+ All Categories
Home > Documents > OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud...

OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud...

Date post: 11-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
118
@OHFacilities / #OFCConf16 Shauna Hooks Customer Support Supervisor OFCC Updates: OAKS CI
Transcript
Page 1: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16

Shauna HooksCustomer Support Supervisor

OFCC Updates: OAKS CI

Page 2: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

DocuSign

• DocuSign electronic signature app has been implemented for contracts, agreements, contract modifications and amendments

• DocuSign workflow replaces the OAKS CI steps used to route documents for signature and eliminates the printing, signing, scanning, uploading and attaching process

2

Page 3: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

DocuSign Process

• Documents and supporting materials are placed in a DocuSign “envelope”

• DocuSign envelopes are stored by DocuSign and cannot be modified except to add additional documents such as a PO

• On execution, the executed document is emailed to all parties

• The coordinator loads the executed document to OAKS CI which approves the OAKS CI record

3

Page 4: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

DocuSign Signatures

• Signers may set up a free DocuSign account to manage documents you sign

• Signers may download the DocuSign app and sign documents from their smart phone or tablet computers

• Signers may use a DocuSign font or upload a copy of their actual signature to be displayed on signed documents

4

Page 5: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

OAKS CI Cloud Upgrade to 16.1• The OAKS CI cloud based system upgraded to v16.1 on June

17th. This was a major upgrade and involved both new functionality and the movement of the application to new state of the art hardware.

• If you are a cloud based user, you received a new password from Oracle with a link to a website which allowed you change your password and set security questions:– OAKS CI Password: https://ohio-primavera-

idm.oracleindustry.com/oim• You also received a new link from us which provides you access

to the OAKS CI (Cloud) site:– OAKS CI : https://ohio-unifier.oracleindustry.com/bluedoor

5

Page 6: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

OAKS CI Cloud Upgrade to 16.1• Upgrade impact

– You now have the ability to assign multiple users as your proxy

6

Page 7: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

OAKS CI Cloud Upgrade to 16.1– You can now drag and drop documents from

your desktop to your folders in document manager

• Locate your documents on your computer• Drag them into the upload screen, which will turn green• Click Upload

7

Page 8: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

OAKS CI Cloud Upgrade to 16.1

• Upgrade impact-– From your Task list you can now click on the paper clip next to the

task to view attachments

8

Page 9: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

OAKS CI Cloud Upgrade to 16.1

• Upgrade impact-– From your Task list you can now click on the flow chart and view

current step of the workflow

9

Page 10: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Questions?

Contact our Customer Support Team:[email protected], 614-644-2211

Page 11: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16

Lisa A. Laney, LEED AP, BD+CSustainability Administrator

OFCC Updates: LEED

Page 12: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Ohio’s LEED School Status

12

There are 371 schools in Ohio registered or certified with the US Green Building Council showing Ohio’s commitment to energy efficient, environmentally friendly & healthy schools!

Milton-Union EVSD K-12

Page 13: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Ohio’s LEED School Status

13

271 LEED Certifications

Platinum – 3Gold – 86

Silver – 176 Certified – 6

Milton-Union EVSD K-12

Page 14: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

LEED V3

14

Reynoldsburg City SDSummit Road High - STEM Academy

• Registration• Eco-Charrettes• Energy

Requirements• Submittals

Page 15: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

LEED V3

15

Photos courtesy of Moody⋅Nolan/Brad Feinknopf (Feinknopf Photography)

V3 Registration: October 31, 2016Sunset: June 30, 2021

Page 16: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

LEED V4

16

Significant Updates• ASHRAE Standards• Integrative Design Process & Upfront Planning• Credit Requirements• Education, Education, Education!

Page 17: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

LEED V4

17

Columbus City SDOld Orchard Elementary

Page 18: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16 18

Southwestern City SDHarmon Elementary

Page 19: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16 19

Questions, Input or Opinions on V4?

Lisa Laney, Sustainability [email protected]

Page 20: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16

Lane BeougherProgram Services Manager

OFCC Updates: Documents

Page 21: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

What did we say?

• At last year’s OFCC Conferences we announced that we were developing language to address joint ventures and limited-liability companies (LLC) for the next release.

• Mission accomplished…

…but wait, there’s more.

21

Page 22: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Joint Ventures and LLCs

• Affected documents:– Architect/Engineer Agreement Forms– A/E Standard Terms and Conditions

– Instructions to Bidders (Contractor)– Instructions to Proposers (CM/DB)

– Agreement Forms (Contractor/CM/DB)– General Conditions (Contractor/CM/DB)

22

Page 23: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Agreement Form (AHE/JV)

5.1.3 Subject to Section 5.1.1, the Agreement shall become binding and effective upon execution by the Contracting Authority, Owner, A/E, and Ohio Attorney General.

5.1.3.1 If the A/E is a joint venture, (1) each individual joint venturer shall (a) sign the Agreement in its own name and (b) be a party to the Contract, and (2) the Contract shall be binding on and apply to all joint venturers jointly and severally.

23

Page 24: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Agreement Form (K-12/LLC)

5.1.3 Subject to Section 5.1.1, the Agreement shall become binding and effective upon execution by the School District Board and A/E, subject to approval of the Commission.

5.1.3.2 If the A/E is a LLC, which the Contracting Authority reasonably believes to be a special purpose or similar entity, the Contracting Authority may, in its sole discretion, require the LLC and each member of the LLC to (1) sign the Agreement in its own name and (2) be a party to the Contract. In that case, the Contract shall be binding on and apply to the LLC and all of its members jointly and severally.

24

Page 25: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Standard Terms & Conditions

7.2.6.5 If the A/E is a joint venture:.1 the A/E may meet the requirements of this Section 7.2.6 by providing a PL policy under which each joint venturer is the insured; or.2 each joint venturer shall individually meet the requirements of this Section 7.2.6 by providing a PL policy (1) under which the individual is the insured and (2) that covers that joint venturer’s interests in the joint venture by endorsement or otherwise. The certificate of insurance shall reflect that the PL policy covers the joint venturer’s interest in the joint venture.

25

Page 26: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Standard Terms & Conditions

Example: Assume that the A/E (1) is the “XY joint venture” of company “X” and company “Y”; and (2) is required under Section 7.2.6 to maintain PL insurance limits of $1M/$2M. In order to comply with Section 7.2.6.5.2, “X” must maintain PL insurance limits of $1M/$2M and “Y” must maintain PL insurance limits of $1M/$2M.

26

Page 27: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 27

Page 28: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Standard Terms & Conditions

7.2.6.6 If the A/E is a LLC, which members consist of two or more separate firms:

.1 the A/E may meet the requirements of this Section 7.2.6 by providing a PL policy under which the LLC is the insured; or.2 each member of the LLC shall individually meet the requirements of this Section 7.2.6 by providing a PL policy (1) under which the individual member is the insured and (2) that covers that member’s interests in the limited-liability company by endorsement or otherwise. The certificate of insurance shall reflect that the PL policy covers the member’s interest in the LLC.

28

Page 29: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E Standard Terms & Conditions

Example: Assume that the A/E (1) is the “XY limited-liability company,” the members of which are “X” and “Y”; and (2) is required under Section 7.2.6 to maintain PL insurance limits of $1M/$2M. In order to comply with Section 7.2.6.6.2, “X” must maintain PL insurance limits of $1M/$2M and “Y” must maintain PL insurance limits of $1M/$2M.

29

Page 30: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 30

Page 31: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Instructions to Proposers (CM/DB)

3.6 Contract Negotiation Submissions3.6.1 The Proposer with whom the Contracting Authority is negotiating shall submit the following documents to the Contracting Authority within five days after commencement of contract negotiations:

3.6.1.10 If the Proposer is a joint venture, the executed agreement between the joint venturers describing the division of services/work and percentage of contract for each company, and a Power of Attorney which authorizes one or more individuals to bind the joint venture and each individual joint venturer to Contract Modifications including GMP Amendments.

31

Page 32: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 32

Agreement Form (CM AHE)

Page 33: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 33

Agreement Form (CM K-12)

Page 34: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Joint Ventures and LLCsContracts affected include:

– Architect/Engineer (including Criteria A/E)– Construction Manager Adviser– Multiple-Prime (with or without CM Adviser)– General Contracting– Construction Manager at Risk– Design-Build

but not:– Consultant Agreement– Limited Scope Contract– Energy Performance Contract

34

Page 35: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Additional Revisions• Markup / Not to Exceed / Lump Sum• GMP Amendment Form revisions• Domestic Steel• Commercially useful function (EDGE)• Communication with A/E’s Consultants• Infringement of patent rights or copyrights• Electronic signatures• Project Schedule• Allowances and Unit Prices• Sustainability Requirements

35

Page 36: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E and Consultant Markup

36

(A/E Agreement Form)

Page 37: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

A/E and Consultant Markup

37

(A/E Standard Terms and Conditions)

37

Page 38: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16 38

Not to Exceed / Lump Sum(A/E Agreement Form)

38

Page 39: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16 39

GMP Amendment revisions

39

Page 40: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

GMP Amendment #1 example

40

Page 41: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

GMP Amendment #2 example

41

Page 42: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 42

GMP Amendment revisions

Page 43: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

GMP Amendment example #1

43

Page 44: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

GMP Amendment example #2

44

Page 45: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 45

Domestic SteelA/E Standard Terms and Conditions

CM at Risk General Conditions

Page 46: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 46

Page 47: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 47

Domestic SteelCM at Risk General Conditions

Page 48: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 48

Commercially useful functionA/E Standard Terms and Conditions

CM at Risk General Conditions

Page 49: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Commercially useful functionOAC 123:2-16-15(B) EOD will consider the following when determining if an EDGE business enterprise is performing a commercially useful function:

(1) The workers on the EDGE contract or project are regular employeesof the contracted EDGE business enterprise.

(a) Regular employees are employees that would be working for the EDGE business enterprise on any other subcontract with any other contractor.

(2) The equipment used by the EDGE business enterprise is owned, leased, or controlled by the EDGE business enterprise.(3) The EDGE business enterprise has the responsibility, with respect to execution of the work of the contract, for actively managing, performing, and supervising the work involved.(4) The EDGE business enterprise has the responsibility, with respect to materials and supplies used on the contract, for negotiating price, determining quality and quantity, ordering, payment, and, where applicable, installation.

49

Page 50: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 50

Communicationwith A/E’s ConsultantsA/E Standard Terms and Conditions

Page 51: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 51

Infringement ofpatent rights or copyrightsA/E Standard Terms and Conditions

Page 52: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 52

Electronic signatures

A/E Standard Terms and Conditions

CM at Risk General Conditions

Page 53: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 53

Page 54: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 54

Project Schedule

A/E Standard Terms and Conditions

A/E Scope of Services

Page 55: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 55

Allowances and Unit PricesInstructions to the A/E

Page 56: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 56

Allowances and Unit PricesInstructions to Bidders

Page 57: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 57

Page 58: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 58

Allowances and Unit PricesGeneral Conditions

Page 59: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 59

Sustainability Requirements (AHE)A/E Scope of Services

Page 60: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 60

Page 61: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16 61

Sustainability Requirements (K-12)

A/E Scope of Services

Page 62: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

• OFCC began using an electronic bidding application in April of 2013.

• Three years have gone by and we’ve opened over 1/2 billion dollars in bids, averaging 10.44% under the A/E’s estimates.

• I’ve compiled a few statistics I’d like to share with you.

62

Page 63: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

63

-

20

40

60

80

100

120

140

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Number of Bid Packages = 314 total

Page 64: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

64

-

50

100

150

200

250

300

350

400

450

500

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Number of Bids Received = 1,289 total

Page 65: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

65

-

100

200

300

400

500

600

700

800

900

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Number of Plan Holders = 2,224 total

Page 66: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

66

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Number of Document Downloads = 17,832 total

Page 67: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

67

$0

$500

$1,000

$1,500

$2,000

$2,500

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Thou

sand

s

Average Value of Base Bids = $1,647,285 overall

Page 68: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Bid Express Metrics

68

$0

$50

$100

$150

$200

$250

FY2013 FY2014 FY2015 FY2016 FY2017 to date

Mill

ions

Actual Value of Base Bids Received = $517,247,490 total

Page 69: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Questions?

Lane [email protected]

69

Page 70: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16

Craig WeiseChief of Projects

Jeff KringAgency | Higher Education Program Manager

Lessons Learned: Completing the 330 Form

Page 71: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Topics:

• Request for Qualifications (RFQ)• RFQ Rating Rubric• Statement of Qualifications F110-330• Selection Rating Form

71

Page 72: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Request for Qualifications (RFQ)

• RFQ posted on OFCC website

• May sign-up for automatic notifications

72

Page 73: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

RFQ Rating Rubric

• Rubric to help evaluators

• Available on OFCC website

73

Page 74: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

SOQ Instructions

• First 10 pages of SOQ

• Please read and follow!– Most ignored

section

74

Page 75: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Statement of Qualifications (SOQ)

75

• F110-330 Form used for all selections– A/E– C-A/E– CMA– CMR– DB– Specialty Consultants

Page 76: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Selection Rating Form

76

• Last page of RFQ• Completing this

form is evaluators goal– Please make it

easy!

Page 77: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1a. Proximity of Firm to Project Site

77

Page 78: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1a. Proximity of Firm to Project Site

• Lead Firm’s Address (Section C, 14a)

• Roadway miles measured from Lead Firm’s office to Project location

• Office where work will be performed, not closest office

• Verified with Google Maps, Map Quest, etc.– We may arrive at a different distance– If multiple sites, use the furthest location

78

Page 79: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1b. Amount of Fees Awarded

79

Page 80: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1b. Amount of Fees Awarded• Total revenues in past 2 years• Revenues awarded by Contracting Authority• Workload for A/E, C-A/E, and CMA

based on value of fees• Workload for CMR and DB

based on total contracts

80

Page 81: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1b. Amount of Fees Awarded

• Fee Ranges (SOQ Form, Part II)

• Revenues may be verified (database)– We may arrive at a different total

81

Page 82: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1c. Number of Licensed Professionals

82

Page 83: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1c. Number of Licensed Professionals

• Licensed professionals from Lead Firm providing primary services(SOQ Form Part II)

83

Page 84: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

1c. Number of Licensed Professionals

• RFQ Section D: Services Required, lists Primary and Secondary services requested

84

Page 85: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm Qualifications

85

Page 86: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm Qualifications• 2a. Project Management Lead• 2b. Project Design Lead/Project Admin. Lead• 2c. Technical Staff• 2d. Construction Administration Staff

• NOTE: use roles as listed in SOQ Instructions

86

Page 87: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm Qualifications

• Resume will be evaluated using criteria in Selection Rating Form

87

Page 88: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm Qualifications

• Education level and professional licenses• Experience in project role• Similar projects completed• Review SOQ Section H to find additional

relevant information about key team members

• Review first page of Resume (1 pg. max)– Subsequent pages will not be evaluated

88

Page 89: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm Qualifications

• Project Management Lead- managing scope, schedule, and budget

• Project Design Lead- creative, effective, efficient design solutions

• Technical Staff- communication, timely admin. of processes

• Construction Administration Staff- identify issues, timely problem solving

89

Page 90: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

2a-d. Primary Firm QualificationsCommon Challenges:• Resume does not include information

directly related to scoring criteria• Section H does not include specific

information addressing scoring criteria• Example Project pages do not include

information directly related to scoring criteria– How are evaluators going to score criteria?

90

Page 91: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3a. Key Consultant Qualifications

91

Page 92: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3a. Key Consultant Qualifications

• Summary of all key disciplines• Includes qualifications of EDGE partners• Review Resumes (Section E)

• Similar evaluation as Lead Firm’s Qualifications

92

Page 93: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3a. Key Consultant Qualifications

• Education level and professional licenses• Experience in project role• Similar projects completed• Review SOQ Section H to find additional

relevant information about key team members

• Review first page of Resume (1 pg. max)– Subsequent pages will not be evaluated

93

Page 94: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3b. EDGE Consultant Participation

94

Page 95: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3b. EDGE Consultant Participation*

* Must be comprised of professional services consulting firm(s) and NOT lead firm

• Is there a fully executed Statement of Intent to Contract and Perform?

• Is the proposed EDGE commitment over the goal advertised in Section F of RFQ?

95

Page 96: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

EDGE Commitment / Statement of Intent

96

Errors/Omissions• EDGE Cert. #• Scope of Services• % Participation• Signatures

– Is certification still valid for vendor?

Page 97: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

3b. EDGE Consultant Participation• Calculate EDGE points. 1 point for every 2%

increase over published goal• EXAMPLE:

5% = 0 Pts. 9% = 2 Pts. 13% = 4 Pts.6% = 0 Pts. 10% = 2 Pts. 14 % = 4 Pts.7% = 1 Pt. 11% = 3 Pts. 15 % = 5 Pts.8% = 1 Pt. 12% = 3 Pts.

• < 5.0% does not meet goal

97

Page 98: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4a. Overall Team Qualifications

98

Page 99: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4a. Previous team collaboration• Review Section G. Matrix • Typical key members include:

• Project Management Lead• Project Design Lead/Project Admin. Lead• Technical Staff• Construction Administration Lead• Key Consultant Leads

• How many projects from Section F have listed team members worked together?

99

Page 100: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4a. Previous team collaboration

• Majority of key team members collaborating equals half of identified team

• EXAMPLE: half of team members have worked together on 5 of 10 projects

100

Page 101: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4b. LEED Project Experience

101

Page 102: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4b. LEED Project Experience• Key team members with LEED certification

(LEED AP, LEED AP BD+C)• Key team members with experience

implementing/administering LEED projects• Projects registered with USGBC• LEED certified projects• Volume/number of LEED registered/certified

projects?

102

Page 103: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4c. BIM Project Experience

103

Page 104: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4c. BIM project experience• Key team members with BIM experience• BIM training/knowledge vs. BIM experience• Depth of BIM experience

• Design• Use of 3D presentation materials• Systems modeling/analysis• Clash detection• Quantity take-offs/estimating• Shop drawings• Construction administration

104

Page 105: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4d. Team organization

105

Page 106: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

4d. Team organization• Organizational chart included• Roles and responsibilities defined:

• Owner/Agency• Contracting Authority• Key team members (identify Consultants & EDGE)

• Clear lines of communication• Main points of contact identified• Defined transition of leadership between

project phases106

Page 107: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5a. Previous team performance

107

Page 108: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5a. Previous team performance• Materials included in SOQ Sect. E, F, and H:

• Excerpts/quotes• Letters of reference• Performance evaluations

• Specificity of comments• Individuals specifically praised• Level of service provided• Date of reference provided• Individual providing references

108

Page 109: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5b. Experience with similar projects

109

Page 110: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5b. Experience with similar projects• Review Relevant Project Experience Matrix F

• How many projects have a majority of similar scopes of work?

• Also review Section H for additional information

110

Page 111: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5c. Budget and Schedule Management

111

Page 112: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5c. Budget and Schedule Management

• Review Project Management Lead Resume• Review Example Project pages• Review Section H for additional information

– Are there tables summarizing performance?– Are the performance metrics on relevant

projects?– Are the performance metrics recent?– How biased are the chosen metrics?

112

Page 113: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5d. Knowledge of Ohio Process

113

Page 114: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

5d. Knowledge of Ohio Process• Do the Project Management Lead, Project

Admin. Lead, and Construction Admin. Staff have previous knowledge of State of Ohio capital improvement processes?– Use of Standard Agreements– Use of Standard Forms– Use of Standard Processes– Use of OAKS CI

114

Page 115: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Disclosure of Past Performance

115

• Has firm been responsive to past clients?

Page 116: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

General Challenges• Lack of info. directly related to criteria• Confusing or inconsistent info. within SOQ• Incomplete forms/submission

– EDGE Statement of Intent to Contract & Perform

• Overall submission length

116

Page 117: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16@OHFacilities / #OFCConf16

Questions?

Craig Weise, [email protected] Jeff Kring, [email protected]

Page 118: OFCC Updates: OAKS CIofcc.ohio.gov/Portals/0/Documents/News-Events/OFCC...• The OAKS CI cloud based system upgraded to v16.1 on June 17. th. This was a major upgrade and involved

@OHFacilities / #OFCConf16

LUNCH !


Recommended