+ All Categories
Home > Documents > Offshore Wind Overview - Stony Brook University · 2018. 5. 14. · Offshore Wind Overview Advanced...

Offshore Wind Overview - Stony Brook University · 2018. 5. 14. · Offshore Wind Overview Advanced...

Date post: 05-Feb-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
13
Offshore Wind Overview Advanced Energy Conference, New York, NY March 28, 2018
Transcript
  • Offshore W ind Overview

    Advanced Energy Conference, New York, NYMarch 28, 2018

  • Im age from Global Wind Energy Council: h t tp ://w w w .gw ec.net /w p -content/upload s/20 17/0 2/7_Annual-and -Global-C um ulative-O ffsh ore-w ind -c apacity-in-20 16 .jpg

    Offshore W ind W orldw ide

  • Cost of Offshore W ind

    Source: NREL 20 16 Offshore Wind Technologies Market Report

  • US Offshore W ind Leases

    DOI/DOE Nat ional Offshore Wind St rategy

    • Block Island 30 MW in operat ion• Mass RFP aw ard expected in

    April 20 18• New York and New Jersey

    develop ing com pensat ion m echanism s

    • Maryland OREC’s aw arded in 20 17

    • Dom inion has cont racted w ith Orsted to com plete 2 WTG’s off Virgin ia

    • Add it ional lease aw ards expected off Mass & NY in 20 18

  • U S C oa sta l B a th ym etry

  • US Offshore W ind Resource

  • Design Cond it ions

  • Offshore W ind Farm Com ponent s

    Im age cred it : h t tps://d ieppe-le-t report .eoliennes-m er.fr/offshore-w ind-pow er/how -offshore-w ind-farm s-w ork/

  • W ind Turb ine Generat ors

    Im age from US Departm ent of Energy Wind Vision Report

    Source: Orsted

  • Foundat ion Types

    — Monop ile— Jacket— Gravity Base— Suct ion Bucket— Float ing

    — Tension Leg Pla t form— Spar bouy— Sem i-subm ersib le

    S ourc e: N R E L 20 14-20 15 O ffsh ore W ind Tec h nologies M ark et R eport

  • Offshore Subst at ions— Receive Int ra Array cab les— House substat ion

    equipm ent— CB’s XFMR’s, t yp ica lly GIS

    — E xp ort at h igh er voltage— M ultip le p otentia l

    arrangem ents

    Im age c red it: W S P

  • Cab les

    — Int ra Array:— Connect WTG’s to

    offshore substa t ion— Typ ica lly 33 –66kV

    — E xp ort:— Connect offshore

    substa t ion to interconnect ion

    — Installation :— Buried severa l m eters

    below sea floor— Jet p low ing com m only

    used m ethod S ourc e: S ubsea W orld N ew s

  • Thank you

    M atth ew P alm er, P EV ic e P resid ent, O ffsh ore W ind M anager

    M att.p alm er@ w sp .c om

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4US Coastal BathymetryUS Offshore Wind ResourceDesign ConditionsOffshore Wind Farm ComponentsWind Turbine GeneratorsSlide Number 10Slide Number 11Slide Number 12Slide Number 13


Recommended