BOISE CITY FIRE TRAINING FACILITY Address: 12142 W Joplin Rd Project: Two single-story buildings within phase one of a training facility for Boise City fire fighters—a 5,926 sq. ſt. Admin/ Classroom Building and a 9,813 sq. ſt. Training & Safety Building. Green Building Method: Complies with 2012 Internaonal Green Construcon Code Owner: City of Boise Architectural Firm: Hummel Architects, Boise, ID Architect Consultant: Rice Fergusmiller Architecture-planning, Bremerton, WA Landscape/Civil Engineer Firm: The Land Group, Eagle, ID Structural Engineer Firm: KPFF, Boise, ID Mechanical/Plumbing/Electrical Engineer Firm: Engineering Inc, Boise, ID
Transcript

BOISE CITY FIRE TRAINING FACILITY

Address: 12142 W Joplin Rd

Project: Two single-story buildings within phase one of a training facility for Boise City fire fighters—a 5,926 sq. ft. Admin/Classroom Building and a 9,813 sq. ft. Training & Safety Building.

Green Building Method: Complies with 2012 International Green Construction Code

Owner: City of Boise

Architectural Firm: Hummel Architects, Boise, ID

Architect Consultant: Rice Fergusmiller Architecture-planning, Bremerton, WA

Landscape/Civil Engineer Firm: The Land Group, Eagle, ID

Structural Engineer Firm: KPFF, Boise, ID

Mechanical/Plumbing/Electrical Engineer Firm: Engineering Inc, Boise, ID

SITE

W CHINDEN BLVD

City of Boise Fire Training Facility CUP Application August 23, 2016

Site Images - From East looking West

Phase 1

View Key

Future Phase

Phase 1

08/22/16 | CUP16-00062

SITE

W CHINDEN BLVD

City of Boise Fire Training Facility CUP Application August 23, 2016

Site Images - From South Bluff looking NorthView Key

Future Phase

Phase 1

08/22/16 | CUP16-00062

City of Boise Fire Training Facility CUP Application August 23, 2016

2.1 Training and Safety Building

08/22/16 | CUP16-00062

City of Boise Fire Training Facility CUP Application August 23, 2016

3.1 Admin / Classroom Building

08/22/16 | CUP16-00062