OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE. Jon Lowell & Matt Brewster. ISO NEW ENGLAND – MARKET DEVELOPMENT. Revised summary of ISO proposal to conform the RT NCPC credit for DA scheduled generators offline following ISO dispatch. NCPC Payments – Hourly Shortfall. Preface. - PowerPoint PPT Presentation
Popular Tags:
9
OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE Jon Lowell & Matt Brewster ISO NEW ENGLAND – MARKET DEVELOPMENT Revised summary of ISO proposal to conform the RT NCPC credit for DA scheduled generators offline following ISO dispatch NCPC Payments – Hourly Shortfall
Transcript
Page 1: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Jon Lowell & Matt BrewsterISO NEW ENGLAND – MARKET DEVELOPMENT

Revised summary of ISO proposal to conform the RT NCPC credit for DA scheduled generators offline following ISO dispatch

NCPC Payments – Hourly Shortfall

Page 2: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Preface

This document presents the ISO proposal for Hourly Shortfall NCPC (one of the “other credits”)

The proposal to conform Hourly Shortfall has changed since last discussed at the Markets Committee (September 10, 2013)

Therefore, every slide is labeled as:

2

New Slide10/8/13

Page 3: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

What is Hourly Shortfall NCPC and what has changed in the ISO proposal?

• Hourly Shortfall compensates a generator with a DA energy obligation which is not dispatched in RT by the ISO– A resource may be financially worse off for following ISO dispatch if

the RT cost to replace its DA energy sale exceeds the DA payment

• The ISO previously proposed a RT opportunity cost model to evaluate the amount by which a generator is worse off– Based upon participant feedback and further analysis, the ISO

proposes to retain the current design (i.e., energy replacement cost compensation), but conformed for offer flexibility

– The replacement cost model aligns the eligibility conditions with the financial value of the best alternative considered

3

New Slide10/8/13

Page 4: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC credit: eligibility

• Eligible resources are: pool-scheduled in the day-ahead market, offline and available, not postured, but decommitted or not dispatched by the ISO in real-time– Includes Fast Start generator with denied RT self-schedule

• Intermittent Power Resources remain ineligible

• Resources are evaluated during hours of a DA commitment– Fast Start generators evaluated by individual hour– Non-Fast Start generator evaluated over contiguous hours at EcoMin

and for energy above EcoMin by individual hour

• Only hours when the RT offer is less than or equal to the DA offer are evaluated (detailed on next two slides)

4

New Slide10/8/13

Page 5: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC credit: consideration of RT Supply Offer

Fast Start generator:

• Each hour, RT offer (Start-up, No-Load, energy offer at DA Cleared MW) must be less than or equal to the DA offer– DA pool commitment of a Fast Start does not become a RT

commitment– Evaluation of RT offer relative to DA offer prevents compensating

resources that are offline due to higher RT offer

• Energy quantity considered is limited to the offered RT high capacity limit; i.e., MIN(EcoMax, Limited Energy limit)

5

New Slide10/8/13

Page 6: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC credit: consideration of RT Supply Offer (continued)

Non-Fast Start generator:

• DA EcoMin quantity is evaluated for the contiguous hours of DA commitment regardless of RT energy offer– DA pool commitment of a non-Fast Start becomes a RT commitment and

resource would be producing at least EcoMin if not for ISO dispatch offline

• Each hour, RT energy offer for energy quantity between DA EcoMin and DA Cleared MW must less than or equal to the DA offer to be evaluated for this quantity– Evaluation of RT energy offer relative to DA offer prevents compensating

resources that would not be dispatched at DA level due to higher RT offer

• Energy quantity considered is limited to the offered RT high capacity limit; i.e., MIN(EcoMax, Limited Energy limit)

6

New Slide10/8/13

Page 7: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC credit: formulas

Fast Start Generator:

= MAX[0, (RT LMPh – DA LMPh) *

MIN(DA Cleared MWh, RT High Limith)]Non-Fast Start Generator:

For EcoMin energy quantity = MAX[0, ∑{ (RT LMPh – DA LMPh)* DA EcoMin MWh }]

For energy quantity above EcoMin = MAX[0, (RT LMPh – DA LMPh) * {MIN(DA Cleared MWh, RT High Limith)- DA EcoMin MWh }]

where:• Non-Fast Start summation is for contiguous hours of DA commitment• RT High Limit is the maximum capability; i.e., MIN(EcoMax, LEG)

7

New Slide10/8/13

Page 8: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC example for Fast Start generator

• Hourly credit evaluated for total DA Cleared MW– For hours where RT offer (Start-up + No-Load + energy) ≤ DA offer

8

New Slide10/8/13

Page 9: OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

Hourly Shortfall NCPC example for non-Fast Start generator

9

New Slide10/8/13

• Net credit across DA commitment evaluated for DA EcoMin quantity

• Hourly credit evaluated for DA Cleared MW > DA EcoMin MW– For hours where RT energy offer ≤ DA energy offer


Recommended