Online Scheduling of Precedence Constrained Tasks
Yumei Huohttp://web.njit.edu/~yh23
Department of Computer Science
New Jersey Institute of Technology
2
Outline
• Introduction: – Three basic scheduling algorithms
• Online Scheduling of Precedence Constrained Tasks– Four nonpreemptive scheduling problems– Three preemptive scheduling problems
• Future Work
3
Outline
• Introduction: – Three basic scheduling algorithms
• Online Scheduling of Precedence Constrained Tasks– Four nonpreemptive scheduling problems– Three preemptive scheduling problems
• Future Work
4
Coffman-Graham algorithm(P2|pj=1, prec|Cmax and P2|pj=1, prec| Ci )
Step 1. Labeling
Step 2. Scheduling
5
Coffman-Graham algorithm (cont.)
• Comparing two decreasing sequences of positive integers: by lexicographical order
• Example:
(8, 6, 4, 3) < (8, 6, 5) and (9, 8, 6) < (9, 8, 6, 4, 3).
6
Example of Coffman-Graham algorithm
1 2
3
4 5
76
8 9
(9) (8)
(7)
(6)(5)
(4)(3)
(1) (2)
8462
9753176543210
(1) (2,1)
7
Hu’s algorithm(P|pj=1, intree|Cmax and P|pj=1, outtree|Cmax )
Step 1. Labeling
Step 2. Scheduling
8
Hu’s algorithm---Level
• Definition: The level of a job i with no immediate successor is its processing time pi. The level of a job with immediate successor(s) is its processing time plus the maximum level of its immediate successor(s).
9
Example for Hu’s algorithm
(1)(2)(3)(5)
(6)
(4)
(7)
(1)(2)(3)(5)
(6)
(4)
(7)
(1)(2)(3)(5)
(6)
(4)
(7)
(8)(9)(10)
(11)
(1)(2)(3)(5)
(6)
(4)
(7)
(8)(9)(10)
(11)(12)(13)
(1)(2)(3)(5)
(6)
(4)
(7)
(8)(9)(10)
(11)(12)(13)
(14)(15)
(8)(9)(10)
(11)(12)(13)
(14)(15)
(16)
10
Muntz-Coffman algorithm (P2|pmtn, prec |Cmax, P|pmtn, intree|Cmax and P|pmtn, outtree|Cmax )
Assign one processor each to the jobs at the highest level. If there is a tie among y jobs (because they are at the same level) for the last x (x < y) processors, then assign x/y processor to each of these y jobs. Whenever either of the two events below occurs, reassign the processors to the unexecuted portion of the unfinished tasks according to the above rule.
Event 1: A task is completed.
Event 2: We reach a point where, if we were to continue the present assignment, we would be executing some tasks at a lower level at a faster rate than other tasks at a higher level.
11
Example for Muntz-Coffman algorithm
Preemptive schedule
Processor-sharing schedule
12
Outline
• Introduction: – Three basic scheduling algorithms
• Online Scheduling of Precedence Constrained Tasks– Four nonpreemptive scheduling problems– Three preemptive scheduling problems
• Future Work
13
Online Scheduling
• Tasks are released, along with their constraints, at various different times.The scheduler schedules tasks with no future information.
• We say that an online scheduling algorithm is optimal if it always produces a schedule with the minimum Cmax, i.e., a schedule as good as any schedule produced by any scheduling algorithm with full knowledge of future releases of tasks.
14
Classical Scheduling Problems with polynomial optimal algorithms
• P|pj=1, intree|Cmax and P|pj=1, outtree|Cmax --- Hu’s a
lgorithm
• P2|pj=1, prec|Cmax and P2|pj=1, prec| Ci --- Coffman-
Graham algorithm
• P2|pmtn, prec |Cmax, P|pmtn, intree|Cmax and P|pmtn, outtree|Cmax --- Muntz-Coffman algorithm
• P|pmtn|Cmax --- McNaughton’s Rule
15
Online version of these problems• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax
– P|pj=1, intreei is released at ri|Cmax
– P|pj=1, outtreei is released at ri|Cmax
– P2|pj=1, preci is released at ri|Cmax
• Preemptive scheduling problems:
– P2|pmtn, preci is released at ri|Cmax
– P|pmtn, intreei is released at ri|Cmax
– P|pmtn, outtreei is released at ri|Cmax
– P|pmtn, rj|Cmax (K.S.Hong and J.Y-T.Leung, 1988)
16
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
17
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
18
P2|pj=p, chainsi are released at ri|Cmax (Counte
rexample)
M=2pj=2
654
1110987321
2 4 6 8 10 12 14 16 18 20 22 240
S1
S26 21 23 250 195
S254
21
63
1110987
2 4 7 9 11 13 15 176 21 23 250 195
654
321
2 4 6 8 10 12 14 16 18 20 22 240
S1
4
5
6
1
2
3
4
5
6
4
5
6
1
2
3
1
2
3
Chains released at r1=0 Chains released at r2=5
7
8
9
10
11
7
8
9
10
11
19
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
20
P|pj=1, intreei is released at ri|Cmax
(Counterexample)4 5 6
7 8 910 11 12
14 1316 1518 1720 1922 21
23
Tree1 released at r1=0
M=3 24
25
26 27
28 29
30 31
32
Tree2 released at r2=4
S11296
22201816141185
2321191715131074
1 2 3 4 5 6 7 8 9 10 11 120
22192017151296
323129271816141185
23213028262524131074
1 2 3 4 5 6 7 8 9 10 11 120
312129192712171513
32302826162411975
23222018251410864
1 2 3 4 5 6 7 8 9 10 11 120
S2
21
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
22
P2|pj=1, preci is released at ri|Cmax
• Algorithm A:
Whenever new tasks arrive, do {
t =the current time;
U= the set of tasks active (i.e., not finished) at time t;
Call the Coffman-Graham algorithm to reschedule the tasks in U;
}
23
Example
1 2
3
4 5
76
8 9
(9) (8)
(7)
(6)(5)
(4)(3)
(1) (2)
8462
9753176543210
(9)(8)
(5)
(1) (2)
Tasks not finished at t=2
(3) (4)
(6) (7)
(10)
10 (11)
Tasks released at t=2
11
12 13
14 15
4
7
5
8 9
62
3110 2 9
9151245
814713111086543 7
24
Our result
Theorem 2.1.4 Algorithm A is optimal for P2|pj=1, preci is released at ri|Cmax.
Moreover, the schedule produced by Algorithm A has the largest number of tasks completed at any time instant t.
(Note: Algorithm A is optimal for P2|pj=1, preci is re
leased at ri| Cj)
25
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
26
P|pj=1, outtreei is released at ri|Cmax
• Algorithm B:
Whenever new tasks arrive, do {
t =the current time;
U= the set of tasks active (i.e., not finished) at time t;
Call Hu's algorithm to reschedule the tasks in U;
}
27
Example
28
Example
29
Our result
Theorem 2.1.5 Algorithm B is optimal for P|pj
=1, outtreei is released at ri|Cmax.Moreover, the schedule produced by Algorithm B has the largest number of tasks completed at any time instant t.
(Note: Algorithm B is optimal for P|pj=1, outtreei is released at ri| Cj)
30
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
31
P|pj=1, pmtn, intreei is released at ri|Cmax
(Counterexample)4 5 6
7 8 910 11 12
14 1316 1518 1720 1922 21
23
Tree1 released at r1=0
M=3 24
25
26 27
28 29
30 31
32
Tree2 released at r2=4
S11296
22201816141185
2321191715131074
1 2 3 4 5 6 7 8 9 10 11 120
12171513
211911975
23222018161410864
1 2 3 4 5 6 7 8 9 10 11 120
S2
22192017151296
323129271816141185
23213028262524131074
1 2 3 4 5 6 7 8 9 10 11 120
312129192712171513
32302826162411975
23222018251410864
1 2 3 4 5 6 7 8 9 10 11 120
32
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, pj=1, intreei is released at ri|Cmax---- no optimal algorithm can
possibly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
33
P2| pmtn,preci is released at ri|Cmax
• Algorithm C:
Whenever new tasks arrive, do {
t =the current time;
U= the set of tasks active (i.e., not finished) at time t;
Call Muntz-Coffman algorithm to reschedule the tasks in U;
}
34
Example
35
Example
36
Our result
Theorem 2.2.4 Algorithm C is an optimal online algorithm for P2| pmtn,preci is releas
ed at ri|Cmax.
37
Our results• Nonpreemptive scheduling problems:
– P2|pj=p, chainsi are released at ri|Cmax-----no optimal algorithm can po
ssibly exist
– P|pj=1, intreei is released at ri|Cmax-----no optimal algorithm can possi
bly exist
– P2|pj=1, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pj=1, outtreei is released at ri|Cmax----- there is optimal algorithm
• Preemptive scheduling problems:
– P|pmtn, intreei is released at ri|Cmax---- no optimal algorithm can possi
bly exist
– P2| pmtn, preci is released at ri|Cmax ---- there is optimal algorithm
– P|pmtn, outtreei is released at ri|Cmax---- there is optimal algorithm
38
P|pmtn, outtreei is released at ri|Cmax
Theorem 2.2.6 Algorithm C is an optimal online algorithm for P|pmtn, outtreei is relea
sed at ri|Cmax.
39
Outline• Introduction:
– Three basic scheduling algorithms
• Online Scheduling of Precedence Constrained Tasks– Four nonpreemptive scheduling problems– Three preemptive scheduling problems
• Future Work
40
Future Work (Continued Work)
• Online scheduling problems– Competitive Ratio– Objective function: mean flow time
41
Thank you!
42
Application of Online Scheduling
• Industrial Applications• Multiuser operating systems such as Unix and
Windows• Web servers• Database servers• Load balancers sitting in front of server farms
(Pruhs K., Sgall J., and Torng E., 2004 )