OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE
Jon Lowell & Matt BrewsterISO NEW ENGLAND – MARKET DEVELOPMENT
Revised summary of ISO proposal to conform the RT NCPC credit for DA scheduled generators offline following ISO dispatch
NCPC Payments – Hourly Shortfall
Preface
This document presents the ISO proposal for Hourly Shortfall NCPC (one of the “other credits”)
The proposal to conform Hourly Shortfall has changed since last discussed at the Markets Committee (September 10, 2013)
Therefore, every slide is labeled as:
2
New Slide10/8/13
What is Hourly Shortfall NCPC and what has changed in the ISO proposal?
• Hourly Shortfall compensates a generator with a DA energy obligation which is not dispatched in RT by the ISO– A resource may be financially worse off for following ISO dispatch if
the RT cost to replace its DA energy sale exceeds the DA payment
• The ISO previously proposed a RT opportunity cost model to evaluate the amount by which a generator is worse off– Based upon participant feedback and further analysis, the ISO
proposes to retain the current design (i.e., energy replacement cost compensation), but conformed for offer flexibility
– The replacement cost model aligns the eligibility conditions with the financial value of the best alternative considered
3
New Slide10/8/13
Hourly Shortfall NCPC credit: eligibility
• Eligible resources are: pool-scheduled in the day-ahead market, offline and available, not postured, but decommitted or not dispatched by the ISO in real-time– Includes Fast Start generator with denied RT self-schedule
• Intermittent Power Resources remain ineligible
• Resources are evaluated during hours of a DA commitment– Fast Start generators evaluated by individual hour– Non-Fast Start generator evaluated over contiguous hours at EcoMin
and for energy above EcoMin by individual hour
• Only hours when the RT offer is less than or equal to the DA offer are evaluated (detailed on next two slides)
4
New Slide10/8/13
Hourly Shortfall NCPC credit: consideration of RT Supply Offer
Fast Start generator:
• Each hour, RT offer (Start-up, No-Load, energy offer at DA Cleared MW) must be less than or equal to the DA offer– DA pool commitment of a Fast Start does not become a RT
commitment– Evaluation of RT offer relative to DA offer prevents compensating
resources that are offline due to higher RT offer
• Energy quantity considered is limited to the offered RT high capacity limit; i.e., MIN(EcoMax, Limited Energy limit)
5
New Slide10/8/13
Hourly Shortfall NCPC credit: consideration of RT Supply Offer (continued)
Non-Fast Start generator:
• DA EcoMin quantity is evaluated for the contiguous hours of DA commitment regardless of RT energy offer– DA pool commitment of a non-Fast Start becomes a RT commitment and
resource would be producing at least EcoMin if not for ISO dispatch offline
• Each hour, RT energy offer for energy quantity between DA EcoMin and DA Cleared MW must less than or equal to the DA offer to be evaluated for this quantity– Evaluation of RT energy offer relative to DA offer prevents compensating
resources that would not be dispatched at DA level due to higher RT offer
• Energy quantity considered is limited to the offered RT high capacity limit; i.e., MIN(EcoMax, Limited Energy limit)
6
New Slide10/8/13
Hourly Shortfall NCPC credit: formulas
Fast Start Generator:
= MAX[0, (RT LMPh – DA LMPh) *
MIN(DA Cleared MWh, RT High Limith)]Non-Fast Start Generator:
For EcoMin energy quantity = MAX[0, ∑{ (RT LMPh – DA LMPh)* DA EcoMin MWh }]
For energy quantity above EcoMin = MAX[0, (RT LMPh – DA LMPh) * {MIN(DA Cleared MWh, RT High Limith)- DA EcoMin MWh }]
where:• Non-Fast Start summation is for contiguous hours of DA commitment• RT High Limit is the maximum capability; i.e., MIN(EcoMax, LEG)
7
New Slide10/8/13
Hourly Shortfall NCPC example for Fast Start generator
• Hourly credit evaluated for total DA Cleared MW– For hours where RT offer (Start-up + No-Load + energy) ≤ DA offer
8
New Slide10/8/13
Hourly Shortfall NCPC example for non-Fast Start generator
9
New Slide10/8/13
• Net credit across DA commitment evaluated for DA EcoMin quantity
• Hourly credit evaluated for DA Cleared MW > DA EcoMin MW– For hours where RT energy offer ≤ DA energy offer