The Narragansett Bay Commission Vincent J. Mesolella One Service Road Chairman Providence, RI 02905 Raymond J. Marshall, P.E. (401) 461-8848 Executive Director (401) 461-6540 FAX
OFFICIAL MINUTES OF:
Meeting of: Long Range Planning Committee Meeting Date: April 25, 2017 Time: 8:30 a.m.
MEMBERS PRESENT: MEMBERS ABSENT: Dr. Richard Burroughs James S. Bennett Seth Handy, Esquire Mario Carlino, Committee Chairman Vincent Mesolella, NBC Chairman Ronald Leone Alan Nathan STAFF AND GUESTS PRESENT: Raymond J. Marshall, NBC Executive Director Laurie Horridge, Esq., NBC Thomas Uva, NBC Mark Thomas, NBC Karen Musumeci, NBC Karen Giebink, NBC Paul Nordstrom, NBC Jamie Samons, NBC Richard Bernier, NBC Deborah Samson, NBC Tom Brueckner, NBC Brandon Blanchard, Pare Corp. Kathryn Kelly, NBC George Palmisciano, Pare Corp. Matt Travers, Stantec Melissa Carter, Stantec Chris Feeney, Stantec Joanne Maceroni, NBC Meg Goulet, NBC Jennifer Harrington, NBC 1. Call to Order In the absence of the Long Range Planning Committee Chairman Mario Carlino, NBC Chairman Mesolella called the April 25, 2017 Long Range Planning Committee Meeting to order at 850 a.m.
A p r i l 2 5 , 2 0 1 7
N B C B O A R D M E E T I N G
Program Update
Phase III CSO Control Facilities Program
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
Agenda
2
1 Looking Back
3 Looking Ahead
4 Discussion
2 The “Optimized Plan”
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
Agenda
3
1 Looking Back
3 Looking Ahead
4 Discussion
2 The “Optimized Plan”
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G B A C K
Timeline
4
4.28.2015 NBC Board selects final alternative for Re-Evaluation Plan.
6.29.2015 Phase III Re-
Evaluation Plan (Draft) submitted to
RIDEM for regulatory review.
4.18.2016 Stantec/Pare receives NTP for Amendment 4.
4.28.2016 NBC responds to “specific comments”.
3.17.2016 RIDEM provides
comments on the Draft plan.
5.16.2016 NBC responses to “general comments”.
3.16.2017 NBC meets with RIDEM to discuss optimized plan, EA, and schedule for approval.
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G B A C K
Stantec/Pare Contract
5
Original contract to complete Phase III
Re-Evaluation
Plan
AMMENDMENT 1
AMMENDMENT 2
AMMENDMENT 3
AMMENDMENT 4
AMMENDMENT 5
AMMENDMENT 6
AMMENDMENT 7
No cost change. Updated SRF terms and conditions.
Additional hydraulic modelling work to complete re-evaluation.
Migrate hydraulic model to InfoWorks and obtain LIDAR mapping data.
Program start-up, temporary flow metering, optimization/validation.
Stress test at Bucklin Point and Environmental Assessment for Phase III.
Geophysical Investigation.
Conceptual Engineering Report Phase III (initial design phase).
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G B A C K
Phase III CSO Re-Evaluation
6
STANTEC/PARE SCOPE Pawtucket Tunnel Geological Study and
Geotechnical Investigation Plan
Upgrade/Expand Hydraulic Model
Implement Temporary Flow Metering Program
Validate/Optimize Selected Alternative
Identify GSI Alternatives and Complete 10% Design for Pilot Project
Package Projects and Estimate Costs
Analyze and Recommend Project Delivery Approaches
Sequence Packages and Develop Schedules
Rate Impact and Affordability Analysis
Develop Environmental Assessment for Phase III optimized plan
Program Start-up Activities and Development of Program Management Plan
SCHEDULE Re-Evaluation Phase – January 2, 2014 to
January 29, 2015
Program Start-up and Alternative Validation/Optimization April 18, 2016 to Present
BUDGET Total Contract Value - $7,165,335.76
(NTP through Amendment 5)
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
Agenda
7
1 Looking Back
3 Looking Ahead –
4 Discussion
2 The “Optimized Plan”
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Results - Total Program
8
Phase Re-Evaluation Plan Optimized Plan
Phase A $588.26M $476.51M
Phase B $54.79M $31.17M
Phase C $104.00M $164.45M
Phase D $68.56M $83.43M
Total $815.56M $755.56M
Optimization yielded
$60M reduction in program cost
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Results Phase IIIA Cash Flow
9
MIL
LIO
NS
$700
$600
$500
$400
$300
$200
$100
Phase IIIA – Cash Flow Analysis
Recommended Plan – Total Optimized Plan - Total
YEAR
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Results Phase IIIA Cash Flow
10
MIL
LIO
NS
YEAR
$700
$600
$500
$400
$300
$200
$100
$0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Phase IIIA – Cash Flow Analysis
Recommended Plan – Total Optimized Plan - Total
Design Phase (Recommended Plan)
Construction Phase (Recommended Plan)
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Results Phase IIIA Cash Flow
11
MIL
LIO
NS
$700
$600
$500
$400
$300
$200
$100
$0
Phase IIIA – Cash Flow Analysis
Recommended Plan – Total Optimized Plan - Total
Construction Phase
(Optimized Plan)
Pre
-Des
ign
Opt
imiz
atio
n (O
ptim
ized
Pla
n) Design Phase
(Optimized Plan)
YEAR
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Process
12
Stakeholder process identified opportunities to analyze/optimize the
selected alternative.
Hydraulic model expansion/enhancement to optimize conceptual
design project.
Analyzed Alternative Project
Delivery Approaches, Risk/Value
Management
Refined and optimized Phase III system conceptual
design.
Improved system operational
performance.
Reduced life-cycle cost of
system components.
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
T H E O P T I M I Z E D P L A N
Highlights
13
Key Cost Savings Changes
Elimination of northern CSO interceptors
Elimination of one drop shaft Reduction in tunnel length due to
east side alignment
Less Disruptive Plan
Avoiding impacts to schools, residential areas, and commercial businesses
Avoiding area with high levels of contamination
Still Conservative Estimate of Cost
Early in the planning process Opportunities for further cost
reduction through design process
PHASE B High and Cross Street Interceptor
103, 104, and 105
PHASE B Middle Street Interceptor
201, 202, and 203
Recommended Plan
(2015)
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
Agenda
22
1 Looking Back
3 Looking Ahead
4 Discussion
2 The “Optimized Plan”
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G A H E A D
Phase III Program Schedule
23
21 22 23 24 25
17 18 19 20 21
Phase IIIA Planning/Design/Pre-Construction: 6/2017 to 12/2021
Construction: 3/2021 to 10/2025 (Note: GSI Pilot Project 3/2018 to 12/2018 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
17 18 19 20 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
29 30 21 22 23 24 25
17 18 19 20 21 26 27 28
Phase IIIB Planning/Design/Pre-Construction: 1/2026 to 12/2028
Construction: 1/2029 to 6/2030
22 23 24 25 29 30 31 32 33 34 35 36 37 38 39 40 41
17 18 19 20 26 27 28 31 32 33 34 35 36 37 38 39 40 41
34 35 36 37
31 32 33 34
29 30
26 27 28
21 22 23 24 25
17 18 19 20 21
Phase IIIC Planning/Design/Pre-Construction: 1/2031 to 3/2034
Construction: 3/2034 to 12/2037
22 23 24 25 29 30 35 36 37 38 39 40 41
17 18 19 20 26 27 28 31 32 33 38 39 40 41
39 40 41
36 37 38 39
34 35 36 37
31 32 33 34
29 30
26 27 28
21 22 23 24 25
17 18 19 20 21
Phase IIID Planning/Design/Pre-Construction: 1/2036 to 9/2039
Construction: 9/2039 to 12/2041
22 23 24 25 29 30 35 40 41
17 18 19 20 26 27 28 31 32 33 38
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G A H E A D
Phase IIIA Program Schedule
24
PM/CM Program Implementation
Geotech/Prel. Design/CER
30% Design
Pawtucket Tunnel and Pump Station Cavern
Tunnel Pump Station Fit-Out
OF-205 Facilities
OF-210, OF-213, and OF-214 Facilities
Mid-BVI Relief Structure Facilities
OF-217 Facilities
OF-218 and Lower BVI Facilities
Regulator Modifications
GSI Pilot Projects
GSI Projects
2017 2018 2019 2020 2021 2022 2023 2024 2025
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
NPC Phase III-A Program Schedule
PM/CM Design Construction Bid Procurement
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G A H E A D
Next 14 Months
25
Conceptual Engineering Report (10% design) for Pawtucket Tunnel/Pump Station
IMPLEMENTATION OF PROGRAM MANAGEMENT PLAN Launch Preliminary Design for Phase IIIA Component Projects
Begin Geotechnical and Environmental Investigations
Develop Design Guidelines
Preliminary Design Tunnel/Drop Shafts/Pumping
Station/Site Civil
Design/Bid/Award GSI Pilot Project
Integration of SCADA and
Operational Controls
Develop a Regulatory Permitting Strategy
Update Program Costs and Schedule
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
L O O K I N G A H E A D
Regulatory Review/Approval
26
May 26, 2017 Submit revised “optimized” plan to RIDEM for review.
June 2017 Public Hearing for EA.
May 26, 2017 Submit Draft EA to RIDEM for review.
August/September 2017
RIDEM approve Phase III Re-evaluation plan.
September/October 2017 RIDEM issues FONSI for EA.
October 2017 NBC/RIDEM agree to terms on modifications to consent decree language.
STANTEC/PARE ● PHASE I I I CSO RE-EVALUATIO N
Agenda
27
1 Looking Back
3 Looking Ahead –
4 Discussion
2 The “Optimized Plan”
2
2. Approval of Minutes – May 24, 2016 – Long Range Planning Committee
NBC Chairman Mesolella asked for a motion to approve the May 24, 2016 Long Range Planning Committee meeting minutes as written. Commissioner Burroughs moved to approve the minutes of the May 24, 2016 Long Range Planning Committee as written. Commissioner Handy seconded the motion. The vote taken by the Long Range Planning Committee was unanimous. The motion carried. 3. Items for Action
A. CSO PHASE III UPDATE
Mr. Marshall advised the Committee that over the last year MWH (who has been acquired by Stantec) and Pare Engineering one of our local firms, have been working on optimizing our Phase III program to try to get the most “bang for the buck” and address as well as they can the affordability issues for the ratepayers. The Committee today will be hearing what they have achieved, where we have been, where we are now and where we are going. Also, at today’s CEO Committee meeting there is an action item for the additional funding for the next level of work for CSO Phase III and at today’s full Board meeting this presentation will be given again so the entire Board of Commissioners get to hear where we are and also act on the matter that will be before CEO for additional design funds. Mr. Marshall introduced Sean Searles of Stantec and advised that he would be making the CSO Phase III Update presentation before the Committee today. Attached is the Stantec’s presentation. After the presentation there was a lengthy discussion between the Committee members, NBC staff and Stantec staff regarding the optimization of the CSO Phase III project, the reduction in cost that could be achieved with the optimization of the project and the improvement in water quality vs. ratepayer affordability issues. 4. Other Business None. 5. Adjournment A motion to adjourn was made by Commissioner Nathan, seconded by Commissioner Burroughs and the Long Range Planning Committee meeting adjourned at 9:40 a.m. Respectfully submitted,
Raymond J. Marshall, P.E. Executive Director/Secretary