October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan. CONTENTS. APEC Low-Carbon Model Town(LCMT) Task Force Meetings APEC LCMT Project Components Feasibility Study of the Yujiapu Center Business District(CBD) Project in Tianjin Concept of the Low-Carbon Town - PowerPoint PPT Presentation
Popular Tags:
14
October, 2011 October, 2011 Shinji Kakuno Shinji Kakuno Agency for Natural Resources and Energy Agency for Natural Resources and Energy METI, Japan METI, Japan The APEC Low-Carbon Model Town The APEC Low-Carbon Model Town Project Project An Overview An Overview
Transcript
Page 1: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

October, 2011October, 2011

Shinji KakunoShinji KakunoAgency for Natural Resources and EnergyAgency for Natural Resources and Energy

METI, JapanMETI, Japan

The APEC Low-Carbon Model Town The APEC Low-Carbon Model Town ProjectProject

An OverviewAn Overview

Page 2: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

1.1. APEC Low-Carbon Model Town(LCMT) Task APEC Low-Carbon Model Town(LCMT) Task

Force MeetingsForce Meetings

2.2. APEC LCMT Project Components APEC LCMT Project Components

3.3. Feasibility Study of the Yujiapu Center Feasibility Study of the Yujiapu Center

Business District(CBD) Project in TianjinBusiness District(CBD) Project in Tianjin

4.4. Concept of the Low-Carbon TownConcept of the Low-Carbon Town

5.5. Policy ReviewPolicy Review

6.6. The Way ForwardThe Way Forward

CONTENTSCONTENTS

2

Page 3: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

3

1 APEC LCMT Task Force Meeting (1) 1 APEC LCMT Task Force Meeting (1)

Ministers agreed to

Launch the APEC LCMT Project

Establish a Task Force

Implement Yujiapu Center Business District Development

Project

as the first case

9th APEC Energy Ministers’ Meeting (Fukui, Japan, 19 June 2010)

Page 4: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

4

1 APEC LCMT Task Force Meeting1 APEC LCMT Task Force Meeting (2) (2)

Ministers instructed a Task Force to

Develop

Provide

Share

Chaired

Attended

Discussed

1st APEC LCMT Task Force Meeting (Tokyo, Japan, 13 July 2010)

9th APEC Energy Ministers’ Meeting (Fukui, Japan, 19 June 2010)

the “Concept of a Low-Carbon Town”

advice on project planning

best practices

by Japan

7 Economies and the Asia Pacific Energy Research Center

“Terms of Reference” and “Criteria for the Project”

Page 5: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

5

1 APEC LCMT Task Force Meeting1 APEC LCMT Task Force Meeting (3) (3)

2nd APEC LCMT Task Force Meeting (Vancouver, Canada, 9 May 2011)

Attended: 13 Economies, Lead Shepherd, EGRNET

Chair and the APERC

Reported: on the Feasibility Study and draft

Concept of Low Carbon Town

Discussed:

LCMT Task Force Workshop (October 18, 2011)

13 Economies, Lead Shepherd, EGNRET

Chair and the APERC

the Feasibility Study and draft Concept of

Low Carbon Town

“ Plan of Action for 2011 ” and

“ Idea of holding a seminar”

Page 6: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

2 LCMT Project2 LCMT Project Components (1)Components (1)

9th APEC ENERGY  M INISTERIAL MEETING - June 2010 in Fukui

1st LCMT TASK FORCE GROUP MEETING – July 2010 in Tokyo

ENERGY WORKING GROUP – September-November 2010

[Concept]

WorkshopOct. 18,2011

[Policy Recommendations][F/S Report]

( I )

Feb.2011

( II )

Apr. 2011

( III )

Aug.2011

6

Page 7: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

7

Basic data for analysis

CO2 saving Effects for each Mitigation Measure

CO2 saving Costs for each Mitigation Measure

Quantitative Analysis of

Low-Carbon Development Strategy

Compiling the results of each analysis

3 Feasibility Study of the Yujiapu CBD project in Tianjin (1)3 Feasibility Study of the Yujiapu CBD project in Tianjin (1)

Page 8: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

Method Images Method Images

Before development

Development ( Business as usual)

Low-CO2 building

Low-CO2 building + DHC

Low-CO2 building + DHC + Untapped energy

Low-CO2 building + DHC + Untapped energy + Renewable energy

t-CO2 / year

200,000

400,000

600,000

800,000

Low-CO2 building + DHC + Untapped energy + Renewable energy + AEMS

DHC: District Heating & Cooling System

8

3 Feasibility Study of the Yujiapu CBD project in Tianjin (2)3 Feasibility Study of the Yujiapu CBD project in Tianjin (2)

AEMS: Area Energy Management System

Total Saving Amount

Page 9: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

2 LCMT Project2 LCMT Project Components (2)Components (2)

9th APEC ENERGY  M INISTERIAL MEETING - June 2010 in Fukui

1st LCMT TASK FORCE GROUP MEETING – July 2010 in Tokyo

ENERGY WORKING GROUP – September-November 2010

WorkshopOct. 18,2011

[F/S Report]

( I )

Feb.2011

[Policy Recommendations]

( III )

Aug.2011

9

( II )

Apr. 2011

[Concept]

Page 10: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

Study Group A & LCMT Task Force

Study Group A developed the draft and circulated among LCMT

Task Force

LCMT Task Force endorsed the final draft

4 The Concept of the Low-Carbon Town in APEC (1)4 The Concept of the Low-Carbon Town in APEC (1)

10

“The Concept of the Low Carbon Town in APEC”

Task Force Japan

Prepared

preliminary draft

Consists of Japanese experts

= Part 1 + Part 2 + Annex

“The Concept” was distributed to EWG

members

Page 11: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

2 LCMT Project2 LCMT Project Components (3)Components (3)

9th APEC ENERGY  M INISTERIAL MEETING - June 2010 in Fukui

1st LCMT TASK FORCE GROUP MEETING – July 2010 in Tokyo

ENERGY WORKING GROUP – September-November 2010

[Concept]

WorkshopOct. 18,2011

[F/S Report]

( I )

Feb.2011

( II )

Apr. 2011

[Policy Recommendations]

( III )

Aug.2011

11

Page 12: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

Study Group B Conduct

5 Policy Review5 Policy Review

12

Peer Review

Recommendation on regulatory schemes, technical matters and others

Site Visit (Yujiapu, Tianjin, China) 10 experts participated (China, Chinese Taipei, Thailand, United States, Vietnam , APERC) Developed draft recommendations and circulated among the LCMT Task Force

“Policy Review Report” was distributed to EWG members

Page 13: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

13

LCMT-TF2EWG41

EWG42 AELM

Con

cep

t of

the L

ow

-C

arb

on

Tow

n

Policy

Recom

men

-d

ati

on

s Team Member

NNomination

On-site Assessment

6 The Way Forward6 The Way Forward2011

(May) (June) (July) (August) (September) (October) (November)

Feasib

ilit

y

Stu

dy

Interim Report

F/SReport

Site visits

Drat [Part1]

Final Draft

Concept

The Concept

Policy ReviewReport

Draft[Part2 & Annex]

Final Draft

Report

Page 14: October, 2011 Shinji Kakuno Agency for Natural Resources and Energy METI, Japan

Agency for Natural Resources and Energy (ANRE)METI, Japan

14

October 2011Shinji Kakuno

ThankThank youyou