+ All Categories
Home > Documents > OLOC - Stage 2 - Total Construction...OLOC - Stage 2 Toongabbie, NSW Construction of a mixed-use...

OLOC - Stage 2 - Total Construction...OLOC - Stage 2 Toongabbie, NSW Construction of a mixed-use...

Date post: 27-Mar-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
1
HEALTH & AGED CARE I PROJECT SHEET OLOC - Stage 2 Toongabbie, NSW Construcon of a mixed-use development comprising of 38 self-contained dwellings, levels of basement carpark, Medical Centre and a Hydrotherapy pool PROJECT DESCRIPTION This mixed use/ aged care development comprises the demolion of exisng structures and the construcon of a part 5 storey, part 4 storey mul-unit residenal building and 38 self-contained dwellings with 2 levels of basement car parking. The development will also house a ground floor medical centre and hydrotherapy pool, a courtyard and a roof top landscaped terrace. Works includes excavaon, piling and all supporng elements, a new storm water detenon system, landscaping, minor roadworks to adjoining lane way OVERCOMING CHALLENGES: Th 2 storey below ground basement – piled wall with capping beam braced by hydraulic struts unl the Basement 1 slab is poured. Logiscs due to the ght constraints of the site and adjoining properes – Tower crane to be used for vercal lights from the work zone along Aurelia Street. INNOVATIONS: Tower crane for vercal liſts Hebel Wall external wall system CLIENT Our Lady of Consolaon PROJECT VALUE $21.6 million CONTRACT Design & Construct COMPLETION September 2021 Total Construcon Website Follow Total on LinkedIn
Transcript
Page 1: OLOC - Stage 2 - Total Construction...OLOC - Stage 2 Toongabbie, NSW Construction of a mixed-use development comprising of 38 self-contained dwellings, levels of basement carpark,

HEALTH & AGED CARE I PROJECT SHEET

OLOC - Stage 2Toongabbie, NSW

Construction of a mixed-use development comprising of 38 self-contained dwellings, levels of basement carpark, Medical Centre and a Hydrotherapy pool

PROJECT DESCRIPTION

This mixed use/ aged care development comprises the demolition of existing structures and the construction of a part 5 storey, part 4 storey multi-unit residential building and 38 self-contained dwellings with 2 levels of basement car parking. The development will also house a ground floor medical centre and hydrotherapy pool, a courtyard and a roof top landscaped terrace. Works includes excavation, piling and all supporting elements, a new storm water detention system,landscaping, minor roadworks to adjoining lane way

OVERCOMING CHALLENGES:Th 2 storey below ground basement – piled wall with capping beam braced by hydraulic struts until the Basement 1 slab is poured.

Logistics due to the tight constraints of the site and adjoining properties – Tower crane to be used for vertical lights from the work zone along Aurelia Street.

INNOVATIONS:Tower crane for vertical liftsHebel Wall external wall system

CLIENTOur Lady of Consolation

PROJECT VALUE$21.6 million

CONTRACTDesign & Construct

COMPLETIONSeptember 2021

Total Construction Website

Follow Total on LinkedIn

Recommended