OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: /3 /201 FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION U.S. Department of Transportation Federal Aviation Administration Construction Progress and Inspection Report Airport Grant Program Period Ending Project Number Airport Name ) Project Description Contractor’s Name 1. Contract Time No. Days Charged to Date Last Working Day Charged (Date 2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature (On earthwork jobs, include soil conditions.) 3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading, drainage, base, surface, lighting, etc.) 4. Work Completed or In Progress this Period 5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.) 5b. Material (Identify material subject to pay reduction.) 6. Description of Anticipated Work by Contractor for Next Period 7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties, etc. and actions taken.) SPONSOR’S INSPECTOR OR REPRESENTATIVE Date Typed or Printed Name and Title Signature 11/23/2018 3-37-0021-045-2017 Fayetteville Regional Airport Airline Terminal Improvements - Part 1 Resolute Building Company 319 11/23/2018 High temperatures have averaged in the mid 50's Concourse A 60%, New Connector 95% Continued plumbing, mechanical, electrical, storefront, and demolition clean-up of existing connector. None None Continue with plumbing, mechanical, electrical, and storefront of Concourse A, continue demolition clean-up of existing connector, install second set of doors at new TSA area None 11/23/2018 Jason D. Pike
Transcript
Page 1: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

OMB CONTROL NUMBER: 2120-0569EXPIRATION DATE: /3 /201

FAA Form 5370-1 ( ) SUPERCEDES PREVIOUS EDITION

U.S. Department of Transportation Federal Aviation Administration

Construction Progress and Inspection Report

Airport Grant Program

Period Ending

Project Number

Airport Name

)

Project Description Contractor’s Name

1. Contract Time No. Days Charged to Date Last Working Day Charged (Date

2. Brief Weather Summary this Period, including Approximate Rainfall and Periods of Below Freezing Temperature

(On earthwork jobs, include soil conditions.)

3. Rough Estimate of Percent Completion to Date of Construction Phases (Include items such as clearing, grading,drainage, base, surface, lighting, etc.)

4. Work Completed or In Progress this Period

5a. Summary of Laboratory and Field Testing this Period (Note failing tests and any retests. Summarize out-of-tolerance.)

5b. Material (Identify material subject to pay reduction.)

6. Description of Anticipated Work by Contractor for Next Period

7. Problem Areas/Other Comments (Include revisions to plans and specifications approved or denied, delays, difficulties,etc. and actions taken.)

SPONSOR’S INSPECTOR OR REPRESENTATIVE

Date Typed or Printed Name and Title Signature

11/23/2018

3-37-0021-045-2017

Fayetteville Regional Airport

Airline Terminal Improvements - Part 1 Resolute Building Company

319 11/23/2018

High temperatures have averaged in the mid 50's

Concourse A 60%, New Connector 95%

Continued plumbing, mechanical, electrical, storefront, and demolition clean-up of existing connector.

None

None

Continue with plumbing, mechanical, electrical, and storefront of Concourse A, continue demolition clean-up of existing connector, installsecond set of doors at new TSA area

None

11/23/2018 Jason D. Pike

Page 2: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

Tarmac concrete installed (Concourse A)

Repair of storm water retention pond due to rain Started grading at cab turn around

Continued bulkhead framing (Concourse A)

Existing connector demolition Storefront installation (TSA Exit Lane)

Page 3: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

61 0.00

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 1 1 General escort & supervision

Ivey Plumbing 0 Plumbing work at Concourse A

Ivey HVAC 0 HVAC work at Concourse A

M-R Electric 0 Electrical work at Concourse A

Trinity 0 Finish temp wall & install soffit @ Conc A

New Shine 0

Sanford Steel 0

Sammax 0

Jones & Smith 4 1 5 Continued demo of existing connector

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 2 2

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 1 0 0 0 0 0 0 0 0 6 0 0 0 0 1 0 0 0 0 0 0 0 0 8

1

X

Temperature: degrees Precipitation: inches

Snow Lightning

Ground: Dry Wet Frozen

Rainy

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

17-Nov-18

Sunny Cloudy

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator

Leroy Haskins Bulldozer

Page 4: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

67 0.07

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 2 1 3 General escort & supervision

Ivey Plumbing 1 2 3 Plumbing work at Concourse A

Ivey HVAC 0

M-R Electric 1 4 5 Electrical work at Concourse A

Trinity 2 2 Finish temp wall & install soffit @ Conc A

New Shine 0

Sanford Steel 0

Sammax 0

Jones & Smith 6 1 7 Continued demo of existing connector

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 5 5

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 2 0 0 1 0 2 0 1 0 18 0 0 0 0 1 0 0 0 0 0 0 0 0 25

X 2

X 1

Temperature: degrees Precipitation: inches

Snow Lightning

Ground: Dry Wet Frozen

Rainy

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

19-Nov-18

Sunny Cloudy

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator

Leroy Haskins Bulldozer

Page 5: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

67 0.00

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 2 1 3 General escort & supervision

Ivey Plumbing 1 1 Plumbing work at Concourse A

Ivey HVAC

M-R Electric 0 Electrical work at Concourse A

Trinity 2 2 Finish temp wall & install soffit @ Conc A

New Shine 0

Sanford Steel 0

Sammax 3 1 4 Working near cab turn around

Jones & Smith 6 1 7 Continued demo of existing connector

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 3 3 Installing second set of doors @ TSA exit

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 2 0 0 1 0 2 0 0 0 13 0 0 0 0 2 0 0 0 0 0 0 0 0 20

X 1

X

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator

Leroy Haskins Bulldozer

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

20-Nov-18

Sunny Cloudy Lightning

Ground: Dry Wet Frozen

Rainy

Temperature: degrees Precipitation: inches

Snow

Page 6: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

60 0.00

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 2 2 4 General escort & supervision

Ivey Plumbing 0

Ivey HVAC 0

M-R Electric 0 Electrical work at Concourse A

Trinity 2 2 Finish temp wall & install soffit @ Conc A

New Shine 0

Sanford Steel 0

Sammax 3 1 4 Working near cab turn around

Jones & Smith 6 1 7 Continued demo of existing connector

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 3 3 Installing second set of doors @ TSA exit

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 2 0 0 0 0 2 0 0 0 14 0 0 0 0 2 0 0 0 0 0 0 0 0 20

X 2

X

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator

Leroy Haskins Bulldozer

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

21-Nov-18

Sunny Cloudy Lightning

Ground: Dry Wet Frozen

Rainy

Temperature: degrees Precipitation: inches

Snow

Page 7: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

54 0.00

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 2 2 4 General escort & supervision

Ivey Plumbing 0

Ivey HVAC 0

M-R Electric 0 Electrical work at Concourse A

Trinity 2 2 Finish temp wall & install soffit @ Conc A

New Shine 0

Sanford Steel 0

Sammax 3 1 4 Working near cab turn around

Jones & Smith 6 1 7 Continued demo of existing connector

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 3 3 Installing second set of doors @ TSA exit

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 2 0 0 0 0 2 0 0 0 14 0 0 0 0 2 0 0 0 0 0 0 0 0 20

X 2

X

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator

Leroy Haskins Bulldozer

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

22-Nov-18

Sunny Cloudy Lightning

Ground: Dry Wet Frozen

Rainy

Temperature: degrees Precipitation: inches

Snow

Page 8: OMB CONTROL NUMBER: 2120-0569 EXPIRATION DATE: Period Ending ... - Gordon … report... · 2019. 2. 22. · X X 61 0.00 Supervisor Carpenters Ironworkers Plumber Mason Drywall Concrete

X

X

49 0.00

Su

pe

rvis

or

Ca

rpe

nte

rs

Iro

nw

ork

ers

Plu

mb

er

Ma

son

Dry

wa

ll

Co

ncr

ete

Ele

ctri

cia

n

Me

cha

nic

al

Lab

ore

r (G

en

era

l)

Lab

ore

r (L

an

dsc

ap

e)

Sh

ee

t M

eta

l

Me

cha

nic

Lab

ore

r (P

ipe

lay

er)

Lab

ore

r (M

aso

nry

)

Op

era

tor

(Ba

ckh

oe

/

Exc

av

ato

r)

Op

era

tor

(Bu

lld

oze

r)

Op

era

tor

(Cra

ne

)

Op

era

tor

(Fo

rkli

ft)

Op

era

tor

(Gra

de

r)

Op

era

tor

(Lo

ad

er)

Pa

inte

r

Ro

ofe

r

Tru

ck D

riv

er

To

tal

nu

mb

er

of

wro

ke

rs

Work Performed

Resolute 1 1 General escort & supervision

Ivey Plumbing 0

Ivey HVAC 0

M-R Electric 0

Trinity 0

New Shine 0

Sanford Steel 0

Sammax 0

Jones & Smith 4 1 1 6 Cleanup of debris

Grieme Roofing 0

2nd Wind 0

Tri City Insulation 0

Batten Tile 0

Dixie Painting 0

ECS 0

VSC 0

Southern Glass 0

Terry's Floor 0

Great Escape Cab. 0

Joyner Keeny 0

Martin Architectural 0

Totals: 1 0 0 0 0 0 0 0 0 4 0 0 0 0 1 0 0 0 0 0 0 0 1 7

1

X

Temperature: degrees Precipitation: inches

Snow Lightning

Ground: Dry Wet Frozen

Rainy

Daily ReportFayetteville Regional Airport - Airline Terminal Improvements - Part 1

Date:

Weather:

23-Nov-18

Sunny Cloudy

Philip Crosby

Resolute Supervisors on site included: Dan Shields Equipment used on site: Backhoe / Excavator