Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator...

Date post: 02-Jan-2016
Category:
Upload: ross-palmer
View: 218 times
Download: 0 times
Share this document with a friend
Popular Tags:
8
Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501
Transcript
Page 1: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

Nuclear Science User Facilities

NSUF Solicitation Overview

Jeff BensonNSUF Program Administrator

Idaho National Laboratory

NSUF User Meeting6/22/15

INL/MIS-15-35501

Page 2: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

2

NSUF RTE Overview

Rapid Turnaround Experiments (RTEs) offer researchers the opportunity to perform quick analysis of a small number of samples. Irradiation experiments that require use of the ATR, MIT, or HFIR reactors do not qualify as rapid turnaround experiments.•All rapid turnaround experiment proposals are reviewed for feasibility, program relevance, group expertise, and scientific merit.

•NSUF makes every effort to match reviewers' expertise to the proposal's research areas. All reviewers are in the NEUP review pool. Proposals are scored on scientific merit (50%), technical feasibility (30%), and capability of the group (20%).

•The NSUF Chief Scientist and TIO of the LWRS program perform the relevance review. Proposals are also reviewed for feasibility at INL and partner facilities.

•A principal investigator and affiliated team members (co PI's working on the same team or research area) may only submit a total of two proposals per call.

•A principal investigator will not be allowed to propose a new RTE if they have three active experiments during the call period.

Page 3: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

3

NSUF Rapid TurnaroundExperiments (RTE)

Rapid Turnaround Experiment solicitations

are on a 4 month cycle:

‾1st call from September - January

‾2nd call from January - May

‾3rd call from May - September

Page 4: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

4

RTE Guidelines for CAES MaCS

• Guidelines for the use of CAES MaCS

• Award for use of the MaCS laboratory is limited to 6 months duration

• Awarded proposals are granted access to the lab for a single researcher per proposal

• FIB time is limited to 6 days in a 6 month period (no more than 2 consecutive days at a time). Maximum of 4 days in a month

• All other instruments are limited to a maximum of 10 days (combined, not per instrument) in a 6 month period with no more than 3 consecutive days at a time

Page 5: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

5

RTE Guidelines for Other Partners

• Award is limited to 6 months duration

• Instrumentation use same as MaCS Lab policies

• Only use one facility per proposal

• Beamline experiment applications will follow RTE schedule

Page 6: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

6

NSUF Full Proposals

• Full Call- Part of the annual DOE-NE CINR FOA – Letter of intent is required for NSUF access– Pre-application is required– Full application is required

• Appendix F: Accessing the Nuclear Science User Facility

Page 7: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

7

NSUF Full Proposals

• NSUF access (NSUF-1)– The NSUF does not provide funding to the proposing researcher to support

salaries, tuition, travel, etc.– FY 15 up to ~$4.7 million available

• NSUF types of awards available– NSUF access only– NSUF access coupled to R&D funding

• Research funding is available to support university/faculty/students or lab led proposals (program supporting/mission supporting)– University-led (NEUP)

• Program supporting (up to $800,000)• Mission supporting (up to $400,000)

– National lab/industry/university led (NEET)• Program supporting (up to $1,000,000)• Mission supporting (up to $500,000)

Page 8: Nuclear Science User Facilities NSUF Solicitation Overview Jeff Benson NSUF Program Administrator Idaho National Laboratory NSUF User Meeting 6/22/15 INL/MIS-15-35501.

8

NSUF Full Proposals

• Kick off webinar sometime the week of August 10-14