The only official copy of this document is the one online in the NSLS-II Document and Records Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version. Doc No: NSLSII-7ID-PRC-001 NSLS-II PROCEDURE: BEAMLINES SST-1 AND SST-2 (7-ID) RADIATION SURVEY PROCEDURE January 5, 2018 Rev. 1 S. Chitra
Transcript
Page 1: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II Document and Records Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

Doc No: NSLSII-7ID-PRC-001

NSLS-II PROCEDURE: BEAMLINES SST-1 AND SST-2 (7-ID)

RADIATION SURVEY PROCEDURE

January 5, 2018

Rev. 1

S. Chitra

Page 2: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

ii

ESH Review:

1/10/2018

X Kim WehuntKim WehuntFacility Support RepresentativeSigned by: Wehunt, Kimberly

By signing this Procedure I acknowledge that it complies with all ESH requirements and if performed correctly, will not present a significant hazard to personnel or equipment.

Beamline Review:

1/9/2018

X Cherno JayeCherno JayeSST-1 Lead Beamline ScientistSigned by: Jaye, Cherno

1/10/2018

X Conan WeilandConan WeilandSST-2 Lead Beamline ScientistSigned by: Weiland, Conan

By signing this Procedure I acknowledge that it is comprehensive and can be performed as written at the beamline.

Authorization Basis Review:

1/8/2018

XSteve MossAuthorization Basis ManagerSigned by: Moss, Steven H

By signing this Procedure I acknowledge that a USI Screening/Evaluation has been performed and this Procedure does not adversely impact the NSLS-II Authorization Basis Documents.

Approved:

1/12/2018

XRobert LeeESH ManagerSigned by: Lee, Robert J

By approving this Procedure I agree that the appropriate personnel have reviewed this document and I authorize this work to commence as written.

Page 3: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

ii

REVISION HISTORY

REVISION SECTION(S) PAGE

DATE List of Reviewers DESCRIPTION

1 All All 05JAN2018

Ackerman, A Benmerrouche, M Broadbent, A Fischer, D Quackenbush, N Robinson, H

First Issue.

ACRONYMS

ALARA As Low as Reasonably Achievable ARM Area Radiation Monitor BSS Bremsstrahlung Shield BST Bremsstrahlung Stop C Center DCM Double Crystal Monochromator DS Downstream EPU Elliptically polarized Undulator ESH Environment, Safety and Health FE Front End FM Fixed Mask FOE First Optical Enclosure FS Fluorescent Screen GB Gas Bremsstrahlung GeV Giga Electron Volts H Horizontal ID Insertion Device IFB Indistinguishable From Background Ln nth Mirror On L Branch. m Meter Mn nth mirror On M Branch. mrad Millirad mrem/hr millirem per hour

NSLS-II National Synchrotron Light Source II PBS Pink Beam Stop PGM Plane Grating Monochromator PSD Photon Science Division PSH Photon Shutter RCT Radiological Control Technician RSC Radiation Safety Components SAF Safety Approval Form SBMS Standards Based Management System SBS Secondary Bremsstrahlung Shield SLT XY Slit SR Synchrotron Radiation SST Spectroscopy Soft and Tender TLD Thermo Luminescent Dosimeter U Undulator US Upstream V Vertical WBS White Beam Stop

Page 4: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A1

1 PURPOSE AND SCOPE

The purpose of this procedure is to perform a comprehensive commissioning radiation survey on the 07-ID beamline, as directed by PS-C-XFD-PRC-004, NSLS-II Beamlines Radiation Safety Commissioning Plan.

The survey scenarios are covered in the Beamlines SST-1 and SST-2 (07-ID, U42 and EPU60) Comprehensive Commissioning Radiation Survey, provided as Attachment A.

2 PREREQUISITES

2.1 Authorization/approval from the NSLS-II Director to initiate commissioning of the beamline has been received.

2.2 A Beamline System Readiness Checklist has been completed in accordance with PS-C-XFD-PRC-003, Enabling Beamlines for Operations.

2.3 The area(s) around the beamline are posted in accordance with SBMS Program Description: Radiological Control Manual.

2.4 All shutters are closed.

2.5 FE slits are fully open (near maximum extent range).

Note: If FE slits cannot be fully open, record the FE slits parameter here: _________________

2.6 All beamline slits are fully open.

2.7 All mirrors and filters are retracted out from beam.

3 HAZARDS, CONTROLS AND LIMITS

3.1 If at any point during performance of this procedure a radiation dose rate of 5 mrem/hr or higher on contact is identified, the radiation survey shall be terminated and the cause investigated, and any hazards shall be mitigated before continuing.

3.2 Minor deviations on Attachment A are allowed in the field; however the deviation shall be documented and submitted to the PSD Director and the ESH Manager for review after the survey.

Page 5: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A2

4 PROCEDURE

Note: Execution of this Comprehensive Commissioning Radiation Survey, along with the evaluation of the data collected, may only be used as a basis by the PSD Director and the ESH Manager to approve commissioning activities at an electron beam current of up to 3 times the electron beam current measured during this survey. Approval of commissioning of the beamline at a higher electron beam current requires re-execution of this Comprehensive Commissioning Radiation Survey.

Note: The step sequences of the survey may be completed out of sequence.

4.1 Authorized Beamline Staff and RCTs establish the initial conditions and record them on Attachment A, Beamline SST-1 and SST-2 (07-ID, U42 AND EPU60) Comprehensive Commissioning Radiation Survey.

4.2 Authorized Beamline Staff and RCTs complete the Comprehensive Commissioning Radiation Survey in accordance with Attachment A.

4.3 Throughout the radiation survey, Authorized Beamline Staff ensure that the photon beam is where it should be using the appropriate diagnostic tools AND ensure that the FE shutter remains open.

Note: Attachment A, with the filled information from the measurements, acts as the Beamline Radiation Survey Interim Report.

4.4 After the survey, the RCT provides the completed Beamline Radiation Survey Interim Report to the PSD Director and the ESH Manager for review.

5 REFERENCES

5.1 NSLSII-DPT-PDN-001, Management of NSLS-II Documents and Records

5.2 PS-C-XFD-PRC-003, Enabling Beamlines for Operations

5.3 PS-C-XFD-PRC-004, NSLS-II Beamlines Radiation Safety Commissioning Plan

5.4 PS-C-XFD-PRC-024, Beamline Photon Shutter Centrally Controlled Lockout/Tagout Procedure

5.5 SBMS Program Description: Radiological Control Manual

Page 6: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A3

6 ATTACHMENTS

Attachment A, Beamline SST-1 and SST-2 (07-ID, U42 AND EPU60) Comprehensive Commissioning Radiation Survey

Attachment B, Beamline Enclosure Diagram for07-ID-A

Attachment C, Diagram of the beamlines on the floor

7 DOCUMENTATION

The following records are generated as a result of this procedure, and shall be maintained in accordance with NSLSII-DPT-PDN-001, Management of NSLS-II Documents and Records:

Completed Comprehensive Commissioning Radiation Surveys/Beamline Radiation Survey Interim Report

8 DEFINITIONS

None.

If you have any questions or feedback regarding this document, please click this link.

Page 7: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A4

Attachment A

Beamlines SST-1 and SST-2 (07-ID, U42 and EPU60)

Comprehensive Commissioning Radiation Survey

Date: _______________

ThefollowingscenariosarecoveredforGB/SR Radiation Survey:

1. Integrity of the 07-ID-A, transport pipe, RSCs and PSH with GB and SR (white and pink beam) on beamline fixed/moveable components.

SurveyConditions:

HOLDPOINT:Evaluateandensurethatallapplicablecontrols listed intheCommissioningSAFare inplace, including LOTO requirements for the beamline photon shutters (in accordancewithPS‐C‐XFD‐PRC‐024,BeamlinePhotonShutterCentrallyControlledLockout/TagoutProcedure).HOLDPOINT:Beforeopeningsafetyshutters intheFE,surveytheupstreamwallof theFOEtomakesurenoradiationcomesthrough.RSLstoBeIdentified: FESlits,ElectronBeamCurrentNOTE:

If the photon shutter PSH6 is not present/installed, the survey should be carried out up to the SS flange that replaces it. Certain steps should be carried out when the PSH is installed.

GeneralAreaSurveys:Forgeneralarea surveys, the followingsteps identify the “key targets” touseduring the surveysat aminimum(seetheappropriatesectionsbelowfordetails):

1.2,1.6,2.1,2.3,3.2,3.6

Placeneutronmonitors;

(1) OutsidethesidewallwheretheARMislocated.(2) Outsidethedownstreamwallnexttotheguillotine,inboardsidewheretheadditionalshieldis

installed.

Page 8: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A5

1 ScatterTargetsinsidetheFOEKeepFEslitsfullyopenandFEphotonshutteropen.

1.1 L1andM1asscattertargetsforGasBremsstrahlung(GB)

With IDgaps fullyopen, insertL1andM1. Surveyoutside thewalls and roofof07‐ID‐Aand thebeamline up to the downstream photon shutters PSH2, PSH5, PSH6 and PSH7 on the floor (seeAttachmentsBandC).

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: In In Out Closed Closed Closed Closed Closed Closed

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Page 9: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A6

1.2 WBSasscattertargetforGB

WithIDgaps fullyopen,retractL1andM1.Surveyoutsidethewallsandroofof07‐ID‐Aandthebeamline up to the downstream photon shutters PSH2, PSH5, PSH6 and PSH7 on the floor (seeAttachmentsBandC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: Out Out Out Closed Closed Closed Closed Closed Closed

Page 10: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A7

1.3 WBSasscattertarget

WiththeIDgapsatitsminimum,andL1andM1retracted,dumpbothofthewhitebeamsonWBS.Survey outside the walls and roof of 07‐ID‐A and the beamline up to the downstream photonshuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: Out Out Out Closed Closed Closed Closed Closed Closed

Page 11: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A8

1.4 L1andM1asscattertargets

With the ID gaps at its minimum, insert L1 and M1 and dump both white beams on these mirrors. Surveyoutside the walls and roof of 07‐ID‐A and the beamline up to the downstream photon shuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: In In Out Closed Closed Closed Closed Closed Closed

StraightSectionVacuumConditions:________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Page 12: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A9

1.5 FM2andFM4asscattertarget

Use L1 and M1 to deflect the pink beams to the outboard side of FM2 and FM4. Surveyoutside thewalls and roof of 07‐ID‐A and the beamline up to the downstreamphoton shutters PSH2, PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC)

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: In In NA Closed Closed Closed Closed Closed Closed

Page 13: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A10

1.6 PSH1andPSH4asscattertargets

Insert L1, M1 and L2 at nominal angles. Dump both of the pink beams on PSH1 and PSH4. Surveyoutside the walls and roof of 07‐ID‐A and the beamline up to the downstream photon shuttersPSH2,PSH5,PSH6andPSH7onthefloor(seeAttachmentsBandC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________PositionofM1_______________________PositionofL2_______________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component: L1 M1 L2 PSH1 PSH4 PSH2 PSH5 PSH6 PSH7

Position: In In In Closed Closed Closed Closed Closed Closed

Page 14: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A11

2 ScatterTargetsontheLBranchFor the steps described in this section, keep ID gaps atminimum, FE slits fully open and FE photonshutteropen.KeepL1&L2at0.53andM1atnominalangle.KeepphotonshuttersPSH4,PSH5,PSH6andPSH7closed.

2.1 PBS(L)asscatteringtarget

OpenphotonshutterPSH1.With theDCM first crystalkept flat,dump thepinkbeamon thepinkbeamstoponLbranch.Survey the fullL‐branchbeamlineand theotherbeamlinesup tophotonshuttersPSH5,PSH6andPSH7(SeeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM______________________GapoftheDCM__________________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed Out Closed NA NA Open NA NA

Page 15: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A12

2.2 DCMasscattertarget

WiththefirstcrystaloftheDCMatnominalposition,dumpthepinkbeamontheDCM.SurveythefullL‐branchbeamlinewithemphasisonthebellowsadjacenttotheDCMandtheotherbeamlinesup to photon shutters PSH5, SH6 and PSH7 (See Attachment C). Repeat for various DCMangles/gaps.

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

Step DCMangle DCMangle/gap DirectFrisk

2.2.1 ☐IFB☐other(describedbelow)

2.2.2 ☐IFB☐other(describedbelow)

2.2.3 ☐IFB☐other(describedbelow)

DoseRateSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Closed NA NA Open Out NA

Page 16: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A13

2.3 GenerictargetinHAXPESendstation

ClosePSH3.OpenPSH2todirectthebeamfromLbranchtoagenericsampleintheHAXPESendstation. Survey the end station and L branch up to the VPPEM end station (see Attachment C).Retractthesampleandrepeat.

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM______________________GapoftheDCM__________________________________________

Sample Direct frisk survey results

Sample in ☐IFB ☐other (described below)

Sample out ☐IFB ☐other (described below)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Open In NA Closed NA NA

Page 17: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A14

2.4 L3/PSH3asscattertargets

RetractthesamplefromtheHAXPESendstation.UseL3todirectthebeamtothephotonshutterPSH3.SurveytheLbranchfromHAXPEStotheVPPEMendstations(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM______________________GapoftheDCM__________________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Open Out In Closed NA NA

Page 18: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A15

2.5 GenerictargetinVPPEMendstation

OpenPSH3.UseL3andL4todirectthebeamontoasampleintheVPPEMendstation.Surveytheendstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM______________________GapoftheDCM__________________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Open Out In Open In In

Page 19: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A16

2.6 BeamstopinVPPEMendstation

RetractthesamplefromtheVPPEMendstation,dumpthemonochromaticbeamsonthebeamstopoftheVPPEM.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM______________________GapoftheDCM__________________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Open Out In Open In Out

Page 20: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A17

2.7 PhotonshutterPSH2asscattertarget

InsertphotonPSH2andsurveyaroundit.

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1______________________L2____________________L3___________________________L4_____________________

AngleofDCM_____________________GapoftheDCM__________________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component PSH1 PSH4 DCM PSH2 HAXPES L3 PSH3 L4 VPPEM

Position Open Closed In Closed Out NA Closed NA Out

Page 21: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A18

3 ScatterTargetsontheMBranchForthestepsdescribedhere,keepIDgapsatminimum,FEshutteropen,FEslitsfullyopen,L1andL2atnominal positions,M1 at 1.32, photon shutters PSH5 and PSH6 closed. Close PSH2, open PSH1 andPSH4,andparktheL‐branchbeamonPSH2withDCMin.

3.1 PGM/M2asscattertarget

InsertM2andpositionitattheminimumangle.DumpthepinkbeamontheM2mirrorandsurveythe PGM chamber with emphasis on the adjacent bellows, the full M‐branch beamline and thetransferbeamlinesuptophotonshuttersPSH5andPSH6(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_______________M2________________M3()_____________M4()__________________M5()____________

Positionofthegrating_______________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM/M

2

M3AB/C

SlitC

SlitAB

PSH7

M4C/M

4D

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

NA

Open

Open

Closed

NA

NA

NA

Open

NA

NA

Open

NA

Page 22: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A19

3.2 PBS(M)asscattertarget

RetractM3.DumpthepinkbeamonthePBSonMbranch.SurveythefullM‐branchbeamlineandthetransferbeamlinesuptophotonshuttersPSH5andPSH6(seeAttachmentC).

Component

PGM

M3AB/C

SlitC

SlitAB

PSH7

M4C/M

4D

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

Out

Open

Open

Closed

NA

NA

NA

Open

NA

NA

Open

NA

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Positionofthegrating_______________________________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Page 23: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A20

3.3 Slit‐Casscattertarget

InsertM3CanddirectthebeamontotheprecisionslitC.SurveythefullM‐branchbeamlineandthetransferbeamlinesup tophotonshuttersPSH5andPSH6(seeAttachmentC).Repeat forvariousanglesofPGM/M2.

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Step AngleofPGM Position/AngleofM2 DirectFriskSurveyResults

3.3.1 ☐IFB☐other(describedbelow)

3.3.2 ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C/M

4D

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Closed

Closed

NA

NA

NA

Open

NA

NA

Open

NA

Page 24: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A21

3.4 GenerictargetinμCALendstation

ClosePSH8andopenPSH7.UseM4CtodirectthebeamtoagenericsampleintheµCALendstation.Survey the end station, downstreamM‐branch beamline and the other beamlines up to photonshuttersPSH2,PSH5andPSH6(seeAttachmentC).RepeatforvariousanglesofPGM/M2.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Positionofsample___________________________

Step AngleofPGM PositionofM2 DirectFriskSurveyResults

3.4.1 ☐IFB☐other(describedbelow)

3.4.2 ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

In

NA

Closed

NA

NA

Open

NA

Page 25: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A22

3.5 BeaminµCALendstationwithoutsample

RetractsamplefromthepreviousstepandrepeatforvariousanglesofPGM/M2.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Positionofsample___________________________

Step AngleofPGM PositionofM2 DirectFriskSurveyResults

3.5.1 ☐IFB☐other(describedbelow)

3.5.2 ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

NA

Closed

NA

NA

Open

NA

Page 26: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A23

3.6 GenerictargetinLARIAT‐1endstation

UseM4C/Dandthe(wobbling)mirrorintheendstationtodirectthebeamtoagenericsampleintheLARIAT‐1endstation.Surveytheendstation,downstreamM‐branchbeamlineandthetransferbeamlinesuptophotonshuttersPSH5andPSH6.Repeatwithoutthesample(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Sample DirectFriskSurveyResults

SampleIn ☐IFB☐other(describedbelow)

SampleOut ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

In

Closed

NA

NA

Open

NA

Page 27: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A24

3.7 GenerictargetinNEXAFSendstation

Close PSH9 and open PSH8. UseM4C/D andM5C to direct the beam to a generic sample in theNEXAFS end station. Survey the end station, downstream M‐branch beamline and the transferbeamlinesuptophotonshuttersPSH5andPSH6(SeeAttachmentC).Retractsampleandrepeat.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Sample DirectFriskSurveyResults

SampleIn ☐IFB☐other(describedbelow)

SampleOut ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C/M

4D

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

Out

Open

In

In

Closed

NA

Page 28: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A25

3.8 GenerictargetinLARIAT‐2endstation

OpenPSH9 and direct the beam to the LARIAT‐2 end station without a sample. Survey the endstation.RepeatwithagenericsampleintheLARIAT‐2endstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

Sample DirectFriskSurveyResults

Sampleout ☐IFB☐other(describedbelow)

SampleIn ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4D

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

NA

Open

Out

Out

Open

In

Page 29: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A26

3.9 PhotonshutterPSH9asscattertarget

ClosePSH9andsurveytheshutter.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

Out

Open

Out

Out

Closed

NA

Page 30: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A27

3.10 PhotonshutterPSH8asscattertarget

ClosePSH8andsurveytheshutter.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Open

In

Out

Out

Closed

NA

NA

Closed

NA

Page 31: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A28

3.11 PhotonshutterPSH7asscattertarget

ClosePSH7andsurveytheshutter.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofM1_____________M2______________M3()___________M4()______________M5()____________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PGM

M3C

SlitC

PSH7

M4C

μCAL

LARIAT‐1

PSH8

M5C

NEXAFS

PSH9

LARIAT‐2

Position

In

In

Open

Closed

In

NA

NA

Closed

NA

NA

Closed

NA

Page 32: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A29

4 ScatterTargetsontheTransferandLBranchesForthestepsdescribedhere,keepIDgapsatminimum,FEshutteropen,FEslitsfullyopen.KeepL1andL2at0.53o,M1at1.32o,M2atitsminimumangleandPGM,DCMandM3ABinnominalpositions.KeepphotonshuttersPSH1andPSH4open.

4.1 SlitABasascatteringtarget

UseM3ABtodirectthebeamtotheprecisionslitABandparktheL‐branchbeamonPSH2inclosedposition.Surveythetransferbranchesuptotheendstations(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VPPEM

Position

Closed

Open

In

Closed

Closed

NA

Closed

Closed

NA

NA

NA

NA

NA

Page 33: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A30

4.2 GenerictargetinHAXPESendstation

Close PSH3 and open PSH5. Use M4A to direct the M‐branch beam to a generic sample in theHAXPESendstation.OpenPSH2todirectthebeamfromLbranchtothesamesample.SurveytheendstationandLbranchuptotheVPPEM(seeAttachmentC).Repeatwithoutthesample.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

Sample DirectFriskSurveyResults

Sampleout ☐IFB☐other(describedbelow)

SampleIn ☐IFB☐other(describedbelow)

Additionalinformation/comments:

______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VP

PE

M

Position

Open

Closed

In

Closed

Open

In

Open

Closed

In

NA

NA

NA

NA

Page 34: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A31

4.3 PSH5asscattertarget

ClosePSH5andsurveyaroundit.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VP

PE

M

Position

Open

Closed

In

Closed

Open

In

Closed

Closed

In

NA

NA

NA

NA

Page 35: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A32

4.4 GenerictargetinVPPEMendstation

If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.

UseM3ABandM4BtodirectthebeamfromtheMbranchtoVPPEMendstation.OpenPSH3anduseL3andL4todirecttheL‐branchbeamtothesameendstation.SurveytheVPPEMendstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH1

PSH4

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VP

PE

M

Position

Open

Open

Open

Open

In

Closed

Open

Out

Closed

Open

Out

In

In

In

In

Page 36: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A33

4.5 BeamstopinVPPEMendstation

If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.

RetractthesamplefromtheVPPEMendstation,dumpboththemonochromaticbeamsonthebeamstopoftheVPPEM.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH1

PSH4

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VP

PE

M

Position

Open

Open

Open

Open

In

Closed

Open

Out

Closed

Open

Out

In

In

In

Out

Page 37: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A34

4.6 SSflangeinsteadofPSH6

IfPSH6isinstalled,skipthisstep.

ClosePSH1 to stop the L‐branchbeam in the FOE.Dump themonochromaticMbeamon the SSflange.SurveythebeamstopandtheVPPEMendstation(seeAttachmentC).

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH1

PSH4

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6(SS

flange)

HAXPES

M4B

L3

L4

VP

PE

M

Position

Closed

Open

Open

Open

In

Closed

Open

Out

Closed

Closed

NA

NA

NA

NA

NA

Page 38: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

A35

4.7 PSH6asscattertarget

If PSH6 is not installed, skip step. Return to complete this step when the PSH is installed.

ClosePSH1tostoptheL‐branchbeamintheFOE.ClosePSH6andsurveyaroundit.

StraightSectionVacuumConditions:_________________________________________________________________________

IDgapU42_____________________________________________EPU60_________________________________________________

PositionofL1____________________L2_______________________L3____________________L4__________________________

PositionofM3AB____________________M4A_______________________M4B____________________

DirectFriskSurveyResults: ☐IFB☐other(describedbelow)

Additionalinformation/comments:

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Signature(ESH)____________________________Signature(Beamline)_________________________________

Component

PSH1

PSH4

PSH2

PSH3

M3AB

PSH7

SlitAB

M4A

PSH5

PSH6

HAXPES

M4B

L3

L4

VP

PE

M

Position

Closed

Open

Open

Open

In

Closed

Open

Out

Closed

Closed

Out

NA

NA

NA

NA

Page 39: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author:S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

B1

Attachment B – Beamline Enclosure Diagram for 07-ID-A

Page 40: NSLS-II PROCEDURE BEAMLINES SST-1 (7-ID) RADIATION …€¦ · Doc No. NSLSII-7ID-PRC-001 Author: S. Chitra Review Frequency: 3yrs Rev. 1 Title: Beamline SST (07-ID) Radiation Survey

The only official copy of this document is the one online in the NSLS-II SharePoint Document Center. Before using a printed copy, verify that it is current by checking the printed document’s revision history with that of the online version.

National Synchrotron Light Source II, Brookhaven National Laboratory

Doc No. NSLSII-7ID-PRC-001 Author:S. Chitra Review Frequency: 3yrs Rev. 1

Title: Beamline SST (07-ID) Radiation Survey Procedure Effective Date: 05JAN2018

C1

Attachment C – Diagram of the Beamlines on the Floor


Recommended