Oberlin City School Facilities Major Facility Maintenance Projects.

Date post: 31-Mar-2015
Category:
Upload: keagan-collinson
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
25
Oberlin City Oberlin City School School Facilities Facilities Major Facility Major Facility Maintenance Projects Maintenance Projects
Transcript
Page 1: Oberlin City School Facilities Major Facility Maintenance Projects.

Oberlin City Oberlin City School Facilities School Facilities

Major Facility Maintenance Major Facility Maintenance ProjectsProjects

Page 2: Oberlin City School Facilities Major Facility Maintenance Projects.

Oberlin High SchoolOberlin High School

Built in 1960Built in 1960 Classroom addition Classroom addition

in 1964in 1964 Classroom and Classroom and

Auditorium Auditorium addition in 1988addition in 1988

86,150 sq.ft.86,150 sq.ft.

Page 3: Oberlin City School Facilities Major Facility Maintenance Projects.

High School HVACHigh School HVAC

Four gas fired hot Four gas fired hot water boilers, 1964, water boilers, 1964, 1987 (2), 2005.1987 (2), 2005. 1964 unit is out of 1964 unit is out of

serviceservice Cost for replacement, Cost for replacement,

$640,000.$640,000. Cost of entire heating Cost of entire heating

system replacement: system replacement: $2,030,800$2,030,800

Page 4: Oberlin City School Facilities Major Facility Maintenance Projects.

High School SystemsHigh School Systems

Roofs: All roofs are over 14 years old, Roofs: All roofs are over 14 years old, except for choir room area. Expected except for choir room area. Expected replacement cost: $490,200replacement cost: $490,200

Electrical: Transformer Replacement: Electrical: Transformer Replacement: $15,000$15,000

Lighting: Upgrade classroom lighting, Lighting: Upgrade classroom lighting, $338,480$338,480

Masonry: $124,050Masonry: $124,050

Page 5: Oberlin City School Facilities Major Facility Maintenance Projects.

High School High School Door/WindowsDoor/Windows

Replacement of all Replacement of all window units: window units: $500,500 $500,500

Replacement of all Replacement of all exterior doors: exterior doors: $62,500$62,500

Page 6: Oberlin City School Facilities Major Facility Maintenance Projects.

High School Hazardous High School Hazardous MaterialMaterial

Removal of all Removal of all hazardous building hazardous building materials: materials: $281,600$281,600

Page 7: Oberlin City School Facilities Major Facility Maintenance Projects.

Oberlin High SchoolOberlin High School

Boilers: $510,000 to $2,030,800Boilers: $510,000 to $2,030,800 Roofs: $490,200Roofs: $490,200 Electrical: $15,000Electrical: $15,000 Lighting: $338,480Lighting: $338,480 Windows and Doors: $563,000Windows and Doors: $563,000 Hazardous material: $281,600Hazardous material: $281,600 Masonry: $124,050Masonry: $124,050 Total: $2,322,250 to $3,843,050Total: $2,322,250 to $3,843,050

Page 8: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston Middle SchoolLangston Middle School

Built in 1923Built in 1923 Addition in 1945Addition in 1945 Renovation and Renovation and

addition in 1982addition in 1982 84,240 sq. ft. 84,240 sq. ft.

Page 9: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston HVACLangston HVAC

Two gas fired hot Two gas fired hot water boilers, 1958water boilers, 1958

Cost of boiler Cost of boiler replacement: replacement: $340,000$340,000

Cost of entire Cost of entire heating system heating system replacement: replacement: $2,021,760$2,021,760

Page 10: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston SystemsLangston Systems

Roof: Single ply roof system installed Roof: Single ply roof system installed in 1996, out of warranty in 2011. in 1996, out of warranty in 2011. Cost to replace: $254,700Cost to replace: $254,700

Electrical: transformer replacement: Electrical: transformer replacement: $15,000$15,000

Lighting: $336,960Lighting: $336,960 Doors: $44,000Doors: $44,000

Page 11: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston Foundation and Langston Foundation and MasonryMasonry

Foundation Foundation sealing: $10,000 +sealing: $10,000 +

Masonry repairs: Masonry repairs: $109,175$109,175

Page 12: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston Hazardous Langston Hazardous MaterialMaterial

Removal of all Removal of all hazardous building hazardous building material: $130,672material: $130,672

Page 13: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston Middle SchoolLangston Middle School

Boilers: $340,000 to $2,021,760Boilers: $340,000 to $2,021,760 Roofs: $254,700Roofs: $254,700 Electrical: $15,000Electrical: $15,000 Lighting: $336,960Lighting: $336,960 Doors: $44,000Doors: $44,000 Masonry: $119,175Masonry: $119,175 Hazardous material: $130,672Hazardous material: $130,672 Total: $1,240,570 to $2,922,267Total: $1,240,570 to $2,922,267

Page 14: Oberlin City School Facilities Major Facility Maintenance Projects.

Prospect Elementary Prospect Elementary SchoolSchool

Built in 1960Built in 1960 Classroom addition Classroom addition

in 1970in 1970 Classroom addition Classroom addition

in 1980in 1980 45,290 sq.ft.45,290 sq.ft.

Page 15: Oberlin City School Facilities Major Facility Maintenance Projects.

Prospect HVACProspect HVAC

Two gas fired steam Two gas fired steam boilers and three boilers and three hot water boilers.hot water boilers.

Cost of boiler Cost of boiler replacement: replacement: $510,00$510,00

Cost of heating Cost of heating system system replacement: replacement: $1,086,960$1,086,960

Page 16: Oberlin City School Facilities Major Facility Maintenance Projects.

Prospect SystemsProspect Systems

Roof: Many different roof surfaces, Roof: Many different roof surfaces, shingles and Garland section under shingles and Garland section under warranty. Cost for replacement: warranty. Cost for replacement: $221,200 $221,200

Electrical: transformer replacement: Electrical: transformer replacement: $15,000$15,000

Lighting: $181,160Lighting: $181,160 Doors/windows: $303,300Doors/windows: $303,300

Page 17: Oberlin City School Facilities Major Facility Maintenance Projects.

Langston Foundation and Langston Foundation and MasonryMasonry

Foundation Foundation sealing: $10,000 +sealing: $10,000 +

Masonry repairs: Masonry repairs: $100,500$100,500

Page 18: Oberlin City School Facilities Major Facility Maintenance Projects.

Prospect Hazardous Prospect Hazardous MaterialMaterial

Removal of all Removal of all hazardous building hazardous building material: $102,200material: $102,200

Page 19: Oberlin City School Facilities Major Facility Maintenance Projects.

Prospect SchoolProspect School

Boilers: $510,000 to $1,086,960Boilers: $510,000 to $1,086,960 Roofs: $221,200Roofs: $221,200 Electrical: $15,000Electrical: $15,000 Lighting: $181,160Lighting: $181,160 Doors/windows: $303,300Doors/windows: $303,300 Masonry: $110,500Masonry: $110,500 Hazardous material: $102,200Hazardous material: $102,200 Total: $1,443,360 to $2,020,320Total: $1,443,360 to $2,020,320

Page 20: Oberlin City School Facilities Major Facility Maintenance Projects.

Eastwood Elementary Eastwood Elementary SchoolSchool

Built in 1955Built in 1955 Addition in 1960Addition in 1960 Addition in 1960Addition in 1960 38,660 sq.ft.38,660 sq.ft.

Page 21: Oberlin City School Facilities Major Facility Maintenance Projects.

Eastwood HVACEastwood HVAC

Two gas fired hot Two gas fired hot water boilers, 1995water boilers, 1995

Expected Expected replacement in replacement in 2015: $340,000.2015: $340,000.

Total cost of Total cost of heating system heating system replacement: replacement: $927,840.$927,840.

Page 22: Oberlin City School Facilities Major Facility Maintenance Projects.

Eastwood SystemsEastwood Systems

Roof: Built up roof system, much Roof: Built up roof system, much over 15 yrs. old. Preschool wing over 15 yrs. old. Preschool wing 2006. Total roof replacement: 2006. Total roof replacement: $198,425 $198,425

Electrical: transformer replacement: Electrical: transformer replacement: $15,000$15,000

Doors/windows: $355,250Doors/windows: $355,250 Masonry repairs: $54,275Masonry repairs: $54,275

Page 23: Oberlin City School Facilities Major Facility Maintenance Projects.

Eastwood Hazardous Eastwood Hazardous MaterialMaterial

Removal of all Removal of all hazardous building hazardous building material: $113,700material: $113,700

Page 24: Oberlin City School Facilities Major Facility Maintenance Projects.

Eastwood Elementary Eastwood Elementary SchoolSchool

Boilers: $340,000 to $927,840Boilers: $340,000 to $927,840 Roofs: $198,425Roofs: $198,425 Electrical: $15,000Electrical: $15,000 Doors/windows: $355,250Doors/windows: $355,250 Masonry: $54,275Masonry: $54,275 Hazardous material: $113,700Hazardous material: $113,700 Total: $1,076,650 to $1,723,915Total: $1,076,650 to $1,723,915

Page 25: Oberlin City School Facilities Major Facility Maintenance Projects.

Oberlin City School District Oberlin City School District TotalsTotals

High School : $2,322,250 to High School : $2,322,250 to $3,843,050$3,843,050

Langston: $1,240,570 to $2,922,267Langston: $1,240,570 to $2,922,267 Prospect: $1,443,360 to $2,020,320Prospect: $1,443,360 to $2,020,320 Eastwood: $1,076,650 to $1,723,915Eastwood: $1,076,650 to $1,723,915

District: $6,082,830 to District: $6,082,830 to $10,509,552$10,509,552