+ All Categories
Home > Documents > NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au...

NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au...

Date post: 18-Jan-2020
Category:
Upload: others
View: 6 times
Download: 0 times
Share this document with a friend
5
schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School upgrade Investing in our schools The NSW Government is investing $6.7 billion over the next four years to deliver 190 new and upgraded schools to support communities across NSW. In addition, a record $1.3 billion is being spent on school maintenance over five years. This is the largest investment in public education infrastructure in the history of NSW. Welcome Day 1 Term 4 We have delivered A new three storey building 10 flexible learning spaces A new toilet block Tiered seating adjacent to the oval
Transcript
Page 1: NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School

schoolinfrastructure.nsw.gov.au

NSW Department of Education – School Infrastructure

Merrylands Public School upgrade

Investing in our schoolsThe NSW Government is investing $6.7 billion over the next four years to deliver 190 new and upgraded schools to support communities across NSW. In addition, a record $1.3 billion is being spent on school maintenance over five years. This is the largest investment in public education infrastructure in the history of NSW.

WelcomeDay 1 Term 4

We have delivered

A new three storey building 10 flexible learning spaces

A new toilet blockTiered seating adjacent to the oval

Page 2: NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School

Floor Plan – New Building Ground Floor

Rev Date By Issue Name CK

03

04

05

06

07

08

09

10

11

12

13

15/06/2018

25/06/2018

27/06/2018

2/07/2018

3/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Rev Date By Issue Name CK

03

04

05

06

07

08

09

10

11

12

13

15/06/2018

25/06/2018

27/06/2018

2/07/2018

3/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Drawing Title

Scale :Drawn :

1:100 @A1SH

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

23/07/2019CW

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Town Planner

Builder

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

A-411997

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

13

NSW Department of Education5 Bridge Street, Sydney

GROUND FLOOR FURNITURE &FINISHES PLAN

FOWLER ROAD,MERRYLANDS NSW 2160

MERRYLANDS PUBLICSCHOOL

5 x 159 = 795

1234

SC1

SC1

SC1

SC1

SC1

SC1

SC1SC1

SC1

TR

TR

TR

TR

SC1

SC1

RWO

RWO

RWO

RWO

RWO

RWO

BALCONY OVER

BALCONY OVER

BUBB

LERS

BUBB

LERS

FW

FWFW

FW

FW

BALCO

NY O

VER

FW

FW

FW

AMB.WC

AMB.WC

FW

SWPIT

SWPIT

SWPIT

SWPIT

SWPIT

SWPIT

SWPIT

FWFW

FW

FW

NEW CONCRETE PATH

FEC

STAIRS 4

FES

STAIRS 3

FES

STAIR 2

FES

CL3 SCREENINGMIN 60% FREE AIR FLOW

0.25

D.11

12345678901

12 13 14 15 16 17 18 19 20 21

11 x 159 = 1,750

6 7 8 9 01 11 21 31 41 51

11 x 159 = 1,750

71819102

TB4A

TT1

TT1

TB1

TB1 TB1

TB1

TB1ATB1A

TB1A TB1A

TB4TB4TB4

TB4 TB4 TB4

TB4A

TB4A

TB4A TB4A

TB4A

TB4A

TB4A

TB4 TB4A TB4

TB4ATB4

TB1A

TB1A TB1A

TB1A

TB1

TB1

TB1

TB1

CONCRETE SLABAND FOOTING REFER

TO STRUCTURAL DOCS

WFB

MESH ATSPOON DRAIN

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1 CH1

TB4A

TB4A

TB4A

TB4A

TB4A

TB4

TB4A

TB4

TB4A

TB4

TB4

TB4TB4TB4

TB4TB4

TB4A

CH17

CH8

CH7

CH7CH7

CH7CH7

CH5CH5

CH5

CH5

CH5

CH5

CH5

CH5

CH5

CH5

CH18

CH10CH10

TB10

CH16

CH16

CH19

CH19

CH12

CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20

CH20

1 x MOBILE UNIT

AV2

AV1

TCS

SH3

SH3

SH3

SH3 SH3

SH3

SH3

SH3

SH3

TB9

TB9

TB9

AV1

CH10

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH11

AC AC AC AC AC AC AC

AC

AC

AC

CH9

CH9

CH9

MECHANICALPLATFORM 9900mmx4850mm

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

RWO

JU.0

3

JU.04

JU.01

JU.02

11

JU.05

RWO

RWO

FW

AMB WC 1RM G.10FCT/SK2

AMB WC 2RM G.12FCT/SK2

UNDERCROFT

FCC

M WCRM G.16FCT/SK2

F WCRM G.17FCT/SK2

ACC WCRM G.11FCT/SK2

HB 1RM G.03

FCP1/SK1

W/D 1RM G.05

FCP1/SK1GARDEN STORE/ PUMPRM G.01FCF/SK1

STORE 1RM G.09

FVS3/SK1

STORE 6RM G.15

FVS3/SK1

LIFTRM G.08CONC.

EDBRM G.07

FCF

BREAKOUT & PAARM G.06

FCP1/FVS1/SK1

STAIR 1

FES

HB 2RM G.04

FCP1/SK1

TIERED SEATING

FCC

STAIRS 5

FCC

TIERED SEATING

FCC

STAIRS 6

FCC

CIRC.RM G.18

FVS3/SK2

COMMSRM G.13

FVS2/SK1

CLEANERRM G.14

FVS3/SK3

MSBRM G.18

FCF

PROPOSED FLOOR FINISHLEGEND

FCP1 - CARPET BROADLOOM

FVS1, FVS2 - VINYL

FVS3 - ANTISTATIC VINYL

FCT - TILES

FCF - CONCRETE

FCC - COLOURED CONCRETE

ABBREVIATIONSFURNITURECH CHAIRSH SHELVINGTB TABLETCS TABLET CHARGING STATION

FLOOR FINISHFCC FLOOR COLOURED CONCRETEFCF FINISH CONCRETE FLOORFCP DIRECT STUCK CARPETFCT CERAMIC FLOOR TILESFVS VINYL SHEETING

NOTE:REFER TO FURNITURE SCHEDULE FOR ITEM DETAIL

HB1Class 5/6D

HB2Class 2/6LJ

Entry Entry

Entry to the new building closed until car park works are completed.

Floor Plan – New Building Level One

Rev Date By Issue Name CK

02

03

04

05

06

07

08

09

10

11

12

30/05/2018

15/06/2018

25/06/2018

27/06/2018

2/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

ISSUED FOR CLIENT REVIEW

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Rev Date By Issue Name CK

02

03

04

05

06

07

08

09

10

11

12

30/05/2018

15/06/2018

25/06/2018

27/06/2018

2/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

ISSUED FOR CLIENT REVIEW

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Drawing Title

Scale :Drawn :

1:100 @A1SH

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

23/07/2019CW

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Town Planner

Builder

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

A-412997

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

12

NSW Department of Education5 Bridge Street, Sydney

FIRST FLOOR FURNITURE &FINISHES PLAN

FOWLER ROAD,MERRYLANDS NSW 2160

MERRYLANDS PUBLICSCHOOL

11 x 159 = 1,750

22324252627282920313

11 x 159 = 1,750

82 92 03 13 23 33 43 53 63 73

CH20CH20

CH20

CH20

CH20

CH20

CH20

CH20CH20CH20

CH20

CH20

CH20CH20

5 D

EGR

EE F

ALL

5 D

EGR

EE F

ALL

DP

DP

DP

DP

DP DP

DP

FW FW FW

FH

FH

FW

RWO RWORWO

RWO

DP

DP

12345678901

12 13 14 15 16 17 18 19 20 21

11 x 159 = 1,750

71819102122232425262

CH4

CH4

CH5

CH5

CH4

CH6

CH9

CH6 CH9

CH15

CH15

CH4

CH9

CH5

CH4

TB11

TB11

CH18

TB11

CH15

TB11

TB11

CH17

CH10

CH10

CH15CH15

CH10

CH15

CH6

CH7

CH5

CH4

CH15 CH15

TB11

CH4

CH6

TB11

CH6

CH6

CH9

CH4

CH5

CH4

CH10

CH8

TT1

TT1

TT1

TT1

CH15

CH15

TB2A

TB2TB2A

TB2

TB2

TB2ATB2

TB2A

CH10

CH10

TB2

TB2A TB2

TB2A

TB2A

TB2 TB2A

TB2

CH4

CH6

CH4

CH4

CH4

CH4

CH5

CH5

CH6

CH6

CH7

CH7

CH3

CH3

CH3

CH3

TB9

CH3

CH3

CH1

CH1

TB9

CH1

CH1CH1

CH1

CH1 CH1CH1

CH1 CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1CH1

CH1

CH1

TB10

CH1CH1

CH1CH1

CH1

CH1

TB10

CH1CH1

CH1CH1

CH1

CH1

CH1TB7

CH1

CH1TB7A

CH1

CH3

CH3

CH3TB9

CH3

CH3

CH1

CH1CH1

CH1 CH1

CH1

CH1

CH1CH1

CH1 CH1

CH1

CH1

TB7A

TB7

CH1CH1

CH1

CH1

TB7A

TB7

CH1 CH1

CH1

TB7ACH1CH1

CH1 CH1

CH3

CH3

CH3

CH3

TB9CH3

CH3

CH3TB9

CH3

CH3

CH3TB9CH3

CH3

TB5TB5TB5

TB5 TB5 TB5

TB5ATB5TB5A

TB5TB5A TB5

TB5ATB5ATB5A

TB5ATB5ATB5A

CH3

CH1

CH1CH1

CH1 CH1

CH1

TB5TB5

TB5 TB5 TB5

TB5

CH12

SH3

SH3

SH3

SH3SH3

SH3

SH3

SH3

SH3

SH3 SH3

SH3

TCS

CH6

CH4

CH4

CH4CH7

CH4

CH5

CH15

CH15

CH10

CH10

CH5

CH4

CH18

TB11

CH10

CH11

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1

CH1CH1

TB5TB5

TB5TB5 TB5

TB5

CH1

CH1

CH1

CH1

CH1CH1

TB5ATB5

TB5A

TB5TB5A

TB5

CH1

CH1

CH1

CH1

CH1CH1

TB5ATB5A

TB5ATB5ATB5A

TB5A

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1

TB5

TB5

TB5

TB5

TB5

TB5

CH1

CH1

CH1

CH1

CH1CH1

CH1 CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

TB5A

TB5

TB5ATB5

TB5A

TB5

TB5A

TB5ATB5ATB5A

TB5ATB5A

TB5A

TB5TB5ATB5

TB5ATB5

TB5A

TB5A

TB5ATB5A

TB5A

TB5A

SH3

CH10

CH11CH11

TCS

TB7CH4

TR

TR

TR

TR

TR

TR

DP

TIEREDSEATING

JU.0

6

JU.0

8

JU.04

JU.07

JU.01

JU.0

1

JU.10

JU.02

JU.09

JU.08

JU.06

(MIR

RO

RED

)

32

BALCONY

FCF

HB 3RM 1.01

FCP1/SK1

HB 4RM 1.02

FCP1/SK1

STORE 2RM 1.12

FVS3/SK1

AMB WC 3RM 1.13FCT/SK2

ACC WCRM 1.14FCT/SK2

COMMSRM 1.16

FVS2/SK1

MOVEMENT 1RM 1.09

FCP1/SK1

STORE 3RM 1.17

FVS3/SK1

CLEANERRM 1.18

FVS3/SK3

EDBRM 1.10

FCF

W/D 2RM 1.05

FCP1/SK1

CIRC.

FES

CIRC.

FES

STAIR 2

FES

STAIR 1

FES

AMB WC 4RM 1.15FCT/SK2

HB 5RM 1.03

FCP1/SK1

HB 6RM 1.04

FCP1/SK1

PAA 1RM 1.07

FVS1/SK1

PAA 2RM 1.08

FVS1/SK1

BALCONY

FCF

LIFTRM 1.11CONC.

W/D 3RM 1.05

FCP1/SK1

PROPOSED FLOOR FINISHLEGEND

FCP1 - CARPET BROADLOOM

FVS1, FVS2 - VINYL

FVS3 - ANTISTATIC VINYL

FCT - TILES

FCF - CONCRETE

FCC - COLOURED CONCRETE

ABBREVIATIONSFURNITURECH CHAIRSH SHELVINGTB TABLETCS TABLET CHARGING STATION

FLOOR FINISHFCC FLOOR COLOURED CONCRETEFCF FINISH CONCRETE FLOORFCP DIRECT STUCK CARPETFCT CERAMIC FLOOR TILESFVS VINYL SHEETING

NOTE:REFER TO FURNITURE SCHEDULE FOR ITEM DETAIL

HB3Class 2R

HB4Class 2/3O

HB5Class 3D

HB6Class 4R

Term 4 classroom relocation

Thirteen classes will relocate into the new building and existing buildings from Day 1 Term 4. For more information on classroom relocations, please see the site plans.

Classes moving to New Building – Ground Floor

Classes moving to New Building – Level One

Page 3: NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School

Rev Date By Issue Name CK

01

02

03

04

05

06

07

21/05/2018

15/06/2018

11/07/2018

23/08/2018

14/09/2018

6/12/2018

15/07/2019

CH

CH

CH

SH

SH

SH

FT

30% DETAILED DESIGN ISSUE

50% DETAILED DESIGN ISSUE

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

LK

FT

JT

Rev Date By Issue Name CK

01

02

03

04

05

06

07

21/05/2018

15/06/2018

11/07/2018

23/08/2018

14/09/2018

6/12/2018

15/07/2019

CH

CH

CH

SH

SH

SH

FT

30% DETAILED DESIGN ISSUE

50% DETAILED DESIGN ISSUE

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

LK

FT

JT

Drawing Title

Scale :Drawn :

1:500 @A1SH

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

15/07/2019CW

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Town Planner

Builder

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

A-003997

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

07

NSW Department of Education5 Bridge Street, Sydney

SITE PLAN PROPOSED

FOWLER ROAD,MERRYLANDS NSW 2160

MERRYLANDS PUBLICSCHOOL

SITE BOUNDARY

SITE ENTRY

NEIGHBOURINGBOUNDARY

PROPOSED SITE LEGEND

INTERNAL LOT BOUNDARY

NEW BUILDING

EXISTING DEMOUNTABLEBUILDINGS

PROTECTIVE FENCINGAND TPZ AREA WITHIN

TREE PROTECTION ZONE(TPZ) BOUNDARIES

EXISTING TREE

SOFT LANDSCAPING

TEMPORARY BUILDINGS /STRUCTURES

NEW TREE

EXISTINGGATED ENTRY

CROSSING

BUS STOP

PROPOSEDTREES. .

NEW SW

NEW SWNEW SW

.

.

.

.

F O W L E R R O A D

MO

RR

IS

S

TR

EE

T

H O L D S W O R T H S T R E E T

MA

TT

HE

W

ST

RE

ET

R E S I D E N T I A LR E S I D E N T I A L

FO

WL

ER

RO

AD

SC

HO

OL

RE

SID

EN

TIA

L

R E S I D E N T I A L R E S I D E N T I A L

RE

SID

EN

TIA

L

VEHICLE ENTRY

PUBLIC

KISS N DROP ZONE

ENTRY STUDENT ENTRY

DISABLED CAR SPACE

APPR

OX.

18

SPAC

ES S

HAR

ED B

Y FO

WLE

RR

OAD

SC

HO

OL

AND

MER

RYL

AND

S P.

S

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

18 19 20 21 22 23 24 2517

6

° .

.

BLOCK G

BLOCKI

BLOCKH

COLABLOCKJ

DEMOUNTABLE

DEMOUNTABLE

DEMOUNTABLE

BLOCKL

BLOCKA

PLAYING FIELD

EXISTINGCARPARK

PLAYGROUND /COURTYARD

TPZ

NEW SOFTLANDSCAPE

EXIS

TING

CAR

PARK

NEW SOFTLANDSCAPE

DEMOUNTABLE

NEWLANDSCAPE

25 SPACES (16 EXISTINGAND 9 PROPOSED)

BLOCK M

ENTR

YEN

TRY

BLOCKC

BLOCKD

BLOCKN

NEW 3 STOREY BUILDING

Classes relocating to –

Block C ■ KZ (Level G)

Block D■ KW (Level G)■ 2S (Level G)

Floor Plan – New Building Level Two

Site Plan

Rev Date By Issue Name CK

02

03

04

05

06

07

08

09

10

11

12

30/05/2018

15/06/2018

25/06/2018

27/06/2018

2/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

ISSUED FOR CLIENT REVIEW

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Rev Date By Issue Name CK

02

03

04

05

06

07

08

09

10

11

12

30/05/2018

15/06/2018

25/06/2018

27/06/2018

2/07/2018

11/07/2018

23/08/2018

6/09/2018

14/09/2018

19/03/2019

23/07/2019

CH

CH

CH

CH

CH

CH

SH

SH

SH

FT

FT

ISSUED FOR CLIENT REVIEW

50% DETAILED DESIGN ISSUE

ISSUED FOR WORKSHOP

ISSUED FOR PRG

ISSUED FOR INFORMATION

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR INFORMATION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

CW

CW

CW

FT

LK

LK

JT

Drawing Title

Scale :Drawn :

1:100 @A1SH

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

23/07/2019CW

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Town Planner

Builder

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

A-413997

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

12

NSW Department of Education5 Bridge Street, Sydney

SECOND FLOOR FURNITURE &FINISHES PLAN

FOWLER ROAD,MERRYLANDS NSW 2160

MERRYLANDS PUBLICSCHOOL

11 x 159 = 1,750

22324252627282920313

TR

TR

11 x 159 = 1,750

93041424344454647484

TR TRTR

TR

11 x 159 = 1,750

82 92 03 13 23 33 43 53 63 73

2,100

SC1

SC1

SC1

SC1

SC1SC1SC1

SC1

SC1 SC1

SC1

SC1

SC1

SC1

SC1

SC1SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1

SC1SC1

SC1

SC1

DP

DP

DP

DPDP

FW FW FW

FW

FH

FH

RWO RWORWO

RWO

5 D

EGR

EE F

ALL

DP

DP

DP

CIRC.

FES

CIRC.

FES

11 x 159 = 1,750

33 34 35 36 37 38 39 40 41 42

CH15

CH15

TT1

TT1

TT1

TT1

CH15

CH15

TB3

TB3ATB3

TB3ATB3

TB3A TB3

TB3A

TB3

TB3A TB3

TB3A

TB3A

TB3TB3A

TB3

TB6

TB6ATB6 TB6A

TB6TB6A

TB6A

TB6A TB6A

TB6A

TB6ATB6A

TB6

TB6 TB6

TB6

TB6TB6

CH7

CH7

CH7

SC1

SC1

CH3

CH3

CH3

CH3

TB9

CH3

CH3

CH2

CH2

TB9

CH2

CH2CH2

CH2

CH2 CH2

CH2

CH2 CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

TB10

CH2CH2

CH2CH2

CH2

CH2

TB10

CH2CH2

CH2CH2

CH2

CH2

CH2TB8

CH2

CH2TB8A

CH2

CH3

CH3

CH3TB9

CH3

CH3

CH2

CH2CH2

CH2 CH2

CH2

CH2

CH2CH2

CH2 CH2

CH2

CH2 TB8TB8A

CH2

CH2CH2

CH2

TB8

TB8A

CH2 CH2

CH2

TB8CH2CH2

CH2TB8A

CH2

CH3

CH3

CH3

CH3

TB9CH3

CH3

CH3TB9

CH3

CH3

CH3TB9

CH3

CH3

CH4

CH4

CH4

CH4

CH4

CH4

CH6

CH9

CH6CH9

CH4

CH9

CH4

CH4

TB6

TB6

TB6 TB6

TB6

TB6

CH15

TB6CH4

CH15

CH15

CH10

TB6ATB6

TB6ATB6 TB6A

CH10

CH10

CH15

TB6A

TB6ATB6A TB6A

TB6ATB6A

CH19

CH19

CH19

CH6

CH19

CH4

CH4

CH4

CH4

CH6

CH10

CH10

CH4

CH4

CH6

CH6

CH9

CH6

TB6TB6TB6

TB6 TB6 TB6

TB6ATB6TB6A

TB6TB6A TB6

CH3

CH2

CH2CH2

CH2 CH2

CH2

TB6ATB6A

TB6ATB6ATB6A

TB6A

CH15CH15

TB12

TB12

CH15CH15

TB12

CH18

TB12

TB12

TB12

CH18

TB12

CH12

CH6

CH9

CH6

CH4

CH4

CH17TB12

CH8

CH10

CH10CH10

CH20CH20

CH20

CH20

CH20 CH20

CH20

CH20

CH20

CH20CH20

CH20

CH20

CH20

1 x MOBILE UNIT

AV2

SH3

SH3

SH3

SH3 SH3

SH3

SH3

SH3

SH3

SH3SH3

SH3

TCS

TCS

AV1

AV1

AV1

AV1

CH2

CH2CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2TB6A

TB6ATB6A

TB6A

TB6ATB6A

CH2

CH2

CH2

CH2

CH2

CH2

TB6

TB6A

TB6

TB6A

TB6

TB6A

CH2 CH2

CH2

CH2CH2

CH2TB6

TB6 TB6

TB6

TB6TB6

CH10

CH10

SH3

CH11

CH7

CH7

CH11

CH11

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

CH2

CH2

CH2CH2

CH2

CH2

VOID

STAIRVOID

TIEREDSEATING

JU.0

1

JU.12

JU.11

JU.01

JU.0

6

JU.0

8

JU.04

JU.07

JU.09

JU.08

JU.06

(MIR

RO

RED

)

ACC WCRM 2.14FCT/SK2

AMB WC 5RM 2.13FCT/SK2

AMB WC 6RM 2.15FCT/SK2

HB 7RM 2.01

FCP1/SK1

W/D 4RM 2.05

FCP1/SK1

CLEANERRM 2.18

FVS3/SK3

HB 8RM 2.02

FCP1/SK1

HB 10RM 2.04

FCP1/SK1

MOVEMENT 2RM 2.09

FCP1/SK1

BALCONY

FCF

LIFTRM 2.11

STORE 4RM 2.12

FVS3/SK1

EDBRM 2.10

FCFSTORE 5

RM 2.17FVS3/SK1

STAIR 1

FES

HB 9RM 2.03

FCP1/SK1

W/D 5RM 2.06

FCP1/SK1

STAIR 2

FES

PAA 3RM 2.07

FVS1/SK1

PAA 4RM 2.08

FVS1/SK1

BALCONY

FCF

COMMSRM 2.16

FVS2/SK1

PROPOSED FLOOR FINISHLEGEND

FCP1 - CARPET BROADLOOM

FVS1, FVS2 - VINYL

FVS3 - ANTISTATIC VINYL

FCT - TILES

FCF - CONCRETE

FCC - COLOURED CONCRETE

ABBREVIATIONSFURNITURECH CHAIRSH SHELVINGTB TABLETCS TABLET CHARGING STATION

FLOOR FINISHFCC FLOOR COLOURED CONCRETEFCF FINISH CONCRETE FLOORFCP DIRECT STUCK CARPETFCT CERAMIC FLOOR TILESFVS VINYL SHEETING

NOTE:REFER TO FURNITURE SCHEDULE FOR ITEM DETAIL

HB7Class 5/6N

HB8Class 5/6T

HB9Class 5/6K

HB10Class 5/6S

Classes moving to New Building – Level Two

Classes moving to Block C Classes moving to Block D

Page 4: NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School

schoolinfrastructure.nsw.gov.au

NSW Department of Education – School Infrastructure

For more information about this project contact School Infrastructure NSW:

Website: schoolinfrastructure.nsw.gov.au

Email: [email protected]

Phone: 1300 482 651

For information about school activities and operations, contact the school directly:

Principal: Bronwyn York

Website: https://merryland-p.schools.nsw.gov.au/

Email: [email protected]

Phone: 02 9632 9709

Contact us

Merrylands Public School upgrade

Merrylands Public School upgrade

Page 5: NSW Department of Education – School Infrastructure Term 4 ... · schoolinfrastructure.nsw.gov.au NSW Department of Education – School Infrastructure Merrylands Public School

schoolinfrastructure.nsw.gov.au

NSW Department of Education – School Infrastructure

Frequently asked questions

What is being delivered in the Merrylands Public School?We are excited to announce that Stage One of the Merrylands Public School upgrade is completed. This exciting project has delivered 10 flexible learning spaces, tiered seating adjacent to the oval and a new toilet block.

Where do students meet their teachers in the mornings? For the first week of Term 4, all students will meet their teachers in the playground and be taken to their classrooms. Students relocating to the new building will line up in the playground area adjacent to the covered walkway. They will assemble in the same area after school.

Will there be any changes to the kiss and drop zone?The existing kiss and drop zone on Holdsworth Street will continue to operate as usual, please see the site plan for more information. Discussions will be commencing soon with local council regarding travel management upgrades. The school will be kept informed of planned traffic changes.

Will there be any changes to the bus stop zone?The existing bus stop on Fowler Road will continue to operate as usual.

Will there be any changes to the school entrances?Students will continue to enter via the two entrances on Mathew Street and the two entrances on Holdsworth Street. The Fowler Road entrance will be closed until the car park works are completed.

What construction works will take place in Term 4?Construction works to deliver Stage Two of the upgrade, the new staff car park, will continue through Term 4. We anticipate the car park will be completed during Term 4.

What are the construction hours for the remaining works?Works will continue in accordance with the Development Application conditions. The hours of construction are 7.00am – 5.00pm on weekdays, and 8.00am – 1.00pm on Saturdays. No works will take place on Sundays or Public Holidays.

When will the project be completed?The Merrylands Public School upgrade is expected to be completed by late 2019.

Rev Date By Issue Name CK

01

02

03

04

05

06

07

21/05/2018

15/06/2018

11/07/2018

23/08/2018

14/09/2018

6/12/2018

15/07/2019

CH

CH

CH

SH

SH

SH

FT

30% DETAILED DESIGN ISSUE

50% DETAILED DESIGN ISSUE

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

LK

FT

JT

Rev Date By Issue Name CK

01

02

03

04

05

06

07

21/05/2018

15/06/2018

11/07/2018

23/08/2018

14/09/2018

6/12/2018

15/07/2019

CH

CH

CH

SH

SH

SH

FT

30% DETAILED DESIGN ISSUE

50% DETAILED DESIGN ISSUE

95% DETAILED DESIGN ISSUE

100% DETAILED DESIGN ISSUE

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION

CW

CW

CW

CW

LK

FT

JT

Drawing Title

Scale :Drawn :

1:500 @A1SH

Status:

Drawing No.Project No.

Project Name

Architect

Client

Date :Checked :

15/07/2019CW

QUALITYCERTIFIED ISO

9001

INITIALLING THE 'DRAWN' AND THE 'CHECK' BOXESCONFIRMS THAT THIS DRAWING HAS BEENPREPARED IN CONFORMITY WITH JDHARCHITECTS Q.M.S. PROCEDURES.

Rev.

CONSTRUCTION

Mechanical, Electrical,Hydraulic, Structural & CivilEngineering Consultant

Building Certifier

Project Manager

Landscape

Town Planner

Builder

© COPYRIGHT JDH ARCHITECTS PTY. LTD.THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONSAND VERIFY ALL ERRORS AND OMISSIONS TO THE ARCHITECT.USE FIGURATIVE DIMENSIONS, DO NOT SCALE THE DRAWINGS.DRAWINGS SHALL NOT BE USED FOR CONSTRUCTIONPURPOSES UNTIL ISSUED BY THE ARCHITECT FORCONSTRUCTION.

A-003997

JDH ARCHITECTS PTY. [email protected] 27 110 978 802ACN 110 978 802NOMINATED ARCHITECT:JAYNE HARRISON (7403)

44 Little Oxford StreetDarlinghurst, NSW 2010Telephone: 02 9281 8697www.jdharchitects.com.au

07

NSW Department of Education5 Bridge Street, Sydney

SITE PLAN PROPOSED

FOWLER ROAD,MERRYLANDS NSW 2160

MERRYLANDS PUBLICSCHOOL

SITE BOUNDARY

SITE ENTRY

NEIGHBOURINGBOUNDARY

PROPOSED SITE LEGEND

INTERNAL LOT BOUNDARY

NEW BUILDING

EXISTING DEMOUNTABLEBUILDINGS

PROTECTIVE FENCINGAND TPZ AREA WITHIN

TREE PROTECTION ZONE(TPZ) BOUNDARIES

EXISTING TREE

SOFT LANDSCAPING

TEMPORARY BUILDINGS /STRUCTURES

NEW TREE

EXISTINGGATED ENTRY

CROSSING

BUS STOP

PROPOSEDTREES. .

NEW SW

NEW SWNEW SW

.

.

.

.

F O W L E R R O A D

MO

RR

IS

S

TR

EE

T

H O L D S W O R T H S T R E E T

MA

TT

HE

W

ST

RE

ET

R E S I D E N T I A LR E S I D E N T I A L

FO

WL

ER

RO

AD

SC

HO

OL

RE

SID

EN

TIA

L

R E S I D E N T I A L R E S I D E N T I A L

RE

SID

EN

TIA

L

VEHICLE ENTRY

PUBLIC

KISS N DROP ZONE

ENTRY STUDENT ENTRY

DISABLED CAR SPACE

APPR

OX.

18

SPAC

ES S

HAR

ED B

Y FO

WLE

RR

OAD

SC

HO

OL

AND

MER

RYL

AND

S P.

S

1 2 3 4 5

7 8 9 10 11 12 13 14 15 16

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

18 19 20 21 22 23 24 2517

6

° .

.

BLOCKN

BLOCK G

BLOCKI

BLOCKH

COLABLOCKJ

DEMOUNTABLE

DEMOUNTABLE

DEMOUNTABLE

BLOCKL

BLOCKD

BLOCKC

BLOCKA

PLAYING FIELD

NEW 3 STOREYBUILDING

EXISTINGCARPARK

PLAYGROUND /COURTYARD

TPZ

NEW SOFTLANDSCAPE

EXIS

TING

CAR

PARK

NEW SOFTLANDSCAPE

DEMOUNTABLE

NEWLANDSCAPE

25 SPACES (16 EXISTINGAND 9 PROPOSED)

BLOCK M

ENTR

YEN

TRY

Stage 2Completion of new staff carpark

Stage 1Completion of Block N

Site map outlining the staged handover of the Merrylands Public School upgrade