1
INDEX
Item No.
Description Page No.
78.01 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bilaspur, Tehsil & Distt. Hoshiarpur by M/s Santokh Singh & Sons BKO, Village Bharta Khurad, Tehsil & District S.B.S. Nagar.
1-3
78.02 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Usmanpur, Tehsil Nawanshahr Distt. S.B.S. Nagar by M/s Anil Kumar BKO, Vill. Soeta, Tehsil & District S.B.S. Nagar.
4-6
78.03 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bodal, Tehsil Dasuya, Distt. Hoshiarpur by M/s Ajmer Pal Singh BKO, Vill. Khera Kotli, P.O. Panwan, Tehsil Dasuya, Distt. Hoshiarpur.
7-9
78.04 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Begampur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Arora Bricks Co., Village Karimpur Chahwala, Tehsil Balachaur, Distt. S.B.S. Nagar.
10-12
78.05 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Badallian, Tehsil Mukerian, Distt. Hoshiarpur by M/s Baba Beant Brick Mfg. Industry, Vill. Badalian Distt. Hoshiarpur.
13-15
78.06 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rakasan, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Bajaj Brick Co., Vill. Rurki Khurd, Tehsil Balachaur, Distt. S.B.S. Nagar.
16-18
78.07 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Badla, Tehsil Dasuya, Distt. Hoshiarpur by M/s Balaji Brick Industry, Vill. Sahu Da Pind, Tehsil Dasuya, Distt. Hosharpur.
19-21
2
78.08 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. jandiali, Tehsil Banga & Distt. S.B.S. Nagar by M/s Baldev Singh Gurdeep Singh B.K.O., Vill. Jandialai, Distt. S.B.S. Nagar.
22-24
78.09 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rahon, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Davinder Kumar & Sons, Village Rahon Tehsil & Distt. S.B.S. Nagar.
25-27
78.10 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Ittian Tehsil Mukerian, Distt. Hoshiarpur by M/s Dev Ichha & Co., BKO, Namoli , Tehsil Mukerian, Distt. Hoshiarpur .
28-30
78.11 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Meharpatoli, Tehsil Dasuya, Distt. Hoshiarpur by M/s Dhir Brick Industry , Vill. Gagjalo, Tehsil Dasuya, Distt. Hoshiarpur.
31-33
78.12 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Badla, Tehsil Dasuya, Distt. Hoshiarpur by M/s Dhir Brick Kiln , Vill. Badla, Tehsil Dasuya, Distt. Hoshiarpur.
34-36
78.13 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Pallian Khurd, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s K.C. Bricks, Village Rahon, Tehsil & Distt. S.B.S. Nagar.
37-39
78.14 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur (Seota) & Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar by M/s K.K. Khosla Brick Industry BKO, Vill. Rasulpur (Seota), Tehsil & Distt. S.B.S. Nagar.
40-42
78.15 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Kot Ranjha, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt. S.B.S. Nagar.
43-45
78.16 Application for environmental clearance under EIA 46-48
3
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Musapur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt. S.B.S. Nagar.
78.17 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mallpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt. S.B.S. Nagar.
49-51
78.18 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur & Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar by M/s Kewal Kirshan Khosla BKO, Vill. Soeta, Tehsil & Distt. S.B.S. Nagar.
52-54
78.19 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Daffar, Tehsil Dasuya, Distt. Hoshiarpur by M/s Kiran Bala B.K.O., Vill. Daffar, Tehsil Dasuya, Distt. Hoshiarpur.
55-57
78.20 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mehlanwali, Tehsil & Distt. Hoshiarpur by M/s Kirit Kiran Birck Industry, Vill. Mehatpur, Distt. Hoshiarpur.
58-60
78.21 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Passi Kandi, Tehsil Dasuya, Distt. Hoshiarpur by M/s Krishan Kumar BKO, Vill. Thiara, Distt. Hoshiarpur.
61-63
78.22 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bassi Gulam Hussain, Tehsil Dasuya, Distt. Hoshiarpur by M/s Kundan Lal Murghai BKO, Vill. Adamwal, Tehsil & Distt. Hoshiarpur
64-66
78.23 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rahon, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Laroiya Brick Kiln, Village Chhokran, Tehsil & Distt. S.B.S. Nagar.
67-69
78.24 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur, Sahwajpur, Chhokran, Kotranja, Tehsil
70-72
4
Nawanshar, Distt. S.B.S. Nagar by M/s Loriya Brick Kiln, Vill. Chhokran, Tehsil & Distt. S.B.S. Nagar.
78.25 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Jugial Tehsil Dasuya, Distt. Hoshiarpur by M/s Laxmi Brick Industry, Vill. Jugial, Tehsil Dasuya, Distt. Hoshiarpur.
73-75
78.26 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Thiarray, Tehsil Dasuya, Distt. Hoshiarpur by M/s National Co-Operative Brick Kiln Industry, Vill. Dagan, Tehsil Mukerian, Distt. Hoshiarpur.
76-78
78.27 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mehmdowal, Tehsil Garhsnkar, Distt. Hoshiarpur by M/s Parshotam Lal Bali BKO, Kaharpur, Tehsil Garhshanar, Distt. Hoshiarpur
79-81
78.28 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Railli, Tehsil Mukerian, Distt. Hoshiarpur by M/s Pawan Kumar BKO, Village Chak Bhian, Tehsil Mukerian, Hoshiarpur.
82-84
78.29 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Lalota, Tehsil Mukerian, Distt. Hoshiarpur by M/s Pawan Kumar Surinder Kumar BKO, Vill. Lalota, Tehsil Mukerian, Distt. Hoshiarpur.
85-87
78.30 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Ittian & Rally Tehsil Dasuya, Distt. Hoshiarpur by M/s Pooja Bricks Mfg. Industry, Village Talwara, Tehsil Mukerian, Distt. Hoshiarpur.
88-90
78.31 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Pallian, Bakhjlaur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Pritpal Singh BKO, Village Sheikhupur, Tehsil & Distt. S.B.S. Nagar.
91-93
78.32 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Manan, Dhirowal Tehsil & Distt. Hoshiarpur by M/s Puri Birck Kiln Industry, Mehatpur, Una Road, Hoshiarpur.
94-96
5
78.33 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mehamdowal Tehsil Garshankar, Distt. Hoshiarpur by M/s Rupica & Sandeep Bricks , Vill. Gohgroan Near Kalewal Bhagtan, Near Mahilpur, Distt. Hoshiarpur.
97-99
78.34 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Dollowal, Tehsil Mukerian, Distt. Hoshiarpur by M/s Sarswati Brick Mfg. Industries, Vill. Jeo Chak, Hoshiarpur.
100-102
78.35 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Dagan, Tehsil Mukerian, Distt. Hoshiarpur by M/s Shankar Enterprises BKO, Village Dagan, Tehsil Mukerian, Distt. Hoshiarpur.
103-105
78.36 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Ghorewaha, Tehsil Dasuya, Distt. Hoshiarpur by M/s Shiv Shakti Brick Indutry (Surinder Pal Brick Kiln, Vill. Nangal Farid, Hoshiarpur.
106-108
78.37 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Ittian, Tehsil Dasuya, Distt. Hoshiarpur by M/s Shiva Brick Industry, Vill. Ittian, Tehsil Dasuya, Distt. Hoshiarpur.
109-111
78.38 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rally, Mukerian, 0Hoshiarpur by M/s Shiva Krishna Gram Udyog, Vill. Dagan Tehsil Mukerian, Distt. Hoshiarpur.
112-114
78.39 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Gagsultan, Tehsil Dasuya, Distt. Hoshiarpur by M/s Sudesh Kumi BKO, Village Gagsultan, Teshil Dasuya, Distt. Hoshiarpur.
115-117
78.40 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Morian, Tehsil Dausya, Distt. Hoshiarpur by M/s Sukhdev Parshad Maini & Co. Vill. Rai Chak, Tehsil Dasuya , Distt. Hoshiarpur .
118-120
78.41 Application for environmental clearance under EIA 121-123
6
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur by M/s Sukhdev Raj BKO, Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur.
78.42 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Kahma, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Sukhvir Singh BKO, Village Kahma, Tehsil & Distt. S.B.S. Nagar.
124-126
78.43 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Sehrak Patti, Tehsil Dasuya, Distt. Hoshiarpur by M/s Trasem Lal & Co., Tehsil Dasuya, Distt. Hosharpur.
127-129
78.44 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Dollowal, Tehsil, Dasuya, Distt. Hoshiarpur by M/s Vasal & Co., BKO, Vill. Ghogra, Tehsil Dasuya, Distt. Hoshiarpur .
130-132
78.45 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur by M/s Vipan Kumar BKO, Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur.
133-135
78.46 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Tund, Tehsil Dasuya, Distt. Hoshiarpur by M/s Vishavkarma Brick Industry, Vill. Argowal, Tehsil Dasuya, Distt. Hoshiarpur
136-138
78.47 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bhagroan, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Lucky Brick Kiln Industries Souna, Village & P.O. Langroya, Tehsil & Distt. District S.B.S. Nagar.
139-141
78.48 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Langroya, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Lucky Brick Kiln Industries Souna, Village & P.O. Langroya, Tehsil & Distt. District S.B.S. Nagar.
142-144
7
78.49 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Palli Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s OPK Brick Industry, Vill. Palli Jhikki, Tehsil Nawanshahr, District S.B.S. Nagar.
145-147
78.50 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Talwandi Fattu, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Pawan Bhalla BKO, Vill. Gunachaur, Tehsil Nawanshahr, District S.B.S. Nagar.
148-150
78.51 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Soondh, Tehsil Banga, Distt. S.B.S. Nagar by M/s Sanjeev & Co. VPO, Godani, Tehsil Banga District, S.B.S. Nagar.
151-153
78.52 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Godani, Tehsil Banga, Distt. S.B.S. Nagar by M/s Sanjeev & Co. VPO, Godani, Tehsil Banga District, S.B.S. Nagar.
154-156
78.53 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Pallian Khurd, Tehsil Banga, Distt. S.B.S. Nagar by M/s Baranala Brick Kiln Industries, Vill. Barnala Kalan, Tehsil & District, S.B.S. Nagar.
157-159
78.54 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Sahiba Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Pawan Kumar BKO, Vill. Khurdan, Tehsil Balachaur, District, S.B.S. Nagar.
160-162
78.55 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Sarhala, Tehsil & Distt. Hoshiarpur by M/s Kamla Rani BKO, Vill. Sandhara, Hoshiarpur.
163-165
78.56 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Palli Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s OP Kirpal BKO, Vill. Palli Jhikki, Tehsil & Distt. District S.B.S. Nagar.
166-168
78.57 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor
169-171
8
minerals (brick clay) in the revenue estate of Vill. Jalal Chak, Tehsil Dasuya, Distt. Hoshiarpur by M/s Sanjeev Kumar BKO, Village Balagan Tehsil Dasuya, District Hoshiarpur.
78.58 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bohara, Tehsil Nawanshahr,Distt. S.B.S. Nagar by M/s Partapa Ram Duggal & Co. BKO, Vill. Garcha, Tehsil and Distt. S.B.S. Nagar.
172-174
78.59 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Ramrai Pur Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Baranala Brick Kiln Industries, Vill. Barnala Kalan, Tehsil & District, S.B.S. Nagar.
175-177
78.60 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Dharamkot, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s MRS Bricks, Vill. Malpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar.
178-180
78.61 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Sahabpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Dharamvir Satish kumar BKO, Village Sanawa, Tehsil & Distt. S.B.S. Nagar.
181-183
78.62 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Jagtewal & Baggowal , Tehsil Balachaur, Distt. S.B.S. Nagar by M/s Dilbag Singh BKO, Vill. Malewal Kohlian, Tehsil Balachaur, Distt. S.B.S. Nagar.
184-186
78.63 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur Theh, Shehbazpur, & Alachaur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s R.G. Bricks, Vill & P.O. Kulam, Tehsil & Distt. S.B.S. Nagar.
187-189
78.64 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Pharala, Tehsil & Distt. S.B.S. Nagar by M/s Bhagwati Bricks Co., Vill. Pharala, Tehsil & Distt. S.B.S. Nagar.
190-192
78.65 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor
193-195
9
minerals (brick clay) in the revenue estate of Vill. Ramgarh, Ranewal & Usmanpur , Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Anil Kumar & Son BKO, Vill. Usmanpur, Tehsil & Distt. S.B.S. Nagar.
78.66 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Sheikhupur , Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Pawan Bhalla BKO, Vill. Gunachaur, Teshil Nawanshahr, Distt. S.B.S. Nagar.
196-198
78.67 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bohan, Tehsil & Distt. Hoshiarpur by M/s Bhole Shankar Bricks Industry, Vill. Barkia Tanoor, Tehsil & Distt. Hoshiarpur.
199-201
78.68 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bohan, Tehsil & Distt. Hoshiarpur by M/s Surinder Singh & Bors. B.K.O., V& P.O. Changran, Tehsil & Distt. Hoshiarpur.
202-204
78.69 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bakhlaur, Tehsil & Distt. S.B.S. Nagar by M/s Rana & Co. BKO, Vill. Mugal Kherabad & P.O. Bakhlaur, Tehsil & Distt. S.B.S. Nagar.
205-207
78.70 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mehlanwali, Tehsil & Distt. Hoshiarpur by M/s Billa Brick Industry, Vill. Bassi Hast Khan, Tehsil & Distt. Hoshiarpur.
208-210
78.71 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Uchi Palli, Tehsil Nawanshahr Distt. S.B.S. Nagar by M/s O.P. Kirpal BKO, Palli Jhikki, Tehsil Nanwanshahr, Distt. S.B.S. Nagar.
211-213
78.72 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Kharderh, Tehsil & Distt. Hoshiarpur by M/s Billa Bricks Traders, Vill. Noorpur, Tehsil & Distt. Hoshiarpur.
214-216
78.73 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Bilaspur, Tehsil & Distt. Hoshiarpur by M/s Hari Darshan Singh BKO, Vill. Bassi Kikkran, Tehsil & Distt. Hoshiarpur.
217-219
10
78.74 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Seikhupur Bhag, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Jagdambey Brick Kiln, Village Majzara Kalan, Tehsil & Distt.S.B.S. Nagar.
220-222
78.75 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Jadla, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Jagdambey Brick Kiln, Village Majzara Kalan, Tehsil & Distt.S.B.S. Nagar.
223-225
78.76 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Kang, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Partapa Ram Duggal & Co. BKO, Vill. Garcha, Tehsil & Distt.S.B.S. Nagar.
226-228
78.77 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Atal Mazara, Tehsil Balachaur, Distt. S.B.S. Nagar by M/s Pawan Kumar BKO, Vill. Khurdan, Teshil Balachaur, Distt.S.B.S. Nagar.
229-231
12
Item No. 78.01 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bilaspur, Tehsil & Distt. Hoshiarpur by M/s Santokh
Singh & Sons BKO, Village Bharta Khurad, Tehsil &
District S.B.S. Nagar.
It is submitted that M/s Santokh Singh & Sons BKO, Village Bharta
Khurad, Tehsil & District S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Bilaspur, Tehsil & Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vigfde office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.82221 Hectares and is located in the revenue estate of Vill. Bilaspur, Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Village Bharta Khurad, Tehsil & District S.B.S. Nagar.
2. The mining of brick clay will be carried out at sites, the details of which are as under:
Site Hadbast No./
Khewat No.
/ Khatoni
Khasra No./ Total are of
site Lease Period
Site 1 170/189/264 24//17/2, 18, 24/1 3 years i.e. upto
08.10.2016
Site 2 170/177/245,
246
4/1, 4/10/5, 2/25/1, 11/1/1,
4/11/1/1
3 years i.e. upto
08.10.2016
Site 3 218/285/296 1//12/2, 13/2, 13/3, 14/1 3 years i.e. upto
08.10.2016
Site 4 170/ 335, 332, 333/ 454, 451, 452, 448,
449, 450
29//13/2/18//20, 21, 19//2, 3/ 8, 9, 10/2, 11/2, 12/2, 13/1, 15, 29//8/9/12/1, 3,
11/2, 12/1, 19//6, 17, 19//24, 25, 25//4, 1, 5/2, 29//3, 7//23, 1, 19//14,
23//21/2, 22/1, 23/2, 29//1, 2
3 years i.e. upto
08.10.2016
13
3. The expected cost of the project will be Rs. 6.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
14
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Santokh Singh & Sons BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
15
Item No. 78.02 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Usmanpur, Tehsil Nawanshahr Distt. S.B.S. Nagar by
M/s Anil Kumar BKO, Vill. Soeta, Tehsil & District
S.B.S. Nagar.
It is submitted that M/s Anil Kumar BKO, Vill. Soeta, Tehsil &
District S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate Vill. Usmanpur, Tehsil Nawanshahr Distt. S.B.S. Nagar. The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.3722 Hectares and is located in the revenue estate of Vill. Usmanpur,
Tehsil Nawanshahr Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Soeta, Tehsil & District
S.B.S. Nagar.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. / Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 229/176/230 19/13, 18, 23/1 2 years i.e. upto
10.02.2015
Site 2 229/99/128 30/20/4, 21/1, 33/1/1/1 1 years i.e.
upto
02.07.2014
Site 3 229/219/292 19//14/1, 14/2/1, 17/1, 17/2/2,
24/1/1
2 years i.e.
upto
30.09.2015
3. The expected cost of the project will be Rs. 3.00 Lacs.
16
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred
17
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Anil Kumar BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.09.213 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
18
Item No. 78.03 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bodal, Tehsil Dasuya, Distt. Hoshiarpur by M/s Ajmer
Pal Singh BKO, Vill. Khera Kotli, P.O. Panwan, Tehsil
Dasuya, Distt. Hoshiarpur.
It is submitted that M/s Ajmer Pal Singh BKO, Vill. Khera Kotli, P.O.
Panwan, Tehsil Dasuya, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Bodal, Tehsil Dasuya, Distt. Hoshiarpur.
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.5 Hectares and is located in the revenue estate of Vill. Bodal, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Khera Kotli, P.O. Panwan, Tehsil
Dasuya, Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 93/815/892 1875, 1876, 1877
Total are of site= 0.5 Hectares
2 Years i.e. upto
21.08.2015
3. The expected cost of the project will be Rs. 3.50 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
19
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(g) Submitted
(h) Submitted
(i) Submitted
(j) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(k) Rs 25000/- will be incurred for implementation of EMP
20
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(l) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Ajmer Pal Singh BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Both mining sites are within 01 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
21
Item No. 78.04 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Begampur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Arora Bricks Co., Village Karimpur Chahwala,
Tehsil Balachaur, Distt. S.B.S. Nagar.
It is submitted that M/s Arora Bricks Co., Village Karimpur
Chahwala, Tehsil Balachaur, Distt. S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate Vill. Begampur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar. The project is covered under category 1(a).
The MoEF vide office memorandum dated 24.06.2013 categorized the mining of
brick earth/clay as category B-2 for appraisal of the project proposal under EIA
Notification dated 14.06.2006. The details of the project proposal as per Form 1
and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.9319 Hectares out of which 1 site is 0.506 Hect and 2 site is 1.4259
Hectare and is located in the revenue estate of Vill. Begampur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Village Karimpur Chahwala,
Tehsil Balachaur, Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two
sites, the details of which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 244/322/420 28//12/2, 13 03.10.2013 to
02.09.2015
Site 2 244/255,259/314, 305
14//4, 5, 7, 8 03.10.2013 to
02.10.2015
3. The expected cost of the project will be Rs. 4.20 Lacs.
The other details of the project are as under:
22
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
23
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Arora Bricks Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1258 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km. from Balachaur Tehsil.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Both mining site within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
Item No. 78.05 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Badallian, Tehsil Mukerian, Distt. Hoshiarpur by M/s
24
Baba Beant Brick Mfg. Industry, Vill. Badalian Distt.
Hoshiarpur.
It is submitted that M/s Baba Beant Brick Mfg. Industry, Vill.
Badalian Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Badallian, Tehsil Mukerian, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 17 Kanal 17 Marlas and is located in the revenue estate of Vill.
Badallian, Tehsil Mukerian, Distt. Hoshiarpur for manufacturing of bricks in
the brick kiln located in the revenue estate of Vill. Badallian, Tehsil
Mukerian, Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./
Khewat No/
Khatoni
No.
Khasra No./ Total area of site Lease
Period
Site 1 360/15/24 3/116, Total area of site = 7 Kanal
17 Marlas
2 Years i.e.
upto
15.06.2015
3. The expected cost of the project will be Rs. 5.00 lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
25
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
26
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Baba Beant Brick Manf. Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
27
Item No. 78.06: Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rakasan, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Bajaj Brick Co., Vill. Rurki Khurd, Tehsil
Balachaur, Distt. S.B.S. Nagar.
It is submitted that M/s Bajaj Brick Co., Vill. Rurki Khurd, Tehsil
Balachaur, Distt. S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Rakasan, Tehsil Nawanshahr, Distt. S.B.S. Nagar.
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4048 Hectares is located in the revenue estate of Vill. Rakasan, Tehsil
Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Rurki Khurd, Tehsil Balachaur,
Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 240/4/5 7//7
Total area of site = 0.4048
Hect.
30.07.2012 Till
extraction
3. The expected cost of the project will be Rs. 1.40 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
28
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(g) Submitted
(h) Submitted
(i) Submitted
(j) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(k) Rs 50000/- will be incurred for implementation of EMP
(l) Farmer will be
29
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Bajaj Brick Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
30
Item No. 78.07 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Badla, Tehsil Dasuya, Distt. Hoshiarpur by M/s Balaji
Brick Industry, Vill. Sahu Da Pind, Tehsil Dasuya,
Distt. Hosharpur.
It is submitted that M/s Balaji Brick Industry, Vill. Sahu Da Pind,
Tehsil Dasuya, Distt. Hosharpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Badla, Tehsil Dasuya, Distt. Hoshiarpur .
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.2140 Hectare and is located in the revenue estate of Vill. Badla, Tehsil
Dasuya, Distt. Hoshiarpur, for manufacturing of bricks in the brick kiln
located in the revenue estate of by Vill. Badla, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoni No.
Khasra No./ Total area
of Site
Lease
Period
Site 1 626/1134,173/
1532, 217
74/15/2, 75//10/2, 75/11,
75/20.
Total area of Site =1.2140 Hectare
4 Years i.e. upto
31.03.2017
3. The expected cost of the project will be Rs. 5.40 lacs.
The other details of the project are as under:
1.
Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
31
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Not Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
to take care of the land after the expiry of the lease period.
32
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Balaji Brick Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
33
Item No. 78.08 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
jandiali, Tehsil Banga & Distt. S.B.S. Nagar by M/s
Baldev Singh Gurdeep Singh B.K.O., Vill. Jandialai,
Distt. S.B.S. Nagar.
It is submitted that M/s Baldev Singh Gurdeep Singh B.K.O., Vill.
Jandialai, Distt. S.B.S. Nagar. has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. jandiali, Tehsil Banga & Distt. S.B.S. Nagar. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 3.74 Hectares is located in the revenue estate of Vill. jandiali, Tehsil
Banga & Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Jandialai, Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of site Lease
Period
Site 1 2/270/318 39/14/, 39/15/1, 39//16/2 Ownership
Site 2 2/58/70 25//23/2/1, 32//3/2, Ownership
Site 3 2/92/87 32//13/2, 32//14/2, 32//17,
32//18
Total area of Site = 3.94
Hect.
Ownership
3. The expected cost of the project will be Rs. 15.00 Lacs.
The other details of the project are as under:
34
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 100000/- will be incurred for implementation of EMP
35
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less
than 5 hectares
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Baldev Singh Gurdeep Singh B.K.O.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Application
The matter is placed before the SEAC for its consideration, please.
36
Item No. 78.09 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rahon, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Davinder Kumar & Sons, Village Rahon Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Davinder Kumar & Sons, Village Rahon
Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Pallian Khurd, Tehsil Nawanshahr, Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2.2829 Hectares out of which 1 site is 1.01150 hectares , 2 Site is
0.8102 hectares, 3 Site is 0.2589 hectares, 4 site is 0.2023 hectares and
is located in the revenue estate of Vill. Rahon, Tehsil Nawanshahr, Distt.
S.B.S. Nagar for manufacturing of bricks in the brick kiln located in the
revenue estate of Village Rahon Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at four
sites, the details of which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 223/75,519, 520, 36 /77,565, 566,
144
57//6/2, 16/1, 6/1/2, 15/1, 58/11, 19/4, 20/1, 32//21,
21/1, 58/1, 2, 9, 10/1
3 years i.e. upto
08.10.2016
Site 2 223/105, 106/1129, 1142
63//25/1, 62//21/1, 62//19, 20/1
Ownership
Site 3 63//16/1, 62//20/2, Ownership
Site 4 63//16/1, 62//20/2
Total area of both sites= 2.2829 Hectares
Ownership
37
3. The expected cost of the project will be Rs. 6.00
Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
38
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less
than 5 hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Davinder Kumar & Sons BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
39
Item No. 78.10 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ittian Tehsil Mukerian, Distt. Hoshiarpur by M/s Dev
Ichha & Co., BKO, Namoli , Tehsil Mukerian, Distt.
Hoshiarpur .
It is submitted that M/s Dev Ichha & Co., BKO, Namoli , Tehsil
Mukerian, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Ittian Tehsil Mukerian, Distt. Hoshiarpur. The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.0829 Hectares and is located in the revenue estate of Vill. Ittian Tehsil
Mukerian, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Village Namoli, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./Khewat No./ Khatoni
No.
Khasra No./ Total area of site Lease Period
Site 1 229/45,124
/59,154
19//5, 19/6, 19//4/1,19//7/2/1. Total area of site = 1.0829
Hectares
27.09.2013 to
26.09.2014
3. The expected cost of the project will be Rs. 4.15 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 Submitted
2. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
40
3. Proof of ownership of land/ Registered Lease
deed of mining area
Submitted
4. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
5. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
6. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
7. Environmental Management Plan indicating
the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the project
proponent will be responsible for
implementation of EMP and the
name of the person(s) responsible
for implementation of EMP.
e) Capital & recurring cost for the EMP
per year and the details of funds for
the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease
41
EMP after the lapse of the period for
which the project proponent is
responsible.
period.
8. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Dev Ichha & Co.
9. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from
boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
The matter is placed before the SEAC for its consideration, please.
42
Item No. 78.11 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Meharpatoli, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Dhir Brick Industry , Vill. Gagjalo, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Dhir Brick Industry , Vill. Gagjalo, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Meharpatoli, Tehsil Dasuya, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4 Heactares and is located in the revenue estate of Vill. Meharpatoli,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Gagjalo, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No/
Khatoni No.
Khasra No./ Total
area of site Lease Period
Site 1 177/156/194 6/20, 19
Total area of site = 0.4
Hectares
2 Years i.e.
26.09.2015
3. The expected cost of the project will be Rs. 4.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
43
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
44
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Dhir Brick Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
45
Item No. 78.12 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Badla, Tehsil Dasuya, Distt. Hoshiarpur by M/s Dhir
Brick Kiln , Vill. Badla, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Dhir Brick Kiln , Vill. Badla, Tehsil Dasuya,
Distt. Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Badla, Tehsil Dasuya, Distt. Hoshiarpur. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4 Hectares and is located in the revenue estate of Vill. Badla, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Badla, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two
sites, the details of which are as under:
Site Hadbast No./ Khewat No/
Khatoni
Khasra No./ Total
area of Site Lease Period
Site 1 628/1106/1492 56/6. Total area of site =
0.4 Hectares
2 Years i.e. upto
26.09.2015
3. The expected cost of the project will be Rs. 5.00
Lacs.
The other details of the project are as under:
1. Properly filled Form 1 Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Submitted
3. Proof of ownership of land/ Registered Submitted
46
Lease deed of mining area
4. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
5. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
6. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
7. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
47
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
8. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Dhir Brick Kiln.
9. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
The matter is placed before the SEAC for its consideration, please.
48
Item No. 78.13 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Pallian Khurd, Tehsil Nawanshahr, Distt. S.B.S. Nagar
by M/s K.C. Bricks, Village Rahon, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s K.C. Bricks, Village Rahon, Tehsil & Distt.
S.B.S. Nagar. has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Village Rahon, Tehsil & Distt. S.B.S. Nagar. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.63 Hectares out of which 1 site is 1.01959 hectares , 2 Site is 0.4046
hectares, 3 Site is 0.2114 hectares and is located in the revenue estate of
Vill. Pallian Khurd, Tehsil Nawanshahr, Distt. S.B.S. Nagar for
manufacturing of bricks in the brick kiln located in the revenue estate of
Village Rahon, Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 225/271/372,377,
378, 381
43//1/1, 13/8/2, 22//19/2, 6//24, 13/7/2, 13/3/1,
14/1/, 14/2, 18/1, 6//17/1,
17/2, 7//4 Min, 4 Min
3 years i.e. upto
09.10.2016
Site 2 5//12/2, 13/1, 14/1 3 years i.e.
upto
09.10.2016
Site 3 5//1, 12/3, 13/1, 14/1 3 years i.e.
upto
49
09.10.2016
3. The expected cost of the project will be Rs. 6.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
50
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s K.C. Bricks.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
51
Item No. 78.14 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rasulpur (Seota) & Usmanpur, Tehsil Nawanshar,
Distt. S.B.S. Nagar by M/s K.K. Khosla Brick Industry
BKO, Vill. Rasulpur (Seota), Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s K.K. Khosla Brick Industry BKO, Vill.
Rasulpur (Seota), Tehsil & Distt. S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Rasulpur (Seota) &
Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar. The project is covered under
category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized
the mining of brick earth/clay as category B-2 for appraisal of the project proposal
under EIA Notification dated 14.06.2006. The details of the project proposal as
per Form 1 and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.64082Hectares out of which 1 site is 0.1987 hectares , 2 Site is 0.4421
hectares and is located in the revenue estate of Vill. Rasulpur (Seota) &
Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar for manufacturing of
bricks in the brick kiln located in the revenue estate of Vill. Rasulpur
(Seota), Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 230/39/52 22//20
Total area of site =0.1987
hectares
2 Years i.e. upto
06.05.2015
Site 2 230/84/115 9//24/2, 22/3/2, 22//4
Total area of site =.4421
hectares
2 Years i.e. upto
06.09.2015
3. The expected cost of the project will be Rs. 4.92 Lacs.
52
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred
53
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less
than 5 hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s K.K. Khosla Brick Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
54
Item No. 78.15 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Kot
Ranjha, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Kamla Rani BKO, Village Musapur, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Kamla Rani BKO, Village Musapur, Tehsil &
Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Kot Ranjha, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4046 Hectares is located in the revenue estate of Vill. Kot Ranjha,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Village Mussapur, Tehsil & Distt.
S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 224/60,61/88, 99, 93, 98
18//9/2, 10/2, 11, 12/1, 12/2, 19/1, 20/1, 19//14/3, 15/1, 15/2, 16/1, 17/1/1,
17/2/1
3 years i.e. upto
09.10.2016
3. The expected cost of the project will be Rs. 1.15 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
55
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
56
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kamla Rani BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
57
Item No. 78.16 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Musapur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Musapur, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 3.1948 Hectares out of which 1 site is 0.5649 hectares, 2 site is 1.8207 hectares and 3 is 0.8092 hectares is located in the revenue estate of Vill. Musapur , Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln located in the revenue estate of Village Mussapur, Tehsil & Distt. S.B.S. Nagar. The industry has also submitted undertaking that the Environmental clearance is being sought for site No. 1,2, & 5 and the distance between these three site is less than 01 km.
2. The mining of brick clay will be carried out at three sites, the details of
which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of site Lease
Period
Site 1 116/613/770 1841, 1842, 3299,/1844, 1849, 1900, 1850, 1851
Ownership
Site 2 116/109,404, 479, 633,638 , 832 /144, 398, 605, 606, 608, 609, 794,
801, 1022
2111/1, 319, 315, 316, 317, 318, 322, 323, 433, 433, 432, 1911,
316, 2/1912, 1919, 1920, 1906/4, 2493, 1908/3, 321, 1910, 1921, 1931, 320, 2492, 1909, 1907/2,
1908/1, 2174/4, 2497, 2498, 2509, 2514, 2223, 2496, 2511, 2512,
2510, 2517/2, 2519, 2518, 2201, 2212, 2135, 2206, 2207, 2208,
2211, 2213, 2219, 2214
2 years i.e. upto
14.10.2013
Site 3 116/151/478 383/478, 151/191, 407, 408, 1460, Ownership
58
1417, 1458, 1459 Total area of both site = 3.1948
Hectare
3. The expected cost of the project will be Rs. 5.90 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
59
of EMP and the name of the person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent
is responsible.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kamla Rani BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Both mining sites are within 01 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
60
Item No. 78.17 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Mallpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Kamla Rani BKO, Village Musapur, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Kamla Rani BKO, Village Musapur, Tehsil &
Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Mallpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4046 Hectares is located in the revenue estate of Vill. Mallpur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of Village Mussapur, Tehsil & Distt. S.B.S.
Nagar.
2. The mining of brick clay will be carried out at site,
the details of which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 170/176/244 12//23/3, 15//3/1, 85//3,
86//1, 24//23, 24/2
1½ years upto 14.05.2015
3. The expected cost of the project will be Rs. 1.15
Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
61
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of
62
for which the project proponent
is responsible.
the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kamla Rani BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
63
Item No. 78.18: Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur & Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar by M/s Kewal Kirshan Khosla BKO, Vill. Soeta,
Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s Kewal Kirshan Khosla BKO, Vill. Soeta, Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur & Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 2.73466 Hectares out of which 1 site is 0.7948 hectares , 2 Site is 0.8295 hectares and 3 site is 1.1102 hectares and is located in the revenue estate of Vill. Rasulpur & Usmanpur, Tehsil Nawanshar, Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Soeta, Tehsil & Distt. S.B.S. Nagar
2. The mining of brick clay will be carried out at three sites, the details of which are as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total area of site Lease
Period
Site 1 230/14/19 55/6, 54/10, 54/15, 16, 17/2, 25/1, 24/1, 19//6/2
Total area of site =0.7948
hectares
28.1.2010 to till
extraction
Site 2 229/529/661 14/2/2, 6/2, 19/15, 16, 17/2,
25/1, 24/1, 19//6/2
Total area of site =0.8295
hectares
05.12.2008 to till
extraction
Site 3 230/7/8 21/11, 12/1, 19/2, 20, 55/16
Total area of site = 1.1102
hectares
26.08.2011 to till
extraction
3. The expected cost of the project will be Rs. 4.91 Lacs.
64
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
to take care of the land
65
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kewal Krishan Khosla BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA notification dated 14.09.2013.
Both mining sites are within 01 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
66
Item No. 78.19 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Daffar, Tehsil Dasuya, Distt. Hoshiarpur by M/s Kiran
Bala B.K.O., Vill. Daffar, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Kiran Bala B.K.O., Vill. Daffar, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Daffar, Tehsil Dasuya, Distt. Hoshiarpur. The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 3.75 Acres and is located in the revenue estate of Vill. Daffar, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Daffar, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ Total
area of site
Lease
Period
Site 1 1/172/205 69//13/2, 69/14, 69/17, 69/18,
59//23/1
Half self own & half on lease.
Upto
26.09.2018
3. The expected cost of the project will be Rs. 4.96 Lacs.
The other details of the project are as under:
1
Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
67
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
68
EMP after the lapse of the period for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kiran Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
69
Item No. 78.20 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Mehlanwali, Tehsil & Distt. Hoshiarpur by M/s Kirit
Kiran Birck Industry, Vill. Mehatpur, Distt. Hoshiarpur.
It is submitted that M/s Kirit Kiran Birck Industry, Vill. Mehatpur, Distt. Hoshiarpur has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Mehlanwali, Tehsil & Distt. Hoshiarpur. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 0.8097 Hectares and both sites area are located in the revenue estate
of Vill. Mehlanwali, Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Mehatpur, Tehsil & Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ Total area of site
Lease Period
Site 1 344/213,511, 799, 941 /264, 519,
725, 1173
37//16/1, 43//19/1, 19/2/1, 20/1, 20/4, 20/5, 21/1/2, 22/1, 60//1/1, 43//20/3,
20/1, 20/2, 21/1/1, 21/2/1,1, 22/1/1/1, 22/1/2/1, 43//5/1, 19/2/2, 20/2, 20/6, 21/1/1, 21/2, 61//4/2/1, 7/1/2, 8/2,
9/2, 12/1, 62//14/2/1
24.02.2011 to
31.12.2016
Site 2 62//8/1, 8/2/1, 3/3
Total area of both sites = 0.8097 Hectares
18.05.2009 to
17.12.2015
3. The expected cost of the project will be Rs. 5.00 Lacs.
The other details of the project are as under:
1.
Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
70
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
71
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5
hectares
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kirit Kiran Birck Industry
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1262 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife w i t h in 01 Km. from proposed site.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Both mining area within 01 km. periphery.
The matter is placed before the SEAC for its consideration, please.
72
Item No. 78.21 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Passi Kandi, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Krishan Kumar BKO, Vill. Thiara, Distt. Hoshiarpur.
It is submitted that M/s Krishan Kumar BKO, Vill. Thiara, Distt.
Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Passi Kandi, Tehsil Dasuya, Distt. Hoshiarpur. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.3974 Hectare and is located in the revenue estate of Vill. Passi Kandi
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Thiara, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./Khewat
No./
Khatoni No.
Khasra No./ Total area of site Lease Period
Site 1 159/ 169/233 15//17. Total area of site =
0.3974
30.09.2013 to
29.09.2018
3. The expected cost of the project will be Rs. 5.25 Lacs.
The other details of the project are as under:
1.
Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
73
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
74
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Krishan Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
75
Item No. 78.22 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bassi Gulam Hussain, Tehsil Dasuya, Distt. Hoshiarpur
by M/s Kundan Lal Murghai BKO, Vill. Adamwal,
Tehsil & Distt. Hoshiarpur
It is submitted that M/s Kundan Lal Murghai BKO, Vill. Adamwal,
Tehsil & Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Bassi Gulam Hussain, Tehsil Dasuya, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2 Acres and is located in the revenue estate of Vill. Bassi Gulam Hussain,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Adamwal, Tehsil & Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./ Khatoi
No.
Khasra No./ Total area
of site
Lease
Period
Site 1 362/95/103 9/15/1/2, 7/2, 6/3, 7/2/2 Total area of site = 0.198
Hect.
3 years i.e. upto
04.08.2016
3. The expected cost of the project will be Rs. 3.80 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
76
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 10000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
77
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kundan Lal Murghai.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
78
Item No. 78.23 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rahon, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Laroiya Brick Kiln, Village Chhokran, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Laroiya Brick Kiln, Village Chhokran, Tehsil
& Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Rahon, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.01 Hectares is located in the revenue estate of Vill. Rahon, Tehsil
Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of Village Chhokran, Tehsil & Distt.
S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 223/518/564 57//6/2, 16/1, 6/1/2, 58//11, 19/4, 20/1, 32//21, 21/1,
58/1, 2, 9, 10/1
Total area of site = 1.01
Hect.
10.11.2011 till
extraction
3. The expected cost of the project will be Rs. 3.00 Lacs.
The other details of the project are as under:
79
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
80
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Laroiya Brick Kiln.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Both mining sites are within 1 Km. periphery
The matter is placed before the SEAC for its consideration, please.
81
Item No. 78.24 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rasulpur, Sahwajpur, Chhokran, Kotranja, Tehsil
Nawanshar, Distt. S.B.S. Nagar by M/s Loriya Brick
Kiln, Vill. Chhokran, Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s K.K. Khosla Brick Industry BKO, Vill. Rasulpur (Seota), Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Rasulpur, Sahwajpur, Chhokran, Kotranja, Tehsil Nawanshar. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.40 Hectares out of which 1 site is 0.6069 hectares , 2 Site is 0.8092 hectares and is located in the revenue estate of Vill. Rasulpur, Sahwajpur, Chhokran, Kotranja, Tehsil Nawanshar for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Chhokran, Tehsil & Distt. S.B.S. Nagar. Earlier the industry has applied for 4 Number mining site and has now submitted undertaking that the Environmental Clearance is being sought for site No. 1 & 2 and distance between these 2 sites is less than 01 Km.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 230/105/140 54/12, 13/1, 18/3
Total area of site = 0.6069
hec.
1 Year i.e upto
30.03.2014
Site 2 227/1/2,1 1855/514/1, 518/1, 711, 1856/508, 1857/503, 1858/502, 1859/721
Total area of site = 0.8092
4 Years i.e. upto
05.07.2015
3. The expected cost of the project will be Rs. 7.10 Lacs.
The other details of the project are as under:
82
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
e) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
f) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be
(m) Submitted
(n) Submitted
(o) Submitted
(p) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(q) Rs 50000/- will be incurred for implementation of EMP
(r) Farmer will be
responsible to take care of
83
responsible for implementation of EMP after the lapse of the period for which the project proponent is responsible.
the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5
hectares
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Laroiya Brick Kiln.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Nawanshahar Range
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013.
Both mining sites are within periphery.
The matter is placed before the SEAC for its consideration, please.
84
Item No. 78.25 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Jugial Tehsil Dasuya, Distt. Hoshiarpur by M/s Laxmi
Brick Industry, Vill. Jugial, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Laxmi Brick Industry, Vill. Jugial, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Jugial, Tehsil Dasuya, Distt. Hoshiarpur. The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 4 Acre 1 Kanal 17 Marlas and is located in the revenue estate of Vill.
Jugial, Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Jugial, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two
sites, the details of which are as under:
Site Hadbast No./Khewat No./ Khatoni
No.
Khasra No./ Total area of
site
Lease
Period
Site 1 369/60,139,201, 665/ 92,179,
242, 626
9//60/2, 9//6, 9//89/3, 9//120, 9//121, 9//121/2, 9//136,
9//1139/1, 9//141/2, 9//174, 9//175, 9//117, 9//134, 9//135, 9//138, 9//181, 9//1671/13/9/2,
9//117.
Total area of site = 4 Acre 1 Kanal 17 Marlas
Self owned
land
85
3. The expected cost of the project will be Rs. 7.55
Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
86
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Laxmi Birck Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
The matter is placed before the SEAC for its consideration, please.
88
Item No. 78.26 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Thiarray, Tehsil Dasuya, Distt. Hoshiarpur by M/s
National Co-Operative Brick Kiln Industry, Vill. Dagan,
Tehsil Mukerian, Distt. Hoshiarpur.
It is submitted that M/s National Co-Operative Brick Kiln Industry,
Vill. Dagan, Tehsil Mukerian, Distt. Hoshiarpur has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Thiarray, Tehsil Dasuya,
Distt. Hoshiarpur. The project is covered under category 1(a). The MoEF vide
office memorandum dated 24.06.2013 categorized the mining of brick earth/clay
as category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.62 Hectares and is located in the revenue estate of Vill. Thiarray,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of , Vill. Dagan, Tehsil Mukerian, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./Khewat
No./
Khatoni No.
Khasra No./ Total area of site Lease
Period
Site 1 169/46/57 9//1, 9//2, 9//9, 9//10. Total are
of site = 1.62 Hectares
1 Year i.e. upto
25.09.2014
3. The expected cost of the project will be Rs. 2.91 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
89
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
90
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s National Co-Operative Brick Kiln Industry
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
91
Item No. 78.27 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Mehmdowal, Tehsil Garhsnkar, Distt. Hoshiarpur by
M/s Parshotam Lal Bali BKO, Kaharpur, Tehsil
Garhshanar, Distt. Hoshiarpur
It is submitted that M/s Parshotam Lal Bali BKO, Kaharpur, Tehsil
Garhshanar, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Mehmdowal, Tehsil Garhsnkar, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.3477 Hectare and is located in the revenue estate of Vill. Mehmdowal,
Tehsil Garhsnkar, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Kaharpur, Tehsil Garhshanar, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ Total area
of site
Lease
Period
Site 1 320/33/39 9//16/1/18, 17/3 Total area of site = 0.3477
Hectare.
2 years i.e. upto
03.10.2015
3. The expected cost of the project will be Rs. 1.51 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
92
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
93
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Parshotam Lal Bali BKO
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1233 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 KM.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
94
Item No. 78.28 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Railli, Tehsil Mukerian, Distt. Hoshiarpur by M/s
Pawan Kumar BKO, Village Chak Bhian, Tehsil
Mukerian, Hoshiarpur.
It is submitted that M/s Pawan Kumar BKO, Village Chak Bhian,
Tehsil Mukerian, Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Railli, Tehsil Mukerian, Distt. Hoshiarpur . The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.25 Hectares and is located in the revenue estate of Vill. Railli, Tehsil
Mukerian, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of , Village Chak Bhian, Tehsil Mukerian,
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./Khewat No./ Khatoni
No.
Khasra No./ Total site of area Lease
Period
Site 1 365/194/255 26//12, 20/2 1.5 Years i.e. upto
01.01.2015
3. The expected cost of the project will be Rs. 3.50 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
95
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
96
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Kumar BKO
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
97
Item No. 78.29 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Lalota, Tehsil Mukerian, Distt. Hoshiarpur by M/s
Pawan Kumar Surinder Kumar BKO, Vill. Lalota, Tehsil
Mukerian, Distt. Hoshiarpur.
It is submitted that M/s Pawan Kumar Surinder Kumar BKO, Vill.
Lalota, Tehsil Mukerian, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Lalota, Tehsil Mukerian, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1 Acre 15 Kanal 13 Marlas and is located in the revenue estate of Vill.
Lalota, Tehsil Mukerian, Distt. Hoshiarpur for manufacturing of bricks in
the brick kiln located in the revenue estate of Vill. Lalota, Tehsil Mukerian,
Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat
No./ Khatoi No.
Khasra No./ Total
area of site
Lease
Period
Site 1 377/78,36/87,42 1567, 1568
Total Area of site 1 Acre 15 Kanal 13
Marlas
5 Years i.e. upto
26.09.2018
3. The expected cost of the project will be Rs. 3.50 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
98
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
99
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Kumar Surinder Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
100
Item No. 78.30 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ittian & Rally Tehsil Dasuya, Distt. Hoshiarpur by M/s
Pooja Bricks Mfg. Industry, Village Talwara, Tehsil
Mukerian, Distt. Hoshiarpur.
It is submitted that M/s Pooja Bricks Mfg. Industry, Village Talwara,
Tehsil Mukerian, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Ittian & Rally Tehsil Dasuya, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2.10 Hectares out of which 1 site is 0.636 hectares and 2 site is 1.466
hectares and is located in the revenue estate of Vill. Ittian & Rally Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Village Talwara, Tehsil Mukerian, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./Khewat
No./
Khatoni No.
Khasra No./ Total area of site Lease
Period
Site 1 365/98/137 31//17, 31//18/1, 31//23/2, 31//24, 30//3/2, 30//3/3. Total
area of site = 0.636 hectares
27.09.2013 to
26.09.2014
Site 2 223/123/15 19//13/1/3, 19//18/2, 19//19, 19//7/2/2, 19//8/1, 19//13/1/1
Total area of site = 1.466
hectares
27.09.2013 to
26.09.2014
3. The expected cost of the project will be Rs. 3.97 Lacs.
101
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred
102
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pooja Bricks Mfg. Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Both mining sites are within 01 Km. Periphery.
The matter is placed before the SEAC for its consideration, please.
103
Item No. 78.31 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Pallian, Bakhjlaur, Tehsil Nawanshahr, Distt. S.B.S.
Nagar by M/s Pritpal Singh BKO, Village Sheikhupur,
Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s Pritpal Singh BKO, Village Sheikhupur,
Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Pallian, Bakhjlaur, Tehsil Nawanshahr, Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.5110 Hectares and is located in the revenue estate of Vill. Pallian,
Bakhjlaur, Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of
bricks in the brick kiln located in the revenue estate of Village Sheikhupur,
Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./Khewal No./ Khatoni
No.
Khasra No./ Total
area of site Lease Period
Site 1 199/106/138 55/11-20
Total area of site = 0.5110 Hect.
1 Year i.e. upto 01.05.2014
3. The expected cost of the project will be Rs. 3.20 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
104
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
105
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Priptal Singh BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
106
Item No. 78.32 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Manan, Dhirowal Tehsil & Distt. Hoshiarpur by M/s
Puri Birck Kiln Industry, Mehatpur, Una Road,
Hoshiarpur.
It is submitted that M/s Puri Birck Kiln Industry, Mehatpur, Una
Road, Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Manan, Dhirowal Tehsil & Distt. Hoshiarpur. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
4. The mining of minor minerals (brick clay) will be carried out in a total area of 0.9999 Hectares out of which 1 site measuring 0.4470 hectares and 1 site measuring 0.5528 hectares is located in the revenue estate of Vill. Manan, Dhirowal Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Mehatpur, Una Road, Hoshiarpur
5. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./Khewal No./ Khatoni
No.
Khasra No./ Total
area of site Lease Period
Site 1 341/413,217
/494, 272
30//24/2, 46/3
total area of site
0.5528 hectares
2 Year i.e. upto
08.07.2015
Site 2 338/8,22/18,23 19//24/1, 25/1, 16/1
total area of site
0.4470 hectares
1 year i.e. upto
30.11.2013
6. The expected cost of the project will be Rs. 7.00
Lacs.
The other details of the project are as under:
107
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
g) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
h) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(s) Submitted
(t) Submitted
(u) Submitted
(v) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(w) Rs 25000/- will be incurred for implementation of EMP
108
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(x) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Puri Brick Kiln Industry.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1255 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Both mining sites are within 01 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
109
Item No. 78.33 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Mehamdowal Tehsil Garshankar, Distt. Hoshiarpur by
M/s Rupica & Sandeep Bricks , Vill. Gohgroan Near
Kalewal Bhagtan, Near Mahilpur, Distt. Hoshiarpur.
It is submitted that M/s Rupica & Sandeep Bricks , Vill. Gohgroan
Near Kalewal Bhagtan, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Mehamdowal Tehsil Garshankar, Distt.
Hoshiarpur . The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.5250 Hectare and is located in the revenue estate of Mehamdowal Tehsil Garshankar, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Gohgroan Near Kalewal Bhagtan, Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are as under:
Site Hadbast No./
Khewat No./
Khatoni
No.
Khasra No./ Total area of site Lease
Period
Site 1 320 26//3/2, 4/1, 7/1, 8/1/1, 8/2/1,
25//18/3, 18/2, 26//4/2
Total area of site = 1.5250 Hect.
2 Years
till
excavation
3. The expected cost of the project will be Rs. 4.50 Lacs. The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Lease deed of mining area
Submitted
110
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at
the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
111
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Rupica & Sandeep Bricks.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1233 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
112
Item No. 78.34 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Dollowal, Tehsil Mukerian, Distt. Hoshiarpur by M/s
Sarswati Brick Mfg. Industries, Vill. Jeo Chak,
Hoshiarpur.
It is submitted that M/s Sarswati Brick Mfg. Industries, Vill. Jeo
Chak, Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Dollowal, Tehsil Mukerian, Distt. Hoshiarpur. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.3974 Hectare and is located in the revenue estate of Vill. Dollowal,
Tehsil Mukerian, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Jeo Chak, Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./
Khewat No./
Khatoni No.
Khasra No./ Total area of site Lease
Period
Site 1 188/19/40 9//3,4,5.
Total area of site = 0.3974 Hectare
17.06.2013 to
16.06.2015
3. The expected cost of the project will be Rs. 5.00 lacs.
The other details of the project are as under:
1. Properly filled Form 1.Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
113
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
114
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sarswati Brick Manfg. Industries.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
115
Item No. 78.35 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Dagan, Tehsil Mukerian, Distt. Hoshiarpur by M/s
Shankar Enterprises BKO, Village Dagan, Tehsil
Mukerian, Distt. Hoshiarpur.
It is submitted that M/s Shankar Enterprises BKO, Village Dagan,
Tehsil Mukerian, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Dagan, Tehsil Mukerian, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.7511 Hectares and is located in the revenue estate of Vill. Dagan,
Tehsil Mukerian, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Dagan, Tehsil Mukerian, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at site, the details of which is as
under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ Total
area of site
Lease
Period
Site 1 290/22/32 23/5, 23//6, 23/7, 23//8 total area of
site = 0.7511
2 Years i.e upto
20.05.2015
3. The expected cost of the project will be Rs. 3.40 Lacs.
The other details of the project are as under:
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
116
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
117
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5 hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Shankar Enterprises BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
118
Item No. 78.36 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ghorewaha, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Shiv Shakti Brick Indutry (Surinder Pal Brick Kiln, Vill.
Nangal Farid, Hoshiarpur.
It is submitted that M/s Shiv Shakti Brick Indutry (Surinder Pal
Brick Kiln, Vill. Nangal Farid, Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Ghorewaha, Tehsil Dasuya, Distt.
Hoshiarpur . The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.6040 Hectare and is located in the revenue estate of Vill. Ghorewaha,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Ghorewaha, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at one sites, the details of which
are as under:
Site Hadbast No./
Khewat No./
Khatoni
No.
Khasra No./ Total area of site Lease
Period
Site 1 16/71/91 12/4, 12/7, Total area of site
=0.6040 Hectare
16.07.2013
to
16.07.2015
3. The expected cost of the project will be Rs. 2.00 lacs.
The other details of the project are as under:
119
1. Properly filled Form 1 Submitted
2. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
3. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
4. Status of mining at the site, if any, alongwith photographs from all the four sides
Not Submitted
5. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
6. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
7. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
120
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
8. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Shiv Shakti Brick Industry (Surinder Pal Brick Kiln).
9. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
The matter is placed before the SEAC for its consideration, please.
121
Item No. 78.37 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ittian, Tehsil Dasuya, Distt. Hoshiarpur by M/s Shiva
Brick Industry, Vill. Ittian, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Shiva Brick Industry, Vill. Ittian, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Ittian, Tehsil Dasuya, Distt. Hoshiarpur. The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 5 Acres 1 Kalan 11 Marlas and is located in the revenue estate of Vill.
Ittian, Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Ittian, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./
Khewat No./
Khatoni No.
Khasra No. / Total area of
Land
Lease
Period
Site 1 229/403, 409, 405/
524, 530,526
13//6/1, 13//24/1, 13//24/2, 13//25/1, 14//21/1, 17/1/1, 18//4/2, 18//5/1, 18//5/2,
17//21/1, 18//25/1, 18//25/2, 32//1/2, 14//20/1, 17//18/2, 17//13/1, 17//14/1, 17//14/2,
17//15, 17//6/2, 17//7/1, 18//2 Total area : 5 Acres 1 Kalan 11
Marlas
Ownership
122
3. The expected cost of the project will be Rs. 8.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 Submitted
2. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
3. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
4. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
5. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
6. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
7. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible
123
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
8. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Shiva Brick Industries.
9. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
The matter is placed before the SEAC for its consideration, please.
124
Item No. 78.38 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rally, Mukerian, 0Hoshiarpur by M/s Shiva Krishna
Gram Udyog, Vill. Dagan Tehsil Mukerian, Distt.
Hoshiarpur.
It is submitted that M/s Shiva Krishna Gram Udyog, Vill. Dagan
Tehsil Mukerian, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Rally, Mukerian, Hoshiarpur . The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2 Hectare and is located in the revenue estate of Vill. Rally, Mukerian,
Hoshiarpur, for manufacturing of bricks in the brick kiln located in the
revenue estate of Vill. Rally, Mukerian, Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoni No.
Khasra No./ Total Area Lease
Period
Site
1
365/53,
135/73,182
8//18, 8//23, 22//15, 15//2,
7//20/2, 8//14/2, 8//15/2,
8//16 Total area of land = 2
Hectares
27.09.2013
to
26.09.2014
3. The expected cost of the project will be Rs. 3.60 lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
125
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Not Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 0.50 lacs will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
126
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Shiva Kirshna Gram Udyog.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
127
Item No. 78.39 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Gagsultan, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Sudesh Kumi BKO, Village Gagsultan, Teshil Dasuya,
Distt. Hoshiarpur.
It is submitted that M/s Sudesh Mukari BKO, Village Gagsultan,
Teshil Dasuya, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Gagsultan, Tehsil Dasuya, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.7049 Hectares and is located in the revenue estate of Vill. Gagsultan,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Gagsultan, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./Khewat
No./ Khatoni No.
Khasra No./ Total area of site Lease
Period
Site 1 182/40/43 40//2, 40//3/1/2, 40//8/2, 40//9, 40/10, 40//11, 40//12, 40//13,
40/12, 40//15/4, 40//16
Total area of site = 0.7049
Hectares
Self owned land i.e.
upto
31.03.2015
3. The expected cost of the project will be Rs. 8.15 Lacs.
The other details of the project are as under:
128
1. Properly filled Form 1 & Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
129
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sudesh Kumari BKO
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not applicable
The matter is placed before the SEAC for its consideration, please.
130
Item No. 78.40 Application for environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Morian, Tehsil Dausya, Distt. Hoshiarpur by M/s Sukhdev Parshad Maini & Co. Vill. Rai Chak, Tehsil
Dasuya , Distt. Hoshiarpur .
It is submitted that M/s Sukhdev Parshad Maini & Co. Vill. Rai Chak, Tehsil Dasuya , Distt. Hoshiarpur has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate of Vill. Morian, Tehsil Dausya, Distt. Hoshiarpur. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.5946 Hectares and is located in the revenue estate of Vill. Morian, Tehsil Dausya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Rai Chak, Tehsil Dasuya , Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at two sites, the details of which are as under:
Site Hadbast No./Khewat No./ Khatoni
No.
Khasra No./ Total area of
site
Lease
Period
Site 1 168/85/115,110 3//19/1, 3//20/3, 3//20/4, 3//21/1, 3//24/1, 2//13, 2//18,
2//23/1
Total area of site = 1.5946
27.09.2013 to
26.09.2014
3. The expected cost of the project will be Rs. 3.75 Lacs. The other details of the project are as under:
1. Properly filled Form 1 Submitted
2. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
3. Proof of ownership of land/ Registered Lease deed of mining area
Submitted
4. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
131
5. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
6. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
7. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of emergency such as accidents at the site including fire.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of
funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent
is responsible.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
8. Whether the periphery of any other area of borrowing/excavation falls
Submitted an undertaking to the effect that there is no other
132
within a radius of 500 m from the
periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sukhdev Parshad Maini& Co.
9. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
10 Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
133
Item No. 78.41 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Balagan, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Sukhdev Raj BKO, Vill. Balagan, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Sukhdev Raj BKO, Vill. Balagan, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1 acre 6 Kanal 1 Marla is located in the revenue estate of Vill. Balagan,
Tehsil Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast
No./Khewat
No. /
Khatoni No.
Khasra No./ Total area of Site Lease
Period
Site 1 133/ 72, 70/
106, 103
3/2/1, 3/2/2, 8/1/1, 8/2/2, 7/1/1, 7/1/2, 7/1/3, 4/1, 4/2, 4/3, 5/2, 22/5/1, 21/1/1, ½ Total area of
Site = acre 6 Kanal 1 Marla
26.09.2013 to
25.09.2018
3. The expected cost of the project will be Rs. 3.55 Lacs.
The other details of the project are as under:
134
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
135
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sukhdev Raj BKO
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
136
Item No. 78.42 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Kahma, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Sukhvir Singh BKO, Village Kahma, Tehsil & Distt.
S.B.S. Nagar.
It is submitted that M/s Sukhvir Singh BKO, Village Kahma, Tehsil
& Distt. S.B.S. Nagar has applied for obtaining environmental clearance under
EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate Vill. Kahma, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.2112 Hectares and is located in the revenue estate of Vill. Kahma,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Kahma, Tehsil Nawanshahr,
Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 112/610/756 10/9, 2, 8, 12, 26, 13, 19/1 14.03.2013 to till
extraction
3. The expected cost of the project will be Rs. 1.55 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
137
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
138
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sukhvir Singh BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
139
Item No. 78.43 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Sehrak Patti, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Trasem Lal & Co., Tehsil Dasuya, Distt. Hosharpur.
It is submitted that M/s Trasem Lal & Co., Tehsil Dasuya, Distt.
Hosharpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Sehrak Patti, Tehsil Dasuya, Distt. Hoshiarpur . The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of
1Acre 6 Kanal and is located in the revenue estate of Vill. Sehrak Patti, Tehsil
Dasuya, Distt. Hoshiarpur, for manufacturing of bricks in the brick kiln located
in the revenue estate of M Vill. Sehrak Patti, Tehsil Dasuya, Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./ Khatoni
No.
Khasra No./ Total area of site Lease
Period
Site 1 626/718/1051,
1052
21/2, 1/2,22, 2/1, 2/2, Total Area
of Site =1Acre 6 Kanal
2 years i.e upto
28.05.2015
3. The expected cost of the project will be Rs. 5.00 lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
140
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Not Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
141
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Tarsem Lal & Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Mukerian, Dasuya & Hazipur of Distt. Hoshiarpur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
142
Item No. 78.44 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Dollowal, Tehsil, Dasuya, Distt. Hoshiarpur by M/s
Vasal & Co., BKO, Vill. Ghogra, Tehsil Dasuya, Distt.
Hoshiarpur .
It is submitted that M/s Vasal & Co., BKO, Vill. Ghogra, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Dollowal, Tehsil, Dasuya, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.8039 Hectare and is located in the revenue estate of Vill. Dollowal,
Tehsil, Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Ghogra, Tehsil, Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are as under:
Site Hadbast No./Khewat No./ Khatoni
No.
Khasra No./ Total area of site Lease
Period
Site 1 188/26/50 6/16, 6/17, 6/24, 6/25, 6/18
Total area of site = 1.8039 Hect.
01.11.2012 to
30.10.2014
3. The expected cost of the project will be Rs. 8.75 Lacs.
The other details of the project are as under:
1.
Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
Submitted
2. Proof of ownership of land/ Registered Submitted
143
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
144
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Vasal & Co. BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
145
Item No. 78.45 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Balagan, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Vipan Kumar BKO, Vill. Balagan, Tehsil Dasuya, Distt.
Hoshiarpur.
It is submitted that M/s Vipan Kumar BKO, Vill. Balagan, Tehsil
Dasuya, Distt. Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2 Acres and is located in the revenue estate of Vill. Balagan, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at site, the details of which is as
under:
Site Hadbast No./ Khewat
No./ Khatoi No. Khasra No. Lease
Period
Site 1 109/7/8 1567, 1568
Total Area 2 Acres
03.06.2013 to
02.06.2014
3. The expected cost of the project will be Rs. 5.50 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
146
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
147
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Vipin Kumar BKO
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
148
Item No. 78.46 Application for environmental clearance under
EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate
of Vill. Tund, Tehsil Dasuya, Distt. Hoshiarpur by
M/s Vishavkarma Brick Industry, Vill. Argowal,
Tehsil Dasuya, Distt. Hoshiarpur
It is submitted that M/s Vishavkarma Brick Industry, Vill. Argowal,
Tehsil Dasuya, Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Tund, Tehsil Dasuya, Distt. Hoshiarpur.
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2 Acres and is located in the revenue estate of Vill. Tund, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Argowal, Tehsil Dasuya, Distt.
Hoshiarpur
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat
No./ Khatoi No.
Khasra No./ Total
area of site
Lease
Period
Site 1 14/10/12 1048/78 = total area
0.8017 Hectare
1 year i.e. upto
31.01.2014
3. The expected cost of the project will be Rs. 3.80 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
149
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
150
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Vishavkarma Brick Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013.
Not Applicable
The matter is placed before the SEAC for its consideration, please.
151
Item No. 78.47 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bhagroan, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Lucky Brick Kiln Industries Souna, Village & P.O.
Langroya, Tehsil & Distt. District S.B.S. Nagar.
It is submitted that M/s Lucky Brick Kiln Industries Souna, Village
& P.O. Langroya, Tehsil & Distt. District S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Bhagroan, Tehsil
Nawanshahr, Distt. S.B.S. Nagar. The project is covered under category 1(a). The
MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick
earth/clay as category B-2 for appraisal of the project proposal under EIA
Notification dated 14.06.2006. The details of the project proposal as per Form 1
and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.8096 Hectares and is located in the revenue estate of Vill. Bhagroan,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Village & P.O. Langroya, Tehsil &
Distt. District S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 139/274,358, 279, 192/ 350, 457,
358, 242
13//16, 17, 18, 14, 60/456, 13//23, 24, 25/1, 26//5 Min,
5 Min
Total area of site – 0.8096
Hect
1year i.e. upto
01.08.2014
3. The expected cost of the project will be Rs. 1.75 Lacs.
152
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
153
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Lucky Brick Kiln Industries Souna.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 Ns dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. from boundary of mining site.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
154
Item No. 78.48 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Langroya, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Lucky Brick Kiln Industries Souna, Village & P.O.
Langroya, Tehsil & Distt. District S.B.S. Nagar.
It is submitted that M/s Lucky Brick Kiln Industries Souna, Village
& P.O. Langroya, Tehsil & Distt. District S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Langroya, Tehsil
Nawanshahr, Distt. S.B.S. Nagar. The project is covered under category 1(a). The
MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick
earth/clay as category B-2 for appraisal of the project proposal under EIA
Notification dated 14.06.2006. The details of the project proposal as per Form 1
and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.63 Hectares out of which 1 site is 1.01959 hectares , 2 Site is 0.4046
hectares, 3 Site is 0.2114 hectares and is located in the revenue estate of
Vill. Langroya, Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing
of bricks in the brick kiln located in the revenue estate of Village & P.O.
Langroya, Tehsil & Distt. District S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 137/21/22 8/24/2, 24/3, 25/1, 11/4/1/1,
11/4/1/1
5 years i.e. upto
14.09.2014
3. The expected cost of the project will be Rs. 1.75 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
155
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 25000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
156
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Lucky Brick Kiln Industries Souna.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
157
Item No. 78.49 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Palli
Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
OPK Brick Industry, Vill. Palli Jhikki, Tehsil
Nawanshahr, District S.B.S. Nagar.
It is submitted that M/s OPK Brick Industry, Vill. Palli Jhikki, Tehsil
Nawanshahr, District S.B.S. Nagar. has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Palli Jhikki, Tehsil Nawanshahr, Distt.
S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.2856 Hectares and is located in the revenue estate of Vill. Palli Jhikki,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Palli Jhikki, Tehsil
Nawanshahr, Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 109/75/136 54//3/3, 4/1, 7, 8/1, 57//6/3,
13/6, 14/1
Total area of site = 0.2856 Hect.
4years i.e. upto
14.09.2017
3. The expected cost of the project will be Rs. 1.75 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
158
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
159
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s OPK Brick Industry.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 km. from the mining site.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
160
Item No. 78.50 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Talwandi Fattu, Tehsil Nawanshahr, Distt. S.B.S.
Nagar by M/s Pawan Bhalla BKO, Vill. Gunachaur,
Tehsil Nawanshahr, District S.B.S. Nagar.
It is submitted that M/s Pawan Bhalla BKO, Vill. Gunachaur, Tehsil
Nawanshahr, District S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Talwandi Fattu, Tehsil Nawanshahr,
Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide
office memorandum dated 24.06.2013 categorized the mining of brick earth/clay
as category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
4. The mining of minor minerals (brick clay) will be
carried out in a total area of 0.42988 Hectares and is located in the
revenue estate of Vill. Palli Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar
for manufacturing of bricks in the brick kiln located in the revenue estate of
Vill. Palli Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar.
5. The mining of brick clay will be carried out at site,
the details of which are as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 191/-/35,36 166/12/2, 19, 20, 21/1, 9/2/1, 9/3, 12/1
Total area of site = 0.42988
Hectares
2years i.e. upto
28.08.2015
6. The expected cost of the project will be Rs. 2.55
Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
161
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(g) Submitted
(h) Submitted
(i) Submitted
(j) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(k) Rs 50000/- will be incurred for implementation of EMP
162
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(l) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Bhalla BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
163
Item No. 78.51 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Soondh, Tehsil Banga, Distt. S.B.S. Nagar by M/s
Sanjeev & Co. VPO, Godani, Tehsil Banga District,
S.B.S. Nagar.
It is submitted that M/s Sanjeev & Co. VPO, Godani, Tehsil Banga
District, S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Soondh, Tehsil Banga, Distt. S.B.S. Nagar. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2.4288 Hectares and is located in the revenue estate of Vill. Soondh,
Tehsil Banga, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of VPO, Godani, Tehsil Banga District,
S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 28/253/283 43//14, 43//15, 43/16, 43/17, 43/18, 43/24, 43/25,
43/26, 50//4, 50//5/1
Total area of site = 2.4288
Hectares
3years i.e. upto
31.12.2016
3. The expected cost of the project will be Rs. 2.50 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
164
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
165
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sanjeev & Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
166
Item No. 78.52 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Godani, Tehsil Banga, Distt. S.B.S. Nagar by M/s
Sanjeev & Co. VPO, Godani, Tehsil Banga District,
S.B.S. Nagar.
It is submitted that M/s Sanjeev & Co. VPO, Godani, Tehsil Banga
District, S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Godani, Tehsil Banga, Distt. S.B.S. Nagar. The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.2144 Hectares and is located in the revenue estate of Vill. Godani,
Tehsil Banga, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of VPO, Godani, Tehsil Banga District,
S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 25/160/188 33
Total area of site = 1.2144
Hectares
5 years i.e. upto
29.06.2018
3. The expected cost of the project will be Rs. 2.30 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
167
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
e) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
f) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(m) Submitted
(n) Submitted
(o) Submitted
(p) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(q) Rs 50000/- will be incurred for implementation of EMP
(r) Farmer will be responsible to take care of the land after the expiry of the lease period.
168
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sanjeev & Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
169
Item No.78.53 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Pallian Khurd, Tehsil Banga, Distt. S.B.S. Nagar by M/s
Baranala Brick Kiln Industries, Vill. Barnala Kalan,
Tehsil & District, S.B.S. Nagar.
It is submitted that M/s Baranala Brick Kiln Industries, Vill.
Barnala Kalan, Tehsil & District, S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Pallian Khurd, Tehsil
Banga, Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF
vide office memorandum dated 24.06.2013 categorized the mining of brick
earth/clay as category B-2 for appraisal of the project proposal under EIA
Notification dated 14.06.2006. The details of the project proposal as per Form 1
and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.9178 Hectares and is located in the revenue estate of Vill. Pallian
Khurd, Tehsil Banga, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Barnala Kalan, Tehsil &
District, S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 225/81/84 10/4/2/2, 7, 8/2, 13, 14, 27
Total area of site = 0.9178
Hectares
2 years i.e. upto
09.04.2015
3. The expected cost of the project will be Rs. 2.00 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
170
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
171
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Barnala Brick Kiln Industries.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
172
Item No. 78.54 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Sahiba Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Pawan Kumar BKO, Vill. Khurdan, Tehsil Balachaur,
District, S.B.S. Nagar.
It is submitted that M/s Pawan Kumar BKO, Vill. Khurdan, Tehsil
Balachaur, District, S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Sahiba Tehsil Nawanshahr, Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.8092 Hectares and is located in the revenue estate of Vill. Sahiba
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Khurdan, Tehsil Balachaur,
District, S.B.S. Nagar.
2. The mining of brick clay will be carried out at sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 237/223/309 30//1, 2/1, 9/2, 10/1, 10/2
Total area of site = 0.8092
Hectares
1 years i.e. upto
06.03.2014
3. The expected cost of the project will be Rs. 2.60 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
173
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
174
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1259 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. Thesil Balachaur
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
175
Item No. 78.55 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Sarhala, Tehsil & Distt. Hoshiarpur by M/s Kamla Rani
BKO, Vill. Sandhara, Hoshiarpur.
It is submitted that M/s Kamla Rani BKO, Vill. Sandhara,
Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Sarhala, Tehsil & Distt. Hoshiarpur. The project is covered
under category 1(a). The MoEF vide office memorandum dated 24.06.2013
categorized the mining of brick earth/clay as category B-2 for appraisal of the
project proposal under EIA Notification dated 14.06.2006. The details of the
project proposal as per Form 1 and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.2483 Hectares and is located in the revenue estate of Vill. Sandhara,
Hoshiarpur for manufacturing of bricks in the brick kiln located in the
revenue estate of Vill. Sandhara, Hoshiarpur.
2. The mining of brick clay will be carried out at sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 104/247,266/415,
435 178,179, 180
Total area of site = 0.2483
Hect.
1 years i.e. upto
05.06.2014
3. The expected cost of the project will be Rs. 2.50 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
176
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
177
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Kamla Rani BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1293 dated 04.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary within 01 Km periphery of mining site.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
178
Item No. 78.56 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Palli
Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
OP Kirpal BKO, Vill. Palli Jhikki, Tehsil & Distt. District
S.B.S. Nagar.
It is submitted that M/s OP Kirpal BKO, Vill. Palli Jhikki, Tehsil &
Distt. District S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Palli Jhikki, Tehsil Nawanshahr, Distt. S.B.S. Nagar.
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4905 Hectares and is located in the revenue estate of Vill. Palli Jhikki,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Palli Jhikki, Tehsil & Distt.
District S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 109/75/136,137 54//3/3, 4/1, 7, 8/1,
57//6/3, 13/6, 14/1
Total area of site – 0.4905 Hect.
4years i.e. upto
01.09.2017
3. The expected cost of the project will be Rs. 2.50 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
179
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
180
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s OP Kirpal BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. from boundary of mining site.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
181
Item No. 78.57 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Jalal
Chak, Tehsil Dasuya, Distt. Hoshiarpur by M/s
Sanjeev Kumar BKO, Village Balagan Tehsil Dasuya,
District Hoshiarpur.
It is submitted that M/s Sanjeev Kumar BKO, Village Balagan
Tehsil Dasuya, District Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Jalal Chak, Tehsil Dasuya, Distt.
Hoshiarpur. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 3 Acres and is located in the revenue estate of Vill. Jalal Chak, Tehsil
Dasuya, Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Balagan, Tehsil Dasuya, Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 184/65,64/79,77 8//22, 23, 24/1, 11//3
Total area of site – 3 Acres
1 year i.e. upto
14.10.2014
3. The expected cost of the project will be Rs. 9.00 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
182
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 20000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
183
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Sanjeev Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1193 dated 27.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Tehsil Dasuya, Mukerian & Tanda.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
184
Item No. 78.58 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bohara, Tehsil Nawanshahr,Distt. S.B.S. Nagar by M/s
Partapa Ram Duggal & Co. BKO, Vill. Garcha, Tehsil
and Distt. S.B.S. Nagar.
It is submitted that M/s Partapa Ram Duggal & Co. BKO, Vill.
Garcha, Tehsil and Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Bohara, Tehsil Nawanshahr,Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.3186 Hectare out of which 1 is 0.1042 Hectare, 2 is 1.2144 Hectare
and is located in the revenue estate of Vill. Bohara, Tehsil
Nawanshahr,Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Garcha, Tehsil and Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 176/86/274 12//18, 23 2 year i.e. upto
07.06.2015
Site 2 176/17/28,31 17/5, 6, 15/1, 4/2, 7/1
Total area of Both of sites =1.3186 Hectare
4 Years i.e. upto
30.09.2017
3. The expected cost of the project will be Rs. 2.80 Lacs.
185
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
186
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Partapa Ram Duggal & Co. BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. radius.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
187
Item No. 78.59 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ramrai Pur Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Baranala Brick Kiln Industries, Vill. Barnala Kalan,
Tehsil & District, S.B.S. Nagar.
It is submitted that M/s Baranala Brick Kiln Industries, Vill.
Barnala Kalan, Tehsil & District, S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate of Vill. Ramrai Pur Tehsil
Nawanshahr, Distt. S.B.S. Nagar. The project is covered under category 1(a). The
MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick
earth/clay as category B-2 for appraisal of the project proposal under EIA
Notification dated 14.06.2006. The details of the project proposal as per Form 1
and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.0180 Hectares out of which 1 site is 0.1632 Hectare, 2 site is 0.4048
Hectares and is located in the revenue estate of Vill. Ramrai Pur Tehsil
Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick
kiln located in the revenue estate of Vill. Barnala Kalan, Tehsil & District,
S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 155/143,160/198,
89
397, 398, 399, 400, 401,
402
3 years i.e. upto
09.10.2016
Site 2 155/143/198 326, 327, 328, 329, 330, 344
Total area of site = 1.0180
Hectares
3 years i.e. upto
09.10.2016
3. The expected cost of the project will be Rs. 1.75 Lacs.
188
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
189
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Barnala Brick Kiln Industries.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in Nawanshahr Range.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
190
Item No. 78.60 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Dharamkot, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s MRS Bricks, Vill. Malpur, Tehsil Nawanshahr,
Distt. S.B.S. Nagar.
It is submitted that M/s MRS Bricks, Vill. Malpur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Dharamkot, Tehsil Nawanshahr, Distt.
S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.3540 Hectare and is located in the revenue estate of MRS Bricks, Vill.
Malpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks
in the brick kiln located in the revenue estate of Vill. Malpur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 168/99/131 2318/1-1847, 2318/1-1847,
2318/1-1847, 2318/1-1847
Total area of sites =0.3540 Hectare
1 year i.e. upto
09.10.2014
3. The expected cost of the project will be Rs. 1.85 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
191
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
192
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s MRS Bricks.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. radius.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
193
Item No. 78.61 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Sahabpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar by
M/s Dharamvir Satish kumar BKO, Village Sanawa,
Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s Dharamvir Satish kumar BKO, Village
Sanawa, Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Sahabpur, Tehsil Nawanshahr, Distt.
S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.1416 Hectare and is located in the revenue estate of Vill. Sahabpur,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Village Sanawa, Tehsil & Distt.
S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 153/85,86,88/ 107, 108, 109, 112, 113, 114,
116, 115
587, 579, 825, 581, 576, 585, 586, 588, 589, 590, 583, 577,
578, 50, 582
Total area of site = 1.1416
Hect.
5 years i.e. upto
28.05.2016
3. The expected cost of the project will be Rs. 4.80 Lacs.
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
194
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
195
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of
borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Dharamvir Satish Kumar BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.03.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. radius.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
196
Item No. 78.62 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Jagtewal & Baggowal , Tehsil Balachaur, Distt. S.B.S.
Nagar by M/s Dilbag Singh BKO, Vill. Malewal Kohlian,
Tehsil Balachaur, Distt. S.B.S. Nagar.
It is submitted that M/s Dilbag Singh BKO, Vill. Malewal Kohlian,
Tehsil Balachaur, Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Jagtewal & Baggowal , Tehsil Balachaur,
Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide
office memorandum dated 24.06.2013 categorized the mining of brick earth/clay
as category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.19352 Hectare and is located in the revenue estate of Vill. Jagtewal
& Baggowal , Tehsil Balachaur, Distt. S.B.S. Nagar for manufacturing of
bricks in the brick kiln located in the revenue estate of Vill. Malewal
Kohlian, Tehsil Balachaur, Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at two sites, the details of which
are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 207/16/25 9//12, 9//19
4 years i.e. upto
01.09.2017
Site 2 409/16/16 69//21, 69//22, 70//25, 72//1, 72//2
Total area of both site 1.19352
1 Years i.e. upto
15.07.2014
3. The expected cost of the project will be Rs. 4.80 Lacs.
197
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
198
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Dilbag Singh BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1258 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife sanctuary in 01 Km. radius.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Both mining site are within 01 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
199
Item No. 78.63 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Rasulpur Theh, Shehbazpur, & Alachaur, Tehsil
Nawanshahr, Distt. S.B.S. Nagar by M/s R.G. Bricks,
Vill & P.O. Kulam, Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s R.G. Bricks, Vill & P.O. Kulam, Tehsil &
Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate Vill. Rasulpur Theh, Shehbazpur, & Alachaur, Tehsil Nawanshahr,
Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide
office memorandum dated 24.06.2013 categorized the mining of brick earth/clay
as category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2.2264 Hectares out of which 1 site is 0.6072 Hect, 2 site is 0.8096
Hectare and 3 site is 0.8096 Hectare is located in the revenue estate of Vill.
Rasulpur Theh, Shehbazpur, & Alachaur, Tehsil Nawanshahr, Distt. S.B.S.
Nagar for manufacturing of bricks in the brick kiln located in the revenue
estate of Vill. & P.O. Kulam, Tehsil & Distt. S.B.S. Nagar. The industry has
also submitted undertaking that the mining site located at (Alachour,
Rasulpur and Shehbazpur) not located more than 1 Km. distance.
2. The mining of brick clay will be carried out at three sites, the details of
which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of site
Lease Period
Site 1 230/156/196 22/21/1, 3//16/2, 17/2/, 24,
25, 24//4/1, 5/1
3 years i.e. upto
09.10.2015
Site 2 227/153/203,205 2500/0, 5, 250/1/7, 14, 2297/9, 6, 2298/10, 8,
2299/8, 1919/4, 1920/7,
1921/660
3 years i.e. upto
09.10.2015
200
Site 3 131/356/484 2625/22, 2626/22, 2625/22
Total area of site =
2.2264 Hect.
3 years i.e. upto
09.10.2015
3. The expected cost of the project will be Rs. 4.50 Lacs.
The other details of the project are as under:
1. Properly filled Form 1 &Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
(a) Submitted
(b) Submitted
(c) Submitted
201
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? If not, submit an undertaking to the effect that there is no other area of borrowing/excavation within a radius of 500 m from the proposed area of borrowing / excavation.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s R.G. Bricks.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1258 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km. from Balachaur Tehsil.
9. Mining sites located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
Boths mining sites are within 01 km. periphery.
The matter is placed before the SEAC for its consideration, please.
202
Item No. 78.64 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Pharala, Tehsil & Distt. S.B.S. Nagar by M/s Bhagwati
Bricks Co., Vill. Pharala, Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s Bhagwati Bricks Co., Vill. Pharala, Tehsil &
Distt. S.B.S. Nagar has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate Vill. Pharala, Tehsil & Distt. S.B.S. Nagar. The project is covered
under category 1(a). The MoEF vide office memorandum dated 24.06.2013
categorized the mining of brick earth/clay as category B-2 for appraisal of the
project proposal under EIA Notification dated 14.06.2006. The details of the
project proposal as per Form 1 and pre-feasibility report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 2.1338 Hectares out of which 1 site is 0.9108 Hect and 2 site is 0.7590,
3 site is 0.0592, 4 site is 0.4048 Hectare and is located in the revenue
estate of Vill. Pharala, Tehsil & Distt. S.B.S. Nagar for manufacturing of
bricks in the brick kiln located in the revenue estate of Vill. Pharala, Tehsil
& Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at four sites, the details of
which are as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of site
Lease Period
Site 1 18/858/1075 96//9/13, 96//11/13, 96//12/2, 96//12/2, 96//12/8, 96//9/13,
96//12/2, 96//12/5, 96//12/8
2 years i.e. upto
01.08.2015
Site 2 18/856, 2, 3/2303, 2304, 1055, 1056
92//22/2/2, 97//2/1, 97//2/2, 97//2/2, 97//2/3, 97//3/6
10 Years i.e. upto
18.11.2018
Site 3 18/524/688 91//20/2/3, 91//20/5/, 15/2,
92//16/2/1
2 years i.e. upto
31.03.2015
Site 4 18/60/105 99//2/1, 99//2/2, 99//3/1,
99//3/2
1 year i.e. upto
10.09.2014
203
3. The expected cost of the project will be Rs. 4.45 Lacs.
The other details of the project are as under:
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
(g) Submitted
(h) Submitted
(i) Submitted
(j) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
204
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(k) Rs 50000/- will be incurred for implementation of EMP
(l) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Bhagwati Brick Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
205
Item No. 78.65 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Ramgarh, Ranewal & Usmanpur , Tehsil Nawanshahr,
Distt. S.B.S. Nagar by M/s Anil Kumar & Son BKO, Vill.
Usmanpur, Tehsil & Distt. S.B.S. Nagar.
It is submitted that M/s Anil Kumar & Son BKO, Vill. Usmanpur,
Tehsil & Distt. S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate Vill. Ramgarh, Ranewal & Usmanpur , Tehsil Nawanshahr,
Distt. S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide
office memorandum dated 24.06.2013 categorized the mining of brick earth/clay
as category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 2.6818 Hectares and is located in the revenue estate of Vill. Ramgarh, Ranewal & Usmanpur, Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Usmanpur, Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at four sites, the details of which are as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total
area of site Lease Period
Site 1 152/32/39 4/21, 22, 7/1/1, ½, 10/1,
2 years i.e. upto 09.10.2015
Site 2 152/31/38 6/13/3, 5/13/5, 14/1, 14/3, 15/2, 16, 17
18/1
2 years i.e. upto
09.10.2015
Site3 152/31/38 5/13/3, 5//13/5, 14/1, 14/3, 15/2, 16, 17,
18/1
2 years i.e. upto
09.10.2015
Site 4 233/211/238 3/1/1/2, 10/2/1, 4/6/1 2 years i.e. upto 09.10.2015
Site 5 229/299/391, 392 19//23/2, 24/2, 28//3/2/2, 4/1
2 years i.e. upto 09.10.2015
206
3. The expected cost of the project will be Rs. 4.50 Lacs.
The other details of the project are as under:
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
207
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Anil Kumar & Sons BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
208
Item No. 78.66 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Sheikhupur , Tehsil Nawanshahr, Distt. S.B.S. Nagar
by M/s Pawan Bhalla BKO, Vill. Gunachaur, Teshil
Nawanshahr, Distt. S.B.S. Nagar.
It is submitted that M/s Pawan Bhalla BKO, Vill. Gunachaur, Teshil
Nawanshahr, Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate Vill. Sheikhupur , Tehsil Nawanshahr, Distt.
S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.56782 Hectares and is located in the revenue estate of Vill. Sheikhupur , Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Gunachaur, Teshil Nawanshahr, Distt. S.B.S. Nagar .
2. The mining of brick clay will be carried out at site, the details of which are as under:
Site Hadbast No./ Khewat No./ Khatoi No.
Khasra No./ total area of site Lease
Period
Site 1 182/170,177,187,367/240,
252,258, 517
19//15, 16, 29, 12//9/1, 29, 19//6, 7, 14, 25, 20//2, 8 Min, 11/3, 12/3 Min, 19/1 Min 19/1 Min, 9//23/1, 20//12/3 Min,
20//8, 9/1, 9/4, 9/2, 11/2, 12/2, 19//4/1,4/2, 5, 17, 2//1, 3,
12//19, 25//2/1 min, 2/1min, 20//21/1min, 25//1 min, 26//5
min, 25//1min, 26//5 min, 25//10/1, 20//21/3, 179, 159,
20//21/3, 179, 159, 20//13, 17, 18, 22/2, 23/1, 158, 180, 181,
25//26
5 years i.e. 15.01.2018
3. The expected cost of the project will be Rs. 3.50 Lacs.
209
The other details of the project are as under:
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
e) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
f) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
(m) Submitted
(n) Submitted
(o) Submitted
(p) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
210
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(q) Rs 50000/- will be incurred for implementation of EMP
(r) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area of borrowing/excavation falls within a radius of 500 m from the periphery of this area borrowing/excavation or not? If yes, how much is the total area of all such borrowing/excavation sites? The project proponent shall submit an undertaking to the effect submit an undertaking to the effect that the total area of all borrowing / excavation sites including the area of the propose project within the radius of 500 m from the proposed area of borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Bhalla BKO.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
211
Item No. 78.67 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bohan, Tehsil & Distt. Hoshiarpur by M/s Bhole
Shankar Bricks Industry, Vill. Barkia Tanoor, Tehsil &
Distt. Hoshiarpur.
It is submitted that M/s Bhole Shankar Bricks Industry, Vill. Barkia Tanoor, Tehsil & Distt. Hoshiarpur has applied for obtaining environmental clearance under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay) in the revenue estate Vill. Bohan, Tehsil & Distt. Hoshiarpur. The project is covered under category 1(a). The MoEF vide office memorandum dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for appraisal of the project proposal under EIA Notification dated 14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area of 1.56782 Hectares and is located in the revenue estate of Vill. Bohan, Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln located in the revenue estate of Vill. Barkia Tanoor, Tehsil & Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of site
Lease Period
Site 1 295/197, 248, 276, 311, 312, 315, 316, 360, 387, 417, 494, 694, 741,781/3,212, 266, 294, 329, 330, 333, 334, 386, 413, 443, 541, 704, 812,
863.
44//6/2, 44//15/1, 38//23/2, 38//23/8, 38//23/4, 44//2/2, 44//14, 44//3/2, 38//13/1,
38//18/4, 38/23/2, 38//24/1, 38/13/2, 38//23/5, 38/23/6,
38//23/9, 38//23/10, 38//24/2, 38//25/1,
38//25/2, 44//4/2, 44//17
Ownership upto 3
years
3. The expected cost of the project will be Rs. 3.00 Lacs.
The other details of the project are as under:
212
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
213
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Bhole Shankar Bricks Industry, Vill. Barkia, Tanoor, Tehsil & Distt. Hoshiarpur.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1322 dated 08.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
214
Item No. 78.68 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bohan, Tehsil & Distt. Hoshiarpur by M/s Surinder
Singh & Bors. B.K.O., V& P.O. Changran, Tehsil & Distt.
Hoshiarpur.
It is submitted that M/s Surinder Singh & Bors. B.K.O., V& P.O.
Changran, Tehsil & Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate Vill. Bohan, Tehsil & Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.56782 Hectares and is located in the revenue estate of Vill. Bohan,
Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of V& P.O. Changran, Tehsil & Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 295/129,738,864, 974, 81, 641, 864, 1076, 8/140, 809,
955, 1069, 91,
693, 954, 119
37//19, 37//20, 38/24/2, 38//25/1, 38//25/2, 44//4/2,
38//6, 38//7/1, 38/15, 37//11, 37//10, 38//18/1, 38/18/2, 38/18/3, 38/7/1,
38//17, 38/16
Ownership land
sufficient
for 3 years
3. The expected cost of the project will be Rs. 4.00 Lacs.
The other details of the project are as under:
215
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
216
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Surinder Singh & Bros. B.K.O.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1329 dated 08.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
217
Item No. 78.69 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bakhlaur, Tehsil & Distt. S.B.S. Nagar by M/s Rana &
Co. BKO, Vill. Mugal Kherabad & P.O. Bakhlaur, Tehsil
& Distt. S.B.S. Nagar.
It is submitted that M/s Rana & Co. BKO, Vill. Mugal Kherabad &
P.O. Bakhlaur, Tehsil & Distt. S.B.S. Nagar has applied for obtaining
environmental clearance under EIA notification dated 14.09.2006 for mining of
minor minerals (brick clay) in the revenue estate Vill. Bakhlaur, Tehsil & Distt.
S.B.S. Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.3156 Hectares and is located in the revenue estate of Vill. Bakhlaur,
Tehsil & Distt. S.B.S. Nagar for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Mugal Kherabad & P.O. Bakhlaur,
Tehsil & Distt. S.B.S. Nagar.
2. The mining of brick clay will be carried out at site, the details of which are
as under:
Site Hadbast No./ Khewat No./
Khatoi No.
Khasra No./ total area of
site
Lease
Period
Site 1 324, 144/ 397,
398, 182
42//19, 17, 19, 2, 3/1, 3/25, 7, 9/1, 3, 22/2, 23, 24/1,
42/4/1, 49//9, 11, 12, 13, 14, 48//6/1, 1, 6/2, 49/4, 42//12,
14, 24, 48//5/2
3 years i.e. upto
08.07.2016
Site 2 324/396, 397, 398, 399, 400,
401, 402
42/2, 3/1, 3/2, 7, 9/1, 33//22/2, 23, 24/1, 42//4/1,
9, 11, 12, 13
3 years i.e. upto
08.07.2016
3. The expected cost of the project will be Rs. 3.50 Lacs.
The other details of the project are as under:
218
1 Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
c) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
d) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(g) Submitted
(h) Submitted
(i) Submitted
(j) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(k) Rs 50000/- will be incurred for implementation of EMP
219
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(l) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Rana & Co.
8. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining site located more than 1 Km. apart are to be considered as different block/ cluster clearance under EIA
notification dated 14.09.2013
All mining sites are within 1 Km. periphery.
The matter is placed before the SEAC for its consideration, please.
220
Item No. 78.70: Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Mehlanwali, Tehsil & Distt. Hoshiarpur by M/s Billa
Brick Industry, Vill. Bassi Hast Khan, Tehsil & Distt.
Hoshiarpur.
It is submitted that M/s Billa Brick Industry, Vill. Bassi Hast Khan,
Tehsil & Distt. Hoshiarpur. has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Mehlanwali, Tehsil & Distt. Hoshiarpur . The project
is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 3.206 Hectares and is located in the revenue estate of Vill. Mehlanwali,
Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Bassi Hast Khan, Tehsil & Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 344/77, 362, 39, 76/113, 439, 48,
113, 112
102//5/3, 16, 103//5, 6, 7, 8, 103//15, 16, 104//11, 12, 19, 20,
21, 22, 23, 108//2/1, 3, 103//9, 10, 11,12,13, 19, 20
5 years i.e. upto
05.09.2018
3. The expected cost of the project will be Rs. 4.00 Lacs.
The other details of the project are as under:
221
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
222
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Bill Brick Industry.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 629 dated 08.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
223
Item No. 78.71 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Uchi
Palli, Tehsil Nawanshahr Distt. S.B.S. Nagar by M/s
O.P. Kirpal BKO, Palli Jhikki, Tehsil Nanwanshahr,
Distt. S.B.S. Nagar.
It is submitted that M/s O.P. Kirpal BKO, Palli Jhikki, Tehsil
Nanwanshahr, Distt. S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Uchi Palli, Tehsil Nawanshahr Distt.
S.B.S. Nagar . The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.015 Hectares and is located in the revenue estate of Vill. Uchi Palli,
Tehsil Nawanshahr Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Palli Jhikki, Tehsil
Nanwanshahr, Distt. S.B.S.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 110/5,397/
5,6 7, 505
37//5/1, 5/2, 5/3, 36//2/1, 2/2,
1, 10, 9/1
1 Years i.e. upto
31.03.2014
Site 2 110/244/301 22//11/2, 19/8, 20 2 years i.e. upto
30.06.2015
3. The expected cost of the project will be Rs. 3.25 Lacs.
The other details of the project are as under:
224
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
225
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s OP Kirpal BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
226
Item No. 78.72 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Kharderh, Tehsil & Distt. Hoshiarpur by M/s Billa
Bricks Traders, Vill. Noorpur, Tehsil & Distt.
Hoshiarpur.
It is submitted that M/s Billa Bricks Traders, Vill. Noorpur, Tehsil &
Distt. Hoshiarpur has applied for obtaining environmental clearance under EIA
notification dated 14.09.2006 for mining of minor minerals (brick clay) in the
revenue estate of Vill. Kharderh, Tehsil & Distt. Hoshiarpur . The project is
covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.248 Hectares and is located in the revenue estate of Vill. Kharderh,
Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Noorpur, Tehsil & Distt. Hoshiarpur.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 98/35,36/
54,55 6//14/2, 6//17/1 1 year i.e.
upto
01.02.2014
3. The expected cost of the project will be Rs. 2.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
227
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land after the expiry of the lease period.
228
EMP after the lapse of the period
for which the project proponent
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Bill Bricks Traders.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1320 dated 08.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in Tehsil Dasuya, Mukerian & Hajipur.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
229
Item No. 78.73 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Bilaspur, Tehsil & Distt. Hoshiarpur by M/s Hari
Darshan Singh BKO, Vill. Bassi Kikkran, Tehsil & Distt.
Hoshiarpur.
It is submitted that M/s Hari Darshan Singh BKO, Vill. Bassi
Kikkran, Tehsil & Distt. Hoshiarpur has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Bilaspur, Tehsil & Distt. Hoshiarpur. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.291 Hectares and is located in the revenue estate of Vill. Bilaspur,
Tehsil & Distt. Hoshiarpur for manufacturing of bricks in the brick kiln
located in the revenue estate of Vill. Bassi Kikkran, Tehsil & Distt.
Hoshiarpur.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease Period
Site 1 356/297, 20,
19/378, 58, 56
5//23/1, 8//9/2, 15//1, 9//3/1, 7/2/2, 8/2, 11/1, 12/2, 13/1, 13/2,
14/1, 17/4/1, 18/1, 18/2, 18/3, 19/2, 22//1/1, 8,9, 19, 21//5/1
5 year i.e. upto
03.07.2018
3. The expected cost of the project will be Rs. 3.00 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
230
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
231
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
to take care of the land after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Hari Darshan Singh BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 1327 dated 08.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
232
Item No. 78.74 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Seikhupur Bhag, Tehsil Nawanshahr, Distt. S.B.S.
Nagar by M/s Jagdambey Brick Kiln, Village Majzara
Kalan, Tehsil & Distt.S.B.S. Nagar.
It is submitted that M/s Jagdambey Brick Kiln, Village Majzara
Kalan, Tehsil & Distt.Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Seikhupur Bhag, Tehsil Nawanshahr, Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 1.8207 Hectares and is located in the revenue estate of Vill. Seikhupur
Bhag, Tehsil Nawanshahr for manufacturing of bricks in the brick kiln
located in the revenue estate of Village Majzara Kalan, Tehsil &
Distt.S.B.S. Nagar..
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. / Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 235/134/174, 175
19//24/2, 25/2, 22//4, 6/1, 7/1, 23//10/1
3 year i.e. upto
31.08.2016
3. The expected cost of the project will be Rs. 5.90 Lacs. The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered
Lease deed of mining area
Submitted
233
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible
to take care of the land after the expiry of the lease period.
234
is responsible.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Jagdambey Brick Kiln.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
235
Item No. 78.75 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Jadla, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Jagdambey Brick Kiln, Village Majzara Kalan, Tehsil &
Distt.S.B.S. Nagar.
It is submitted that M/s Jagdambey Brick Kiln, Village Majzara
Kalan, Tehsil & Distt.Hoshiarpur has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Jadla, Tehsil Nawanshahr, Distt. S.B.S. Nagar. The
project is covered under category 1(a). The MoEF vide office memorandum dated
24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.66304 Hectares and is located in the revenue estate of Vill. Jadla,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Village Majzara Kalan, Tehsil &
Distt.S.B.S. Nagar.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 146/533/613 49//24/7, 25, 21, 73//1, 10/1,
74//4, 5, 6
3 years i.e. upto
28.02.2016
3. The expected cost of the project will be Rs. 5.90 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
236
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
237
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Jagdambey Brick Kiln.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 6121 dated 07.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
238
Item No. 78.76 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill.
Kang, Tehsil Nawanshahr, Distt. S.B.S. Nagar by M/s
Partapa Ram Duggal & Co. BKO, Vill. Garcha, Tehsil &
Distt.S.B.S. Nagar.
It is submitted that M/s Partapa Ram Duggal & Co. BKO, Vill.
Garcha, Tehsil & Distt.S.B.S. Nagar has applied for obtaining environmental
clearance under EIA notification dated 14.09.2006 for mining of minor minerals
(brick clay) in the revenue estate of Vill. Kang, Tehsil Nawanshahr, Distt. S.B.S.
Nagar. The project is covered under category 1(a). The MoEF vide office
memorandum dated 24.06.2013 categorized the mining of brick earth/clay as
category B-2 for appraisal of the project proposal under EIA Notification dated
14.06.2006. The details of the project proposal as per Form 1 and pre-feasibility
report are as under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.2074 Hectares and is located in the revenue estate of Vill. Kang,
Tehsil Nawanshahr, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Garcha, Tehsil & Distt.S.B.S.
Nagar.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease
Period
Site 1 169/151/161 6//3/8 2 years i.e. upto
21.09.2015
3. The expected cost of the project will be Rs. 45000/-.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
239
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 50000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
240
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Partapa Ram Duggal & Co.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 260 NS dated 30.09.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.
241
Item No. 78.77 Application for environmental clearance under EIA
notification dated 14.09.2006 for mining of minor
minerals (brick clay) in the revenue estate of Vill. Atal
Mazara, Tehsil Balachaur, Distt. S.B.S. Nagar by M/s
Pawan Kumar BKO, Vill. Khurdan, Teshil Balachaur,
Distt.S.B.S. Nagar.
It is submitted that M/s Pawan Kumar BKO, Vill. Khurdan, Teshil
Balachaur, Distt.S.B.S. Nagar has applied for obtaining environmental clearance
under EIA notification dated 14.09.2006 for mining of minor minerals (brick clay)
in the revenue estate of Vill. Atal Mazara, Tehsil Balachaur, Distt. S.B.S. Nagar.
The project is covered under category 1(a). The MoEF vide office memorandum
dated 24.06.2013 categorized the mining of brick earth/clay as category B-2 for
appraisal of the project proposal under EIA Notification dated 14.06.2006. The
details of the project proposal as per Form 1 and pre-feasibility report are as
under:
1. The mining of minor minerals (brick clay) will be carried out in a total area
of 0.4046 Hectares and is located in the revenue estate of Vill. Atal Mazara,
Tehsil Balachaur, Distt. S.B.S. Nagar for manufacturing of bricks in the
brick kiln located in the revenue estate of Vill. Khurdan, Teshil Balachaur,
Distt.S.B.S. Nagar.
2. The mining of brick clay will be carried out at sites, the details of which are
as under:
Site Hadbast No./
Khewat No. /
Khatoni
Khasra No./ Total are of site Lease Period
Site 1 236/
143/ 231 44, 45, 983/48 3 years i.e.
upto
31.07.2016
3. The expected cost of the project will be Rs. 2.30 Lacs.
The other details of the project are as under:
1. Properly filled Form 1. Pre-feasibility report as per Ministry of Environment & Forests, Circular dated 30.12.2010.
Submitted
2. Proof of ownership of land/ Registered Submitted
242
Lease deed of mining area
3. Status of mining at the site, if any, alongwith photographs from all the four sides
Submitted
4. 500 meter radius map of the area from periphery of project site clearly indicating the physical features
Submitted
5.. Site-cum-location plan of the mining site indicating the hadbast number, khasra number and khewat/khatoni number etc on aksh chhajra map.
Submitted
6. Environmental Management Plan
indicating the following:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
b) Compliance of various environmental regulations.
c) Steps to be taken in case of
emergency such as accidents at
the site including fire.
d) For how long period the
project proponent will be
responsible for implementation
of EMP and the name of the
person(s) responsible for
implementation of EMP.
e) Capital & recurring cost for the
EMP per year and the details of
funds for the same.
f) Name of the individual persons /
organization, who will be
(a) Submitted
(b) Submitted
(c) Submitted
(d) Applicant will be responsible for implementation of EMP till the expiry of the lease period.
(e) Rs 30000/- will be incurred for implementation of EMP
(f) Farmer will be responsible to take care of the land
243
responsible for implementation of
EMP after the lapse of the period
for which the project proponent
is responsible.
after the expiry of the lease period.
7. Whether the periphery of any other area
of borrowing/excavation falls within a
radius of 500 m from the periphery of this
area borrowing/excavation or not? If yes,
how much is the total area of all such
borrowing/excavation sites? The project
proponent shall submit an undertaking to
the effect submit an undertaking to the
effect that the total area of all borrowing
/ excavation sites including the area of
the propose project within the radius of
500 m from the proposed area of
borrowing/ excavation is less than 5
hectares.
Submitted an undertaking to the effect that there is no other brick earth mining operations carried out within a radius of 500 m from the proposed mining sites of the M/s Pawan Kumar BKO.
8.. Certificate of Deptt. of Forests & Wildlife Preservation to the effect that there is no boundary of National Park & Wildlife within a radius of 1.0 km
of from boundary of the mining site.
Submitted a copy of letter no. 3305 dated 03.10.2013 from Deptt. of Forests, wherein, it has mentioned that there is no boundary of National Park & Wildlife in 01 Km.
9. Mining sites located more than 1 Km.
apart are to be considered as different
block/ cluster clearance under EIA
notification dated 14.09.2013
Not Applicable
The matter is placed before the SEAC for its consideration, please.