Date post: | 04-Apr-2019 |
Category: |
Documents |
Upload: | trinhquynh |
View: | 233 times |
Download: | 0 times |
Ocean Park Master Redevelopment Project
Quarterly Environmental Monitoring & Audit Report – from January 2009 to March 2009
Summ t i
Waterfront
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
ii
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY.......................................................................................................................................I
1. INTRODUCTION .....................................................................................................................................1
Background..............................................................................................................................................1 Project Organization and Contacts of Key Management.........................................................................1 Construction Activities During The Reporting Quarter.............................................................................1
2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS .......................................................5
Monitoring Parameters and Locations.....................................................................................................5 Monitoring Methodology and Calibration Details .....................................................................................5 Environmental Quality Performance Limits (Action and Limit Levels) .....................................................5 Environmental Mitigation Measures.........................................................................................................5
3. MONITORING RESULTS........................................................................................................................6
Air Quality ................................................................................................................................................6 Noise........................................................................................................................................................6 Terrestrial Ecology ...................................................................................................................................6 Marine Ecology ........................................................................................................................................6
4. AUDIT RESULTS.....................................................................................................................................7
Implementation Status of Environmental Mitigation Measures................................................................7 Status of Environmental Licensing and Permitting ..................................................................................7 Advice on Solid and Liquid Waste Management Status ..........................................................................8
5. NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS).................................................................................................10
Summary of Exceedances.....................................................................................................................10 Review of the Reasons for and the Implications of Non-compliance ....................................................10 Summary of Actions Taken ....................................................................................................................10
6. ENVIRONMENTAL COMPLAINTS........................................................................................................11
Complaints Log ......................................................................................................................................11 Complaints Handling Procedure ............................................................................................................11
7. NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS............................................11
8. COMMENTS, CONCLUSIONS AND RECOMMENDATIONS ..............................................................12
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
iii
List of Tables Table 1.1 Details of the Contracts .......................................................................................................................1 Table 1.2 Summary of Works undertaken in the Reporting Quarter ...................................................................1 Table 1.3 Status of Environmental Submissions.................................................................................................3 Table 4.1 Estimated Amounts of Different Types of Materials Generation from October to December 2008.....9 List of Figures Figure 1.1 Management Organizations Figure 1.2 Layout of Work Site (Waterfront) Figure 1.3 Layout of Work Site (Summit) and Location of Terrestrial Ecology Monitoring Figure 1.4 Layout of Work Site (Astounding Asia) Figure 1.5 Layout of Work Site (Entry Plaza, Aqua City and Grand Aquarium) Figure 1.6 Location of Noise and Air Monitoring Stations Figure 1.7 Location of Subtidal Monitoring Stations
List of Appendices Appendix A Contact Details of Key Management Appendix B Environmental Monitoring Programme Appendix C Summary of Calibration Details Appendix D Action and Limit Levels Appendix E Graphical Presentation of Air Quality Monitoring Results Appendix F Graphical Presentation of Noise Monitoring Results Appendix G Implementation Status of Environmental Mitigation Measures Appendix H Status of Environmental Licenses and Permits Appendix I Complaint Flow Diagram and Complaint Log Appendix J Coral monitoring Results
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
I
EXECUTIVE SUMMARY This is the eighth combined quarterly Environmental Monitoring and Audit (EM&A) report for the Project “Master Redevelopment Project of Ocean Park”. This report summarizes the EM&A works performed in the period between 26 January 2009 and 25 March 2009. Environmental Monitoring Works Environmental Monitoring and Audit Progress A summary of monitoring and audit activities conducted in the reporting quarter is listed below: 1-hour Total Suspended Particulates (TSP) monitoring 44 sessions for AM1
44 sessions for AM2 44 sessions for AM3A
24-hour TSP monitoring 15 sessions for AM1 15 sessions for AM2 15 sessions for AM3A
Daytime noise monitoring 13 sessions for all stations Evening and night time noise monitoring 10 sessions for all stations Holiday daytime noise monitoring 0 sessions for all stations Terrestrial ecology monitoring 0 session Coral monitoring 1 session for Site 1-5 and Control Station C Environmental site inspection 13 sessions (include IEC audit)
Air Quality All measured 1-hour TSP and 24-hour TSP concentrations in the reporting quarter were below the Action and Limit Levels. Noise All measured noise levels during daytime and evening time were below the Action and Limited levels in the reporting quarter. Terrestrial Ecology Terrestrial ecology monitoring had ceased since September 2008. Hence, terrestrial ecology monitoring was not required in the reporting quarter. Please note that all the terrestrial ecology monitoring have been completed in August 2008 according to the requirement under the EM&A Manual. Coral Monitoring One session of coral monitoring was scheduled for Site 1-5 & Control Station in the reporting quarter. The results showed that there was no exceedance of Action and Limit Levels. Environmental Complaints and Prosecutions No complaint, summon or prosecution related to environmental issues was made against the Project within the reporting quarter.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
1
1. INTRODUCTION
Background
1.1 The “Master Redevelopment Project of Ocean Park” (hereinafter known as the “Project”) is implemented by the Ocean Park Corporation at its existing site of Ocean Park and Nam Long Shan, Aberdeen. The Project involves both reconstruction/modification of existing facilities and expansion of the Park, and therefore under Environmental Permit, EP-249/2006/A.
1.2 The construction works of the project consists of various contracts. Details of the contracts, which are required to perform the EM&A programme, are shown in Table 1.1 below.
Table 1.1 Details of the Contracts
Contract
No. Contract Title Contractor Construction
Commencement CI-05 Site Formation, Funicular
Tunnel and Miscellaneous Works
Dragages-Bouygues JV
12 March 2007
CW-02 Astounding Asia W. Hing Construction Co. Ltd.
1 August 2007
CI07 Entry Plaza, Aqua City and Grand Aquarium
Leighton Construction (Asia) Limited
15 August 2008
1.3 The contractors will conduct environmental monitoring and audits during the construction stage and produce contract specific monthly & quarterly EM&A reports. The RSS would prepare a combined quarterly EM&A for the whole project. This is the combined quarterly EM&A Report including the IEC audit findings, CI05, CW02 and CI07 EM&A Works. This report presents the results of EM&A works conducted in the reporting quarter from 26 January 2009 to 25 March 2009.
Project Organization and Contacts of Key Management
1.4 An organization structure and the line of communication were set up for the Project between the Project Proponent, Project Manager’s Representative (PMR), Independent Environmental Checker (IEC), the Contractor and the Environmental Team (ET). The project organization and contact details of key management are shown in Figure 1.1 and Appendix A respectively.
Construction Activities during the Reporting Quarter
1.5 The site activities during the reporting quarter are summarized in Table 1.2.
Table 1.2 Summary of Works undertaken in the Reporting Quarter
Month Item Work Activity
Jan 09 Feb 09 Mar 09
Waterfront (CI-05)
1. Waterfront Terminus Construction (e.g. Retaining Wall, Base Slab, Column, Platform Slab, Track and Pad Footing, E&M and Finishing Works.
2. External U/G Drainage & Utilities and Road Works
Summit (CI-05)
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
2
Month Item Work Activity
Jan 09 Feb 09 Mar 09
1. Tunnel internal structure (e.g. wall and upper slab, cable trench, walkway slab, air duct and etc.)
2. Tunnel E&M
3. Drill & Blast for Summit Site Formation
4. Summit Terminus and FS Tank Building (e.g. Superstructure Works)
5. Soil Nail Works at North Haul Road 6. EVA Road Construction
Tai Shue Wan (CI-05)
1. Site Clearance Works
Government Entrusted Works (CI05)
1. Excavation
2. Trial Pit Excavation
3. Construction of Manhole
4. Laying of sewer & OPC water main
5. Road Surface Reinstatement
6. Backfilling
Vet Hospital (CS-01), Construction phase has ceased in mid-October 2008
1. N/A - - - Astounding Asia (CW-02)
1. Building services works at Astounding Asia Restaurant and New Panda Habitat.
2. Builder’s works and E&M works at New Bird Theatre.
3. Formation works, drain works, E&M works, landscaping works and irrigating works at external area.
Entry Plaza, Aqua City and Grand Aquarium (CI-07) 1. Wall construction (G/F to 1/F construction
at Grand Aquarium
2. Rock filling, excavation, sheet piling and backfilling at Entry Plaza
3. Footing and column construction at Entry Plaza
4. Retaining wall construction
5. Road works at New Access Road
1.6 A layout plan of the Project is provided in Figure 1.2 to Figure 1.3, Figure 1.4 and Figure 1.5. Figure 1.2 and 1.3 shows the layout plan of CI-05 waterfront work site and CI05 Summit work site. Figure 1.4 shows the layout plan of CW-02 Astounding Asia. Figure 1.5 shows the layout plan of CI-07 Entry
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
3
Plaza, Aqua City and Grand Aquarium.
1.7 The status of submissions until 25 March 2009 as specified in the Environmental Permit No. EP-249/2006/A is presented in Table 1.3.
Table 1.3 Statuses of Environmental Submissions
EP-249/2006/A Condition Submission Revision Status
Contract CI05 1.12 Notification of
Commencement Date of construction stage
Dated 14 February 2007
Submitted to EPD on 15 February 2007
2.3 Management Organization
Dated 15 December 2006
Submitted to the EPD on 29 December 2006.
2.4 Construction Programme
2 Dated 14 February 2007
Submitted to the EPD on 15 February 2007
2.13 Drainage Proposal A2 Dated 26 April 2007
Placed in EIAO Register Office for public information on 30 May 2007
2.14 Silt Curtain Proposal B Dated 30 January 2007
Placed in EIAO Register Office for public information on 1 March 2007
2.18 As-built Drawing for Enhancement Works for Pond 35
A Dated 17 July 2007
Placed in EIAO Register Office for public information on 7 August 2007
2.20a Transplantation Proposal for Uncommon Plant Species
D Dated 27 August 2007
Placed in EIAO Register Office for public information on 25 September 2007
2.20b Detailed Compensatory Planting As-built Drawing
A Dated 4 October 2007
Placed in EIAO Register Office for public information on 30 October 2007
2.21 Waste Management Plan
D Dated 27 August 2007
Placed in EIAO Register Office for public information on 25 September 2007
3.3 Baseline Air Quality and Noise Monitoring Report
B Dated 28 February 2007
Submitted to the EPD on 5 March 2007
3.3 Baseline Coral Survey Report
A Dated 13 June 2007
Submitted to the EPD on 18 June 2007
All Contract (including CI05, CW02 and CI07) 3.1 and under Section 13.14 of EM&A Manual
Quarterly EM&A Report for October to December 2008
A Dated 22 January 2009
Submitted to the EPD on 23 January 2009
3.4 Monthly EM&A Report for January 2009
A Dated 10 February 2009
Submitted to the EPD on 11 February 2000
3.4 Monthly EM&A Report for February 2009
A Dated 12 March 2009
Submitted to the EPD on 12 March 2009
3.4 Monthly EM&A Report for March 2009
A Dated 9 April 2009
Submitted to the EPD on 15 April 2009
CityBus Limited 2.5 Written Notice on Dated 17 Submitted to the EPD on 22
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
4
EP-249/2006/A Condition Submission Revision Status
Completion of Total Petroleum Hydrocarbon (TPH) Contaminated Soil Disposal
January 2007 January 2007
2.6 Written Notice on Completion of Solidification Treatment of Heavy Metals Contaminated Soil
Dated 17 January 2007
Submitted to the EPD on 22 January 2007.
2.8 As-built Remediation Plan
3 Dated 14 March 2007
Submitted to the EPD on 16 March 2007
Hong Kong School of Motoring Ltd. 2.10 Confirmation letter to
confirm that land contamination remediation works within HKSM has been completed
Dated 13 April 2007
Submitted to EPD on 13 April 2007.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
5
2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters and Locations
2.1 The EM&A Manual designates locations for the CET to monitor environmental impacts in terms of air quality, noise and ecology from the Project. The locations of air quality, noise and ecology monitoring and their control station(s) if applicable are depicted in Figure 1.6 and Figure 1.7. Appendix B gives the details of the monitoring programme.
Monitoring Methodology and Calibration Details
2.2 All monitoring works were conducted and monitoring equipment was regularly calibrated in accordance with the EM&A Manual. The calibration certificates were provided in the Monthly EM&A report. Summary of calibration are attached in Appendix C.
Environmental Quality Performance Limits (Action and Limit Levels)
2.3 The environmental quality performance limits, i.e. Action and Limit levels (AL Levels) were derived from the baseline monitoring results and/or other approaches as detailed in the EM&A Manual. Should the measured environmental quality parameters exceed the AL Levels, the respective action plans would be implemented. The AL Levels for each environmental parameter are given in Appendix D.
Environmental Mitigation Measures
2.4 Relevant mitigation measures as recommended in the Project EIA Report had been stipulated in the EM&A Manual and EMIS for the Contractor to adopt. A list of mitigation measures is given in Appendix G.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
6
3. MONITORING RESULTS
Air Quality
3.1 No exceedance of Action and Limit Level for 1-hour TSP and 24-hour TSP was recorded in the reporting quarter. Graphical presentations of the air quality monitoring results are provided in Appendix E.
Noise
3.2 Noise monitoring was carried out for daytime (0700-1900) and evening time (1900 -2300) at four stations in the reporting quarter. No night time and holiday noise monitoring was scheduled in the reporting quarter. Graphical presentations of the noise monitoring results are provided in Appendix F.
3.3 All measured noise levels during daytime and evening time were below the AL levels in the reporting quarter.
Terrestrial Ecology
3.4 According to the requirement in the EM&A Manual, the monitoring of transplanted plants at the receptor has been completed in August 2008. No further monitoring is recommended and regular inspection would be carried out.
Marine Ecology
3.5 The subtidal monitoring was conducted in the reporting quarter and the results showed that there was no exceedance of Action and Limit Levels. Details of results are shown in Appendix J.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
7
4. AUDIT RESULTS
Implementation Status of Environmental Mitigation Measures
4.1 This was the eighth quarter of Ocean Park Master Redevelopment Project including Contract CI05, CW02 and CI07. The major activities were summarized in Table 1.2. The Contractor and sub-Contractor had implemented most of the mitigation measures to minimize the environmental impacts due to construction activities. Regarding a few minor observations as noted during ET’s site inspections, the Contractor and sub-Contractor rectified all the problems and no major environmental impact was induced.
4.2 IEC’s audits were carried in monthly basis (i.e. on 23 January 2009, 20 February 2009 and 20 March 2009). No non-compliance was issued for CI05, CW02 and CI07. 5 observations were recorded for CI05 during the reporting quarter, 6 and 5 observations were recorded for CW02 and CI07 respectively during the reporting quarter. Observations details were provided in the Monthly EM&A report.
4.3 The updated implementation status of environmental mitigation measures (EMIS) is given in Appendix G.
CI05
4.4 Accumulation of construction waste was observed at Waterfront and Summit.
4.5 Stockpile of excavated materials were not covered.
4.6 Haul road at Summit was dry.
4.7 An oil tank was observed placed on bare ground at Summit.
4.8 General refuse and construction waste was accumulated at Summit
CS01 (Construction phase had ceased in mid-October 2008)
CW02
4.9 A stockpile of construction materials was not covered.
4.10 General refuse was accumulated on the slope surface.
4.11 Some general refuses were scattered on site.
4.12 Over 20 cement bags were placed on bare ground without cover to suppress dust.
4.13 Stockpiles of dusty construction materials were not covered by any means.
4.14 Oil drums were placed on bare ground without drip trays.
CI07
4.15 Stockpiles of excavated materials were not covered.
4.16 Mud was accumulated in the wheel wash bay.
4.17 Haul roads and unpaved areas were dry and dusty.
4.18 An oil drum was placed on bare ground.
4.19 Stockpiles of excavated material were not provided with water spray.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
8
Status of Environmental Licensing and Permitting
4.20 Environmental licenses and permits including Environmental Permit for the Project, construction noise permits, chemical waste producer and effluent discharge license were in place and valid during the reporting quarter. A summary status of licences and permits is given in Appendix H.
Advice on Materials Management Status
4.21 Table 4.1 summarises the estimated amounts of different types of materials generated from the Project during the reporting quarter. The materials were reused in other projects specified as below:
• Central Reclamation Phase III, the excavated materials were reused as forming an access road. This would be delivered by barges. The delivery was started in November 2007 and excavated materials were delivered to the site within the reporting quarter.
• NW-SW (Swire Sita), the soil materials were reused as the topsoil of landfill. This would be delivered by trucks to subcontractor’s barges at Yau Tong. The delivery was started in September 2007 and excavated materials were delivered to the site within the reporting period.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
9
Table 4.1 Estimated Amounts of Different Types of Materials Generation from January 2009 to March 2009.
Estimated Amount (tones) Materials Type
Jan 09 Feb 09 Mar 09 Disposal Locations
322.51 tones
260.14 tones
323.11 tones
SENT Landfill
498.27 tones
445.78 tones
765.68 tones
TKOSF
C&D waste
6.76 tones -- -- TMSF
32,932.61 tones
10,509.09 tones
27,558.48 tones
QBBP / CWPFBP
122.96 tones
186.04 tones
132.43 tones
TKOFB
790.28 tones
1,725.33 tones
1,502.33 tones
Swire Sita
Excavated Material (mainly soil)
1,575.21 tones -- -- Central Reclamation Phase III
17,035.14 tones -- -- Internal transfer to CI07
Chemical waste -- -- -- Collected by licensed collector
General waste 83.5 m3 76.22 m3 65.0 m3 Collected by licensed collector Notes: All figures are in tones unless specific.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
10
5. NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)
Summary of Exceedances
5.1 In the reporting quarter, no exceedance was recorded in the air quality monitoring events, noise monitoring events, terrestrial ecology monitoring events and coral monitoring events.
Review of the Reasons for and the Implications of Non-compliance
5.2 As there was no exceedance or non-compliance during the reporting quarter. Thus, no further action was required.
Summary of Actions Taken
5.3 The Contractor and sub-Contractor generally implemented all the required mitigation measures to suppress the environmental impacts. As no exceedance was recorded in the reporting quarter, no further action was required.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
11
6. ENVIRONMENTAL COMPLAINTS
Complaints Log
6.1 During this quarter, no complaint received.
Complaints Handling Procedure
6.2 All complaints will be handled in accordance with the EM&A Manual. The complaint handling procedure and the complaint log are provided in Appendix I.
7. NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS
7.1 No summon or prosecution related to environmental issues was made against the Project within the reporting quarter.
Ocean Park Master Redevelopment Project
Quarterly EM&A Report from January to March 2009
12
8. COMMENTS, CONCLUSIONS AND RECOMMENDATIONS
8.1 The implemented EM&A programme ensured that any environmental impacts to the receivers would be readily detected and timely actions could be taken to rectify any non-compliance. Assessment and analysis of monitoring results collected demonstrated the environmental acceptability of the Project. Weekly site inspections ensured that the EIA recommendations were effectively implemented.
8.2 The CET carried out air quality, noise monitoring, coral monitoring and weekly site inspection in accordance with the EM&A Manual. No exceedance or non-compliance was recorded during this quarter.
8.3 No exceedance of Action and Limit Level for 1-hour TSP, 24-hour TSP, daytime and evening time noise monitoring were recorded in the reporting quarter.
8.4 The subtidal monitoring was scheduled in the reporting quarter and the results showed that there was no exceedance of Action and Limit Levels.
8.5 During this quarter, no complaint was received.
8.6 No summons and prosecutions related to environmental issues were made against the Project in the reporting quarter.
Appendix A
Ocean Park Master Redevelopment Project Quarterly EM&A Report from January 2009 to March 2009
APPENDIX A – CONTACTS OF KEY ENVIRONMENTAL PERSONNEL
Company Contact Person Position Telephone No.
Ocean Park Corporation Arthur Wong Project Director 29103106
Ernest Torbet Project Manager Representative (PMR) 28715888
Maunsell Consultants Asia Ltd KC Chan Safety and Environmental
Manager 29103151
Mott MacDonald Hong Kong Ltd Dr. Anne Kerr Independent Environmental Checker 28285757
YT So Project QSE Manager 25554110 Dragages-Bouygues J.V. (for Contract CI05) Schroeder Tam Contractor’s ETL 25554113
W. Hing Construction Co., Ltd. (for Contract CW02) Billy Lee Contractor’s Project
Manager 61934096
Cinotech Consultant Ltd. (for Contract CW02) Dr. Priscilla Choy Contractor’s ETL 21512089
Leighton Contractors (Asia) Ltd (for Contract CI07) Thomas Lee Contractor’s Environmental
Coordinator 36652609
Appendix B
Ocean Park Master Redevelopment Project Quarterly EM&A Summary Report Contract CI05 January 2009 to March 2009
Dragages Bouygues JV
APPENDIX B – ENVIRONMENTAL MONITORING PROGRAMME
From 26 December 2008 to 25 March 2009
Sun Mon Tue Wed Thu Fri Sat
December 2008
26
27
28
29 1-hrTSP NM (D)
30 1-hr TSP 24-hr TSP NM (E)
31 1-hr TSP
January 2009
1
2 1-hr TSP
3
4
5 1-hr TSP 24-hr TSP NM (D)
6
7 1-hr TSP NM (E)
8
9 1-hr TSP
10 1-hr TSP 24-hr TSP
11
12 1-hr TSP NM (E)
13
14 1-hr TSP NM (E)
15
16 1-hr TSP 24-hr TSP
17
18
19 1-hr TSP NM (D)
20
21 1-hr TSP NM (E)
22 1-hr TSP 24-hr TSP
23 1-hr TSP
24 1-hr TSP
25
26 CNY Holiday
27 CNY Holiday
28 CNY Holiday
29 1-hr TSP 24-hr TSP NM (D)
30 1-hr TSP NM (E)
31
February 2009
1
2 1-hr TSP NM (D)
3
4 1-hr TSP 24-hr TSP NM (E)
5
6 1-hr TSP
7
8 SM (Sites 1 to 5 and Control Station C)
9 1-hr TSP NM (D)
10
11
12
13 1-hr TSP
14
Ocean Park Master Redevelopment Project Quarterly EM&A Summary Report Contract CI05 January 2009 to March 2009
Dragages Bouygues JV
APPENDIX B – ENVIRONMENTAL MONITORING PROGRAMME
From 26 December 2008 to 25 March 2009
Sun Mon Tue Wed Thu Fri Sat
February 2009
15
16 1-hr TSP 24-hr TSP NM (D)
17
18 1-hr TSP
19
20 1-hr TSP
21 1-hr TSP 24-hr TSP
22
23 1-hr TSP NM (D)
24
25 1-hr TSP
26
27 1-hr TSP 24-hr TSP
28
March 2009
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Notes: NM (D) denotes Daytime Noise Monitoring. NM (E) denotes Evening Noise Monitoring if construction work is in progress. SM denotes Subtidal Monitoring. Any update / change in the schedule due to weather or other safety factors will be reported in the
monthly EM&A report.
Appendix C
Ocean Park Redevelopment Project Contract No. CI07 – Entry Plaza, Aqua City and Grand Aquarium Quarterly EM&A Report – January, February and March 2009
Copyright © Leighton 2008
Leighton Contractors (Asia) Limited
CALIBRATION DETAILS Air Quality Monitoring Equipments
Monitoring Location AM1 AM2 AM3/AM3A
High Volume Sample/Dust Trak Serial No. 1174 1177 9998
Sampler Identification ET / EA / 003 / 08 ET / EA / 003 / 07 ET / EA / 003 / 12
Date of Calibration 05 January 2009 & 05 March 2009
05 January 2009 & 05 March 2009
05 January 2009 & 05 March 2009
Calibration Due Date 04 March 2009 & 04 May 2009
04 March 2009 & 04 May 2009
04 March 2009 & 04 May 2009
Result Good Good Good Noise Monitoring Equipments
Monitoring Location CN1, CN2, CN3 & CN4
Sound Level Meter Brand Name and Model Rion NL-31
Serial No. 00773032
Date of Calibration 26 November 2007
Calibration Due Date 25 November 2009
Result Good
Appendix D
Ocean Park Redevelopment Project Contract No. CI07 – Entry Plaza, Aqua City and Grand Aquarium Quarterly EM&A Report – January, February and March 2009
Copyright © Leighton 2008
Leighton Contractors (Asia) Limited
Table B.1 Action and Limit Levels for 1-hour average TSP and 24-hour average TSP
Monitoring
24-hr TSP (g/m3) 1-hr TSP (g/m3) Monitoring Location Action Level Limit Level Action Level Limit Level
AM1 183 260 440 500
AM2 181 260 500 500
AM3/AM3A 194 260 500 500 Table B.2 Action and Limit Levels for Daytime, Evening & Night-time Noise Monitoring
Time Period Action Limit
0700-1900 hrs on normal weekdays 75 dB(A) *
1900-2300 hrs on normal weekdays; and 0700-1900 hrs on
holidays 60/65/70 dB(A) **
2300-0700 hrs of next day
When one documented complaint is received from
any one of the sensitive receivers
45/50/55 dB(A) ** * reduce to 70dB(A) for school and 65dB(A) during school examination periods, if applicable ** to be selected based on the Area Sensitivity Rating of A/B/C, and the conditions of the CNP(s) must be
followed
Appendix E
Figure E.1 1-hr TSP monitoring results of Monitoring Station AM1
0
50
100
150
200
250
300
350
400
450
500
550
600
650
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
1hr-
TSP
( g/
m3 )
Limit Level
Action Level
Figure E.2 1-hr TSP monitoring results of Monitoring Station AM2
0
50
100
150
200
250
300
350
400
450
500
550
600
650
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
1hr-
TSP
( g/
m3 )
Action and Limit L l
Figure E.3 1-hr TSP monitoring results of Monitoring Station AM3A
0
50
100
150
200
250
300
350
400
450
500
550
600
650
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
1hr-
TSP
( g/
m3 )
Action and Limit Level
Figure E.4 24-hr TSP monitoring results of Monitoring Station AM1, AM2 & AM3A
0
50
100
150
200
250
300
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
24hr
-TSP
( g/
m3 )
AM 1 AM 2 AM 3A Action Level for AM 1 Action Level for AM 2 Action Level for AM 3A Limit Level
Limit Level
Action Level for AM1
Action Level for AM2
Action Level for AM3A
Appendix F
Fig F.1 - Daytime Noise Monitoring Results of Monitoring Stations CN1, CN2, CN3 & CN4
50.0
55.0
60.0
65.0
70.0
75.0
80.0
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
Leq,
30m
ins,
dB
(A)
CN1 CN2 CN3 CN4 Limit Level for CN 1 Limit Level for CN 2, CN 3 & CN 4
Limit Level for CN1
Limit Level for CN 2, CN 3 & CN 4
Fig F.2 - Evening Noise Monitoring Results of Monitoring Stations CN1, CN2, CN3 & CN4
45.0
50.0
55.0
60.0
65.0
26-N
ov-0
8
01-D
ec-0
8
06-D
ec-0
8
11-D
ec-0
8
16-D
ec-0
8
21-D
ec-0
8
26-D
ec-0
8
31-D
ec-0
8
05-J
an-0
9
10-J
an-0
9
15-J
an-0
9
20-J
an-0
9
25-J
an-0
9
30-J
an-0
9
04-F
eb-0
9
09-F
eb-0
9
14-F
eb-0
9
19-F
eb-0
9
24-F
eb-0
9
01-M
ar-0
9
06-M
ar-0
9
11-M
ar-0
9
16-M
ar-0
9
21-M
ar-0
9
Date of Monitoring
Leq,
15m
ins,
dB
(A)
CN1 CN2 CN3 CN4 Limit Level
Limit Level
No monitoring since no restricted hours works.
Appendix G
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Air Emission
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 yes Use of regular watering, with complete coverage, to reduce dust emissions from exposed site surfaces and unpaved roads, particularly during dry weather.
Superintendent/Supervisor/Foremen
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
2 yes Side enclosure and covering of any aggregate or dusty material storage piles to reduce emissions. Where this is not practicable owing to frequent usage, watering shall be applied to aggregate fines.
Superintendent/Supervisor/Foremen
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
3 yes Use of frequent watering for particularly dusty construction areas, temporary stockpiles and areas close to ASRs.
Superintendent/Supervisor/Foremen
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
4 yes Open stockpiles shall be avoided or covered. Where possible, prevent placing dusty material storage piles near ASRs.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
5 yes Restricting heights from which materials are dropped, as far as practicable to minimise the fugitive dust arising from unloading/loading.
Superintendent/Supervisor/Foremen
Subcontractor
08/08 - 11/10 OK
6 yes Tarpaulin covering of all dusty vehicle loads transported to, from and between site locations.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
7 yes Use of vehicle wheel and body washing facilities at the exit points of the site. Superintendent/Supervisor/ForemenProject Environmental Co-ordinatorSubcontractor
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
8 yes Imposition of speed controls for vehicles on unpaved site roads. Ten kilometers per hour is the recommended limit.
Superintendent/Supervisor/ForemenProject Environmental Co-ordinator
08/08 - 11/10 OK
Copyright © Leighton. 2008 Page 1 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Air Emission
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
9 yes Dusty activities should be re-scheduled if high-wind conditions are encountered. Superintendent/Supervisor/ForemenProject Environmental Co-ordinator
08/08 - 11/10 OK
10 yes Where possible, routing of vehicles and positioning of construction plant should be at the maximum possible distance from ASRs.
Superintendent/Supervisor/ForemenProject Environmental Co-ordinator
08/08 - 11/10 OK
11 yes Implementation of an environmental monitoring and auditing program to monitor the construction process in order to enforce controls and modify method of work if dusty conditions arise.
Project Environmental Co-ordinator
08/08 - 11/10 N.A.
12 yes The works areas shall be fenced off with hoarding. The height of hoarding should not be less than 2.4 m from ground level
Superintendent/Supervisor/Foremen
Weekly Environmental Inspection Checklist
08/08 - 11/10 OK
Copyright © Leighton. 2008 Page 2 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Noise
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 yes Only well-maintained plant should be operated on-site and plant should be serviced regularly during the construction program
Superintendent/Supervisor/ForemenProject Environmental CoordinatorSubcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
2 yes Silencers or mufflers on construction equipment should be utilized and should be properly maintained during the construction program
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 N.A.
3 yes Mobile plant, if any, should be sited as far from NSRs as possible Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
4 yes Machines and plant (such as trucks) that may be in intermittent use should be shut down between work periods or should be throttled down to a minimum
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
5 yes Plant known to emit noise strongly in one direction should, wherever possible, be orientated so that the noise is directed away from the nearby NSRs
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
6 yes Quiet Plant considered for at Entry Plaza construction for Site Clearance, Demolition, Realignment of Ocean Park Road, Drainage Diversion, Sewerage Diversion, Site Formation & Excavation, Piling Works and Superstructure Construction where calculated noise levels exceed limits
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
7 yes Quiet Plant considered for Aqua City construction during - Site Clearance, Demolition, Slopeworks, Site Formation & Excavation, Piling Works and Superstructure Construction where calculated noise levels exceed limits
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
8 yes Moveable noise barriers considered for at Entry Plaza construction for Site Clearance, Demolition, Realignment of Ocean Park Road, Drainage Diversion, Sewerage Diversion, Site Formation & Excavation, Piling Works and Superstructure Construction where calculated noise levels exceed limits
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 N.A.
9 yes Moveable barriers considered for Aqua City construction during - Site Clearance, Demolition, Slopeworks, Site Formation & Excavation, Piling Works and Superstructure Construction where calculated noise levels exceed limits
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 N.A.
Copyright © Leighton. 2008 Page 1 of 1
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Water
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 Yes Before commencing any site formation work, all sewer and drainage connections should be sealed to prevent debris, soil, sand etc. from entering public sewers/drains.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 09/08 OK
2 Yes Temporary ditches should be provided to facilitate run-off discharge into appropriate watercourses, via appropriately sized/ designed silt retention pond or similar structure. No site run-off should enter artificial ponds. Cut-off ditches should be provided for all major site clearance/ excavation works where soils would be exposed so that instances of uncontrolled run-off from exposed areas would be minimized. As well as channels, earth/ concrete bunds and/ or sand bags, as appropriate, should be deployed to direct surface run-off towards channels. Catchpits and perimeter channels should be constructed in advance of relevant site formation works.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
3 Yes Boundaries of earthworks should be marked and surrounded by dykes or embankments for flood protection, as necessary.
Superintendent/Supervisor/Foremen
land surveyor
08/08 to 11/10 OK
4 Yes Sand/silt removal facilities such as sand/silt traps and sediment basins should be provided to remove sand/silt particles from runoff to meet the requirements of the Technical Memorandum standard under the Water Pollution Control Ordinance. The design of silt removal facilities should be based on the guidelines provided in ProPECC PN 1/94. All drainage facilities and erosion and sediment control structures should be inspected monthly and maintained to ensure proper and efficient operation at all times and particularly during rainstorms.
Superintendent/Supervisor/Foremen
project environmental co-ordinator
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
5 Yes Silt removal facilities, channels and manholes should be maintained and the deposited silt and grit should be regularly removed, at the onset of and after each rainstorm to ensure that these facilities are functioning properly at all times.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
6 Yes Exposed soil surfaces should be covered, Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
7 Yes Water pumped out from foundation excavations should be discharged into silt removal facilities.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
Copyright © Leighton. 2008 Page 1 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Water
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
8 Yes If excavation cannot be avoided during rainy seasons, temporarily exposed slope/soil surfaces should be covered by a tarpaulin or other means, as far as practicable, and temporary access roads should be protected by crushed stone or gravel, as excavation proceeds. Interceptiong channels should be provided (e.g. along the crest/ edge of the excavation) to prevent storm runoff from washing across exposed soil surfaces. Arrangements should always be inplace to ensure that adequate surface protection measures can be safely carried out well before the arrival of a rainstorm. Other measures that need to be implemented before, during and after rainstorms are summarized in ProPECC PN 1/94.
Superintendent/Supervisor/Foremenproject environmental co-ordiantorSubcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 N.A.
9 Yes Exposed soil areas should be minimized to reduce potential for increased siltation and contamination of runoff.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
10 Yes Earthwork final surfaces should be well compacted and subsequent permanent work or surface protection should be immediately performed. Appropriate intercepting channels should be provided where necessary. Rainwater pumped out from trenches or excavations should be directed to silt removal facilities before discharge.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
11 Yes Open stockpiles of construction materials or construction wastes on-site of more than 50m3 should be covered with tarpaulin or similar fabric during rainstorms
Superintendent/Supervisor/Foremen
Subcontractor
08/08 to 11/10 OK
12 Yes Debris and refuse generated on-site should be collected, handled and disposed of properly to avoid entering any nearby water bodies and public drainage system. Stockpiles of cement and other construction materials should be kept covered when not being used.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
13 Yes Temporary sanitary facilities, such as portable chemical toilets, should be employed on-site where necessary to handle sewage from the workforce. A licensed contractor would be responsible for appropriate disposal of waste matter and maintenance of these facilities.
Superintendent/Supervisor/Foremenproject environmental co-ordinatorSubcontractor
Weekly Environmental Inspection Checklist
08/08 to 11/10 OK
Copyright © Leighton. 2008 Page 2 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Ecological Resources
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 Yes All excavation works carried out close to water bodies shall be carefully controlled to avoid runoff entering watercourses, especially during periods of heavy rain.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 N.A.
2 Yes Site runoff shall be directed towards regularly cleaned and maintained silt traps and where appropriate, oil/grease separators to minimise risk of sedimentation and pollution.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
3 Yes Suitable size / capacity silt traps and oil/grease interceptors shall be used. Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 N.A.
4 Yes Coral monitoring shall be implemented (by others) Project Environmental Coordinator
08/08-11/10 N.A.
5 Yes Noise mitigation measures including the use of quiet excavation methods, quiet construction plant and temporary noise barriers shall be implemented to minimise disturbance to habitats adjacent to the works areas
Superintendent/Supervisor/ForemenProject Environmental Coordinator/ EngineerSubcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
6 Yes Vegetation survey and subsequent transplantation of locally uncommon or restricted species (i.e. Long Tentacle Orchid, Sword-leaved Orchid, Green-flowered Rattlesnake-Plantain, Cycad-fern Balloon Flower and Chinese Lily) shall be carried out to determine the feasibility and suitability of individual plants for transplantation to protect plant species of conservation interest
Project Environmental Coordinator/ Engineer
08/08-11/10 OK
7 Yes Receptor sites shall be identified. Superintendent/Supervisor/ForemenProject Environmental Coordinator
08/08-11/10 OK
8 Yes Transplantation shall be supervised by a suitably qualified botanist/ horticulturist to protect plant species of conservation interest
Project Environmental Coordinator
08/08-11/10 OK
9 Yes A detailed transplantation methodology shall be formulated during the detailed design stage based on the information collected during the detailed vegetation survey to protect plant species of conservation interest
N.A.
Copyright © Leighton. 2008 Page 1 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Ecological Resources
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
10 Yes Equipment or stockpile shall only be in designated works areas wherever practicable.
Superintendent/Supervisor/Foremen
08/08-11/10 OK
11 Yes Access routes shall be selected as far as practicable on existing disturbed land. Superintendent/Supervisor/ForemenProject Environmental CoordinatorSubcontractor
08/08-11/10 N.A.
12 Yes Construction activities shall be restricted to designated works areas. Superintendent/Supervisor/Foremen
Weekly Environmental Inspection Checklist
08/08-11/10 OK
13 Yes The works areas shall be reinstated immediately after completion of works. Superintendent/Supervisor/Foremen
Subcontractor
08/08-11/10 OK
14 Yes Waste skips shall be provided to collect general refuse and construction wastes. Superintendent/Supervisor/ForemenProject Environmental Coordinator
Weekly Environmental Inspection Checklist
08/08-11/10 OK
15 Yes The wastes shall be disposed of timely and properly off-site. Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
16 Yes Drainage arrangements shall include sediment traps to collect and control construction run-off
Superintendent/Supervisor/ForemenEngineer
Weekly Environmental Inspection Checklist
08/08-11/10 OK
17 Yes Open burning on works sites is illegal, and shall be strictly enforced. Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
Copyright © Leighton. 2008 Page 2 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Archaeological and Historical Resources
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 Yes If any works are planned within one metre of the grave, a one metre buffer zone will be provided around the grave, demarcated by a temporary fence.
Superintendent/Supervisor/Foremen
08/08-11/10 N.A.
Copyright © Leighton. 2008 Page 1 of 1
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Waste Management
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
1 Yes Nomination of an approved person, such as a site manager, to be responsible for good site practices, arrangements for collection and effective disposal to an appropriate facility, of all wastes generated at the site (Good site practices)
Superintendent/project environmental coordinator
08/08-11/10 OK
2 Yes Training of site personnel in proper waste management and chemical handling procedures
project environmental coordinator
08/08-11/10 OK
3 Yes Provision of sufficient waste disposal points and regular collection of waste Site supervisor Weekly Environmental Inspection Checklist
08/08-11/10 OK
4 Yes Appropriate measures to minimise windblown litter and dust during transportation of waste by either covering trucks or by transporting wastes in enclosed containers
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
5 Yes Regular cleaning and maintenance programme for drainage systems, sumps and oil interceptors.
project environmental coordinator
EMP 08/08-11/10 OK
6 Yes Waste reduction measures: Sort C&D waste from demolition and decommissioning of the existing facilities to recover recyclable portions such as metals
Superintendent/Supervisor/Foremenproject environmental coordinatorSubcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
7 Yes Segregation and storage of different types of waste in different containers, skips or stockpiles to enhance reuse or recycling of materials and their proper disposal
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
8 Yes Encourage collection of aluminium cans by providing separate labelled bins to enable this waste to be segregated from other general refuse generated by the work force
Superintendent/Supervisor/Foremenproject environmental coordinatorSubcontractor
08/08-11/10 OK
9 Yes Proper storage and site practices to minimise the potential for damage or contamination of construction materials
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
10 Yes Plan and stock construction materials carefully to minimise amount of waste generated and avoid unnecessary generation of waste.
Superintendent/Supervisor/Foremen
Subcontractor
08/08-11/10 OK
Copyright © Leighton. 2008 Page 1 of 2
Ocean Park Redevelopment Project CI07 - Entry Plaza, Aqua City and Grand Aquarium
Environmental Mitigation Implementation Schedule - Waste Management
ID No
Environmental Aspect(not required for actions specifically recommended in Environmental Impact
Assessment)
Specifically Recommeded
in Environmental
Impact Assessment?
Actions RequiredThese actions can be amended if necessary to suit particular needs unless they are in
response to a specified legal requirements Action party(s)
Additional Control/monitoring and measurement
procedures/ methods
(if necessary)Scheduled
months Status
11 Yes General refuse should be stored in enclosed bins or compaction units separate from C&D material. A reputable waste collector should be employed by the contractor to remove general refuse from the site, separately from C&D material. Preferably an enclosed and covered area should be provided to reduce the occurrence of 'wind blown' light material
Superintendent/Supervisor/Foremenproject environmental coordinatorSubcontractor
08/08-11/10 OK
12 Yes In order to minimise impacts resulting from collection and transportation of C&D material for off-site disposal, the excavated materials arising from site formation should be reused on-site as backfilling material and for landscaping works as far as practicable. In addition, volcanic rock generated from the tunnelling works should be subject to beneficial re-use. Other mitigation requirements are listed below:- A Waste Management Plan should be prepared- A recording system for the amount of wastes generated, recycled and disposed (including the disposal sites) should be used- In order to monitor the disposal of C&D and solid wastes at public filling facilities and landfills, and to control fly-tipping, trip ticket systems will be adopted.
Engineerproject environmental coordinator
Weekly Environmental Inspection Checklist
08/08-11/10 OK
13 Yes Chemical waste: Contractor would be required to register with the EPD as a chemical waste producer and to follow the guidelines stated in the Code of Practice on the Packaging, Labelling and Storage of Chemical Wastes .
project environmental coordinator
Weekly Environmental Inspection Checklist
08/08-11/10 OK
14 Yes Chemical waste: Good quality containers compatible with the chemical wastes should be used, and incompatible chemicals should be stored separately. Appropriate labels should be securely attached on each chemical waste container indicating the corresponding chemical characteristics of the waste, such as explosive, flammable, oxidizing, irritant, toxic, harmful, corrosive, etc.
Superintendent/Supervisor/Foremen
Subcontractor
Weekly Environmental Inspection Checklist
08/08-11/10 OK
15 Yes Chemical waste:The Contractor shall use a licensed collector to transport and dispose of the chemical wastes, either to the approved Chemical Waste Treatment Centre, or another licensed facility, in accordance with the Waste Disposal (Chemical Waste) (General) Regulation
Superintendent/Supervisor/Foremen
08/08-11/10 OK
Copyright © Leighton. 2008 Page 2 of 2
C-1
Appendix C - Summary of Environmental Mitigation Implementation Schedule
Types of
Impacts
Mitigation Measures
Status
• Use of regular watering, with complete coverage, to reduce dust emissions from exposed site surfaces and unpaved roads, particularly during dry weather.
*
• Use of frequent watering for particularly dusty construction areas, temporary stockpiles and areas close to ASRs. *
• Side enclosure and covering of any aggregate or dusty material storage piles to reduce emissions. Where this is not practicable owing to frequent usage, watering shall be applied to aggregate fines.
N/A
• Open stockpiles shall be avoided or covered. Where possible, prevent placing dusty material storage piles near ASRs.
*
• Restricting heights from which materials are dropped, as far as practicable to minimise the fugitive dust arising from unloading/ loading.
^
• Tarpaulin covering of all dusty vehicle loads transported to, from and between site locations. ^
• Use of vehicle wheel and body washing facilities at the exit points of the site. ^
• Provision of wind shield and dust extraction units or similar dust mitigation measures at the loading points, and use of water sprinklers at the loading area where dust generation is likely during the loading process of loose material, particularly in dry seasons/ periods.
N/A
• Imposition of speed controls for vehicles on unpaved site roads. Ten kilometers per hour is the recommended limit.
N/A
• Dusty activities should be re-scheduled if high-wind conditions are encountered. ^
• Where possible, routing of vehicles and positioning of construction plant should be at the maximum possible distance from ASRs.
N/A
• Suitable buffer zone should be provided and the works areas should be fenced off with hoarding. The height of hoarding should not be less than 2.4m from ground level. N/A
Crushing Plant
• Water sprays on the crusher. N/A
• Fabric filters installed for the crushing plant. N/A
Construction
Dust
• When transferring materials from crusher to the conveyors, chutes or dust curtains would be used for controlling dust.
N/A
C-2
Types of
Impacts
Mitigation Measures
Status
Barging Point & Conveyor Belt System
• The conveyors would be placed within a totally enclosed structure N/A
• Profiled steel cladding would be provided at two sides of loading point. N/A
• Dust suppression sprays would be installed and operated in strategic locations at the feeding inlet and outlet. N/A
• The barging point would be placed within a totally enclosed structure incorporating an enclosed chute for material transfer to the barge. Flexible curtain would be hanged on the enclosed chute prevent dust emission when excavated materials/rocks transported into the barge.
N/A
• Some areas of the Park would remain open for visitors during the construction period. Therefore, suitable buffer zones from major construction activities should be provided where practical and the works areas should be fenced off with hoarding during the construction phase. It is recommended to erect hoarding of a height not less than 2.4m from ground level.
N/A
Construction Phase
• Only well-maintained plant should be operated on-site and plant should be serviced regularly during the construction programme
^
• Silencers or mufflers on construction equipment should be utilized and should be properly maintained during the construction programme
N/A
• Mobile plant, if any, should be sited as far from NSRs as possible. N/A
• Machines and plant (such as trucks) that may be in intermittent use should be shut down between work periods or should be throttled down to a minimum
^
• Plant known to emit noise strongly in one direction should, wherever possible, be orientated so that the noise is directed away from the nearby NSRs
^
• Material stockpiles and other structures should be effectively utilized, wherever practicable, in screening noise from on-site construction activities
N/A
Adoption of Quieter Plant
Construction
Noise
• In order to reduce the excessive noise impacts at the affected NSRs at the Waterfront during normal daytime working hours, quieter plants are recommended. The Contractors do not have to use specific items of quiet plant adopted in this assessment. The Contractors may use other type of quiet plant, which have the same total SWL, to meet their needs
^
C-3
Types of
Impacts
Mitigation Measures
Status
Use of Movable Noise Barrier
• The use of movable barrier for certain PME could further alleviate the construction noise impacts. In general, 5dB (A) reduction for movable PME and 10dB (A) for stationary PME can be achieved depending on the actual design of movable noise barrier.
N/A
• The Contractor should be responsible for designing of the movable noise barrier with due consideration given to the size of the PME and the requirement of intercepting the line of sight between the NSRs and PME. Barrier material of surface mass in excess of 7kg/m2 is recommended to achieve the predicted screening effect.
N/A
• Exceedance of up to 5dB (A) would be predicted at the Police Training School (NSR PTS) during the examination periods. Early liaison with the principal of this impacted school is recommended to plan for the construction programme. Noisy construction activities should be avoided during the examination period as far as practicable so as to reduce the potential noise impact at the school to comply with the noise criterion of 65dB(A).
N/A
Construction Phase
• All excavation works carried out close to water bodies shall be carefully controlled to avoid runoff entering watercourses, especially during periods of heavy rain.
^
• Site runoff shall be directed towards regularly cleaned and maintained silt traps and where appropriate, oil/grease separators to minimize risk of sedimentation and pollution.
N/A
• Suitable size / capacity silt traps and oil/grease interceptors shall be used. N/A
• Noise mitigation measures including the use of quiet construction plant and movable noise barriers shall be implemented to minimize disturbance to habitats adjacent to the work areas.
N/A
• Trees located within the works areas shall be preserved as far as practicable. *
• Placement of equipment or stockpile in designated works areas and access routes selected on existing disturbed land to minimise disturbance to natural habitats
^
• Construction activities shall be restricted to the work areas that would be clearly demarcated ^
• The work areas shall be reinstated immediately after completion of the works ^
• Waste skips shall be provided to collect general refuse and construction wastes. The wastes would be disposed of timely and properly off-site.
N/A
• Drainage arrangements shall include sediment traps to collect and control construction run-off ^
• Open burning on works sites is illegal, and shall be strictly enforced ^
Ecology
• Landscaping works on newly formed land shall as far as possible make use of native plant species ^
C-4
Types of
Impacts
Mitigation Measures
Status
Construction Runoff and Drainage
• Before commencing any site formation work, all sewer and drainage connections should be sealed to prevent debris, soil, sand etc. from entering public sewers/drains.
^
• Temporary ditches should be provided to facilitate run-off discharge into appropriate watercourses, via appropriately sized/ designed silt retention pond or similar structure. No site run-off should enter artificial ponds. Cut-off ditches should be provided for all major site clearance/ excavation works where soils would be exposed so that instances of uncontrolled run-off from exposed areas would be minimized. As well as channels, earth/ concrete bunds and/ or sand bags, as appropriate, should be deployed to direct surface run-off towards channels. Catchpits and perimeter channels should be constructed in advance of relevant site formation works.
^
• Boundaries of earthworks should be marked and surrounded by dykes or embankments for flood protection, as necessary.
^
• Sand/silt removal facilities such as sand/silt traps and sediment basins should be provided to remove sand/silt particles from runoff to meet the requirements of the Technical Memorandum standard under the Water Pollution Control Ordinance. The design of silt removal facilities should be based on the guidelines provided in ProPECC PN 1/94. All drainage facilities and erosion and sediment control structures should be inspected monthly and maintained to ensure proper and efficient operation at all times and particularly during rainstorms.
^
• Silt removal facilities, channels and manholes should be maintained and the deposited silt and grit should be regularly removed, at the onset of and after each rainstorm to ensure that these facilities are functioning properly at all times.
^
• Exposed soil surfaces should be covered. ^
• Water pumped out from foundation excavations should be discharged into silt removal facilities. ^
• If excavation cannot be avoided during rainy seasons, temporarily exposed slope/soil surfaces should be covered by a tarpaulin or other means, as far as practicable, and temporary access roads should be protected by crushed stone or gravel, as excavation proceeds. Interceptiong channels should be provided (e.g. along the crest/ edge of the excavation) to prevent storm runoff from washing across exposed soil surfaces. Arrangements should always be in place to ensure that adequate surface protection measures can be safely carried out well before the arrival of a rainstorm.. Other measures that need to be implemented before, during and after rainstorms are summarized in ProPECC PN 1/94.
^
• Exposed soil areas should be minimized to reduce potential for increased siltation and contamination of runoff. ^
Water Quality
• Earthwork final surfaces should be well compacted and subsequent permanent work or surface protection should be immediately performed. Appropriate intercepting channels should be provided where necessary. Rainwater pumped out from trenches or excavations should be directed to silt removal facilities before discharge.
^
C-5
Types of
Impacts
Mitigation Measures
Status
• Open stockpiles of construction materials or construction wastes on-site of more than 50m3 should be covered with tarpaulin or similar fabric during rainstorms
N/A
General Construction Activities
• Debris and refuse generated on-site should be collected ^
• Oils and fuels should only be used and stored in designated areas which have pollution prevention facilities. To prevent spillage of fuels and solvents to nearby water bodies and public drains
^
Sewage from Construction Workforce
• Temporary sanitary facilities, such as portable chemical toilets, should be employed on-site where necessary to handle sewage from the workforce. A licensed contractor would be responsible for appropriate disposal of waste matter and maintenance of these facilities
^
Good Site Practice
• nomination of an approved personnel, such as a site manager, to be responsible for good site practices, arrangements for collection and effective disposal to an appropriate facility, of all wastes generated at the site
*
• regular cleaning and maintenance programme for drainage systems, sumps and oil interceptors N/A
• training of site personnel in proper waste management and chemical handling procedures ^
• provision of sufficient waste disposal points and regular collection for disposal *
• appropriate measures to minimise windblown litter and dust during transportation of waste by either covering trucks or by transporting wastes in enclosed containers
^
Waste Reduction Measures
• sort C&D waste from demolition and decommissioning of the existing facilities to recover recyclable portions such as metals
^
• segregation and storage of different types of waste in different containers, skips or stockpiles to enhance reuse or recycling of materials and their proper disposal.
^
• proper storage and site practices to minimise the potential for damage or contamination of construction materials
*
• to encourage collection of aluminium cans by individual collectors, separate labelled bins shall be provided to segregate this waste from other general refuse generated by the work force.
^
Waste /
Chemical
• plan and stock construction materials carefully to minimise amount of waste generated and avoid unnecessary generation of waste.
^
C-6
Types of
Impacts
Mitigation Measures
Status
General Refuse
• General refuse should be stored in enclosed bins or compaction units separate from C&D material. A reputable waste collector should be employed by the contractor to remove general refuse from the site, separately from C&D material. Preferably an enclosed and covered area should be provided to reduce the occurrence of 'wind blown' light material.
^
Construction and Demolition Material
• A Waste Management Plan should be prepared. ^
• In order to monitor the disposal of C&D and solid wastes at public filling facilities and landfills and to control fly-tipping, a trip-ticket system should be included. One may make reference to ETWB TCW No.31/2004 for details.
^
• A recording system for the amount of wastes generated, recycled and disposed (including the disposal sites) should be proposed.
^
Chemical Waste
� If chemical wastes are produced at the construction site, the Contractor would be required to register with the EPD as a Chemical Waste Producer and to follow the guidelines stated in the Code of Practice on the Packaging, Labelling and Storage of Chemical Wastes. Good quality containers compatible with the chemical wastes should be used, and incompatible chemicals should be stored separately. Appropriate labels should be securely attached on each chemical waste container indicating the corresponding chemical characteristics of the chemical waste, such as explosive, flammable, oxidizing, irritant, toxic, harmful, corrosive, etc. The Contractor shall use a licensed collector to transport and dispose of the chemical wastes, to either the Chemical Waste Treatment Centre at Tsing Yi, or another licensed facility, in accordance with the Waste Disposal (Chemical Waste) (General) Regulation
^
Remarks:
^ Compliance of mitigation measure;
X Non-compliance of mitigation measure;
N/A Not Applicable; • Non-compliance but rectified by the contractor; * Recommendation was made during site audit
but improved/rectified by the contractor.
Appendix H
Appendix H Licenses and Permits
CNP
Permit number Starting Date
Expired Date Valid Time Location Contract
No. Status
CI05 - DBJV
GW-RS0682-08 15-Oct-08 14-Apr-09 Concrete lorry mixer; Poker, vibrating, hand-held (electric); and Crane, tower
CI05 Expired
GW-RS0750-08 1-Nov-08 30-Apr-09 Crane, mobile (500 tonnes); Crane mobile (300 toones); Crane mobile (90 tonnes); Crane mobile (50 tonnes); and Lorry, with crane, 5.5 tonnes < gross vehicle weight < 38 tonnes
CI05 Valid
GW-RS0752-08 1-Nov-08 30-Apr-09 Crane, mobile (500 tonnes); Crane mobile (300 toones); Crane mobile (90 tonnes); Crane mobile (50 tonnes); and Lorry, with crane, 5.5 tonnes < gross vehicle weight < 38 tonnes
CI05 Valid
GW-RS0001-09 2-Jan-09 1-Jun-09 Light Tower, Excavator, tracked; Dump truck, 5.5 tonens < gross vehicle weight < 38 tonnes
CI05 Valid
GW-RS0103-09 28-Feb-09 27-Aug-09 Breaker, mini-robot mounted; Excavator, tracked; Light goods vehicle, gross vehicle weight < 5.5 tonnes; Breaker, hand-held, mass > 10 kg and < 20 kg; Road miller; Asphalt paver; Road roller; Dump truck, 5.5 tonnes < gross vehicle weight < 38 tonnes
Nam Long Shan Road
CI05 Valid
CW-02 (W. Hing)
GW-RS0163-09 1-Mar-09 31-Aug-09 19:00 - 23:00 hours (Not being a general holidays) 07:00 - 19:00 hours (General holidays)
Ocean Park, Wong Chuk
Hang
CW-02 Valid
CI07 (LCAL) GW-RS0791-08 10-Nov-08 9-Apr-09 For water pumps, generator and
wastewater treatment plant operation from 19:00 to 23:00 (any day not being a general holiday and 07:00 to 23:00 (general holiday including Sunday)
Ocean Park, Wong Chuk
Hang
CI07 Expired
GW-RS0906-08 17-Dec-08 14-Jun-09 Fro water pump and wastewater treatment plant operation for any day 23:00 to 07:00 on next day
Ocean Park, Wong Chuk
Hang
CI07 Valid
PP-RS0035-08 12-Dec-08 11-Jun-08 For drop hammer driving steel sheet pile from 07:00 to 19:00 hours on all days expect general holidays (including Sundays)
Ocean Park, Wong Chuk
Hang
CI07 Valid
Appendix H Licenses and Permits
Other Permits & Licenses CI05
Permit /Ref/ No Valid Period Section Status Notification of Construction Work under APCO 001017998 - - Waterfront Notified 001018054 - - Summit Notified Effluent Discharge License EP820/W9/XW232 20 Jun 07 30 Jun 12 Summit Valid EP820/W9/XW234 13 Jul 07 31 Jul 12 Waterfront Valid Specific Process License L-11-044 (1) 20-Sep-07 19-Sep-12 Conduct Specified Process in the
premises at Ocean Park MRP Contract CI-05 (at top of Nam Long Shan Road)
Valid
Registration as Chemical Waste Producer WPN5213-199-D2373-01 7-May-07 - For disposal of chemical wastes,
mainly spent lubricants Registered
Construction Waste Disposal Charging Scheme 7004888 - - Waterfront + Summit Issued
CW02
Permit/Ref/No Valid Period Section Status Notification of Construction Work under APCO 001022480 11 July 07 - Astounding Asia Notified Effluent Discharge License EP820/W9/XW240 12 Oct 07 31 Oct 12 Astounding Asia Valid Registration as Chemical Waste Producer 5213-199-W2894-18
20 Aug 07 - Form Oil, Lubricant oil, paint, solvent and diesel.
Registered
Construction Waste Disposal Charging Scheme 7005864 - - Astounding Asia Issued
CI07
Permit/Ref/No Valid Period Section Status Notification of Construction Work under APCO 001032366 - - Entry Plaza Notified Effluent Discharge License EP820/W2/XW246 5 Sep 08 30 Sep 13 Entry Plaza Valid Registration as Chemical Waste Producer 5213-199-L2174-28
22 Sep 08 - Form Oil, Lubricant oil, paint, solvent and diesel.
Registered
Construction Waste Disposal Charging Scheme 7007576 - - Entry Plaza Issued
Appendix I
Appendix J
Appendix J Coral Monitoring Results for the Reporting Quarter Results for January 2009
No impact coral monitoring was conducted within January 2009. It was because the monitoring frequency was changed to quarterly until the end of construction works as recommended in approved EM&A Manual.
Results for February 2009
In the monitoring surveys conducted in February 2009, sedimentation on the tagged colonies from all the 5 Monitoring Sites 1 to 5 and the Control Site C increased by 1 to 5% (total 15 colonies with 3 from the Control Site C) and deceased by 1 to 7% (total 11 colonies with 3 from the Control Site C) when compared with the Initial Survey conducted on 7 to 12 April 2007. There was no blenching in all the 5 monitoring Sites and the Control Site C. Partial mortality increased in 21 colonies by 1 to 12% with 7 from the Control Site C.
In all the 5 Monitoring Sites and 1 control site, level of sedimentation on the tagged corals varied within a small range (≤10%) without an observable trend. The variation was believed to be resulted from combined environmental factors such as monsoonal wind, tidal current, peripheral transports, substratum type, etc. The low level of increment in bleaching and partial mortality suggested minor adverse effect was caused by the observed sedimentation.
The data from this monitoring survey showed no significant enhancement in sedimentation, bleached or mortality in all the 5 monitoring sites 1 to 5 when compared with the Control Site C. Hence, no adverse impact by the construction activity on the coral community was evidenced. Results for March 2009 No impact coral monitoring was conducted within January 2009. It was because the monitoring frequency was changed to quarterly until the end of construction works as recommended in approved EM&A Manual. The next scheduled monitoring should be in May 2009.
Figure 1.1
Figure 1.1 Management OrganizationFigure 1.1 Management Organization
Environmental Protection Department
Independent Environmental
Checker – Dr. Anne Kerr, Mott MacDonald
Individual Contractor’s Environmental Team Leader
DBJV (CI-05) – Schroeder TamWing Hing(CW-02) – Dr. Priscilla Choy
LCAL (CI07) – Thomas Lee
Project Proponent –OPC, Arthur Wong
PMR (RSS Team) – MCAL & Project Manager Representative, Ernest Torbet
Individual Contractors(DBJV , WH & LC AL)
Submit Report + Liaison
EM&A Programme + Recommendation
Supervision
Liaison + Submit Report + Recommendation & Improvements
Submit Report + Liaison
Recommendation & Improvements
Liaison
Employment Relationship
Working Relationship
Submit Report + Liaison
Recommendation & Improvements
Figure 1.2
Figure 1.3
Figure 1.4
Figure 1.5
DATEREVISION DESCRIPTION CHK. BY AUTH. BY
DRAWN BY
CHECKED BY
DATE
PROJECT TITLE DESIGNED BY
DRAWING NO.
DRAWING TITLE
REV.
Copyri
ght
Rese
rved
14:5
4:3
9C
S H
oD
ate
:2008-8
-27
Pri
nt
By
:T
ime :
A3 420m
m x
297m
m
SCALE @ A3
Figure 1.6
Figure 1.7