44
Transcript
Page 1: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 2: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 3: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 4: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 5: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 6: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 7: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 8: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

rain water to be detailed. (xvi) Calculation on sizing of solar water heating systems to be furnished. (xvii) A backup arrangement of at least 50% solar powered systems connected to the grid

and at least two solar powered lights and one solar powered fan in each flat (xviii) A management plan for excavation and dewatering to ensure compliance to the

CGWA guidelines and regulation. (xix) Solid waste management plan alongwith area earmarked for solid waste management

scheme. (xx) Management of excavated soil. Pollution control measures to be taken to control

fugitive emission during construction phase including marble /stone cutting. (xxi) Details energy conservation measures to be taken. taken (all points mentioned in the

proposal such as orientation to support reduced heat gain, use of ASHRAE 90.1, use of ECBC compliant envelope measures to be supported through drawings and details in the proposal

The proposal was deferred till the desired information is submitted. The above information shall be provided with the uploading of minutes on the website.

11.3.18. Residential Development With Convenient Shopping at Plot B,S.no 393/2B+2A/1,Village-Talegaon Dabhade Maharashtra by M/s Naiknavare Real Estate LLP – Environmental Clearance - [F.No.21-37/2016-IA-III] M/s Naiknavare Real Estate LLP has proposed for Residential Development with Convenient Shopping at Plot B, S. no. 393/2B+2A/1,Village-Talegaon Dabhade, Tal- Maval, District Pune, Maharashtra. Total Plot Area is 11071.35 Sq.mt. Built-up Area is 33,600.19 Sq.mt. Configuration of Building is as given below: Residential :

Type Configuration Tenements Height (m)

A P1+P2+12 138 38.02

B P1+P2+12 138 38.02

C P1+P2+12 144 39.3

Commercial :

Sr. no Configuration Shops Height (m)

A+B Ground 24 3

Parking facility for 247 Four wheelers and 508 two wheelers is proposed to be provided against the requirement of 54 and 508 respectively (according to local norms). During construction phase, total water requirement is expected to be 4KLD which will be met by water from Potable water tankers. During the construction phase, soak pits and septic tanks will be provided for disposal of waste water. During operation phase, total water requirement will be 294 m3/day. Out of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining water requirement ( 96m3/day) will be met from recycled/ treated effluent. Excess treated effluent will be discharged into existing sewer line. Sewage (257 m3/day) will be treated in the STP. Treated sewage will be recycled for flushing and horticulture purpose. Solid waste generation will be 973 kg/day. out of which, quantity of biodegradable solid waste is 601 kg/day and non-biodegradable waste is 372 kg/day. biodegradable waste will be treated in mechanized

Page 9: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

composting unit. 4 nos of recharge pits of size 2 m x 0.9 m x 2 m(1 m filter media) will be proposed. The total power requirement during construction phase is 25 KVA and will be met from MSEDCL and total power requirement during operation phase is 1200 kW and will be met from MSEDCL. After detailed deliberation, the Committee sought following additional information:

(i) Status of application of the project proposal in SEIAA, Maharashtra. (ii) Copy of application submitted for clearance from NBWL (iii) Present landuse of the proposed project site. (iv) Pl confirm whether site is not located on the wet land. (v) Details of waterbodies located within 10 km distance to be furnished. (vi) Cost of project as well as capital cost and recurring cost per annum for implementing

EMP to be provided. (vii) Commitment that shops and other establishments in residential blocks with have to

conform to residential area norms in terms of noise pollution and vehicular movements and shall not create a nuisance for residents of the Blocks.

(viii) Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour to be furnished.

(ix) Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan. Highlight the fire tender pathway.

(x) Details of source of water supply alongwith permission to be submitted. (xi) Excess treated sewage disposal plan/scheme to be submitted. (xii) Assessment of ground level concentration of pollutants due to DG set (1 x 125 KVA). (xiii) Effort shall be made to reduce capacity of DG set and remaining standby power shall

be met from solar energy. (xiv) Treatment scheme for sewage and its recycling mode. (xv) Advantage of proposed sewage treatment plant vis a vis conventional sewage

treatment plant. Commitment shall be provided for meeting the design standards of treatment plant.

(xvi) Details of rain water harvesting system to be furnished. Clarity on recharge pits, storage systems for rain water and use of appropriate filtration system for collected rain water to be detailed.

(xvii) Calculation on sizing of solar water heating systems to be furnished. (xviii) A backup arrangement of at least 50% solar powered systems connected to the grid

and at least two solar powered lights and one solar powered fan in each flat (xix) A management plan for excavation and dewatering to ensure compliance to the

CGWA guidelines and regulation. (xx) Solid waste management plan alongwith area earmarked for solid waste management

scheme. (xxi) Management of excavated soil. Pollution control measures to be taken to control

fugitive emission during construction phase including marble /stone cutting. (xxii) Details energy conservation measures to be taken. taken (all points mentioned in the

proposal such as orientation to support reduced heat gain, use of ASHRAE 90.1, use of ECBC compliant envelope measures to be supported through drawings and details in the proposal

The proposal was deferred till the desired information is submitted. The above information shall

be provided with the uploading of minutes on the website.

Page 10: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Point wise compliance to points raised during

11th Expert Appraisal Committee – (Infra-2)

For

“Neelaya”

“Residential development with convenient shopping” Item no 11.3.18

File no 21-37/2016-IA-III

At

Plot B S. Nos 393/1+393/2 Village-Talegoan Dabhade,

Tehsil- Maval, Dist.-Pune State -Maharashtra.

By

M/s Naiknavare Real Estate LLP

Page 11: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Point no 1 Status of application of the project proposal in SEIAA, Maharashtra Reply This is a fresh application for Environment Clearance uploaded on MoEF & CC portal. No application was made at SEAC/ SEIAA Maharashtra for this proposed residential project with convenient shopping. Point no 2 Copy of application submitted for clearance from NBWL Reply The project does not fall within 10 km of any sanctuary, National Parks, eco sensitive zone, etc. So clearance from NBWL is not required. Toposheet for the same is enclosed as Enclosure-1 Point no 3 Present land use of the proposed project site.

Reply Presently the land is an open land under the residential zone as per the Regional plan. Copy of regional plan is enclosed as Enclosure-2 Point no 4 Please confirm whether site is not located on the wet land. Reply Site is not located on the wetland. Regional plan, Google Image and Toposheet confirming the same is enclosed as Enclosure -1 and Enclosure- 3 respectively. Point no 5 Details of water bodies located within 10 km distance to be furnished. Reply Details of water bodies located within 10 km distance are listed in the table given below;

Sr.no Water body Aerial distance (in

km) from Plot boundary

1 Indrayani River 2.65

2 Talegaon Lake 2.00 3 Dehuroad Lake 9.50

4 Sawraj Nagar Lake (Talegaon Dabhade)

0.25

Page 12: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

5 Jadhavwadi Dam 8.00

6 Adhale Reservoir Lake 8.25

7 Pavana River 2.60

8 Pusne Dam 10.80

9 Kusgaon Lake 10.70

10 Andra Lake 7.20

11 Vadgaon War Lake 3.80

12 Urse Lake 3.40 Toposheet/Google Image indicating the same are enclosed as Enclosure-4 and Enclosure-5 respectively Point no 6 Cost of project as well as capital cost and recurring cost per annum for implementing EMP to be provided. Reply Cost of the projected is estimated to be 5.64 crores. Capital cost/annum for implementing EMP is 186.47 lakhs whereas recurring cost will be 14.91 Lakhs/annum

Point no 7 Commitment that shops and other establishments in residential blocks with have to conform to residential area norms in terms of noise pollution and vehicular movements and shall not create a nuisance for residents of the Blocks. Reply We have proposed 24 no of convenient shops on the ground floor of bldg A and B. No noise generating activities are expected to take place from the convenient shops. We have segregated the parking for residential and commercial users. Commitment stating that shops and other establishments in residential blocks with have to conform to residential area norms in terms of noise pollution and vehicular movements and shall not create a nuisance for residents of the Blocks is attached as Enclosure-6

Point no 8 Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour to be furnished. Reply

Page 13: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Layout plan indicating road, greenbelt, drainage, sewer line, STP, solid waste handling area, rain water harvesting structure, etc. in different colour is enclosed as Enclosure-7. Point no 9 Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan. Highlight the fire tender pathway Reply Layout of parking plan indicating entry and exit points of vehicular movement as well as traffic management plan with highlighted fire tender pathway is enclosed as Enclosure-8

Point no 10 Details of source of water supply along with permission to be submitted. Reply Source of water supply for this proposed residential project with convenient shopping is from Talegaon Dabhade Nagarparishad. We have obtained the water supply NOC from Talegaon Dabhade Nagarparishad dated 17.11.2016. Same is enclosed as Enclosure-9

Point no 11 Excess treated sewage disposal plan/scheme to be submitted. Reply Water requirement for the project during non-monsoon.

Page 14: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

All quantities are in m3/day

Excess treated sewage disposal plan:

Total sewage generated is 257 m3/day which will be treated in the STP of capacity 260 m3.After

treatment water available for reuse is 231 m3/day that will be reused for flushing (96 m3/day)

and gardening (8 m3/day) respectively. Remaining 127 m3/day will be supplied to National

Institute of Post Harvest Technology (NIPHT’s) Horticulture Training Centre.

Point no 12

Assessment of ground level concentration of pollutants due to DG set (1 x 82.5 KVA).

Reply

Generators set emissions were below model acceptable levels. Hence ground level concentrations cannot be generated. In turn the emissions were well within prescribed limits

Point no 13 Effort shall be made to reduce capacity of DG set and remaining standby power shall be met from solar energy. Reply We are reducing capacity of proposed 125 KVA DG set to 82.5 KVA by reducing common load. We are going to install on grid type solar PV (without battery) and not storing the same, hence it is not possible to get standby power from on grid solar PV at evening, night and early morning time. Hence we propose to reduce capacity by reducing some common load only.

Page 15: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Point no 14 Treatment scheme for sewage and its recycling mode. Reply Sewage generated from the proposed project will be treated in the STP of capacity 260 KL. The technology is named as PHYTORID. The components of PHYTORID System are given as follows

Technical details are enclosed as Enclosure-10

Point no 15

Advantage of proposed sewage treatment plant vis a vis conventional sewage treatment plant. Commitment shall be provided for meeting the design standards of treatment plant. Reply Advantage of proposed sewage treatment plant vis a vis conventional sewage treatment plant is given in the table below; Sr.no PHYTORID STP SYSTEM CONVENTIONAL STP SYSTEM

1

It is a very cost effective technology when compared with the traditional wastewater treatment methods. Running cost is Rs.7.50 per Cum.

It is a not cost effective technology when compared with the Phytorid wastewater treatment methods. Running cost is Rs. 11.00 per Cum.

Page 16: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

2

Treatment efficiencies for the removal of fecal coliforms, BOD, COD, nutrients are up to 80%, which is greater than the traditional chemical methods.

Needs online chemical dosing for removal of fecal coliforms, BOD & COD.

3

Since it utilizes natural vegetation and rhizosphere microorganisms, it is ecofriendly method of treating sewage

Sludge digesion has to be made in standard environment. To maintain the environment artificial aeration is required.

4 An important factor to be considered is the aesthetic improvement that is provided by this methodology

Mostly it is located under ground as well as remote location where movement is less.

5 The system can be accommodated in any suitable place and design matching the landscape and garden.

The system is comprises many pumps which leads minimum space required for tanks.

6 The system can be used in nodes to avoid pumping of waste water in case of uneven areas.

Pumps gives easy option to design the system but it is totally depend on pumps.

7 Phytorid technology can be designed in decentralized manner for large projects.

Cannot be designed in decentralized manner.

8 Negligible maintenance cost. Maintenance cost is high because of pumps

9 Aesthetically Designed Has to be underground or at remote place.

10 Reduction in transformer load Transformer load is high as compare to

Phytorid system.

11 Self sustainable unit:- No need to add Bio-Culture frequently No Chemicals required

Need frequently culture, chemical dosing & aeration is mandatory.

12 No Skilled Labour / Operator Required Skilled pump operator required.

13 Low coordination with different agencies (for STP) like cable supplier / panel mfg.

Manual interference is less except the ozonation system.

Page 17: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Commitment shall be provided for meeting the design standards of treatment plant will be

submitted.

Point No 16 Details of rain water harvesting system to be furnished. Clarity on recharge pits, storage systems for rain water and use of appropriate filtration system for collected rain water to be detailed. Reply The storm water collected from the site shall be recharged through 04 Nos. of recharge pits with size 2 m x 0.9 m x 2 m (1 m filter media). Overflow of the same shall be connected to the network of internal storm water drainage pipe and chambers. We have not proposed storage of the rain water. Layout indicating the locations and connectivity to the external storm water drain is enclosed as Enclosure-11

Point No 17

Calculation on sizing of solar water heating systems to be furnished

Reply

It is proposed to provide solar water heating system for catering needs of hot water of the occupants. For E.C. the hot water requirement has been worked out on the basis of 70 lit. /day / Flat for the hot water available @ 60 deg C. The capacities required for each building would be as follows:

Sr. No Bldg. No. of Flats

Solar System Cap. lit/

day

No. of panels

required

No. of panels

required

PHASE-1

1 A-Type 138 9660 77.28 SAY 77

2 B-Type 138 9660 77.28 SAY 77

3 C-Type 144 10080 80.64 SAY 81

Total 420 29400 235.2 235

These systems will have to be installed on terrace, in shadow free space, facing south. The supply for cold water will be taken from the proposed over head tank. The systems would be either thermosyphon type or Forced Circulation as per location of panels. The Solar tanks will be installed on Terrace area of building considering equal load distribution on R.C.C slab. For thermosyphon system maintenance cost is negligible. Only cleaning and dusting of panels is required.

But the success of providing solar water heating system will depend upon the shadowless area i.e. made available at Terrace Level per building.

Page 18: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Point no 18 A backup arrangement of at least 50% solar powered systems connected to the grid and at least two solar powered lights and one solar powered fan in each flat

Reply We have calculated total shadow free space available on terrace after locating solar water heating system, It is possible to install 10 KW Solar PV on grid system on available space. We are ready to install the same.

Point no 19 A management plan for excavation and dewatering to ensure compliance to the CGWA guidelines and regulation. Reply Management of excavated soil is given in the table below; • Building out to out dimension 42.28 m x 20.35 m, so considering 1.5m extra margin for both

the sides excavated area dimension will be 45.28 m x 23.35 m • For 3 Nos. of bldg. consider excavation depth will be 1.5 m • So net excavation qty. of 3 bldg. :- 3 x (45.28 x 23.35) x 1.5 = 4757 Cum Say 4800 Cum • Consider 20% of top soil from total excavated qty. = 4800 X 20% =960 Cum • Open Space area :- 1108.38 m2 • As per contour layout existing OGL for open space area is 93.5 • As per Master layout finish level of open space area is 96.00, so there will be 2.5 m filling • We will be use excavated qty. of soil i.e. 960 Cum for landscaping work. • All remaining qty of excavated material i.e. (4800-960) =3840 Cum will be use for plinth

refilling and road formation work. No basement is proposed for the project. As per the hydrogeology report water table at the project site is 15 to 30 m BGL so, there is no ingress of water anticipated during foundation of building. Hence permission of CGWA is not required. Point no 20 Solid waste management plan along with area earmarked for solid waste management scheme. Reply We have enclosed solid waste management plan as enclosure-12 Area allocated for waste management facility on site is 69 m2 Layout indicating the area earmarked for solid waste management scheme is given herewith.

Page 19: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

SOLID WASTE MANAGEMENT FACILITY LAYOUT

Point no 21 Management of excavated soil. Pollution control measures to be taken to control fugitive emission during construction phase including marble /stone cutting. Reply Management of excavated soil is given in the table below; • Building out to out dimension 42.28 m x 20.35 m, so considering 1.5m extra margin for both

the sides excavated area dimension will be 45.28 m x 23.35 m • For 3 Nos. of bldg. consider excavation depth will be 1.5 m • So net excavation qty. of 3 bldg. :- 3 x (45.28 x 23.35) x 1.5 = 4757 Cum Say 4800 Cum • Consider 20% of top soil from total excavated qty. = 4800 X 20% =960 Cum • Open Space area :- 1108.38 m2 • As per contour layout existing OGL for open space area is 93.5 • As per Master layout finish level of open space area is 96.00, so there will be 2.5 m filling

Page 20: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

• We will be use excavated qty. of soil i.e. 960 Cum for landscaping work. • All remaining qty of excavated material i.e. (4800-960) =3840 Cum will be use for plinth

refilling & road formation work. Pollution control measures to be taken to control fugitive emission during construction phase are listed as follows; • Site barricades will be provided along with the tree planting at the site boundary; • Excavation and transport will be done during off peak hours along with material loading from

site minimize to about 15-20mins; • During windy conditions, dust suppression measures will be adopted (dampening with water,

tire washing facility at the entrance of the project site, etc.; • The vehicles hired for transportation of material and labor shall have PUC certificate in order to

reduce air emissions; • Dust covers will be provided on trucks used for transportation of materials prone to fugitive

dust emissions; • If small volumes of concrete are to be mixed (manually), mixing is to be undertaken on a hard

surface covered in plastic sheeting so that concrete waste and runoff can be contained; • Traffic Management - vehicular movement to be regulated with proper parking facility and

internal road system; • The generators used on the site for energy backup will be CPCB norms complied for air

emissions. There will be no marble/stone-cutting on site. If required, pre-cut materials will be purchased from vendors.

Point no 22

Details energy conservation measures to be taken (all points mentioned in the proposal such as

orientation to support reduced heat gain, use of ASHRAE 90.1, use of ECBC compliant

envelope measures to be supported through drawings and details in the proposal.

Reply

Details energy conservation measures taken are given below as follows;

Energy Saving Percentage;

Page 21: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

ECBC Compliance;

Section Requirement Compliance

4-3-1

Roof assembly U factor to be max 0.261w/m² °C

Complies

This is a Non AC residential Building, Roof U factor– 3.72 w/m² °C

Six to nine inches of brick coba which provides insulation and Broken Ceramic tile is used on roof top terraces will help reduce solar heat gain/reflect heat but does not meet the level of insulation expected for 24hrs AC building like BPO in ECBC.

4-3-3 Vertical fenestration Max U factor to be

3.30 w/m² °C

Complied DGU Glazing providing at Vertical fenestration DGU U Factor – 1.81 w/m² °C

4-3-3 Vertical fenestration SHGC to be

maximum 0.25

Complied DGU Glazing providing at Vertical fenestration

4-3-3 Minimum visible transmission to be 0.20 for 0.4 WWR.

Complied DGU glazing with High Visual light transmittance and decent thermal control chosen

Page 22: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

5-2-2 Minimum Equipment

efficiencies for Air conditioning

Complies , as per IS 1391

The A.C.in the flat is not provided by the proponent.

The minimum efficiency of the A.C. available in the market is above 90-95 % for Star Rated AC’s

5-2-2 Equipment efficiency standards

Complies Complies

6-2-1 Solar Water Heating Complies as per IS 13129 Part(1&2)

We are providing 70 LPD per flat solar water heating system.

7-2-1 Lighting control Complies Automatic control device, astronomical time switch providing for common lights.

8-2-1 Transformers Complies Providing good efficiency Transformers with low losses.

8-2-2 Energy efficient motors

Complies Providing good efficiency motors.

8-2-4 Check metering &monitoring

Complies Electrical metering providing for record energy.

Page 23: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 24: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 25: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 26: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 27: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 28: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 29: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

21

G.H. NAIKNAVARE

SHIVAJINAGAR ,PUNE-5

1204/4 GHOLE ROAD,

PROJECT

SCALE DATEDRG.NO.

NTS 24.1.1721

AT TALEGAON DABHADE,TAL-MAVAL,DIST-PUNE

ON S.NO.393/2B+2A/1PROPOSED RESIDENTIAL SCHEME

FIRE TENDER MOVEMENT/REFUSE AREA LAYOUT

FIRE TENDER MOVEMENT/ REFUSE AREA LAYOUT

Page 30: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 31: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 32: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 33: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 34: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Technical Proposal

Designing & Implementation of a Sewage

Treatment Plant Using Phytorid Technology

(Capacity 1,60,000 Ltr/day)

At

Moshi, Pune

Page 35: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Phytorid technology for Wastewater Treatment

1.0 INTRODUCTION Sewage is being carried out from drainage systems and open channels (nallah) for

past several decades in any urban settlement. These nallahs also serves as

channels for storm water run-off. Most of the nallahs discharge into the rivers. On

one side due to increasing population the discharge into the rivers/lakes is ever

increasing and on the other side a lot of water being thrown as sewage through

nallahs. This water can be seen as untapped resource if a suitable treatment method

is used for cleaning of nallah water to a quality which can be used for non-potable

applications. Ultimately, cleaning of water bodies and availability of water can be

achieved.

In order to make the method feasible selection of technology for sewage treatment

should be on criteria such as plant which works without electricity, require minimum

maintenance and most importantly, the technology should be self-sustainable.

National Environmental Engineering Research Institute (NEERI), Nagpur have

developed a novel technology based on natural method of treatment of sewage using

constructed wetlands. The technology is named as PHYTORID and is well patented

nationally and internationally.

Use of plant species along with their root system along with the natural attenuation

processes can be combined together to get the Phytorid Technology. It is one such

technological solution, which can be easily implemented in cities as well as in rural

areas for treatment of wastewater. The system is based on use of specific plants

normally found in natural reed with filtration and treatment capability. This system can

be utilized for a wide variety of applications. It can be used for secondary and tertiary

treatment of municipal wastewater, sludge management, treatment of industrial or

agricultural effluent as well as for the treatment of landfill leachates.

PHYTORID technology is developed by NEERI for sewage treatment. NEERI is a

government research institute under Council of Scientific and Industrial Research.

This is one of the most reputed laboratories for environmental research and

consultancy. This technology has world patent to its credit. The national

environmental policy recommends use of constructed wetland systems for efficient

sewage treatment.

Page 36: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Phytorid technology for Wastewater Treatment

2.0 SIMPLE SOLUTION FOR SEWAGE TREATMENT The main objective of the proposed project is to provide a simple, feasible, practically

sound, eco-friendly, maintenance free and cost-effective technology, which can

handle the sewage waste water treatment leading to reuse of treated water for

purposes like gardening.

PHYTORID is a scientifically developed systematic treatment methodology for waste water. � PHYTORID combines Physical, Biological and Chemical processes. � Works on gravity � No electric power requirement � Scalable technology � Easy to maintain � Adds to aesthetics � Cost effective

3.0 TYPICAL DESIGN FEATURES

The general concept design for the Phytorid system is presented in Figure 1.

However, the design may be further modified as per specifications and land

availability. The schematic also depicts modular concept of combining beds into

series or parallel configurations, particularly for higher capacity treatment plants.

The sub-surface flow type, Phytorid system is proposed for the treatment of sewage

or domestic wastewater which will consists of a basin or a channel with a barrier to

prevent seepage, but the systems/ cells/ beds contain a suitable depth of porous

media. A primary treatment facility would also be constructed along with basic for

effective removal of solids and thus reduces the marginal BOD.

Page 37: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Phytorid technology for Wastewater Treatment

The porous media also supports the root structure of emergent vegetation. The

design of the Phytorid system assumes that the water level in the cells will remain

below the top of the filter media.

Figure.1: Cross Sectional View of Phytorid System

The vegetation to be utilized for the said Phytorid system is very important. Various

species of aquatic plants have been utilized to attain maximum efficiency in the

treatment of domestic wastes. These include species like Phramites australis,

Phalaris arundinacea, Glyceria maxima, Typha spp., Scirpus spp., other common

grasses etc.

In a plant for treatment of nallah water it is proposed to lift the sewage to Phytorid

system using a pump and then treated water is either used for gardening or can be

discharge into nallah at the downstream. However in case of the actual plant the

flows to and from Phytorid will be managed by gravity.

4.0 ADVANTAGES OF PHYTORID TECHNOLOGY � Treatment efficiencies for the removal of faecal coliforms, BOD, COD, nutrients

are up to 80%, which is greater than the traditional chemical methods.

� It is a very cost effective technology when compared with the traditional

wastewater treatment methods.

Bed

Sectional View Plan

Next

Inlet

Outlet

Parallel System

Series System Combined

Page 38: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Phytorid technology for Wastewater Treatment

� Since it utilizes natural vegetation and rhizosphere microorganisms, it is eco-

friendly method of treating sewage.

� An important factor to be considered is the aesthetic improvement that is

provided by this methodology.

� No mosquitoes and odour nuisance

� The treated water can be used for enhancement of environmental architecture

such as roadside fountains.

� The quality of treated water is comparable to irrigation standards

5.0 METHODOLOGY The treatment process consists of primary treatment plant followed by Phytorid

treatment system. The hydraulic loading shall be started with 40% capacity in the

beginning till the time of acclimatization of the plants to the hydraulic load and shall

be later increased to 100%. The further loading and efficiency shall be monitored to

establish how much more of either hydraulic or BOD load can be effectively used.

This would entirely depend upon the variation in the sewage characteristics used for

treatment.

6.0 LAND AREA REQUIREMENTS The total area required for sewage treatment plant for a capacity of 100 m3/day is

approximately 180 m2. The area includes area requirements for phytorid bed. The

phytorid bed on nallah will be constructed at the space available and avoiding flood

levels during mansoon period.

7.0 TREATMENT EFFICIENCIES Phytorid system being natural method, the final efficiencies as indicated in Table 1,

will be achieved after the system is stabilized which may require a period of 6 months

after commissioning.

Table 1: Performance of PHYTORID for urban waste Pollutant Performance (% removal) Total suspended solids 75 – 95 Biochemical oxygen demand 70 – 80 Chemical oxygen demand 60 – 75 Total nitrogen 60 – 70 Phosphate 50 – 60 Fecal coliform 85 – 95

Page 39: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

Phytorid technology for Wastewater Treatment

8.0 OPERATION AND MAINTENANCE This technology is natural system; as a result operation is mostly passive and

requires little operator intervention. Requirement for area can change on various

factors such as load (kg BOD/day), ambient temperature, topography of the region,

flow characteristics, etc. Maintaining uniform flow across the Phytorid system through

inlet and outlet adjustment is extremely important to achieve the expected treatment

performance. Sampling of inlet and outlet will be carried out for a period of 3 months

every fortnight after stabilization of the treatment systems for first one year.

Page 40: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining
Page 41: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

(A)  Construction Phase

SOLID WASTE MANAGEMENT

Sr. no Particulars Responsible Care

1 Debris, Waste Concrete, Waste Plaster

Remove every week or reuse for backfilling &  road makingWaste Plaster road making.

2 Food waste Composting

Sr. no Item  Quantity Reuse/Recycle

1 Excavated Soil 4800m3 Formation and Filling of Road and garden top soil ‐within plot (RG area)

2 Top soil 960m3Used for Landscaping work2 Top soil Used for Landscaping work.

2 Murum/rock 3840 m3 Used for plinth refilling & road formation

2 Reinforcement 27477 Kg 21477 Kg used for road network & plinth6000 Kg sold to Scrap vendor

Page 42: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

CONSTRUCTION WASTE MANAGEMENT PLANReuse/Recycle/ DisposalSr. No. Item  Reuse/Recycle/ Disposal (Quantity and Details )

1 Rein. Steel Scrap (MT) 27 shall be sold to authorized recycler2 Cement (Bags) 150 shall be disposed to authorized land fill site( g ) p

3 Ready Mix Concrete waste (Cum)108  this wastage Qty. of Concrete we will be use for Development work PCC such as compound wall PCC, misc. concrete work at site.5 h f k ll b

4 Bricks / Blocks (Nos.)2458 Nos. this wastage Qty. of Bricks we will be use for Podium misc. brickbat waterproofing, Filter media for gardening work..

5 Crush Sand (C.ft.) 1901 shall be disposed to authorized land fill site5 Crush Sand (C.ft.) 1901 shall be disposed to authorized land fill site

6 Tile (S.ft.) 14100 shall be disposed to authorized  vendor

7 Stone (Marble, Granite, Quartz,  Exact size of  stone will be purchase & will be fix 7 Kota) (S.ft.) at site so no wastage.

8 Gypsum plaster (Kgs.) 40000 Shall be disposed  to authorized land fill site

Page 43: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

MUNICIPAL SOLID WASTE MANAGEMENT

Waste Quantity k /d

Management kg/day 

Biodegradable   601 Dry & wet garbage collected separately.Wet garbage treatment in Mechanized composting unitunit. 

Non‐Biodegradable  

372 Handed over to Talegaon Dabhade Nagarparishad.

STP Sludge 10 Use as manure for LandscapingSTP Sludge 10 Use as manure for Landscaping.

Page 44: environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/Online/... · of which, fresh water requirement from Talegaon Dabhade Nagarparishad will be 190 m3/day and remaining

SOLID WASTE MANAGEMENT PLAN AND SECTION 

• Not hindering the fire tender movement