NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation Search) DOE Office of Science Review Greg Bock NuMI Project Manager May 25, 2004 Outline Project overview Progress since last review including responses to your recommendations Schedule & Funding update Summary and Outlook
Transcript
Page 1: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 1Status of NuMI

NuMI (Neutrinos at the Main Injector)MINOS (Main Injector Neutrino Oscillation Search)

DOE Office of Science Review Greg Bock

NuMI Project Manager May 25, 2004

Outline• Project overview • Progress since last review including responses to your recommendations• Schedule & Funding update•Summary and Outlook

Page 2: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 2

Construct Facilities and Equipment for a Two Detector Neutrino Oscillation Experiment with Variable Energy Neutrino Beam (Start 2005)

Near Detector: 980 tonsFar Detector: 5400 tons

NuMI Project

Det. 2

Det. 1

Obtain firm evidence for oscillations and measure oscillation parameters,m2, sin22Probe for e appearance.

Page 3: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 3

• TEC = WBS 1.0 NuMI Facility ($109M)« Construction of beam line facility at Fermilab « project scope includes

* underground excavation and outfitting of tunnels and halls* construction of two surface buildings * design, construction and installation of technical components in NuMI

beamline

• OPC = WBS 2.0 MINOS Detector + WBS 3.0 Project Support ($62M)« Construction of two detectors and Soudan Far detector cavern« project scope includes

* WBS 2.0 : design , construction and installation of two detectors* WBS 3.0 : early phase of R&D tasks for NuMI and MINOS

excavation and outfitting and pre-operating of MINOS Far detector cavern at Soudan Underground Laboratory

Project Scope

Page 4: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 4NuMI Facilities at Fermilab

•Major, complicated conventional construction

•3 major technical installations in three different areas:

•Several hundred feet of accelerator enclosure—half of which is between two operating machines

• Downstream end of carrier tunnel, Pre-Target and Target Areas--primary beam focus, 8KT neutrino beam target station

•MINOS area—beam monitoring, ~1 KT hadron absorber and ~ 1 KT neutrino detector

Completed Oct 20, 2003 Completed Mar 10, 2004

Page 5: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 5

Signs of a Healthy Project in May 2004(slide from November, updates in “Red italics”)

• Service Buildings and Outfitting work complete (done)• Work cell and bottom of target chase shielding installed in the target hall

(bottom shielding done, work cell almost complete and more)• ND Plane installation underway and ND commissioning underway (done,

somewhat ahead of schedule)• Ready for Summer 2004 shutdown (will be ready for Fall shutdown)• Award of 4th period safety incentive to RBI (not awarded—a laceration)• Accelerator studies underway according to plan (proceeding as planned)• Continuing progress on tunnels and halls contract closeout (ongoing)• Excellent progress on “readiness reviews” preparation• Decay pipe pumped down• Fiber optics and controls links available in all areas• Far detector continuing to take data• Staying within budget and on schedule

• We remain a healthy project

Page 6: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 6

Conventional Construction (WBS1.2): Complete

MINOS Beneficial OccupancyMarch 10, 2004

Original Subcontract $17.9M

Design Changes 2.2M

(transfer water handling 300K)

(upgraded water handling 600K)

(drawings 600K)

(additions 500K)

Field Changes .5M

Changes unresolved with RBI .04M

Safety/Perf Incentive .05M

Service Buildings and Outfitting

Page 7: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 7Primary Beam

• All major magnets installed in the beamline, correctors installed in pre-target, LCW running, PS refurbishing completed

• Remaining correctors, instrumentation, magnetic shielding, kickers, and vacuum will be installed beginning in August (need 8 weeks of ~12 scheduled)

MI60 Region

Pre-Target

NuMI Stub

Page 8: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 8Instrumentation and Kicker Magnet

Kicker magnet & power supply assembled and testing is underway; installation, during Fall shutdown

Page 9: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004

Page 9

Target, Horns & Modules

Horn 2 & ModuleIHEP Baffle

• Horn 1 &2 & Modules assembly complete

• Horn module installation in May and June

• Target/Baffle Module complete

• Horn PS installed. Stripline installation, underway. Horn pulsing in late July

Page 10: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 10

Target Pile Construction

• Target pit shielding installation and work cell construction is on schedule

• Used contingency, stayed on schedule

• Radioactive component handling practice in November

• Beam in December

Page 11: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 11

Primary Beam

• Thermal studies on quadrupole magnets indicate that we need to ramp 20 quadrupole magnets - CR ($80k) will be proposed

• Recycler shielding design validated in FMI in February shutdown

• BPM signal conditioning electronics procurement in progress

« Large image current on pre-target beam pipe may require some special handling, e.g ferrite cores, ceramic breaks to mitigate noise

• Construction of profile monitors proceeding at UT-Austin

« First profile monitor at FNAL

« Construction of the next 5 PM’s due July 1 – on schedule

« Balance of PM’s due Sept 1 – on schedule

• We are holding bi-weekly meetings with the Instrumentation Department

Page 12: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 12

Absorber and Neutrino Beam Monitoring and Utilities

• Decay pipe vacuum system pumped down to 1.4 Torr

• The 8 aluminum absorber core modules have been pre-assembled into 2 super-modules & water connections made

• Absorber installation has started – using winch “back-up” plan

« Electric forklift failed performance requirements - will be used for “flat surface” installation after repairs

• All muon monitors are ready for installation (UT-Austin)

• Hadron monitor is being assembled at UT-Austin

• All water skids are below-ground

• Fiber optic cables are installed in all areas

• Controls link available in all areas

• FIRUS cabling is installed in all areas

Page 13: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 13

CD4 Commissioning and the Transition to Operations

• Commissioning Plan for Project Completion (“CD4”) as specified in the Project Execution Plan :« Demonstrate a functioning Far Detector (atmospheric neutrinos and muons)« Demonstrate a functioning Beamline and Near Detector (with beam neutrinos)

while avoiding undue activation of the components

• April 15 Commissioning Workshop « CD4 preparations« Main Injector« Near Detector« Commissioning for physics

• Planning for evolution to initial operational intensity« 2.5E13 protons , 5/6 batches, 5E12 in Booster , 1.9s cycle« Integrated into AD/HQ planning: tasks, people, studies« Multi-batch studies, dampers, beam loading compensation, booster collimation,

booster notch and timing

Page 14: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 14

PEP Commissioning Goals

Parameter

Measurement

Commissioning Goal

Proton intensity in target hall

Toroid (or equivalent) beam intensity monitor at entrance to the Target Hall

Greater than 1x1012 120 GeV protons/spill

Beam alignment

Transverse distributions of the proton beam and secondary beams.

Proton direction established to within 1 mr of the known direction to the Far Detector in the Soudan mine.

Neutrino beam energy Near detector event energy

Low energy, 2-4 GeV

Cosmic ray muons detected in the MINOS Near Detector

Near Detector data read out through DAQ system

Majority of the 153 Near Detector planes sensitive to muons

Near detector neutrino flux

Charged current event rate in 1.5 ton fiducial region

Observe neutrinos in the Near Detector produced by the NuMI beam

Cosmic ray muons and atmospheric neutrinos detected in each of the two MINOS Far Detector Super Modules

Far Detector data read out through DAQ system

Majority of the 484 planes of the Far Detector sensitive to muons and atmospheric neutrinos.

Table 1(a) Technical Commissioning Goals

Page 15: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 15

Main Injector Commissioning

• Team of accelerator physicists and MINOS collaborators in place and planned studies ongoing

• A beam intensity of 2.31013 protons/cycle is now operationally achievable in MI. 3.3 1013 at 8 Gev already

• Good performance of MI transverse damper should be operational in June.

• Good progress on Booster cogging• By October 2004 we expect to meet

intensity and beam quality goals• When the kicker, recycler magnetic

shielding and instrumentation are installed, FMI is ready for CD4

Page 16: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 16

The MINOS Detectors

• Far Detector (Soudan Lab)

– 8m Octagonal Tracking Calorimeter

– 2 sections, 15m each

– 486 planes of steel & scintillator

– 95,000 scintillator strips

– 5.4 kT total mass

• Near Detector (MINOS Hall - FNAL)

« 3.8 x 4.8m “octagonal” steel & scintillator tracking calorimeter

« Same basic construction, sampling & response as the far detector

« 282 planes of steel

« 153 planes of scintillator

« 980 ton total mass

All the MINOS ND components and pre-assemblies are COMPLETE

Far Detector is still complete

Page 17: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 17

MINOS Far Detector

• Two Magnetized Supermodules began routine operation August 2003

• All project components associated with Far Detector fully closed out

Page 18: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 18

Atmospheric ’s in MINOS Far Detector

Expected Events in 24 kT years for m2=0.003 eV2, sin2 2 = 1.0Neutrino Antineutrino

Reco’d contained vertex with muon 440 260Reco’d upward going muon 280 120

• Analyzed Exposure to date« SM1

* 131 live days* Sept 02 - May 03

« SM1+SM2 * 173 live days* Jul 03 – Mar 04

• Analysis of Candidates continues« Upwardgoing muons« Contained Events

• Plots such as shown on the left will demonstrate CD4 goal attainment

Page 19: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 19

MINOS Near Detector

282 steel plates~20ft x ~12ft x 1inFinal Length (with gaps) 55ft

Start InstallationAt the downstream end

Spectrometer Section 161 planes

Calorimeter Section

121 planes

Page 20: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 20

Near Detector Installation

Plane Installation Spectrometer Region

* 5 planes per day, ending with an instrumented plane each day

« Calorimeter Region* 3 planes per day beginning 6/14

* Anticipate 50% complete by 7/9

* Anticipate 100% by 8/15

Magnet Installation« Power Supply underground

« Coil at D0 assembly building

« Anticipate lowering coil and begin installing it in August

Page 21: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 21

Near Detector Plane Commissioning(MINOS Collaborators)

• Procedure « Attach fiber cables

« Light leak check plane

« Connect to PMT

« Readout plane with DAQ

• Status« Daily work planning

metings

« 131/161 spectrometer planes are installed

Page 22: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 22

Near Detector Electronics(WBS 2.3 is complete)

• Production and checkout complete

• All racks are assembled and underground

• Electronics commissioning well ahead of plane installation

Page 23: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 23

Near Detector Commissioning Preparation

Near Detector is composed of three regions : Veto, Calorimeter, Spectrometer. Electronics in the spectrometer are multi-plexed giving a challenge for event reconstruction.

• Data Acquisition« Cosmic Ray Mode

* Initiated by a PMT dynode signal over threshold

« Spill mode* 10 s spill gate

* Event Reconstruction

Page 24: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 24

Cosmic Ray Muons in Near Detector(Data!)

Page 25: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 25

Near Detector Data

ADC weighted hit distribution vs Plane(blue =U;red=V)

ADC weighted Plane vs Strip

Page 26: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 26

Environment, Safety and Health

• Our safety plan emphasizes Fermilab’s safe work policies. Throughout the project we are taking time to plan ahead, identify hazards, put controls in place, monitor, assess, and correct.

• Safety across the project remains uppermost on all our minds. Deep underground facility unique at Fermilab.

• Take action when necessary. Investigate incidents and implement appropriate corrective actions including stand-downs and disciplinary actions.

• Added ES&H staff to cover increase in activities for construction. We have maintained that dedicated ES&H staff for installation.

• Two injuries since November review: ironworker suffered a hernia while using a pry bar during pretarget area installation and an electrician suffered a laceration requiring stitches while stripping cable insulation

Page 27: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 27

Environment, Safety and Health

• Documentation team formed: gather, finalize and post documents.

• ES&H reviews continue. Joint AD/PPD Safety Committee provides oversight.

• Increased our management involvement in safety walk throughs. Management also participating in Near Detector installation and commissioning acitivities including daily meetings with detector installation crews.

• Weekly meeting added specifically for management to discuss safety with the installation managers, project engineers, and safety staff

• Visited Spallation Neutron Source to observe and discuss installation safety

• Continuing to monitor Environmental compliance—no issues here at all.

• Working on Shielding Assessment and SAD preparation for some time already. Goal is to be ready for approval in Summer 2004. Working closely with all stakeholders.

• Shielding Assessment is now before the AD Shielding Committee !

Page 28: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 28

Doe Milestones FY2002-2005

Milestone Description

PEP Milestone

#DOE

Milestones March Forecast Float NotesCosmic Rays Observed in Far Detector L-2-10 3/22/2002 8/31/2001 203 CompleteTechnology Choice Made for Muon Monitors L-2-16 5/30/2002 12/10/2001 171 CompleteService Building & Outfitting Bid Package Out L-1-10 7/30/2002 2/25/2002 155 Complete75% Scintillator Produced L-2-19 8/30/2002 5/24/2002 98 CompleteNear Detector Hall Excavation Complete L-2-7 12/30/2002 8/30/2002 122 CompleteTarget Hall Excavation Complete L-1-5 12/30/2002 10/4/2002 87 CompleteLambertson & C-Magnets Assembled & Tested L-2-12 2/1/2003 10/31/2002 93 CompleteFirst Far Detector Super Mod Complete & Tested L-1-7 3/15/2003 7/24/2002 234 CompleteInner & Outer Conductors for First Production Horn Assembled L-1-6 4/14/2003 2/5/2003 68 CompleteTarget Service Building Shell Complete L-2-18 9/30/2003 6/17/2003 105 CompleteNear Plane Pre-assembly Complete L-2-20 10/10/2003 12/17/2002 297 CompleteFar Detector Complete & Tested L-1-8 4/25/2004 7/9/2003 291 CompleteBeneficial Occupancy of Service Buildings at Fermilab L-2-11 5/31/2004 3/10/2004 82 COMPLETED MAR 10Start Commissioning with Both Near and Far DAQ L-2-21 8/30/2004 6/9/2004 82Complete Installation of Horn Power Supply L-2-17 9/1/2004 6/11/2004 82 COMPLETED MAY 21MI Stub Installation Complete L-2-15 3/11/2005 10/7/2004 155 Near Detector Complete & Tested L-2-14 3/31/2005 12/27/2004 94First Horn Installed L-2-13 4/7/2005 6/24/2004 287Start Commissioning L-1-9 9/1/2005 12/22/2004 253CD-4 Start Operations L-0-3 9/30/2005 2/1/2005 241 End of Commissioning

Start commissioning with protons in December 2004

Page 29: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 29

NuMI’s Level 3 Milestones(Tracking our final approach: “Plunkett Plot”)

Milestone Accomplishment

0

10

20

30

40

50

60

70

80

22-M

ar

19-A

pr

17-M

ay

14-J

un

12-J

ul

9-A

ug

6-S

ep

4-O

ct

1-N

ov

29-N

ov

27-D

ec

24-J

an

21-F

eb

21-M

ar

Total Integral Expected

Total IntegralAccomplished

Summary of L3 Milestones:«Total number: 343«Completed since Nov: 29«Remaining until CD4: 49

L3 milestones remaining from March 1

Page 30: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 30

What do we worry about?

• Continuing close attention to working safely• What isn’t here and “on the shelf”?

« MINOS (WBS 2.0) fabrication is complete« Technical Components (WBS 1.1) (details in Baller to Cutler email)

* Instrumentation: profile monitors, BLM, some electronics cards * Air handling system, pond pumps, remote handling camera parts, concrete blocks all

due in over the next months* Hadron monitor needs to be shipped from Texas* Plan “B’ for absorber installation (winch) seems to be working

« Main Injector will be ready• Used more contingency than specifically identified last November, but we

have stayed within the overall range and on schedule. We will undoubtedly use some more installation contingency—absorber, ramping of quads—as we complete the work. We will stay on schedule and within budget.

• As we finish off pieces of the project we are even better able to handle new challenges.

• FY05 TEC funding: we would like the rescissions restored

Page 31: NuMI G. Bock DOE Office of Science Review May 2004 Page 1 Status of NuMI NuMI (Neutrinos at the Main Injector) MINOS (Main Injector Neutrino Oscillation.

NuMI

G. Bock DOE Office of Science

ReviewMay 2004Page 31

Conclusion

• The last 6 months have gone very well: over 97% complete, far detector taking physics data . We remain on the plan for completion by February 2005. We are only months (!) away from being ready to turn the beam and experiment on.

• Beam installation going well in the Main Injector, Target Hall and Absorber areas. Most things will be complete before the Fall sutdown: Ready for protons in December

• Both installation and commissioning of the Near Detector are going smoothly, efficiently and ahead of the original baseline schedule. The current plan is to complete plane installation around mid-August. Coil installation should take 3-4 weeks. The detector should be fully operational, taking cosmic ray data for several months before beam turn on.

• We are looking forward to finishing the NuMI Project and beginning the MINOS experiment.