U. S. Nuclear Regulatory CommissionDocument Control DeskWashington, D. C. 20555
Subject: Oconee Nuclear Site Docket No. 50-287Core Operating Limits Report (COLR)
Gentlemen:
Attached, pursuant to Oconee Technical Specifications 5.6.5, isan information copy of a revision to the Core Operating LimitsReport for Oconee Unit 3, Cycle 21, Rev. 17.
Ve ruly yours,
Jones Site, Vice PresidentOconee Nuclear Site
Attachment
JYcoD
www.duke-energy.com
NRC Document Control DeskMay 12, 2003Page 2
xc w/att: Mr. L. A. Reyes, Regional AdministratorU. S. Nuclear Regulatory Commission, Region II
Mr. L. N. Olshan, Project ManagerOffice of Nuclear Reactor Regulation
Mr. Mel ShannonSenior Resident InspectorOconee Nuclear Site
DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TOPRIORI_1111MIX00" THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS
PRIORI ___________ OTHERWISE IDENTIFIED BELOW
1) 00620 DOC MGMT DUKE FILMED MAN EC03C2) 00813 DOC MGMT EC03C ORIGINAL_
4) 06700 ONS MANUAL MASTER FILE ON03DM5) 06937 R R ST CLAIR EC08G
DOCUMENT NO
ONEI-0400-070
FOR INFORMATION
DOIDuke Power Company
CUMENT TRANSMITTAL FORM
REFERENCENUCLEAR GENERAL OFFICE
OCONEE NUCLEAR STATION
WORK ITEM: M-7
RESP GROUP: NE
CORE OPERATING LIMITS REPORT
OCONEE 3 CYCLE 21
Page 1 of 1
QA COND REV #/ DATE DISTR CODE
)NLY
017 04/11/03 NOMD-27 VI
2
x
Ai 4 15
VIvi
Date: 04/11/03
Document Transmittal #: DUK031010003
QA CONDITION M Yes ] NoOTHER ACKNOWLEDGEMENT REQUIRED D Yes
IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASEACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Power Conpany7800 Rochester HighwayDocument ManagementON02DMSeneca, South Carolina 29672
Recd By
Date
6 17 8 9 10 1 I 12 1 13 114
G'0
15 TOTAL
4
REMARKS: DUKETOTAL PAGES: 33DOCUMENT RELEASE EXEMPT FROM NUCLEAR MODIFICATION PROGRAM.
K S CANADY
MANAGER
NUCLEAR ENGINEERING
BY:
J W SIMMONS JWS/TER EC08H
_ I 1 1 1 1S 1 1 II I I 1 1 I II I
I
I
F4 r;
ONEI-0400-70 Rev 17Page 1 of 33
FOR INFORMATION ONLYDuke Power Company
Oconee 3 Cycle 21 FOR INFORMATION ONLY
Core Operating Limits Report
MVWGAND AP DITCMQA Condition I 0APftft#JCft3r
Prepared By R. W. Murray Date: i%Ape z203
Checked By L. D. McClain
CDR By: R. G. Chow ;
Approved By: R. R. St. Clair /t, S/, lz.4>
Date: 10 fpr iODS3
Date: 4/. /zc3
Date:
A Ma oiV- -i -- |- - q_w _ _ a
;L "- ISCri
Document No./ Rev. ONEI-0400-70 (Rev. 17)Date 9-Apr-2003Page No. 2 of 33
INSPECTION OF ENGINEERING INSTRUCTIONS
Inspection Waived By: Date: __ _A __3(Sponsor)
CATAWBA
InspectionWaived
MCE (Mechanical & Civil) E Inspected By/Date:
RES (Electrical Only) E Inspected By/Date:
RES (Reactor) E Inspected By/Date:
MOD I Inspected By/Date:
Other ( l) Inspe.cted By/Date:
OCONEE
InspectionWaived
MCE (Mechanical & Civil) Inspected By/Date:
RES (Electrical Only) Inspected By/Date:
RES (Reactor) Inspected By/Date:
MOD Inspected By/Date:
Other ( ) Inspected By/Date:
MCGUIRE
InspectionWaived
MCE (Mechanical & Civil) El Inspected By/Date:
RES (Electrical Only) [ Inspected By/Date:
RES (Reactor) [ Inspected By/Date:
MOD El Inspected By/Date:
Other ( ) Inspected By/Date:
)
ONEI-0400-70 Rev 17Page 3 of 33
Oconee 3 Cycle 21
Core Operating Limits Report
Insertion Sheet for Revision 17
This revision is not valid until the end of operation for Oconee 3 Cycle 20.
Remove these revision 16 pages
1-31
Insert these revision 17 pages
1-33
Revision Log
Effective Pages PagesRevision Date Revised Added
Pages Total EffectiveDeleted Pages
lOconee 3 Cycle 21 revisions below l| I 17 Apr. 2003 1 - 31 32 - 33 - 33
Oconee 3 Cycle 20 revisions belowI 16 Oct. 2002 1 - 3, 5 - - 31
15 Nov. 2001 1 - 3 - - 3114 Nov. 2001 1 - 31 - - 31
rOconee 3 Cycle 19 revisions below I13 Apr. 2000 1 - 31 - - 31
!
ONEI-0400-70 Rev 17Page 4 of 33
Oconee 3 Cycle 21
1.0 Error Adjusted Core Operating Limits
The Core Operating Limits Report for 03C21 has been prepared in accordance with the requirementsof ITS 5.6.5. The core operating limits within this report have been developed using NRC approvedmethodology identified in references 1 through 10. The RPS protective limits and maximum allowablesetpoints are documented in references 11 through 13. These limits are validated for use in 03C21by references 14 through 16. The 03C21 analyses assume a design flow of 107.5% of 88,000 gpmper RCS pump, radial local peaking (FAh) of 1.714, and axial peaking factor (Fz) of 1.5, and an EOC( 100 ppmB) Tavg reduction of up to 10 F provided 4 RCPs are in operation and Tavg does not decreasebelow 569 F.
The error adjusted core operating limits included in section 1 of the report incorporate all necessaryuncertainties and margins required for operation of the 03C21 reload core.
1.1 References
1. Nuclear Design Methodology Using CASMO-3 / SIMULATE-3P, DPC-NE-1 004P-A, Revision 0,SER dated November 23, 1992.
2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1002A, Revision 1,SER dated October 1, 1985.
3. Oconee Nuclear Station Reload Design Methodology, NFS-1001A, Revision 5,SER dated December 8, 2000.
4. ONS Core Thermal Hydraulic Methodology Using VIPRE-01, DPC-NE-2003P-A, Revision 1,SER dated June 23, 2000.
5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005P-A, Revision 2,SER dated June 8,1999.
6. Fuel Mechanical Reload Analysis Methodology Using TACO3, DPC-NE-2008P-A,SER dated April 3,1995.
7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, Revision 1,SER dated May 25,1999.
8. DPC-NE-3000P-A, Thermal Hydraulic Transient Analysis Methodology, Rev. 2,SER dated October 14, 1998.
9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model forOnce-Through Steam Generator Plants, SER dated February 18, 1997.
10. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,SER dated February 4, 2000.
11. Variable Low Pressure Safety Limit, OSC-4048, Revision 4, January 2001.
12. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of1.094, OSC-5604, Revision 2, October 2001.
13. ATc and EOC Reduced Tavg Operation, OSC-7265, Rev. 1, Duke Power Co., June 2002.
14. 03C21 Maneuvering Analysis, OSC-8178, Revision 0, November 2002.
15. 03C21 Specific DNB Analysis, OSC-8220, Revision 0, October 2002.
16. 03C21 Reload Safety Evaluation, OSC-8400, Revision 0, April 2003.
ONEI-0400-70 Rev 17Page 5 of 33
Oconee 3 Cycle 21
Miscellaneous Setpoints
BWST boron concentration shall be greater than 2220 ppm and less than 3000 ppm.Referred to by ITS 3.5.4.
Spent fuel pool boron concentration shall be greater than 2220 ppm.Referred to by ITS 3.7.12.
The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.Referred to by ITS SLC 16.5.13.
CFT boron concentration shall be greater than 1835 ppm. The average boron concentration in theCFT's shall be less than 4000 ppm. Referred to by ITS 3.5.1.
RCS and Refueling canal boron concentration shall be greater than 2220 ppm.Referred to by ITS 3.9.1.
Shutdown Margin (SDM) shall be greater than 1% Ak/k.Referred to by ITS 3.1.1.
Moderator Temperature Coefficient (MTC) shall be less than:Linear interpolation is valid within the table provided.Referred to by ITS 3.1.3.
MTCx 1-4Ap /F+0.70+0.400.00
-0.125-0.25
% FP01580100120
Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall beReferred to by ITS 3.4.1. 4 RCP: measured hot leg pressure > 2125 psig
3 RCP: measured hot leg pressure > 2125 psig
DNB parameter for RCS loop average temperature shall be:Referred to by ITS 3.4.1.
The measured Tavg must be less than COLR limits minusinstrument uncertainty. ATc is the setpoint value selected bythe operators, Values are expanded by linear interpolation onpage 33 of this document without instrument uncertainty.
Max Loop Tavg (Incl 2°F unc)ATc, F 4 RCP Op 3 RCP Op
0 581.0 581.0 *
1 581.4 581.22 581.8 581.43 582.1 581.74 582.5 581.95 582.9 582.1
* This limit is applied to the loop with the lowest loop average temperature consistent withthe NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.
DNB parameter for RCS loop total flow shall be:Referred to by ITS 3.4.1.
4 RCP: Measured > 107.5 %df3 RCP: Measured > 74.7 % of 4 RCP min flow
Regulating rod groups shall be withdrawn in sequence starting with group 5, group 6, and finally group 7.Referred to by ITS 3.2.1.
Regulating rod group overlap shall be 25% ± 5% between two sequential groups.Referred to by ITS 3.2.1.
)
ONEI-0400-70 Rev 17Page 6 of 33
Oconee 3 Cycle 21
EFPD
0 to 445
445 to EOC
Core Power Level, %FP
Full Incore
Out of Core
Backup Incore
Steady State Operating Band
Rod Index APSR %WDMin Max Min Max
292 ± 5 300 30 40
292 ± 5 300 100 100
Quandrant Power Tilt Setpoints
Steady State Transient30 - 100 0 - 30 30 - 100 0 - 30
3.50 7.57 7.07 9.36
2.39 6.09 5.63 7.72
2.26 3.87 3.63 4.81
Referred to by ITS 3.2.3.
Maximum0 - 100
16.51
14.22
10.07
!
ONEI-0400-70 Rev 17
Page 7 of 33Oconee 3 Cycle 21
Variable Low RCS Pressure RPS Setpoints
Referred to by ITS 3.3.1
2400
P = 2355 psigT =618 F
2300
2200
AcceptableQL Operation
2100U)
P= 11.14* Tout470600
2000
CD
1900 Unacceptable
Operation
1800 - P= 1800 psig
T =584 F
1700 I i
540 560 580 600 620 640
Reactor Coolant Outlet Temperature, °F
ONEI-0400-70 Rev 17Page 8 of 33
)
Oconee 3 Cycle 21
RPS Power Imbalance Setpoints
% Imbalance
-33.0-33.0-14.414.433.033.0
-33.0-33.0-14.414.433.033.0
Maximum Allowable RPS Power Imbalance Setpoints
% Imbalance
-35.0-35.0-14.414.435.035.0
-35.0-35.0-14.414.435.035.0
% FP
4 Pumps
3 Pumps
090.4
107.9107.990.4
0
063.180.680.663.1
0
% FP
4 Pumps
3 Pumps
090
109.4109.4
900
062.381.781.762.3
0
ONEI-0400-70 Rev 17Page 9 of 33
Oconee 3 Cycle 21
Operational Power Imbalance Setpoints
4 Pumps
3 Pumps
%FP
0
80
90
100
102
102
100
90
80
0
0.0
68.87
69.35
77.0
77.0
67.46
66.98
0.0
FullIncore
-25.6
-25.6
-22.5
-14.3
-12.7
17.0
19.1
24.9
27.6
27.6
-25.6
-25.6
-12.7
17.0
27.6
27.6
BackupIncore
-25.1
-25.1
-22.1
-14.0
-12.3
17.0
18.9
24.5
27.1
27.1
-25.1
-25.1
-12.3
17.0
27.1
27.1
Out ofCore
-25.6
-25.6
-22.5
-14.3
-12.7
17.0
19.1
24.9
27.6
27.6
-25.6
-25.6
-12.7
17.0
27.6
27.6
II
)
ONEI-0400-70 Rev 17Page 10 of 33
Oconee 3 Cycle 21
Operational Power Imbalance Setpoints
Operation with 4 RCS Pumps, BOC to EOC
% FP I RPS Trip I Full Incore Alarm I Out of Core Alarm
107.9
107106
105
104103102101
100
99989796
95
94939291
90.4
90
89888786
85
84838281
80
0
-14.40
-15.36-16.42
-17.48
-18.55-19.61-20.67-21.73
-22.80
-23.86-24.92-25.99-27.05
-28.11
-29.17-30.24-31.30-32.36-33.00
-33.00
-33.00-33.00-33.00-33.00
-33.00
-33.00-33.00-33.00-33.00
-33.00
-33.00
14.40
15.3616.42
17.48
18.5519.6120.6721.73
22.80
23.8624.9225.99
'27.05
28.11
29.1730.2431.3032.3633.00
33.00
33.0033.0033.0033.00
33.00
33.0033.0033.0033.00
33.00
33.00
-12.70-13.50
-14.30
-15.12-15.94-16.76-17.58
-18.40
-19.22-20.04-20.86-21.68-22.17
-22.50
-22.81-23.12-23.43-23.74
-24.05
-24.36-24.67-24.98-25.29
-25.60
-25.60
17.0018.05
19.10
19.6820.2620.8421.42
22.00
22.5823.1623.7424.3224.67
24.90
25.1725.4425.7125.98
26.25
26.5226.7927.0627.33
27.60
27.60
-12.70-13.50
-14.30
-15.12-15.94-16.76-17.58
-18.40
-19.22-20.04-20.86-21.68-22.17
-22.50
-22.81-23.12-23.43-23.74
-24.05
-24.36-24.67-24.98-25.29
-25.60
-25.60
17.0018.05
19.10
19.6820.2620.8421.42
22.00
22.5823.1623.7424.3224.67
24.90
25.1725.4425.7125.98
26.25
26.5226.7927.0627.33
27.60
27.60
% FP j RPS Trip Full Incore Alarm Out of Core Alarm
ONEI-0400-70 Rev 17Page 11 of 33
Oconee 3 Cycle 21
Operational Power Imbalance Setpoints
Operation with 3 RCS Pumps, BOC to EOC
°/ FP RPS Trip Full ncore Alarm Out of Core Alarm_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ A l a m _ __I_ _
80.6
80
7978
77.076
75
74737271
70
6968.96867
66.9866
65
6463.1636261
60
0
-14.40
-15.04
-16.10-17.16-18.23-19.29
-20.35
-21.41-22.48-23.54-24.60
-25.67
-26.73-26.86-27.79-28.85-28.87-29.92
-30.98
-32.04-33.00-33.00-33.00-33.00
-33.00
-33.00
14.40
15.04
16.1017.1618.2319.29
20.35
21.4122.4823.5424.60
25.67
26.7326.8627.7928.8528.8729.92
30.98
32.0433.0033.0033.0033.00
33.00
33.00
-12.70-14.29
-15.88
-17.46-19.05-20.64-22.23
-23.81
-25.40-25.60-25.60-25.60-25.60-25.60
-25.60
-25.60-25.60-25.60-25.60-25.60
-25.60
-25.60
17.0018.06
19.12
20.1821.2322.2923.35
24.41
25.4725.6026.5327.5827.6027.60
27.60
27.6027.6027.6027.6027.60
27.60
27.60
-12.70-14.29
-15.88
-17.46-19.05-20.64-22.23
-23.81
-25.40-25.60-25.60-25.60-25.60-25.60
-25.60
-25.60-25.60-25.60-25.60-25.60
-25.60
-25.60
17.0018.06
19.12
20.1821.2322.2923.35
24.41
25.4725.6026.5327.5827.6027.60
27.60
27.6027.6027.6027.6027.60
27.60
27.60
F IF A. l I A% FP J RPS Trip Full Incore Alarm Out of Core Alarm
!
Oconee 3 Cycle 21
RPS Power Imbalance Setpoints
Referred to by ITS 3.3.1
Thermal Power Level, %FP
120
(-14.4,107.9)
Ml = 0.941
Acc
(-33,90.4)
100 -
(-14.4,80.6)
60 -
Acceptable 3 or 4
40 -
20 -
ONEI-0400-70 Rev 17
Page 12 of 33
(14.4,107.9)
I
M2 = -0.941
Operation
(33,90.4)
(14.4,80.6) l
(33,63.1)
Operation
-10 0 10
Percent Power Imbalance
!
(-33,63.1)
-40 -30 -20 20 30 40
g :l
&
,\ l
Oconee 3 Cycle 21Imbalance Setpoints for 4 Pump Operation, BOC to EOC
ONEI-0400. .ev 17Page 13 of 33
--. . I r L I~2 T-RPS Trip Setpoint _'--_
...; I _. _.-e..;. . !O. t;o� - 1- 7 1 -,'
. ..J_ I .-._ ":,T-i. �- .
T . I I I I. I I * s I I I * I i - W --- 9-+ -1 4
. +---t .4 --4- 4--~ -I- - 4 - I .-~ -.. . .
; I . ' I - . I~ : : . T i ~ 7 . .~
I -- _ I U
g l-- Tr
________ � '.--r�
- V�±�t Incore & Outcore Alarm 33.T*--.--. I -�-r-1 -.- -
1 t I -4--.-
r1-r---- 1�-�
... �: 1 - �- -7-;-
.-1 .1. r.. .. ............
_._. -... I _.. ..
ZiElL.. .__
-� + - +
RPS Trip Setpoint
t-.-r-- --- ~ --
I.~ -- I
.1- --
1r2*
.I L 1 :.. -' -1
' -4 ..
77
..- ... ..- .~ ..
I.. i-t-
-4 _. r'-i __..--J.- 1-4 t .._- 4 ..-..
-1.-
.- '-4- 4 . 4
J 1 -ZF
.J _ 4 z.-
ml
T::...i-44- -r=--
4 I" L T- -1 '- I- -I t r r - -- r .- t -- r 4 1- ---,-I -- I + - ~ " .. .
_ _. 17,-,7-_: :7 , __
'T .1--r-
± . i ; 4 . j 4 4 : . f~ J - - Y ;- 4 -rj z l 4 . T . 2 r:t z r . I -
1-- -- -
........ I.
77T
4~~~~~~~~-_:. -L
' < t 4~~~~~~~~~~~~~r . " ... E c~~~~~~~~~~~~~~~~t ~~~~~d ...-...4 ~ ~ ~ -4 -~~~~ 4 . j~~~~~ . . v 1 - ~ ~ ~ .7
-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 '15 20 25 30 35 40
Percent Axial Imbalance
-Y110
100
90
80
70 T 7-I-1C1)
0(L
0
1C(L)
C1)[L
60
50
40
30
20
1 0
0
. 7 -.. : .- ! ..
�' -7 L.-
1 7 " ---" -
i : : i op I I i ! i : ' � : ! ' ' ; . 1 i . i - � s- i . - I
_- .. .. -.11- - �-J- --- -1- -. I--- - ? --
. -4..-- -. 7. _.. . i __ .. � t. - i -. --- " __ - i
.�- ... 7 I*.-i.
- ": 7 '
-.L -
_1 _T-__ f __ 4... i_l-�__ .�-
... =.:2. -.-_;- 1
I
... .-i
:. . -t- I
. - �:4-
� .-4-
. 1. __.1 _. ."71 --. -.11-
.__ -14-J.- -. . __1_
;�*� -4.- ' [--Z �_� T _' -41: �: �: I
- --- I --,--� --i --t - -------
. 1- .! -1 �7'::.::-L. .r:l.-i --- .__4, i- -I-)
-1-1 1
. . . .
.= -'T' i ,
.-. -..T .... .I.---II T,-t "I..-
-I+ -r .-
_.L' J-T- -I _'.:4_ +_177_+ 4 -
--1- ."... .. �.-i.-I ...
-i "; T -�-. J.... I.. ---
-1. _.. 11.-..
-4-4-4-4-
--L._i__ � - --� 4 --j --f I --f -1 --I -�- i .+,-..i'..
� r_ j -T.- ...
.7�. .__.; --
I.! -1- -4---i.- -1- j .. j -j-+-
.i -i ..4__ ... t-4-1- _:'7.-
Oconee 3 Cycle 21
Imbalance Setpoints for 3 Pump Operation, BOC to EOC
ONEI-0400-70T=,ev 17
Page 14 of 33
.~~~ztzt-. ~~~~~j~~7 r~~~ 1~~~1~~ ~ ~ Tj
j...
_____ 1
L4.£. : J .L 4-..
RPS Trip Setpoint -
-.- ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~~~~RPS Trip Setpoint
.. _ __.. ...... rr ~__
-t4
-. 1 4. 4~4 ~_
-4-~~~~~~~~~~~~~1- - - n - - - -7 --771- J--4
-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40
Percent Axial Imbalance
110
100
90
80
70
C,
0' 60U-
0
50C)U
C,0-
40
30
20
10
0
ONEI-0400-70 Rev 17Page 15 of 33
Oconee 3 Cycle 21
Operational Rod Index Setpoints
RI Insertion Setpoint%FP No Inop Rod
102.0
100.0
90.0
80.0
50.0
48.0
15.0
13.0
5.0
3.0
2.8
0.0
77.0
75.0
50.0
48.0
15.0
13.0
5.0
3.0
2.8
0.0
263.5
261.5
251.5
241.5
201.5
195.2
91.5
76.5
16.5
1.5
0.0
0.0
237.5
234.8
201.5
195.2
91.5
76.5
16.5
1.5
0.0
0.0
1 Inop Rod
289.7
287.5
276.7
266.0
233.7
231.5
165.5
161.5
93.5
76.5
74.8
51.0
285.2
281.5
235.2
231.5
165.5
161.5
93.5
76.5
74.8
51.0
RI WithdrawalSetpoint
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
300
4 Pumps
)
3 Pumps
ONEI-0400-70 Rev 17Page 16 of 33
Oconee 3 Cycle 21
Shutdown Margin Rod Index Setpoints
RI Insertion SetpointNo Inop Rod 1 nop Rod
224.6 289.7
221.5 287.5
141.5 231.5
76.5 161.5
1.5 76.5
0.0 74.8
0.0 51.0
227.4
221.5
141.5
76.5
1.5
0.0
0.0
285.2
281.5
231.5
161.5
76.5
74.8
51.0
RI WithdrawalSetpoint
300
300
300
300
300
300
300
300
300
300
300
300
300
300
4 Pumps
3 Pumps
%FP
102.0
100.0
48.0
13.0
3.0
2.8
0.0
77.0
75.0
48.0
13.0
3.0
2.8
0.0
)
Oconee 3 Cycle 21Rod Index Setpoints
4 Pump Operation, No Inoperable Rods, BOO to EOC
ONEI-0400-70 Rev 17Page 17 of 33
Shutdown Margin etpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
102 100 99.8 24.8 100 100 63.5101 100 9910 24.0 100 iOO 62.5100 1-00 98 .2 23.2- 100 100 6.1.599 100 97.5 22.5 100 100 60.598 0096.7 21.1010 59.597 100 95.9 20.9 100 100 58.596 100 - 95.2 20.2 100 100 57.595 iQO 94.4 19.4 100 100 56.594 100 93.6 186.6 100 100o 55.5
-93 100 92.9 17f.9 100 100 54.5962 1 0 0 92.1 17. 100 1060 53-.591 100 91.3 16.3 100 100 52.590 100 - 90.6 15.6 100 - 100 51.5
9 100 896.8 14 .8& 100b 10050.88100" _ 89.0 14.0 100 10 49.5O
87 100 88.2 13~~~~~ ~~~.2 _ 100 100 48.586 _ _ 100...8~~7.5 12.5 -100 -100 47.5
85 '100 86.7 11.7 100 100 46.584 100 85.90 10.9 100 . 100 45.5
83 100 85.2 1~~~ ~ ~~~0.2 100 100 44.582 100 ~~~~ ~~84.4 9.4 100 100 43.581 100 ~~~~ ~~83.6 8.6 100 100 42.5
80 100 82.9 7.9 100 100 41.579 __ 100 82.1 7.1 100 100 40.278 100- 81.3 6.3 100 100 3.
77 100~~( 80.6 5.6 100 103.76 0 7.84. 00 100 36.275 10 904.0 100 - . 100 34.874 100 78.2 3.2 100 100 33.573 100 77.5 2.5 100 100 32.272 100 7671.7 100 100 30.871 _ 1007590910002.70 100 75.2 0.2 100 100 28.2
69.8 100 75.0 0- 100 100 27.9-69 100 73.8 0 100 100 - 26.868 1072.3 0 100 100 25.5
67.6 __ 100 7Y1.7 010100 25.067 100 70.7 0 100 99.6 24.6
66 - ~100 69.2 0 100 98.9 23.965 100 67.7o -0 100 98.2 -,23.2
64 100 66.1 ~~ ~~~~~~~0 00. 97.62-2.6
62 100 63.0 0 100. -96.2 21.26110 6.50 . 00956o0.
60 ~~~~~~~~000100 . 94.9 19.959 ~~10 58.4 0 100 94.2 _ 19.2
58 100 ~~~~ ~ ~ ~~5.9 0109368.. 7100 _ 55.3 0 _ 100 92.9 17.9
56 100~lo 53. 8 0 0 2217.255 100. .52.3 ~~ ~~~~0 100 91.6 16.6
00 50.7 0 ~ ~~~~ ~~~~ 10 90' 6.9 1.5~--- 160. 49.2 06 100 90.2 1-5.2
52 100 *47.7 0 100 89.6 14.651 100 46.1 0o 1008.919
50 100 44.6 0 100 88.2 13.2
%Frp CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7__________ Shutdown Margin Setpoint Operational Alarm Setpoint
RI = 300 is withdrawal limit at all power levels. Cotneonexpa.
)
Continued on next page.
Oconee 3 Cycle 21Rod Index Setpoints
4 Pum-p bperation, No Inoperable Rods, BOO to EOC
ONEI-0400-70 Rev 17Page 18 of 33
Shutdown Margin Stpoint Operational Alarm Setpoint%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
49 100 43.0 0 100 86.7 11.748 100 41.5, 0 100' 85.1l 10.1,47 100 *39.6 0 100 83.5 8.546 100 -- 3.6 0O 10082.0` 7 .045 10 35.9 0 100 80.4 5.444 100 34.1 0 100 78.8 3.843 100 32.2 0 100 77.2' 2.242 100 30.4 0 100 75.7 0.7
41.6 100 29.6 0 100 75.0 04.1 10 285o 010 7.2040 100 26.6 0 100 70.1 0
391l005. 0 100 -67.3 0-39 99.9 2.9 10 6 66. 038 99.0 2.0 100' 63.8 -
37 980O3.' 10 .6. 036 971 .1 010 57.
34 _ 95.2 20.2 _ 0 100 _ 51.2 0~ -.33 -94.319.3 ___ 0 1006 48.1 0
32 93.4 ~~~~~18.4 -- 10 _--44.9 -0
31 92.5 - - 17.5 _ __ 0 100 ~~~~~~~~~~~~41.8 030 __ 91.5 16.5 _010 3.
29 90.6 15.6 0 - 100 35.5 08 ~~~89.7 14.7 _ 0_ _ 10 2.4 0-
88.8 138 __ 10 2.2
26 87.8 - 12.8 _ 0 __ ~~~~ ~~~~~~100 26.1 025.7 8. 25 _0 _ 0 __2.
25 86.9 - 11.9 - -- 0 ~ 99.0 -.- 24.0 0__ 24 ~~86.0 11.0 O 74 2. 0
23 85.0 ~~~~10.0 _0 95.8 20.8022 ~84.1 9.0 942 120
83.2 -- 8.2 _0927170
20 __ 82.2 -_7.2 _ 0- 91.1 -16.1 019 81.3 6.3 0 _89.5 14.5 018 __ 04 5.4 _0 880 13.001 7 _ 79.5 4.5 __0 864 1401 6 78.5 -3.5 - 48 9801 5 77.6 2.6 _ 0 83.2 8.2 0
14 -- 76.7 1.7 0 - 7. .13 ~~75.8 0.8 0 758 0.8
12.8 75. ____
12 69.00 0 69.0 01.1 61.5 "O_ O-1. 0
10 ~ 54.0 0 54.0 09 46.5 0 0 46.5 _
8 -39.0 ----- 0O 39.0
6 _24.0 O_ 0 24.0 _0 05 165 _00 65004 9.0 b 09. 03 1.5 O 1.5 0
2.8 0' 0 0- 0 0 02 0 0 0 0 0 01 0 0 0 0 0 00 0 0 0 0 0 0
%P CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7_______ I Shutdown Margin Setpoint _ 1_ Operational Alarm Setpoint
RI = 300 is withdrawal limit at all pDower levels.
I
Oconee 3 Cycle 21Rod Index Setpoints
3 Pump Operation, No Inoperable Rods, BOC t EOC
ONEI-0400-70 Rev 17Page 19 of 33
Shutdown Margin Stpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
77 100 100 27.4 100 100 37.576.2- 10 100 25.00 0 100 36.4
76 100 99.7 24.7 100 100 36.175 100 98.2 23.2 100 100 34.874 100 96.8 21.8 100 100 33.573 100 95.3 20.3 100 100 32.1
:72 100 ~3.8 8. 100" 100 30.871 100 92.3 17.3 100 100 29.570 100 90.8 15.8 100 100 28.169 100 89.4 14.4 100 100 26.868 10 87.9 12.b10 iQo' 25.5-
67.6 100 - 87.4 12.4 100 100 25.067 100 86.4 11.4 100 99.6 24.666 100 84.9 9.9 _ 100 _98.9 23.965 100 83.4 -8.4 100o 98.2 23.2
100 82~~.0 _7.0 _ 100 _ 97.6 22.663~ 1-0_8. 55 10969 _ 21.
62 1~~I 0 0, 7904.0 10 0 9 6. 2 21.261 100 77.5 2.5 -100. 95.6 20.660 100 7. . 0 49 1.59.3 10 70 010944 19.459 100 74.1 0 100 -94.2 19.258 -100 71.1 0 100 93.6 18.657 100 68.2 0 0 29 17.9
56 100 65.2 0 100 92.2 ~~~~~~~~17.255 100 62.2 ~~ ~~~~~0 0 916 16.6
54 10~~0 59. 0 90.9 15.9
53 ~~100 5.010 902 15.252 100. 53.4 0 100 89.6 14.651 100 -50.4 __ 0i10 88.9 13.950 100 47.40108.2 32
49 ~~100 44.5 __0 100 86.7 11.748 100 ~~~~~41.5 0 100 85.1 10.1
47 100 39.6 0 -100 83.5 8.546 100- - -37.8 0 100 82.0 7.0
'45- - 1i00 0 100 80.4 5.444 100 341010 7. -38
43 ~~100 32.2 -- 0 -- 100 - 77.2 2.2-42 100 30.4 0 100 75.7 0.7
41.6 100 2960__10 _7.0
41 100 28.5 ~~~~~~ ~~~0 1 00 .7.3.2- 0 40 ~100 2.6 0 100 70.1 0
39.1 100 25.0 _ 0 ~~~~~~~~~~- 673 39 99.9 24.9 0 _ 100 66.9 __0
38 99 . 24.0 _ ~0 10 6.37 ~~~98 23.0 0 -. 100 60.6 0
..... 96.-212 0-4.34 -95.2 __20.2 __0 10.- 51.2 . -
33 ~94.3 19.3 010 4. ..
32... 93.14 _ 186.4 0 - 10'I0 46 -,-
31 92.5--17.5 0 -10 - 41.8 030 '91.5 '16.5 0l100 38.6 029 90.6 15.6 0 100 35.5 028 89.7 14.7 0 100 32.4 0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7__________ Shutdown Margin Setpoint Operational Alarm Setpoint
RI = 300 is withdrawal limit at ali power levels. Cotneonex aeContinued on next t)aQe.
Oconee 3 Cycle 21Rod Index Setpoints
3 Pump Operation, No Inoperable Rods, BOC to EOC
ONEI-0400-70 Rev 17Page 20 of 33
Shutdown Margin Setpoint 1[ Operational Alarm Setpoint% FP CRGP5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7
-l
88.887.887.586.986.085.084.183.282.281.380.479.578.577.6, ,. . . _
76.775.8
_75.069.061.554.046.5_39.031.524.016.59.01.50
0__. _ _
13.812.812.511.911.010.09.1,8.27.2
.6.35.44.53.52.61.70.8
0, ___
0O_
0
00
_ _
0
0
_ 0
__
O
00000000�000
0
0
0cV0000
0 . _
00
0_- ._ . _ . _
O
10010010099.097.495.894.292.7
.9 ,. 91.189.588.086.484.883.279.575.875.069.0
_61.5_54.0_
46.539.031.524.016.59.01.5
0 _
0_. . _
29.226.125.024.022.420.819.217.716.114.513.011.49.88.24.5
0
0
0 ._ .. 0
0
_ 000
06~-00. _ 0
- _ , --.-I _-- _ -.
0000000000
000
0000000
00000
RI = 300 is withdrawal limit at all power levels.
27
25.7252423222120191817161514
10
9
543
2.8210
% FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7_________ ` jj Shutdown Margin Setpoint Operational Alarm Setpoint
,- - --
~~~~~~~~~~~~~.. -............
I , . , _ 0.............. ... . . .-- ---- - - - - --- ---
. .
I- - - - .......
_ . . . _ _
._ .. _. .
, ...
.._ .
....
.... .
.. ..
..
Oconee 3 Cycle 21Rod ndex Setpoints
4 PUmp Operation, I Inoperable Rod, BOC to E00
ONEI-0400-70 Rev 17Page 21 of 33
ShtonMargin Stpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
102 100 1 00 89.7 100 100 89.71oi io 10 8810 100 88.6100 100 100 87.5 100 100 87.599 100 100 86.4 100 100 86.498 100 100 85.3. .100 100 85.397 100 100 84.3 100 100 84.3~96 100 100 83.2 100 100 83.295 100 100 82.1* 100 -. 100 82.194 160 100 81.0 100 100 81.093 10 100o 80.0 _ 1 00' 100O 80.092 100 -100 -78.9 *100 100 78.991 100 77d -~.8 '100 100 77".890 100 100 76.7O10 100 76.789 100 100 75.7 100 100 75.788 1 0 0 - '- 4 100 _10 74.6 0
____ ~~~~~~10-- 100 74.6
* 86 100- -100 7-2.4 100- 1 6 O- '72.485 ~ 100 100 71.3 _100 100 71.4
100 10~~i0 -69.2 10 100 69.
__ ~~~100 100 68.1 100 100 68.1
81 100 '100 67.0 100 100 67.110010 64.9 1064.9
78 100~lo 100 863.8 100 -.- 100 63.877 100 100 62.7 100 ~~~100 6.
76 100 100 61~------ F.7 100f-617r75 100 100 60.6 100 10 60.6
74 ~~100 100 59.5 10010 9.* 73 100~~io 100 58.4 100 100 58.5
72 100 100 57.3 100 100 ~~~~~~~57.471 __ 100 100 56.3 ~100 105.
70 100 100 55.2 __100 100 55.2-69- 100 100 54.1 100 10 5.68 100 100 53.0 100 100 53.1
67 100 100 52.0 _ ~~~~ ~~~~1 1052.066 ~~1 00 100 50.9 100 100 50.9
65 100 -- 100 49.8 100 100 49.964 100~~~lo 100 48.10 lb . 48.
6 ~ 1010 477 10 10 7.762 - 00 . 100 -46.6- 1 00 100 O 46.66 1 10 0 4. 0 - 10 ob 4.60 . 100 100 44.4 __100 100 44.5
Th 100 43.3 _0 100 43.458 . 1010 23100d 10d '42.3
56 100b 40.1- 100O 40O.2-55 100 100 39.0 _100 _ 100 39.1
54 . 100 10 30 100 100 38.053 100 -100 - 36.9 100 bo 36.952 . io 0 35.8 100 - 100 .3.51 . 34J 100- 100 34.8-50 100 100 33.7 100 100 33.749 ibo 100b 32.6' 100 100 32.648 100 100 31.5 100 100 31.5
%/oFP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7__________ Shutdown Margin Setpoint I Operational Alarm Setpoint
RI = 300 is withdrawal limit at all power levels. Cotneonet a.Continued on neXt Daae.
Oconee 3 Cycle 21Rod Index Setpoints
4 Pump Operation, 1 Inoperable Rod, BOO to EOC
ONEI-0400-70 Rev 17Page 22 of 33
ShtonMargin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
47 100 100 29.5 100 100 29.546 100 100 *27.5 160 100 27.545 100 100 25.5 100 100 25.5
44.8 100 100 25.0 100 100 25.044 -100 _ 99.2 24.2 _100 99.2 24.243 100 ~ 98.2 23.2 1 10 98.2 23.242 100 97.2 22.2 100 97.2 22.241 100 96.2 21.2 _ 100 96.2 21.2
40 1006 95.2 20.2 100 95.2 20.239 100 94.2 .19.2 100 94.2 19.238 100 93.2 18.2 100 93.2 18.237 10 922 1 0. 2 12 17236 100 91.2 16.2 100 91.2 16.235 10 9.15200 90.2 15.234 100 896.2 142100 89.2 14.233 10 882 13.2 __100 88.2 13.232 . 100 87.2 12.2 100 87.2 12.231 100 86.2 11.2 100 _86.2 _ 11.230 100~ 85.2 .10.2 100 85.2 10.2
29 100 84.2 9.2 100 84.2 9.228 100 83.28. _103282
27 ~~100 82.2 7.2 _ _100 82.2 7.2
26 100 81.2 6.2 100 81.2 6.225I~ 100... 80.2 5.2 _108. .
- -24 -. 100o 79.2 4.2 107. 4.2
23- 100-- 78.2 32100 _78.2 3.222 100 77.2 2.2 100 77.2 2.2
21 100Q 76.2 1.2 __100 76.2 1.220 ~~100 75.2 0.2 100 75.2 0.2
19.8. .100 75.0 0 100-675 . 0~19- . 100 73.5 - 0 _100 - .73.5 - . -
18 - 100io 71.5 0 - 107.5 -0.
17 100 69.5 0 - 100 69.5 .... 0..-
16 100 67.5 _0 ~ 100 _67.5 015 10 65.5 0 10 _6.
14 100 63.5 0 100 63.5 -.-- 013 100 61.5 0 - ~~100 615o 12 100 53.0 0 _ 100 -53.0 01 1 100 44.5-- 0 104.
10 .. 6.0 _ 0 _ 3 100 360 _ 0 9 . 1~00 . 27.5 _ 0 10- -27.5~ 0
8.7 100 5.010_ 25.0
7 928 17.8 0 _ _92.8 17.8 6 885 1. _0 88.5 13.5 0
5 84.2 _ 9.2 0 _ _2 84.2 9.2 04 80.0 5.- __-0 8005. .3. 75.8 .0.8 0 - 75.8 0.8 0
2 74.8 -0 0 74.8 0 02 -68.0 0 0 6 8.0 0 01 59.5 0 0 59.5 0 00 51 0 0 51 0 0
% FP CRGP 5 RG6 CRGP 7 R 5 CRGP 6 CRGP 7__________ Shutdown Margin Setpoint Operational Alarm Setpon
RI = 300 is withdrawal limit at all power levels.
Ij
Oconee 3 Cycle 21Rod Index Setpoints
3 Pump Operation 1 Incoperable Rod, BOO to EOC
ONEI-0400-70 Rev 17Page 23 of 33
II Shutdown Margin Setpoint operational Alarm Setpoint% FP 11CRGP5 CRGP6 CRGP7 11CRGP5 ICRGP6 CRGP7
7776757473
7170
69
67
6564
6362
58
57565554953
49
464544.84443424140
32'
26
24
100100100100
100100100100100100100100
100-
100
- - 6 & 0
100__ 1_00-
100
... . O. .. .
10- -. 1 6 --0 '
100
1 00
100
1001J00
100
100.<66
1001-00*
100
100100100100100100100 100100100100
i 6 o-100
100
100
100
100
100
100
100
100
100
1~00
99.2
98.2
97.2
96
95.2
94.2
93.2
92.
90.2
8872
86.2
84.2
81.2
80b.2
79.2
85.283.481.5796.677.875974.172 .270.4
6-6.7
63.061.1
5.455.6
50.048.246.344.542.640.838.937.1
33.431.529.52 7 .5 ' _25.525.024.223.222.221.220.219.2
17.2
16.215.214.2
100100100100
* 100100100100100
100
i66~.1-66~
100
100
100100
100
100
100100100
100
100
ibo -
lob
100100
100
100100100100100
1001001*00
100100
100
100100
100
1001002
98.297.296.295.2
94.2
9.2
92.291.290.289.2
85.283.481.579.677.875.974.172.270.468.566.7
63.0
59.357 .4
55.6
5.7
51.9
4.2
23.222.221.2
18.217.216.215.214.213.2
10.29.28.2.7.26 .25.24.2
RI = 300 is withdrawal limit at all power levels. Cotneonetpae
}
% FP ICRGP 5 CRGP 6 CR-GP 7 CRGP 5 CRGP 6 CRGP 7________ k Shutdown Margin Setpoint ]j Operational Alarm Setpoint _
It------------4--- --- -
Continued on next page.
Oconee 3 Cycle 21Rod Index Setpoints
3 Pump Operation, 1 Inoperable Rod, BOO to EOC
ONEI-0400-70 Rev 17Page 24 of 33
Shutdow Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7
23 100 78 .2 3.2 100 78.2 3.222 - 100 77.2 2.2 100 - 77.2 2.221 100 76.2 _ 1.2 100 76.2 1.220 100 75.2 0.2 100 75.2 0.2
19.8 10 750 0 100 75.0 0100 7~~ 10 3.5 0 oo 73 -
1-8 100 71.5 0 100 71.5 017 100 69.5 _ 0 .10 69.5 016 100 67. 0 100 015 11i66, 65. 0 __0 6575 014 10 6.0. 103.5 013 100 615010 61.5012 100 53.0 0 100 53.0 01 1 44o.5 0o 0 44.5610 10 36.0 0 - 100 36.0 - 0
100 -27. 100 27.5 -
8.7 - 10- 2~5.0 06 - 100 25.0 . -
8 ~ 97.0 22.0 0 97.0 22.0 -.
7 92.8 17.8 0 92.8 17.8088.5 13.5 0 _88.5 13.5 0_
5 84.2 9.2 0 84.2 9.2 04 ~~~80.0 5.0 _ 00 5.00
3 75.8 08__0 - . 75.8 0.8 _0
2.8 ~74.8 - 0 -0 74.8 002 _-..- -.. ~05. 68.0 0 0 _ _ 68.0 0 0
1 59.5~~~~~~~~~~~~~~~~9. 0 51 0 _ __ ___ ~~ ~~~0 51 _O 0O0
% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP7__________ Shutdown Margin Setpoint Operational Alarm Setpoint
RI = 300 is withdrawal limit at all power levels.
)
I Oconee 3 Cycle 21
Control Rod Position Setpoints._.4_ ,A No Inoperable Rods, 4 Pump Flow
U
ONEI-0400-70 _ 17
Page 25 of 33
I ti I
UnacceptableOperation
i-ri
if__41w
ii
I lAll 114TA 111 jnl 111111111111 1 1 TmTT#l IITUXUTUS ,, rt
-EilMl-ml M ITHl ,1ITl IIl l l l l lI "TTTl#F(l I,STrrll llt 1lT
S1 81[1::1[:1H+H jm14011F44. !- . ~ t i;
-~~~~~~. ..., ; I 1. X1 1. I
.. ; ~~~~~~~_' 1. 1##,# I~~~~~~~~~~- 5 15 25 35 45 55
+H1i 14 L
i-I I
I I
I411
Hi
HA 4
4J1I
1:
65 75 85 95 _1
44 _4FI |Restricted
:-~ trg Operation
V _,
14I t- '
:4. .
I -
I _r-41r
-r
r- r
Tt,
I I
_ 17
,.4
-I
I i
I
-if4. ' i| .
".In4 4 r
414
irT±K4 1 t ¢ '
Acceptable
!¢. T t4' ;r
Ope,_trationr',i4;r
H--''i r- 'td T 11 T T1-
i ii
TI1 'r; I 1 | *r
~~~~~~N 44 -; L = |t I8r @ -rr!7t 1FT! hj t'l[; - 'I* ,-4-J~~~~~~~~~. 4 rrw 7. ri ,-,.. ,l_~ru 6 _11 _ M4 1 *Xz4 t-
I '1II 1- ' I- ' I ! t'. , I
4~~~~~~~~~~~~ ? ' -? ' -!'- i*n<s f 7T 'Y4...................................'titj
41
Control Rod Position, % WD
105
100
95
90
- 85
80
75
70
65
60
55
- 50
45
40
35
30
-25
20
* 15
10
4.5
0o i 0 20 30 40 50 60 70 80 90 100
| Group 7
'!,
105 -
100 -
95 -
90 -
85 -
80 -
75 -
70 -
65 -ELL 60-
-0
0
X~ 45
a:
40
35
30
25
20
15
10
5
0
, I e ..
i--
! -
, ._
I. -
I .
I r-
!. i
I 1 P
�*1
I,1
zL141
; 7,
T -
0 10 20 30 40 50 60 70 80 90 100 I Group 5
f .,I T
.I i
i !-
T'i"
--
.: - :~'1-rT. ~1I~7+TT7
_ .'"1 I,l.'
': -'': I
,.4.,...,r-H t - ITt Hr,,i-I 4r,F-t I
n
IE
tffI
11 1_ _ .i _
I4, _, P
i
illI11.t
14
i.1
:11 iii-HIilLh,
tf I -�
_ rjv1
§1+ ; ;,_..
'
.I'_ 7i-,L,i_ --
q T
lI I
I
5MX e , ~. Wi ,:. ' i
.i;�'
t - l.t4 .ns iI 'I .,!
ONEI-0400-7(. ._ 1 17
I Oconee 3 Cycle 21
iiYSJ~Thfi Control Rod Position SetpointsNo Inoperable Rods, 3 Pump Flow
UnacceptableOperation
:i
tA I r
Ti te. r-
.+, I_ LL
J4-
L 4
5 15
ih jRestrictedOperation
t H + [ili IX
HIMX4T 1z1,111 _ rT r t _ _
G 5roup 6 5 7 9
45 55 65 75 85 95 {:
iI:II i
I1
i1E
It
AcceptableOperation
l * tf ' i -
_ =
ti~ " t+. tl-14
_, 41 ;TT
s4ti tti t*FJ rW';i t,, L
'III
_' itiI. I
W-
4 _ rI+r Pt t
I
If
tr.1 rrT- ri
4t _, T- _ 11 i .
Page 26 of 33
7 ~~105t T:T ,
1100
Ti 'T' - 95
* ;rr F4:-; 85
4r T i~ 8 0
*:70
-irt7
-EH+t
4, r -
? I
A iI
i IIti,ti i
tTV_
L
r
I!
I 4,
65
60
55
50
45
40
Control Rod Position, % WD
35
30
25
20
15
10
5
00 10 20 30 40 50 60 70 80 90 100|
| Group7
r i -
itr.. +-t-tji+H '-41AI
II]ILj
105
100
95
90
85
80
75
70
65
Ii
aLi-
I-
a)
0
0Ma)
60
55
50
45
Ii
40
35
30
25
20
15
10
5
00 10 20 30 40 50 60 70 80 90 100 I
I Group 5
.
rITHH r i ; . I T+lt *it
. -1l- t-T[* =.ittlTT-+tHT i+-~1i 7"--
I~~ ~~~~~ I I I I ] T r- 1-.ls: ::*:
r-w.'.
t.I-+,
I ,:
I ! *-7r .L .7.
.
. IIII
_ r
!-, t rr
H r.
Mi" .
in
tHt
M
tr*tH
ITT
9
'TTT;i
I IT 41 I I
11
ir� T,
.-. r,Ia1M11
lio 11
TrrTT
II
.6
i
[p11"p �
itI
I
IpI H41ll +l ik4tqZq74
25 35II
I
4�
iefitHI-H t
=;.
ONEI-0400-7 17
105 _ Oconee 3 Cycle 21 Page 27 of 33
00 T 2 otrol Rod Position SetpointsiHiIH1 00 95 t g i tg~~~~~~~~1 Inoperable Rod, 4Pum pFlow1X W lfififi
90 .~ . V"n * '1i1 11 1 Wlti 4 r "E g j i85
6 54
85 - X ~~H H fi l it MI W lIll]tiMWI i19fi fi1llZ
75 - L~~~~~~~~~~~~~~~~~~~~~~__L -_L _u 11 I _LL I 1 ;Wt _H Jil Ill EX 65 - W W X1 ffi ffi 1 ~~~~~~~~~~~4+W -- 4+ 4 -MLH Xg gE t<,
75
70 -
35 +.. + X S W ~~~~~~~~~~~1 -- LL _ 1i|Xil.
65 -550 JI Tr SlWWEE U@ll
15 Grou 6 J1WEH! E FH1 S !"tE I Sv ! r4W1 tzrrt.~
5 '5 15 25 35 45 55 75 8 li| |5 tflTh!
30
Control Rod Position, % WD
ONEI-0400-7.v 17
Oconee 3 Cycle 21 | Page 28 of 33105 ~~~Control Rod Position Setpoints 1 ! ti* -10
100 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~105
80 ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~ j~~~~~~~~~~~~~~~~~~~~~4;.~~~~~~i, .10-
1; 1W W WI Inop erab le R d, 3 unmp Flo w. 1 +l Bn .- 0
90 - tit;1Ttt H ffi X ffi ffi HT X t ffi ffi X X1H ffi X1 1W W W1 }r;g w w mi m >;4-71 ti H4,i H~U+l T
75 95_8
=7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~7
0
55~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~t885~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~5
0 55 50
40) - -.jW1 WWWWWWll$riiEl tr! cc to -X 45
30 7
20 .~ r'W ,.-t- g ' iF W E Hr'1 tt- 20
1o5 tH _ H 1W X E1 1 gE g X P E jGjilull s I~~~~~~~~~~~- tiE _ iiLt1-l t11 r~- f- H--,10 60
555
0 ~ 1~ 25 35 5 55 6 75 85 95 fH~ liftit t4t, ~+f± t ....... 4
Control Rod Position, % WD
ONEI-0400-70 Rev 17Page 29 of 33
Oconee 3 Cycle 21
2.0 Core Operating Limits -- Not Error Adjusted
The data provided on the following pages satisfies a licensing commitment to identify specificparameteis before instrumentation uncertainties are incorporated.
References provided in section 1 of this COLR identify the sources for the data which follows.
Quadrant Power Tilt Limits
Referred to by ITS 3.2.3.
Steady State
Core Power Level, %FP
Quadrant Power Tilt, %
Transient
30- 100 0 -30 30- 100 0 -30
5.44 10.00 . 9.44 12.00
Maximum
0 - 100
20.00
Variable Low RCS Pressure Protective Limits
Referred to by ITS 2.1.1.
Core Outlet Pressurepsia
180019002000210022002300
Reactor Coolant Outlet Temperature, F3 RCS Pumps 4 RCS Pumps
581.0590.0598.9607.9616.9625.9
578.3587.3596.3605.2614.2623.2
)
ONEI-0400-70 Rev 17Page 30 of 33
Oconee 3 Cycle 21
Axial Power Imbalance Protective Limits
Referred to by ITS 2.1.1
'U.,, � .1.
I Nc�fl�or P���se
RPS Operational
-48.0
-48.0-31.131.148.0
48.0
-48.0-48.0
-31.131.1
48.048.0
-36.6-36.6-33.5-24.2
30.036.439.039.0
-36.6
-36.6
39.0
39.0
4 Pumps
3 Pumps
%FP
0809010011211210090800
074.677.086.686.677.074.6
0
ONEI-0400-70 Rev 17Page 31 of 33
Oconee 3 Cycle 21
Rod Index Limits
Referred to by ITS 3.2.1
I < 4> ~~~~ Use n
Operational RI Shutdown Margin RI Insertion Limit RI Withdrawal%FP Insertion Limit No nop Rod 1 nop Rod Limit
102100908050155
7750155
262260250240200900
236200900
220
140750
220140750
286
23016075
28023016075
300300300300300300300
300300300300
4 Pumps
)
3 Pumps
)
ONEI-0400-70 Rev 17Page 32 of 33
Oconee 3 Cycle 21
LOCA Limits
I 0 6 a t Use� �-�-"'� >� II � � .. I
Core ElevationFeet LOCA LHR kw/ft Limit Versus Burnup
Mk-B1OL Fuel
Mk-B11 andMk-B11A Fuel
0.0002.5064.2646.0217.7799.53612.00
0.0002.5064.2646.0217.7799.53612.00
0 GWd/mtU15.616.516.817.017.016.715.8
0 GWd/mtU15.516.316.516.816.516.215.4
30 GWd/mtU15.616.516.817.017.016.715.8
40 GWd/mtU15.516.316.516.816.516.215.4
62 GWd/mtU11.611.611.611.611.611.611.6
62 GWd/mtU12.612.612.612.612.612.612.6
ONEI-0400-70 Rev 17Page 33 of 33
Oconee 3 Cycle 21
4 RCP Operation - Loop Average Temp., F 3 RCP Operation - Loop Average Temp., FATcold, F l Tavg (Analytical) Tavg (Analytical)
U.o <b81.1) <b81.O0.1 <581.0 <581.00.2 <581.1 <581.00.3 <581.1 <581.10.4 <581.2 <581.10.5 <581.2 <581.10.6 <581.2 <581.10.7 <581.3 <581.20.8 <581.3 <581.20.9 <581.3 <581.21.0 <581.4 <581.21.1 <581.4 <581.21.2 <581.5 <581.31.3 <581.5 <581.31.4 <581.5 <581.31.5 <581.6 <581.31.6 <581.6 <581.41.7 <581.6 <581.41.8 <581.7 <581.41.9 <581.7 <581.42.0 <581.8 <581.42.1 <581.8 <581.52.2 <581.8 <581.52.3 <581.9 <581.52.4 <581.9 <581.52.5 <582.0 <581.62.6 <582.0 <581.62.7 <582.0 <581.62.8 <582.1 <581.62.9 <582.1 <581.63.0 <582.1 <581.73.1 <582.2 <581.73.2 <582.2 <581.73.3 <582.3 <581.73.4 <582.3 <581.73.5 <582.3 <581.83.6 <582.4 <581.83.7 <582.4 <581.83.8 <582.4 <581.83.9 <582.5 <581.94.0 <582.5 <581.94.1 <582.6 <581.94.2 <582.6 <581.94.3 <582.6 <581.94.4 <582.7 <582.04.5 <582.7 <582.04.6 <582.7 <582.04.7 <582.8 <582.04.8 <582.8 <582.14.9 <582.9 <582.15.0 <582.9 <582.1