+ All Categories
Home > Documents > OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS eTMF TC Inaugural Meeting 16 December 2013

Date post: 18-Jan-2016
Category:
Upload: nell
View: 37 times
Download: 0 times
Share this document with a friend
Description:
OASIS eTMF TC Inaugural Meeting 16 December 2013. TC Process Overview. TC Process is created by OASIS Board, carried out by TC Adminstration Job of TC Administration Support activities of OASIS members Turn TC Process guidelines into practical rules - PowerPoint PPT Presentation
Popular Tags:
10
OASIS eTMF TC Inaugural Meeting 16 December 2013
Transcript
Page 1: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS eTMF TC Inaugural Meeting16 December 2013

Page 2: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 2

TC Process Overview• TC Process is created by OASIS Board, carried

out by TC Adminstration• Job of TC Administration

Support activities of OASIS members Turn TC Process guidelines into practical rules Communicate procedures & best practices to TCs Represent TC interests to Board Improve tools & support for members Recommend improvements to process itself

Page 3: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 3

Work Product LifecycleYour work products will progress through

the following stages for a Standards Track Work Product: 1. Working draft (no official standing) 2. Committee Specification Draft3. Committee Specification Public Review Draft 4. Committee Specification 5. Candidate OASIS Standard 6. OASIS Standard7. Approved Errata

Page 4: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 4

Work Product LifecycleStages for a Non-Standards Track Work

Product:1. Working draft (no official standing) 2. Committee Note / Public Review Draft

(optional)3. Committee Note

Non-Standards Track Work Products are non-normative – white papers, adoption collateral, etc.

Administrative documents (meeting minutes, etc.) must be maintained on OASIS-provided systems

Page 5: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 5

Work Product Lifecycle

Page 6: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 6

Making contributionsTC members may contribute existing or new

work to the TC for consideration in its work TC is under no obligation to do anything with itContribution only gives OASIS non-exclusive

right to use and republish. Full rights remain with the contributor

Process is simple:Load contribution to TC’s document repository Send email to the TC mailing list announcing

the contribution and including a link to the uploaded file

Page 7: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 7

Contacts with TC AdminActivity Timeframe TCA Interactions

Working Draft Up to TC Request WD template

Approve Committee Spec / Note Draft

Up to TC Request CSD/CND upload (optional)

Public Review CSD: 30 days 1st / 15 days subsequentCND: 15 days

Request public review

Approve Committee Specification / Note

After final public review Request Special Majority ballot Upload & announce CS

Approve Candidate OASIS Standard

After Committee Specification

Request Special Majority ballot

Public review 60 days Announce results

Membership vote After public review Launch membership ballot

OASIS Standard After successful ballot Upload & announce OS

Page 8: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 8

TC Process OverviewSome other things to know:• TCs run on Roberts Rules of Order,

including its requirements for quorum• To vote, you must maintain meeting

attendance

Page 9: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 9

TC ResourcesAlready in place:

TC web site & collaboration tools (“Kavi”)

Public TC web pages

TC mailing listPublicly archived

Only TC Members may post

Members and Observers are subscribed automatically

TC comment list (non-member feedback to TC)Chair automatically subscribed – others must join

Chat room http://webconf.soaphub.org/conf/room/etmf

Page 10: OASIS eTMF TC Inaugural Meeting 16 December 2013

OASIS Presentation to eTMF TC 10

TC ResourcesAvailable at TC request:

Wiki JIRA issues management project SVN version control instance Publicly viewable. Only TC members may edit.


Recommended