NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90...

Date post: 09-Jun-2020
Category:
Upload: others
View: 15 times
Download: 0 times
Share this document with a friend
14
PIRELLI ENERGY CABLES AND SYSTEMS PIRELLI ENERGY PIRELLI ENERGY CABLES AND SYSTEMS CABLES AND SYSTEMS 400/225 kV 225/63 kV 63/20 kV 20/1 kV NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT Oscar Cristianci Oscar Oscar Cristianci Cristianci
Transcript
Page 1: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

PIRELLI ENERGYCABLES AND SYSTEMS

PIRELLI ENERGYPIRELLI ENERGYCABLES AND SYSTEMSCABLES AND SYSTEMS

400/225 kV

225/63 kV

63/20 kV

20/1 kV

NUCLEAR POWERPLANT

20/1 kV

90/20 kV

225/90 kV

225/90 kV400/225 kV

HYDROELECTRIC POWERPLANT

Oscar CristianciOscarOscar Cristianci Cristianci

Page 2: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

PIRELLI ENERGY CABLES AND SYSTEMSPROFIT & LOSS

PIRELLI ENERGY CABLES AND SYSTEMSPROFIT & LOSS

Net SalesNet Sales

EBITEBIT% on Net Sales% on Net Sales

Euro mnEuro mn

EBITDAEBITDA% on Net Sales% on Net Sales

2,5672,567

1221224.7%4.7%

19991999

2252258.8%8.8%

3,1623,162

58581.8%1.8%

20002000

1651655.2%5.2%

EmployeesEmployees 13,11513,11514,38414,384

FactoriesFactories 50505454

EBIT (w/o overhead)EBIT (w/o overhead)

% on Net Sales% on Net Sales154154

6.0%6.0%102102

3.2%3.2%

Page 3: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

The energy cable market is characterisedby a high fragmentation of competitors

Pirelli (+ BICC)NexansBICC GeneralYazakiSouthWireFurukawa* SumitomoSuperiorDrakaFujikura* HitachiMarmon GroupPhelps DodgeLeviton GroupShowaNKT (F&G)Delphi PackardMadecoIndustrias AxasMitsubishi cableTOTAL

Pirelli (+ BICC)NexansBICC GeneralYazakiSouthWireFurukawa* SumitomoSuperiorDrakaFujikura* HitachiMarmon GroupPhelps DodgeLeviton GroupShowaNKT (F&G)Delphi PackardMadecoIndustrias AxasMitsubishi cableTOTAL

9,3%6,54,23,83,32,92,92,62,52,21,81,41,31,01,00,90,90,80,70,750,5%

9,3%6,54,23,83,32,92,92,62,52,21,81,41,31,01,00,90,90,80,70,750,5%

Top 20 competitors50,5%

Others 49,5%(with Mkt Share <0,7)

Top 20 competitors

Source: Pirelli estimate

PIRELLI ENERGY CABLES AND SYSTEMS COMPETITORS IN THE ENERGY CABLES MARKET

world = 35,8 bn Euro

PIRELLI ENERGY CABLES AND SYSTEMS COMPETITORS IN THE ENERGY CABLES MARKET

world = 35,8 bn Euro

(*) JV in Power Utilities

Page 4: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

NORTH AMERICAPirelli share:6%

SOUTH AMERICAPirelli share: 19%

WESTERN EUROPEPirelli share: 22%

ASIA PACIFICPirelli share: 2%

EASTERN EUROPEPirelli share: 32%

EASTERN EUROPEPirelli share: 32%

AUSTRALIAPirelli share:35%

Power CablePirelli share:10 %

G.M. + SpecialPirelli share:4%

Power CablePirelli share:20 %

G.M. + SpecialPirelli share:17%

Power CablePirelli share: 32%

G.M. + SpecialPirelli share:16%

Power CablePirelli share: 33%

G.M. + SpecialPirelli share:32%

Power CablePirelli share:40 %

G.M. + SpecialPirelli share:32%

PIRELLI ENERGY CABLES AND SYSTEMSWORLDWIDE MARKET SHARES

PIRELLI ENERGY CABLES AND SYSTEMSWORLDWIDE MARKET SHARES

AFRICAPirelli share: 9%

Power CablePirelli share:10 %

G.M. + SpecialPirelli share:8%

Page 5: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

YearsYears

PerformancesPerformances

2001200120002000

PIRELLI ENERGY CABLES AND SYSTEMSVALUE CREATION: STRATEGY

PIRELLI ENERGY CABLES AND SYSTEMSVALUE CREATION: STRATEGY

RestructuringRestructuring

Market FocusMarket FocusNew productsNew products

GrowthGrowth

Page 6: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

Medium VoltageMedium VoltageMedium Voltage

PIRELLI ENERGY CABLES AND SYSTEMSTHE BUSINESS STRUCTURE

PIRELLI ENERGY CABLES AND SYSTEMSTHE BUSINESS STRUCTURE

ENERGYENERGYENERGY

Sales at December 31, 2000 (Euro mn)Sales at December 31, 2000 (Euro mn)

World # 1World # 1

UtilitiesUtilitiesUtilities GeneralMarket

GeneralGeneralMarketMarket SpecialsSpecialsSpecials

Low VoltageLow VoltageLow Voltage

Building cablesBuilding cablesBuilding cables

High VoltageHigh VoltageHigh Voltage

Medium VoltageMedium VoltageMedium VoltageBranchementBranchementBranchement

AutomotiveAutomotiveAutomotive

Pro

du

cts

Pro

du

cts

Pro

du

cts

Sales: 3,162

Employees: 14,384

Factories: 54 (6 shared)

Sales:Sales: 3,1623,162

Employees:Employees: 14,38414,384

Factories:Factories: 54 (6 shared)54 (6 shared)

EnamelledEnamelledEnamelled

O.E.M.O.E.M.O.E.M.

IndustrialsIndustrialsIndustrials

1,4941,494 1,0811,081 587587

ROS 1.8%

ROS w/o overhead 3.2%

ROS ROS 1.8%1.8%

ROS w/o overhead ROS w/o overhead 3.2%3.2%

Low VoltageLow VoltageLow Voltage

Subm. SystemsSubmSubm. Systems. Systems

AccessoriesAccessoriesAccessories

InstallationsInstallationsInstallations

Page 7: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

Utilities strategy Impact on suppliers

è Focus from “purchasing cost” to“total cost of ownership”

è Aggressive purchasingtechniques

• Encouraging importers• Speeding up the homologation

process

è Downsizing/restructuring• Deskilling• Unstable organisations

è Long term partnership with globalsolutions providers

• 5 years or more on single sourcebasis

è Management services for LV & MV• Stock holding/management• Cut length schemes• Delivery to site• Accessories

è Outsource of design, build and MVprojects management

Ø Pirelli’s offering system is anticipating the delivery of global solutions to matchrenewed utilities’ strategy

ØØ Pirelli’s offering system is anticipating the delivery of global solutions to matchPirelli’s offering system is anticipating the delivery of global solutions to matchrenewed utilities’ strategyrenewed utilities’ strategy

PIRELLI ENERGY CABLES AND SYSTEMS EVOLUTION IN THE UTILITIES BUSINESS STRATEGYPIRELLI ENERGY CABLES AND SYSTEMS

EVOLUTION IN THE UTILITIES BUSINESS STRATEGY

Page 8: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

Distributors strategy Impact on suppliers

è Growth through acquisition world-wide

è Added value improvement:• new product lines• (electrical à electronic)• new application (residential,

industrial, utilities…)• new services and customer

relationship (training…)

è Cost reduction:• Supplier rationalization• New logistic platform

è Global Supplier in one international frameagreement

è Broader product range technology/innovation requirement

è Supply chain and informationtechnology integration

è “Brand” awareness through a direct andmore relationship approach(C.R.M.,fidelization system…)

PIRELLI ENERGY CABLES AND SYSTEMS EVOLUTION IN GENERAL MARKET BUSINESS STRATEGY

PIRELLI ENERGY CABLES AND SYSTEMS EVOLUTION IN GENERAL MARKET BUSINESS STRATEGY

Ø E-business, key management accounts, full range supplierØ Cost leadership, sell-out partnership

ØØ E-business, key management accounts, full range supplierE-business, key management accounts, full range supplierØØ Cost leadership, sell-out partnershipCost leadership, sell-out partnership

Page 9: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

OEM/ Contractors strategy Impact on suppliers

è Refocusing on their core competence

è Centralisation of Purchasing dept.• from local buying to global contract• Headquarters negotiation and local

executions• Product standardisation to

overcome local barriers

è Rethinking Total Cost of Ownership /Installation

è Opportunity to catch new customers

è Deeper knowledge of customer’sapplication field

è Few global players (manufacturers orvalue added resellers)

è Local presence and global key accountmanagement

è Cable services (precutting, harnessing,delivery to site)

PIRELLI ENERGY CABLES AND SYSTEMS EVOLUTION IN SPECIALS BUSINESS STRATEGY

PIRELLI ENERGY CABLES AND SYSTEMS EVOLUTION IN SPECIALS BUSINESS STRATEGY

Ø Targeting global accounts at local and central levelØ Refocus the global product offer through world excellence center with Supply chain

reengineeringØ Launch of “Technergy”, the new world-wide Integrated Cabling Solution

ØØ Targeting global accounts at local and central levelTargeting global accounts at local and central levelØØ Refocus the global product offer through world excellence center with Supply chainRefocus the global product offer through world excellence center with Supply chain

reengineeringreengineeringØØ Launch of “Launch of “TechnergyTechnergy”, the new ”, the new worldworld-wide Integrated Cabling Solution-wide Integrated Cabling Solution

Page 10: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

PIRELLI ENERGY CABLES AND SYSTEMSENERGY INNOVATION

20 PIRELLI PATENTS (15 Filed / 5 under Filing)

PIRELLI ENERGY CABLES AND SYSTEMSENERGY INNOVATION

20 PIRELLI PATENTS (15 Filed / 5 under Filing)

LVMV

On these 5 product lines strong patents have been filed

AFUMEX TM low smoke - zero Halogen

GMGM UTUT

LV LVMVHV

COMPACT TM Weight / dimension reduction(same power transmission)

AIR BAG TM New protection system concept for underground

PIT STOP TM Self repairing cable system

HYBRID TM Multifunction cable(Energy / Communication)

Armoured Air Bag

Damaged Repaired

SPSP

LV LVMVHV

LVMV

LV LVMV

LVMV

LVMVHV

LVMV

LV LVMVHV

LVMV

Page 11: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

20002000

71%

29%

67%

33%

58%

42%

20012001 20022002

* Bare conductors and enamelled are excludedIndonesia, South Africa, China included from 2001

NEW PRODUCTS MATURE PRODUCTS

PIRELLI ENERGY CABLES AND SYSTEMSENERGY BUSINESS: PRODUCT INNOVATIONENERGY BUSINESS: PRODUCT INNOVATION * *

50%

50%

20032003

P. SALES (Mn Euro) WORLD

∆ Contribution Margin % New vs Mature∆ Contribution Margin % New vs Mature

+2 %+2 % +3 %+3 % +5 %+5 % +6 %+6 %

Page 12: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

COMPETITIVEINNOVATIVE SOLUTIONS

ENVIRONMENTAL FACTORS(EMF, visual impact…)

NETWORK AVAILABILITYRELIABILITY

SAFETY FACTORS

CONVERGENCE OF FACTORS WHICH ARE UNFAVOURABLETO OVERHEAD LINES

CONVERGENCE OF FACTORS WHICH ARE UNFAVOURABLETO OVERHEAD LINES

A competitive cable system is thebest solution to environmental,

reliability and safety issues

PIRELLI ENERGY CABLES AND SYSTEMSPIRELLI ENERGY CABLES AND SYSTEMS

UNDERGROUNDUNDERGROUNDUNDERGROUND

Page 13: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Reduced time for assembly, fewer joints

Land value not consideredLand value not considered

PIRELLI ENERGY CABLES AND SYSTEMS150 KV CABLE SYSTEM: ECONOMICAL COMPARISON

Traditional vs Innovative

PIRELLI ENERGY CABLES AND SYSTEMS150 KV CABLE SYSTEM: ECONOMICAL COMPARISON

Traditional vs Innovative

Advantages on single components (lightweight, self protection, longer lengthts) are amplified in the system

Traditional Innovative

Compact Air Bag design, reliable water and mechanical protection

Compact joints , no resin filling,

Fewer joints ( longer lengths)

K Euro/km1,031

K Euro/km217

K Euro/km180

ACCESSORIES

CIVIL WORKS

PIRELLIWORKS

CABLE

Aerial

Compact trench and joint bay,

faster cable laying

K Euro/km335

InnovativeFully Mechanized

•“zero” magnetic field• zero visual impact• higher reliability

•“zero” magnetic field• zero visual impact• higher reliability

Aerial

K Euro/km206

Past Present

Page 14: NUCLEAR POWERPLANT HYDROELECTRIC POWERPLANT · NUCLEAR POWERPLANT 20/1 kV 90/20 kV 225/90 kV 225/90 kV 400/225 kV HYDROELECTRIC POWERPLANT OscarOscar Cristianci Cristianci. PIRELLI

YearsYears

PerformancesPerformances

2001200120002000

PIRELLI ENERGY CABLES AND SYSTEMSVALUE CREATION: STRATEGY

PIRELLI ENERGY CABLES AND SYSTEMSVALUE CREATION: STRATEGY

RestructuringRestructuring

Market FocusMarket FocusNew productsNew products

GrowthGrowth