1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013
Transcript
Page 1: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

1

OccupationWorks GuideCamberwell - Box HillAPLT Friday 21st Continuous

to 04:00 Monday 24th June 2013

Page 2: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

2

Page 3: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

3

ContentsAbsolute Occupation Management 4

Site Management & Track Protection Roster 5

O Circular(s) 6

SW Circular(s) 7

S Circular(s) 8

Protection Diagram 12

Signal Diagrams 13

Permit to Foul Particulars 15

Permit to Foul Summary Register 26

Intergrated Works Program 27

Track Machine Movements 31

Level Crossing Disarrangement 32

Overhead Diagram 33

Bus Route Diagram 34

Permit to Work Summary 36

Environmental Sites 37

Page 4: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

4

Absolute Occupation ManagementAbsolute Occupation Location & Duration

Camberwell - Box Hill, Up, Down & Centre Lines After the Passage of TD 3588 (01:35 Hours) Saturday 22nd to 04:00 Monday 24th June 2013.

O Circular IDO.966/13

SW Circular IDAccess Procedure - N/ASidings - N/A

S Circular IDService Alteration - S.2770/13 & S.2771/13

Site OfficeCommand Centre located at Up Track side Surrey Hills Station

Works Progress ReportingProgress reporting will occur at 6 hourly intervals. The Occupation Coordinator will contact each Work Group Supervisor at approx 6 hourly intervals.

Occupation Works Guide

Page 5: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

5

Site Management & Track Protection Roster

TRACk FORCe PROTeCTION COORDINATOR ROSTeR

Friday 21st June Night Shift

Saturday 22nd June Day Shift

Saturday 22nd June Night Shift

Sunday 23nd June Day Shift

Sunday 23rd June Night Shift

Name Andrew Wahl Darren Jones Andrew Wahl Darren Jones Andrew Wahl

Mobile Number 0439 512 031 0417 416 542 0439 512 031 0417 416 542 0439 512 031

Date 21/06/13 22/06/13 22/06/13 23/06/13 23/06/13

Shift Duration 23:00 - 07:00 06:30 - 18:30 18:00 - 06:00 05:30 - 17:30 17:00 - 04:00

OCCUPATION MANAGeMeNT ROSTeR

Friday 21st June Night Shift

Saturday 22nd June Day Shift

Saturday 22nd June Night Shift

Sunday 23nd June Day Shift

Sunday 23rd June Night Shift

Name Sean Squire Dave Bates Ian Cranston Dave Bates Ian Cranston

Mobile Number 0419 202 121 0408 121 627 0410 413 656 0408 121 627 0410 413 656

Date 21/06/13 22/06/13 22/06/13 23/06/13 23/06/13

Shift Duration 23:00 - 08:00 08:00 - 20:00 20:00 - 08:00 08:00 - 20:00 20:00 - 04:00

Page 6: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

6

O Circular(s)

OPeRATIONAL RAIL SAFeTY O.966/2013 O.966/2012

Page 1 of 1

DISTRIBUTION Room 301 Flinders Street, Metrol. Phone 57410. Camberwell & Box Hill 19th June 2013.

Absolute Occupation Notice

The Absolute Occupation must be issued in accordance with the instructions contained in Section 15 of the 1994 Book of Rules.

The Signallers and Train Controller must confer and agree that the section of line for which the Absolute Occupation is required is clear, and the last train has cleared the section.

The Signallers must not grant the Absolute Occupation until the necessary Blocking Facilities have been applied and the permission of the Train Controller has been obtained.

SECTION/LOCATION/ PURPOSE

CAMBERWELL – BOX HILL STATION LIMITS UP, DOWN & CENTRE LINES 22KV renewal and Signal works.

DAY, DATE AND TIME REQUIRED

FRIDAY 21/06/2013 From after passage last train continuous until 04:00 hours MONDAY 24/06/2013.

AREA OF ABSOLUTE OCCUPATION/ ISSUING SIGNALLER

the Down Line between Signal Posts CAM311 and BOX304, the Centre Line between Signal Posts CAM321 and BOX314, issued by the Signaller Camberwell the Down Line between Signal Posts BOX304 and BOX308, the Centre Line between Signal Posts BOX314 and BOX315, the Up Line between Signal Posts BOX303 and CAM335, issued by the Signaller Box Hill

SPECIAL NOTE

1. A baulk will be placed on the Up line at a point clear on the Up side of points 201D to protect Overhead isolation of Up line.

2. Signal BOX301 will be inhibited to prevent a train being signalled towards Signal BOX303.

In conjunction with the Absolute Occupation the points listed below must be secured by locking devices, The Track Force Protection Co-ordinator is responsible for ensuring the points are secured when the Absolute Occupation is granted. The Signaller must apply a Blocking Facility to the affected points. When the Absolute Occupation is to be cancelled, the Track Force Protection Co-ordinator must remove the locking devices. The Signaller must remove the Blocking Facility and test the points when the Absolute Occupation is returned.

POINTS SECURED DURING ABSOLUTE OCCUPATION

NA.

STAFFING REQUIREMENTS

A Signaller must be on duty at Camberwell & Box Hill during the period of the Absolute Occupation

Wayne Walsh, Head of Operational Rail Safety, Per:-

REQUISITION JOB ID OH-13-079 ZP008530

Page 7: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

7

SW Circular(s)

N/A

Page 8: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

8

S Circular(s)

L:\Timetables\Circulars\Circulars 2013\S Circulars\Occupation\BLY CHL Group\S13-2770 CAM-BOX (Sat 22-06-13).doc Page 1 of 26

S.2770/13 S.2770/13

Job Reference: OC 13-034 Network PlanningOccupation Requisition: OH -13-0079 Level 2, 595 Collins StreetSpecial trains unit kilometres: Melbourne, victoriaBuild up unit kilometres: -7981.74 km 14617 AshCost Centre: Metro Infrastructure Tuesday, 11 June 2013extended build up in operation: No

ABSOLUTE OCCUPATION BETWEEN CAMBERWELL AND BOX HILLSATURDAY 22ND JUNe 2013

Purpose of occupation: Renewal of 22k equipment

In connection with the above occupation, commencing with APLT Friday and until BPFT Monday, Between CAMBERWELL and BOX HILL, the alterations herein will apply tonormal services on the date shown above.

Down JourneysCommencing with the first train and until the last train inclusive, all down Lilydale and Belgrave trains will operate as per W.T.T. to Camberwell, and then

continue to Alamein as the shuttle service, operating as per W.T.T. to Alamein unless stated otherwise.

A rail replacement bus service connecting with train arrivals will convey passengers from Camberwell to Box Hill with two running pattern Stopping all stations to Boxhill express to Boxhill

Trains will operate as per W.T.T. times from Box Hill to Lilydale/Belgrave, with a new TD Number.Altered and additional trains as per schedule pages will convey passengers from Ringwood to Lilydale/Belgrave.Altered arrangements will increase journey time by up to 32 minutes.

Up JourneysCommencing with the first train and until the last train inclusive, all up Lilydale and Belgrave trains will operate as per W.T.T. to Box Hill with altered TD numbers,terminate, and form down trains.A rail replacement bus service connecting with train arrivals will convey passengers from Box Hill to Camberwell with two running pattern.

Stopping all stations to Camberwell express to Camberwell

Page 9: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

9

S.2770/13 S.2770/13

L:\Timetables\Circulars\Circulars 2013\S Circulars\Occupation\BLY CHL Group\S13-2770 CAM-BOX (Sat 22-06-13).doc Page 2 of 26

Up Alamein shuttle trains will operate as per (or in some cases, 1” later than) W.T.T. to Camberwell and then continue through to Flinders Street as the upLilydale/Belgrave service operating as per W.T.T. to Flinders Street unless stated otherwise.Commencing from 10 30 am until 19 25 pm every alternate up service will originate at CAM Plat 02. See schedule pages for more details.Altered arrangements will increase journey time by up to 32 minutes.

Passenger NotificationOfficers in Charge are to ensure that altered train arrangements are posted a minimum of eight (8) days in advance of the date mentioned, so that the travelling public aregiven prior notice of these changes to the service. Station Supervisors are to ensure these instructions are enacted, and that all staff are familiar with the altered travelarrangements and potentially longer duration of passenger journeys. Officers in Charge at Camberwell & Box Hill,and then at late night Camberwell & Ringwood are toensure that connections are maintained between trains and the buses providing the substitute services.

Altered and additional trainsThe following trains are CANCELLED:

00 35 Up RWD (No 3562) empty

01 51 up BeG-UFG (No 3136) empty

The following additional empty trains will operate as follows:

04 25 down RWD-BeG (No 7271) formed by 04 18 arrival BeG (No 7270), RWD plat 01 depart at 04 25, FTG arr 04 34*, UFG 04 37*, UPW 04 40*, TCM 04 41*, BeG Plat02, arr 04 44 and forms 04 51 up BeG-BOX (No 3600).

04 39 down BOX-LIL (No 7221) formed by 04 34 arrival LIL (No 7220), BOX plat 03 depart at 04 39, BBN 04 42*, MCH 04 46*, RWD 04 50*, MLk arr 04 59, depart 05 02, LILarr Plat 02 at 05 08 and forms 05 29 up LIL-BOX (No 3802).

04 50 down CAM-RIv (No 2201) formed by ON, 6 cars SDG e, CAM depart 04 50, R, RIv Plat 02 arr 04 53 and forms 04 58 up RIv-CAM (No 2200) additional empty.

04 58 up RIv-CAM (No 2200) formed by 04 53 arrival CAM (No 2201), RIv depart Plat 02 at 04 58, R, CAM arrive Plat 02 at 05 01 and forms 05 12 down CAM-ALM (No2303).

05 04 down BOX-LIL (No 7201) formed by 04 59 arrival LIL (No 3800), BOX plat 03 depart at 05 04, BBN 05 07*, MCH 05 10*, RWD 05 14*, MLk arr 05 22*, LIL arr Plat 01at 05 27 and forms 05 57 up LIL-RWD (No 3302).

05 15 down CAM-RIv (No 2203) formed by ON, 6 cars SDG B, CAM depart 05 15, R, RIv Plat 02 arr 05 18 and forms 05 23 up RIv-CAM (No 2202) additional empty.

05 23 up RIv-CAM (No 2202) formed by 05 18 arrival CAM (No 2203), RIv depart Plat 02 at 05 23, R, CAM arrive Plat 02 at 05 26 and forms 05 32 down CAM-ALM (No2305).

05 38 down BOX-RWD (No 7251) formed by 05 29 arr BeG (No 3600), BOX depart plat 03 at 05 38, BBN 05 41*, RWD arr Plat 02 at 05 48 and forms 05 54 RWD-BeG (No3105).

07 00 up RWD-BOX (No 7250) formed by ON 6 cars, RWD depart at 07 00, BBN 07 07*, BOX arr Plat 03 at 07 11 and forms 07 22 down BOX-BeG (No 3005).

Page 10: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

10

S.2770/13 S.2770/13

L:\Timetables\Circulars\Circulars 2013\S Circulars\Occupation\BLY CHL Group\S13-2770 CAM-BOX (Sat 22-06-13).doc Page 9 of 26

Bus InformationSubstitute buses are being provided by U.S.Bus Lines (Monbulk Depot: 9752 1444)

Bus schedules indicated in the schedule pages will show additional time between the second-last and final stations of the section. This time margin isderived by rounding down and transposing intermediate section times to the last leg of the section, to prevent early running at intermediate locations. Busstops are marked with special blue Metro “Train Replacement Bus Stop” flags, (see picture), at the locations below:

Bus Stopping Locations

All additional cost incurred is to be referenced to the cost centre “MTM Infrastructure“ for cost recovery purposes.

Details of all additional staff rostered in connection with this are to be entered in the Customer services/Train services overtime return section on the computer network.

Appropriate Metro Operations Departments are to arrange for the necessary staff to be on duty for the above movements.

All concerned are to note and arrange.

STATION UP STOP DOWN STOP

Camberwell At the Metro designated Bus Stop outside the stationentrance in Cookson Street (South side)

At the Metro designated Bus Stop corner of Holly &Cookson Street (North side)

East Camberwell At the regular Bus Stop in Stanhope Grove (near theroundabout) east side.

At the regular Bus Stop in Stanhope Grove (near theroundabout) West side.

Canterbury At the Metro designated Bus Stop in Canterbury Roadnear the pedestrian crossing (South side)

At the Metro designated Bus Stop in Canterbury Roadnear the pedestrian crossing (North side)

Chatham At the Metro designated Bus Stop corner of RedversStreet & Canterbury Road (South side)

At the Metro designated Bus Stop corner of StanleyTerrace & Canterbury Road (North side)

Surrey Hills At the regular Bus Stop opposite the station in WindsorCrescent (South side)

At the regular Bus Stop outside the station car park inWindsor Crescent (North side)

Mont Albert At the regular Bus Stop in Mont Albert Road (Southside) At the regular Bus Stop in Mont Albert Road (North side)

Box Hill (Terminating) At the Metro designated Bus stop on Maroondah Hwy . At the Metro designated Bus stop on Maroondah Hwy.

Page 11: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

11

L:\Timetables\Circulars\Circulars 2013\S Circulars\Occupation\BLY CHL Group\S13-2771 CAM-BOX (Sun 23-06-13).doc Page 1 of 31

S.2771/13 S.2771/13

Job Reference: OC 13-034 Network PlanningOccupation Requisition:OH 13-0079 Level 2, 595 Collins StreetSpecial trains unit kilometres: -404.52 Melbourne, victoriaBuild up unit kilometres: km 544.18 14618 NikhilCost Centre: Metro Infrastructure Tuesday, 11 June 2013extended build up in operation:

ABSOLUTE OCCUPATION BETWEEN CAMBERWELL AND BOXHILLSUNDAY 23RD JUNE 2013

Purpose of occupation: Renewal Of 22 KV equipment

In connection with the above occupation, commencing with APLT Friday night and until BPFT Monday Morning,Between Camberwell and BOX HILL, the alterations herein will apply to normal services on the date shown above.

Down JourneysCommencing with the first train and until the last train inclusive, all down Lilydale and Belgrave trains will operateas per W.T.T. to Camberwell, and then continue to Alamein as the shuttle service, operating as per W.T.T. toAlamein.

A rail replacement bus service connecting with train arrivals will convey passengers from Camberwell to Box Hillwith two running pattern

Stopping all stations to Boxhill express to Boxhill

Trains will operate as per W.T.T. times from Box Hill to Lilydale and Belgrave, with a new TD Number.

Altered arrangements will increase journey time by up to 32 minutes.

Up JourneysCommencing with the first train and until the last train inclusive, all up Lilydale and Belgrave trains will operate asper W.T.T. to Box Hill, terminate, and form down trains. A rail replacement bus service connecting with trainarrivals will convey passengers from Box Hill to Camberwell with Two running pattern.

Stopping all stations to Camberwell express to Camberwell

Up Alamein shuttle trains will operate as per (or in some cases, 1” later than) W.T.T. to Camberwell and thencontinue through to Flinders Street as the up Lilydale/Belgrave service operating as per W.T.T. to FlindersStreet.Commencing from 10 30 am until 19 25 pm every alternate up service will originate at CAM Plat 02. Seeschedule pages for more details.

Altered arrangements will increase journey time by up to 32 minutes.

Passenger Notification

Officers in Charge are to ensure that altered train arrangements are posted a minimum of eight (8) days in advance ofthe date mentioned, so that the travelling public are given prior notice of these changes to the service. StationSupervisors are to ensure these instructions are enacted, and that all staff is familiar with the altered travelarrangements and potentially longer duration of passenger journeys. Officers in Charge at Camberwell & Box Hill,are to ensure that connections are maintained between trains and the buses providing the substitute services.

Altered and additional trainsThe following trains are CANCELLED:

07 31 Down UFG – BeG (No 3137) empty is cancelled.

19 42 Down UFG (No 3005) empty is cancelled.

Page 12: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

12

Protection Diagram

Page 13: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

12 13

Signal Diagrams

Page 14: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

14

Page 15: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

1514

Permit to Foul ParticularsWORk GROUP 1: OveR HeAD 22kv (JOHN HOLLANDS)

Work Group Limits: Structutre H399+61 to H472+45 Down Track (Up end Chatham to Box Hill)

Scope of Works: 22kv Rehabilitation WorksSaturday: 02:00 - 15:00 Between Str:426 -440+80 Down Line (Mont Albert Station to Creswick Lane Bridge)Saturday: 15:00 - 23:00 Between Str:399 - 411+11 Down Line (Up end Union Road to Signal L415)Saturday 23:00 - 07:00 Sunday Between Str 368 - 380+30 Down Line (Sig 367 to Robinson Road Bridge)Sunday: 07:00 - 01:30 Monday Between Str 440 - 472+45 Down Line (Signal L441 to Box Hill Station)

Site Access: Union Road PCR & Mont Albert Road PCR

Hi-Rail vehicles: 2 X Hi-Rail eWP’s & Tray Truck with Spider

Other Plant & equipment: various hand tools-

Wheels Free Area & Times: Wheels Free For All Work Parties Sunday 23 June @ 16:00 - 00:01 Monday

Wheels Free exception for 22kv works (As agreed by Noel McMahon.)

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Refer to P6 Program if more detail required

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Craig Baxter Rob Lord Craig Baxter Rob Lord

Mobile Number 0428 847 090 0412 105 133 0428 847 090 0412 105 133

Date 22/06/13 22/06/13 23/06/13 23/06/13

Shift Duration 02:00 - 14:00 14:00 - 02:00 02:00 - 14:00 14:00 - 02:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Matt Briggs Dean Gauci Matt Briggs Dean Gauci Matt Briggs

Mobile Number 0437 844 953 0447 649 794 0437 844 953 0447 649 794 0437 844 953

Date 21/06/13 22/06/13 22/06/13 23/06/13 23/06/13

Shift Duration 00:01 – 10:00 10:00 - 20:00 20:00 - 06:00 06:00 - 16:00 16:00 - 02:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable, eAP for 22kv Feeder N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A NO

Page 16: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

16

WORk GROUP 2: OveR HeAD 22kv (JOHN HOLLANDS)

Work Group Limits: Structutre H460+77 to H472+45 Down Track (elgar Road Bridge to Box Hill)

Scope of Works: 22kv Prep works for Rehabilitation WorksSaturday: 02:00 - 08:00 Sunday Between Str 460 - 472 Down Line (Mont Albert Station to Box Hill Station)

Site Access: Mont Albert Road PCR

Hi-Rail vehicles: 1 X Hi-Rail eWP

Other Plant & equipment: various hand tools-

Wheels Free Area & Times: N/A

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Refer to P6 Program if more detail required

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Craig Baxter Rob Lord Craig Baxter

Mobile Number 0428 847 090 0412 105 133 0428 847 090

Date 22/06/13 22/06/13 23/06/13

Shift Duration 02:00 - 14:00 14:00 - 02:00 02:00 - 08:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Barry Howard Melinda Steur Sigride Paeglis

Mobile Number 0419 327 535 0411 740 727 0433 164 077

Date 22/06/13 22/06/13 23/06/13

Shift Duration 00:01 – 11:00 11:00 - 22:00 22:00 - 08:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable, eAP for 22kv Feeder N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A NO

Page 17: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

17

WORk GROUP 3: SIGNALS (PAINTING)

Work Group Limits: Surrey Hills - Box Hill

Scope of Works: Saturday: Paint Signal Targets in a down direction L407, H407, L415, L421, H421, H433, L441, L423, L433 & BOX312

Sunday: Paint Signal Targets L410, H418, L418, H428, L428, L434, L440, H440, L450, BOX205 & BOX215

Site Access: Saturday: Mont Albert Road PCR working from Down Track and may require Centre Track.

Sunday: Mont Albert Road PCR working from Up Track and may require Centre Track.

Hi-Rail vehicles: Hi-Rail boom lift truck

Other Plant & equipment: Hand tools

Wheels Free Area & Times:

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes:

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Supervisor Troy Whiteside Steve Barrett

Mobile Number 0417 139 961 0407 364 004

Date 22/06/2013 23/06/2013

Shift Duration 07:00 - 17:00 07:00 - 17:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Level 3 Troy Whiteside Steve Barrett

Mobile Number 0417 139 961 0407 364 004

Date 22/06/2013 23/06/2013

Shift Duration 07:00 - 17:00 07:00 - 17:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 18: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

18

WORk GROUP 4: SIGNALS (INSTALLING & INSULATION)

Work Group Limits: east Camberwell - Canterbury

Scope of Works: Saturday & Sunday shifts: Install signals CAM345, L334, L335 & H335 on gantry between eCM & CBY

& stand signal mast L325. Remove old signal masts L325, L343 & L326

Sunday afternoon shift: Test signals L325, L343, L326, CAM345, L334, & L335 on gantry between eCM & CBY

Site Access: Union Rd PCR & Ballast Pad at eCM Substation.

Hi-Rail vehicles: Crane Truck, excavator, Tip Truck & elevated Work Platform

Other Plant & equipment: Hand tools

Wheels Free Area & Times: Wheels Free For All Work Parties Sunday 23 June 16:00 - 00:01, Occupation Limits

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Crane Truck working on Down Track, Cherry Picker working on Centre Track.

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Joe Mifsud Kon Triantafillos Jim Panayotides

Mobile Number 0408 266 419 0411 239 017 0411 239 037

Date 22/06/2013 23/06/2013 23/06/2013

Shift Duration 07:00 - 17:00 08:00 - 16:00 16:00 - 00:01

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Joe Mifsud Kon Triantafillos Jim Panayotides

Mobile Number 0408 266 419 0411 239 017 0411 239 037

Date 22/06/2013 23/06/2013 23/06/2013

Shift Duration 07:00 - 17:00 08:00 - 16:00 16:00 - 00:01

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable - 22kv Feeder N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 19: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

19

WORk GROUP 5: STRUCTUReS & FACILITIeS (GUY BASeS)

Work Group Limits: east Camberwell - Mont Albert Road

Scope of Works: Installation of New Anchor Bases

Saturday: Contruct @ Structures 320D - 322D - 339U - 360U - 366 U&D - 414 U&D

Sunday: Poor concrete for above Anchor Bases

Site Access: Mont Albert Road or Union Rd. Up Track

Hi-Rail vehicles: 1 x Hi Rail tool Truck, 1 x Sucker truck, 1 x excavator all on Up Track

Other Plant & equipment: Concrete Truck, Concrete Line Pump, Small plant And Hand Tools

Wheels Free Area & Times: Wheels Free For All Work Parties as of Sunday 23 June @ 16:00

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Concrete Truck, Concrete Line Pump will work from Rail Reserve.

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Peppi BernardiGreg kicaj

Peppi Bernardi

Mobile Number 0438 793 8970418 666 448

0438 793 897

Date 22/06/13 23/06/13

Shift Duration 05:00 - 15:0007:00 - 17:00

07:00 - 17:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Peppi BernardiGreg kicaj

Peppi Bernardi

Mobile Number 0438 793 8970418 666 448

0438 793 897

Date 22/06/13 23/06/13

Shift Duration 05:00 - 15:0007:00 - 17:00

07:00 - 17:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable - 22kv Feeder N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 20: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

20

WORk GROUP 6: STRUCTUReS & FACILITIeS (GUY BASeS)

Work Group Limits: Surrey Hills - Mont Albert Road

Scope of Works: Installation of New Anchor Base

Contruct @ Structure, 414 U&D. #Up Structure is between Up and Centre Tracks

Poor concrete for above Anchor Base

Site Access: Mont Albert Road

Hi-Rail vehicles: 1 x Hi Rail tool Truck, 1 x Sucker truck, 1 x excavator all on Centre and Down Tracks

Other Plant & equipment: Concrete Truck, Concrete Line Pump, Small plant And Hand Tools

Wheels Free Area & Times: Wheels Free For All Work Parties as of Sunday 23 June @ 16:00, Occupation Limits

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Concrete Truck, Concrete Line Pump will work from Rail Reserve.

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Greg kicaj

Mobile Number 0418 666 448

Date 23/06/13

Shift Duration 07:00 - 17:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Greg kicaj

Mobile Number 0418 666 448

Date 23/06/13

Shift Duration 07:00 - 17:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable - 22kv Feeder N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 21: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

21

WORk GROUP 7: TRACk (Re-RAILING THe UP LINe)

Work Group Limits: Mont Albert Road - Box Hill

Scope of Works: Re-railing of the Up Track between Mont Albert Rd to Up end Box Hill Station (Signal BOX 205) and re-sleepering elgar Road Bridge Up Track.

Working from the Centre and Up Tracks only

Site Access: Mont Albert Down end gate access & Mont Albert Road level Crossing

Hi-Rail vehicles: 2x Hi-Rail excavators

Other Plant & equipment: 1x Loader, 1x Backhoe

Wheels Free Area & Times: Wheels Free For All Work Parties as of Sunday 23 June @ 16:00

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Bridge re-sleepering will be tamped by back-hoe/excavator. Track Machines not required.

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Josh etrich Jimmy Mihail Josh etrich

Mobile Number 0448 497 879 0459 105 819 0448 497 879

Date 22/06/13 22/06/13 22/06/13

Shift Duration 02:45 - 10:00 10:01 - 20:00 20:01 - 06:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Josh etrich Jimmy Mihail Josh etrich

Mobile Number 0448 497 879 0459 105 819 0448 497 879

Date 22/06/13 22/06/13 22/06/13

Shift Duration 02:45 - 10:00 10:01 - 20:00 20:01 - 06:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

1500v Traction Cable N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A No

Page 22: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

22

WORk GROUP 8: OveR HeADS (WIRe RUN)

Work Group Limits: STR 359+40 to 392+35 (Down end Caterbury to Union Road) Working on Centre Track and collecting scrap from Up Track

Scope of Works: Contact Wire Run

Site Access: Union Rd or Mont Albert Rd

Hi-Rail vehicles: 3 eWP’s & Truck 1 x Tip Truck for collecting scrap overhead wire.

Other Plant & equipment: various hand tools

Wheels Free Area & Times: N/A

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes:

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Duty Officer

Mobile Number 9619 5799

Date 23/06/13

Shift Duration 14:00 - 23:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Night Sunday Day Sunday Night

Name Duty Officer

Mobile Number 9619 5799

Date 23/06/13

Shift Duration 14:00 - 23:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

N/A N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 23: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

23

WORk GROUP 9: OveR HeAD (WIRe RUN)

Work Group Limits: STR 390+55 to 414+11 (Robinson Road Bridge to Mont Albert Road) Working on Centre Track and collecting scrap from Up Track

Scope of Works: Contact Wire Run

Site Access: Union Rd or Mont Albert Rd

Hi-Rail vehicles: 3 eWP’s & Truck 1 x Tip Truck for collecting scrap overhead wire.

Other Plant & equipment: various hand tools

Wheels Free Area & Times: N/A

Traffic Management: Union Road & Mont Albert will have traffic management 06:00 Saturday to 20:00 Sunday. Level Crossings will be test switch operational.

Issue Permit to Foul: Command Centre Surrey Hills

Notes:

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Duty Officer

Mobile Number 9619 5799

Date 22/06/13

Shift Duration 14:00 - 23:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Duty Officer

Mobile Number 9619 5799

Date 22/06/13

Shift Duration 14:00 - 23:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

N/A N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 24: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

24

WORk GROUP 10: OveR HeAD (SPARk GAP BONDING RePAIRS)

Work Group Limits: Occupation Limits

Scope of Works: Spark Gap Bonding Repairs

Site Access: various locations

Hi-Rail vehicles: No

Other Plant & equipment: Hand Tools

Wheels Free Area & Times: N/A

Traffic Management: N/A

Issue Permit to Foul: Command Centre Surrey Hills

Notes: Spark Gap Repairs & some Rail Drilling only

WILL WORk AROUND ALL OTHeR WORk GROUPS

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Rod Sheppard Rod Sheppard

Mobile Number 0408 838 345 0408 838 345

Date 22/06/13 23/06/13

Shift Duration 07:00 - 18:00 07:00 - 18:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Rod Sheppard Rod Sheppard

Mobile Number 0408 838 345 0408 838 345

Date 22/06/13 23/06/13

Shift Duration 07:00 - 18:00 07:00 - 18:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

No N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 25: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

25

WORk GROUP 11: SIGNALS (PRe TeST OF GR BOXeS)

Work Group Limits: east Camberwell to Canterbury

Scope of Works: Pre Test of GR Boxes

Site Access: east Camberwell Substation

Hi-Rail vehicles: No

Other Plant & equipment: Hand Tools

Wheels Free Area & Times: N/A

Traffic Management: N/A

Issue Permit to Foul: Command Centre Surrey Hills

Notes:

SUPeRvISOR ROSTeR

Friday Night Saturday Day Saturday Night Sunday Day Sunday Night

Name Noel McMahon

Mobile Number 0411 239 192

Date 22/06/13

Shift Duration 17:00 - 01:00

PeRMIT TO FOUL ReCIPIeNT ROSTeR

Friday Night Saturday Day Saturday Night Sunday Night

Name Noel McMahon

Mobile Number 0411 239 192

Date 22/06/13

Shift Duration 17:00 - 01:00

HIGH vOLTAGe PeRMIT PLANT TRAIN

No N/A

ADJACeNT LINe PROTeCTION ReqUIReD TRACk MACHINe

N/A N/A

Page 26: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

2625

Permit to Foul Summary RegisterOCCUPATION: P.T.F. ID

Dept. Work Description Work Location Shift Details Friday 21st June Night Shift

Saturday 22nd June Day Shift

Saturday 22nd June Night Shift

Sunday 23rd June Day Shift

Sunday 23rd June Night Shift

P/O Notes

1 Over Head

(JHG)

22kv Rehabilitation Works

Up end Chatham - Box Hill. Refer to WG form for more detail

Name Matt Briggs Dean Gauci Matt Briggs Dean Gauci Matt Briggs Yes PTF Meet Point Command Centre Surrey HillsContact No. 0437 844 953 0447 649 794 0437 844 953 0447 649 794 0437 844 953 Access to Occo Union Road PCR & Mont Albert PCRTimes 00:01 – 10:00 10:00 - 20:00 20:00 - 06:00 06:00 - 16:00 16:00 - 02:00 Hi-Rail 2 X Hi-Rail eWP’s & Tray Truck with Spider

2 Over Head

(JHG)

Prep works for 22kv Rehabilitation Works

elgar Road Bridge - Box Hill.

Name Barry Howard Melinda Steur Sigride Paeglis Yes PTF Meet Point Command Centre Surrey HillsContact No. 0419 327 535 0411 740 727 0433 164 077 Access to Occo Mont Albert PCRTimes 00:01 – 11:00 11:00 - 22:00 22:00 - 08:00 Hi-Rail 1 X Hi-Rail eWP

3 Signals Paint Signal Targets Surrey Hills - Box Hill Name Troy Whiteside Steve Barrett Yes PTF Meet Point Command Centre Surrey HillsContact No. 0417 139 961 0407 364 004 Access to Occo Mont Albert Road PCRTimes 07:00 - 17:00 07:00 - 17:00 Hi-Rail Hi-rail boom lift truck

4 Signals Installing & Testing New Signals

east Camberwell - Canterbury

Name Joe Mifsud Kon Triantafillos Jim Panayotides Yes PTF Meet Point Command Centre Surrey Hills

Contact No. 0408 266 419 0411 239 017 0411 239 037 Access to Occo Union Rd PCR & Ballast Pad at eCM Substation.

Times 07:00 - 17:00 08:00 - 16:00 16:00 - 00:01 Hi-Rail Crane Truck, excavator, Tip Truck & elevated Work Platform

5 Structure & Facilities

Installation of New Anchor Bases

east Camberwell - Mont Albert Road

Name Peppi BernardiGreg kicaj

Peppi BernardiYes PTF Meet Point Command Centre Surrey Hills

Contact No. 0438 793 8970418 666 448

0438 793 897Access to Occo Mont Albert Road or Union Rd.

Times 05:00 - 15:0007:00 - 17:00

07:00 - 17:00 Hi-Rail 1 x Hi Rail tool Truck, 1 x Sucker truck, 1 x excavator all on Up Track

6 Structure & Facilities

Installation of New Anchor Base

Surrey Hills - Mont Albert Road

Name Greg kicaj Yes PTF Meet Point Command Centre Surrey Hills

Contact No. 0418 666 448 Access to Occo Mont Albert Road

Times 07:00 - 17:00 Hi-Rail 1 x Hi Rail tool Truck, 1 x Sucker truck, 1 x excavator all on Up Track

7 Track Re-Railing Up Track Mont Albert Road - Box Hill

Name Josh etrich Jimmy Mihail Josh etrich Yes PTF Meet Point Command Centre Surrey Hills

Contact No.0448 497 879 0459 105 819 0448 497 879

Access to Occo Mont Albert, Down end access gate & Mont Albert Road PCR

Times 02:45 - 10:00 10:01 - 20:00 20:01 - 06:00 Hi-Rail 2x Hi-Rail excavators8 Over Head 1500v Wire Run Down end Caterbury -

Union RoadName Duty Officer PTF Meet Point Command Centre Surrey Hills

Contact No. 9619 5799 Access to Occo Union Rd or Mont Albert Rd

Times 14:00 - 23:00 Hi-Rail 3 eWP’s & Truck 1 x Tip Truck

9 Over Head 1500v Wire Run Robinson Road Bridge - Mont Albert Road

Name Duty Officer PTF Meet Point Command Centre Surrey Hills

Contact No. 9619 5799 Access to Occo Union Rd or Mont Albert Rd

Times 14:00 - 23:00 Hi-Rail 3 eWP’s & Truck 1 x Tip Truck

10 Over Head Spark Gaps Repairs Occupation Limits Name Rod Sheppard Rod Sheppard PTF Meet Point Command Centre Surrey Hills

Contact No. 0408 838 345 0408 838 345 Access to Occo various Locations

Times 07:00 - 18:00 07:00 - 18:00 Hi-Rail N/A

11 Signals Pre Test of GR Boxes east Camberwell to Canterbury

Name Noel McMahon PTF Meet Point Command Centre Surrey HillsContact No. 0411 239 192 Access to Occo east Camberwell SubstationTimes 17:00 - 01:00 Hi-Rail N/A

12 Signals Support for Re-Railing Works & Signal Testing

Occupation Limits NameUwe Swiderski

Sergundo BurgosJim Panayotides

David Matthews Frank Dobrigna David MatthewsPTF Meet Point Command Centre Surrey Hills

Contact No.0408 266 454

0409 944 6300411 239 037

0408 593 550 0408 567 036 0408 593 550Access to Occo various Locations

Times 00:01 - 08:01 08:00 - 16:0016:00 - 23:59

00:01 - 08:00 08:00 - 18:00 20:00 - 06:00 Hi-Rail N/A

Page 27: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

27

Activity ID Activity Name OriginalDuration

RemainingDuration

Start Finish Location Track Activity %Complete

Predecessors Successors Comments

East Camberwell to Box Hill Major Occupation ProgrammeEast Camberwell to Box Hill Major Occupation Programme 53h 53h 21-Jun-13 23:00 24-Jun-13 04:00

Occupation Start-UpOccupation Start-Up 11h 11h 21-Jun-13 23:00 22-Jun-13 10:00

Key ActivitiesKey Activities 1h 10n 1h 10n 22-Jun-13 01:35 22-Jun-13 02:45

All DisciplinesAll Disciplines 1h 10n 1h 10n 22-Jun-13 01:35 22-Jun-13 02:45

All WorksAll Works 1h 10n 1h 10n 22-Jun-13 01:35 22-Jun-13 02:45AC3570 Last Train Through Box Hill (Weekend 1) 0h 0h 22-Jun-13 01:35* 0% AC5510,

AC2940, AC5850AC2910 eCM-BOX Overhead Isolation Weekend 1 Complete 0h 0h 22-Jun-13 02:15 0% AC2940 AC5520

AC2930 All Permits Issued for Weekend 1 0h 0h 22-Jun-13 02:45 0% AC5520, AC5510

AC3090, AC3080, AC5590, A...PreliminariesPreliminaries 3h 45n 3h 45n 21-Jun-13 23:00 22-Jun-13 02:45

All DisciplinesAll Disciplines 3h 45n 3h 45n 21-Jun-13 23:00 22-Jun-13 02:45

All WorksAll Works 3h 45n 3h 45n 21-Jun-13 23:00 22-Jun-13 02:45AC5490 Pre-Start Briefing (Weekend 1) 1h 1h 21-Jun-13 23:00* 22-Jun-13 00:00 0% AC5500,

AC2940, AC5850AC5500 Pre-Work Briefing (Weekend 1) 1h 1h 22-Jun-13 00:00 22-Jun-13 01:00 0% AC5490 AC5510 Includes plant checks

AC5510 Permit to Foul Issued (Weekend 1) 0h 25n 0h 25n 22-Jun-13 01:35 22-Jun-13 02:00 0% AC5500, AC3570

AC2930, AC3170, AC6020, A...AC5520 Permit to Work & eAP Issued (Weekend 1) 0h 30n 0h 30n 22-Jun-13 02:15 22-Jun-13 02:45 0% AC2910 AC2930

All AreasAll Areas 8h 25n 8h 25n 22-Jun-13 01:35 22-Jun-13 10:00

OverheadsOverheads 0h 40n 0h 40n 22-Jun-13 01:35 22-Jun-13 02:15

IsolationsIsolations 0h 40n 0h 40n 22-Jun-13 01:35 22-Jun-13 02:15AC2940 Undertake Overhead Isolations for Weekend 1 0h 40n 0h 40n 22-Jun-13 01:35 22-Jun-13 02:15 0% AC5490,

AC3570AC2910

CitiPowerCitiPower 0h 0h 22-Jun-13 10:00 22-Jun-13 10:00IsolationsIsolations 0h 0h 22-Jun-13 10:00 22-Jun-13 10:00AC5850 CitiPower Lv Isolation at Union Rd 0h 0h 22-Jun-13 10:00* 0% AC3570,

AC5490AC3160

OccupationOccupation 47h 45n 47h 45n 22-Jun-13 02:00 24-Jun-13 01:45

OverallOverall 10h 45n 10h 45n 23-Jun-13 15:00 24-Jun-13 01:45

All DisciplinesAll Disciplines 10h 45n 10h 45n 23-Jun-13 15:00 24-Jun-13 01:45

Key ActivitiesKey Activities 10h 45n 10h 45n 23-Jun-13 15:00 24-Jun-13 01:45AC3430 Construction of New Guy Base Anchors Complete (east Camberwell to Box

Hill)0h 0h 23-Jun-13 15:00 0% SNFY46320,

SNFY46330, SNFY46340, SNFY46350...

AC3370

AC3250 Track Works Complete (east Camberwell to Box Hill) Weekend 1 0h 0h 23-Jun-13 16:00 0% AC6140 AC5910

AC3080 Wheels Free for Signals (east Camberwell to Box Hill) Weekend 1 0h 0h 23-Jun-13 16:00* 0% AC3220, AC3210, AC3090, AC2930, A...

AC3240, AC3370

AC3260 Overheads (MTM) Works Complete Weekend 1 0h 0h 23-Jun-13 23:00 0% AC5920, AC5930

AC3370

AC3200 Overhead (JHG) Works Complete (east Camberwell to Box Hill Up Track) Weekend 1

0h 0h 24-Jun-13 01:30 0% AC3130 AC3370

AC3040 Signal Works Complete (east Camberwell to Box Hill) Weekend 1 0h 0h 24-Jun-13 01:45 0% AC3240, AC5610, AC5690, AC5870, A...

AC5370, AC3370

East Camberwell to Box HillEast Camberwell to Box Hill 47h 45n 47h 45n 22-Jun-13 02:00 24-Jun-13 01:45

Overheads (JHG)Overheads (JHG) 47h 30n 47h 30n 22-Jun-13 02:00 24-Jun-13 01:3022kV AC Transmission Renewal22kV AC Transmission Renewal 47h 30n 47h 30n 22-Jun-13 02:00 24-Jun-13 01:30AC3170 On Track Plant 0h 30n 0h 30n 22-Jun-13 02:00 22-Jun-13 02:30 DN 0% AC5510

AC3120 Renew Transmission Wire @ H426+10 to H430+95 [140m, 2 Bays] 3h 3h 22-Jun-13 02:00 22-Jun-13 05:00 Mont Albert Station DN 0% AC5510 AC3150 Spider

AC3270 Prep Work at H460+77 to H472+45 30h 30h 22-Jun-13 02:00* 23-Jun-13 08:00 0% AC5510 AC3190 seperate PTF required.

AC3150 Renew Transmission Wire @ H430+95 to H433+87 2h 30n 2h 30n 22-Jun-13 05:00 22-Jun-13 07:30 DN 0% AC3120 AC3140

AC3140 Renew Transmission Wire @ H433+87 to H436+87 2h 30n 2h 30n 22-Jun-13 07:30 22-Jun-13 10:00 DN 0% AC3150 AC3100

AC3100 Renew Transmission Wire @ H436+87 to H438+37 2h 30n 2h 30n 22-Jun-13 10:00 22-Jun-13 12:30 DN 0% AC3140 AC3300

AC3300 Renew Transmission Wire @ H438+37 to H440+80 2h 30n 2h 30n 22-Jun-13 12:30 22-Jun-13 15:00 DN 0% AC3100 AC3700

AC3700 Renew Transmission Wire @ H406+68 to H408+11 [59m, 1 Bay] 2h 30n 2h 30n 22-Jun-13 15:00 22-Jun-13 17:30 DN 0% AC3300 AC3710

AC3710 Renew Transmission Wire @ H408+11 to H411+11 [91m, 2 Bays] 2h 30n 2h 30n 22-Jun-13 17:30 22-Jun-13 20:00 DN 0% AC3700 AC3160

AC3160 Renew Transmission Wire @ H399+61 to H402+01 [73m, 1 Bay] 3h 3h 22-Jun-13 20:00 22-Jun-13 23:00 Union Rd Level Crossing DN 0% AC5850, AC3710

AC5860, AC3110

Traffic management required

AC3110 Renew Transmission Wire @ H368+55 to H380+30 [328m, 6 Bays] 8h 8h 22-Jun-13 23:00 23-Jun-13 07:00 Chatham Station DN 0% AC3160 AC3190 Spider

AC3190 Renew Transmission Wire @ H440+80 to H453+05 [373m, 5 Bays] 6h 30n 6h 30n 23-Jun-13 07:00 23-Jun-13 13:30 Hood St, Creswick Ln DN 0% AC3110, AC3270

AC3180

AC3180 Renew Transmission Wire @ H453+05 to H459+05 [183m, 3 Bays] 5h 5h 23-Jun-13 13:30 23-Jun-13 18:30 DN 0% AC3190 AC3130

Fri Sat Sun Mon TueJun 17 Jun 24

Last Train Through Box Hill (Weekend 1)

eCM-BOX Overhead Isolation Weekend 1 Complete

All Permits Issued for Weekend 1

Pre-Start Briefing (Weekend 1)

Pre-Work Briefing (Weekend 1)

Permit to Foul Issued (Weekend 1)

Permit to Work & eAP Issued (Weekend 1)

Undertake Overhead Isolations for Weekend 1

CitiPower Lv Isolation at Union Rd

Construction of New Guy Base Anchors Complete (east Camberwell to Box Hill)

Track Works Complete (east Camberwell to Box Hill) Weekend 1

Wheels Free for Signals (east Camberwell to Box Hill) Weekend 1

Overheads (MTM) Works Complete Weekend 1

Overhead (JHG) Works Complete (east Camberwell to Box Hill Up Track) Weekend 1

Signal Works Complete (east Camberwell to Box Hill) Weekend 1

On Track Plant

Renew Transmission Wire @ H426+10 to H430+95 [140m, 2 Bays]

Prep Work at H460+77 to H472+45

Renew Transmission Wire @ H430+95 to H433+87

Renew Transmission Wire @ H433+87 to H436+87

Renew Transmission Wire @ H436+87 to H438+37

Renew Transmission Wire @ H438+37 to H440+80

Renew Transmission Wire @ H406+68 to H408+11 [59m, 1 Bay]

Renew Transmission Wire @ H408+11 to H411+11 [91m, 2 Bays]

Renew Transmission Wire @ H399+61 to H402+01 [73m, 1 Bay]

Renew Transmission Wire @ H368+55 to H380+30 [328m, 6 Bays]

Renew Transmission Wire @ H440+80 to H453+05 [373m, 5 Bays]

Renew Transmission Wire @ H453+05 to H459+05 [183m, 3 Bays]

Layout: Current LayoutTASk filter: Date Filter.

Metro Trains MelbourneECM - BOX Corridor Shut (Weekend 21th-24th June)

Print Date: 19-Jun-13Data Date: 12-Apr-13

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone Page 1 of 4 Date Revision Checked Approved19-Jun-13 12:... Revision 17

Intergrated Works Program

Page 28: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

28

Activity ID Activity Name OriginalDuration

RemainingDuration

Start Finish Location Track Activity %Complete

Predecessors Successors Comments

AC3130 Renew Transmission Wire @ H459+05 to H472+45 [408m, 8 Bays] 7h 7h 23-Jun-13 18:30 24-Jun-13 01:30 DN 0% AC3180 AC3200

CitiPowerCitiPower 0h 0h 23-Jun-13 16:00 23-Jun-13 16:00ReinstatementReinstatement 0h 0h 23-Jun-13 16:00 23-Jun-13 16:00AC5860 CitiPower Lv Restoration at Union Rd 0h 0h 23-Jun-13 16:00* 0% AC3160 AC3380

Overheads (MTM)Overheads (MTM) 33h 33h 22-Jun-13 14:00 23-Jun-13 23:00

Contact Wire RenewalContact Wire Renewal 33h 33h 22-Jun-13 14:00 23-Jun-13 23:00AC5930 Contact Wire Renewal @ e Camberwell to Surrey Hills STR 390+55 TO

414+11 CTR TRACk9h 9h 22-Jun-13 14:00* 22-Jun-13 23:00 CTR 0% AC2930 AC3260

AC5920 Contact Wire Renewal @ e Camberwell to Surrey Hills STR 359+40 to 392+35 CTR TRACk

9h 9h 23-Jun-13 14:00* 23-Jun-13 23:00 CTR 0% AC2930 AC3260 AC3110

TrackTrack 38h 38h 22-Jun-13 02:00 23-Jun-13 16:00

Re-RailingRe-Railing 38h 38h 22-Jun-13 02:00 23-Jun-13 16:00AC6020 eclips and Insulators to be Removed and Stockpiled to the Side 8h 8h 22-Jun-13 02:00 22-Jun-13 10:00 Mont Albert to Box Hill UP 0% AC5510 AC6030 Shift 1

AC6030 excavators to stockpile rail lenghts in secure location within six foot to be collected by rain train at later date

7h 7h 22-Jun-13 03:00 22-Jun-13 10:00 Mont Albert to Box Hill UP 0% AC6020 AC6040 Shift 1

AC6040 New rail to lifted into position on sleepers utilising excvators and loaders 6h 6h 22-Jun-13 04:00 22-Jun-13 10:00 Mont Albert to Box Hill UP 0% AC6030 AC6050 Shift 1

AC6050 Single Bolt rail ends together 6h 6h 22-Jun-13 04:00 22-Jun-13 10:00 Mont Albert to Box Hill UP 0% AC6040 AC6060 Shift 1

AC6060 Reattatch e-clips and Insulators 6h 6h 22-Jun-13 04:00 22-Jun-13 10:00 Mont Albert to Box Hill UP 0% AC6050 AC6070 Shift 1

AC6070 excavators to stockpile rail lenghts in secure location within six foot to be collected by rain train at later date

7h 7h 22-Jun-13 10:00 22-Jun-13 17:00 Mont Albert to Box Hill UP 0% AC6060 AC6080 Shift 2

AC6080 New rail to lifted into position on sleepers utilising excvators and loaders 8h 8h 22-Jun-13 10:00 22-Jun-13 18:00 Mont Albert to Box Hill UP 0% AC6070 AC6090 Shift 2

AC6090 Single Bolt rail ends together 9h 9h 22-Jun-13 10:00 22-Jun-13 19:00 Mont Albert to Box Hill UP 0% AC6080 AC6100 Shift 2

AC6100 Reattatch e-clips and Insulators 10h 10h 22-Jun-13 10:00 22-Jun-13 20:00 Mont Albert to Box Hill UP 0% AC6090 AC6110 Shift 2

AC6110 Welding out of all joints 6h 6h 22-Jun-13 20:00 23-Jun-13 02:00 Mont Albert to Box Hill UP 0% AC6100 AC6120 Shift 3

AC6120 Destress of 330m modules 4h 4h 23-Jun-13 02:00 23-Jun-13 06:00 Mont Albert to Box Hill UP 0% AC6110 AC6130 Shift 3

AC6130 Final site cleanup of rubbish and removal of all track plant 2h 2h 23-Jun-13 04:00 23-Jun-13 06:00 Mont Albert to Box Hill UP 0% AC6120 AC6140, AC5620

Shift 3

AC6140 Signals to start reconnecting and testing 11h 11h 23-Jun-13 05:00 23-Jun-13 16:00 Mont Albert to Box Hill UP 0% AC6130 AC3250, AC3080

Shift 3

SignalsSignals 42h 45n 42h 45n 22-Jun-13 07:00 24-Jun-13 01:45Incandescent Signal Replacement with LEDIncandescent Signal Replacement with LED 33h 33h 22-Jun-13 07:00 23-Jun-13 16:00AC3090 Incandescent Signal Replacement with LeD at Signal CAM345 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 east Camberwell 0% AC2930 AC3230,

AC3220, AC3210, A...AC3210 Incandescent Signal Replacement with LeD at Signal L334 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 east Camberwell 0% AC3090 AC3080

AC3220 Incandescent Signal Replacement with LeD at Signal L335 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 east Camberwell 0% AC3090 AC3080

AC3230 Incandescent Signal Replacement with LeD at Signal H335 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 east Camberwell 0% AC3090 AC5940

AC5980 Stand and Install Signal L325 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 east Camberwell 0% AC2930 AC3040

AC5940 Incandescent Signal Replacement with LeD at Signal CAM345 9h 9h 23-Jun-13 07:00* 23-Jun-13 16:00 east Camberwell 0% AC3230 AC5950

AC5950 Incandescent Signal Replacement with LeD at Signal L334 9h 9h 23-Jun-13 07:00 23-Jun-13 16:00 east Camberwell 0% AC5940 AC5960

AC5960 Incandescent Signal Replacement with LeD at Signal L335 9h 9h 23-Jun-13 07:00 23-Jun-13 16:00 east Camberwell 0% AC5950 AC5970

AC5970 Incandescent Signal Replacement with LeD at Signal H335 9h 9h 23-Jun-13 07:00 23-Jun-13 16:00 east Camberwell 0% AC5960 AC3080

Signal TestingSignal Testing 9h 45n 9h 45n 23-Jun-13 16:00 24-Jun-13 01:45AC3240 Signal Testing & Commissioning of L325, L326, L343, L334, CAM345, H335

& L3359h 45n 9h 45n 23-Jun-13 16:00 24-Jun-13 01:45 0% AC3080 AC3040 L326 & L343 are installed in the pre-work occupation

nights

Painting of Signal Backgrounds (DOWN Track)Painting of Signal Backgrounds (DOWN Track) 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00AC3790 Painting of Signal Targets L407 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Up side of Mont Albert Rd DN 0% AC2930 AC3800

AC3800 Painting of Signal Targets H407 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Up side of Mont Albert Rd DN 0% AC3790 AC3810

AC3810 Painting of Signal Targets L415 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Up side of Mont Albert Rd DN 0% AC3800 AC3820

AC3820 Painting of Signal Targets L421 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Up side of Mont Albert Rd DN 0% AC3810 AC3830

AC3830 Painting of Signal Targets H421 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Up side of Mont Albert Rd DN 0% AC3820 AC3940

AC3940 Painting of Signal Targets H433 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Down side of Mont Albert Rd

DN 0% AC3830 AC3990

AC3990 Painting of Signal Targets L441 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Down side of Mont Albert Rd

DN 0% AC3940 AC5880

Fri Sat Sun Mon TueJun 17 Jun 24

Renew Transmission Wire @ H459+05 to H472+45 [408m, 8 Bays]

CitiPower Lv Restoration at Union Rd

Contact Wire Renewal @ e Camberwell to Surrey Hills STR 390+55 TO 414+11 CTR TRACk

Contact Wire Renewal @ e Camberwell to Surrey Hills STR 359+40 to 392+35 CTR TRACk

eclips and Insulators to be Removed and Stockpiled to the Side

excavators to stockpile rail lenghts in secure location within six foot to be collected by rain train at later date

New rail to lifted into position on sleepers utilising excvators and loaders

Single Bolt rail ends together

Reattatch e-clips and Insulators

excavators to stockpile rail lenghts in secure location within six foot to be collected by rain train at later date

New rail to lifted into position on sleepers utilising excvators and loaders

Single Bolt rail ends together

Reattatch e-clips and Insulators

Welding out of all joints

Destress of 330m modules

Final site cleanup of rubbish and removal of all track plant

Signals to start reconnecting and testing

Incandescent Signal Replacement with LeD at Signal CAM345

Incandescent Signal Replacement with LeD at Signal L334

Incandescent Signal Replacement with LeD at Signal L335

Incandescent Signal Replacement with LeD at Signal H335

Stand and Install Signal L325

Incandescent Signal Replacement with LeD at Signal CAM345

Incandescent Signal Replacement with LeD at Signal L334

Incandescent Signal Replacement with LeD at Signal L335

Incandescent Signal Replacement with LeD at Signal H335

Signal Testing & Commissioning of L325, L326, L343, L334, CAM345, H335 & L335

Painting of Signal Targets L407

Painting of Signal Targets H407

Painting of Signal Targets L415

Painting of Signal Targets L421

Painting of Signal Targets H421

Painting of Signal Targets H433

Painting of Signal Targets L441

Layout: Current LayoutTASk filter: Date Filter.

Metro Trains MelbourneECM - BOX Corridor Shut (Weekend 21th-24th June)

Print Date: 19-Jun-13Data Date: 12-Apr-13

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone Page 2 of 4 Date Revision Checked Approved19-Jun-13 12:... Revision 17

Page 29: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

28 29

Activity ID Activity Name OriginalDuration

RemainingDuration

Start Finish Location Track Activity %Complete

Predecessors Successors Comments

AC4100 Painting of Signal Targets L423 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Down side of Mont Albert Rd

DN 0% AC5880 AC5870

AC5870 Painting of Signal Targets L433 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Down side of Mont Albert Rd

DN 0% AC4100 AC3040

AC5880 Painting of Signal Targets BOX312 10h 10h 22-Jun-13 07:00 22-Jun-13 17:00 Down side of Mont Albert Rd

DN 0% AC3990 AC4100

Painting of Signal Backgrounds (UP Track)Painting of Signal Backgrounds (UP Track) 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00AC5590 Painting of Signal Targets L410 10h 10h 23-Jun-13 07:00* 23-Jun-13 17:00 Up side of Mont Albert Rd UP 0% AC2930 AC5600

AC5600 Painting of Signal Targets H418 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Up side of Mont Albert Rd UP 0% AC5590 AC5610

AC5610 Painting of Signal Targets L418 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Up side of Mont Albert Rd UP 0% AC5600 AC3040

AC5620 Painting of Signal Targets H428 10h 10h 23-Jun-13 07:00* 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC2930, AC6130

AC5630

AC5630 Painting of Signal Targets L428 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5620 AC5640

AC5640 Painting of Signal Targets L434 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5630 AC5650

AC5650 Painting of Signal Targets L440 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5640 AC5660

AC5660 Painting of Signal Targets H440 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5650 AC5670

AC5670 Painting of Signal Targets L450 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5660 AC5680

AC5680 Painting of Signal Targets BOX205 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5670 AC5690

AC5690 Painting of Signal Targets BOX215 10h 10h 23-Jun-13 07:00 23-Jun-13 17:00 Down side of Mont Albert Rd

UP 0% AC5680 AC3040

Structures & FacilitiesStructures & Facilities 32h 32h 22-Jun-13 07:00 23-Jun-13 15:00

Guy BasesGuy Bases 32h 32h 22-Jun-13 07:00 23-Jun-13 15:00SNFY46230 Str. 320 D: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 east Camberwell DN 0% AC2930 SNFY46320

SNFY46240 Str. 322 D: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 east Camberwell DN 0% AC2930 SNFY46330

SNFY46250 Str. 339 U: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Canterbury UP 0% AC2930 SNFY46340

SNFY46260 Str. 360 U: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Canterbury UP 0% AC2930 SNFY46350

SNFY46270 Str. 366 U: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Canterbury UP 0% AC2930 SNFY46360

SNFY46280 Str. 366 D: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Canterbury DN 0% AC2930 SNFY46370

SNFY46300 Str. 414 D: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Surrey Hills to Mont Albert DN 0% AC2930 SNFY46380

SNFY46310 Str. 414 C: Construct New Guy Base 10h 10h 22-Jun-13 07:00* 22-Jun-13 17:00 Surrey Hills to Mont Albert CTR 0% AC2930 SNFY46390

SNFY46320 Str. 320 D: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 east Camberwell DN 0% SNFY46230 AC3430, AC3080

SNFY46330 Str. 322 D: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 east Camberwell DN 0% SNFY46240 AC3430, AC3080

SNFY46340 Str. 339 U: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Canterbury UP 0% SNFY46250 AC3430, AC3080

SNFY46350 Str. 360 U: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Canterbury UP 0% SNFY46260 AC3430, AC3080

SNFY46360 Str. 366 U: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Canterbury UP 0% SNFY46270 AC3430, AC3080

SNFY46370 Str. 366 D: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Canterbury DN 0% SNFY46280 AC3430, AC3080

SNFY46380 Str. 414 D: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Surrey Hills to Mont Albert DN 0% SNFY46300 AC3430, AC3080

SNFY46390 Str. 414 C: Construct New Guy Base 8h 8h 23-Jun-13 07:00* 23-Jun-13 15:00 Surrey Hills to Mont Albert CTR 0% SNFY46310 AC3430, AC3080

Occupation CompletionOccupation Completion 12h 12h 23-Jun-13 16:00 24-Jun-13 04:00

All AreasAll Areas 12h 12h 23-Jun-13 16:00 24-Jun-13 04:00

OverheadOverhead 2h 15n 2h 15n 24-Jun-13 01:45 24-Jun-13 04:00

ReinstatementReinstatement 2h 15n 2h 15n 24-Jun-13 01:45 24-Jun-13 04:00

Fri Sat Sun Mon TueJun 17 Jun 24

Painting of Signal Targets L423

Painting of Signal Targets L433

Painting of Signal Targets BOX312

Painting of Signal Targets L410

Painting of Signal Targets H418

Painting of Signal Targets L418

Painting of Signal Targets H428

Painting of Signal Targets L428

Painting of Signal Targets L434

Painting of Signal Targets L440

Painting of Signal Targets H440

Painting of Signal Targets L450

Painting of Signal Targets BOX205

Painting of Signal Targets BOX215

Str. 320 D: Construct New Guy Base

Str. 322 D: Construct New Guy Base

Str. 339 U: Construct New Guy Base

Str. 360 U: Construct New Guy Base

Str. 366 U: Construct New Guy Base

Str. 366 D: Construct New Guy Base

Str. 414 D: Construct New Guy Base

Str. 414 C: Construct New Guy Base

Str. 320 D: Construct New Guy Base

Str. 322 D: Construct New Guy Base

Str. 339 U: Construct New Guy Base

Str. 360 U: Construct New Guy Base

Str. 366 U: Construct New Guy Base

Str. 366 D: Construct New Guy Base

Str. 414 D: Construct New Guy Base

Str. 414 C: Construct New Guy Base

Layout: Current LayoutTASk filter: Date Filter.

Metro Trains MelbourneECM - BOX Corridor Shut (Weekend 21th-24th June)

Print Date: 19-Jun-13Data Date: 12-Apr-13

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone Page 3 of 4 Date Revision Checked Approved19-Jun-13 12:... Revision 17

Page 30: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

30

Activity ID Activity Name OriginalDuration

RemainingDuration

Start Finish Location Track Activity %Complete

Predecessors Successors Comments

AC3370 Certify Overheads (Weekend 1) 0h 30n 0h 30n 24-Jun-13 01:45 24-Jun-13 02:15 0% AC3430, AC3200, AC3080, AC3040, A...

AC3380

AC3360 Overhead Power Restoration (Weekend 1) 1h 1h 24-Jun-13 03:00 24-Jun-13 04:00 0% AC3380 AC3400

SignalsSignals 0h 30n 0h 30n 24-Jun-13 01:45 24-Jun-13 02:15

ReinstatementReinstatement 0h 30n 0h 30n 24-Jun-13 01:45 24-Jun-13 02:15AC5370 Certify Signals (Weekend 1) 0h 30n 0h 30n 24-Jun-13 01:45 24-Jun-13 02:15 0% AC3040 AC3380

TrackTrack 3h 3h 23-Jun-13 16:00 23-Jun-13 19:00ReinstatementReinstatement 3h 3h 23-Jun-13 16:00 23-Jun-13 19:00AC5910 Certify Track (Weekend 1) 3h 3h 23-Jun-13 16:00 23-Jun-13 19:00 0% AC3250 AC3380

All DisciplinesAll Disciplines 1h 45n 1h 45n 24-Jun-13 02:15 24-Jun-13 04:00

Completion WorksCompletion Works 1h 45n 1h 45n 24-Jun-13 02:15 24-Jun-13 04:00AC3380 Return All Permits (Weekend 1) 0h 45n 0h 45n 24-Jun-13 02:15 24-Jun-13 03:00 0% AC3370,

AC5370, AC5860, AC5910

AC3360

AC3390 Track Handed Back to Operations (Weekend 1) 0h 0h 24-Jun-13 04:00 0% AC3400

AC3400 Occupation Complete (Weekend 1) 0h 0h 24-Jun-13 04:00 0% AC3360 AC3390

Fri Sat Sun Mon TueJun 17 Jun 24

Certify Overheads (Weekend 1)

Overhead Power Restoration (Weekend 1)

Certify Signals (Weekend 1)

Certify Track (Weekend 1)

Return All Permits (Weekend 1)

Track Handed Back to Operations (Weekend 1)

Occupation Complete (Weekend 1)

Layout: Current LayoutTASk filter: Date Filter.

Metro Trains MelbourneECM - BOX Corridor Shut (Weekend 21th-24th June)

Print Date: 19-Jun-13Data Date: 12-Apr-13

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone Page 4 of 4 Date Revision Checked Approved19-Jun-13 12:... Revision 17

Page 31: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

Occupation Works Guide

31

Track Machine Movements

N/A

Page 32: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

32

Level Crossing Disarrangement

Page 33: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

33

Overhead Diagram

Page 34: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

34

Bus Route Diagram

Camberwell Inset

BUS PICK-UP AND SET-DOWN POINTS

WARNING - Railway line may be operational Trains or track machinesmay run at any time.

Melway Reference: Maps 46

MAIN T.E.R.I MAP (SAS & EXP)

CAM-05

Stopping all stations& Express Bus Route

CAMBERWELL - BOX HILL(Map 1 of 2)

Camberwell - Opposite the station in Cookson Street.East Camberwell - Near the Roundabout in Stanhope Grove.Canterbury - Near Rochester Road Pedestrian Traffic Lights in Canterbury Road.Chatham - At Pedestrian Lights in Canterbury Road.

Stops all Stations

Express Bus Route

Bus Stop Locations

Distance 7Km

Express via Canterbury Rd directDistance 7Km

Up and Down(Same as stop or opposite)

Up stop only

Down stop only

File Name: TERI CAM-06.worBy Stephen Gray27/9/2012

CAM-06

Page 35: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

34 35

BUS PICK-UP AND SET-DOWN POINTS

Surrey Hills - Opposite the station in Windsor Crescent.Mont Albert - At the Regular Bus Stop in Mont Albert Road.Box Hill - At the Temporary Bus Stop on Whitehorse Road (South side).

WARNING - Railway line may be operational Trains or track machinesmay run at any time.

Melway Reference: Maps 46 & 47

MAIN T.E.R.I MAP (SAS & EXP)

CAM-05

EXPRESSvia Canterbury Road

File Name: TERI CAM-06.worBy Stephen Gray27/9/2012

Stopping all stations& Express Bus Route

CAMBERWELL - BOX HILL(Map 2 of 2)

CAM-06

Stops all Stations

Express Bus Route

Bus Stop Locations

Distance 7Km

Express via Canterbury Rd directDistance 7Km

Up and Down(Same as stop or opposite)

Up stop only

Down stop only

Box Hill Inset

U-Turn here oppositeBox Hill Town Hall(See as below)

Page 36: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

36

1500v AeRIAL PeRMIT TO WORk SUMMARY

Dept Duration Task Location Limits Recipient Mobile

Track APLT 21/06 - 06:00 23/06 Re-Railing Up Track Mont Albert to Box Hill Str 420 - Str 472 Josh etrich 0448 497 879

S&F 07:00 - 17:00 22/06 Installation of OH Structure Guy Anchors east Camberwell to Box Hill Str 318 - Str 420 Peppi Bernardi 0438 793 897

S&F 07:00 - 17:00 23/06 Installation of OH Structure Guy Anchors east Camberwell to Box Hill Str 318 - Str 420 Greg kicaj 0418 666 448

Signals 07:00 - 17:00 22/06 Install Signals east Camberwell Str 321 - Str 353 Joe Mifsud 0408 266 419

Signals 07:00 - 17:00 22/06 Paint Signals east Camberwell Str 400 - Str 455 Troy Whiteside 0417 139 961

Signals 07:00 - 17:00 23/06 Paint Signals east Camberwell Str 400 - Str 466 Steve Barrett 0407 364 004

O/H APLT 21/06 - BPFT 24/06 22kv Rehabilation Works east Camberwell to Box Hill Str 318 - Str 480 Matt Briggs 0437 844 953

O/H 02:00 22/06 - 08:00 23/06 22kv Rehabilation Works Surrey Hills to Box Hill Str 400 - Str 480 Barry Howard 0419 327 535

2.2kv PeRMIT TO WORk SUMMARY

Dept Duration Task Location Limits Recipient Mobile

- - - - - - -

22,000v PeRMIT TO WORk SUMMARY

Dept Duration Task Location Limits Recipient Mobile

Track APLT 21/06 - 06:00 23/06 Re-Railing Up Track Mont Albert to Box Hill Str 420 - Str 472 Josh etrich 0448 497 879

S&F 07:00 - 17:00 22/06 Installation of OH Structure Guy Anchors east Camberwell to Box Hill Str 318 - Str 420 Peppi Bernardi 0438 793 897

S&F 07:00 - 17:00 23/06 Installation of OH Structure Guy Anchors east Camberwell to Box Hill Str 318 - Str 420 Greg kicaj 0418 666 448

Signals 07:00 - 17:00 22/06 Install Signals east Camberwell Str 321 - Str 353 Joe Mifsud 0408 266 419

Permit to Work Summary

Page 37: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

37

36

environmental Sites MTM HERITAGE SITE PLANS

Flags

taff

Melbou

rne

Centr

al

Parlia

men

t

North Melbourne

Foot

scra

y

Spotswood

Yarraville

Seddon

Newport

Nth Williamstown

Williamstown

WilliamstownLave

rton

Westona

Altona

SeaholmeAirc

raft

Cros

sing

Wer

ribee

West Footscray

Totte

nham

Middle Footscray

Sunsh

ineAlbion

Ginifer

Diggers Rest

Watergardens

Newmarket

Kensington

Showgrounds

Flemington

Racecourse

Ascot Vale

Moonee Ponds

Essendon

Glenbervie

Strathmore

Pascoe Vale

Oak Park

GlenroyJacana

Broadmeadows

Coburg

Moreland

Anstey

Brunswick

Royal Park

Flemington Bridge

Macaulay

Batman

Merlynston

Fawkner

Gowrie

Upfield

Jol im

ont

West Richmond

North Richmond

Collingwood

Victoria Park

Clifton Hill

Rushall

Merri

Northcote

Croxton

Thornbury

Bell

Preston

Regent

Reservoir

Ruthven

Keon Park

Thomastown

Lalor

Epping

Westgart

h

DennisFairfie

ld

Alphington

Darebin

Ivanhoe

Eaglemont

Heidelberg

Rosanna

Macleod

Watsonia

Greensborough

Montmorency

Eltham

Wattleglen

Hurstbridge

Sth Yarra

Prahran

Windsor

Balaclava

Ripponlea

Elsternwick

Gardenvale

Nth Brighton

Middle Brighton

Brighton Beach

Hampton

Sandringham

Beach

Hawks

burn

Toora

kArm

adale

Malvern

Caulfie

ld

Mordialloc

ParkdaleMentone

CheltenhamHighett

MoorabbinPatterson

BentleighMcKinnonOrmond

Glenhuntly

Aspendale Chel

sea

Bonb

each

Fran

ksto

n

To L

ong

Isla

nd

Leaw

arra

Baxt

er

Som

ervi

lle

Tyab

b

Hast

ings

Bitte

rn

Moo

rado

o

Ston

y Po

int

Crib

Poi

nt

Carnegie

Murrum

beena

Oakleigh

Hughesdale

HuntingdaleClayton

Westall

SpringvaleSandown Park

Noble ParkYarram

an

Dande

nong

Gener

al Moto

rsHall

am

Narre W

arren

Berwick

Beaco

nsfie

ldOffic

er

Merinda Park

Cranbourne

Diamond Creek

EastRichmond

BurnleyHawthorn

Glenferrie

AuburnWillis

on

Burwoo

d

Ashburto

n

AlameinRive

rsdale

Hartwell

Heyington

Kooyong

Tooronga

Gardiner

DarlingGlen Iris

East Malvern

Mount

Holmesglen

Jordanville

Syndal

Glen Waverley

East Camberwell

Canterbury

Chatham

Surrey Hills

Box Hill

Laburnum

Blackburn

Nunawading

Mitcham

Heatherdale

Ringwood

Mont Albert

Croydon

Mooroolbark

East Ringwood

Lilydale

Heathmon

tBoronia

Ferntree G

ully

Upper F

erntree G

ullyUpw

ey

Teco

ma

Belgrav

e

Craigieburn

Roxburgh Park

NewportShops

Pais

ley

Gal

vin( c

lose

d )

( clo

sed)

Southern

Flinders St

Cross

Lynbrook

St. Albans

Coolaroo

Sunbury

Carru

m

Seaf

ord

Kana

nook

Bayswate

r

Keilor Plains

Waverley

Hopp

ers

South Morang

Paken

ham

Cardini

a Roa

d

(clos

ed)

Edith

vale

Windsor Railway Station Complex

Ripponlea Railway Station Complex

Middle Brighton Railway Station

New Street Railway Gates

North Melbourne Railway Station Complex

Williamstown RailwayStation Complex

Werribee Railway Station

Yarraville - Interlocking Railay Crossing Gates,Anderson Street

Upfield Railway LinePrecinct: Park Streetto Coburg Station

Lilydale Railway Station Refreshment Rooms

Mentone Railway Station and Gardens

Caulfield Railway Station Complex

Clayton Railway Station Complex

South Yarra Railway Station

Sunshine (Devonshire Rd Footbridge) - HV McKayMemorial Gardens

Essendon RailwayStation Complex

Glenferrie RailwayStation Complex

Hawthorn RailwayStation Complex

Auburn RailwayStation Complex

Ringwood Railway Station Complex

Flinders Street RailwayStation Complex, including Signal Box A

Clifton Hill RailwayStation

Maribyrnong RiverRail Bridge

Footscray RailwayStation Complex

Malvern Railway Station

Flemington Railway SubstationFormer Tottenham Station

(archeological site undercarpark)

Aboriginal Cultural Heritage exclusion zone: Watsons Road, Diggers Rest to Jacksons Hill Bridge, Sunbury

Sunbury Railway Station - Water Tower

Sunbury: Railway bridge over Blind Creek

Sunbury Hill: Railway bridge over Jacksons Creek Tributary

Sout

hKe

nsin

gton

ALL PLACES REGISTERED WITH THE VICTORIAN HERITAGE REGISTER (VHR) OR THE VICTORIAN ABORIGINAL HERITAGE REGISTER (VAHR) ARE LEGALLY PROTECTED UNDER THE HERITAGE ACT 1995 AND THE ABORIGINAL HERITAGE ACT 2006.

This map shows network sites with a VHR or VAHR listing only.

Prior to commencing work check the most recent version of the Victorian Heritage Register in the Victorian Heritage database (Department of Planning and Community Development website) and Local Council Heritage Overlays (Local Council websites) as this list is not exhaustive.

NETWORK HERITAGE SITES L4-SQE-INF-020 Version: 1 Effective From: 15 March 2013

Camberwell

Approving Manager: Environment ManagerPRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

Approved Date: 15/03/2013 Next Review Date: 15/03/2016Page 1 of 2

Page 38: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

38

MTM PROTECTED FLORA PLAN

Sout

hKe

nsin

gton

Flag

staff

Melb

ourn

eCe

ntra

l

Parlia

men

t

North Melbourne

Foo t

scra

y

Spotswood

Yarraville

Seddon

Newport

Nth Williamstown

Williamstown

WilliamstownLave

rton

Westona

Altona

SeaholmeAirc

raft

Cros

sing

Wer

ribee

Wes

t Foo

tscr

ay

Totte

nham

Mid

dle

Foot

scra

y

Sunsh

ineAlbion

Ginifer

Diggers Rest

Watergardens

Newmarket

Kensington

Showgrounds

Flemington

Racecourse

Ascot Vale

Moonee Ponds

Essendon

Glenbervie

Strathmore

Pascoe Vale

Oak Park

GlenroyJacana

Broadmeadows

Coburg

Moreland

Anstey

Brunswick

Royal Park

Flemington Bridge

Macaulay

Batman

Merlynston

Fawkner

Gowrie

Upfield

Jol im

ont

West Richmond

North Richmond

Collingwood

Victoria Park

Clifton Hill

Rushall

Merri

Northcote

Croxton

Thornbury

Bell

Preston

Regent

Reservoir

Ruthven

Keon Park

Thomastown

Lalor

Epping

Westgarth

DennisFairfie

ld

Alphington

Darebin

Ivanhoe

Eaglemont

Heidelberg

Rosanna

Macleod

Watsonia

Greensborough

Montmorency

Eltham

WattleglenHurstbridge

Sth Yarra

Prahran

Windsor

Balaclava

Ripponlea

Elsternwick

Gardenvale

Nth Brighton

Middle Brighton

Brighton Beach

Hampton

Sandringham

Beach

Hawks

burn

Toora

kArm

adale

Malvern

Caulfie

ld

Mordialloc

ParkdaleMentone

CheltenhamHighett

MoorabbinPatterson

BentleighMcKinnonOrmond

Glenhuntly

Aspendale Edith

v ale

Che

lsea

Bonb

each

Fran

ksto

n

To L

ong

Isla

nd

Leaw

arra

Baxt

er

Som

ervi

lle

Tyab

b

Has

tings

Bitte

rn

Moo

rado

o

Ston

y Po

int

Crib

Poi

nt

Carnegie

Murrum

beena

Oakleigh

Hughesdale

HuntingdaleClayton

Westall

SpringvaleSandown Park

Noble ParkYarram

an

Dande

nong

Gener

al Moto

rsHall

am

Narre W

arren

Berwick

Beaco

nsfie

ldOffic

er

Merinda Park

Cranbourne

Diamond Creek

EastRichmond

BurnleyHawthorn

Glenferrie

Auburn

Willison

Burwood

Ashburto

n

AlameinRive

rsdale

Hartwell

Heyington

Kooyong

Tooronga

Gardiner

DarlingGlen Iris

East Malvern

Mount

Holmesglen

Jordanville

Syndal

Glen Waverley

East Camberwell

Canterbury

Chatham

Surrey Hills

Box Hill

Laburnum

Blackburn

Nunawading

Mitcham

Heatherdale

Ringwood

Mont Albert

Croydon

Mooroolbark

East Ringwood

Lilydale

Heathmon

tBoronia

Ferntree G

ully

Upper F

erntree G

ullyUpw

ey

Teco

ma

Belgrav

e

Craigieburn

Roxburgh Park

NewportShops

Pais

ley

Gal

vin

( clo

sed)

(clo

sed)

Southern

Flinders St

Cross

Lynbrook

St. Albans

Coolaroo

Sunbury

Car

rum

Seaf

ord

Kana

nook

Bayswater

Keilor Plains

Waverley

Hopp

ers

South Morang

Paken

ham

Cardini

a Roa

d

(clos

ed)

Camberwell

Windsor 7.758 - 8.214 Km - Down sideDandenong Road to Alma Road. Alma Park area.Unfenced.

Between Aircraft and Hoppers CrossingDSE No: 360824.55 - 25.35 Km - Up side.Forsyth Road.

SunshineDSE No: 359811.02 - 11.57 KmDown side. Near grain silos. Unfenced.

South Morang Fenced site adjacent to station on theUp side.

Heathmont28.442 - 28.473 Km - Up side.28.682 - 28.744 Km - Up side.28.796 - 29.057 Km - Up side.Three sites are Fenced.

Huntingdale18.1 - 18.183 - Up side.Huntingdale Station to Moroney St. Fenced.

Ginifer. DSE No: 359715.2 - 15.59 KmUp side. Threeseparate fenced sites.

Stony PointDSE No: 710774.00 - 74.30 Km.Up side. Fenced.

General Motors to HallamDSE No: 524036.15 - 36.70 Km - Up side.Fenced.

Officer 1. DSE No: 564048.50 - 48.6 Km - Up & Down.

Officer 2. DSE No: 5642 49.28 - 49.3 Km - Up side.

Officer 4. DSE No: 565050.3 - 50.55 Km - Down side.

PakenhamDSE No. 529959.50 - 61.60 Km - Up side59.96 - 61.66 Km - Down side.Ryan Road. Unfenced.

LangwarrinDSE No: 491748.71 - 51.97 - Up side.Langwarrin to Golf Links Road.

Merinda ParkDSE No: 513241.60 - 42.18 Km.Up side.

Cardinia Road. DSE No: 798352.92 - 53.15 Km - Down side

Greens RoadDSE No: 524534.77 - 34.89 - Up side.

St AlbansDSE No: 354618.35 - 18.50 Km - Down side18.54 - 18.73 Km - Down side18.31 - 18.50 Km - Up side Three separate fenced sites.

Calder Park (Diggers Rest 1/3)DSE No: 356829.02 - 29.30 Km - Up side

Calder Park (Diggers Rest 2/3)DSE No: 356928.90-29.25 Km - Down side

Calder Park (Diggers Rest 3/3)29.60-29.86 Km - Up side

Calder Park Rail Reserve SouthDSE No:8499: 27.64-27.86 Km - Up side & DSE No: 8435: 27.65-27.90 Km - Down side

Calder Park - Holden Road. DSE No: 8436. 28.35-28.55 Down side

Sydenham Rail Reserve 2. DSE No.8423. 24.37-25.16 Km - Up

Sydenham. DSE No.355125.50-25.77 - Down side

Barkers Creek - Sunbury Station. DSE No: 843736.68 - 37.49 Km - Down side

South Sunbury east. DSE No: 3526 36.60 - 36.85 Km - Up side

South Sunbury. DSE No: 352536.08 - 36.68 Km - Down side

Sunbury to Diggers Rest 1/5. DSE No: 3522 33.75 - 33.90 Km - Down side

Sunbury to Diggers Rest 2/5. DSE No: 352334.60 - 35.00 Km - Up side

Sunbury to Diggers Rest 3/5. DSE No: 352434.90 - 35.05 Km - Down side

Note: there is also an Aboriginal Cultural Heritage exclusion zone: Watsons Road, Diggers Rest to Jacksons Hill Bridge, Sunbury.

NETWORK PROTECTED FLORA SITES L4-SQE-INF-010 Version: 2 Effective From: 15 March 2013

Approving Manager: Environment ManagerPRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

Approved Date: 15/03/2013 Next Review Date: 15/03/2016Page 1 of 2

BIOSITES ARE PROTECTED UNDER THE ENVIRONMENT PROTECTION AND BIODIVERSITY CONSERVATION ACT 1999 AND MAY CONTAIN RARE OR ENDANGERED PLANT SPECIES. SIGNIFICANT PENALTIES WILL APPLY IF THE VEGETATION IS DAMAGED OR DESTROYED.

Check this map and the Network Heritage Sites map (L4-SQE-INF-020) before carrying out work in the rail reserve. If in doubt, ask one of the following staff for clarification:

Tree Clearing and Conformance Officer, Infrastructure - Track Delivery

Environment Manager, HSEQ

Page 39: Occupation Works Guide - Metro Trains · 1 Occupation Works Guide Camberwell - Box Hill APLT Friday 21st Continuous to 04:00 Monday 24th June 2013. Occupation Works uide 2. 3 ...

38 39

MTM MFB/CFA BOUNDARY LIMITS


Recommended