OMB CONTROL NUMBER: 2120-0569EXPIRATION DATE: /3 /201
FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION
U.S. Department of Transportation Federal Aviation Administration
Construction Progress and Inspection Report
Airport Grant Program
Period Ending
Project Number
Airport Name
)
Project Description Contractor’s Name
1. Contract Time No. Days Charged to Date Last Working Day Charged (Date
2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature
(On earthwork jobs, include soil conditions.)
3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading,drainage, base, surface, lighting, etc.)
4. Work Completed or In Progress this Period
5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.)
5b. Material (Identify material subject to pay reduction.)
6. Description of Anticipated Work by Contractor for Next Period
7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties,etc. and actions taken.)
SPONSOR’S INSPECTOR OR REPRESENTATIVE
Date Typed or Printed Name and Title Signature
11/23/2018
3-37-0021-045-2017
Fayetteville Regional Airport
Airline Terminal Improvements - Part 1 Resolute Building Company
319 11/23/2018
High temperatures have averaged in the mid 50's
Concourse A 60%, New Connector 95%
Continued plumbing, mechanical, electrical, storefront, and demolition clean-up of existing connector.
None
None
Continue with plumbing, mechanical, electrical, and storefront of Concourse A, continue demolition clean-up of existing connector, installsecond set of doors at new TSA area
None
11/23/2018 Jason D. Pike
Tarmac concrete installed (Concourse A)
Repair of storm water retention pond due to rain Started grading at cab turn around
Continued bulkhead framing (Concourse A)
Existing connector demolition Storefront installation (TSA Exit Lane)
X
X
61 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 1 1 General escort & supervision
Ivey Plumbing 0 Plumbing work at Concourse A
Ivey HVAC 0 HVAC work at Concourse A
M-R Electric 0 Electrical work at Concourse A
Trinity 0 Finish temp wall & install soffit @ Conc A
New Shine 0
Sanford Steel 0
Sammax 0
Jones & Smith 4 1 5 Continued demo of existing connector
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 2 2
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 1 0 0 0 0 0 0 0 0 6 0 0 0 0 1 0 0 0 0 0 0 0 0 8
1
X
Temperature: degrees Precipitation: inches
Snow Lightning
Ground: Dry Wet Frozen
Rainy
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
17-Nov-18
Sunny Cloudy
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer
X
X
67 0.07
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 2 1 3 General escort & supervision
Ivey Plumbing 1 2 3 Plumbing work at Concourse A
Ivey HVAC 0
M-R Electric 1 4 5 Electrical work at Concourse A
Trinity 2 2 Finish temp wall & install soffit @ Conc A
New Shine 0
Sanford Steel 0
Sammax 0
Jones & Smith 6 1 7 Continued demo of existing connector
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 5 5
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 2 0 0 1 0 2 0 1 0 18 0 0 0 0 1 0 0 0 0 0 0 0 0 25
X 2
X 1
Temperature: degrees Precipitation: inches
Snow Lightning
Ground: Dry Wet Frozen
Rainy
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
19-Nov-18
Sunny Cloudy
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer
X
X
67 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 2 1 3 General escort & supervision
Ivey Plumbing 1 1 Plumbing work at Concourse A
Ivey HVAC
M-R Electric 0 Electrical work at Concourse A
Trinity 2 2 Finish temp wall & install soffit @ Conc A
New Shine 0
Sanford Steel 0
Sammax 3 1 4 Working near cab turn around
Jones & Smith 6 1 7 Continued demo of existing connector
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 3 3 Installing second set of doors @ TSA exit
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 2 0 0 1 0 2 0 0 0 13 0 0 0 0 2 0 0 0 0 0 0 0 0 20
X 1
X
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
20-Nov-18
Sunny Cloudy Lightning
Ground: Dry Wet Frozen
Rainy
Temperature: degrees Precipitation: inches
Snow
X
X
60 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 2 2 4 General escort & supervision
Ivey Plumbing 0
Ivey HVAC 0
M-R Electric 0 Electrical work at Concourse A
Trinity 2 2 Finish temp wall & install soffit @ Conc A
New Shine 0
Sanford Steel 0
Sammax 3 1 4 Working near cab turn around
Jones & Smith 6 1 7 Continued demo of existing connector
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 3 3 Installing second set of doors @ TSA exit
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 2 0 0 0 0 2 0 0 0 14 0 0 0 0 2 0 0 0 0 0 0 0 0 20
X 2
X
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
21-Nov-18
Sunny Cloudy Lightning
Ground: Dry Wet Frozen
Rainy
Temperature: degrees Precipitation: inches
Snow
X
X
54 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 2 2 4 General escort & supervision
Ivey Plumbing 0
Ivey HVAC 0
M-R Electric 0 Electrical work at Concourse A
Trinity 2 2 Finish temp wall & install soffit @ Conc A
New Shine 0
Sanford Steel 0
Sammax 3 1 4 Working near cab turn around
Jones & Smith 6 1 7 Continued demo of existing connector
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 3 3 Installing second set of doors @ TSA exit
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 2 0 0 0 0 2 0 0 0 14 0 0 0 0 2 0 0 0 0 0 0 0 0 20
X 2
X
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
22-Nov-18
Sunny Cloudy Lightning
Ground: Dry Wet Frozen
Rainy
Temperature: degrees Precipitation: inches
Snow
X
X
49 0.00
Su
pe
rvis
or
Ca
rpe
nte
rs
Iro
nw
ork
ers
Plu
mb
er
Ma
son
Dry
wa
ll
Co
ncr
ete
Ele
ctri
cia
n
Me
cha
nic
al
Lab
ore
r (G
en
era
l)
Lab
ore
r (L
an
dsc
ap
e)
Sh
ee
t M
eta
l
Me
cha
nic
Lab
ore
r (P
ipe
lay
er)
Lab
ore
r (M
aso
nry
)
Op
era
tor
(Ba
ckh
oe
/
Exc
av
ato
r)
Op
era
tor
(Bu
lld
oze
r)
Op
era
tor
(Cra
ne
)
Op
era
tor
(Fo
rkli
ft)
Op
era
tor
(Gra
de
r)
Op
era
tor
(Lo
ad
er)
Pa
inte
r
Ro
ofe
r
Tru
ck D
riv
er
To
tal
nu
mb
er
of
wro
ke
rs
Work Performed
Resolute 1 1 General escort & supervision
Ivey Plumbing 0
Ivey HVAC 0
M-R Electric 0
Trinity 0
New Shine 0
Sanford Steel 0
Sammax 0
Jones & Smith 4 1 1 6 Cleanup of debris
Grieme Roofing 0
2nd Wind 0
Tri City Insulation 0
Batten Tile 0
Dixie Painting 0
ECS 0
VSC 0
Southern Glass 0
Terry's Floor 0
Great Escape Cab. 0
Joyner Keeny 0
Martin Architectural 0
Totals: 1 0 0 0 0 0 0 0 0 4 0 0 0 0 1 0 0 0 0 0 0 0 1 7
1
X
Temperature: degrees Precipitation: inches
Snow Lightning
Ground: Dry Wet Frozen
Rainy
Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1
Date:
Weather:
23-Nov-18
Sunny Cloudy
Philip Crosby
Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator
Leroy Haskins Bulldozer