+ All Categories
Home > Documents > OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  ·...

OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  ·...

Date post: 08-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
24
D.K. Hasell 24 January, 2011 OLYMPUS Logo Shirts Still some available in my office Polo shirts - 15 T-shirts - 8 Mostly large and extra-large though 1 Tuesday, January 25, 2011
Transcript
Page 1: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

OLYMPUS Logo ShirtsStill some available in my office• Polo shirts - 15 €• T-shirts - 8 €

Mostly large and extra-large though

1Tuesday, January 25, 2011

Page 2: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Collaboration OrganisationSpokesman and Deputy Spokesman• elected for one year• current term coming to an end• what to do now?

Extend term for one year• gets through construction and installation phase• spokesman and deputy should have significant presence at DESY for

actual experiment

Extend for 6 months• determine whether or not we have a working detector

Item for collaboration board to decide

2Tuesday, January 25, 2011

Page 3: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Collaboration OrganisationOLYMPUS Collaboration Guidelines• from last meeting• document on web page

• http://web.mit.edu/OLYMPUS/PRESENTATIONS/20101101/OLYMPUS_Guidelines.pdf

• should be discussed and approved by group leaders

Management structure• collaboration board• spokes man and deputy• coordinators

Funding• operating costs - list from Uwe

Shifts• experiment and test and calibration runs - list from Uwe

3Tuesday, January 25, 2011

Page 4: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Collaboration OrganisationAnalyses• division of topics• approval process

Presentations• approval process• copy to secretary - Sylvie Faverot-SpenglerPublications• technical publications• physics publications• review committee

Author lists• technical publications• physics publication

First draft only !!!!4

Tuesday, January 25, 2011

Page 5: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Contact List For each component and system• list of contacts in case of problems, emergency• must have expert or responsible person at DESY• available 24/7

5Tuesday, January 25, 2011

Page 6: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Next Talk

6Tuesday, January 25, 2011

Page 7: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Wire Chambers

7Tuesday, January 25, 2011

Page 8: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Wire Chambers

8

Wire chambers completely re-wired over summer• some shorts and broken wires known from re-wiring

• chose not to repair then because students left at end of summer

Soldering HV connections in January - 10,000 wires• Axel, Colton, Brian, Emma, Charles, and Caroline from MIT• Lauren from ASU• repairing wires as they go• finished daisy chaining last week• soldering cable assemblies to end of this week

HV boards being made at MIT-Bates - Bob Abruzzio• plan to install all by mid-February

Wire chamber ready to move to DORIS hall end February• test with gas and HV in frames in DORIS Hall - March• install in sub-detector frames - April

Tuesday, January 25, 2011

Page 9: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

HV Wiring

9Tuesday, January 25, 2011

Page 10: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

HV Wiring

10Tuesday, January 25, 2011

Page 11: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

HV Wiring

11Tuesday, January 25, 2011

Page 12: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

GEM TrackerMechanical design started• 90 x 30 cm2 active area• substantial frame to hold foils flat

• possibly need spacer frame or lines• will investigate with plain Kapton foils

Discussion with firm Tech-Etch to produce GEM foils• largest possible 55 x 50 cm2 probably• not big enough, need to have gap in GEM tracker

Discussion with Tech-Etch to produce 2D readout boards• line and pad design with vias• flexible choice for readout geometry

• cartesian, stereo, angle dependent, …

Design by June - JulyProduce and test by NovemberInstall before January run.

12Tuesday, January 25, 2011

Page 13: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

GEM Tracker

13Tuesday, January 25, 2011

Page 14: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

GEM 2D Readout Board

14Tuesday, January 25, 2011

Page 15: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Next Talk

15Tuesday, January 25, 2011

Page 16: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Monte CarloSome progress• much more work needed• volunteers ???

Progress• symmetric Möller added but not summing energy• Möller/Bhabha generator added• work started on reconstruction

• early days still but looks positive• read MC data and get hits for each event• make first estimate fortrack parameters• use GEANT4 to track charged geantino• MC - 100 events/s on laptop• RECON - 1000 events/s on laptop for 1 charge geantino

• track finder algorithm - Emma Tolley• multilayer perceptron neural network to select track hits from noise hits• will return set of candidate track hits with a probability for being valid track

16Tuesday, January 25, 2011

Page 17: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

MC Directory HierarchyOLYMPUS.cc - main programGNUMakefile - make file

detector/ - subdirectory for detectors

generator/ - subdirectory for generators

physics/ - subdirectory for physics

run/ - subdirectory for run handling routines

event/ - subdirectory for event handling routines

utilities/ - subdirectory for utility routines

17Tuesday, January 25, 2011

Page 18: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

MC Directory Hierarchydetector/

• Detector.cc - main routine for building the OLYMPUS detector• Detector.h - header file

• beampipe/ - subdirectory for beampipe• gemtracker/ - subdirectory for GEM Tracker• luminosity monitor/ - subdirectory …• magneticfield/ - …• mwpc/ - ...• symmetricmoller/ - …• targetchamber/ - ...• timeofflight/ - ...• toroidmagnet/ - …• wirechamber/ - ...

18Tuesday, January 25, 2011

Page 19: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

MC Directory Hierarchydetector/gemtracker/

• GT.cc - main GEM tracker class to build the detector• GT.h - header file for GT.cc• GT_SD.cc - routine defining the sensitive detector class• GT_SD.h - header file for GT_SD.cc• GT_Hit.cc - routine defining the hits class• GT_Hit.h - header file ...• GT_Data.cc - routine defining the data class• GT_Data.h - header file …• GT_Messenger.cc - defines messenger class for user interface• GT_Messeneger.h - header file …

Similar for other sensitive detectors - WC, TF, ...

Simpler for non-sensitive detectors - beampipe, ...

19Tuesday, January 25, 2011

Page 20: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

OLYMPUS Monte CarlCurrent version GEANT4.9.4• CLHEP 2.1.0.1 - only for GEANT4.9.4• Qt - 4.7.1

ROOT - 5.28• FFTW 3.2.2• GSL 1.14

20Tuesday, January 25, 2011

Page 21: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

MC Directory Hierarchygenerator/

• GN.cc - main class for generating primary events• GN.h - header file for GN.cc• GN_Data.cc - generator data class• GN_Data.h - …• GN_Messenger.cc - messenger class for user interface• GN_Messenger.h - …

• ep/ - subdirectory for ep elastic scattering• ee/ - subdirectory for Möller and Bhabha scattering

21Tuesday, January 25, 2011

Page 22: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

MC Directory HierarchyOLYMPUS.cc - main programGNUMakefile - make file

detector/ - subdirectory for detectors

generator/ - subdirectory for generators

physics/ - subdirectory for physics

run/ - subdirectory for run handling routines

event/ - subdirectory for event handling routines

utilities/ - subdirectory for utility routines

22Tuesday, January 25, 2011

Page 23: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

Next Talk

23Tuesday, January 25, 2011

Page 24: OLYMPUS Logo Shirts - MITweb.mit.edu/OLYMPUS/PRESENTATIONS/20110124/Hasell.pdf · 24.01.2011  · Discussion with Tech-Etch to produce 2D readout boards • line and pad design with

D.K. Hasell 24 January, 2011

AOBNext meeting• early January to organise work during shutdown?• after January to evaluate where we are?

OLYMPUS shirts• available in my office• Polo shirts - 15 €• T-shirts - 8 €• People who pre-ordered have priority• Some extras are available for those who didn’t pre-order

AOB

24Tuesday, January 25, 2011


Recommended