Page 1: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 1 -

Dispatch Center

Overview

DPC 2.1.0

Page 2: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 2 -

OMNITRACKER Dispatch Center in Overview Key Features Process and Interfaces Workflow and Examples OMNITRACKER Dispatch View and Google Maps Integration Off-line processing of Work Orders Extensibilities

Contents

DPC 2.1.0

Page 3: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 3 -

Planning and dispatching of external field staff with OMNITRACKER Dispatch Center Solution for planning, dispatching and tracking of work orders Administration of skills that are needed for accomplishing the work order Integrated route planning using OMNITRACKER GIS Gateway or Google Maps

integration Automatic transfer of work orders to the field staff Automatic processing of the work order forms returned by the field staff

OMNITRACKER Dispatch Center in Overview

DPC 2.1.0

Page 4: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 4 -

OMNITRACKER Dispatch Center in Overview

DPC 2.1.0

Page 5: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 5 -

OMNITRACKER Dispatch Center in Overview

Process and process phases: Dispatch request from a request

management system Work order to field staff Response of field staff Response to request management

system

Dispatch Center can be integrated with existing OMNITRACKER solutions. Integration via „Field Mappings".

Connection to external request management systems via different transport services (web service, email, export/import) available.

DPC 2.1.0

Page 6: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 6 -

Planning and Processing Fast dispatching of orders (Dispatch Requests) Generation of dispatch requests directly out of request / service management

systems (e.g. incident/problem/change management) possible Less administration effort to dispose field staff Effective use of resources Management of skills Automatic calculation of way to and from the customer Data synchronization between mobile devices and OMNITRACKER

Key Features 1/2

DPC 2.1.0

Page 7: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 7 -

User Interface and Display User-friendly route planning Intuitive user interface Route planning via „drag & drop"

Miscellaneous Interfaces to request management systems (e.g. OMNITRACKER IT Service

Management) Connection with route planner using OMNITRACKER GIS Gateway or Google

Maps Integration with further OMNITRACKER solutions Display of dependencies at a glance

Key Features 2/2

DPC 2.1.0

Page 8: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 8 -

Workflow and Interfaces

DPC 2.1.0

Page 9: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 9 -

Different possibilities for generating a dispatch request: Web service: Transfer of a subset of

incident, problem or change information from a connected request management system to OMNITRACKER Dispatch Center

Structured email: Data transfer via email to OMNITRACKER Dispatch Center

Import/export: Import of information via lists in OMNITRACKER Dispatch Center

Field mapping: Via field mapping from integrated OMNITRACKER solutions

Generating Dispatch Request

DPC 2.1.0

Page 10: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 10 -

OMNITRACKER User Interface

DPC 2.1.0

Page 11: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 11 -

For the dispatch planning the following views are available: Time line view for the timing Map display for the spacial planningDispatch Center offers the following possibilities for map integration: Google Maps: Access to the maps

of Google Maps Dispatch View: Requires the

integration of the core component OMNITRACKER GIS Gateway for the connection to a geoinformation system.

Dispatch Planning: Views and Map Integration

DPC 2.1.0

Page 12: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 12 -

New dispatch request has to be dispatched: Define customer and location of the

request Specify title and description to

define the request Define the time frame in which the

request has to be processed Specify the required skills and

materials for processing the request If a request management system is

connected (e.g. OMNITRACKER IT Service Management Center), the creation of a dispatch request can be done directly out of an incident, problem or change ticket.

Workflow: To be Dispatched

DPC 2.1.0

Page 13: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 13 -

In the time line view the selected planning date is displayed.

In the list the dispatch requests that have not yet been assigned are displayed.

In the time line view the requests that have not yet been assigned are displayed at the bottom.

Dispatch requests can be assigned to a technician using drag & drop.

At the top on the right useful information about the selected entry is displayed: planned route for the selected

employee distance of the employee to the

customer site

The planned route is displayed in the map.

Dispatch Planning using Google Maps (Example 1)

DPC 2.1.0

Page 14: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 14 -

If a request is selected, at the top on the right the distances from the technicians' home locations to the customer sites are displayed.

Technicians that do not have the required skills for the selected request are shaded.

The customer site is displayed in the map.

By clicking a marked place in the map the address of the place is displayed.

Dispatch Planning using Google Maps (Example 2)

DPC 2.1.0

Page 15: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 15 -

Technician who is supposed to process the work order at customer site is assigned.

Time of the on-site appointment is defined.

Predecessor and successor can be defined in the dispatch request form and within the dispatch planning.

In the dispatch planning the travel times can be calculated automatically: From the employee's home location

to the first job From one job to the next one From the last job to the employee's

home location

Workflow: Dispatched

DPC 2.1.0

Page 16: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 16 -

Assignment via Drag & Drop (Example)

Request is assigned to a technician with the required skills via drag & drop: within the time line view from the list into the time line

view

DPC 2.1.0

Page 17: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 17 -

Field staff responsible receives the order data as PDF via email.

Field staff can send back the completed PDF.

The dispatch request is updated automatically: If the order could be completed,

the state is changed to "Techn. Solved".

If the order could not be completed, the state is changed to "Rejected". Then it can be dispatched again.

Optionally the GPS coordinates of the employee's current position can be transmitted to OMNITRACKER Dispatch Center.

Processing the Work Order

DPC 2.1.0

Page 18: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 18 -

Techn. Solved Technician has completed the order successfully on-site and returns the PDF

form with the state "OK". State of the dispatch request is changed automatically to „Techn. Solved", on-

site and travel times as well as the comments are taken over.

Rejected Technician could not complete the order, e.g. because the customer could not

be reached on-site, and returns the PDF form with the state "Not OK". State of the dispatch request is changed automatically to „Rejected", on-site

and travel times as well as the comments are taken over.

Workflow: Techn. Solved, Rejected

DPC 2.1.0

Page 19: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 19 -

Both possibilities of dispatch planning offer almost exactly the same functionality: View for planning in the time line Drag & drop functionality Display of the planned route in the map Route planning in the map (Dispatch View only) Automatic alignment with start of working day Predecessor-successor relationships for sequence of orders Route optimization Current position of the resource can be displayed Batch mode available

OMNITRACKER Dispatch View and Google Maps Integration

DPC 2.1.0

Page 20: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 20 -

OMNITRACKER Dispatch Center offers the following possibilities for route optimization: Calculation of travel times corresponding to the assigned dispatch requests and

the position of the field staff Compact aggregation of the requests planned for one employee to avoid idle

time. The first order is aligned automatically with the start of the employee's working hours.

Geographical optimization of the route to avoid detours

Route Planning and Optimization

DPC 2.1.0

Page 21: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 21 -

If the field staff cannot access OMNITRACKER on the way, they can use the PDF forms of the work orders to document the results of their work. By returning the PDFs as email attachment to OMNITRACKER Dispatch Center the data can be processed off-line. The following data are updated automatically in the dispatch request: State (depending on the state reported by the technician) Start and end of the on-site work Travel times Technician's comment

Off-line processing of Work Orders

DPC 2.1.0

Page 22: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 22 -

OMNITRACKER Dispatch Center can be integrated easily with existing OMNITRACKER installations

Integration of further OMNITRACKER solutions, e.g. OMNITRACKER IT Service Management Center

Extensibilities

DPC 2.1.0

Page 23: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 23 -

Questions?

Thanks for your attention!

DPC 2.1.0

Page 24: OMNITRACKER Dispatch Center · 2020. 9. 25. · OMNITRACKER Dispatch Center in Overview Process and process phases: Dispatch request from a request management system Work order to

© OMNINET - 24 -

OMNINET GmbHD-90542 [email protected] – http://www.omninet.de

OMNINET Austria GmbHA-1010 [email protected] – http://www.omninet.at

OMNINET Technologies NV/SAB-3018 [email protected] – http://www.omninet.be

OMNINET NederlandNL-2517 Den Haag [email protected] – http://www.omninet.nl

OMNINET OOO (Russia and CIS)RUS-Moscow [email protected] – http://www.omninet.ru

OMNINET GmbH (Schweiz)CH-8808 Pfä[email protected] – http://www.omninet.ch

OMNINET USAUS-New York, NY [email protected] – http://www.omninet.biz

DPC 2.1.0

OMNINET Software Solutions


Recommended