
1.6 PSH1andPSH4asscattertargets
Insert L1, M1 and L2 at nominal angles. Dump both of the pink beams on PSH1 and PSH4. Surveyoutside the walls and roof of 07‐ID‐A and the beamline up to the downstream photon shuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________PositionofM1_______________________PositionofL2_______________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7
Position: In In In Closed Closed Closed Closed Closed Closed
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A11
2 ScatterTargetsontheLBranchFor the steps described in this section, keep ID gaps atminimum, FE slits fully open and FE photonshutteropen.KeepL1&L2at0.53andM1atnominalangle.KeepphotonshuttersPSH4,PSH5,PSH6andPSH7closed.
2.1 PBS(L)asscatteringtarget
OpenphotonshutterPSH1.With theDCM first crystalkept flat,dump thepinkbeamon thepinkbeamstoponLbranch.Survey the fullL‐branchbeamlineand theotherbeamlinesup tophotonshuttersPSH5,PSH6andPSH7(SeeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM______________________GapoftheDCM__________________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed Out Closed NA NA Open NA NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A12
2.2 DCMasscattertarget
WiththefirstcrystaloftheDCMatnominalposition,dumpthepinkbeamontheDCM.SurveythefullL‐branchbeamlinewithemphasisonthebellowsadjacenttotheDCMandtheotherbeamlinesup to photon shutters PSH5, SH6 and PSH7 (See Attachment C). Repeat for various DCMangles/gaps.
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
Step DCMangle DCMangle/gap DirectFrisk
2.2.1 ☐IFB☐other(describedbelow)
2.2.2 ☐IFB☐other(describedbelow)
2.2.3 ☐IFB☐other(describedbelow)
DoseRateSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Closed NA NA Open Out NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A13
2.3 GenerictargetinHAXPESendstation
ClosePSH3.OpenPSH2todirectthebeamfromLbranchtoagenericsampleintheHAXPESendstation. Survey the end station and L branch up to the VPPEM end station (see Attachment C).Retractthesampleandrepeat.
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM______________________GapoftheDCM__________________________________________
Sample Direct frisk survey results
Sample in ☐IFB ☐other (described below)
Sample out ☐IFB ☐other (described below)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Open In NA Closed NA NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A14
2.4 L3/PSH3asscattertargets
RetractthesamplefromtheHAXPESendstation.UseL3todirectthebeamtothephotonshutterPSH3.SurveytheLbranchfromHAXPEStotheVPPEMendstations(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM______________________GapoftheDCM__________________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Open Out In Closed NA NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A15
2.5 GenerictargetinVPPEMendstation
OpenPSH3.UseL3andL4todirectthebeamontoasampleintheVPPEMendstation.Surveytheendstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM______________________GapoftheDCM__________________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Open Out In Open In In
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A16
2.6 BeamstopinVPPEMendstation
RetractthesamplefromtheVPPEMendstation,dumpthemonochromaticbeamsonthebeamstopoftheVPPEM.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM______________________GapoftheDCM__________________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Open Out In Open In Out
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A17
2.7 PhotonshutterPSH2asscattertarget
InsertphotonPSH2andsurveyaroundit.
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1______________________L2____________________L3___________________________L4_____________________
AngleofDCM_____________________GapoftheDCM__________________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM
Position Open Closed In Closed Out NA Closed NA Out
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A18
3 ScatterTargetsontheMBranchForthestepsdescribedhere,keepIDgapsatminimum,FEshutteropen,FEslitsfullyopen,L1andL2atnominal positions,M1 at 1.32, photon shutters PSH5 and PSH6 closed. Close PSH2, open PSH1 andPSH4,andparktheL‐branchbeamonPSH2withDCMin.
3.1 PGM/M2asscattertarget
InsertM2andpositionitattheminimumangle.DumpthepinkbeamontheM2mirrorandsurveythe PGM chamber with emphasis on the adjacent bellows, the full M‐branch beamline and thetransferbeamlinesuptophotonshuttersPSH5andPSH6(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_______________M2________________M3()_____________M4()__________________M5()____________
Positionofthegrating_______________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM/M
2
M3AB/C
SlitC
SlitAB
PSH7
M4C/M
4D
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
NA
Open
Open
Closed
NA
NA
NA
Open
NA
NA
Open
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A19
3.2 PBS(M)asscattertarget
RetractM3.DumpthepinkbeamonthePBSonMbranch.SurveythefullM‐branchbeamlineandthetransferbeamlinesuptophotonshuttersPSH5andPSH6(seeAttachmentC).
Component
PGM
M3AB/C
SlitC
SlitAB
PSH7
M4C/M
4D
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
Out
Open
Open
Closed
NA
NA
NA
Open
NA
NA
Open
NA
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Positionofthegrating_______________________________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A20
3.3 Slit‐Casscattertarget
InsertM3CanddirectthebeamontotheprecisionslitC.SurveythefullM‐branchbeamlineandthetransferbeamlinesup tophotonshuttersPSH5andPSH6(seeAttachmentC).Repeat forvariousanglesofPGM/M2.
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Step AngleofPGM Position/AngleofM2 DirectFriskSurveyResults
3.3.1 ☐IFB☐other(describedbelow)
3.3.2 ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C/M
4D
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Closed
Closed
NA
NA
NA
Open
NA
NA
Open
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A21
3.4 GenerictargetinμCALendstation
ClosePSH8andopenPSH7.UseM4CtodirectthebeamtoagenericsampleintheµCALendstation.Survey the end station, downstreamM‐branch beamline and the other beamlines up to photonshuttersPSH2,PSH5andPSH6(seeAttachmentC).RepeatforvariousanglesofPGM/M2.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Positionofsample___________________________
Step AngleofPGM PositionofM2 DirectFriskSurveyResults
3.4.1 ☐IFB☐other(describedbelow)
3.4.2 ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
In
NA
Closed
NA
NA
Open
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A22
3.5 BeaminµCALendstationwithoutsample
RetractsamplefromthepreviousstepandrepeatforvariousanglesofPGM/M2.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Positionofsample___________________________
Step AngleofPGM PositionofM2 DirectFriskSurveyResults
3.5.1 ☐IFB☐other(describedbelow)
3.5.2 ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
NA
Closed
NA
NA
Open
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A23
3.6 GenerictargetinLARIAT‐1endstation
UseM4C/Dandthe(wobbling)mirrorintheendstationtodirectthebeamtoagenericsampleintheLARIAT‐1endstation.Surveytheendstation,downstreamM‐branchbeamlineandthetransferbeamlinesuptophotonshuttersPSH5andPSH6.Repeatwithoutthesample(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Sample DirectFriskSurveyResults
SampleIn ☐IFB☐other(describedbelow)
SampleOut ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
In
Closed
NA
NA
Open
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A24
3.7 GenerictargetinNEXAFSendstation
Close PSH9 and open PSH8. UseM4C/D andM5C to direct the beam to a generic sample in theNEXAFS end station. Survey the end station, downstream M‐branch beamline and the transferbeamlinesuptophotonshuttersPSH5andPSH6(SeeAttachmentC).Retractsampleandrepeat.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Sample DirectFriskSurveyResults
SampleIn ☐IFB☐other(describedbelow)
SampleOut ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C/M
4D
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
Out
Open
In
In
Closed
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A25
3.8 GenerictargetinLARIAT‐2endstation
OpenPSH9 and direct the beam to the LARIAT‐2 end station without a sample. Survey the endstation.RepeatwithagenericsampleintheLARIAT‐2endstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
Sample DirectFriskSurveyResults
Sampleout ☐IFB☐other(describedbelow)
SampleIn ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4D
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
NA
Open
Out
Out
Open
In
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A26
3.9 PhotonshutterPSH9asscattertarget
ClosePSH9andsurveytheshutter.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
Out
Open
Out
Out
Closed
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A27
3.10 PhotonshutterPSH8asscattertarget
ClosePSH8andsurveytheshutter.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Open
In
Out
Out
Closed
NA
NA
Closed
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A28
3.11 PhotonshutterPSH7asscattertarget
ClosePSH7andsurveytheshutter.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofM1_____________M2______________M3()___________M4()______________M5()____________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PGM
M3C
SlitC
PSH7
M4C
μCAL
LARIAT‐1
PSH8
M5C
NEXAFS
PSH9
LARIAT‐2
Position
In
In
Open
Closed
In
NA
NA
Closed
NA
NA
Closed
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A29
4 ScatterTargetsontheTransferandLBranchesForthestepsdescribedhere,keepIDgapsatminimum,FEshutteropen,FEslitsfullyopen.KeepL1andL2at0.53o,M1at1.32o,M2atitsminimumangleandPGM,DCMandM3ABinnominalpositions.KeepphotonshuttersPSH1andPSH4open.
4.1 SlitABasascatteringtarget
UseM3ABtodirectthebeamtotheprecisionslitABandparktheL‐branchbeamonPSH2inclosedposition.Surveythetransferbranchesuptotheendstations(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VPPEM
Position
Closed
Open
In
Closed
Closed
NA
Closed
Closed
NA
NA
NA
NA
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A30
4.2 GenerictargetinHAXPESendstation
Close PSH3 and open PSH5. Use M4A to direct the M‐branch beam to a generic sample in theHAXPESendstation.OpenPSH2todirectthebeamfromLbranchtothesamesample.SurveytheendstationandLbranchuptotheVPPEM(seeAttachmentC).Repeatwithoutthesample.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
Sample DirectFriskSurveyResults
Sampleout ☐IFB☐other(describedbelow)
SampleIn ☐IFB☐other(describedbelow)
Additionalinformation/comments:
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VP
PE
M
Position
Open
Closed
In
Closed
Open
In
Open
Closed
In
NA
NA
NA
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A31
4.3 PSH5asscattertarget
ClosePSH5andsurveyaroundit.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VP
PE
M
Position
Open
Closed
In
Closed
Open
In
Closed
Closed
In
NA
NA
NA
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A32
4.4 GenerictargetinVPPEMendstation
If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.
UseM3ABandM4BtodirectthebeamfromtheMbranchtoVPPEMendstation.OpenPSH3anduseL3andL4todirecttheL‐branchbeamtothesameendstation.SurveytheVPPEMendstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH1
PSH4
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VP
PE
M
Position
Open
Open
Open
Open
In
Closed
Open
Out
Closed
Open
Out
In
In
In
In
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A33
4.5 BeamstopinVPPEMendstation
If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.
RetractthesamplefromtheVPPEMendstation,dumpboththemonochromaticbeamsonthebeamstopoftheVPPEM.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH1
PSH4
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VP
PE
M
Position
Open
Open
Open
Open
In
Closed
Open
Out
Closed
Open
Out
In
In
In
Out
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A34
4.6 SSflangeinsteadofPSH6
IfPSH6isinstalled,skipthisstep.
ClosePSH1 to stop the L‐branchbeam in the FOE.Dump themonochromaticMbeamon the SSflange.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH1
PSH4
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6(SS
flange)
HAXPES
M4B
L3
L4
VP
PE
M
Position
Closed
Open
Open
Open
In
Closed
Open
Out
Closed
Closed
NA
NA
NA
NA
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
A35
4.7 PSH6asscattertarget
If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.
ClosePSH1tostoptheL‐branchbeamintheFOE.ClosePSH6andsurveyaroundit.
StraightSectionVacuumConditions:_________________________________________________________________________
IDgapU42_____________________________________________EPU60_________________________________________________
PositionofL1____________________L2_______________________L3____________________L4__________________________
PositionofM3AB____________________M4A_______________________M4B____________________
DirectFriskSurveyResults: ☐IFB☐other(describedbelow)
Additionalinformation/comments:
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________
Component
PSH1
PSH4
PSH2
PSH3
M3AB
PSH7
SlitAB
M4A
PSH5
PSH6
HAXPES
M4B
L3
L4
VP
PE
M
Position
Closed
Open
Open
Open
In
Closed
Open
Out
Closed
Closed
Out
NA
NA
NA
NA
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author:S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
B1
Attachment B – Beamline Enclosure Diagram for 07-ID-A
The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.
National Synchrotron Light Source II, Brookhaven National Laboratory
Doc No. NSLSII-7ID-PRC-001 Author:S. Chitra Review Frequency: 3yrs Rev. 1
Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018
C1
Attachment C – Diagram of the Beamlines on the Floor