+ All Categories
Home > Documents > Olive Board Shortcut Formulae

Olive Board Shortcut Formulae

Date post: 19-Feb-2018
Category:
Upload: mbakewl
View: 214 times
Download: 0 times
Share this document with a friend

of 20

Transcript
  • 7/24/2019 Olive Board Shortcut Formulae

    1/20

    INDICES

    The first rule: anx am= am+n

    The second rule: (an)m= amn

    The third rule: aman= am-n

    The fourth rule: ao= 1

    The fifth rule:

    nmnm

    1

    m

    n

    m

    m1

    )a()a(a

    a

    1a

    a

    1a

    If am=an, then m = n

    If am= bmand m;

    Then a = b if m is odd

    Or a = b if m is Even

    www OliveBoard in

    #1 Site for Bank PO Exams

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    2/20

    AVERAGES

    elementsofNumber

    elementsofSumAverageSimple

    n

    nn

    www

    xwxwxwAverageWeighted

    ...

    ...

    21

    2211

    naaaaMeanArithmetic n /)...( 321

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    3/20

    FRACTIONS AND PERCENTAGES#1 Site for Bank PO Exams

    www OliveBoard in

    FRACTIONS %AGE FRACTION %AGE FRACTION %AGE

    1/2 50 1/8 12.5 1/14 7.14

    1/3 33.33 1/9 11.11 1/15 6.67

    1/4 25 1/10 10 1/16 6.25

    1/5 20 1/11 9.09 1/17 5.88

    1/6 16.67 1/12 8.33 1/18 5.55

    1/7 14.28 1/13 7.69 1/19 5.26

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    4/20

    r% change can be nullified by % change in

    another direction.

    E.g.: An increase of 25% in prices can be nullified by a

    reduction of [100x25/(100+25)] = 20% reduction in

    consumption.

    If a number x is successively changed by a%, b%, c%...

    Final value =

    The net change after two successive changes of a% and b% is

    PERCENTAGES

    r100

    r100

    ...100

    c1

    100

    b1

    100

    a1x

    %100

    abba

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    5/20

    PARTNERSHIP

    If two partners A and B are investing their money to run abusiness then

    (Simple Partnership)

    If two partners A and B are INVESTINGtheir MONEYfor

    different period of time to run a business then

    (Compound Partnership)

    BofProfit

    AofProfit

    BofperiodTimexBofCapital

    AofperiodTimexAofCapital

    BofProfit

    AofProfit

    BofCapital

    AofCapital

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    6/20

    INTEREST

    Amount = Principal + Interest

    Simple Interest = PNR/100

    Compound Interest =

    Population formula P =

    SI and CI are same for a certain sum of money (P) at a certain rate (r)

    per annum for the first year. The difference after a period of two years is

    given by

    Depreciation formula = Initial Value x

    SI and CI are same for a certain sum of money (P) at a certain rate (r)

    per annum for the first year. The difference after a period of two years is

    given by,

    P100

    r1P

    n

    n

    100r1P

    n

    100

    r1

    2

    2

    100

    PR

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    7/20

    PROFITAND LOSS

    % Profit=

    Discount % =

    Effective Discount after successive discount of a%

    and b% is (a + bab/100). Effective Discount

    when you buy x goods and get y goods free is

    100x1WeightActual

    WeightActualWeightClaimed

    100x

    icePrMarked

    icePrSellingicePrMarked

    100xyx

    y

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    8/20

    ALLIGATION

    n

    a

    ba

    mixtureofQuantity

    operationnafterentityoriginalofQuantity

    1

    2

    xx

    xx

    itemondsecofQuantity

    itemfirstofQuantity

    #1 Site for Bank PO Exams

    www OliveBoard in

    SUCCESSIVE REPLACEMENT-

    Where a is the original quantity, b is the quantity that is

    replaced and n is the number of times the operation is

    carried out,

    ALLIGATION- The ratio of weights of the two

    items mixed will be inversely proportional to the

    deviation of attributes of these two items from theaverage attribute of the resultant mixture.

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    9/20

    ALLIGATIONAlligation:

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    10/20

    RATIO AND PROPOTION

    n^krfqdpb

    reqcpa

    krfqdpb

    reqcpa

    kfdb

    ecakf/ed/cb/aIf

    dc

    dc

    ba

    bathenba&

    d

    c

    b

    aIf

    nnn

    nnn

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    11/20

    TIME SPEED AND DISTANCE

    Speed = Distance/Time

    1 kmph = 5/18 m/sec; 1 m/sec = 18/5 kmph

    If the distance covered is constant then the average speed is

    Harmonic Mean of the values (s1,s2,s3.sn)

    If the time taken is constant then the average speed is Arithmetic

    Mean of the values (s1,s2,s3.sn)

    n321

    n321Avg

    t....ttt

    d....ddd

    TakenTimeTotal

    CoveredDistanceTotalSpeed

    n321Avg

    s/1....s/1s/1s/1

    nSpeed

    )speedstwofor(ss

    ss2Speed

    21

    21Avg

    n

    s....sssSpeed n321Avg

    )speedstwofor(2ssSpeed 21Avg

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    12/20

    TIME SPEED AND DISTANCE

    SpeedlativeRe

    eredcovbetolengthTotaltakentime,TrainsFor

    Downstream/Upstream: In water, the direction along the stream is

    called downstream. And, the direction against the stream is called

    upstream

    If the speed of a boat in still water is u km/hr and the speed of the

    stream is v km/hr, then:

    Speed downstream = (u + v) km/hr

    Speed upstream = (u - v) km/hr

    If the speed downstream is a km/hr and the speed upstream is b

    km/hr, then:

    hr/km)ba(2

    1waterstillinSpeed

    hr/km)ba(2

    1

    streamofRate

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    13/20

    TIME AND WORK If a person can do a certain task in t hours, then in 1 hour he would

    do 1/t portion of the task.

    A does a particular job in a hours and B does the same job in b

    hours, together they will take hours

    A does a particular job in a hours more than A and B combined

    whereas B does the same job in b hours more than A and B

    combined, then together they will take hours to finish the job.

    A does a particular job in a hours, B does the same job in b hours

    and C does the same job in c hours, then together they will take

    hours.

    If A does a particular job in a hours and A&B together do the job in t

    hours, the B alone will take hours.

    ba

    ab

    ab

    cabcababc

    ta

    at

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    14/20

    TIME ANDWORK

    IfA does a particular job in a hours, B does the same job in b hoursand ABC together do the job in t hours, then

    C alone can do it in hours

    A and C together can do it in hours

    B and C together can do it in hours

    If the objective is to fill the tank, then the Inlet pipesdo positive work

    whereas the Outlet pipesdo negative work. If the objective is to empty

    the tank, then the Outlet pipesdo positive work whereas the InletPipesdo negative work.

    btatab

    abt

    tb

    bt

    ta

    at

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    15/20

    PIPES AND CISTERN

    A pipe connected with a tank or a cistern or a reservoir, that fits it is

    known as a inlet.

    Outlet- A pipe connected with a tank or cistern or reservoir, emptying it

    is known as a outlet

    If a pipe can fill a tank in y hours then part filled in 1 hour = 1/yIf a pipe can empty a tank in y hours, then part emptied in 1 hour = 1/y

    If a pipe can fill a tank in x hours and another pipe can empty the full

    tank in y hours where(x>y) then on opening both the pipes the net part

    filled in one hour is = ( 1/x - 1/y)

    if a pipe can fill a tank in x hours and another pipe can empty the full

    tank in y hours(y>x) then on opening both the pipes, the net part

    emptied in 1 hour = (1/y1/x)

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    16/20

    PERMUTATIONS AND COMBINATIONS

    When two tasks are performed in succession, i.e., they are

    connected by an 'AND', to find the total number of ways ofperforming the two tasks, you have to MULTIPLYthe individual

    number of ways. When only one of the two tasks is performed, i.e.

    the tasks are connected by an 'OR', to find the total number of ways

    of performing the two tasks you have to ADDthe individual number

    of ways.

    Linear arrangement of r out of 'n' distinct items (nPr):

    The first item in the line can be selected in 'n' ways AND the second

    in (n 1) ways AND the third in (n 2) ways AND so on. So, thetotal number of ways of arranging 'r' items out of 'n' is

    (n)(n - 1)(n 2)...(n - r + 1) =)!rn(

    !n

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    17/20

    PERMUTATIONS AND COMBINATIONS

    Circular arrangement of 'n' distinct items: Fix the first item andthen arrange all the other items linearly with respect to the first item.

    This can be done in (n 1)!ways.

    In a necklace, it can be done in ways

    Selection of r items out of 'n' distinct items (nCr):Arrange of ritems out of n = Select r items out of n and then arrange

    those r items on r linear positions.

    nPr=nCrx r!

    Number of ways of arranging 'n' items out of which `p' are alike, 'q'

    are alike, 'r' are alike in a line is given by =

    2

    )1n(

    )!rn(!r

    !n

    !r!q!p

    !n

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    18/20

    PROBABILITY

    If the probability of an event occurring is P, then

    the probability of that event occurring r times in

    n trials is = nCrx Prx (1-P)n-r

    #1 Site for Bank PO Exams

    www OliveBoard in

    CONDITIONAL PROBABILITY FORMULA

    conditional probability that A occurs given that B

    has occurred is written as P(A|B) and defined by

    P(A|B) = P(A B) / P(B)

    OUTCOMESTOTAL

    OUTCOMESFAVOURABLEYPROBABILITLTHEORITICA

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    19/20

    PROBABILITYOdds

    outcomesfavorabletheofNumber

    outcomefavourablenotagainstOdds

    outcomesfavorablenotofnumberoutcomesfavorableofNumberfactorinOdds

    If A and B are two independent events, then,

    P (A B) = P (A) P (B) orP (AB) = P (A) P (B)

    If the probabilities of happening of n independent events be p1, p2pnrespectively, then

    (i) Probability of happening none of them

    =(1p1) (1p2) . (1 - pn)(ii) Probability of happening atleast one of them

    =1 - (1p1) (1p2) . (1 - pn)

    (iii) Probability of happening of first event and not happening of

    the remaining

    = p1

    (1p2

    ) (1p3

    ) (1 - pn

    )

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts
  • 7/24/2019 Olive Board Shortcut Formulae

    20/20

    MENSURATION

    NAME OF PLANE

    FIGURE

    AREA IN SQUARE

    UNIT

    PERIMETER IN UNITS

    CIRCLE r2 2r

    RECTANGLE LENGTH* WIDTH 2(LENGTH+WIDTH)

    SQUARE SIDE*SIDE 4*SIDE

    TRIANGLE 0.5*BASE*HEIGHT SUM OF ALL SIDES

    RHOMBUS LENGTH*HEIGHT 4*LENGTH OF A SIDE

    #1 Site for Bank PO Exams

    www OliveBoard in

    https://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcutshttps://www.oliveboard.in/tests/ibpspo/?ref=shortcuts

Recommended