EERSTER RIVER MULTI PURPOSE SPORTS CENTRE • PROFESSIONAL TEAM • RFP/TENDER FOR PROFESSIONAL SERVICES TO DESIGN A MULTI PURPOSE SPORTS HALL. VMA –ARCHITECTS /PROJECT MANAGER OWS-STRUCTURAL & CIVIL L2K –QUANTITY SURVEYOR ICE GROUP –ELECTRICAL ENG. MAN –MECHANICAL ENG. A.GEACH –LAND SURVEYOR G.FARMER –HEALTH & SAFETY CONSULTANT. SUBMISSION OF COMPLETED TENDER DOCUMENT
Popular Tags:
71
Transcript
Page 1: OFFICE WORK 1
Page 2: OFFICE WORK 1
Page 3: OFFICE WORK 1
Page 4: OFFICE WORK 1
Page 5: OFFICE WORK 1
Page 6: OFFICE WORK 1

EERSTER RIVER MULTI PURPOSE SPORTS CENTRE

Page 7: OFFICE WORK 1

STAGE 1• RFP/TENDER FOR PROFESSIONAL SERVICESTO DESIGN A MULTI PURPOSE SPORTS HALL.

• PROFESSIONAL TEAMVMA – ARCHITECTS /PROJECT MANAGEROWS- STRUCTURAL & CIVILL2K – QUANTITY SURVEYORICE GROUP – ELECTRICAL ENG.MAN – MECHANICAL ENG.A.GEACH – LAND SURVEYORG.FARMER – HEALTH & SAFETY CONSULTANT.

SUBMISSION OF COMPLETED TENDER DOCUMENT

Page 8: OFFICE WORK 1

STAGE 2 & 3TENDER AWARD

• DESIGN CONCEPT & DESIGN DEVELOPMENT• THE BRIEFHALL 476 sqmMINOR HALL 42sqmKITCHEN 28sqmABLUTION 51sqmSEMINAR /ADMIN AREA -76sqmREFUSE ROOM - 8sqmSTORE ROOM 10sqmDISABLED TOILET 5sqmENTRANCE FOYER - 93sqmVIEWING DECK 30sqm

COORDINATION OF ALL CONSULTANTS INPUT INTO THE DESIGN.REVIEW DESIGN WITH ALL STATUTORY BODIES.

Page 9: OFFICE WORK 1
Page 10: OFFICE WORK 1
Page 11: OFFICE WORK 1
Page 12: OFFICE WORK 1
Page 13: OFFICE WORK 1
Page 14: OFFICE WORK 1

PRECEDENT STUDY

House Brebnor– Stanley Saitowitz

Page 15: OFFICE WORK 1

House Brebnor– Stanley Saitowitz

Page 16: OFFICE WORK 1

•Piazza del Campidoglio – Michelangelo Buonarroti

Page 17: OFFICE WORK 1

•Piazza del Campidoglio – Michelangelo Buonarroti

Page 18: OFFICE WORK 1
Page 19: OFFICE WORK 1
Page 20: OFFICE WORK 1
Page 21: OFFICE WORK 1
Page 22: OFFICE WORK 1
Page 23: OFFICE WORK 1
Page 24: OFFICE WORK 1
Page 25: OFFICE WORK 1
Page 26: OFFICE WORK 1
Page 27: OFFICE WORK 1
Page 28: OFFICE WORK 1
Page 29: OFFICE WORK 1
Page 30: OFFICE WORK 1
Page 31: OFFICE WORK 1
Page 32: OFFICE WORK 1
Page 33: OFFICE WORK 1
Page 34: OFFICE WORK 1
Page 35: OFFICE WORK 1
Page 36: OFFICE WORK 1
Page 37: OFFICE WORK 1
Page 38: OFFICE WORK 1
Page 39: OFFICE WORK 1
Page 40: OFFICE WORK 1
Page 41: OFFICE WORK 1
Page 42: OFFICE WORK 1
Page 43: OFFICE WORK 1

STAGE 4

• TECHNICAL DOCUMENTATION OF CONSULTING TEAM

• REVIEW THE ESTIMATED COST

• LOCAL AUTHORITY APPROVAL

Page 44: OFFICE WORK 1

• TENDER FOR CONSTRUCTION ADVERTISED

• CONTRACTOR RECOMMENDED FOR APOINTMENT

• SAFAZ (WOMAN BUILDER)

• CONTRACT ADMINISTRATION & SITE SUPERVISION

• PRACTICAL COMPLETION / WORKS COMPLETION / FINAL COMPLETION

• AS BUILT DRAWINGS –MAINTANANCE MANUAL COMPLIANCE CERTIFICATES – OCCUPATION CERTIFICATES

STAGE 5

Page 45: OFFICE WORK 1
Page 46: OFFICE WORK 1
Page 47: OFFICE WORK 1
Page 48: OFFICE WORK 1
Page 49: OFFICE WORK 1
Page 50: OFFICE WORK 1
Page 51: OFFICE WORK 1
Page 52: OFFICE WORK 1
Page 53: OFFICE WORK 1
Page 54: OFFICE WORK 1
Page 55: OFFICE WORK 1
Page 56: OFFICE WORK 1
Page 57: OFFICE WORK 1
Page 58: OFFICE WORK 1
Page 59: OFFICE WORK 1
Page 60: OFFICE WORK 1
Page 61: OFFICE WORK 1
Page 62: OFFICE WORK 1
Page 63: OFFICE WORK 1
Page 64: OFFICE WORK 1
Page 65: OFFICE WORK 1
Page 66: OFFICE WORK 1
Page 67: OFFICE WORK 1
Page 68: OFFICE WORK 1
Page 69: OFFICE WORK 1
Page 70: OFFICE WORK 1
Page 71: OFFICE WORK 1

THE END .THANK YOU