• Prison Population 48,696
• Releases in CY 2005 26,677
•Under supervision 33,886
• 32 Prisons (2 Privately operated)
• Staff 14,387
• Annual Budget $1.7 B
Who we are
Legacy System Migration
Unisys CS 7400 Series LINC Microsoft SQL Server C#
Mainframe Language Database Language
The Business Case
On the mainframe side we have
Mainframe costs $1,325,700/yr
On the WEB side
Annual Totals $440,000/yr
Complete Replacement Approach
Optical Storage Visiting and Mail
Inmate Training Photo ID Education
Human Resources Inmate Health Care
Prison Industry Institution Warehouse
$38 MILLION
Early Days- BOLD VISION
Project Scope
• To move or migratemigrate existing “as is” legacy mainframe based Systems to web-based applications running on Windows Servers utilizing SQL Server relational database .
– Departmental Offender Tracking System (DOTS)– Employee Relations System (ERS)– Office Automation System (OASYS)
Project Management Methodology
We established an Office of Project Management and have several staff PMI certified.1) Assist in defining a detailed scope and required deliverables of the project that align with agency goals and objectives
2) Assist with project risk assessments and mitigation plans
3) Assist with identification and coordination of all available resources
4) Development of work plans to keep a project on time and on budget
5) Assist in managing change control processes
Steps Toward the Migration
We also decided if we used the original vendor who developed and supported the legacy application, we could omit the business process analysis step at considerable savings.
Deliverables and Deployment
• Maintaining the “as is” approach was difficult.
• Everyone had suggested modifications
• As we would receive a module, we would preview it with a users group and through training and user feedback, we would fix and polish the module.
• We would then mount the module and deploy it to the enterprise.
Project Plan
• Follow Project Management Guidelines.
• Delivery based “FIXED-PRICEFIXED-PRICE” Model with sets of modules delivered on a bi-annual basis. Each Delivery includes a Working System, Source Code, System & User documentation.
• Allows for an Independent Verification and Validation vendor to review source code and system documentation prior to payment.
• Upon delivery, acceptance and installation on the new web-based platform, these modules will be “shut-downshut-down” on the mainframe resulting in Cost Savings for ODRC.
Project Steps per Delivery
1: Develop Modules for a Delivery SetApproximately every 6 months [ Vendor ]
2: Install Set on ODRC Test Environment
Over the weekend [ Vendor & ODRC ]
3: “Train-the-Trainer” & Test SystemFifteen business days per Set [ Vendor & ODRC ]
4: Acceptance
3 weeks starting at Step 3 [ ODRC ]
5: Installation & Rollout in ProductionNext day after Step 4 Acceptance [ Vendor & ODRC ] Shut-down delivered modules on the mainframe
• The platform of choice is Microsoft Windows Server 2003 and Microsoft SQL 2000. The application will be all web based and programmed in .Net coding.
• Microsoft clustering provides failover for the SQL servers.
• Using the .NET framework
• C# is the development language
• Readily available skill set
Technical Information
Other Issues
• Enhancements and new builds were funded and developed separately.
• There were AD HOC additions due to legislation and litigation.
• We formalized an agency help desk.
• We built a test and train environment.
• We prioritized all of our modules and selected a schedule for conversion.
4-Year Schedule:1,500 machines @ $750/machine = 1.13 m/yr
Gartner group was consulted with the question: How long should I keep a desktop PC?Gartner has recommended a PC life cycle strategy to match the warranty and useful life. Typically 3 years
They estimate 75% of enterprises will adopt a 4 year PC replacement strategy for up to 85% of their users.
PC Replacement Program
Videoconferencing technology was implemented for telemedicine the mid 90’s
• expanded to more than 100 sites including all 32 institutions, Parole and Community Services Central Officethe Corrections Training Academy Community Based Correctional Facilities.
• Also used for remote Parole Board hearings, legal proceedings with local courts, as well as Federal agencies such as Social Security Administration and the Immigration and Naturalization Services.
• since the inception, more than 40,000 medical consults
• 2006 ODRC conducted 5,104 medical consults and 2,170 non-medical video
conferences.
Videoconferencing
Content Management• Beginning in 2002, we began using ONBASE from the Hyland Software Inc. to replace our microfiche system with digital imaging of records.
• We currently scan 10,000 documents per day at our Central Office location.
• We have remote scanning operations that scan all of our sex offender assessments.