Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package Request for Qualifications RFQ #: ASPA-TS-2019-01 Addendum #1 Date: January 23, 2019 Item Description 1 The list of attendees that participated in the Project Information Meeting on January 22, 2019 is attached (see Attachment 1). 2 The presentation that was used for the Project Information Meeting on January 22, 2019 is attached (see Attachment 2). 3 All other parties that are interested in participating in this Request for Qualifications process are encouraged to notify the Project Point of Contact, Pete Olivero, via e-mail ([email protected]) with their point of contact information to be added to the prospective offeror’s list.
Transcript
Page 1: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package

Request for Qualifications RFQ #: ASPA-TS-2019-01

Addendum #1 Date: January 23, 2019

Item Description

1 The list of attendees that participated in the Project Information Meeting on January 22, 2019 is attached (see Attachment 1).

2 The presentation that was used for the Project Information Meeting on January 22, 2019 is attached (see Attachment 2).

3

All other parties that are interested in participating in this Request for Qualifications process are encouraged to notify the Project Point of Contact, Pete Olivero, via e-mail ([email protected]) with their point of contact information to be added to the prospective offeror’s list.

Page 2: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package

Request for Qualifications RFQ #: ASPA-TS-2019-01

Addendum #1 Date: January 23, 2019

ATTACHMENT 1

LIST OF ATTENDEES PROJECT INFORMATION MEETING

JANUARY 22, 2019

Page 3: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package

Request for Qualifications RFQ #: ASPA-TS-2019-01

PROJECT INFORMATION MEETING JANUARY 22, 2019

SIGN-IN SHEET

Name Company Phone E-Mail

Kevin Milord Milord Co. (708) 598-7900 [email protected]

John MacGregor Milord Co. (404) 209-1551 [email protected]

Randy Green Milord Co. (404)209-1551 [email protected]

David Kaufman Haskell (904) 614-2111 [email protected]

Travis Deatherage White-Sprunner Construction (251) 471-5189 [email protected]

Jack Morrisroe Bhate Geo (251) 242-7451 [email protected]

Darryl Harris Wharton Smith (228) 284-2068 [email protected]

Kirby Latham Neel-Schaffer (251) 471-2000 [email protected]

Melissa Horton Jesco, Inc. (251) 432-7611 (334) 391-2798 [email protected]

Adam Street Wharton Smith (228) 284-2068 [email protected]

Page 4: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package

Request for Qualifications RFQ #: ASPA-TS-2019-01

Name Company Phone E-Mail

Austin Matthews Wharton Smith (228) 684-2068 [email protected]

Ben Radcliff Radcliff (251) 666-7252 [email protected]

Edith Louder Geotechnical Engr-Testing (251) 680-3205 [email protected]

Tom Clark Clark, Geer, Latham (251) 344-7073 [email protected]

Tom Jones Driven Engineering (DBE) (251) 649-4011 [email protected]

Steve Brown Blade Construction (251) 970-1050 [email protected]

Curt Doyle Geotechnical Engr-Testing (251) 666-7197 [email protected]

Ryan Gilliver G.A. West (251) 259-6464 [email protected]

Pete Olivero Alabama State Port Authority (251) 441-7533 [email protected]

Stan Gottlieb Aptim Port Services (251) 344-1913 [email protected]

Scott Wagner Aptim Port Services (251) 344-1913 [email protected]

Robert Otts Aptim Port Services (251) 344-1913 [email protected]

Page 5: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Alabama State Port Authority Automotive RO/RO Terminal Ancillary Buildings Package

Request for Qualifications RFQ #: ASPA-TS-2019-01

Addendum #1 Date: January 23, 2019

ATTACHMENT 2

PRESENTATION PROJECT INFORMATION MEETING

JANUARY 22, 2019

Page 6: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Automotive RO/RO TerminalAncillary Buildings Design-Build Package

Project Information MeetingJanuary 22, 2019

Alabama State Port Authority

Page 7: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Project Overview

2

Planned Work Packages:• Steel Demolition (In Progress)• Site Demolition (In Bidding)• Civil / Site Improvements (RFP in Process)• Wharf Rehabilitation (RFQ in Process)• Buildings (RFQ in Process)

Page 8: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Project Overview

3

Site• Raise grade to minimum elevation of +13’• Maximize vehicle storage space

Wharf• Accommodate RO/RO vessels (175m – 265m)

Bulk Area• First point of rest for cargo operations• Vehicle Processing Center• Fueling Station

Intermodal Rail Area• 10 Tracks (5 cars per track)• Heavy equipment storage pad

Intermodal Truck Area• 10 Truck spaces• Trucker Waiting Station

Picking Area• Vehicle storage• Rail Ferry cross over

Administration Building• Existing Building 50

Page 9: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

Scope of Work Summary

4

• Engineering Design of all Improvements• Procurement and Construction of Vehicle Processing Center (approx. 55,000 sf), including

building foundation• Procurement and Construction of Fueling Station (2 – 1,000 gal above ground storage tanks),

including foundation, secondary containment and canopy structure• Procurement and Construction of Trucker Waiting Station (approx. 625 sf), including building

foundation• Procurement and Construction of all associated Electrical, HVAC, Potable Water, Sanitary

Waste Water and Stormwater Drainage Systems for each building• Limited paving and other utilities infrastructure around perimeter of each building• All interior furnishings and equipment will be procured and installed by ASPA/AMIT; close

coordination with both ASPA and AMIT will be required to ensure all building design is fit for purpose

• Construction Engineering & Quality Assurance

Page 10: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

5

Terminal Zarate – Vehicle Processing CenterCar Wash Area

Car Wash Lanes• Manual Car Wash Equipment• Floor Drain System• Floor Striping

Car Wash Lanes• Manual Car Wash Equipment• Floor Drain System• Floor Striping

Car Wash Lanes• Vehicle Lift Equipment• Floor Drain System• Floor Striping

Car Wash Lanes• Automatic Car Wash Equipment• Basic Reference Only

Page 11: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

6

Terminal Zarate – Vehicle Processing CenterPre-Delivery Inspection Lanes

PDI Lanes• Floor Striping• Utility Stations

PDI Lanes• Special Equipment – Vehicle Wrap Station• Equipment by ASPA/AMIT

Page 12: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

7

Terminal Zarate – Vehicle Processing CenterBody Shop

Body Shop Work Space• Partitions for Each Space• Grated Flooring with Oil Dry• Utility Station• Ventilation

Body Shop Work Space• Ventilation System / Roof Penetration

Body Shop Work Space• Partitions for Each Space• Grated Flooring with Oil Dry• Ventilation System

Page 13: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

8

Terminal Zarate – Vehicle Processing CenterPaint Booth

Paint Booth• Equipment (System) by ASPA/AMIT• Natural Gas Required for Project• Ventilation System – Part of Equipment Package – Roof Penetrations Req’d

Page 14: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

9

Terminal Zarate – Vehicle Processing CenterWork Stations

Work Station Area• Floor Striping• Vehicle Lift Equipment (by ASPA/AMIT)• Utility Stations

Work Station Area• Utility Stations• Floor Striping

Work Station Area• Vehicle Lift Equipment (by ASPA/AMIT)

Page 15: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

10

Procurement & FundingProcurement• Two-Phase Process

• Request for Qualifications (Current Process)• Request for Proposals (Short-Listed Contractors)

Project Funding• Grants

• US DOT TIGER Grant• RESTORE ACT Grant

• Compliance with all grant requirements• Including Davis Bacon Act Wage Rates & Payroll Reporting

Disadvantaged Business Enterprise• Participation Goal is 7.9% of Contract Value

ASPA Point of Contact• Pete Olivero

Page 16: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

11

ScheduleNumber Item Date

1 Advertise RFQ January 4, 2019

2Project Information Meeting (Killian Room, International Trade Center, 250 North Water Street, Mobile, Alabama)

January 22, 20192:00 PM (CST)

3 Deadline to Submit Questions February 1, 20194:00 PM (CST)

4 ASPA Response to Questions February 8, 20194:00 PM (CST)

5 Statement of Qualifications Submission Date February 15, 20192:00 PM (CST)

6 ASPA Evaluation Complete February 22, 2019

7 Notification to Short-Listed Offerors February 22, 2019

8 Anticipated RFP Release Date February 22, 2019

9 RFP Due Date April 26, 2019 (may be earlier)

10 Anticipated Notice to Proceed Date June 21, 2019 (may be earlier)

11 Final Completion July 9, 2020

Page 17: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

12

Statement of Qualifications(Attachment 3.1.2)

Statement of Qualifications Component Form(if any)

RFQCross reference

Included within 15- page

limit?

SOQ Page Reference

Statement of Qualifications Checklist and Contents Attachment 3.1.2 Section 3.1.2 no

Acknowledgement of RFQ, Revision and/or Addenda Attachment 2.10 Section 2.10 no

Letter of Submittal (on Offeror’s letterhead)

Authorized Representative’s signature NA Section 3.2.1 yes

Offeror’s point of contact information NA Section 3.2.2 yes

Principal officer information NA Section 3.2.3 yes

Offeror’s Corporate Structure NA Section 3.2.4 yes

Identity of Lead Contractor and Lead Engineer NA Section 3.2.5 yes

Affiliated/subsidiary companies Attachment 3.2.6 Section 3.2.6 no

Evidence of obtaining bonding NA Section 3.2.8 no

DBE statement within Letter of Submittal confirming Offeroris committed to achieving the required DBE goal NA Section 3.2.9 yes

Page 18: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

13

Statement of Qualifications(Attachment 3.1.2)

Statement of Qualifications Component Form(if any)

RFQCross reference

Includedwithin 15- page

limit?

SOQPage

Reference

Offeror’s Team Structure

Identity of and qualifications of Key Personnel NA Section 3.3.1 yes

Key Personnel Resume – DB Project Manager Attachment 3.3.1 Section 3.3.1.1 no

Key Personnel Resume – Quality Assurance Manager Attachment 3.3.1 Section 3.3.1.2 no

Key Personnel Resume – Design Manager Attachment 3.3.1 Section 3.3.1.3 no

Key Personnel Resume – Construction Manager Attachment 3.3.1 Section 3.3.1.4 no

Organizational chart NA Section 3.3.2 yes

Organizational chart narrative NA Section 3.3.2 yes

Experience of Offeror’s Team

Lead Contractor Work History Form Attachment 3.4.1(a) Section 3.4.1 no

Lead Engineer/Architect Work History Form Attachment 3.4.1(b) Section 3.4.1 no

Project Risk

Identify and discuss three critical risks for the Project NA Section 3.5.1 yes

Page 19: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

14

Statement of Qualifications Evaluation Factors

Section Weight

3.3 Offeror’s Team Structure 40%

3.4 Experience of Offeror’s Team 40%

3.5 Project Risks 20%

TOTAL 100%

Page 20: o u ^ W } µ Z } ] Ç Z µ ( } Y µ o ] ( ] ] } v Z&Y · W ^W ... · Automotive RO/RO Terminal. Ancillary Buildings Design-Build Package. Project Information Meeting. January 22,

15

Closing

Read the RFQ Package Closely• Statement of Qualification Contents & Formatting• Key Dates• Process for Questions & Clarifications• Requirement to Keep Team Intact• All Other Provisions