Office of Bridges & Structures December 1, 2017April 27, 2018 Page 1 of 10 Creating Plan Revisions – O.B.S. Version (Prior to 12-1-2015 the RA sheet was labeled 1A) Plan revisions may be needed to document changes, including a different construction method, a plan alteration, or a plan correction. DO NOT DELETE OR MOVE ANY EXISTING DETAILS, ELEMENTS, TEXT OR PLAN SHEETS when creating revisions. The revised text or details are NEVER DELETED, but rather crossed-through (strike-over) with 2 lines and then the NEW INFORMATION IS ADDED using only the Bridge Office “brgRev…..” levels. The CADD cell revision symbol “REV-TRIANGLE” (denoting which revision, i.e. 1 st , 2 nd , 3 rd ...) is placed as near as possible to the note, lines, views or dimensions that are revised. The cell is located in the Bridge Office “brgFinal.cel” cell library. The Bridge Office process calls out the use of specific Revision Levels that are to be used in CADD, this allows for the “shutting off” of the plan revisions to view the original plan details in the CADD file. The strike-over and new information is encircled with a cloud using the “brgRevAnnotation” level. Revision dates and a summarized Reason for the change are given on each detail sheet affected by the revision. Use the cell REV-TRIANGLE next to revision and the clouded note. When possible, place note in lower right corner of ALL revised and added plan sheets. If a sheet is revised and later revised again, the clouds are to be removed from the first, previous, revision corrections leaving the “strike-over”. The second, or latest, revision changes are to be the only items that are both “strike-over and clouded”. Previous Revision Current Revision
Transcript

OfficeofBridges&Structures December1,2017April27,2018

Page 1 of 10

Creating Plan Revisions – O.B.S. Version (Prior to 12-1-2015 the RA sheet was labeled 1A)

Plan revisions may be needed to document changes, including a different construction method, a plan alteration, or a plan correction. DO NOT DELETE OR MOVE ANY EXISTING DETAILS, ELEMENTS, TEXT OR PLAN SHEETS when creating revisions. The revised text or details are NEVER DELETED, but rather crossed-through (strike-over) with 2 lines and then the NEW INFORMATION IS ADDED using only the Bridge Office “brgRev…..” levels. The CADD cell revision symbol “REV-TRIANGLE” (denoting which revision, i.e. 1st, 2nd, 3rd...) is placed as near as possible to the note, lines, views or dimensions that are revised. The cell is located in the Bridge Office “brgFinal.cel” cell library. The Bridge Office process calls out the use of specific Revision Levels that are to be used in CADD, this allows for the “shutting off” of the plan revisions to view the original plan details in the CADD file. The strike-over and new information is encircled with a cloud using the “brgRevAnnotation” level. Revision dates and a summarized Reason for the change are given on each detail sheet affected by the revision.

Use the cell REV-TRIANGLE next to revision and the clouded note.

When possible, place note in lower right corner of ALL revised and added plan sheets.

If a sheet is revised and later revised again, the clouds are to be removed from the first, previous, revision corrections leaving the “strike-over”. The second, or latest, revision changes are to be the only items that are both “strike-over and clouded”.

Previous Revision Current Revision

OfficeofBridges&Structures December1,2017April27,2018

Page 2 of 10

-Revision Dimensions- If a new “revision” dimension is required then use the “Rev. Eng…..” dimension styles. These dimensions will look like a standard dimension but they are using brgRevDimensionLines and brgRevTextNormal levels. The dimension “Leader Note” style uses “TextNormal” level whereas all other dimension styles use “DimensionLines” level for display.

Revision Dimension Styles

OfficeofBridges&Structures December1,2017April27,2018

Page 3 of 10

-Revision Index Sheet- The inclusion of the REVISION plan sheet, RA, is to be added to the plan set after the Title Sheet. The brgrevision (Revision English Sheet) model can be referenced or imported into MicroStation from the brgSeed.dgn file. If there is no Title Sheet, then the RA sheet is to be placed after the Quantity Sheet. On sheet RA, a more extensive explanation and description of the plan revision should be given. The CADD model name for the Revision Sheet (SHEET NUMBER RA) is the same model name as the Title Sheet (or Quantity Sheet) with an ‘RA’ added, CCDDDDs000RA (i.e. 420399s000RA), indicating the revision sheet. This sheet (RA) will follow the Title Sheet model. If more than the single RA Revision Sheet is needed the additional Revision Sheet/s should be named RB, RC, etc. for the plan Sheet Number. The Model names for additional Revision Sheets should be named CCDDDDs000RB for the second Revision Sheet and CCDDDDs000RC for the third Revision Sheet, etc.

Example of Model name for Plan Revision Sheet RA.

The addition of Revision Sheet RA is to be added to the INDEX OF SHEETS on the Title Sheet and placed after the Title Sheet listing. The revision box on the Title Sheet is to be filled out with the revision date.

Example of plan revision information added to the Title Sheet.

OfficeofBridges&Structures December1,2017April27,2018

Page 4 of 10

Example of multiple plan revisions and revision sheets added to the Title Sheet.

Example of Plan Revision Sheet RA.

For each revision, an Engineering Seal is to be added with the Revision Date on the signature line and a listing of the revised plan sheet numbers is to be listed in MicroStation Normal Text properties (brgTextNormal level). The Title Sheet, sheet number, does not have to be shown in the listing of revised sheets (unless a change is made to the Title Sheet). The TOTAL SHEETS on the Title Sheet does not change. Changing the total sheets could conflict with the sheet numbers on the original Engineer Seal shown on the Title Sheet. The added sheets will be accounted for on the Revision Sheet RA and “signed for” by the Revision Engineer with their seal on the Revision Sheet.

OfficeofBridges&Structures December1,2017April27,2018

Page 5 of 10

Sheet RA will need the revision Engineer’s seal with the revision date and a listing of the revised sheets and any new added sheets. If a second revision occurs, the second revision Engineer’s seal is to be added to the revision sheet and detailed with the new revision date and a listing of the plan sheets affected in the second revision. Ensure the revision date matches on all sheets that are part of the same revision.

Engineer Seal

The Revision Sheet (RA) title block list’s the design number being revised. If multiple designs are in this project and a second revision occurs involving other designs, these revised design numbers need to be added to the title block to indicate all the design numbers involved in the revisions. If a second revision occurs, the new revision DATE, SHEET NUMBERS and DESCRIPTION OF REVISIONS will indicate more than one revision has occurred and separate the previous revision from the current revision. The cell named REVISED, which shows the revision date, needs to be attached in the lower right-hand corner of each revised sheet, existing and new, and including the revision sheet RA in the plan. If a second revision occurs with a different revision date, the date shown on the REVISED cell shown below is to be changed to reflect the date of the second revision. The strike-over is not to be used on the REVISED cell. The cell named REVISED is not used on the Title Sheet.

Example of REVISED cell.

OfficeofBridges&Structures December1,2017April27,2018

Page 6 of 10

-Revision Levels- The revision levels used for Bridge Office project files are provided through the level library filter called “Bridge Revisions”. The filter names are listed in the table below.

Bridge Office Levels

The Bridge Office revision levels that are to be used for placing revised elements and text on existing sheets are shown below, as viewed in MicroStation Level Manager, of the Bridge Office Revisions filter. The colors, style and weight of the levels are provided. Note the revision level ‘brgRevAnnotation’ is to be used for strike-over and clouds, and ‘brgRevTextNormal’ is to be used for the revision notes within the clouds on the revised sheets. All revision details are to use the revision levels for the appropriate material, dimension lines and text.

Plan Revisions Level Filter

OfficeofBridges&Structures December1,2017April27,2018

Page 7 of 10

-Revision Detailing- If new details are added to an existing sheet then the new details are added using only the Bridge Office “brgRev…..” levels and the Bridge Office “Rev. Eng…..” dimension styles. If a plan sheet becomes cluttered with revisions or if the revision is large, such as a pier redesign, then it would be best to void the original plan sheet and add a new revised plan sheet to allow for clear details. With all revision sheets that are new added sheet/s to a plan, an ’A’ is to be appended to the CADD Model Number, Design Sheet Number and the Plan Sheet Number. For revised sheets requiring a new detail sheet to replace the original (voided) plan sheet, use the voided model number with an ‘A’ appended to the new model number (i.e. 420399s005A). This new added sheet is to follow the voided sheet in the set of plans. If several new sheets are added but are scattered throughout the plan, they should be placed in the proper plan sheet location and numbered using the model and sheet number of the sheet they follow with an ‘A’ appended to the numbers. If more than one new additional plan sheet is needed in sequence, the other new additional sheet/s would follow the new ‘A’ sheet and would be named in the CADD Model ‘420399s005A01’, ‘420399s005A02’, etc. This will locate any new added design sheets in the correct model order in MicroStation. When a NEW sheet is added, the normal (non-revision) Bridge Office CADD levels are to be used on all new additional, or replacement sheets. The use of the revision CADD levels are needed when placing revision details to existing plan sheets. The ‘brgRevAnnotation’ and ‘brgRevTextNormal’ levels are to be used for the clouded note on all sheets.

Example of clouded note.

OfficeofBridges&Structures December1,2017April27,2018

Page 8 of 10

Example of Void Plan Revision sheet.

The word “VOID” and the “X” are placed using the proper Bridge Office revision levels.

If a later revision occurs and the ‘A’ sheets that were done with the previous revision are voided, or if additional revision sheets are added, then the replacement sheet numbers for the CADD Model Number, Design Sheet Number and Plan Sheet Numbers would be A1a, A2a (Model 420399s005A01a, 420399s005A02a) etc. Using capitalized and lower-case letters are to be adhered to when renaming revision sheets. Example CADD Model Numbering for revisions:

Original Plan Sheet; 420399s005 1st Revision Added two plan sheets after original plan sheet;

420399s005A01, 420399s005A02 2nd Revision Added two more plan sheets to the previous 5A01 plan sheet that was added from the first revision;

420399s005A01a, 420399s005A01b

Example Plan Sheet Numbering for revisions to the corresponding Models example: Original Plan Sheet; SHEET NUMBER 6 1st Revision Added two plan sheets after original plan sheet;

SHEET NUMBER 6A01, 6A02 2nd Revision Added two more plan sheets to the previous 6A01 plan sheet that was added from the first revision;

SHEET NUMBER 6A01a, 6A01b

OfficeofBridges&Structures December1,2017April27,2018

Page 9 of 10

Example Design Sheet Numbering for revisions to the corresponding Models example: Original Plan Sheet; DESIGN SHEET NO. 5 1st Revision Added two plan sheets after original plan sheet;

DESIGN SHEET NO. 5A01, 5A02 2nd Revision Added two more plan sheets to the previous 6A01 plan sheet that was added from the first revision;

DESIGN SHEET NO. 5A01a, 5A01b -Revision PDF in ProjectWise- Note: A set of only the revised sheets should be made into a multipage PDF file with the revision Engineer’s signature. Include the title sheet if there is one. Use the contract ID format, County-Route, federal control Section-Paren (CC-RRRS-PPP_Rev1_date MM-DD-YYYY).pdf. Do not use the # sign to list the Revision number, use Rev1, Rev2, etc.

Example: IMX-35-3(167)129- -02-77 would be 77-0353-167_Rev1_05-12-2014. Store the revision PDF file in ProjectWise under the contract ID sub-folder titled “Revisions” (CC-RRRS-PPP ex. 77-0353-167) in the Projects Directory. (The “Revisions” subfolder may need to be created.)

OfficeofBridges&Structures December1,2017April27,2018

Page 10 of 10

Quick Guide

Revision – The term “revision” refers to any change on the plans after the plans have been Let.  Do not delete or move any original plan details or notes, only cross out and add new details and text. 

Revision Note and Reason – Each revision is to have a REVISED note showing the date of the revision and what 

was revised and a REASON for the revision stated in a brief description. 

Revision Date ‐ The date of the revision will be on every sheet that is revised.  Ensure the revision date 

matches on all sheets that are part of the same revision. 

Revision Number – Each revision is assigned a number in sequence, starting with 1 then 2 and so on.   

Revision Symbol – A revision symbol is a Revision Number enclosed in an equilateral triangle.  Revision 

symbols shall be used to located the revision in the plans. 

Revision Symbol Location – Revision symbols shall be located as near as possible to the notes, lines, views or 

dimensions that are revised. 

Multiple Changes – All changes to a plan that are incorporated at the same time shall be identified by the 

same revision number and symbol. 

Revising a Change – Whenever a previous revision is revised again then a new revision symbol is placed next to 

the previous one. 

S27

175

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

17377

Chen

Haiping

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

HYDRAULIC DESIGN

by me or under my direct personal supervision and that I

I hereby certify that this engineering document was prepared

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

14746

Mulholland

David J.

R-37W R-36W

T-89

N

FO

X A

VE

190TH ST

HO

PE A

VE

230TH ST

PER

KIN

S A

VE

210TH ST

200TH ST

ESTH

ER A

VE

230TH ST

230TH ST

IRA A

VE

230TH ST

190TH ST

190TH ST

PER

KIN

S A

VE

NEE

DH

AM A

VE

190TH ST

GA

RD A

VE

IRA A

VE

220TH ST220TH ST

JA

CKSO

N A

VE

LEE A

VE

ESTH

ER A

VE

GA

RD A

VE

LEE A

VE

200TH ST

OTTER A

VE

MA

CE A

VE

200TH ST

210TH ST

JA

CKSO

N A

VE

200TH ST

HO

PE A

VE

FO

X A

VE

210TH ST

210TH ST

205TH ST

NEMAHA

EARLY

River

Boyer

River

D E L A W A R E

1415161718

19 20 2122

2324

252627282930

31 32 3334 35 36

46

7 8 9

13141516

1718

1920

2122 23 24

252627282930

31 32 33 3435

36

25

36

123

4

56

7 8 9 10 12

1234

9 10 11 12

D15

M43

M43

D15

D27D27

85

POP.

557

POP.

5

AREA

WILDLIFE

MARSH

KIOWAINFORMATION.

PLANS FOR TRAFFIC DATA

REFER TO INDIVIDUAL SITUATION

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:07 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S000 11x17_pdf.pltcfg

65

80

N

20

71

20

PROJECT NUMBER

R.O.W. PROJECT NUMBER

PROJECT IDENTIFICATION NUMBERLE

TTI

NG

DA

TE

REVISIONS

TOTAL SHEETS

INDEX OF SEALS

NAMESHEET NO. TYPE

PLANS OF PROPOSED IMPROVEMENTS ON THE

PRIMARY ROAD SYSTEM

IOWA DOT * OFFICE OF BRIDGES AND STRUCTURESENGLISH

NO. DESCRIPTION

INDEX OF SHEETS

1 TITLE SHEET

2

PLANS

STANDARD ROAD

PROJECT DIRECTORY NAME: 9702001098

LOCATION MAP

SOIL PROFILE SHEET

ROADWAY SHEETS

-

ESTIMATE SHEET FOR ROADWAY

ON SHEET NUMBER

STANDARD ROAD PLANS ARE LISTED

SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK ON THIS PROJECT.

SPECIFICATIONS, DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND

AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS APPLICABLE GENERAL SUPPLEMENTAL

THE IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY

UNITED STATES HIGHWAY

INTERSTATE HIGHWAY

STATE HIGHWAY

COUNTY HIGHWAY

RAILROAD

AIRPORT

BRIDGE

HYDROLOGY

STATE BOUNDARY

COUNTY BOUNDARY

TOWNSHIP LINE

SECTION LINE

ROAD NAMES

PIPELINE

INTERSTATE HIGHWAY

PRIMARY HIGHWAY-DIVIDED

PRIMARY HIGHWAY

PORTLAND CEMENT CONCRETE ROAD

ASPHALT ROAD

BITUMINOUS ROAD

GRAVEL ROAD

EARTHEN ROAD

CORPORATE BOUNDARY

UNINCORPORATED PLACE

ABBEY ROAD

LEGEND

Highway Division

ELWOOD

PROJECT NUMBER

DESIGN 116

DESIGN 116ESTIMATE SHEET -

DESIGN 116

NHSN-020-2(143)--2R-81

NHSN-020-2(143)--2R-81

SAC COUNTY

SA

C

CO

UN

TY

SAC COUNTY

9/20/2016

BRIDGE REPLACEMENT - PPCB

BRI

DG

E

RE

PL

AC

EM

EN

T - P

PC

B

OVER BOYER RIVER 1.9 MILES WEST OF US 71

NEW DUAL BRIDGES AS PART OF 4 LANE US 20 PROJECT

98-97-020-010-06

HAIPING CHEN STRUCTURAL DESIGN1

DAVID J. MULHOLLAND HYDRAULIC DESIGN

FILE NO. 30568

1

Haiping Chen

2016

David J. Mulholland

2016

7/1/2016 7/1/2016

65

30 -2

59 -31

31

DESIGN 216

DESIGN 216ESTIMATE SHEET -

DESIGN 216

/216

DE

SI

GN 116

-

SA

C

CO

UN

TY

65SHEET 5 & 35 OF

SPS.1-SPS.5

SPS.1 DENNIS L. HOOVER GEOTECHNICAL DESIGN

C.1

65 OF 59SHEETS 1 THRU

NHS

N-020-2(1

43)--2

R-81

C.1

C.1

KELLY BELL ROADWAY DESIGNC.1

REVISION SHEET

SEE REVISION SHEET RA 03-09-2017

SEE REVISION SHEET RA 03-27-2017

RA-RB

SEE REVISION SHEET RA 04-11-2017

SEE REVISION SHEET RB 04-15-2017

DESIGNER / CHECKER / DETAILER SHEET NUMBER 1DESIGN TEAM

bkloss
Highlight
bkloss
Highlight
bkloss
Text Box
EXAMPLE OF TITLE SHEET WITH 4 PLAN REVISIONS.

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:10 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S000RA example 11x17_pdf.pltcfg

LISTING OF PROJECT REVISIONS

DATE

REVISION SHEET

NUMBER

SHEET

NUMBER

SHEETDATE

RA

RA

2

DESIGN NO. 116

FILE NO. 30568

3

7

8

1003-09-2017

SAC COUNTY

NHSN-020-2(143)--2R-81

8A

03-09-2017

03-09-2017

03-09-2017

03-09-2017

03-09-2017

03-09-2017

03-09-2017

8B03-09-2017

8C03-09-2017

03-09-2017

3-9-2017

2018

SHEETS 1, RA, 2, 3, 7, 8, 8A, 8B, 8C,

8D, 9, 10

8D

9

1

1

1

1

1

1

1

1

NUMBER

REV. ITEM

1

1

NUMBER

REV. ITEMDESCRIPTION OF REVISIONS DESCRIPTION OF REVISIONS

Name

REVISION SHEET ADDED.

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

STEEL QUANTITIES. ADDED ITEM NO. 19.

CHANGED STRUCTURAL CONCRETE (BRIDGE), PILES STEEL HP10x57 AND REINFORCINGREVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CONCRETE QUANTITIES.

CHANGED PIER 2 REINFORCING STEEL (NON-COATED), PILES STEEL HP10x57 AND STRUCTURALREVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CHANGED PIER 2 FOOTING LOCATION.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

ADDED NEW PIER 2 SHEET.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

ADDED NEW SHEET, PIER 2 FOOTING DETAILS.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

ADDED NEW PIER 2 SHEET.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

REMOVE EXISTING PIER 2 FOOTING LAYOUT.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

SEPARATED PIER 1 AND 2 QUANTITIES ADDED TABLE AND ADDED ADDITIONAL STEEL NOTE.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

ADDED NEW SHEET, PARTIAL REMOVAL OF PIER 2 FOOTING.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CHANGED TYPICAL PIER TO PIER 1 AND ELEVATION NOTE TO LOOKING EAST.REVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

STEEL QUANTITIES. ADDED ITEM NO. 19.

CHANGED STRUCTURAL CONCRETE (BRIDGE), PILES STEEL HP10x57 AND REINFORCINGREVISED:2203-27-2017

203-27-2017

203-27-2017

203-27-2017

2018

Name

2

3

704-11-2017

04-11-2017

04-11-2017 3

3

3

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

STEEL QUANTITIES. ADDED ITEM NO. 19.

CHANGED STRUCTURAL CONCRETE (BRIDGE), PILES STEEL HP10x57 AND REINFORCINGREVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CONCRETE QUANTITIES.

CHANGED PIER 2 REINFORCING STEEL (NON-COATED), PILES STEEL HP10x57 AND STRUCTURALREVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CHANGED PIER 2 FOOTING LOCATION.REVISED:

03-27-2017

RE

VIS

ED:

AP

RIL 11, 2017

3

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CONCRETE QUANTITIES.

CHANGED PIER 2 REINFORCING STEEL (NON-COATED), PILES STEEL HP10x57 AND STRUCTURALREVISED:

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CHANGED PIER 2 FOOTING LOCATION.REVISED:7

8

SURVEY ERROR.

PIER 2 FOOTING MISPLACED 1.4 FT. NORTH OF PLAN ALIGNMENT DUE TO CONSTRUCTIONREASON:

CHANGED TYPICAL PIER TO PIER 1 AND ELEVATION NOTE TO LOOKING EAST.REVISED:

2018

Name

04-11-2017

SHEETS 1, RA, 2, 3, 7

SHEETS 1, RA, 2, 3, 7, 8

DESIGNER / CHECKER / DETAILER COUNTY

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

bkloss
Text Box
EXAMPLE OF 1st REVISION.
bkloss
Text Box
EXAMPLE OF 2nd REVISION.
bkloss
Text Box
EXAMPLE OF 2nd REVISION.
bkloss
Text Box
EXAMPLE OF 3rd REVISION.
bkloss
Text Box
PLAN REVISION SHEET TEMPLATE IS LOCATED IN THE "brgseed.dgn" FILE AS "brgrevision" MODEL.
bkloss
Text Box
EXAMPLE OF MULTIPLE PLAN REVISIONS ON ONE REVISION SHEET.

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:11 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S000RB example 11x17_pdf.pltcfg

LISTING OF PROJECT REVISIONS

DATE

REVISION SHEET

NUMBER

SHEET

NUMBER

SHEETDATE

RB

RB

3

DESIGN NO. 116

FILE NO. 30568

7

8

SAC COUNTY

NHSN-020-2(143)--2R-81

8A

04-15-2017

04-15-2017

04-15-2017

04-15-2017

04-15-2017

04-15-2017

2018

4

4

4

4

4

4

NUMBER

REV. ITEM

NUMBER

REV. ITEMDESCRIPTION OF REVISIONS DESCRIPTION OF REVISIONS

Name

REVISION SHEET ADDED.

RE

VIS

ED:

AP

RIL 15, 2017

04-15-2017

3A04-15-2017

EXCESSIVE CHANGES CREATED AN UNCLEAR QUANTITY SHEET.REASON:

THIS SHEET VOIDED.REVISED:

8A1

CORNER REMOVED TO ALLOW CLEARANCE FOR MSE WALL. REASON:

REMOVED 2'-0`x`2'-0 CORNER OF PIER 1.REVISED:

SHEETS 1, RB, 3, 3A, 7, 8, 8A, 8A1

THAT IS NOW VOIDED SHEET 3.

TO PROVIDE CLEAR DETAILS IN RELATION TO THE PREVIOUS HEAVILY REVISED QUANTITY SHEET REASON:

THIS SHEET ADDED.REVISED:

THIS ALLOWS FOR THE LOCATION OF WATER MAIN TO PASS THROUGH THE PIER.REASON:

ADDED 1'-6½ HOLE TO COLUMN OF PIER 1.REVISED:

CONDITIONS.

THE ANCHOR DETAIL WAS NEEDED FOR ADDITIONAL REQUIRED PILES DO TO EXISTING SOIL REASON:

PILE UPLIFT ANCHOR DETAIL WAS ADDED.REVISED:

WOOD PILES WERE ADDED TO FOOTING DUE TO EXISTING SOIL CONDITIONS.REASON:

THIS SHEET ADDED.REVISED:

DESIGNER / CHECKER / DETAILER COUNTY

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

bkloss
Text Box
EXAMPLE OF 4th REVISION.

810116S001

ESTIMATED BRIDGE QUANTITIES

ITEM NO. ITEM CODE ITEM UNIT TOTAL AS BUILT QUAN.

1 2104-2710020 CY 1,083.0EXCAVATION, CLASS 10, CHANNEL

2 2402-2720000 CY 236EXCAVATION, CLASS 20

3 2402-2721000 CY 271EXCAVATION, CLASS 21

4 2403-0100010 CY 638.2STRUCTURAL CONCRETE (BRIDGE)

5 2404-7775000 LB 26,164REINFORCING STEEL

6 2404-7775005 LB 107,045REINFORCING STEEL, EPOXY COATED

7 2404-7775009 LB 4,610REINFORCING STEEL, STAINLESS STEEL

8 2407-0562890 EACH 6BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB90

9 2407-0562905 EACH 12BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB105

10 2408-7800000 LB 6,019STRUCTURAL STEEL

11 2414-6424110 LF 642.0CONCRETE BARRIER RAILING

12 2501-0201057 LF 5,810PILES, STEEL, HP 10 X 57

13 2501-6335010 LF 140PREBORED HOLES

14 2507-2638650 SY 15.3BRIDGE WING ARMORING - EROSION STONE

15 2507-3250005 SY 1,732.0ENGINEERING FABRIC

16 2507-6800061 TON 1,666.0REVETMENT, CLASS E

17 2507-8029000 TON 20.0EROSION STONE

18 2533-4980005 LS 1.00MOBILIZATION

ESTIMATE REFERENCE INFORMATION

ITEM CODE DESCRIPTIONITEM

NO.

10 2408-7800000 STRUCTURAL STEEL

INCLUDES INTERMEDIATE DIAPHRAGM WEIGHT AND DRAIN WEIGHT.

11 2414-6424110 CONCRETE BARRIER RAILING

IF PLACEMENT OF CONCRETE IS DONE BY THE SLIPFORMING METHOD, CLASS BR CONCRETE IS REQUIRED. CAST-IN-PLACE

BARRIER RAILS SHALL USE CLASS C MIX. PRICE BID FOR THIS ITEM SHALL INCLUDE THE COST OF CAST-IN-PLACE FORMS

IF REQUIRED FOR PLACEMENT OF THE CONCRETE.

12 2501-0201057 PILES, STEEL, HP 10 X 57

- -

13 2501-6335010 PREBORED HOLES

- -

14 2507-2638650 BRIDGE WING ARMORING - EROSION STONE

INCLUDES FURNISHING AND PLACING ENGINEERING FABRIC, EROSION STONE, AND ALL REQUIRED EXCAVATING, SHAPING AND COMPACTING

FOR WING ARMORING.

15 2507-3250005 ENGINEERING FABRIC

ENGINEERING FABRIC SHALL BE MATERIAL AS SPECIFIED FOR EMBANKMENT EROSION CONTROL IN ACCORDANCE WITH

ARTICLE 4196.01,B,3, OF THE STANDARD SPECIFICATIONS.

16 2507-6800061 REVETMENT, CLASS E

ESTIMATED AT 1.6 TON/CY.

17 2507-8029000 EROSION STONE

ESTIMATED AT 1.6 TON/CY.

18 2533-4980005 MOBILIZATION

- -

ESTIMATE REFERENCE INFORMATION

ITEM CODE DESCRIPTIONITEM

NO.

1 2104-2710020 EXCAVATION, CLASS 10, CHANNEL

- -

2 2402-2720000 EXCAVATION, CLASS 20

- -

3 2402-2721000 EXCAVATION, CLASS 21

- -

4 2403-0100010 STRUCTURAL CONCRETE (BRIDGE)

INCLUDES COST OF FURNISHING AND PLACING SPLASH BASINS (INCLUDING EXCAVATION, EROSION STONE OR CLASS E REVETMENT, AND

ENGINEERING FABRIC).

INCLUDES ALL PREFORMED EXPANSION JOINT FILLER REQUIRED.

INCLUDES FURNISHING AND PLACING SUBDRAIN (INCLUDING EXCAVATION), FLOODABLE BACKFILL, POROUS BACKFILL,

GEOTEXTILE FABRIC, WATER FLOODING, AND SUBDRAIN OUTLET AT ABUTMENTS AND TOE OF BERM.

INCLUDES FURNISHING AND PLACING 3 INCH DIAMETER PVC PLASTIC PIPE AND EXPANDING FOAM IN THE ABUTMENT WINGS.

5 2404-7775000 REINFORCING STEEL

- -

6 2404-7775005 REINFORCING STEEL, EPOXY COATED

- -

7 2404-7775009 REINFORCING STEEL, STAINLESS STEEL

- -

8 2407-0562890 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB90

INCLUDES PIER AND ABUTMENT BEARING MATERIAL.

INCLUDES CONTRACTOR FILLING OUT BEAM NUMBERS BY LOCATION AND BEAM SEAT ELEVATIONS IN "PPC BEAM DATA SPREADSHEET"

AND FORWARDING ELECTRONIC SPREADSHEET TO THE ENGINEER.

9 2407-0562905 BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTB105

INCLUDES PIER AND ABUTMENT BEARING MATERIAL.

INCLUDES CONTRACTOR FILLING OUT BEAM NUMBERS BY LOCATION AND BEAM SEAT ELEVATIONS IN "PPC BEAM DATA SPREADSHEET"

AND FORWARDING ELECTRONIC SPREADSHEET TO THE ENGINEER.

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/22/2017 12:59:14 PM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S001 11x17_pdf.pltcfg

ESTIMATED QUANTITIES

2

6,020

645.1

19 2401-6745354 REMOVAL OF CONCRETE FOOTINGS, AS PER PLAN EACH 1

27,578

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REINFORCING STEEL QUANTITIES. ADDED ITEM NO. 19.

CONCRETE (BRIDGE), PILES STEEL HP10x57 AND

REVISED: 03-09-2017 CHANGED STRUCTURAL

19 2401-6745354

- -

REMOVAL OF CONCRETE FOOTINGS, AS PER PLAN

1

1

1

2

2

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REINFORCING STEEL QUANTITIES. ADDED ITEM NO. 19.

CONCRETE (BRIDGE), PILES STEEL HP10x57 AND

REVISED: 03-27-2017 CHANGED STRUCTURAL

2

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REINFORCING STEEL QUANTITIES. ADDED ITEM NO. 19.

CONCRETE (BRIDGE), PILES STEEL HP10x57 AND

REVISED: 04-11-2017 CHANGED STRUCTURAL

3

3

3

RE

VIS

ED:

AP

RIL 11, 2017

28,556

6,100

670.5

28,560

6,143

675.0

ITEM NO.

4

5

12

TOTAL

1

1

DESIGNER / CHECKER / DETAILER COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 3 REVISIONS ON THIS SHEET.

810116S002

REVISI

ON EXAM

PLE

VOID

VOID

VOID

VOID

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:14 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S002 11x17_pdf.pltcfg

3

SUMMARY QUANTITIES SHEET

23 2,415

6,020

97.4

645.1

14,424

27,578

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

STRUCTURAL CONCRETE QUANTITIES.

STEEL (NON-COATED), PILES STEEL HP10x57 AND

REVISED: 03-09-2017 CHANGED PIER 2 REINFORCING

11

1

1 1

1

1

1

2 3

23

3

3

2

2

3

3

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

STRUCTURAL CONCRETE QUANTITIES.

STEEL (NON-COATED), PILES STEEL HP10x57 AND

REVISED: 04-11-2017 CHANGED PIER 2 REINFORCING

RE

VIS

ED:

AP

RIL 15, 2017

ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION SURVEY

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

STRUCTURAL CONCRETE QUANTITIES.

STEEL (NON-COATED), PILES STEEL HP10x57 AND

REVISED: 03-27-2017 CHANGED PIER 2 REINFORCING

323

2,420

6,025

2,452

6,032

242

26

645.7

98.02

647.0

101.5 14,429

27,5852

27,593

14,443

4

QUANTITY SHEET.

REASON: EXCESSIVE CHANGES CREATED CONFUSING

REVISED: 04-15-2017 THIS SHEET VOIDED.

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 4 REVISIONS ON THIS SHEET. THIS SHEET BECAME EXCESSIVELY CLUTTERED WITH REVISIONS. THEREFORE IS WAS VOIDED AND A NEW REPLACEMENT SHEET WAS CREATED.

810116S002A

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:25 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S002A 11x17_pdf.pltcfg

SUMMARY QUANTITIES SHEET

RE

VIS

ED:

AP

RIL 15, 2017

LOCATION

PIER #1

PIER #2

TOTAL (CU. YDS.)

WEST ABUTMENT

EAST ABUTMENT

LOCATION LOCATION

TOTAL (LBS.)TOTAL (CU. YDS.)

CONCRETE

STRUCTURAL

CONCRETE

HPC STRUCTURAL

REINFORCING STEEL

NON-COATED

REINFORCING STEEL

EPOXY COATED

REINFORCING STEEL

STAINLESS STEEL

EXCAVATION

CLASS 20

SUMMARY OF CONCRETE QUANTITIES SUMMARY OF REINFORCING STEEL SUMMARY OF EXCAVATION

LOCATION

PIER #1

PIER #2

NUMBER

WEST ABUTMENT

EAST ABUTMENT

TYPE

SUBSTRUCTURE

(LIN. FT.)

LENGTH

(LIN. FT.)

TOTAL

SUMMARY OF FOUNDATIONS

FOUNDATION TYPE

STUB ABUTMENT

STUB ABUTMENT HP10x57

HP10x57 9

10

36

32HP10x57

HP10x57

FRAME PIER

FRAME PIER

EXCAVATION

CLASS 10

- -

- -

-

-

40'

40' 400'

360'

1,255

1,261

** INCLUDES ABUTMENT, PIER DIAPHRAGMS AND ABUTMENT WINGS

BARRIER RAIL - TWO RAILS

BARRIER RAIL END SECTION

PIER #1

PIER #2

ABUTMENT WINGS

PIER #1

PIER #2 90.5

90.5

9,886

1,064768

12,843

12,843

7.6 ABUTMENT WINGS 792

BARRIER RAIL END SECTION 2.6

457.0 216 96,041

3,842BARRIER RAIL - TWO RAILS 64.6

** INCLUDES ABUTMENT, PIER DIAPHRAGMS AND ABUTMENT WINGS

BRIDGE DECK + ABUT. & PIER DIAPHRAGMS ** BRIDGE DECK + ABUT. & PIER DIAPHRAGMS **

12,050 107,045481050,000 2300

3A

QUANTITY SHEET.

IN RELATION TO PREVIOUS HEAVILY REVISED

REASON: TO PROVIDE CLEAR DETAIL SHEET

REVISED: 04-15-2017 THIS SHEET ADDED.

4

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF NEW ADDED PLAN REVISION SHEET.

810116S006REVI

SION

EXAMPLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:33 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S006 11x17_pdf.pltcfg

VA

RIE

S

44'-

2

3'-0

1'-61'-6

10'-6

5'-35'-3

91'-0 ( ALONG TANGENT )

14'-

09'-

0

23'-

0

10'-6

5'-35'-3

14'-

09'-

0

23'-

0

107'-0 ( ALONG TANGENT )

24'-

719'-

7

VA

RIE

S

44'-

2

1'-6 1'-6

3'-0

106'-0 ( ALONG TANGENT )

304'-0 | - | ABUTMENT BEARING ( ALONG TANGENT )

24'-

719'-

791'-3 ( ALONG MAINLINE ) 107'-1Π( ALONG MAINLINE ) 106'-0 ( ALONG MAINLINE )

10'-

1‰

15'-

25'-

6

2'-

02'-0 8'-6

21'-

0

STAKING DIAGRAM

7

RE

VIS

ED:

AP

RIL 15, 2017

1

45.94' LT.

12452+49.77

STATION

46.07' LT.

12453+41.03

STATION

46.12' LT.

12454+48.16

STATION

1 0°29'30.73" 1 0°09'54.43"

12453

+00

12454

+00

12455

+00

STAKING DIAGRAM

W.B. US 20

ROADWAY

| APPROACH

BRG.

ABUTMENT

| WEST

| PIER 1 | PIER 2

CURVE

HORIZONAL

US 20

MAINLINE

46.12' RT

12455+54.16

STATION

W.B. US 20

ROADWAY

| APPROACH

BRG.

ABUTMENT

| EAST

12453+87.15

PT STA.

LT

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REVISED: 03-09-2017 CHANGED PIER 2 LOCATION.

1

1

2

11'-0

5'-6 5'-6

SURVEY ERROR.

REASON: PIER 1 FOOTING SIZE CHANGE DUE TO

REVISED: 03-27-2017 CHANGED PIER 2 LOCATION.

3

FOOTING

ORIGINAL

FOOTING

ORIGINAL45'-

0

25'-

5

45'-

0

25'-

5

3

3

3

3

REASON: ADDED SIDEWALK TO BRIDGE.

TO THE NORTH.

REVISED: 04-11-2017 LENGTHEN ABUTMENTS 10"

NORMAL TO MAINLINE OF US 20.

OF ABUTMENT OR PIER AND A LINE

ANGLE MEASURED BETWEEN CENTERLINE

OF US 20 WESTBOUND ROADWAY.

ARE NORMAL TO TANGENT OF CENTERLINE

ALL ABUTMENT AND PIER CENTERLINES

4

FOR MSE WALL.

REASON: CORNER REMOVED TO ALLOW CLEARANCE

CORNER OF PIER 1.

REVISED: 04-15-2017 REMOVED 2'-0`x`2'-0

1

24

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 4 REVISIONS ON THIS SHEET.

810116S007

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

EXAMPLE

REVISI

ON

8/22/2017 7:50:15 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007 11x17_pdf.pltcfg

42'-0

1'-

91'-

9

3'-

6

3‰

3‰

8 8 1'-01'-0 1'-9

2'-6

3

4'-

03'-

011'-

04'-

0

22'-

0

1'-

0

6

5

6

5

22 SPA. @ 1'-0 = 22'-0, 23`-`5f1

3'-

0

66

10

SP

A.

@ 1'-

0

= 10'-

0

1'-7

12'-3 3

1'-0

1'-09

6`@`0'-6

61'-0

3'-

0

1'-

61'-

6

17'-0

1'-6 7'-0 7'-0 1'-6

3„

TO |

3'-6

3'-93'-03'-9

10'-6

33

33

10 SPA. @ 1'-0 = 10'-0, 11`-`5f2 1'-

03

33

23'-0

2'-55 BEAM SPACES @ 7'-5‰(}) = 37'-22'-5

18'-623'-6

12 SPA. @ 10 = 10'-0, 13`-`8g2

96

1'-6

1'-0 3

6 SPA. @ 1'-0

38 SPA. @ 7 = 22'-2; 39`-`8g1

5'-

10

MI

N.

1'-0 1'-0

6 SPA.`@ 1'-0 8 SPA.`@ 0'-9

8 SPA.@ 0'-9

14 SPA. @ 1'-0 = 14'-0`;`9d1 & 9d2 SPCG.

6`@`0'-6

3E

Q.

SP

A.

6'-

0

3'-0

edcba

8

LINE F

BEAM

4 - 5

m1

(TYP.)

UNDER BEAMS B, C, D & E.

PLACE MAT OF 5m1 & 5n1 BARS

NOTE:

PIL

E

O

F

TO

P

( LOOKING NORTH )

B0TT. OF FOOTING

TOP OF FOOTING

6

1

(TY

P.)

MI

N.

LA

P

LA

P (T

YP.)

44-

5e1

&

22-

5e2

(TYP.)

MIN. LAP

AA

LINE E

BEAM

=6'-0; 5c4=3'-0; 5c35c2 5c5=6'-0; 5c1

SECTION THRU STEM

"d" B

AR

S

END ELEVATION

PIL

E

O

F

TO

P

B0TT. OF FOOTING

TOP OF FOOTING

SINGLE HOOP

CC

LINE A

BEAM

LINE D

BEAM

LINE C

BEAM LINE B

BEAM

KEYWAY (TYP.)

2x8 BEVELED

11a1

PIER CAP PLAN

5c

5c

| PIER CAP

| PIER CAP

ROADWAY

| APPROACH

| PIER CAP

R=1'-6

ABOUT | PIER

SYMMETRICAL

5e2

5e1

9d1

9d2

(LOW STEP)

ELEV. A ELEV. C ELEV. E

5m1

ELEV. B ELEV. D

11a1

5c4

5c3

5c1

5c2

8g1 8g2

5f2

5f1 9d1

HOOP

DOUBLE

5c5

8a2

8a3

8a4

6b1

9d2

5n1

5e2 5e1

KEYWAY

BEVELED

2x8x14'-0

KEYWAY

BEVELED

2x8x14'-0

ELEV. F

5f1

8g1

CAP

| PIER

8a2

11a1

8g2

5f2

6b1

BOTT. FTG. ELEV.

POINT

STEP

a

1311.70

1311.85

1312.00

1312.09

1311.95

1311.80

ELEV. B

ELEV. A

ELEV. C

ELEV. D

ELEV. E

ELEV. F

b

c

d

e

1•

1289.70

PIER 2

PIER 2

1312.20

1312.35

1312.50

1312.59

1312.45

1312.30

1•

1290.20

PIER 1

PIER 1

PIER DETAILS

BB

DOUBLE HOOPDBL HOOPD.H.

3`@`6

PIER ELEVATION

PIER CAP

ABOUT |

SYMMETRICAL

SECTION B-B, SECTION C-C AND FOOTING LAYOUT.

SEE DESIGN SHEET NUMBER 08 FOR SECTION A-A,

5c1

=6'-0; 5c4

DOUBLE HOOP

=3'-0; 5c3DBL HOOP

=6'-0; 5c1

SINGLE HOOP

5c

PIER STEPS

TABLE OF

ELEVATIONS

TABLE OF PIER

5e1

PIER 1

PIER 1

PIER 1( LOOKING EAST )

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

PIER 1 AND ELEVATION NOTE TO LOOKING EAST.

REVISED: 03-09-2017 CHANGED TYPICAL PIER TO

RE

VIS

ED:

AP

RIL 15, 2017

2•

1312.43

1312.67

1312.53

1312.38

1312.28

1312.58

DETAILS SHEET FOR DETAILS

ABUT. & PIER DIAPHRAGM

NEOPRENE BRG. PADS, SEE

9d1 & 9d2

5 EQ. SPA.`

4`-`5n1

1'-6½

THROUGH.

REASON: LOCATION FOR WATER MAIN PASS

PIER 1 COLUMN.

REVISED: 04-15-2017 ADDED 1'-6½ HOLE TO

REASON: DUE TO CONSTRUCTION SURVEY ERROR.

STEP ELEVATIONS.

REVISED: 03-27-2017 CHANGED PIER 1 POINT AND

11

2

4

1

4

1

1

2

2

4

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 3 REVISIONS ON THIS SHEET.

810116S007A

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:49 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007A 11x17_pdf.pltcfg

23'-0

10'-

6

23'-0

4'-

0

3'-0 REMOVAL

3'-0 REMOVAL

5'-

35'-

3

11'-6 11'-6

1'-6

1'-6

93

1'-0

PIER 2 FOOTING REMOVAL

REMOVAL OF CONCRETE

PIER 2 FOOTING ELEVATION

PIER 2 PLAN

CONCRETE REMOVAL LIMIT

CONCRETE REMOVAL LIMIT

BARS AS SHOWN

TRIM EXISTING 5f2

BAR TO 1'-6 MIN.

TRIM EXISTING 5f2

(5f1&8g1)

BARS AS SHOWN

~ REMOVE LOOSE

APPROVED BY THE ENGINEER.

INCORPORATED INTO THE EXISTING FOOTING AS

~ LOOSE BARS 5f1 & 8g1 MAY BE CLEANED AND

NEW WORK (U.A.C.)

EXISTING BARS INTO

INCORPORATE

PROTECT AND

5f1 BARS AS SHOWN

~ REMOVE LOOSE

8g1 BARS AS SHOWN

~ REMOVE LOOSE

BARS AS SHOWN

TRIM EXISTING 5f2

FOOTING

| PIER

| PIER FOOTING

NEW WORK U.A.C. (TYP.)

EXISTING 9d1 BARS INTO

PROTECT AND INCORPORATE

U.A.C. (TYP.)

INTO NEW WORK

EXISTING PILES

INCORPORATE

PROTECT AND

8A

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REVISED: 03-09-2017 THIS SHEET ADDED.

INTO NEW WORK U.A.C.(TYP.)

EXISTING 8g2 & 5f2 BARS

PROTECT AND INCORPORATE

PILE UPLIFT ANCHOR DETAIL(TYPICAL FOR ALL CORNER PIER PILES)

ALT. ANCHOR ROD

THE STANDARD SPECIFICATIONS IN THE SAME LOCATION AS THE STUDS.

SHALL BE DRILLED OR PUNCHED IN ACCORDANCE WITH SECTION 2408 OF

ANCHOR ROD WITH (4) A563 GRADE A HEX NUTS MAY BE USED. THE HOLE

IN LIEU OF TWO STUDS, ONE ‡"½ x 1'-0 LONG, THREADED F1554 GRADE 36

RE

VIS

ED:

AP

RIL 15, 2017

PIER FOOTING

BOTTOM OF

HP10x57

PILE WEB

| PILE

STUD WELD TO WEB

‡"½ x 4" HEADED

TRIMMED TOP OF PILE

REQUIRED PILES.

REASON: ANCHOR DETAIL NEEDED FOR ADDITIONAL

DETAIL ADDED.

REVISED: 04-15-2017 PILE UPLIFT ANCHOR

4

4

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 2 REVISIONS ON THIS SHEET.

810116S007A1

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:51 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007A1 11x17_pdf.pltcfg

23'-0

10'-

6

23'-0

4'-

0

3'-0 REMOVAL

3'-0 REMOVAL

5'-

35'-

3

11'-6 11'-6

1'-6

1'-6

PIER 2 FOOTING REMOVAL

PIER 2 FOOTING ELEVATION

PIER 2 PLAN

CONCRETE REMOVAL LIMIT

CONCRETE REMOVAL LIMIT

BARS AS SHOWN

TRIM EXISTING 5f2

BAR TO 1'-6 MIN.

TRIM EXISTING 5f2

(5f1&8g1)

BARS AS SHOWN

~ REMOVE LOOSE

NEW WORK (U.A.C.)

EXISTING BARS INTO

INCORPORATE

PROTECT AND

5f1 BARS AS SHOWN

~ REMOVE LOOSE

8g1 BARS AS SHOWN

~ REMOVE LOOSE

BARS AS SHOWN

TRIM EXISTING 5f2

FOOTING

| PIER

| PIER FOOTING

NEW WORK U.A.C. (TYP.)

EXISTING 9d1 BARS INTO

PROTECT AND INCORPORATE

U.A.C. (TYP.)

INTO NEW WORK

EXISTING PILES

INCORPORATE

PROTECT AND

INTO NEW WORK U.A.C.(TYP.)

EXISTING 8g2 & 5f2 BARS

PROTECT AND INCORPORATE

RE

VIS

ED:

AP

RIL 15, 2017

8A1

FOR ADDITIONAL SUPPORT.

REASON: WOOD PILES WERE ADDED TO FOOTING

REVISED: 04-15-2017 THIS SHEET ADDED.

4

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

810116S007B

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:54 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007B 11x17_pdf.pltcfg

25'-

6

VA

RIE

S7'-

0

44

3'-6

3• 3•

43 SPA103 SPA4

3• 3•

7'-

0

44

3'-6

3• 3•

43 SPA103 SPA4

3• 3•

44

3• 3•

1'-

03 S

PA.

@ 1'-

0

= 3'-

0V

ARIE

S

3'-6

43 SPA103 SPA4

1'-010†1'-0

1'-010†1'-0

1'-010†1'-0

10'-6

2'-9 2'-6 2'-6 2'-9

20'-

05'-

6

NE

W

CO

NS

TR

UC

TI

ON

1'-

62'-

62'-

65'-

01'-

33'-

92'-

62'-

62'-

61'-

6

2'-

1'-

05 S

PA.

@ 1'-

0

= 5'-

04

1'-

05 S

PA.

@ 1'-

0

= 5'-

04

3 EQ. SPA.3 EQ. SPA.

SECTION A-A SECTION B-B

PILES REQUIRED AT PIER NO. 2

23 - HP10x57 STEEL BEARING

5c1

8a2

8a3

8a4

6b1

11a1

STEP

LOW

@4=1'-0 @4=1'-0

5n1

5m1

6b1

8a2

8a3

8a4

6b1

11a1

STEP

LOW

@4=1'-0 @4=1'-0

5n1

5m1

6b1

5c

8a2

8a3

6b1

11a1

STEP

LOW

6b1

5c

@4=1'-0 @4=1'-0

SECTION C-C

5m1

RE

VIS

ED:

MA

RC

H

9, 2017

PIER 2 DETAILSPIER 2 FOOTING LAYOUT

.SECTION C-C AND SECTION B-B

, SECTION A-ALOCATION OF

SEE DESIGN SHEET 07D FOR

HP10x57 PILE

ADDITIONAL

SPACING

FOOTING

| PIER

FOOTING

| PIER

PIL

E

SP

ACI

NG

RDWY.

| W.B.

8B

PILING DRIVE VERTICALLY

HP10x57 STEEL BRG.

2 ADDITIONAL 105'-0

FOOTING. BATTER PILE 1:4 IN DIRECTION SHOWN.

PILE DIMENSIONS SHOWN ARE AT BOTTOM OF

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REVISED: 03-09-2017 THIS SHEET ADDED.

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

810116S007C

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:56 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007C 11x17_pdf.pltcfg

25'-6

10'-

6

25'-6

4'-

0

4 SPA. @ 1'-0 = 4'-0 1'-0

78 SPA. @ 7 = 4'-8

10'-

6

33

3'-0

5'-6

10'-

6

3'-

93'-

03'-

9

3„

TO |

3'-03'-0 19'-6 COLUMN STEM

5'-6 NEW CONCRETE

5'-6 WIDENED FOOTING

10'-1‰15'-4Ž

2'-7Ž

20'-0 EXISTING FOOTING

10

SP

A.

@ 1'-

0

= 10'-

0; 11 - 5f

3* (T

OP)

&

5'-6 WIDENED FOOTING

8

8C

RE

VIS

ED:

MA

RC

H

9, 2017

PIER 2 FOOTING REPAIR

8g1*

8g3*

5f3*9d2*

9d1

5f1*

5 - 5f1*

9 - 8g1*

9d1*

9d2*

5e1 5e2 5e1*5e1

PIER 2 PLANCAP NOT SHOWN

PIER 2 FOOTING ELEVATION

PART PIER 2 PLANPILES, FOOTING LONGIT. AND TRANS. BARS NOT SHOWN

W.B. US 20

| APPROACH ROADWAY

| PIER 2

12 S

PA

@ 10

= 10'-

0; 13 - 8g

3*

"d" B

AR

S (T

YP.)

5f1

8g1

CONST. JT.

KEYWAY

2x8x1'-6

5e2 5e15e1 9d2

9d1*

5e3*

5e1

5f2

8g2

5e3*5e2

5e1 5e15e1 5e1

9d2 9d1

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

FOOTING DETAILS.

REVISED: 03-09-2017 THIS SHEET ADDED, PIER 2

5e3*

5e2

9d1 9d2

5e1

& FOOTING

| REVISED COLUMN

9d1* & 9d2*

5 EQ. SPA.

UPDATED REINFORCING STEEL TABLE.

PROVIDED. SEE DESIGN SHEET 9 FOR

ADDITIONAL REINFORCING BARS TO BE

* NOTE:

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

810116S007D

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:48:58 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S007D 11x17_pdf.pltcfg

42'-0

1'-

91'-

9

3'-

6

3‰

3‰

8 8 1'-01'-0 1'-9

2'-6

3

4'-

03'-

011'-

04'-

0

22'-

0

1'-

0

6

5

1'-0

7

19 SPA. @ 1'-0 = 19'-0, 20`-`5f1

3'-

0

66

10

SP

A.

@ 1'-

0

= 10'-

0

1'-0

1'-09

6`@`0'-6

61'-0

3'-

0

1'-

61'-

6

19'-6

3„

TO |

3'-6

10'-6

33

33

10 SPA. @ 1'-0 = 10'-0, 11`-`5f3 1'-

0

33

25'-6

2'-55 BEAM SPACES @ 7'-5‰(}) = 37'-22'-5

18'-623'-6

12 SPA. @ 10 = 10'-0, 13`-`8g3

6`@`0'-6

96

1'-6

1'-0 3

6 SPA. @ 1'-0

33 SPA. @ 7 = 19'-3; 34`-`8g1

5'-

10

MI

N.

1'-0 1'-0

3'-03'-0

1'-6 8'-3 8'-3 1'-6

5'-6

1'-7

11'-1‰

11'-4Ž

7

1'-0

8 SPA. @ 7

4 SPA. @ 1'-0

2'-7Ž

3

8

2'-7Ž

14 SPA. @ 1'-0 = 14'-0`;`9d1 & 9d2 SPCG.

8 SPA.@ 0'-9

6 SPA.`@ 1'-0 8 SPA.`@ 0'-9

3E

Q.

SP

A.

edcba

PIER 2 DETAILS

RE

VIS

ED:

MA

RC

H

9, 2017

LINE F

BEAM

4 - 5

m1

(TYP.)

UNDER BEAMS B, C, D & E.

PLACE MAT OF 5m1 & 5n1 BARS

NOTE:

PIL

E

O

F

TO

P

B0TT. OF FOOTING

TOP OF FOOTING

6

1

(TY

P.)

MI

N.

LA

P

LA

P (T

YP.)

(TYP.)

MIN. LAP

AA

LINE E

BEAM

=6'-0; 5c4=3'-0; 5c35c2 5c5=6'-0; 5c1

SECTION THRU STEM

END ELEVATION

PIL

E

O

F

TO

P

B0TT. OF FOOTING

TOP OF FOOTING

SINGLE HOOP

CC

LINE A

BEAM

LINE D

BEAM

LINE C

BEAM LINE B

BEAM

KEYWAY (TYP.)

2x8 BEVELED

11a1

5c

5c

9d1

9d2

(LOW STEP)

ELEV. A ELEV. C ELEV. E

5m1

ELEV. B ELEV. D

11a1

5c4

5c3

5c1

5c2

5f2

HOOP

DOUBLE

5c5

8a2

8a3

8a4

6b1

9d2

5n1

KEYWAY

BEVELED

2x8x14'-0

KEYWAY

BEVELED

2x8x14'-0

ELEV. F

5f1*

8g1*

8a2

11a1

6b1

BOTT. FTG. ELEV.

POINT STEP

a 1311.70

1311.85

1312.00

1312.09

1311.95

1311.80

ELEV. B

ELEV. A

ELEV. C

ELEV. D

ELEV. E

ELEV. F

b

c

d

e

1•

1289.70

PIER 2PIER 2

BB

DOUBLE HOOPDBL HOOPD.H.

3`@`6

5c1

=6'-0; 5c4

DOUBLE HOOP

=3'-0; 5c3DBL HOOP

=6'-0; 5c1

SINGLE HOOP

5c

PIER STEPS

TABLE OF

ELEVATIONS

TABLE OF PIER

5f1

8g2

8g1

PIER 2 ELEVATION( LOOKING EAST )

PIER 2 CAP PLAN

PIER 2 CAP

ABOUT |

SYMMETRICAL

| PIER 2 CAP W.B. US 20

| APPROACH ROADWAY

W.B. US 20

| APPROACH ROADWAY

5f3*

8g3*

8g3*

44-

5e1, 22-

5e2

&

11-

5e3

6b1

9d1

9d1*

9d2*

5f1*

8g1*

5f3*

5e1 5e1*

| PIER 2

FOOTING/COLUMN

| PIER 2

| PIER 2

| REVISED STEM

| PIER 2

"d" B

AR

S (T

YP.)

8D

5e15e1

5e2

5e1*

5e3*

5e2 5e2

5e3*

5`-`5f1*

= 4'-0;

9`-`8g1*

= 4'-8;

WIDENED FOOTING

W.B. US 20

ROADWAY

| APPROACH

SECTION B-B, SECTION C-C AND FOOTING LAYOUT.

SEE DESIGN SHEET NUMBER 07B FOR SECTION A-A,

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REVISED: 03-09-2017 THIS SHEET ADDED.

DETAILS SHEET FOR DETAILS

ABUT. & PIER DIAPHRAGM

NEOPRENE BRG. PADS, SEE

UPDATED REINFORCING STEEL TABLE.

PROVIDED. SEE DESIGN SHEET 9 FOR

ADDITIONAL REINFORCING BARS TO BE

* NOTE:

4`-`5n1

9d2*

9d1* AND

5 EQ. SPA.

(TYP.)

9d1 & 9d2

5 EQ. SPA.

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

810116S008

EXAMPLE

REVISI

ON

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:49:00 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S008 11x17_pdf.pltcfg

23'-

0

10'-6

23'-

0

10'-6

VA

RIE

S7'-

0

44

3'-6

3• 3•

43 SPA103 SPA4

3• 3•

7'-

0

44

3'-6

3• 3•

43 SPA103 SPA4

3• 3•

44

3• 3•

1'-

03 S

PA.

@ 1'-

0

= 3'-

0V

ARIE

S

3'-6

43 SPA103 SPA4

1'-6 3'-9 3'-9 1'-6 1'-6 3'-9 3'-9 1'-6

1'-

62'-

62'-

65'-

05'-

02'-

62'-

61'-

6

1'-

62'-

62'-

65'-

05'-

02'-

62'-

61'-

6

1'-010†1'-0

1'-010†1'-0

1'-010†1'-0

3 EQ. SPA. 3 EQ. SPA.

1'-

05 S

PA.

@ 1'-

0

= 5'-

04

1'-

05 S

PA.

@ 1'-

0

= 5'-

04

PIER DETAILS

PIER 1 PIER 2

SECTION A-A SECTION B-B

9

PILES REQUIRED AT PIER NO. 1

19 - HP10x57 STEEL BEARING

PILES REQUIRED AT PIER NO. 2

21 - HP10x57 STEEL BEARING

PIER FOOTING LAYOUT

5c1

8a2

8a3

8a4

6b1

11a1

STEP

LOW

@4=1'-0 @4=1'-0

5n1

5m1

6b1

8a2

8a3

8a4

6b1

11a1

STEP

LOW

@4=1'-0 @4=1'-0

5n1

5m1

6b1

5c

8a2

8a3

6b1

11a1

STEP

LOW

6b1

5c

@4=1'-0 @4=1'-0

SECTION C-C

.SECTION C-C AND SECTION B-B

, SECTION A-ALOCATION OF

SEE DESIGN SHEET 07 FOR

5m1

RE

VIS

ED:

MA

RC

H

9, 2017

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

REVISED: 03-09-2017 REMOVE PIER 2 FOOTING.

FOOTING. BATTER PILE 1:4 IN DIRECTION SHOWN.

PILE DIMENSIONS SHOWN ARE AT BOTTOM OF

1

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

810116S009

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

8/14/2017 10:49:02 AM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\81020143_116.brg 810116S009 11x17_pdf.pltcfg

6

2'-

8

8'-2

2'-

11•

12'-5•

12'-1•9'-6•

6

6

6'-

8

3'-2

6

6

2'-1

6'-

8

6

2'-

8

6

3'-

11†

TO

3'-

8•

5'-

8‰

TO

4'-

6'-

7‰ - 5'-

10

2'-

8

3'-6

5'-411

PIER QUANTITIES

10

DRESSED AND BEVELED STRIP.

ALL EXPOSED CORNERS OF 90° OR SHARPER ARE TO BE FILLETED WITH A ƒ"

PLACING OF REINFORCING.

ALL BATTERED PILE SHALL BE TRIMMED TO A HORIZONAL LINE TO AID IN

BENT BAR DETAILS

D=2•

5n1

3'-2

2'-

0

2'-0

9d1

D=9

FOOTING

TOTAL - CU. YDS.

REINFORCING IS TO BE SECURELY WIRED IN PLACE BEFORE

CONCRETE IS POURED.

STEM

CAP & STEPS

PIER NO. 1 PIER NO. 2LOCATION

CONCRETE PLACEMENT QUANTITIES

D=4•

6b1

D=2•

5c1

D=2•

5c2,5c3,5c4,5c5

5c2

5c3

5c4

5c5

5e25e1

CAP HOOPS

REINFORCING STEEL TOTAL ( LBS.)

CAP, STEPS, LONGIT.

CAP, STEPS, TRANSV.

6

16

16

16

BAR LOCATION SHAPE NO. LENGTH WEIGHT

FOOTING TO COLUMN DOWEL

COLUMN VERTICAL

38

38

FOOTING, TOP, TRANSV. & LONGIT.

FOOTING, BOTT., TRANSV. & LONGIT.

23

39

5m1

5n1

8a2

11a1

5c1

9d1

9d2

5f1

8g1

CAP, TOP, LONGIT.

28a3

28a4 CAP, SIDES, LONGIT.

CAP, SIDES, LONGIT.

CAP, SIDES, LONGIT.

6b1 CAP, BOTT., LONGIT. 8

FOOTING, TOP, TRANSV. & LONGIT. 115f2

FOOTING, BOTT., TRANSV. & LONGIT. 138g2

44

22

5e1

5e2

CAP HOOPS5c2

CAP HOOPS5c3

CAP HOOPS5c4

CAP HOOPS5c5

13

16

28

36

8

35.8

20.0

34.7

90.5

35.8

20.0

34.7

90.5

D=2•

REINFORCING STEEL`-` ONE PIER

41'-8

41'-8

35'-2

27'-0

22'-0

7'-2

3'-6

20'-8

10'-7

14'-0

10'-2

10'-2

22'-8

22'-8

18'-6

VARIES

VARIES

24'-2

3'-8

VARIES

D=2•

3542

668

188

144

264

280

309

515

566

107

1367

1809

555

244

260

1059

787

58

120

13,010

8'-

7

168COLUMN TIES

COLUMN HOOPS

RE

VIS

ED:

MA

RC

H

9, 2017

23.0

1REINFORCING STEEL`-` PIER 2

CAP HOOPS

REINFORCING STEEL TOTAL ( LBS.)

CAP, STEPS, LONGIT.

CAP, STEPS, TRANSV.

6

16

16

16

BAR LOCATION SHAPE NO. LENGTH WEIGHT

FOOTING TO COLUMN DOWEL

COLUMN VERTICAL

38

38

FOOTING, TOP, TRANSV. & LONGIT.

FOOTING, BOTT., TRANSV. & LONGIT.

23

39

5m1

5n1

8a2

11a1

5c1

9d1

9d2

5f1

8g1

CAP, TOP, LONGIT.

28a3

28a4 CAP, SIDES, LONGIT.

CAP, SIDES, LONGIT.

CAP, SIDES, LONGIT.

6b1 CAP, BOTT., LONGIT. 8

FOOTING, TOP, TRANSV. & LONGIT. 115f2

FOOTING, BOTT., TRANSV. & LONGIT. 138g2

44

22

5e1

5e2

CAP HOOPS5c2

CAP HOOPS5c3

CAP HOOPS5c4

CAP HOOPS5c5

13

16

28

36

8

41'-8

41'-8

35'-2

27'-0

22'-0

7'-2

3'-6

20'-8

10'-7

14'-0

10'-2

10'-2

22'-8

22'-8

18'-6

VARIES

VARIES

24'-2

3'-8

VARIES

3542

668

188

144

264

280

309

515

566

107

1367

1809

555

244

260

1059

787

58

120

168COLUMN TIES

COLUMN HOOPS

FOOTING TO COLUMN DOWEL

COLUMN VERTICAL

10'-7

14'-0

BAR LOCATION SHAPE NO. LENGTH WEIGHT

11

11

3'-8COLUMN TIES

COLUMN HOOPS

5 10'-2

11

13

10'-2

REINFORCING STEEL`-` PIER 2 *

REINFORCING STEEL TOTAL ( LBS.)*

TOTAL ( LBS.)

5'-4

42

53

61

8

8

9

11'-2

6'-3

13,010

5e3

D=6

8e3

9d1

9d2

5e1

5e3

5f1

5f3

8g1

8g3

39.7

97.4

1,414

14,424

FOOTING, BOTT., LONGIT.

FOOTING, BOTT., TRANSV.

FOOTING, TOP, LONGIT.

FOOTING, TOP, TRANSV.

SURVEY ERROR.

OF PLAN ALIGNMENT DUE TO CONSTRUCTION

REASON: PIER 2 FOOTING MISPLACED 1.4 FT. NORTH

QUANTITIES AND ADDED DOWEL NOTE.

REVISED: 03-09-2017 SEPARATED PIER 1 AND 2

4'-

1‚

}

4'-

1‚

}

128

381

217

244

288

PIER NOTES:

PILE DESIGN NOTES:

NOTE : ALL DIMENSIONS ARE OUT TO OUT. D = PIN DIAMETER.

DESIGN SHEETS 7C & 7D.

PROVIDED FOR WIDENED FOOTING. SEE

ADDITIONAL REINFORCING BARS TO BE

* NOTE:

ANALYSIS WITH BEARING GRAPH.

EMBEDDED LESS THAN 50 FEET. CONSTRUCTION CONTROL REQUIRES A WEAP

PER PLAN UNLESS PILES REACH REFUSAL. IN NO CASE SHALL A PILE BE

TONS AT END OF DRIVE. THE PILE CONTRACT LENGTH SHALL BE DRIVEN AS

THE REQUIRED NOMINAL AXIAL BEARING RESISTANCE FOR PIERS PILES IS 154

DRIVING RESISTANCE.

AFFECT THE UPPER 9 FEET OF EMBEDDED PILE LENGTH AND CAUSE 18 KIPS OF

RESISTANCE FACTOR (PHI) OF 0.76. DESIGN SCOUR (100-YEAR) WAS ASSUMED TO

DETERMINED FROM A MIXED SOIL CLASSIFICATION AND A GEOTECHNICAL

THE NOMINAL AXIAL BEARING RESISTANCE FOR CONSTRUCTION CONTROL WAS

219 KIPS, AND A GEOTECHNICAL RESISTANCE FACTOR (PHI) OF 0.65.

MIXED SOIL CLASSIFICATION, A TOTAL FACTORED AXIAL LOAD PER PILE (PU) OF

THE CONTRACT LENGTH OF 105 FEET FOR THE PIERS PILES IS BASED ON A

1

1

1

1

1

1

COUNTY

DESIGN SHEET NO. OF DESIGN NO.FILE NO.

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

DESIGN FOR 0° SKEW

91'-0 & 106'-0 END SPANS 107'-0 INTERIOR SPAN

JULY, 2016

11630568

SAC

304'-0 x 41'-0 PRETENSIONED

PRESTRESSED CONCRETE BEAM BRIDGE

SAC COUNTY

NHSN-020-2(143)--2R-81

RADIUS=16,000'

58

STA. 12454+02.16, 46.12' LT

DESIGNER / CHECKER / DETAILER

bkloss
Text Box
EXAMPLE OF 1 REVISION ON THIS SHEET.

S27

175

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

17377

Chen

Haiping

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

HYDRAULIC DESIGN

by me or under my direct personal supervision and that I

I hereby certify that this engineering document was prepared

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

14746

Mulholland

David J.

R-37W R-36W

T-89

N

FO

X A

VE

190TH ST

HO

PE A

VE

230TH ST

PER

KIN

S A

VE

210TH ST

200TH ST

ESTH

ER A

VE

230TH ST

230TH ST

IRA A

VE

230TH ST

190TH ST

190TH ST

PER

KIN

S A

VE

NEE

DH

AM A

VE

190TH ST

GA

RD A

VE

IRA A

VE

220TH ST220TH ST

JA

CKSO

N A

VE

LEE A

VE

ESTH

ER A

VE

GA

RD A

VE

LEE A

VE

200TH ST

OTTER A

VE

MA

CE A

VE

200TH ST

210TH ST

JA

CKSO

N A

VE

200TH ST

HO

PE A

VE

FO

X A

VE

210TH ST

210TH ST

205TH ST

NEMAHA

EARLY

River

Boyer

River

D E L A W A R E

1415161718

19 20 2122

2324

252627282930

31 32 3334 35 36

46

7 8 9

13141516

1718

1920

2122 23 24

252627282930

31 32 33 3435

36

25

36

123

4

56

7 8 9 10 12

1234

9 10 11 12

D15

M43

M43

D15

D27D27

85

POP.

557

POP.

5

AREA

WILDLIFE

MARSH

KIOWAINFORMATION.

PLANS FOR TRAFFIC DATA

REFER TO INDIVIDUAL SITUATION

REVISI

ON EXAM

PLE

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

11/30/2017 5:24:54 PM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\RevisionTemplate_81020143_116.brg 810116S000 11x17_pdf.pltcfg

65

80

N

20

71

20

PROJECT NUMBER

R.O.W. PROJECT NUMBER

PROJECT IDENTIFICATION NUMBERLE

TTI

NG

DA

TE

REVISIONS

TOTAL SHEETS

INDEX OF SEALS

NAMESHEET NO. TYPE

PLANS OF PROPOSED IMPROVEMENTS ON THE

PRIMARY ROAD SYSTEM

IOWA DOT * OFFICE OF BRIDGES AND STRUCTURESENGLISH

NO. DESCRIPTION

INDEX OF SHEETS

1 TITLE SHEET

2

PLANS

STANDARD ROAD

PROJECT DIRECTORY NAME: 9702001098

LOCATION MAP

SOIL PROFILE SHEET

ROADWAY SHEETS

-

ESTIMATE SHEET FOR ROADWAY

ON SHEET NUMBER

STANDARD ROAD PLANS ARE LISTED

SPECIAL PROVISIONS SHALL APPLY TO CONSTRUCTION WORK ON THIS PROJECT.

SPECIFICATIONS, DEVELOPMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND

AND BRIDGE CONSTRUCTION, SERIES 2015, PLUS APPLICABLE GENERAL SUPPLEMENTAL

THE IOWA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAY

UNITED STATES HIGHWAY

INTERSTATE HIGHWAY

STATE HIGHWAY

COUNTY HIGHWAY

RAILROAD

AIRPORT

BRIDGE

HYDROLOGY

STATE BOUNDARY

COUNTY BOUNDARY

TOWNSHIP LINE

SECTION LINE

ROAD NAMES

PIPELINE

INTERSTATE HIGHWAY

PRIMARY HIGHWAY-DIVIDED

PRIMARY HIGHWAY

PORTLAND CEMENT CONCRETE ROAD

ASPHALT ROAD

BITUMINOUS ROAD

GRAVEL ROAD

EARTHEN ROAD

CORPORATE BOUNDARY

UNINCORPORATED PLACE

ABBEY ROAD

LEGEND

Highway Division

ELWOOD

PROJECT NUMBER

DESIGN 116

DESIGN 116ESTIMATE SHEET -

DESIGN 116

NHSN-020-2(143)--2R-81

NHSN-020-2(143)--2R-81

SAC COUNTY

SA

C

CO

UN

TY

SAC COUNTY

9/20/2016

BRIDGE REPLACEMENT - PPCB

BRI

DG

E

RE

PL

AC

EM

EN

T - P

PC

B

OVER BOYER RIVER 1.9 MILES WEST OF US 71

NEW DUAL BRIDGES AS PART OF 4 LANE US 20 PROJECT

98-97-020-010-06

HAIPING CHEN STRUCTURAL DESIGN1

DAVID J. MULHOLLAND HYDRAULIC DESIGN

FILE NO. 30568

1

Haiping Chen

2016

David J. Mulholland

2016

7/1/2016 7/1/2016

65

30 -2

59 -31

31

DESIGN 216

DESIGN 216ESTIMATE SHEET -

DESIGN 216

/216

DE

SI

GN 116

-

SA

C

CO

UN

TY

65SHEET 5 & 35 OF

SPS.1-SPS.5

SPS.1 DENNIS L. HOOVER GEOTECHNICAL DESIGN

C.1

65 OF 59SHEETS 1 THRU

NHS

N-020-2(1

43)--2

R-81

C.1

C.1

KELLY BELL ROADWAY DESIGNC.1

REVISION SHEET

SEE REVISION SHEET RA 03-09-2017

SEE REVISION SHEET RA 03-27-2017

RA-RB

SEE REVISION SHEET RA 04-11-2017

SEE REVISION SHEET RB 04-15-2017

DESIGNER / CHECKER / DETAILER

SEE REVISION SHEET RB 11-21-2017

SHEET NUMBER 1DESIGN TEAM

bkloss
Text Box
EXAMPLE OF TITLE SHEET WITH 5 PLAN REVISIONS.
bkloss
Highlight

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

REVISI

ON EXAM

PLE

DateSignature

Printed or Typed Name

Pages or sheets covered by this seal:

by me or under my direct personal supervision and that I

STRUCTURAL DESIGN

I hereby certify that this engineering document was prepared

LICENSED

PROFESSIONAL EN

GIN

EER

IOWA

of the State of Iowa.

am a duly licensed Professional Engineer under the laws

My license renewal date is December 31,

12345

Last Name

First Name

IS MEANT

TO BE

SHOWN.

THE REVI

SION

MARK-UPS

ARE

WHAT

THE PLAN

DETAILS A

RE ARBI

TRARY,

OTHER THAN

BRIDGE

DESIG

N.

REVISI

ON SHEETS

FROM AN

OFFIC

E

THIS IS S

HOWING

ADDITI

ON OF

11/30/2017 5:30:22 PM bkloss W:\Highway\Bridge\Cadd\Documentation\Plan Revisions and Examples\RevisionTemplate_81020143_116.brg 810116S000RB example 11x17_pdf.pltcfg

LISTING OF PROJECT REVISIONS

DATE

REVISION SHEET

NUMBER

SHEET

NUMBER

SHEETDATE

RB

RB

3

FILE NO. 30568

7

8

SAC COUNTY

NHSN-020-2(143)--2R-81

8A

04-15-2017

04-15-2017

04-15-2017

04-15-2017

04-15-2017

04-15-2017

2018

4

4

4

4

4

4

NUMBER

REV. ITEM

NUMBER

REV. ITEMDESCRIPTION OF REVISIONS DESCRIPTION OF REVISIONS

Name

REVISION SHEET ADDED.

04-15-2017

3A04-15-2017

EXCESSIVE CHANGES CREATED AN UNCLEAR QUANTITY SHEET.REASON:

THIS SHEET VOIDED.REVISED:

8A1

CORNER REMOVED TO ALLOW CLEARANCE FOR MSE WALL. REASON:

REMOVED 2'-0`x`2'-0 CORNER OF PIER 1.REVISED:

SHEETS 1, RB, 3, 3A, 7, 8, 8A, 8A1

THAT IS NOW VOIDED SHEET 3.

TO PROVIDE CLEAR DETAILS IN RELATION TO THE PREVIOUS HEAVILY REVISED QUANTITY SHEET REASON:

THIS SHEET ADDED.REVISED:

THIS ALLOWS FOR THE LOCATION OF WATER MAIN TO PASS THROUGH THE PIER.REASON:

ADDED 1'-6½ HOLE TO COLUMN OF PIER 1.REVISED:

CONDITIONS.

THE ANCHOR DETAIL WAS NEEDED FOR ADDITIONAL REQUIRED PILES DO TO EXISTING SOIL REASON:

PILE UPLIFT ANCHOR DETAIL WAS ADDED.REVISED:

WOOD PILES WERE ADDED TO FOOTING DUE TO EXISTING SOIL CONDITIONS.REASON:

THIS SHEET ADDED.REVISED:

DESIGNER / CHECKER / DETAILER

11-21-2017

MIT.1-MIT.4

A.1,

2018

Name

11-21-2017

SHEETS 1, RB

ACCOMODATE THE CONSTRUCTION OF THE BRIDGE PIER FOOTING.

MITIGATION REQUIRED BY THE REVISION OF THE SECTION 404 PERMIT NO. 2016-1018 IN ORDER TO

SHEET MIT.1, MIT.2, MIT.3, MIT.4 - ADD CHANNEL STRAIGHTENING DESIGN AND THE STREAM

SHEET A.1 - ADDED LISTING OF PROJECT REVISIONS AND SIGNATURE BLOCK FOR REVISIONS.REASON:

ADDED PLAN SHEETS A.1 AND MIT.1 THRU MIT.4.REVISED:

DESIGN NO. 116, 216

RE

VIS

ED:

NO

VE

MB

ER 21, 2017

COUNTY

IOWA DEPARTMENT OF TRANSPORTATION - HIGHWAY DIVISION

PROJECT NUMBER SHEET NUMBERDESIGN TEAM

bkloss
Text Box
EXAMPLE OF 5th PLAN REVISION INCLUDING NEW ADDED PLAN SHEETS FROM AN OFFICE OTHER THAN BRIDGES AND STRUCTURES.
bkloss
Text Box
EXAMPLE OF A REVISED PLAN SHEET PROVIDED FROM AN OFFICE OTHER THAN THE BRIDGE OFFICE TO BE INCLUDED IN THE BRIDGE PLANS.
bkloss
Text Box
EXAMPLE OF A REVISED PLAN SHEET PROVIDED FROM AN OFFICE OTHER THAN THE BRIDGE OFFICE TO BE INCLUDED IN THE BRIDGE PLANS.
bkloss
Text Box
EXAMPLE OF A REVISED PLAN SHEET PROVIDED FROM AN OFFICE OTHER THAN THE BRIDGE OFFICE TO BE INCLUDED IN THE BRIDGE PLANS.
bkloss
Text Box
EXAMPLE OF A REVISED PLAN SHEET PROVIDED FROM AN OFFICE OTHER THAN THE BRIDGE OFFICE TO BE INCLUDED IN THE BRIDGE PLANS.
bkloss
Text Box
EXAMPLE OF A REVISED PLAN SHEET PROVIDED FROM AN OFFICE OTHER THAN THE BRIDGE OFFICE TO BE INCLUDED IN THE BRIDGE PLANS.

Recommended