+ All Categories
Home > Documents > NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division ...

NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division ...

Date post: 17-Dec-2015
Category:
Upload: rafe-roberts
View: 220 times
Download: 0 times
Share this document with a friend
Popular Tags:
12
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division www.europeanspallationsource.se November 12, 2014
Transcript

NSS Requirements Review:Utilities

Michelle EverettLab Coordinator

Scientific Activities Division

www.europeanspallationsource.seNovember 12, 2014

100 Level(ground level)

110 Level(1st floor above ground leveldemountable)

Passageways

Liquid Nitrogen filling station

Bay door

Forklift access

Personnel doorTemp parking

Main Entrance

Access

4

Utilities: Basic Requirements

• All utilities, media piping, and infrastructure shall be sized to support the needs of 40 instruments

• The supply of utilities and media available in 2019 shall be able to support 22 instruments

5

Utilities: Gases & Liquids

• Ar – 10 l/min at 10 bar• N2 – 10 l/min at 10 bar• Instrument grade -40 °C compressed air – 16.5

m3/min at 10 bar• Helium recovery lines for LHe boil off connecting to

cryo plant• 4 gas supply lines 15mm diameter per instrument for

detector gas supply• Cooling water• Tap water in experimental halls – 2 faucets per hall• 4 liquid N2 refilling stations (one per sector)

6

Utilities: Power

• All but 2 instruments need access to 120 kW of electrical power

• 2 instruments need access to 200 kW of electrical power (Neutron Spin Echo)

• Instruments will have need of 85 kW for cooling, 10 of which will go to the air, and 75 kW to water

• Electrical power supply shall allow for 10MW instantaneous power within 2 ms for up to 1 sec every minute

7

Utilities: Electrical Installations

• Cable ducting in the gallery, Hall 3, and the culvert shall provide space for the following cross section from the source to each instrument– Power cable and copper bar of X x Y mm to be determined

at a later date– 100 x 100 mm for optical fibers for IT, DMSC, EPICS, etc.– 100 x 150 mm for Personal Safety Systems– 100 x 150 mm for Machine Protection System

8

Utilities: Electrical Installations

• Cables in all installations shall be grouped according to EMC emittance and susceptibility . Each group shall be installed in a seperate trunk

• Cables require a minimum bending radius. The gallery shall accommodate this by adding space of double the gantry width in each 90 degree corner

• NSS shall review power distribution and trunk model during design process

• An exclusion zone of 10m from electrical transformers to labs and instrument equipment shall be met

9

Utilities: Electrical Installations

• All motors on cranes and rolling doors shall be EM-shielded compliant IEC regulations

• Electrical power shall be available in the instrument hall for installation activities. 4 grounded plugs of 230V/20A along the perimeter of the experimental halls no further than 10 m apart

• Electrical power shall be available in the guide hall to support installation activities. 4 grounded plugs of 230V/20A along the perimeter of the experimental halls no further than 15 m apart

10

Utilities: Ventilation

• Fume hoods at the instrument require ventilation to the outside

• Out gas from experiments using gas flow through samples will require ventilation to the outside

11

Utilities: Network

• Network cabling for DMSC, EPICS, IT, MPS, PSS